Anda di halaman 1dari 5

ABBREVIATIONS

2ooN

2 out of N (Voting System)

3LPE

3 Layer Polyethylene

AC

Alternating Current

AMS

Asset Management System

API

American Petroleum Institute

ASME

American Society of Mechanical Engineers

BDV

Blow Down Valve

BE$T

Block Estimating Tool (PEL In House Software)

BH

Bore Hole

BHP

BHP Engineering and Construction, LP

BOPD
BPD

Barrels of Oil per Day


Barrels per Day

BS&W

Basic Sediment and Water

BWPD

Barrels of Water per Day

CA

Corrosion Allowance

CAPEX

Capital Expenditure

CCTV

Closed Circuit Television

CDP

Crude delivery pipeline

CNG

Compressed Natural Gas

CPF

Central Processing Facility

DC

Direct Current

DCC

Document Control Center

DCS

Distributed Control System

DPR

Department of Petroleum Resources

ENVID
EPC

Environmental Hazard Identification (Workshop)


Engineering, Procurement and Construction

EPF
ESD

ESSDS
EWS

Early Production Facility


Emergency Shut Down

Emergency Safety and Shut Down System


Engineering Work Station

FEED

Front End Engineering Design

F&G

Fire and Gas

FGDS

Fire and Gas Detection System

FID

Field investment decision

FOC

Fibre Optic Cable

FUN

Frontier, Universal and Network Group

GOR

Gas Oil Ratio

GOSP

Gas Oil Separation Plant

HAZID

Hazard Identification (Workshop)

HAZOP

Hazard and Operability

HC

Hydrocarbon

HP

High Pressure

HSE

Health, Safety and Environmental

HSSE

Health, Safety, Security and Environmental

HVAC

Heating, Ventilation and Air Conditioning

ICSS

Integrated Control & Safety System

I/O

Input / Output

IS

Inherent Safety

IT

Information Technology

ITT

Invitation to Tender

JT

Joule Thompson

LACT

Lease and Custody Transfer

LAN

Local Area Network

LFL

Lower Flammable Limit

LLI

Long Lead Item

LNG

Liquefied Natural Gas

LOS

Line of Sight

LP

Low Pressure

LPG

Liquefied Petroleum Gas

LTS

Low Temperature Separation

LV

Low Voltage

MAC

Manual Alarm Callpoint (Industry Standard Acronym)

MCP

Manual Call Point (used by Cakasa)

MOS

Maintenance Override Switch

MTO

Material Take Off

MTR

Membrane Technology and Research

NAG

Non Associated Gas

NAPIMS

National Petroleum Investment Management Services

NB

Nominal Bore

NDT

Non-destructive test

NFPA

National Fire Protection Association

NGL

Natural Gas Liquids

NPV

Net Present Value

OPEX

Operating Expenditure

OWS

Operator Work Station

PED

Process Engineering Diagram

PEL

Petrofac Engineering Ltd

PFD

Process Flow Diagram

P&ID

Piping and Instrumentation Diagram

PSSR

Project Pre-Startup Safety Review

PSV

Pressure safety valve,=RV, release valve

PTB

Pounds per Thousand Barrels

PVT

Pressure, Volume, Temperature

QIT

Qua Iboe Terminal

RAM

Reliability, Availability and Maintenance

RIO

Remote Input / Output

RP

Recommended Practise

RVP

Reid Vapour Pressure

SHEAMS
SIMOPS

Safety, Health and Environmental Actions Monitoring System


Simultaneous Operations

SIL

Safety Integrity Level

SIS

Safety Instrumented System

SLD

Single Line Diagram

SPT

Standard Penetration Test

TBP

True Boiling Point

TOR

Terms of reference

TVP

True Vapour Pressure

UK

United Kingdom

UER

Universal Energy Resources

UFD

Utility Flow Diagram

UPS

Uninterruptible Power Supply

WHCP

Wellhead Control Panel

WHFP

Wellhead Flowing Pressure

Reserve

PDP

proved developed producing reserves

PDNP

proved developed non-producing reserves

PBDP

probable developed producing reserves

PBDNP
PUD
PBUD

probable developed non-producing reserves


proved undeveloped reserves
probable undeveloped reserves

Anda mungkin juga menyukai