Anda di halaman 1dari 6

PIPING STRESS LOG

User Advisory - Each sheet of this Excel Workbook "Tool" is locked and password protected. The user may
only enter date in the "yellow" cells. Other cells on this "Tool" includes locked "cells" that may contain complex
math formulas. Care should be taken to learn where these cells are and if the streadsheet is ever unlocked that
the cells with the formulas are not disturbed. Disturbing or altering the formulas in these cells may render the
"Tool" unable to function properly.
Instruction # 1
Simply copy the form from the website to your company server and save it as your Master copy
Instruction # 2
Study the Sample and the blank form. Test it by entering some sample data and print out the form so you will
understand what you will get.
Instruction # 3
To modify the form for Celceus of Farenheight (C or F ) the sheet must be unlocked and the appropreate change
made then the sheet should be Locked again.
Instruction #4

After all changes are made, relock the sheet. Make a copy of the electronic form for each Unit.
Instruction #5
The password for each sheet of this "Tool" is jop . You may sellect a password of your choice when you re-lock
the sheet.
Instruction #6
If you have any questions please contect me by e-mail (jopennock@netscape.net)

otected. The user may


at may contain complex
heet is ever unlocked that
e cells may render the

ter copy

out the form so you will

d the appropreate change

rm for each Unit.

choice when you re-lock

Project:

SAMPLE PROJECT

STRESS LOG

Number:
Unit No.:

12345678

Stress Check Sub-Totals

Unit No. is the Prefix for all Line Numbers

110

CA2C

125

FA2C

12

CS

Hydrocarbon

100

SS

Hydrocarbon

100

1-4

SS

Hydrocarbon

175

9Cr

Hydrocarbon

200

Special (3)

12

Oper. Temp
(C)

Formal (3)

10

CA2C

Commodity

Visual (3)

AA1C

102

Material

Dominate Size
(Enter one size
only)

101

Stress Check Category

Sheet(s)

Line Class

Line Number

Informal (3)

10-

Notes: (1) R&R = "Revise as discussed/noted and Resubmit", (2) "IFC" = Issued For
Construction (3) Enter a number of sheets in these columes

Total

Date
Received

6/1/10
1

6/1/10
4

6/5/10
1

SAMPLE

6/6/10

C. Simmons

4/1/10

% Complete=

14.3%

Resubmit Date

Report Date:

IFC (2) (3)

Stress Eng. Name:


Progress Status

6/9/10

1
1
4

Date Final IFC


Issue Sign Off (2)

Resubmit Return
Date

6/3/10

Hold (3)

6/1/10

R & R (1) (3)

Date
Returned

Approved (3)

Status

6/6/10

Project:

STRESS LOG

Number:
Unit No.:

Stress Check Sub-Totals


Unit No. is the Prefix for all Line Numbers

Special (3)

Formal (3)

Informal (3)

Oper. Temp
(C or F)

Visual (3)

Commodity

Material

Line Class

Sheet(s)

Line Number

Dominate Size
(Enter one size
only)

Notes: (1) R&R = "Revise as discussed/noted and Resubmit", (2) "IFC" = Issued For Construction
Stress Check Category
(3) Enter a number of sheets in these columes

SS LOG

Stress Eng. Name:


0

Report Date:
0

% Complete=

Resubmit Date

Progress Status

IFC (2) (3)

Total

#DIV/0!

Date Final IFC


Issue Sign Off (2)

Resubmit Return
Date

Hold (3)

Date
Returned

R & R (1) (3)

Date
Received

Approved (3)

Status

Anda mungkin juga menyukai