Skills:

Conversant with international standards like API-1104, ASME-IX, ASME-B31.3, ASME-B31.8, AWS D1.1
pertaining to Piping, Pipe Line, Storage Tanks, Pressure Vessels, Equipment Erection & Installation.
Proficient in PC usage. Advanced user of computer programs like MS EXCELL.
Familiar with P&IDs, Isometrics, etc.
Total Experience : Above 15 Years
August 2010 to till date
Employer : BETZ ENGINEERING ZONE, Chennai.
Position : QA/ QC Inspector
Client : (1) Nuclear Power Corporation of India Ltd., MAPS, Kalpakkam, Chennai
November 2008 to June 2010
Employer : RI DONG Corporation Pte Ltd, Singapore.
Position : QC Welding Inspector/ PAINTING SUPERVISOR
Client : (1) CPGC CH2M HILL.
(2) Shell Seraya Pte Ltd.,
(3) SHELL Ethylene Cracker Complex Boiler in Pulau Ular project
Work Summary:
A judicious professional with nearly 14 years of experience in Project Management, Erection, Inspection &
Testing in India and abroad for Refinery, Gas Plant Project, Petrochemical Industries & Thermal power
plant projects.
Proven skills in managing the construction activities and coordinating various aspects of project
construction including inspection, material submission and working drawing from contractors, and
processing documentation as required.
Displayed proficiency in carrying out inspection of Unit Piping preventing nonconformance in process
materials, during cutting, fit-ups, welding etc.
Adept at managing engineering operations, fabrication and co-ordination with internal departments.
Well versed with ASME piping code & API standards.
Well experience in cross country pipe line and process piping job.
Excellent communication, interpersonal & negotiation skills with strong organizational & team building
abilities.
AREA OF EXPOSURE
Lead the inspection activities and monitor the inspection status.
Preparation of WPS, PQR, & WPQ. Qualifying welding procedures and welders with SMAW & GTAW
Process on API-1104 , ASME B31.3, ASME SEC IX and AWS D 1.1. Materials Used: CS, SS, Monel,
Inconel, Low alloys & high Alloys.
Estimating Welding Consumables requirements.
Preparation of Inspection test plan, procedure for PWHT & Repair welding
Preparation of Method Statements.
Regularizing project activities as per project quality requirements.
Resolving technical queries, Non conformity and corrective action.
Inspection of raw materials, joint fit-up, welding, dimensional, Hydro test
Preparation of weld map, daily welding report and weekly welding summary.
Monitoring welding control (welding procedure, welders and welding consumable).
Control the QC equipments calibration record.

Co-ordination of NDE & Implementing the system procedure.


Reviewing of RT films, PWHT charts and other NDE reports.
Witnessing of Hold/Witness points as per the approved quality plan.
Preparation of punch list and re-inspection of all punch listed items.
Knowledge of Preparing complete test packages (hydro, pneumatic, visual) including check list and all
applicable reports as per commissioning marked-up P&ID.
Evaluating designs, coordinating with consultants and sub contractors for changes in the same.
Monitoring installation and testing of pipe work, valves, and other piping items.
Review hydro test package, carry out inspection of the lines prior to testing.
Imparting continuous on job training to the workforce for enhancing their productivity & operational
efficiencies through knowledge enhancement / skill building.
Conducting inspection of Plates, Pipes, Fittings, Flanges, Gaskets, and Stud Bolts at stockiest end as
per respective materials specifications, codes, standards & clients specifications.
Conducting Line checking, preparation of punch list as per test packages and maintaining traceability of
punch list close-out process.
Joint inspection with respective personnel for pressure test release, pressure test and re-instatement of
piping systems.
December 2007 October 2008
Employer : Lotus co, Chennai.
Position : NDT Inspector
Client : Chennai Petroleum Corp Ltd,
RT carried out for all piping and vessels. Interpretation of RT films. Calibration of the UT equipments
periodically. UT carried out for finished product of exhaust valves. Conducting PT for fillet welds as per
project specification as per IBR. Conducting MPT for fillet welds as per project specification as per IBR.
Conducting stage wise inspection of PT & MT for fabricated items.
Jan 1997 to October 2007
Employer : MABEL Engineering Pvt Ltd, Chennai.
Position : QC Supervisor
Client : Kochi Refineries Ltd
Kochi DHDS Projects, Chennai Petroleum Corp Ltd,
TNEB Gas & Stream Power Project, Mannarkudi,
HPCL, Suriyapet, AP. (Storage Terminal Unit)
RT carried out for all piping and vessels. Film interpretation of RT films. Calibration of the UT equipments
periodically. UT carried out for finished product of exhaust valves. Conducting PT for fillet welds as per
project specification as per IBR. Conducting MPT for fillet welds as per project specification as per IBR.
October 1995 to October 1997
Employer : BABU ENGINEERING CORPORATION, Neyveli.
Position : QC Supervisor
Client : II Thermal Power Station (7x210 MW), Neyveli.
GMDC Lignite Projects, Gujarat.

Summary
Preparation of WPS, PQR, WPQ as per the project requirement and ASME Sec IX.
Conducting WQT as per specified WPS, Mechanical Test as per ASME Sec IX.
Inspection of Raw Material as per the Correlated Material Test Certificate & Dimensions.
Preparation of Raw Material Inspection Reports.
Conducting in Process Inspection of piping, storage Tanks and Documents Preparation.
Co-ordination with Third Party Inspection for client.
Co-ordination of NDT such as RT, UT, MPI & DPT.
Preparation of weld map and NDT requirements for Pressure Vessels, Storage Tanks & Piping.
Preparation of as built Drawing of Pressure Vessels, Storage Tanks & Piping.
Conducting PWHT for pipe joints & Vessels.
Interpretation of RT Films & PWHT Charts.
Conducting Water, Steam Flushing of piping.
Preparation of Final Dimensional Reports Checking for Storage Tanks, Pressure Vessels.
Conducting Chemical Cleaning like Pickling & Passivation for Piping & Silos.
Preparation of Test packs for as per the Project Specification.
Conducting Pneumatic & Hydro Test as project Specification.
Knowledge in Preparation of Data Folder as per client requirements
Declaration:
I hereby declare that all the above-furnished details are true to the best of my knowledge.
Yours Sincerely,
S. UMA SANKARA NARAYANAN