GOVERNMENT OF KARNATAKA
KARNATAKA NEERAVARI NIGAM LIMITED
Invitation for Bid No.: KNNLTelemetry1
Office of the Executive Engineer, Karnataka
Neeravari Nigam Limited (KNNL), No. 4 Division
BRLBC Bhadravathi, Shivamogga, Karnataka
state, India Telephone: ++91-08282-271063,
Fax; ++91-08282-271063 E-mail:
eeknnlbdvt@yahoo.co.in Dated : 23 Feb 2015
InvitationforBids
26February2015
L3172IND:KarnatakaIntegratedandSustainableWaterResourcesManagementInvestmentProgram
Project1
ContractPackageNumber:FlowMeasurementandTelemetrySystemSupplyandInstallation(FMT
ICB2)
1. This Invitation for Bids follows the Procurement Plan for this project that appeared in
the ADB Business Opportunities in July 2014.
2. India has applied forfinancing from the Asian Development Bank (ADB) towards the
cost of the Karnataka Integrated and Sustainable Water Resources Management
Investment Program - Project 1, and intends to apply part of the financing to payments
under the contract for Flow Measurement and Telemetry System Supply and
Installation on Item Rate Basis.
3. The Karnataka Neeravari Nigam Limited (KNNL, the Purchaser) now invites sealed
Bids from eligible Bidders for supply and installation on Item Rate Basis of flow
measurement and telemetry system.
4. International Competitive Bidding (ICB) will be conducted in accordance with ADBs
Single-Stage: Two-Envelope bidding procedure and is open to all Bidders from eligible
source countries.
5. Interested eligible Bidders may obtain further information from KNNL and inspect the
Bidding Document at the address given below, from 11:00 to 17:00 hours on all
working days.
6. The Bidding Document, in the English language, may be purchased by interested
Bidderson the submission of a written application to the address below and upon
payment of a nonrefundable fee of Indian Rupees 10000/- (Rs. ten thousand only) or in
equivalent USdollar currency starting from 26 Feb 2015 to 27 April 2015. Those bidders
, who desireto receive the document by courier shall have to pay Rs. 1000/- (rupees
one thousand only) extra for delivery within India, or Rs.3000/- (rupees three Thousand
only) extra for deliveryoutside India. The method of payment will be through demand
draft in favor of theExecutive Engineer, Karnataka Neeravari Nigam Limited (KNNL), No.
4 Division BRLBCBhadravathi. No liability will be accepted for loss in transit or late
delivery of BiddingDocument.
7. Bidding documents are also available on project website http://www.knnlindia.com/.
Eligible interested bidders can see and download the document and can participate in
bidding procedure. Such bidders will
Page2of100
submit cost of bidding document, which is Indian Rupees 5000/- (Rs. five thousand
hundred only) or in equivalent US dollar currency along with technical proposal through
demand draft in favour of the Executive Engineer, Karnataka Neeravari Nigam Limited
(KNNL), No. 4 Division BRLBC Bhadravathi, payable at Bhadravathi. No bids will be
entertained without cost of bidding document.
8. Bids must be delivered at Office of the The Managing Director, KNNLRegistered office,
Coffee Board Building, 4th floor, Dr. B.R. Ambedkarveedhi, Bangalore-1,Karnataka, India
before 27 April 2015, 16:00 hours. All Bids must be accompanied by a Bid Security as
stated in the Bidding Document. Late bids shall be rejected. Bids will be opened in the
presence of the Bidders representatives who choose to attend at office of The
Managing Director, KNNLRegistered office, Coffee Board Building, 4th floor, Dr. B.R.
Ambedkarveedhi, Bangalore-1,Karnataka, India at 17:00 hours on 27 April 2015.
9. Pre-bid meeting with the bidders will be held at office of The Managing Director, KNNL
Registered office, Coffee Board Building, 4th floor, Dr. B.R. Ambedkarveedhi, Bangalore1, Karnataka, India on 20 March 2015 at 12:30 hours. For Bidders who are Interested in
participating in the bid process, the site visit will be arranged on 18 March 2015, 10:00
hours with prior intimation to the Executive Engineer. Any other information required
can be obtained from the undersigned in the working hours between 10:00 and 17:00
hours.
10. The KNNL will not be responsible for any costs or expenses incurred by Bidders in
connection with the preparation or delivery of Bids.
Executive Engineer,
Karnataka Neeravari Nigam Limited (KNNL),
No. 4 Division BRLBC Bhadravathi,
Shivamogga, Karnataka state, India
Telephone:++9108282271063,
Fax:++9108282271063
Email:eeknnlbdvt@yahoo.co.in
ADBKNNLICBProcurementofGoodsandServices
Page3of100
GovernmentofKarnataka
KarnatakaNeeravariNigamLimited(KNNL)
KarnatakaIntegratedandSustainableWaterResourcesManagement
InvestmentProgram
(ADBLoanNo.MFF no. 0085 / IND / Loan No. 3172)
:
BIDDINGDOCUMENT
For
FlowmeasurementandtelemetrysystemsupplyandinstallationonItem
RateBasis.
(FollowingADBsSingleStageTwoEnvelopeBiddingProcedure)
InvitationforBidsNo.:KNNLTelemetry1
Issuedon:
26Feb
2015
ICBPackageNo.:KNNLFMTICB2
Employer:ProjectDirector,KISWRMIP,
Representedby
Country:India
Page4of100
TableofContents
PART1BiddingProcedures
SectionI.
SectionII.
SectionIII.
SectionIV.
SectionV.
1
1
2
BidDataSheet............................................................................................... 1
3
EvaluationandQualificationCriteria............................................................ 1
4
BiddingForms............................................................................................... 1
5
EligibleCountries.......................................................................................... 1
InstructionstoBidders...................................................................................
PART2SupplyRequirements
SectionVI.
ScheduleofSupply........................................................................................61
PART3ConditionsofContractandContractForms
7
SectionVII. GeneralConditionsofContract..................................................................... 1
8
SectionVIII. SpecialConditionsofContract...................................................................... 1
9
SectionIX.
ContractForms............................................................................................... 1
ADBKNNLICBProcurementofGoodsandServices
Page5of100
SectionI.InstructionstoBidders
TableofClauses
General...............................................................................................................................7
1.
...............................................................................................................................................
ScopeofBid...........................................................................................................................7
2.
...............................................................................................................................................
SourceofFunds...................................................................................................................... 7
3.
...............................................................................................................................................
CorruptPractices.................................................................................................................... 7
4.
...............................................................................................................................................
EligibleBidders...................................................................................................................... 9
5.
.............................................................................................................................................
EligibleGoodsandRelatedServices.....................................................................................11
ContentsofBiddingDocument.................................................................................11
6.
.............................................................................................................................................
SectionsoftheBiddingDocument....................................................................................... 11
7.
.............................................................................................................................................
ClarificationofBiddingDocument....................................................................................... 12
8.
.............................................................................................................................................
AmendmentofBiddingDocument........................................................................................12
PreparationofBids...................................................................................................... 13
9........................................................................................................................................... Cost
ofBidding.............................................................................................................................13
10.
.............................................................................................................................................
LanguageofBid................................................................................................................... 13
11.
.............................................................................................................................................
DocumentsComprisingtheBid.............................................................................................13
12......................................................................................................................................... Bid
SubmissionSheetsandPriceSchedules................................................................................ 14
13.
.............................................................................................................................................
AlternativeBids....................................................................................................................14
14......................................................................................................................................... Bid
PricesandDiscounts.............................................................................................................14
15.
.............................................................................................................................................
CurrenciesofBid..................................................................................................................16
16.
.............................................................................................................................................
DocumentsEstablishingtheEligibilityoftheBidder............................................................ 16
17.
.............................................................................................................................................
DocumentsEstablishingtheEligibilityofGoodsandRelatedServices ................................. 17
18. DocumentsEstablishingtheConformityoftheGoodsandRelatedServicestothe
BiddingDocument.................................................................................................... 17
19.
.............................................................................................................................................
DocumentsEstablishingtheQualificationsoftheBidder...................................................... 17
20.
.............................................................................................................................................
PeriodofValidityofBids..................................................................................................... 18
21......................................................................................................................................... Bid
Security................................................................................................................................ 18
Page6of100
22.
.............................................................................................................................................
FormatandSigningofBid....................................................................................................19
SubmissionandOpeningofBids..............................................................................20
23.
.............................................................................................................................................
SealingandMarkingofBids.................................................................................................20
24.
.............................................................................................................................................
DeadlineforSubmissionofBids...........................................................................................21
25......................................................................................................................................... Late
Bids...................................................................................................................................... 21
26.
.............................................................................................................................................
Withdrawal,Substitution,andModificationofBids............................................................. 21
27......................................................................................................................................... Bid
Opening................................................................................................................................22
EvaluationandComparisonofBids........................................................................24
28.
.............................................................................................................................................
Confidentiality......................................................................................................................24
29.
.............................................................................................................................................
ClarificationofBids..............................................................................................................24
30.
.............................................................................................................................................
ResponsivenessofTechnicalProposal................................................................................. 25
31.
.............................................................................................................................................
Nonconformities,Errors,andOmissions..............................................................................25
32.
.............................................................................................................................................
PreliminaryExaminationofBids......................................................................................... 26
33.
.............................................................................................................................................
ExaminationofTermsandConditions;TechnicalEvaluation................................................27
34.
.............................................................................................................................................
ConversiontoSingleCurrency..............................................................................................27
35.
.............................................................................................................................................
MarginofPreference............................................................................................................ 27
36.
.............................................................................................................................................
EvaluationofBids................................................................................................................ 27
37.
.............................................................................................................................................
ComparisonofBids.............................................................................................................. 29
38.
.............................................................................................................................................
PostqualificationoftheBidder.............................................................................................29
39.
.............................................................................................................................................
PurchasersRighttoAcceptAnyBid,andtoRejectAnyorAllBids .................................... 29
AwardofContract........................................................................................................29
40.
.............................................................................................................................................
AwardCriteria...................................................................................................................... 29
41.
.............................................................................................................................................
PurchasersRighttoVaryQuantitiesatTimeofAward........................................................30
42.
.............................................................................................................................................
NotificationofAward...........................................................................................................30
43.
.............................................................................................................................................
SigningofContract...............................................................................................................30
44.
.............................................................................................................................................
PerformanceSecurity............................................................................................................30
ADBKNNLICBProcurementofGoodsandServices
Page7of100
General
1. ScopeofBid
1.1
InsupportoftheInvitationforBidsindicatedintheBidData
Sheet(BDS),thePurchaser,asindicatedintheBDS,issues
thisBiddingDocumentforthesupplyofGoodsandRelated
ServicesincidentaltheretoasspecifiedinSectionVI,Schedule
ofSupply(SS).Thename,identification,andnumberoflots
oftheInternationalCompetitiveBidding(ICB)areprovidedin
theBDS.
1.2
ThroughoutthisBiddingDocument:
(a)theterminwritingmeanscommunicatedinwritten
formwithproofofreceipt;
(b)ifthecontextsorequires,singularmeanspluralandvice
versa;and
(c)daymeanscalendarday.
2. Sourceof
Funds
3. Corrupt
Practices
2.1
TheBorrowerorRecipient(hereinaftercalledBorrower)
indicatedintheBDShasappliedfororreceivedfinancing
(hereinaftercalledfunds)fromtheAsianDevelopmentBank
(hereinaftercalledtheADB)towardthecostoftheproject
namedintheBDS.TheBorrowerintendstoapplyaportionof
thefundstoeligiblepaymentsunderthecontractforwhichthis
BiddingDocumentisissued.
2.2
PaymentsbytheADBwillbemadeonlyattherequestofthe
BorroweranduponapprovalbytheADBinaccordancewith
thetermsandconditionsofthefinancingagreementbetween
theBorrowerandtheADB(hereinaftercalledtheLoan
Agreement),andwillbesubjectinallrespectstothetermsand
conditionsofthatLoanAgreement.Nopartyotherthanthe
BorrowershallderiveanyrightsfromtheLoanAgreementor
haveanyclaimtothefunds.
2.3
TheLoanAgreementprohibitsawithdrawalfromtheloan
accountforthepurposeofanypaymenttopersonsorentities,
orforanyimportofequipment,plant,ormaterials,ifsuch
paymentorimportisprohibitedbyadecisionoftheUnited
NationsSecurityCounciltakenunderChapterVIIofthe
CharteroftheUnitedNations.
3.1
ADBsAnticorruptionPolicyrequiresborrowers(including
beneficiariesofADBfinancedactivity),aswellasbidders,
suppliers,andcontractorsunderADBfinancedcontracts,
observethehigheststandardofethicsduringtheprocurementand
executionofsuchcontracts.Inpursuanceofthispolicy,
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page8of100
theADB:
(1) defines,forthepurposesofthisprovision,thetermssetforth
belowasfollows:
(1) corruptpracticemeanstheoffering,giving,receiving,or
soliciting,directlyorindirectly,anythingofvalueto
influenceimproperlytheactionsofanotherparty;
(2) fraudulentpracticemeansanyactoromission,including
amisrepresentation,thatknowinglyorrecklesslymisleads,
orattemptstomislead,apartytoobtainafinancialorother
benefitortoavoidanobligation;
(3) coercive practice means impairing or harming, or
threateningtoimpairorharm,directlyorindirectly,any
partyorthepropertyofthepartytoinfluenceimproperly
theactionsofaparty;
(4) collusivepracticemeansanarrangementbetweentwoor
morepartiesdesignedtoachieveanimproperpurpose,
includinginfluencingimproperlytheactionsofanother
party;
2) willrejectaproposalforawardifitdeterminesthatthebidder
recommended for award has, directly or through an agent,
engagedincorrupt,fraudulent,collusive,orcoercivepractices
incompetingfortheContract;
3) willcanceltheportionofthefinancingallocatedtoacontractif
itdeterminesatanytimethatrepresentativesoftheborroweror
of a beneficiary of ADBfinancing engaged in corrupt,
fraudulent, collusive, or coercive practices during the
procurement or the execution of that contract, without the
borrower having taken timely and appropriate action
satisfactorytoADBtoremedythesituation;
4) willsanctionafirmoranindividual,atanytime,inaccordance
withADBsAnticorruptionPolicyandIntegrityPrinciplesand
Guidelines (both as amended from time to time), including
declaringineligible,eitherindefinitelyorforastatedperiodof
time, to participate in ADBfinanced or ADBadministered
activities or to benefit from an ADBfinanced or ADB
administeredcontract,financiallyorotherwise,ifitatanytime
determinesthatthefirmorindividualhas,directlyorthrough
anagent,engagedincorrupt,fraudulent,collusive,orcoercive
or
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page9of100
otherprohibitedpractices;and
(e)willhavetherighttorequirethataprovisionbeincludedin
biddingdocumentsandincontractsfinancedbyADB,
requiringbidders,suppliersandcontractorstopermitADB
oritsrepresentativetoinspecttheiraccountsandrecords
andotherdocumentsrelatingtothebidsubmissionand
contractperformanceandtohavethemauditedbyauditors
appointedbyADB.
4.Eligible
Bidders
3.2
Furthermore,Biddersshallbeawareoftheprovisionstatedin
SubClause3.2andSubClause35.1(c)oftheGeneral
ConditionsofContract.
4.1
ABiddermaybeanaturalperson,privateentity,government
ownedentity(subjecttoITBSubClause4.5)orany
combinationofthemwithaformalintenttoenterintoan
agreementorunderanexistingagreementintheformofa
JointVenture(JV).InthecaseofaJV:
(a)allpartiestotheJVshallbejointlyandseverallyliable;
and
(b)aJVshallnominateaRepresentativewhoshallhavethe
authoritytoconductallbusinessesforandonbehalfof
anyandallthepartiesoftheJVduringthebidding
processand,intheeventtheJVisawardedtheContract,
duringcontractexecution.
4.2
ABidder,andallpartiesconstitutingtheBidder,shallhavethe
nationalityofaneligiblecountry,inaccordancewithSection
V,EligibleCountries.ABiddershallbedeemedtohavethe
nationalityofacountryiftheBidderisacitizenoris
constituted,orincorporated,andoperatesinconformitywith
theprovisionsofthelawsofthatcountry.Thiscriterionshall
alsoapplytothedeterminationofthenationalityofproposed
subcontractorsorsuppliersforanypartoftheContract
includingrelatedservices.
4.3
ADBconsidersaconflictofinteresttobeasituationinwhich
apartyhasintereststhatcouldimproperlyinfluencethat
partysperformanceofofficialdutiesorresponsibilities,
contractualobligations,orcompliancewithapplicablelaws
andregulations,andthatsuchconflictofinterestmaycontributeto
or constitute a prohibited practice under ADB's Anticorruption
Policy.InpursuanceofADB'sAnticorruptionPolicysrequirement
thatBorrowers(includingbeneficiariesofADBfinancedactivity),
aswellasbidders,suppliers,andcontractorsunderADBfinanced
contracts,observethehighest
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page10of100
standard of ethics. ADB will take appropriate actions, which
includenotfinancingofthecontract,ifitdeterminesthataconflict
of interest has flawed the integrity of any procurement process.
ConsequentlyallBiddersfoundtohaveaconflictofinterestshall
bedisqualified.ABiddermaybeconsideredtobeinaconflictof
interest with one or more parties in this bidding process if,
includingbutnotlimitedto:
1) havecontrollingshareholdersincommon;or
2) receiveorhavereceivedanydirectorindirectsubsidyfrom
anyofthem;or
3) havethesamelegalrepresentativeforpurposesofthisBid;or
4) have a relationship with each other, directly or through
commonthird parties,thatputsthem ina position tohave
accesstoinformationaboutorinfluenceontheBidofanother
Bidder,orinfluencethedecisionsofthePurchaserregarding
thisbiddingprocess;or
5) a Bidder participates in more than one bid in this bidding
process.ParticipationbyaBidderinmorethanoneBidwill
result in the disqualification of all Bids in which it is
involved.However, thisdoesnotlimitthe inclusionofthe
samesubcontractor,nototherwiseparticipatingasaBidder,in
morethanonebid;or
anyofitsaffiliatesparticipatedasa
consultantin
thepreparationofthedesignortechnical
specificationsofthegoodsandservicesthatarethesubjectof
thebid.
(f)aBidderor
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page11of100
reasonablyrequest.
47 Firmsshallbeexcludedifbyanactofcompliancewithadecision
oftheUnitedNationsSecurityCounciltakenunderChapterVIIof
theCharteroftheUnitedNations,theBorrowerscountryprohibits
anyimportofgoodsorcontractingofworksorservicesfromthat
countryoranypaymentstopersonsorentitiesinthatcountry.
5.EligibleGoods5.1
andRelated
Services
Allgoodsandrelatedservicestobesuppliedunderthe
ContractandfinancedbytheADB,shallhaveastheircountry
oforiginaneligiblecountryoftheADB(seeSectionV,
EligibleCountries).
52 For purposes of this Clause, the term goods inclu des
commodities, rawmaterial, machinery,equipment, andindustrial
plants;andrelatedservicesincludesservicessuchasinsurance,
installation,training,andinitialmaintenance.
53 Thetermcountryoforiginmeansthecountrywherethegoods
have been mined, grown, cultivated, produced, manufactured, or
processed; or through manufacture, processing, or assembly,
another commercially recognized article results that differs
substantially in its basic characteristics from its imported
components.
54 Thenationalityofthefirmthatproduces,assembles,distributes,or
sellsthegoodsshallnotdeterminetheirorigin.
55 IfsorequiredintheBDS,aBidderthatdoesnotmanufactureor
produce the Goods it offers to supply shall submit the
ManufacturersAuthorizationusingtheformincludedinSectionV,
BiddingFormstodemonstratethatithasbeendulyauthorizedby
themanufacturerorproduceroftheGoodstosupplytheseGoodsin
thePurchaserscountry.
ContentsofBiddingDocument
6.Sectionsofthe6.1
Bidding
Document
TheBiddingDocumentconsistofParts1,2,and3,which
includealltheSectionsindicatedbelow,andshouldbereadin
conjunctionwithanyAddendaissuedinaccordancewithITB
Clause8.
PART1BiddingProcedures
0 SectionI.InstructionstoBidders(ITB)
0 SectionII.BidDataSheet(BDS)
0 SectionIII.EvaluationandQualificationCriteria
0 SectionIV.BiddingForms
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page12of100
0 SectionV.EligibleCountries
PART2SupplyRequirements
0 SectionVI.ScheduleofSupply
PART3Contract
0 SectionVII.GeneralConditionsofContract(GCC)
0 SectionVIII.SpecialConditionsofContract(SCC)
0 SectionIX.ContractForms
61 TheInvitationforBidsissuedbythePurchaserisnotpartofthe
BiddingDocument.
62 The Purchaser is not responsible for the completeness of the
Bidding Document and its addenda, if they were not obtained
directlyfromthePurchaser.
63 TheBidderisexpectedtoexamineallinstructions,forms,terms,
andspecificationsintheBiddingDocument.Failuretofurnishall
informationordocumentationrequiredbytheBiddingDocument,
mayresultintherejectionoftheBid.
7. Clarificationof
Bidding
Document
8. Amendmentof
Bidding
Document
7.1
AprospectiveBidderrequiringanyclarificationoftheBidding
DocumentshallcontactthePurchaserinwritingatthe
PurchasersaddressindicatedintheBDS.ThePurchaserwill
respondinwritingtoanyrequestforclarification,provided
thatsuchrequestisreceivednolaterthantwentyone(21)days
priortothedeadlineforsubmissionofBids.ThePurchaser
shallforwardcopiesofitsresponsetoallBidderswhohave
acquiredtheBiddingDocumentdirectlyfromit,includinga
descriptionoftheinquirybutwithoutidentifyingitssource.
ShouldthePurchaserdeemitnecessarytoamendtheBidding
Documentasaresultofaclarification,itshalldosofollowing
theprocedureunderITBClause8andSubClause24.2.
8.1
AtanytimepriortothedeadlineforsubmissionoftheBids,
thePurchasermayamendtheBiddingDocumentbyissuing
addenda.
82 AnyaddendumissuedshallbepartoftheBiddingDocumentand
shall be communicated in writing to all who have obtained the
BiddingDocumentdirectlyfromthePurchaser.
83 TogiveprospectiveBiddersreasonabletimeinwhichtotakean
addendumintoaccountinpreparingtheirBids,thePurchasermay,
atitsdiscretion,extendthedeadlineforthesubmissionoftheBids,
pursuanttoITBSubClause24.2
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page13of
100
PreparationofBids
9.CostofBidding
9.1
TheBiddershallbearallcostsassociatedwiththepreparation
andsubmissionofitsBid,andthePurchasershallnotbe
responsibleorliableforthosecosts,regardlessoftheconduct
oroutcomeofthebiddingprocess.
10.Languageof
Bid
10.1
TheBid,aswellasallcorrespondenceanddocumentsrelating
totheBidexchangedbytheBidderandthePurchaser,shallbe
writteninthelanguagespecifiedintheBDS.Supporting
documentsandprintedliteraturethatarepartoftheBidmaybe
inanotherlanguageprovidedtheyareaccompaniedbyan
accuratetranslationoftherelevantpassagesinthelanguage
specifiedintheBDS,inwhichcase,forpurposesof
interpretationoftheBid,suchtranslationshallgovern.
11.Documents
Comprisingthe
Bid
11.1
TheBidshallcomprisetwoenvelopessubmitted
simultaneously,onecontainingtheTechnicalProposalandthe
otherthePriceProposal,enclosedtogetherinanoutersingle
envelope.
11.2
Initially,onlytheTechnicalProposalsareopenedatthe
address,dateandtimespecifiedinITBSubClause27.1.The
PriceProposalsremainsealedandareheldincustodybythe
Purchaser.TheTechnicalProposalsareevaluatedbythe
Purchaser.NoamendmentsorchangestotheTechnical
Proposalsarepermitted.BidswithTechnicalProposalswhich
donotconformtothespecifiedrequirementswillberejected
asdeficientBids.
11.3
PriceProposalsoftechnicallycompliantBidsareopenedin
publicatadateandtimeadvisedbythePurchaser.ThePrice
ProposalsareevaluatedandtheContractisawardedtothe
BidderwhoseBidhasbeendeterminedtobethelowest
evaluatedsubstantiallyresponsiveBid.
11.4
TheTechnicalProposalshallcontainthefollowing:
(a)TechnicalProposalSubmissionSheet;
(b)BidSecurity,inaccordancewithITBClause21;
(c) alternativeTechnicalProposal,ifpermissible,inaccordance
withITBClause13;
(d) writtenconfirmationauthorizingthesignatoryoftheBidto
committheBidder,inaccordancewithITBClause22;
(e) documentaryevidenceinaccordancewithITBClause16
establishingtheBidderseligibilitytobid;
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page14of100
(6) documentaryevidenceinaccordancewithITBClause17,that
theGoodsandRelatedServicestobesuppliedbytheBidder
areofeligibleorigin;
(7) documentaryevidenceinaccordancewithITBClauses18and
30, that the Goods and Related Services conform to the
BiddingDocument;
(8) documentary evidence in accordance with ITB Clause 19
establishing the Bidders qualifications to perform the
contractifitsBidisaccepted;and
(9) anyotherdocumentrequiredintheBDS.
115ThePriceProposalshallcontainthefollowing:
(1) Price Proposal Submission Sheet and the applicable Price
Schedules,inaccordancewithITBClauses12,14,and15;
(2) alternative Price Proposal corresponding to the alternative
Technical Proposal, if permissible, in accordance with ITB
Clause13;and
(3) anyotherdocumentrequiredintheBDS.
12.BidSubmission12.1TheBiddershallsubmittheTechnicalProposalandthePrice
Sheetsand
ProposalusingtheappropriateSubmissionSheetsfurnishedin
Price
SectionIV,BiddingForms.Theseformsmustbecompleted
Schedules
withoutanyalterationstotheirformat,andnosubstitutesshall
beaccepted.Allblankspacesshallbefilledinwiththe
informationrequested.
122TheBiddershallsubmit,aspartofthePriceProposal,thePrice
SchedulesforGoodsandRelatedServices,accordingtotheirorigin
asappropriate,usingtheformsfurnishedinSectionIV,Bidding
Forms.
13 Alternative
.
Bids
14
. BidPricesand
Discounts
13.1 UnlessotherwiseindicatedintheBDS,alternativebidsshall
notbeconsidered.
14.1 ThepricesanddiscountsquotedbytheBidderinthePrice
ProposalSubmissionSheetandinthePriceSchedulesshall
conformtotherequirementsspecifiedbelow.
142All items in the Schedule of Supply must be listed and priced
separatelyinthePriceSchedules.IfaPriceScheduleshowsitems
listedbutnotpriced,theirpricesshallbeassumedtobeincludedin
thepricesofotheritems.ItemsnotlistedinthePriceScheduleshall
beassumednottobeincludedintheBid,andprovidedthattheBid
issubstantiallyresponsive,thecorrespondingadjustmentshallbe
appliedinaccordancewith
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page15of100
ITBSubClause31.3
143The price to be quoted in the Price Proposal Submission Sheet
excludinganydiscountsoffered.
144The Bidder shall quote any unconditional discounts and the
methodologyfortheirapplicationinthePriceProposalSubmission
Sheet.
145The terms EXW, CIF, CIP, and other similar terms shall be
governedbytherulesprescribedinthecurrenteditionofIncoterms,
publishedbyTheInternationalChamberofCommerce,atthedate
oftheInvitationforBidsorasspecifiedintheBDS.
146PricesproposedinthePriceScheduleFormsforGoodsandRelated
Services,shallbedisaggregated,whenappropriate,asindicatedin
thissubclause.Thisdisaggregationshallbesolelyforthepurpose
offacilitatingthecomparisonofBidsbythePurchaser.Thisshall
notinanywaylimitthePurchasersrighttocontractonanyofthe
termsoffered:
(1) ForGoodsofferedfromwithinthePurchaserscountry:
(1) the price of the goods quoted EXW (ex works, ex
factory,exwarehouse,exshowroom,orofftheshelf,as
applicable),includingallcustomsdutiesandsalesand
othertaxesalreadypaidorpayableonthecomponents
andrawmaterialusedinthemanufactureorassemblyof
goods quoted ex works or ex factory, or on the
previouslyimportedgoodsofforeignoriginquotedex
warehouse,exshowroom,orofftheshelf;
(2) salestaxandallothertaxesapplicableinthePurchasers
country and payable on the Goods if the Contract is
awardedtotheBidder;and
(3) thetotalpricefortheitem.
(2) ForGoodsofferedfromoutsidethePurchaserscountry:
(1) the price of the goods quoted CIF(named port of
destination),orCIP(borderpoint),orCIP(namedplace
ofdestination),inthePurchaserscountry,asspecified
intheBDS;
(2) thepriceofthegoodsquotedFOBportofshipment(or
FCA,asthecasemaybe),ifspecifiedintheBDS.
(3) thetotalpricefortheitem.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page16of100
(c) ForRelatedServices:
1) the local
currency cost
component of
each item
comprising the
Related
Services;and
2) the foreign
currency cost
component of
each item
comprising the
Related
Services,
inclusive of all
custom duties, sales
and other similar
taxes applicable in
the Purchasers
country, payable on
theRelatedServices,
if the Contract is
awarded to the
Bidder
15. CurrenciesofBid
16.Documents
Bidder shall be
subjecttoadjustment
during
the
performance of the
Contract, a Bid
submitted with a
fixedpricequotation
shallnotberejected,
but the price
adjustment shall be
treatedaszero.
148IfsoindicatedinITB
SubClause1.1,Bids
arebeinginvitedfor
individual contracts
(lots) or for any
combination of
contracts(packages),
Bidders wishing to
offer any price
reduction for the
award of more than
one Contract shall
specifyintheirPrice
Proposals the price
reductionsapplicable
to each package, or
alternatively, to
individual Contracts
within the package.
Price reductions or
discounts shall be
submitted
in
accordancewithITB
SubClause 14.4,
provided the Price
Proposalsforalllots
are submitted and
opened at the same
time.
151Bid prices shall be
quoted in the
followingcurrencies:
(1) Bidders
may
express
their bid
price in
any fully
convertible
currency.
IfaBidder
wishes to
bepaidina
combinatio
n
of
amounts in
different
currencies,
it may
quote its
price
accordingl
y but shall
use no
more than
three
currencies
in addition
to the
currencyof
the
Purchaser
scountry.
(2) If some of
the
expenditur
es for the
Related
Services
are to be
incurred in
the
borrowing
country,
such
expenditur
es
andwillbe
shoul
payable in
d be
the
expre
Purchaser
ssed
scurrency.
in the
16.1 Toestablishtheireligibility
Bid
inaccordancewithITBClause4,
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page17of100
Establishing
Biddersshall:
theEligibility
oftheBidder
(a)completethe
eligibility
declarations
inthe
Bi
d
SubmissionSheet,includedinSectionIV,Bidding
Forms;and
(b)iftheBidderisanexistingorintendedJVinaccordance
withITBSubClause4.1,submitacopyoftheJV
Agreement,oraletterofintenttoenterintosuchan
Agreement.Therespectivedocumentshallbesignedby
alllegallyauthorizedsignatoriesofallthepartiestothe
existingorintendedJV,asappropriate.
17.Documents
Establishing
theEligibility
ofGoodsand
Related
Services
18.Documents
Establishing
theConformity
oftheGoods
andRelated
Servicestothe
Bidding
Document
17.1ToestablishtheeligibilityoftheGoodsandRelatedServices,
inaccordancewithITBClause5,Biddersshallcompletethe
countryoforigindeclarationsinthePriceScheduleForms,
includedinSectionIV,BiddingForms.
18.1ToestablishtheconformityoftheGoodsandRelatedServices
totheBiddingDocument,theBiddershallfurnishaspartofits
TechnicalProposalthedocumentaryevidencespecifiedin
SectionVI,ScheduleofSupply.
18.2Thedocumentaryevidencemaybeintheformofliterature,
drawingsordata,andshallconsistofadetaileddescriptionof
theessentialtechnicalandperformancecharacteristicsofthe
GoodsandRelatedServices,demonstratingsubstantial
responsivenessoftheGoodsandRelatedServicestothose
requirements,andifapplicable,astatementofdeviationsand
exceptionstotheprovisionsofSectionVI,ScheduleofSupply.
18.3Standardsforworkmanship,process,material,andequipment,
aswellasreferencestobrandnamesorcataloguenumbers
specifiedbythePurchaserintheScheduleofSupply,are
intendedtobedescriptiveonlyandnotrestrictive.TheBidder
mayofferotherstandardsofquality,brandnames,and/or
cataloguenumbers,providedthatitdemonstrates,tothe
Purchaserssatisfaction,thatthesubstitutionsensure
substantialequivalenceoraresuperiortothosespecifiedinthe
ScheduleofSupply.
19.Documents
Establishing
19.1ToestablishitsqualificationstoperformtheContract,the
Proposa
Biddershallsubmit aspartof itsTechnical l
the
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
SectionIII,EvaluationandQualificationCriteria.
192 IfsorequiredintheBDS,aBidderthatdoesnotmanufactureorproducethe
Goods it offers to supply shall submit the Manufacturers Authorization
usingtheformincludedinSectionIV,BiddingFormstodemonstratethatit
hasbeendulyauthorizedbythemanufacturerorproduceroftheGoodsto
supplytheseGoodsinthePurchaserscountry.
the
Qualifications
oftheBidder
193 IfsorequiredintheBDS,aBidderthatdoesnotconductbusinesswithinthe
PurchasersCountryshallsubmitevidencethatitwillberepresentedbyan
Agent in the country equipped and able to carry out the Suppliers
maintenance,repairandsparepartsstockingobligationsprescribedinthe
ConditionsofContractand/orTechnicalSpecifications.
201BidsshallremainvalidfortheperiodspecifiedintheBDSafterthe
bid submission deadline date prescribed by the Purchaser. A Bid
valid for a shorter period shall be rejected by the Purchaser as
nonresponsive.
202In exceptional circumstances, prior to the expiration of the bid
validity period, the Purchaser may request Bidders to extend the
periodofvalidityoftheirBids.Therequestandtheresponsesshallbe
madeinwriting.IfaBidSecurityisrequestedinaccordancewith
ITBClause21,itshallalsobeextendedforacorrespondingperiod.
ABiddermayrefusetherequestwithoutforfeitingitsBidSecurity.A
Bidder granting the request shall not be required or permitted to
modifyitsBid.
20. Period
of
Validity
ofBids
211UnlessotherwisespecifiedintheBDS,theBiddershallfurnishas
partofitsbid,inoriginalform,eitheraBidSecuringDeclarationora
BidSecurityasspecifiedintheBDS.InthecaseofaBidSecurity,
theamountshallbeasspecifiedintheBDS.
21.BidSecurity
212IfaBidSecuringDeclarationisspecifiedpursuanttoITB21.1the
BiddershallusetheformincludedinSectionIV,BiddingForms.
213The Bid Security shall be, at the Bidders option, in any of the
Page
followingforms:
evidence
indicatedfor
each
qualification
criteria
specifiedin
(1) abankguarantee;
(2) anirrevocableletterofcredit;or
(3) acashiersorcertifiedcheck;
(4) DDtobedrawninfavourofExecutiveEngineer,No.
4DivisionBRLBCBhadravathi,Bhadravatipayable
at
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page19of100
Bhadravati
allfromareputablebankfromaneligiblecountry.Incaseofaa
bankguarantee,theBidSecurityshallbesubmittedusingtheBid
SecurityFormincludedinSectionIV,BiddingForms,oranother
form acceptable to the Purchaser. The form must include the
completenameoftheBidder.TheBidSecurityshallbevalidfor
twentyeightdays(28)beyondtheendofthevalidityperiodofthe
bid.Thisshallalsoapplyiftheperiodforbidvalidityisextended.
21.4
IfabidSecurityisrequiredinaccordancewithITBSubClause
21.1,anyBidnotaccompaniedbyasubstantiallyresponsiveBid
SecurityinaccordancewithITBSubClause
21.2,shallberejectedbythePurchaserasnonresponsive.
21.5
TheBidSecurityofunsuccessfulBiddersshallbereturnedas
promptlyaspossibleuponthesuccessfulBidderfurnishingthe
PerformanceSecuritypursuanttoITB43andITBClause44.
21.6
TheBidSecurityofthesuccessfulBiddershallbereturnedas
promptlyaspossibleoncethesuccessfulBidderhassignedthe
ContractandfurnishedtherequiredPerformanceSecurity.
21.7
TheBidSecuritymaybeforfeitedortheBidSecuring
Declarationexecuted:
(a) ifaBidderwithdrawsitsBidduringtheperiodofbid
validityasspecifiedinITBClause20.1,exceptas
providedinITBSubClause20.2;or
(b) ifthesuccessfulBidderfailsto:
(i)
signtheContractinaccordancewithITBClause43;
(ii) furnishaPerformanceSecurityinaccordancewith
ITBClause44;or
(iii)acceptthecorrectionofitsBidPricepursuantto
ITBClause31.
21.8
22.Formatand
SigningofBid
TheBidSecurityofaJVmustbeinthenameoftheJVthat
submitsthebid.IftheJVhasnotbeenlegallyconstitutedatthe
timeofbidding,theBidSecurityshallbeinthenamesofall
futurepartnersasnamedintheletterofintentmentionedin
ITBSubClause16.1.
22.1TheBiddershallprepareoneoriginaloftheTechnical
ProposalandoneoriginalofthePriceProposalasdescribedin
ITB Clause11andclearlymarkeachORIGINAL
TECHNICAL PROPOSALandORIGINALPRICE
PROPOSAL.Inaddition,theBiddershallsubmitcopiesof
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page20of100
theTechnicalProposalandthePriceProposal,inthenumber
specifiedintheBDSandclearlymarkthemCOPYNO
TECHNICALPROPOSALandCOPYNO.PRICE
PROPOSAL.Intheeventofanydiscrepancybetweentheoriginal
andthecopies,theoriginalshallprevail.
222TheoriginalandallcopiesoftheBidshallbetypedorwrittenin
indelibleinkandshallbesignedbyapersondulyauthorizedtosign
onbehalfoftheBidder.Thisauthorizationshallconsistofawritten
confirmationasspecifiedintheBDSandshallbeattachedtothe
Bid. The name and position held by each person signing the
authorization must be typed or printed below the signature. All
pagesoftheBid,exceptforunamendedprintedliterature,shallbe
signedorinitialledbythepersonsigningtheBid.
223Anyinterlineations,erasures,oroverwritingshallbevalidonlyif
theyaresignedorinitialledbythepersonsigningtheBid.
SubmissionandOpeningofBids
23.Sealingand
Markingof
Bids
23.1TheBiddershallenclosetheoriginaloftheTechnical
Proposal,theoriginalofthePriceProposal,andeachcopyof
theTechnicalProposalandeachcopyofthePriceProposal,
includingalternativebids,ifpermittedinaccordancewithITB
Clause13,inseparatesealedenvelopes,dulymarkingthe
envelopesasORIGINALTECHNICALPROPOSAL,
ORIGINALPRICEPROPOSALandCOPYNO
TECHNICALPROPOSALandCOPYNO.PRICE
PROPOSAL,asappropriate.Theseenvelopescontainingthe
originalandthecopiesshallthenbeenclosedinonesingle
envelope.
23.2
Theinnerandouterenvelopesshall:
(a) bearthenameandaddressoftheBidder;
(b) beaddressedtothePurchaserinaccordancewithITB
SubClause24.1;and
(c) bearthespecificidentificationofthisbiddingprocess
indicatedintheBDS.
23.3
Theouterenvelopesandtheinnerenvelopescontainingthe
TechnicalProposalsshallbearawarningnottoopenbefore
thetimeanddatefortheopeningofTechnicalProposals,in
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page21of
100
accordancewithITBSubClause27.1.
23.4 TheinnerenvelopescontainingthePriceProposalsshallbeara
warningnottoopenuntiladvisedbythePurchaserin
accordancewithITBSubClause27.2.
23.5 Ifallenvelopesarenotsealedandmarkedasrequired,the
Purchaserwillassumenoresponsibilityforthemisplacement
orprematureopeningofthebid.
23.6 AlternativeBids,ifpermissibleinaccordancewithITBClause
13,shallbeprepared,sealed,marked,anddeliveredin
accordancewiththeprovisionsofITBClauses22and23,with
theinnerenvelopesmarkedinadditionALTERNATIVE
NO.asappropriate
24.Deadlinefor
Submissionof
Bids
25.LateBids
26.Withdrawal,
Substitution,
and
Modificationof
Bids
24.1 BidsmustbereceivedbythePurchaserattheaddressandno
laterthanthedateandtimeindicatedintheBDS.
242ThePurchasermay,atitsdiscretion,extendthedeadlineforthe
submission of Bids by amending the Bidding Document in
accordance with ITB Clause 8, in which case all rights and
obligationsofthePurchaserandBidderspreviouslysubjecttothe
deadlineshallthereafterbesubjecttothedeadlineasextended.
25.1 ThePurchasershallnotconsideranyBidthatarrivesafterthe
deadlineforsubmissionofBids,inaccordancewithITB
Clause24.AnyBidreceivedbythePurchaserafterthe
deadlineforsubmissionofBidsshallbedeclaredlate,rejected,
andreturnedunopenedtotheBidder.
26.1 ABiddermaywithdraw,substitute,ormodifyitsBidafterit
hasbeensubmittedbysendingawrittenNotice,dulysignedby
anauthorizedrepresentative,andshallincludeacopyofthe
authorizationinaccordancewithITBSubClause22.2(except
thatwithdrawalnoticesdonotrequirecopies).The
correspondingsubstitutionormodificationofthebidmust
accompanytherespectivewrittennotice.AllNoticesmustbe:
(a) submittedinaccordancewithITBClauses22and23
(exceptthatWithdrawalNoticesdonotrequirecopies),
andinaddition,therespectiveinnerandouterenvelopes
shallbeclearlymarkedWithdrawal,Substitution,
Modification;and
(b) receivedbythePurchaserpriortothedeadlineprescribed
forsubmissionofbids,inaccordancewithITBClause
24.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page22of100
26.2 BidsrequestedtobewithdrawninaccordancewithITBSub
Clause26.1shallbereturnedunopenedtotheBidders.
26.3 NoBidshallbewithdrawn,substituted,ormodifiedinthe
intervalbetweenthedeadlineforsubmissionofbidsandthe
expirationoftheperiodofbidvalidityspecifiedinITBClause
20.1oranyextensionthereof.
27.BidOpening
27.1 ThePurchasershallconducttheopeningofTechnical
ProposalsinthepresenceofBiddersrepresentativeswho
choosetoattend,attheaddress,dateandtimespecifiedintheBDS.
272The Price Proposals will remain unopened and will be held in
custody of the Purchaser until the time of opening of the Price
Proposals. The date, time, and location of the opening of Price
Proposals will be advised in writing by the Purchaser. If the
TechnicalProposalandthePriceProposalaresubmittedtogetherin
oneenvelope,thePurchasermayrejecttheBid.Alternatively,the
PriceProposalmaybeimmediatelyresealedforlaterevaluation.
273First,envelopesmarkedWITHDRAWALshallbeopened,read
out,andrecorded,andtheenvelopecontainingthecorresponding
Bidshallnotbeopened,butreturnedtotheBidder.NoBidshallbe
withdrawnunlessthecorrespondingWithdrawalNoticecontainsa
validauthorizationtorequestthewithdrawalandisreadoutand
recordedatbidopening.
274Next,outerenvelopesmarkedSUBSTITUTIONshallbeopened.
TheinnerenvelopescontainingtheSubstitutionTechnicalProposal
and/or Substitution Price Proposal shall be exchanged for the
correspondingenvelopesbeingsubstituted,whicharetobereturned
totheBidderunopened.OnlytheSubstitutionTechnicalProposal,
ifany,shallbeopened,readout,andrecorded.SubstitutionPrice
Proposals will remain unopened in accordance with ITB Sub
Clause 27.2. No envelope shall be substituted unless the
correspondingSubstitutionNoticecontainsavalidauthorizationto
requestthesubstitutionandisreadoutandrecordedatbidopening.
275Next, outer envelopes marked MODIFICATION shall b e
opened. No Technical Proposal and/or Price Proposal shall be
modifiedunlessthecorrespondingModificationNoticecontainsa
validauthorizationtorequestthemodificationandisreadoutand
recordedattheopeningofTechnicalProposals.OnlytheTechnical
Proposals,bothOriginalaswellas
Modification,aretobeopened,readout,andrecordedatthe
opening.PriceProposals,bothOriginalaswellas
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page23of100
Modification,willremainunopenedinaccordancewithITB
SubClause27.2.
276All other envelopes holding the Technical Proposals shall be
openedoneatatime,andthefollowingreadoutandrecorded:
(1) thenameoftheBidder;
(2) whetherthereisamodificationorsubstitution;
(3) thepresenceofaBidSecurity,ifrequired;and
(4) anyotherdetailsasthePurchasermayconsiderappropriate.
OnlyTechnicalProposalsandalternativeTechnicalProposalsread
outandrecordedatbidopeningshallbeconsideredforevaluation.
No Bid shall be rejected at the opening of Technical Proposals
exceptforlatebids,inaccordancewithITBSubClause25.1.
277ThePurchasershallpreparearecordoftheopeningofTechnical
Proposalsthatshallinclude,asaminimum:thenameoftheBidder
and whether there is a withdrawal, substitution, modification, or
alternativeoffer;andthepresenceorabsenceofaBidSecurity,if
one was required. The Bidders representatives who are present
shallberequestedtosigntherecord.TheomissionofaBidders
signatureontherecordshallnotinvalidatethecontentsandeffect
of the record. A copy of the record shall be distributed to all
Bidders.
278At the end of the evaluation of the Technical Proposals, the
Purchaser will invite bidders who have submitted substantially
responsiveTechnicalProposalsandwhohavebeendeterminedas
being qualified for award to attend the opening of the Price
Proposals. The date, time, and location of the opening of Price
ProposalswillbeadvisedinwritingbythePurchaser.Biddersshall
begivenreasonablenoticeoftheopeningofPriceProposals.
279The Purchaser will notify Bidders in writing who have been
rejectedonthegroundsofbeingsubstantiallynonresponsivetothe
requirements of the Bidding Document and return their Price
Proposalsunopened.
2710ThePurchasershallconducttheopeningofPriceProposalsofall
Bidders who submitted substantially responsive Technical
Proposals,inthepresenceofBidders`representativeswhochoose
toattendattheaddress,dateandtimespecifiedbythePurchaser.
TheBiddersrepresentativeswhoarepresentshall
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page24of100
berequestedtosignaregisterevidencingtheirattendance.
2711AllenvelopescontainingPriceProposalsshallbeopenedoneata
timeandthefollowingreadoutandrecorded:
(1) thenameoftheBidder
(2) whetherthereisamodificationorsubstitution;
(3) theBidPrices,includinganydiscountsandalternativeoffers;
and
(4) anyotherdetailsasthePurchasermayconsiderappropriate.
OnlyPriceProposals,discounts,andalternativeoffersreadoutand
recordedduringtheopeningofPriceProposalsshallbeconsidered
for evaluation. No Bid shall be rejected at the opening of Price
Proposals.
2712The Purchaser shall prepare a record of the opening of Price
Proposalsthatshallinclude,asaminimum:thenameoftheBidder,
theBidPrice(perlotifapplicable),anydiscounts,andalternative
offers. The Bidders representatives who are present shall be
requestedtosigntherecord.TheomissionofaBidderssignature
on the record shall not invalidate the contents and effect of the
record.AcopyoftherecordshallbedistributedtoallBidders.
EvaluationandComparisonofBids
28.Confidentiality28.1Information
relating totheexamination,
evaluation,
comparison,
and
postqualification
of
Bids, and
recommendation of contract award, shall not be disclosed to
Bidders or any other persons not officially concerned with such
processuntilinformationonContractawardiscommunicatedtoall
Bidders.
282Any attempt by a Bidder to influence the Purchaser in the
examination,evaluation,comparison,andpostqualificationofthe
BidsorContractawarddecisionsmayresultintherejectionofits
Bid.
283NotwithstandingITBSubClause28.2,fromthetimeofopening
the Technical Proposals to the time of Contract award, if any
BidderwishestocontactthePurchaseronanymatterrelatedtothe
biddingprocess,itshoulddosoinwriting.
29.Clarificationof29.1Toassistintheexamination,evaluation,comparisonandpost
Bids
qualificationoftheBids,thePurchasermay,atitsdiscretion,
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page25of100
askanyBidderforaclarificationofitsBid.Anyclarification
submittedbyaBidderthatisnotinresponsetoarequestbythe
Purchasershallnotbeconsidered.ThePurchasersrequestfor
clarificationandtheresponseshallbeinwriting.Nochangein
thepricesorsubstanceoftheBidshallbesought,offered,or
permitted,excepttoconfirmthecorrectionofarithmeticerrors
discoveredbythePurchaserintheevaluationofthePrice
Proposals,inaccordancewithITBClause31.
30.Responsiveness
ofTechnical
Proposal
30.1The
Purchasersdeterminationoftheresponsivenessofa
TechnicalProposalistobebasedonthecontentsofthe
TechnicalProposalitself.
30.2AsubstantiallyresponsiveTechnicalProposalisonethat
conformstoalltheterms,conditions,andspecificationsofthe
BiddingDocumentwithoutmaterialdeviation,reservation,or
omission.Amaterialdeviation,reservation,oromissionisone
that
:
(a)
affectsinanysubstantialwaythescope,quality,or
performanceoftheGoodsandRelatedServicesspecified
intheContract;or
(b)
limitsinanysubstantialway,inconsistentwiththe
BiddingDocument,thePurchasersrightsortheBidders
obligationsundertheContract;or
(c)ifrectifiedwouldunfairlyaffectthecompetitiveposition
ofotherBidderspresentingsubstantiallyresponsive
TechnicalProposals.
30.3IfaTechnicalProposalisnotsubstantiallyresponsivetothe
BiddingDocument,itshallberejectedbythePurchaserand
maynotsubsequentlybemaderesponsivebytheBidderby
correctionofthematerialdeviation,reservation,oromission.
31.Nonconformi
ties,Errors,
andOmissions
31.1ProvidedthataTechnicalProposalissubstantiallyresponsive,
thePurchasermaywaiveanynonconformityoromissionin
theBidthatdoesnotconstituteamaterialdeviation.
31.2
ProvidedthataTechnicalProposalissubstantiallyresponsive,the
Purchaser may request that the Bidder submit the necessary
informationordocumentation,withinareasonableperiodoftime,
to rectify nonmaterial, nonconformities or omissions in the
Technical Proposal related to documentation requirements. Such
omissionshallnotberelatedtoanyaspectofthePriceProposalof
theBid.FailureoftheBiddertocomplywiththerequestmayresult
intherejectionofitsBid.
31.3
ProvidedthataTechnicalProposalissubstantiallyresponsive,
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page26of100
thePurchaserwillrectifynonmaterialnonconformitiesor
omissions.Tothiseffect,theBidPriceshallbeadjusted
duringevaluationofPriceProposals,forcomparisonpurposes
only,toreflectthepriceofthemissingornonconformingitem
orcomponent.Theadjustmentshallbemadeusingthemethod
indicatedinSectionIII,EvaluationandQualificationCriteria.
31.4
ProvidedthattheTechnicalProposalissubstantially
responsive,thePurchaserwillcorrectarithmeticalerrors
duringevaluationofPriceProposalsonthefollowingbasis:
(a)
ifthereisadiscrepancybetweentheunitpriceandthe
totalpricethatisobtainedbymultiplyingtheunitprice
andquantity,theunitpriceshallprevailandthetotal
priceshallbecorrected,unlessintheopinionofthe
Purchaserthereisanobviousmisplacementofthe
decimalpointintheunitprice,inwhichcasethetotal
priceasquotedshallgovernandtheunitpriceshallbe
corrected;
(b)
ifthereisanerrorinatotalcorrespondingtotheaddition
orsubtractionofsubtotals,thesubtotalsshallprevailand
thetotalshallbecorrected;and
(c)
ifthereisadiscrepancybetweenwordsandfigures,the
amountinwordsshallprevail,unlesstheamount
expressedinwordsisrelatedtoanarithmeticerror,in
whichcasetheamountinfiguresshallprevailsubjectto
(a)and(b)above.
31.5IftheBidderthatsubmittedthelowestevaluatedBiddoesnot
acceptthecorrectionoferrors,itsBidshallbedisqualifiedand
itsBidSecuritymaybeforfeited,oritsbidsecuring
declarationshallbeexecuted.
32.Preliminary
Examination
ofBids
32.1
ThePurchasershallexaminetheTechnicalProposaltoconfirm
thatalldocumentsandtechnicaldocumentationrequestedin
ITBSubClause11.4havebeenprovided,andtodeterminethe
completenessofeachdocumentsubmitted.
32.2ThePurchasershallconfirmthatthefollowingdocumentsand
informationhavebeenprovidedintheTechnicalProposal.If
anyofthesedocumentsorinformationismissing,theoffer
shallberejected.
(a)
TechnicalProposalSubmissionSheetinaccordancewith
ITBSubClause12.1;
(b)
writtenconfirmationofauthorizationtocommitthe
Bidder;
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page27of100
(3) BidSecurity,ifapplicable;and
(4) ManufacturersAuthorization,ifapplicable.
323Likewise,followingtheopeningofPriceProposals,thePurchaser
shallexaminethePriceProposalstoconfirmthatalldocumentsand
financial documentation requested in ITB SubClause 11.5 have
been provided, and to determine the completeness of each
documentsubmitted.
324The Purchaser shall confirm that the following documents and
informationhave been provided in thePrice Proposal. If any of
these documents or information is missing, the offer shall be
rejected.
(1) PriceProposalSubmissionSheetinaccordancewithITBSub
Clause12.1;and
(2) PriceSchedules,inaccordancewithITBClauses12,14,and
15.
33.Examinationof33.1ThePurchasershallexaminetheBidstoconfirmthatallterms
Termsand
andconditionsspecifiedintheGCCandtheSCChavebeen
Conditions;
acceptedbytheBidderwithoutanymaterialdeviationor
Technical
reservation.
Evaluation
332The Purchaser shall evaluate the technical aspects of the Bid
submittedinaccordancewithITBClause18,toconfirmthatall
requirementsspecifiedinSectionVI,ScheduleofSupplyofthe
BiddingDocumenthavebeenmetwithoutanymaterialdeviationor
reservation.
333If, after the examination of the terms and conditions and the
technicalevaluation,thePurchaserdeterminesthattheTechnical
Proposal is not substantially responsive in accordance with ITB
Clause30,itshallrejecttheBid.
34. Conversionto
Single
Currency
35. Marginof
Preference
36. Evaluationof
34.1 ForevaluationandcomparisonofPriceProposals,the
Purchasershallconvertallbidpricesexpressedintheamounts
invariouscurrenciesintoasinglecurrency,usingtheselling
exchangeratesestablishedbythesourceandonthedate
specifiedintheBDS.
35.1 UnlessotherwisespecifiedintheBDS,amarginofpreference
shallnotapply.
36.1 ThePurchasershallevaluatePriceProposalsofeachBidfor
Bids
whichtheTechnicalProposalhasbeendeterminedtobe
substantiallyresponsive.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page28of100
362ToevaluateaPriceProposal,thePurchasershallonlyuseallthe
criteriaandmethodologiesdefinedinthisClauseandinSectionIII,
Evaluation and Qualification Criteria. No other criteria or
methodologyshallbepermitted.
363To evaluate a Price Proposal, the Purchaser shall consider the
following:
(1) theBidPrice;
(2) price adjustment for correction of arithmetic errors in
accordancewithITBSubClause31.4;
(3) priceadjustmentduetodiscountsofferedinaccordancewith
ITBSubClause14.4;
(4) applicationofalltheevaluationfactorsindicatedinSection
III,EvaluationandQualificationCriteria.
364InthecalculationoftheevaluatedcostoftheBids,thePurchaser
shallexcludeandnottakeintoaccount:
(1) inthecaseofGoodsandRelatedServicesofferedfromwithin
the Purchasers country, all sales tax and all other taxes,
applicable in the Purchasers country and payable on the
GoodsiftheContractisawardedtotheBidder;
(2) in the case of Goods and Related Services offered from
outsidethePurchaserscountry,allcustomsduties,salestax,
and other taxes, applicable in the Purchasers country and
payableontheGoodsiftheContractisawardedtotheBidder;
and
(3) any allowance for price adjustment during the period of
performanceoftheContract,ifprovidedintheBid.
365The Purchasers cost evaluation of a Bid may require the
considerationofotherfactors,inadditiontotheBidPricequotedin
accordancewithITBClause14.Thesefactorsmayberelatedtothe
characteristics,performance,andtermsandconditionsofpurchase
oftheGoodsandRelatedServices.Thefactorsselected,ifany,
shallbeexpressedinmonetarytermstofacilitatecomparisonofthe
Bids, unless otherwise specified in Section III, Evaluation and
QualificationCriteria.Thefactorstobeusedandthemethodology
ofapplicationshallbeasindicatedinSectionIII,Evaluationand
QualificationCriteria.
366IfthisBiddingDocumentallowsBidderstoquoteseparateprices
fordifferentlots,andtheawardtoasingleBidderofmultiplelots,
themethodologyofevaluationtodeterminethelowestevaluatedlot
combinations,includinganydiscounts
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page29of100
offeredintheBidSubmissionSheet,isasspecifiedinSection
III,EvaluationandQualificationCriteria.
37.Comparisonof
Bids
38.Postqualifi
cationofthe
Bidder
37.1ThePurchasershallcompareallsubstantiallyresponsivebids
todeterminethelowestevaluatedbid,inaccordancewithITB
Clause36.
38.1ThePurchasershalldeterminetoitssatisfactionduringthe
evaluationofTechnicalProposalswhetherBiddersare
qualifiedtoperformtheContractsatisfactorily.
38.2Thedeterminationshallbebaseduponanexaminationofthe
documentaryevidenceoftheBiddersqualificationssubmitted
bytheBidder,pursuanttoITBClause19,toclarificationsin
accordancewithITBClause29andthequalificationcriteria
indicatedinSectionIII,EvaluationandQualificationCriteria.
FactorsnotincludedinSectionIII,Evaluationand
QualificationCriteriashallnotbeusedintheevaluationofthe
Biddersqualification.
38.3Anaffirmativedeterminationshallbeaprerequisiteforthe
openingandevaluationofaBiddersPriceProposal.A
negativedeterminationshallresultintothedisqualificationof
theBid,inwhicheventthePurchasershallreturntheunopened
PriceProposaltotheBidder.
39.Purchasers
Rightto
AcceptAny
Bid,andto
RejectAnyor
AllBids
39.1ThePurchaserreservestherighttoacceptorrejectanyBid,
andtoannulthebiddingprocessandrejectallBidsatanytime
priortoContractaward,withouttherebyincurringanyliability
totheBidders.
AwardofContract
40.AwardCriteria
40.1ThePurchasershallawardtheContracttotheBidderwhose
offerhasbeendeterminedtobethelowestevaluatedBidandis
substantiallyresponsivetotheBiddingDocument,provided
furtherthattheBidderhasremainedqualifiedtoperformthe
Contractsatisfactorily.
40.2ABidshallberejectedifthequalificationcriteriaasspecified
inSectionIII,EvaluationandQualificationCriteriaareno
longermetbytheBidderwhoseofferhasbeendeterminedto
bethelowestevaluatedBid.InthiseventthePurchasershall
proceedtothenextlowestevaluatedBidtomakeasimilar
reassessmentofthatBidderscapabilitiestoperform
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page30of100
satisfactorily.
41.Purchasers
RighttoVary
Quantitiesat
TimeofAward
41.1
AtthetimetheContractisawarded,thePurchaserreservesthe
righttoincreaseordecreasethequantityofGoodsandRelated
ServicesoriginallyspecifiedinSectionVI,Scheduleof
Supply,providedthisdoesnotexceedthepercentages
indicatedintheBDS,andwithoutanychangeintheunitprices
orothertermsandconditionsoftheBidandtheBidding
Document.
42.Notificationof
Award
42.1
Priortotheexpirationoftheperiodofbidvalidity,the
PurchasershallnotifythesuccessfulBidder,inwriting,thatits
Bidhasbeenaccepted.Atthesametime,thePurchasershall
alsonotifyallotherBiddersoftheresultsofthebidding.
42.2
UntilaformalContractispreparedandexecuted,the
notificationofawardshallconstituteabindingContract.
42.3ThePurchaserwillpublishinanEnglishlanguagenewspaper
orwellknownfreelyaccessiblewebsitetheresultsidentifying
thebidandlotnumbersandthefollowinginformation:(i)
nameofeachBidderwhosubmittedaBid;(ii)bidpricesas
readoutatbidopening;(iii)nameandevaluatedpricesofeach
Bidthatwasevaluated;(iv)nameofbidderswhosebidswere
rejectedandthereasonsfortheirrejection;and(v)nameofthe
winningBidder,andthepriceitoffered,aswellastheduration
andsummaryscopeofthecontractawarded.Afterpublication
oftheaward,unsuccessfulbiddersmayrequestinwritingto
thePurchaserforadebriefingseekingexplanationsonthe
groundsonwhichtheirbidswerenotselected.ThePurchaser
shallpromptlyrespondinwritingtoanyunsuccessfulBidder
who,afterPublicationofcontractaward,requestsadebriefing.
43.Signingof
Contract
43.1
Promptlyafternotification,thePurchasershallsendtothe
successfulBiddertheAgreementandtheSpecialConditionsof
Contract.
43.2Withintwentyeight(28)daysofreceiptoftheAgreement,the
successfulBiddershallsign,date,andreturnittothe
Purchaser.
44.Performance
Security
44.1
Withintwentyeight(28)daysofthereceiptofnotificationof
awardfromthePurchaser,thesuccessfulBiddershallfurnish
thePerformanceSecurityinaccordancewiththeGCC,using
forthatpurposethePerformanceSecurityFormincludedin
SectionIX,ContractForms,oranotherformacceptabletothe
Purchaser.
44.2
FailureofthesuccessfulBiddertosubmittheabovementioned
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page31of100
PerformanceSecurityorsigntheContractshallconstitutesufficient
groundsfortheannulmentoftheawardandforfeitureoftheBid
Security.InthateventthePurchasermayawardtheContracttothe
next lowest evaluated Bidder whose offer is substantially
responsiveandisdeterminedbythePurchasertobequalifiedto
performtheContractsatisfactorily.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page32of100
SectionII.BidDataSheet
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page33of100
SectionII.BidDataSheet
A.Introduction
ITB1.1
ThenumberoftheInvitationforBidsis:KNNLTelemetry1
ITB1.1
ThePurchaseris:TheProjectDirector,KISWRMIP,
Representedby
ITB1.1
ThenameoftheICBis:Flowmeasurementandtelemetrysystemsupply
andinstallationonItemRateBasis
TheidentificationnumberoftheICBis:KNNLFMTICB2
ThenumberandidentificationoflotscomprisingthisICBis:One
24NosMultipathTransitTimeFlowMeters
76NosNoncontactSurfacevelocityRadarFlowMeters
1NosFloatmounteddownwardlookingADCP
3NosHandheldPortableVerticaltoplookingADCP.Mountedon
WadingRod.
6NosFullyAutomaticClimateStations.
ShivamoggaZonetobeequippedwithCentralMonitoringandcontrol
StationHardwareandsoftwarewithmonitoringandcontrolcentersasper
ScheduleVI.
Telemetryofallfieldsystemsandcentrallyconnectedtothemonitoring
andcontrolcenter.
ApplicationSoftwareforallcanaldatacapturing,modelingand
simulation,planneddatacapturing,actualflowdata,comparativeanalysis
ofplanvsactualflowinrealtime,SmartphoneapplicationandSMS/web
basedreportingsoftware.
5yearsO&M.
Insuranceofequipmentsatsiteandcentralmonitoringstations.
Supplyof5%ofthequantityasSparescoveringallthesupplieditems.
ITB2.1
TheBorroweris:India
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page34of100
ITB2.1
ThenameoftheProjectis:KarnatakaIntegratedandSustainableWater
ResourcesManagementInvestmentProgram.
ITB5.5
TheBidderisrequiredtoincludewithitsBid,documentationfromthe
ManufactureroftheGoods,thatithasbeendulyauthorizedtosupply,in
thePurchaserscountry,theGoodsindicatedinitsBid.
B.BiddingDocument
ITB7.1
Forclarificationpurposesonly,thePurchasersaddressis:
The Executive Engineer, Karnataka Neeravari Nigam Limited (KNNL),
No. 4 Division BRLBC Bhadravathi, Shivamogga, Karnataka state, India
Telephone: ++91-08282-271063, Fax; ++91-08282E-mail: eeknnlbdvt@yahoo.co.in
ITB7.4
BoardBuilding,No.1,Dr.B.R.AmbedkarRoad,Bangalore560001,
Karnatakastate,India
A site visit shall be organized at 10 am on 18 March 2015 by the
Executive Engineer Bhadravathi.
C.PreparationofBids
ITB10.1
ThelanguageoftheBidis:English
ITB 11.4 (i) The Bidder shall submit with its Technical Proposal the following additional
documents:
1. Audited andcertified balance sheets of bidder for the latest
Fivefinancialyears.
2. A legally notarized or attested by appropriate authority in the
biddershomecountryandvalidjointventureconsortiumagreement
if applicable specifying the financial stakes of each of the joint
venturepartner.
3. IndianbidderhavetoproduceIncometaxclearancecertificateand
Salestaxcertificate,andforinternationalbidderstheyhavetoproduce
similarkindofcertificatesaccordingtotheircountrysTaxLawif
applicable.
4. BidshallcontainthecopyofISO90012008orequivalent
ofmanufacturer.
5. BiddershallsubmittheBIScertificationforIndianmanufacturer
and international certification for foreign manufacturer, or test
certification
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page35of100
whichishigherorequivalenttotheBISspecificationforqualityassurance
foreachiteminscheduleofsupply.
6.Manufacturersexperienceinmanufacturing(numbersofyearsin
business,totalsystemssoldinpast5years,locationofmanufacturing
units)andsupplyofitemswithlistofclients.
7.Thebiddershouldclearlyconfirmthatallthemanufacturingfacilities
existinhisfactoryforinspectionandtestingandthesewillbemade
availabletothepurchaserorhisrepresentative/thirdpartyinspection
agency/iesforinspection.
8.Thecertificatesaslistedinthetechnicalspecificationsaretobe
submittedbythebidderalongwiththebid
ITB11.5(c)
TheBiddershallsubmitwithitsPriceProposalthefollowingadditional
documents:None
ITB13.1
AlternativeBidsshallnotbepermitted
ITB14.5
TheIncotermseditionis:2010
ITB14.6(b) ForGoodsofferedfromoutsidethePurchaserscountry,theBiddershall
(i)
quotepricesusingthefollowingIncoterms:CIF,Nearestportofentry,
Karnatakastate,India
ITB14.6(b) Inadditiontotheabove,theBiddershallquotepricesforGoodsoffered
(ii)
fromoutsidethePurchaserscountryusingthefollowingIncoterms:Not
applicable.
ITB14.7
ThepricesquotedbytheBiddershallbe:fixed
ITB15.1
CurrenciesofthebidareINRplusupto3foreigncurrenciesofBidders
choice.
ITB19.3
TheBidderisrequiredtoincludewithitsbid,evidencethatitwillbe
representedbyanAgentinthePurchaserscountry.
ITB20.1
Thebidvalidityperiodshallbeonehundredtwenty(120)days.
ITB21.1
ABidSecurityisrequiredasperSectionIInstructiontoBidders,Clause
21.
TheamountandcurrencyoftheBidSecurityshallbe:
32500USD.
D.SubmissionandOpeningofBids
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page36of100
ITB22.1
InadditiontotheoriginaloftheBid,thenumberofcopiesis:oneand
additionallyaCDcontainingallthedocumentsshallbesubmittedalong
withthebidcover.
ITB22.2
ThewrittenconfirmationofAuthorizationtosignonbehalfoftheBidder
shallconsistof:
aletterofAuthorityshowingthetypedorprintedname,positionheldand
thesignatureofeachpersongivingtheauthority,andthename,position
andsignatureofthepersonauthorizedtosubmitthebid.
IncaseofaJV,thewrittenconfirmationoftheauthorizationtosignon
behalfoftheBiddershallbeinthenameofthenominatedRepresentative
whoshallhavetheauthoritytoconductallbusinessesforandonbehalfof
anyandallthepartiesoftheJVduringthebiddingprocessand,inthe
eventtheJVisawardedtheContract,duringcontractexecution.
ITB23.2(c)
Theidentificationofthisbiddingprocessis:SingleStageTwoEnvelope
biddingprocess.
ITB24.1
Forbidsubmissionpurposesonly,thePurchasersaddressis:
Attention:TheExecutiveEngineer,No.4DivisionBRLBCBhadravathi,
KarnatakaNeeravariNigamLimited(KNNL),ConferenceRoom,4th
Floor,CoffeeBoardBuilding,No.1,Dr.B.R.AmbedkarRoad,Bangalore
560001,Karnatakastate,
India
ITB24.1
Thedeadlineforbidsubmissionis:
Date:
Time
:
ITB
27.1
27April2015
4.00PM
Thebidopeningshalltakeplace
at:
KarnatakaNeeravariNigamLimited(KNNL),ConferenceRoom,4th
Floor,CoffeeBoardBuilding,No.1,Dr.B.R.AmbedkarRoad,Bangalore
560001,Karnatakastate,India
Date:27April
2015
Time:5.00
PM
E.Evaluation,andComparisonofBids
ITB34.1
Thecurrencythatshallbeusedforbidevaluationandcomparison
purposestoconvertallbidpricesexpressedinvariouscurrenciesintoa
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page37of100
singlecurrencyis:IndianRupees
Thesourceofthesellingexchangerateshallbe:ReserveBankofIndia
Thedateforthesellingexchangerateshallbe:28dayspriortotechnicalbid
actualopeningdate
ITB35.1
Amarginofpreferenceshallnotapply.
F.AwardofContract
ITB41.1
Thepercentagebywhichquantitiesmaybeincreasedis:15%
Thepercentagebywhichquantitiesmaybedecreasedis:15%
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page38of100
SectionIII.EvaluationandQualificationCriteria
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page39of100
SectionIII.EvaluationandQualificationCriteria
TableofCriteria
EvaluationCriteria
1.
Scope
1.1LocalHandlingandInlandTransportation
Costsforinlandtransportation,insurance,andotherincidentalcostsfordeliveryofthe
goods from the EXW premises, or port of entry, or border point to Project Site as
definedinSectionVI,ScheduleofSupply,shallbequotedinthePRICESCHEDULE
NO.3 FOR RELATED SERVICES TO BE OFFERED FROM OUTSIDE AND
WITHINTHEPURCHASER'SCOUNTRYprovidedinSectionIV,BiddingForms.
Thesecostswillbetakenintoaccountduringbidevaluation.IfaBidderfailstoinclude
suchcostsinitsBid,thenthesecostswillbeestimatedbythePurchaseronthebasisof
publishedtariffsbytherailorroadtransportagencies,insurancecompanies,orother
appropriatesources,andaddedtoEXWorCIForCIPprice.
1.2MinorOmissionsorMissingItems
PursuanttoSubClause31.3oftheInstructionstoBidders,thecostofallquantifiable
nonmaterialnonconformitiesoromissionsfromthecontractualandcommercialconditions
shall be evaluated. The Purchaser will make its own assessment of the cost of any
nonmaterialnonconformitiesandomissionsforthepurposeofensuringfaircomparisonof
Bids.
MultipleContracts
2.
Notapplicable.
3.
TechnicalCriteria
Thecostofallquantifiabledeviationsordeficienciesfromthetechnicalrequirementsas
specifiedinSectionVI,ScheduleofSupplyofgoodsandservicesshallbeevaluatedbased
onthecompliancesubmittedagainstthetechnicalspecifications.ThePurchaserwillmake
its own assessment of the cost of these deviations or deficiencies for the purpose of
ensuringfaircomparisonofBids
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page40of100
4.
EconomicCriteria
41 AdjustmentforDeviationsfromtheTermsofPayment
DeviationsfromtheTermsofPaymentasspecifiedinSpecialConditionsofContract,
SubClause16.1,arenotpermitted.
42 AdjustmentforDeviationsintheDeliveryandCompletionSchedule
DeviationsfromtheDeliveryandCompletionSchedulespecifiedinSectionVI,Schedule
ofSupply,arenotpermitted.
MarginofPreference
Nomarginofpreferenceisapplicable
6. DeemedExportBenefits
TheBiddersareinformedtoascertainontheirownavailabilityofDeemedExportBenefits.
Theyaresolelyresponsibleforobtainingsuchbenefitswhichtheyhaveconsideredintheir
bidsandincaseoffailuretoreceivesuchbenefitsforreasonswhatsoever,includingchangein
GOIExport&ImportPolicy,thepurchaserwillnotcompensatetheBidder.Purchasershall
provideprojectauthoritycertificateasperdeemedexportpolicyofGovernmentofIndiato
facilitatethebidder.
ThosewhohavequotedconditionallythattheirofferissubjecttoavailabilityofDeemed
ExportBenefitwillbetreatedasnonresponsiveandhencewillberejected.
QualificationCriteria
ToensurethatthelowestevaluatedBidderhasthenecessaryqualificationstosuccessfullyfulfill
itsobligationsunderthecontract,thebiddersqualificationsshallbeassessedonapass/failbasis
inaccordancewiththecriteriadescribedbelow:
1.
FinancialCriteria
11 FinancialsizeofOperation
Thefinancialturnoverofthebidder,andincaseofJVacombinedturnoverinanytwoyearsoutof
lastfiveyears200809to201314shallnotbelessthan3.25millionUSDorequivalent.Audited
balancesheetcertifiedbyCharteredaccountantshouldbeenclosed.
1) AnnualturnoveroftheLeadPartner(incaseoftheJV)shouldnotbelessthan2.1Mill
USDforatleasttwoyearsinlastfiveyearsending201314.Acertificate
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page41of100
fromapracticingCharteredAccountantshallbesubmittedinsupportoftheturnover.
b) AnnualturnoveroftheJVAssociatedPartner(incaseoftheJV)shouldnotbeless
than1.2MillUSDforatleasttwoyearsinlastfiveyearsending201314.Acertificate
fromapracticingCharteredAccountantshallbesubmittedinsupportoftheturnover.
2.CashflowCapacity
2.1 Biddershouldhavetoproducerelevantcertificateofavailablefinancialresources(Working
capital +Bank credit) amounting to (credit from cooperative bank will not be accepted) to
equivalentof1.00MillUSD.ormore.BankCredit:Validcertificateissuedbythebankinfavor
ofthebiddercertifyingtheextentofcreditfacilityavailabletothebidderlesstheextentofcredit
alreadywithdrawnandoutstandingasontheweekofbidsubmission.
2.2
3.
ExperienceCriteria
31 ContractualExperience
3.1.1Experiencecertificatefromacompetentauthorityofhavingsupplied
andsuccessfullycommissionednotlessthan20nosopencanalflow
metersoftypeTransitTimeandNoncontactsurfacevelocityRadar
respectivelywithtelemetrictransmission,remotedataacquisitionand
datadisseminationsoftware,inopencanalirrigationnetworkduring
thelast7yearsshallbesubmitted.
3.1.2Experiencecertificateforhavingsuccessfullycarriedoutoperations
and maintenance for open canal telemetric flow meters and water
management system in a irrigation canal system with open surface
flow,fromacompetent
authorityofatleast2continuousyearsmaintenancewithinlast7years
highlightingmaintenanceperformanceofsuchsystemsinremotelocations.
3.1.3ReputedManufacturersofflowmetersofthetyperequiredinthisbid
andtheirexistingauthorizedsystemintegratorsorJointventures(JV)
withpartners,whohavepreviousexperienceofsimilarWorks,asgiven
inthedocuments,canbidforthiswork.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page42of100
32. TechnicalExperience
1. The manufacturer shall have minimum 5 (Five) years of experience in
manufacturing flow measurement sensors and transmitter software with
telemetryequipmentandDataAcquisitionsoftwareoftheexactsametype
asrequiredunderthisbidding.
2. Thebiddershouldhavesuccessfullyimplementedanopenirrigationcanal
simulationandhydraulicbehaviorcalculationsoftware,forcanaloperation
andwatermanagementplanningandaccounting.
3. Themanufacturerintheprevious2yearsshouldhavemanufacturedand
suppliedtwo(2)timesthequantityormoreasinthisScheduleofSupplies
VI,andshouldbetheexactsametypeofflowmeasurementsensorsand
transmitters.
4. Thebiddershouldprovidemanufacturersauthorizationtocomplywiththe
clausesofthisbidasinSectionIX.
5. The manufacturer of flow meters shall certify the technical compliance
with their seal and signature stating clearly stating their specifications
complianceoranydeviationswithrespecttothetechnicalspecificationin
SectionVI.
6. The manufacturer of flow meters shall certify that all the flow meter
transmittersandtheirinbuiltsoftwaresareallfromasinglemanufacturer
andareofsinglemakeandmodel;itshallcertifythattheyshallnothave
compatibilitychallengesduetovariousmakesandmodels.
7. ThemanufacturershouldhaveBISorISOcertificationoranyinternational
certification,whichishigherorequivalenttotheBISspecificationorfrom
anequivalenttestlaboratoryforqualityassuranceforeachitemindicated
inscheduleofsupply.
4. ProductionCapacity
Manufacturersminimumtotalproductionofthematerialssimilartothetypespecifiedinthe
ScheduleofSupplyshouldbeatleasttwotimesofestimatedtenderquantityforeachtypeof
flowmeterandtransmittersintheimmediatepastyear.
Eachbiddershallprovidedetailsoftheirpresentavailableproductioncapacityalongwith
detailsoftheirtotalordersonhandanditssupplyschedule.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page43of100
5.
LitigationHistory
Compliance
Requirements
Criteria
Documents
Joint Venture
Requirement
Submission
Single Entity
All Partners
Each
One
Requirements
Combined
Partner
Partner
PendingLitigation
All pending litigation shall be treated as
must meet
not
must meet
not
Fill up Pending
requirement
applicable
requirement
applicable
Litigation Form in
by itself or
by itself or
as partner to
as partner to
past or
past or
existing JV
existing JV
positive.
forms.
Each Bidder or members of a JV must fill in the Form LIT 1 in Section IV Bidding forms:
Form LIT 1: Pending Litigation and Arbitration
6. GeneralRequirementsfortheBiddertocomply
1. CompleteworksofManufacturing,supply,installation&commissioning&5
yearsO&M,throughthisbiddingselectionmethodwillbeawardedtoasingle
contractororaJointVenture(JV).
2. Annualturnoverfromthebiddersshallbefromrelevantcontractsforsupply,
installation and commissioning of flow measurement, softwares and
automations.
3. ACopyoftheRegistrationoftheCompany.Taxreturnsfilednumbersforthe
latestavailablefinancialyear.
Allthesecuritydocumentssuchassolvencycertificates,advance&performancebankguarantees
willbefurnishedbytheleadpartneramongthebiddersandtheleadpartnerwillberesponsiblefor
thebankguaranteeinforcetilltheconclusionofthecontractasperthetermsoftheagreement.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page44of100
SectionIV.BiddingForms
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page45of100
SectionIV.BiddingForms
TableofForms
TechnicalProposalSubmissionSheet.....................................................................47
PriceProposalSubmissionSheet............................................................................. 49
PriceScheduleNo.1GOODSTOBEOFFEREDFROMWITHINTHE
PURCHASER'SCOUNTRY.....................................................................................51
PriceScheduleNo.2.GOODSTOBEOFFEREDFROMOUTSIDE
THEPURCHASER'SCOUNTRY..........................................................................54
PriceScheduleNo.3.RELATEDSERVICESTOBEOFFEREDFROM
OUTSIDEANDWITHINTHEPURCHASER'SCOUNTRY.......................57
PriceSchedule4COMPREHENSIVEANNUALMAINTENANCE(60
months)includingwatchandward.........................................................................60
BidSecurity....................................................................................................................63
ManufacturersAuthorization..................................................................................65
FormLIT1..................................................................................................................66
PendingLitigationandArbitration.........................................................................66
SectionVII.GeneralConditionsofContract.......................................................69
SectionVIII.SpecialConditionsofContract....................................................... 89
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page47of100
TechnicalProposalSubmissionSheet
Date:
ICBNo.:
InvitationforBidNo.:
LotNo.:
To:_______________________________________________________________________
We,theundersigned,declarethat:
1) WehaveexaminedandhavenoreservationstotheBiddingDocument,includingAddenda
No.:
2) WeoffertosupplyinconformitywiththeBiddingDocumentandinaccordancewiththe
deliveryschedulespecifiedinSectionVI,ScheduleofSupply,thefollowingGoodsand
RelatedServices:
3) OurBidshallbevalidforaperiodof120daysfromthedatefixedforthebidsubmission
deadlineinaccordancewiththeBiddingDocument,anditshallremainbindinguponus
andmaybeacceptedatanytimebeforetheexpirationofthatperiod;
4) IfourBidisaccepted,wecommittoobtainaPerformanceSecurityintheamountof10
percentoftheContractPriceforthedueperformanceoftheContract;
5) Ourfirm,includinganysubcontractorsorsuppliersforanypartoftheContract,have
nationalitiesfromthefollowingeligiblecountries
;
6) Wearenotparticipating,asBidders,inmorethanoneBidinthisbiddingprocess,other
thanalternativeoffersinaccordancewiththeBiddingDocument;
7) Ourfirm,itsaffiliatesorsubsidiaries,includinganysubcontractorsorsuppliersforany
partoftheContract,hasnotbeendeclaredineligiblebytheADB;
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page48of100
8)
We declare that our firm, affiliates or subsidiaries, including any subcontractors or supplier for
any part of the contract,
0 Are
0 Are not
on the sanction list of Indian Central or any State Government of India, or any entity controlled by
the Indian Central or any State Government (controlling interest).
9) WeunderstandthatthisBid,togetherwithyourwrittenacceptancethereofincludedin
yournotificationofaward,shallconstituteabindingcontractbetweenus,untilaformal
Contractispreparedandexecuted.
10) Weunderstandthatyouarenotboundtoacceptthelowestevaluatedbidoranyotherbid
thatyoumayreceive.
11) WeagreetopermitADBoritsrepresentativetoinspectouraccountsandrecordsand
other documents relating to the bid submission and to have them audited by auditors
appointedbyADB.
Name
Inthecapacityof
Signed
DulyauthorizedtosigntheBidforandonbehalfof
Date
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page49of100
PriceProposalSubmissionSheet
Date:
ICBNo.:
InvitationforBidNo.:
LotNo.:
To:_______________________________________________________________________
We,theundersigned,declarethat:
1) WehaveexaminedandhavenoreservationstotheBiddingDocument,includingAddenda
No.:
2) WeoffertosupplyinconformitywiththeBiddingDocumentandinaccordancewiththe
deliveryschedulespecifiedinSectionVI,ScheduleofSupply,thefollowingGoodsand
RelatedServices:
3) ThetotalpriceofourBid,excludinganydiscountsofferedinitem(d)belowis:
4) Thediscountsofferedandthemethodologyfortheirapplicationare:
5) The following commissions,gratuities, or fees have beenpaidor are tobe paid with
respecttothebiddingprocessorexecutionoftheContract:
NameofRecipient
Address
Reason
Amount
(Ifnonehasbeenpaidoristobepaid,indicatenone.)
6) WeagreetopermitADBoritsrepresentativetoinspectouraccountsandrecordsand
other documents relating to the bid submission and to have them audited by auditors
appointedbyADB.
Name
Inthecapacityof
Signed
DulyauthorizedtosigntheBidforandonbehalfof
Date
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page51of100
PriceScheduleNo.1GOODSTOBE
OFFEREDFROMWITHINTHE
PURCHASER'S
COUNTRY
1
NameofBidder_____________________IFBNumber______________Page___
of___
2
3
4
5
6
7
8
Item
Descriptio Countr Domesti Quantityand
n(asin
yof
cValue
UnitOf
the
Origin
addedin Measuremen
brochure
Percent
t
attached)
9
Unit
price
EX
works
INR
Total
EX
W
price
per
item
INR
5x6
Manufacture,Supply,of
24full
MultipathTransittime(at
system
2/3planes)Flowmeasuring
systemwithdatalogging,
transmission,secure
enclosureandpower
supply.
Manufacture,Supply,of
76full
Noncontactsurface
system
velocityRadarflowmeter
withdatalogging,
transmission,secure
enclosureandpower
supply.
Manufacture,Supply,ofInstrumentsforCrossVerificationandvalidationofflowmeasurementst
factorforeverysite.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page52of
100
3.a ADCPBoatMounted
Type
1fullsystem
3.
b
3fullsystem
HandheldPortableVertical
toplookingADCP.
MountedonWadingRod
supplied.
Manufacture,Supply,of
AutomatedfullClimate
Stationwithintegrationfor
datalogging,transmission,
secureenclosureandpower
supply.
Supply,ofCentral
Monitoringandcontrol
StationHardwareand
software.AsgiveninItem
descriptionin3.3,4.1.5in
technicalrequirements
SectionVI.
GSM/GRPS
CONNECTIVITY
Accessories/dongles/modem
sfor100sites
Supplyof5%quantityoffield
installation/sensors,
electroniccards,Electrical
equipments,anyspecial
cables,batteries,signal
transmittingcomponents,
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
6fullsystem
Lumpsum
Asgivenin
Item
description
in3.3,4.1.5
intechnical
requirements
SectionVI
100sites
Lumpsum
Page53of100
G
P
R
S
m
o
d
e
m
,
s
i
g
n
a
l
p
r
o
c
e
s
s
o
r
,
e
t
c
.
S
i
n
c
e
t
h
e
c
o
m
p
o
n
e
n
t
s
a
r
e
b
i
d
d
e
r
s
p
e
c
i
f
i
c
,
t
h
e
s
a
m
e
s
h
a
l
l
b
e
e
l
a
b
o
r
a
t
e
d
b
y
t
h
e
b
i
d
d
e
r
i
n
i
t
s
b
i
d
.
T
h
e
s
e
s
p
a
r
e
s
s
h
a
l
l
h
a
n
d
e
d
o
v
e
r
t
o
t
h
e
P
u
r
c
h
a
s
e
r
a
f
t
e
r
t
h
e
&
p
e
r
i
o
i
s
c
o
m
p
l
e
t
e
d
s
a
t
i
s
f
a
c
t
o
r
i
l
y
.
Notes:
Column4:
InaccordancewithmarginofpreferenceITBClause35,ifapplicable.
DomesticValueAddedcomprisesdomesticlabor,thedomesticcontentofmaterials,
domesticoverheadsandprofitsfromthestageofminingtherawmaterialuntilfinal
assembly.
Column6:
IncoterminaccordancewithITBClause14
CurrencyinaccordancewithITBClause15
Priceshallincludeallcustomsdutiesandsalesandothertaxesalreadypaidor
payableonthecomponentsandrawmaterialsusedinthemanufactureor
assemblyoftheitemorthecustomdutiesandsalesandothertaxesalready
paidonpreviouslyimporteditems.
Column8:
awarded
Name
Inthecapacityof
PayableinthePurchaserscountryifContractis
Signed
DulyauthorizedtosigntheBidforandonbehalfof
Date
ADBKNNLICBProcurementofGoodsandServices
SingleStage:Two
Envelope
Page54of
100
PriceScheduleNo.2.GOODSTOBE
OFFEREDFROMOUTSIDETHE
PURCHASER'S
COUNTRY
NameofBidder_____________________IFBNumber______________Page___
of___
1
Item
4
Description(
asinthe
brochure
attached)
5
6
Country Quantityand
of
UnitOf
Origin
Measurement
8
Unit
price
CIF
(USD)
TotalC
pricepe
item(U
)
4x5
Manufacture,Supply,of
24fullsystem
MultipathTransittime(at
2/3planes)Flowmeasuring
systemwithdatalogging,
transmission,secureenclosure
andpowersupply.
Manufacture,Supply,ofNon
76fullsystem
contactsurfacevelocityRadar
flowmeterwithdatalogging,
transmission,secureenclosure
andpowersupply.
Manufacture,Supply,ofInstrumentsforCrossVerificationandvalidationofflowmeasurements
factorforeverysite.
3.a
ADCPFloatMountedType
1fullsystem
3.
b
HandheldPortableVertical
toplookingADCP.Mounted
onWadingRodsupplied.
3fullsystem
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page55of100
Manufacture,Supply,of
AutomatedfullClimate
Stationwithintegrationfor
datalogging,transmission,
secureenclosureandpower
supply.
6fullsystem
Supply,ofCentralMonitoring
andcontrolStationHardware
andsoftware.Asgivenin
Itemdescriptionin3.3,4.1.5
intechnicalrequirements
SectionVI.
LumpsumAs
giveninItem
descriptionin
3.3,4.1.5in
technical
requirements
SectionVI
GSM/GRPS
CONNECTIVITY
Accessories/dongles/mdems
100sites
100sites
Supplyof5%quantityoffield
installation/sensors,electronic
cards,Electricalequipments,any
specialcables,batteries,signal
transmittingcomponents,GPRS
modem,signalprocessor,etc.
Sincethecomponentsarebidder
specific,thesameshallbe
elaboratedbythebidderinits
bid.Thesesparesshallbe
handedovertothePurchaser
aftertheO&Mperiodis
completedsatisfactorily.
Lumpsum
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page56of100
Notes:
Column5and6:IncoterminaccordancewithITBClause14
CurrencyinaccordancewithITBClause15
Name
Inthecapacityof
Signed
DulyauthorizedtosigntheBidforandonbehalfof
Date
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page57of100
PriceScheduleNo.3.RELATED
SERVICESTOBEOFFERED
FROMOUTSIDEANDWITHIN
THEPURCHASER'SCOUNTRY
NameofBidder_____________________IFBNumber
______________Page___of___
2
3
4
5
Description ( as
in
the brochure
attached)
Quantity
and
Country Unit Of
of
Measurem
Origin
ent
1 to
100 sites
100 sites
Unit pric
in
INR
100 sites
ADBKNNLICBProcurementofGoodsandServices
SingleStage:Two
Envelope
Page58of100
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
100 sites +
6
climate
stations
100 sites
Lumpsum
- as per
3.3,
4.1.5 in
Section VI
100 sites
and
Central
Monitoring
and
operations
center
Page59of100
LUMPSUM
for 100
sites +
Calibration
equipment
s+
6 climate
stations
Notes:
Column5and6:
CurrenciesinaccordancewithITBClause15
Pricesaretobequotedinclusiveofallsales,Serviceandothersimilartaxes
applicableinthePurchaserscountryandpayableontheRelatedServices,ifthe
ContractisawardedtotheBidder
Name
Inthecapacityof
Signed
DulyauthorizedtosigntheBidforandonbehalfof
Date
ADBKNNLICBProcurementofGoodsandServices
SingleStage:Two
Envelope
Page60of
100
PriceSchedule4COMPREHENSIVEANNUAL
MAINTENANCE(60
months)including
watchandward.
NameofBidder_____________________IFBNumber______________Page
___of___
A
C
Item
No
Descriptionofitems
D
Quantity
TotalMaintenancechargesfor5yearsa
inRupeesLumpsumannualcharges.
Year2
Year3
Name
Inthecapacityof
Signed
DulyauthorizedtosigntheBidforandonbehalfof
Date
Notes:
CurrenciesinaccordancewithITBClause15
Pricesaretobequotedinclusiveofallsales,Serviceandothersimilartaxes
applicableinthePurchaserscountryandpayableontheRelatedServices,ifthe
ContractisawardedtotheBidder
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Year4
Page61of100
PriceScheduleGrandSummary
Item
Total
Price1
Foreign
Description
INforeigncurrency
1 TotalPriceScheduleNo.1.
2 TotalPriceScheduleNo.2.
3 TotalPriceScheduleNo.3.
4 TotalPriceScheduleNo.4
TOTAL(toPriceProposal)
InWords
InFigures
Name
Inthecapacityof
Signed
DulyauthorizedtosigntheBidforandonbehalfof
Date
ADBKNNLICBProcurementofGoodsandServices
SingleStage:Two
Envelope
Loc
InIN
Page62of100
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page63of100
BidSecurity
Date:
________________________
ICBNo.:
_____________________
InvitationforBidNo.:
__________
LotNo.:
To:_____________________________________________________________________
Whereas___________________________________________________________________
___________________________________________________________________________
(hereinaftertheBidder)hassubmitteditsBiddated____________________________forICB
No.___________forthesupplyof______________________________________
__________________________________________________________________hereinafter
calledtheBid.
KNOWALLPEOPLEbythesepresentsthatWE_________________________________
of___________________________________________________havingourregisteredofficeat
_________________________________________________ (hereinafter the Guarantor), are
boundunto___________________________________________________
_________________________________________________________________(hereinafterthe
Purchaser)inthesumof________________________________________________
forwhichpaymentwellandtrulytobemadetotheaforementionedPurchaser,theGuarantor
bindsitself,itssuccessors,orassigneesbythesepresents.SealedwiththeCommonSealofthis
Guarantorthis____________________dayof_________________________,_____.
THECONDITIONSofthisobligationarethefollowing:
1. IftheBidderwithdrawsitsBidduringtheperiodofbidvalidityspecifiedbytheBidderin
theBidSubmissionSheet,exceptasprovidedinITBSubClause20.2;or
2. IftheBidder,havingbeennotifiedoftheacceptanceofitsBidbythePurchaser,during
theperiodofbidvalidity,failsorrefusesto:
(1) executetheContract;or
(2) acceptthecorrectionofitsBidbythePurchaser,pursuanttoITBClause
31;or
(3) furnishthePerformanceSecurity,inaccordancewiththeITBClause44.
WeundertaketopaythePurchaseruptotheaboveamountuponreceiptofitsfirstwritten
demand, without the Purchaser having to substantiate its demand, provided that in its
demandthePurchaserstatesthattheamountclaimedbyitisduetoit,
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page64of100
owingtotheoccurrenceofoneormoreoftheaboveconditions,specifyingtheoccurred
conditions.
Thissecurityshallremaininforceuptoandincludingtwentyeight(28)daysafterthe
period of bid validity, and any demand in respect thereof should be received by the
Guarantornolaterthantheabovedate.
Name
Inthecapacityof
Signed
DulyauthorizedtosigntheBidSecurityforandonbehalfof
Date
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page65of100
ManufacturersAuthorization
Date:
ICBNo.:
InvitationforBidNo.:
To:
Name
Inthecapacityof:
Signed
DulyauthorizedtosigntheAuthorizationforandonbehalfof
Date
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page66of100
FormLIT1
PendingLitigationandArbitration
ApplicantsLegalName:...........................................
JV Partner Legal Name: ...............................................
Date:.......................................
IFP No.: ........................................
ICBNo.:......................................
Page
............of...........pages
EachApplicantormemberofaJVmustfillinthisformifsorequiredunderCriterion2.1ofSection3
(QualificationCriteria).
Pending Litigation and Arbitration
Nopendinglitigationandarbitration
BelowisadescriptionofallpendinglitigationandarbitrationinvolvingtheApplicant(or
eachJVmemberifApplicantisaJointVenture).
Valueof
Year
MatterinDispute
Valueof
PendingClaim
PendingClaim
inUS$
asaPercentage
Equivalent
ofNetWorth
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page67of
100
SectionV.EligibleCountries
ListofEligibleCountriesoftheAsianDevelopmentBank
1.
Afghanistan
35.
2.
Armenia
36.
Mongolia
3.
Australia
37.
Myanmar
4.
Austria
38.
Nauru, Republic of
5.
Azerbaijan
39.
Nepal
6.
Bangladesh
40.
Netherlands
7.
Belgium
41.
New Zealand
8.
Bhutan
42.
Norway
9.
Brunei Darussalam
43.
Pakistan
10.
Cambodia
44.
Palau
11.
Canada
45.
12.
46.
Philippines
13.
Cook Islands
47.
Portugal
14.
Denmark
48.
Samoa
15.
49.
Singapore
16.
Finland
50.
Solomon Islands
17.
France
51.
Spain
18.
Georgia
52.
Sri Lanka
19.
Germany
53.
Sweden
20.
54.
Switzerland
21.
India
55.
Tajikistan
22.
Indonesia
56.
Taipei,China
23.
Italy
57.
Thailand
24.
Ireland
58.
25.
Japan
59.
Tonga
26.
Kazakhstan
60.
Turkey
27.
Kiribati
61.
Turkmenistan
28.
Korea, Republic of
62.
Tuvalu
29.
Kyrgyz Republic
63.
United Kingdom
30.
64.
31.
Luxembourg
65.
Uzbekistan
32.
Malaysia
66.
Vanuatu
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page68of100
33.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Automated Water accounting using online volumetric flow meters in KNNL Canals.
2-2 of 69
Page
Calibration ..........................................................................................................
................................
Security and
maintenance ......................................................................................................
...........
Maintenance .......................................................................................................
...............................
Remote connectivity charges on year to year
basis ..........................................................................
3-23
3-23
3-23
3-24
data
425
logging,
..................................................................................................
...................4-25
velocity Radar
flow
..................................................................................................
Canals.
Page 2-3 of
69
Automated Water accounting using online volumetric flow meters in KNNL Canals.
2-4 of 69
Page
Automated Water accounting using online volumetric flow meters in KNNL Canals.
3-5 of 69
3.1.1
Page
Discharge
Introduction
Automated Water accounting using online volumetric flow meters in KNNL Canals.
3-6 of 69
3.1.2
Page
Automated Water accounting using online volumetric flow meters in KNNL Canals.
3-7 of 69
Page
0The system should be open ended and non proprietary, future ready and
easily scalable to accommodate additional features at field level like
gate position sensors, RTUs, Motor start/stop/safety controls, power
controls, relays controls, threshold settings, two way control and
communication, SCADA Software and Human-Machine Interface (HMI) so
as to be upgraded into a SCADA system for automated gate operation in
the future.
3.1.3
SITE VISIT
The scope requires bidders to understand the existing system, the canal
design details, site conditions, canal operational methods and then adapt
the technology and software to suit the existing operational needs. To fully
understand the scope, the local conditions, the operating conditions of the
system to be installed, it is advised that the bidder visit the site and be fully
acquainted with physical canal system and local situations pertaining to the
work. It is the responsibility of the bidder to visit the water delivery network
site at their own cost and risk before quoting and shall study the existing
arrangement of all the operations and the adaptation of system that need
to be deployed, its suitability and feasibility considering the ground reality.
Bidder are also advised study the existing network, the number of sites that
need to be considered for the system to enable efficient water delivery and
operations and also study the need to consider additional requirement for
deploying secure and failure free operations before quoting.
3.1.4
1. Survey & study of the identified sites in the list of all the canal network
where the flow meters, and remote monitoring station has to be
established.
2. Submission of design drawings / specifications for all the components &
civil work for each location.
3. Civil construction suitable for installing flow meters at main canal,
branch canals and the distributaries.
04. Supply, Transportation to site & installation / testing / commissioning of
the telemetric volumetric flow meters, and completing the cabling work,
security system including power supply to the system.
05. Discharge in the Canal must be monitored in real time and correlated to
act as SMS inputs for controlling the discharge at the head regulator.
Discharges into Canal should target complementing the planned water
allocation schedule based on crop-water requirements.
Automated Water accounting using online volumetric flow meters in KNNL Canals.
3-8 of 69
Page
Automated Water accounting using online volumetric flow meters in KNNL Canals.
3-9 of 69
Page
3.1.5
scope ofofthe
O&M included
in the scope
of work:
1. The
Deputation
specialists
and technical
resources
:
1) Specialist Flow meters, Instrumentation and software
2) Technicians Flow meters, Instrumentation and software
3) Field Personnel as per requirement and scale of works involved.
2. Preventive & breakdown maintenance, replacement of
equipments supplied so as to achieve trouble free operation.
all
the
3. Analysis of the demand data & entry of the same into the divisional
monitoring stations after approval of respective authority of KNNL
engineers.(Only in case of emergencies )
4. Submission of the monthly flow performance report to SE, authenticated
by the Executive Engineer.
5. Generation & submission of various reports related to water
management to various administration levels of KNNL up to level of C E
and M.D.
6. Security of the equipments & reporting the failures through vandalism to
respective Executive Engineer with sufficient proofs so as to process
further.
7. Training of KNNL officers for participation in operation of the information
system during the O&M period & after the maintenance period, they
shall be in a position to independently maintain. The complete knowhow
of the instrument operations, the software and hardware operations
shall be included in the training program.
8. The customized application software shall be the property of KNNL. The
same shall be handed over in CDs apart from the installed and
commissioned programs in the Server. The software that requires
licensing from the manufacturer shall be licensed and license certificates
shall be submitted to KNNL.
9. Data backup, data storage and restoration when required, database
administration and software maintenance to ensure continuous data
acquisition, data processing and data dissemination to the users.
Automated Water accounting using online volumetric flow meters in KNNL Canals.
3-10 of 69
Page
Power supply: The entire system will run on suitably planned, with an over
capacity planned considering the heavy seasonal rainfall and cloud cover in
this area. The supply shall include solar panel, intelligent charge controller,
battery, power conditioning, isolaters and protection systems.
Power supply shall be designed with thorough consideration for stable
operation of the system 24x7 for the entire season. Especially, the power
supply to remote telemetry stations shall be carefully designed because
external power supply will not be available.
KNNL ICB Procurement of Goods and Services
Supply
Automated Water accounting using online volumetric flow meters in KNNL Canals.
3-11 of 69
Page
Automated Water accounting using online volumetric flow meters in KNNL Canals.
3-12 of 69
Page
FLOW UNITS
Selectable in the following units:
0- m/s: cubic meters per second - m/h: cubic meters per hour
0- cfs: cubic feet per second - cfm: cubic feet per minute
0- cfh: cubic feet per hour
For the TOTALIZER:
Selectable in the following units:
0- m: cubic meters
0- cf: cubic feet
Reliability
The volumetric discharge monitoring and water accounting system is
required to be designed for continuous day and night operation and shall
be online throughout, particularly in the Kharif and Rabi season. Designers
shall consider the reliability of data acquisition and data receipt
confirmation with necessary checks and identifiers for non receipt of data
to help re attempt closing of data gaps, if any, by automated resending of
data or identifying the missed data and pulling data from the field
instruments. Consideration shall be made during design and installation for
the field instruments to perform continuously for the entire year with
reliable and long lasting power supply(and battery back up) and choosing
the strongest signal strength for good communication from the GSM/GPRS
network provider. For the important functions of the data acquisition, data
Automated Water accounting using online volumetric flow meters in KNNL Canals.
3-13 of 69
Page
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 3-14 of 69
3.2.1
SL.NO
.
Location
Parent
Chainage in
KM
Discharg
e
Type of fllow meter
Protective
Shed
LBC
337.63
3
15.5 ft /se
RBC
2650
1.24 ft3/sec
meter
Main Canal
3 Main canal BRBC
BRBC (GK)
Transit Time.
Transit Time.
191.95
ft3/se
BRBC
meter
BRBC
78.9 95 ft3/sec
Main Canal
BRBC d/s after
6 Main canal BRBC
ABC
Main Canal
7 Main canal BRBC
BRBC R-2
MBC @R-2
DBC @R-2
Transit Time.
At off take of
9 Davanagere Branch Canal
At off take of
8 Malebennur Branch Canal
Transit Time.
Transit Time.
At off take of
10 Harihara Branch Canal
HBC @R-3 on
DBC
11 Harapanahalli Distributory
Harpanahalli
Dist. At off
take
on DBC@R-5
At MBC D/s
after 4th Zone
12 Malebennur Branch Canal
dy
Transit Time.
Branch Canal
At DBC D/s
after
2nd Zone dy
Transit Time.
BRBC
45 ft3/sec
meter
Non contact surface
BRBC
45 ft3/sec
meter
BRBC
50 ft3/sec
meter
BRBC
50 ft3/sec
meter
50-100
ft3/se
meter
15
33
Equipment Type
1
Qty
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 3-15 of 69
3.2.2
Gondhi
Canal
Discharge
in
Distributory/Main
SL.No. Canal
Chainage in
Km
ft3/sec
Protective
Shed
2 Dy-1
3 Dy-2
22.5
24.3
24.7
27
28.8
30
33.8
39.4
44
50.24
53.46
15 Dy-13
54.06
16 Dy-14
55.21
1 Main Canal
4 Dy-3
5 Dy-4
6 Dy-5
7 Dy-6
8 Dy-7
9 Dy-8
10 Dy-9
0.00Km
11 Dy-10
12 Main Canal
13 Dy-11
14 Dy-12
meter
Non contact surface
velocity Radar flow
5.496 meter
0.00KM
5.80 KM
17 Dy-15
18 Dy-16
Distributory/Main
SL.No. Canal
1 Main Canal
2 Main Canal
55.85
56.38
Chainage in
Km
Designed discharged in Cusecs
20 Telemetric Flow
Meter
Equipment Type
1
20
Qty
for
open
20
Section VI, Schedule of
Supply
Automated Water accounting using online volumetric flow meters in KNNL Canals.
3-16 of 69
3.2.3
Page
Location
Parent
KM
ft3/sec
1 Main Canal
UTP
0.15
2 Main Canal
UTP
35
3 Main Canal
UTP
UTP
Main
87.1
5 Main Canal
UTP
118
6 Main Canal
UTP
UTP
Main
156
166.267
Distributory41
Canal
Distributory72
Canal
UTP
Main
Distributory83
Canal
9 Main Canal
UTP
UTP
Main
1 Distributory04
Canal
UTP
Main
1 Distributory15
Canal
108.35
176.89
201.055
176.83
211.035
Protective
Shed
1
11
Equipment
Type
1
2
Qty
6
ope
n
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 3-17 of 69
Dischar
ge
in
Type of Flow
ft3/sec Meter
Non contact surface
velocity Radar flow
63.56 meter
Non contact surface
velocity Radar flow
38.14 meter
Non contact surface
velocity Radar flow
Hadagali Branch
3 Canal
176.58 meter
Non contact surface
velocity Radar flow
40 meter
Multi path 2 plane
Transit
635.67 Time.
Non contact surface
Equipment Type
1
Protective
Shed
Qty
1
7
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 3-18 of 69
3.2.5
Location
Canal Canal Canal Canal -
At Reach 24 KM
At Reach 70 KM to
75 KM
At Reach 104 KM to
106 KM
At Reach 157 KM to
160 KM
Dischar
ge
in
ft3/sec Type of Flow Meter
Multi path 3 plane Transit
4000 Time.
Multi path 3 plane Transit
2978 Time.
Multi path 2 plane Transit
1950 Time.
Multi path 2 plane Transit
1070 Time.
Protective
Shed
1
1
1
1
At Head reach
At Headreach
At Headreach 270570 m
At reach 15700 m
At Headreach 1080
-1500 m
Equipment Type
1
2
Qty
8
ope
n
1
1
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 3-19 of 69
3.2.6
6.
Canal
Location
Basvanna
1 channel
2 Bichal canal
Anagundi
3 canal
4 Belagodahalli
5 Bella canal
6 Kalagatta
upper
7 gangawati
lower
8 ganagwati
9 Hulugi canal
10 Kampli
11 Shivapura
ft3/sec
Meter
Non contact surface
velocity
Protective
Shed
12 Ramasagar
84
13 Deshnur
33
14 Raya
15 Sirugppai
16 Turtha
259
56
119
Equipment Type
Non Contact Surface Velocity
Radar for
open canals.
Qty
16
Section VI, Schedule of
Supply
Automated Water accounting using online volumetric flow meters in KNNL Canals.
3-20 of 69
Page
Automated Water accounting using online volumetric flow meters in KNNL Canals.
3-21 of 69
Page
3.3.1
Canals.
Page 3-22 of 69
Table 7.
EE Upper
Tunga
EE
EE
Vijayanaga EE- Tungabhdra
Singatalur r
Canal
Project
Division
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
tabular forms on
large
screen.
Large screen
which can
show a single
canal
network at a
time,
zooming into the
stations, subdivsions
and divsions.
Computer with
local
storage capacity
Servers with
large
storage capacity,
redundancy back up
plan and
archiving
facility
Operators of
application
software for
planning,
real time data
acquisition and
control,
system
administrator
staff for 5 years,
Joint
handling of the
function
with KNNL
officers.
Interface with all
office
for first level user
support, actions,
maintenance,
complaints, etc..
Planning /
monitoring
server, SMS
communication
softwares and
field
complaint
assistance to
all users of KNNL
Internet facility
with up
to 4 Mbps
broadband
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
facility 25 GB
capacity/month .
Internet facility
with
upto 2 Mbps
broadband
facility with 10
GB
capacity/month
UPS for computer
and
modem. 30 hours
full
running back up.
Automated Water accounting using online volumetric flow meters in KNNL Canals.
3-23 of 69
Page
3.4 Calibration
After the initial tests and during the commissioning stage itself, all flow meters
should be field calibrated with reference to a float mounted ADCP which uses
Acoustic Doppler current profiler velocity profiling and area determination method,
in the main canal with a minimum of 10 transects(bank to bank) and a handheld 2
beam ADCP in the branches and distributories with clear 10 different readings at
each site covering the normal flow range. All such calibration reference instrument
readings and the installed volumetric discharge system readings are to be formally
recorded and submitted for verification by the KNNL officer in charge at site. The
KNNL officer in charge will witness the calibration activity and will record the same
in the measurement book for certifying the commissioning of the flow meters.
3.6 Maintenance
For stable data acquisition over years, the system should have a preventive
maintenance schedule. A year-on-year comparison of data will lead to
improvements eventually.
Preventive maintenance consists of daily inspection, periodical inspection
and exchange of parts. Daily inspection is to check whether the entire
Automated Water accounting using online volumetric flow meters in KNNL Canals.
3-24 of 69
Page
Automated Water accounting using online volumetric flow meters in KNNL Canals.
4-25 of 69
4 TECHNICAL SPECIFICATION TO
SUBMITTED WITH TECHNICAL BID.
Sl.
no
Multipath
COMPLIED
Item
4.1.1
BE
Trans
it
Flow
measuri
ng
syste
wit
m
h
loggin
data
g,
transmission
,
secur
e
velocity and the mean cross-sectional velocity. If the
measured
enclosur
e
and
power
velocity at a single elevation is not sufficient to
supply.
establish this
relation, measurements at more elevations can be
carried out.
The resulting samples of flow velocity can be
vertically integrated
to provide an estimate of mean cross-sectional
velocity.
Discharge calculation also requires the crosssectional area of the
water to be known. An ultrasonic Transit-Time
Page
AND
system will,
therefore, normally be capable not only of making
sample
measurements of velocity, but also of determining
(or accepting a
signal from some other device determining) water
depth, and of
storing details of the relation between water depth
and crosssectional area. It will also normally be capable of
executing the
mathematical functions necessary to compute flow
from the
relevant stored and directly determined data.
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-26 of 69
accuracy.
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-27 of 69
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-28 of 69
Canals.
Page 4-29 of
69
Temperature
Full
scale/deg
ree
Long Term Stability: 0.1% Full Scale and should ensure long term
stability without any field calibration requirements. 0.1% / year 3mm
for 30m range
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-30 of 69
pressure-sealed up to 50 bar
GSM/GPRS MODEM.
Transmits data from the data logger at scheduled
time, set limits or on events.
GSM/GPRS modem and antenna in one single housing.
GSM/GPRS system compatibility: the GSM/GPRS
system shall be standard quad-band and completely
compatible with the systems in service in Karnataka
state.
The data transfer must be possible by GSM
(standard) and GPRS communication depending on
coverage and availability, 850, 900, 1800 and
1900mhz (quad band),
The system must offer an integrated alarm
management
system
(definition
of
different
parameter limits) for >7 thresholds for automatic
alarming in case of reaching a freely predefined
threshold for each channel. Actions of system
according to action plan and communication ways,
settable at site or remotely.
An alarm notification must be sent via sms to
concerned phone numbers and to the central
monitoring station.
0 over the air configuration facility shall be
compulsory, to ensure remote configuration
from a central station.
0 for remote up gradation and administration
management ( all control and set up options,
data download and programming
of data logger will also be done by online GSM/GPRS
communication)
GSM/GPRS modem reset
continuity of transmission.
function
to
ensure
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-31 of 69
In
the
field
Configuration
Via
smartphone/Tablet/Laptop /PC and direct by the field
key board.
ENCLOSURE
All equipments shall be housed in a single dust proof,
rain proof, insect, reptile proof enclosure to protect
all equipments on the ground and only the sensors,
antenna and solar power cables shall enter the
enclosure via appropriate glands or connectors.
Drawings of the same shall be provided in the
technical sheets or data sheets.
Appropriate earthing facilities shall be done as per IS
specification.
The installations should be robust and should be
protected from harsh environmental conditions like
extreme heat, rain, flood, dust and humidity.
The field enclosures shall be installed in such a way
that it should be protected from casual attacks and
vandals.
The installations should offer no direct access to any
material to be yanked or pulled or ripped off easily.
All wirings should be protected by running it
underground and covering it flush to the surface or
running it along the installation with proper harness,
ties and clamps.
Solar panels must be secured against strong winds
and accumulation of water and dust over long
period. Should be tilted for optimum sunshine.
Protections grill for the solar panel.
Mount the sensors on the canal bed or wall with
proper mountings and security provisions during dry
periods.
Make only narrow cuts in canal bed and wall, to run
the cables from the sensors to the foundation of the
panel/enclosure which houses all the electronics.
Finish the cut flush with the bed and resistant to water
flow.
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-32 of 69
wrong
connection
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-33 of 69
and
Execution of works
CONTRACTORS SERVICE
The contractor is to provide only a factory trained,
licensed and experienced service technician for
start-up testing, commissioning in accordance with
the general requirements specified in the other
sections.
Provide training service to the officers as detailed in
other section of this document.
The suppliers on site service shall include training
course for the user, installation supervision,
configuration and setup program, parameter
determination, and setting into operation and
commissioning.
Provide site calibration and setup report with all
actual dimensions.
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-34 of 69
INSTALLATIONS
Follow manufacturer's installation and calibration
procedures.
All wetted material shall be corrosion resistant.
The Flow Monitor supplier to supply all materials
except wall anchors and anchor bolts.
Velocity and level sensors shall be pre-mounted on
sensor mounting plate by flow monitor supplier.
Sensor cable shall be attached to back of the mounting
plate.
Sufficient sensor cable length to be coiled loose to
permit removal of sensor mounting plate from the
channel for inspection without disconnecting
sensors.
Mounting hardware shall be 316 stainless steel and
supplied by the flow meter manufacturer.
Provide Manufacturer specified cables from sensors
to flow transmitter.
TRAINING
The Vendor shall submit training instructions in
accordance with
Sections of the tender documents.
The Vendor shall conduct training sessions for the
system operating personnel to instruct the staff on
the proper operation, care, and maintenance of the
equipment and systems supplied under this contract.
The manufacturer shall provide a qualified service
engineer to inspect the completed installations for
lubrication, alignment, free operation and proper
control, and to instruct operations personnel in the
proper operation and maintenance of the units. At
least Five (5) days of field service shall be provided.
Training shall include both classroom and field
training.
OPERATION AND MAINTENANCE MANUALS
Submit Operation and Maintenance Manuals, and
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-35 of 69
tender documents.
Name, address, and telephone number of the
nearest competent service representative who can
furnish parts and technical service.
Descriptive
literature,
including
illustrations,
covering the operational features of the equipment,
specific for the particular installation, with all
inapplicable information omitted or marked out.
Operating, maintenance and troubleshooting information.
Complete maintenance parts list.
Complete connection, interconnecting and assembly
diagrams.
Approved shop drawings complete with electrical
information.
VENDOR WARRANTY
For Product Warranties, refer to the Sections of the
tender documents and the following:
The equipment shall be free from defects in design,
workmanship or materials.
In the event a component fails to perform as
specified or is proven defective in service during the
warranty period, the manufacturer shall promptly
repair or replace the defective part at no cost to the
owner.
In the
canal
4.1.2
Non
flow
meter
with
data
loggi
ng,
transmission
,
enable easy removal just before the canal stoppage or remounting just after starting the canal.
It is necessary
the
meters shall
designed
that
flow
be
for
continuou operati
s
on
witho
ut
any
stoppage
and
repeated
secur
e
enclosure
and
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-36 of 69
24 GHz
Accuracy:
Canals.
Page 4-37
of 69
12 24 V DC
max. 200mA
0.35 to 8
m (1,2 to
26 ft)
Accuracy:
Output:
Power supply:
12 - 24 VDC
Process temperature: -30 to 90C (-22 to
+194F)
PP, PVDF or
Material:
PTFE
Ingress protection: IP 68
ENCLOSURE
All equipments shall be housed in a single dust proof,
rain proof, insect, reptile proof enclosure to protect
all equipments on the ground and only the sensors,
antenna and solar power cables shall enter the
enclosure via appropriate glands or connectors.
Drawings of the same shall be provided in the
technical sheets or data sheets.
Appropriate earthing facilities shall be provided as
per IS standards.
The installations should be robust and should be
protected from harsh environmental conditions like
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-38 of 69
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-39 of 69
wrong
connection
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-40 of 69
Execution of works
CONTRACTORS SERVICE
The contractor is to provide only a factory trained,
licensed and experienced service technician for
start-up testing, commissioning in accordance with
the general requirements specified in the other
sections.
Provide training service to the officers as detailed in
other section of this document.
The suppliers on site service shall include training
course for the user, installation supervision,
configuration and setup program, parameter
determination, and setting into operation and
commissioning.
Provide site calibration and setup report with all
actual dimensions
INSTALLATIONS
Follow manufacturer's installation and calibration
procedures.
All wetted material shall be corrosion resistant.
The Flow Monitor supplier to supply all materials
except wall anchors and anchor bolts.
Velocity and level sensors shall be pre-mounted on
sensor mounting plate by flow monitor supplier.
Sensor cable shall be attached to back of the mounting
plate.
Sufficient sensor cable length to be coiled loose to
permit removal of sensor mounting plate from the
channel for inspection without disconnecting
sensors.
Mounting hardware shall be 316 stainless steel and
supplied by the flow meter manufacturer.
Provide Manufacturer specified cables from sensors
to flow transmitter.
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-41 of 69
TRAINING
The Vendor shall submit training instructions in
accordance with
Sections of the tender documents.
The Vendor shall conduct training sessions for the
system operating personnel to instruct the staff on
the proper operation, care, and maintenance of the
equipment and systems supplied under this contract.
The manufacturer shall provide a qualified service
engineer to inspect the completed installations for
lubrication, alignment, free operation and proper
control, and to instruct operations personnel in the
proper operation and maintenance of the units. At
least Five (5) days of field service shall be provided.
Training shall include both classroom and field
training.
OPERATION AND MAINTENANCE MANUALS
Submit Operation and Maintenance Manuals, and
data covering each item of equipment, in accordance
with Sections of the tender documents.
Name, address, and telephone number of the
nearest competent service representative who can
furnish parts and technical service.
Descriptive
literature,
including
illustrations,
covering the operational features of the equipment,
specific for the particular installation, with all
inapplicable information omitted or marked out.
Operating, maintenance and troubleshooting information.
Complete maintenance parts list.
Complete connection, interconnecting and assembly
diagrams.
Approved shop drawings complete with electrical
information.
VENDOR WARRANTY
For Product Warranties, refer to the Sections of the
tender documents and the following:
Cana
ls.
Page 4-42
of 69
or materials.
In the event a component fails to perform as
specified or is
proven defective in service during the warranty
period, the
manufacturer shall promptly repair or replace the
defective part
at no cost to the owner.
After the installation of the flow meter and initial
tests and during
the commissioning stage itself, all flow meters should
be field
3
4.1.3
calibration
factor for
every
sit
e.
Instruments
for
Cross
Verification
an validatio
d
n
o
f
flow
measuremen
ts
t
o
arrive at
locations.
Ease of use easy to carry, easy to deploy, and easy to
operate; just
Usi
ng
ADC
P
wit
h
Float
mounted
a larg canal
t
e
s
0.7 mete
>
5
rs
depth.
sectional shape and improved characterization of slopes
and irregular
river beds
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-43 of 69
Type
Description
Float mounted, Acoustic Doppler
Current
Profiler (ADCP) for the highaccuracy
measurement of water flow, level
and
Qt
y
Locations
ADCP - Boat
Mounted
Type
Handheld Portable
Vertical top looking
2 ADCP.-
Mounted on Wading
Rod
supplied.
rainguard.
The laptop should have a a
software that
Canals
.
Page 4-44 of
69
2cm to 5m (automatic
Cell size: selection)
Bottom Tracking
specification:
Velocity
range:
9m/s
Depth
range:
0.4m to 100 m
0.25%
relative
Accuracy
of
bottom velocity to
2mm/s
ADCP,
Resolution
1mm/s
Depth Measurement
specification:
Range :
0.3m to 100m
1% (with uniform water temperature and
Accuracy salinity profile)
Resolutio 1m
n:
m
Internal
16M
memory:
B
Communications Standards: RS-232, Bluetooth,
200m range
Power:
Input
voltage
10.518V DC
Power
consumption
1.5W typical
Battery
12V, 7A- minim lead
gel
(inside
float)
hr
um
acid
cell
(rechargeable) with battery charger provided as part of the
package.
Battery
>40 hrs continuous
capacity
operation
Float/Boat
(included)
Configurati
on
Material
Weight
Three hulls
(trimaran)
Polyethylene
10kg bare; 17kg with instrument and
battery
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-45 of
69
provide
should be possible
distribution.
in
the
vertical
2-D Velocity
Meter Velocity
range 5 m/s
KNNL ICB Procurement of Goods and Services
of Supply
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-46 of 69
IP 68 ingress protection.
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-47 of
69
4.1.4
Automatic full
climate
stations
Precipitation
Wind direction
Wind velocity
Air temperature
Air humidity
Atmospheric pressure
Radiation
contact)
Tipping bucket material: Heavy duty plastic.
Bird protection - to prevent any interference of
Combined Ultrasonic
Wind Direction Sensor /
Wind Speed Sensor
Output frequency: 1, 2, 4Hz
outputs per second.
Section VI, Schedule
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-48 of 69
m/s
resolution 1
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-49 of
69
4.1.5
Monitoring
and
Control
Station
Hardware
and
software.
Central
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-50 of 69
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-51 of 69
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-52 of 69
between the field devices and the centrally hosted web based
software.
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-53 of 69
4.1.5.1
Computing
hardware and Internet connection during the contract period for 5 years.
associated
accessorie
s.
To run the central control and monitoring station, with redundancy and 24/7
operation without fail. All
necessary antivirus, necessary softwares, power, data back up facility. Servers &
Workstation +
displays. Based on zonal office instructions, one appropriate office will have a
control room type display
and information dissemination mechanism through computers.
The system shall have the built-in flexibility to permit easy configuration in
accordance with the specific
end user requirements, as well as quick and easy modification by the end user in
the field.
Supported on the latest Microsoft Windows Server and WebClient systems.
The KNNL office will have a central monitoring station.
There will be a large display panel to depict the entire canal along with the live flow
data VS the
planned data.
The display will provide the live water accounting from head to the tail of the canal
network.
EEs office will have a large display panel with necessary inputs coming from the
PCs which are
connected to the
internet.
The facility should have power back up for continuous running.
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 4-54 of 69
softwares source
KNNL ICB Procurement of Goods and Services
Supply
Automated Water accounting using online volumetric flow meters in KNNL Canals.
55 of 69
Page 4-
code to KNNL at the end of the maintenance period so that it could be used for
further improvement of the system.
4.1.6
All sites will have a shed 1.5 sq meters in external dimension, 2 meters in height,
with foundation,
concrete flooring, and RCC slab. Steel door + locks + to prevent unauthorized /
forced entry.
The protection features for the power supply and electronics should also include
protection against over
voltage, over load, wrong polarity and lightning. The instruments should have proper
protection against
insects, lizards, reptile, birds, pest gaining entry, protection against humidity and
dust is a must.
01. The room should have proper ventilation but dust/ insects / entry should be avoided
to fullest
possibilit
y.
02. Solar panels should not be visible for a person standing outside the room.
03. Solar panels should be fitted to the roof in such a way that the same should not be
easily
removed by
vandal.
04. Entry to the room should be difficult for vandals by making the walls & structure
sufficiently
strong.
05. Sufficient lighting to be provided from insider & outside. Outside lighting
should be
automatically operated with an infra red movement switch.
4.2 Survey of
site,
Site
Installations
Design
Drawing
s,
Shed
Design
& captured.
Drawing
s,
Power
senso
supply,
r The work includes Design and drawings of
cables laying
Shed along with cable entry and exit
drawing
s,
structur
e
drawing
s,
Civil
Power supply AC / DC
Site
Signal
cables
Automated Water accounting using online volumetric flow meters in KNNL Canals.
56 of 69
cro
ss
Page 4-
Enclosures
section
measurement
Protection, cabling and earthing.
distributary.
and
dat
a
verificatio pla
n,
n
dat
a
collection,
Documentatio
n
sig
and n
off by
concern
ed
officers
in
circle
office.
4.3
Installation
of and on the
flow meters
work
aft taki
er
ng
the
material t
s
o the
relevant sites
Complete turnkey installation with all manpower, machines, tools, labour, transport,
accommodation, material storage, rent. Ensuring proper installation against vandalism,
should be robust and to sustain long term operations. Includes all electrical,
instrumentation, electronics, software, hardware, safety, mechanical installation. Civil work
including underground conduit laying, sensor bed foundation and instrumentation mount
foundation. Painting and finishing the installation site and consumables. Underground pipes
of necessary lengths, digging & pipe laying, covering and finishing the bed and slope lining.
Sensor mounting plates + anchor bolts (corrosion resistant) Sensor mounting plates on the
bed and or slope of the canal, non degradable, non corrosive and chemical proof. Reputed
Anchor bolts of SS.
Solar panel grill for protection on both upper and bottom side with clamps and bolts
with stand for tilt to the south direction.
Underground pipes from bed mounted sensor to the panel + time of flight will have to be
complete for each site, and considering 3 path the same should be assessed by the bidder.
Put together each installation will have all the cables running through underground
conduits/pipes.
The contractor shall arrange own Construction tools, consumables, water, power, machines,
Manpower, transport, fuel, communication equipment, etc during the contract period.
Consumables include construction tools, construction material, cutting material tools, pipes,
water sealants, water, power, etc.
Automated Water accounting using online volumetric flow meters in KNNL Canals.
57 of 69
Page 4-
The supplier shall arrange necessary expertise, materials, and manpower in all locations of
the installation.
The supplier shall arrange Secure the sensors with fabricated frame. Frame will be
embedded in canal bed and finished; Care should be taken not to obstruct water flow and
turbulence. Mount the sensors on the canal bed or wall with proper mountings and security
provisions during dry periods.
Make only narrow cuts in canal bed and wall, to run the conduits carrying the cables from
the sensors to the foundation of the panel/enclosure which houses all the electronics. Finish
the cut flush with the bed and offers no resistant to water flow.
Securing the electronics panel/enclosure to protect against vandalism, theft or break in
during the flow seasons and also the dry seasons.
There should be sufficient design, fabrication work, and if necessary civil work ( foundation,
secure room, etc) to be carried out to prevent and alert if any attempt is made to break /
sever / disconnect / damage the equipments which results in no-power or no-signal or nodata situation.
All connections should be via cable trays, cables ends should have proper lugs, connectors,
terminal blocks, earthing, cable ties, no loose wires and loose taping to be found.
There should be a Pouch attached to the inside of the enclosure with small spares, screws,
bolts, nuts, connectors, wires, fuses, drawings, instruction manuals, etc.
Desiccant containers should be used to prevent moisture damaging the sensitive
electronics.
All screws, bolts, nuts should be of stainless steel.
Cable glands and sealing should be used where the cables enter and exit.
Ensure, rats, snakes, bees, insects, water dust, and rain does not enter the enclosure.
The team deployed for the works should consist of the following engineering experience.
Civil, Mechanical, Instrumentation, Software.
The team should be well connected and available always for the KNNL Engineers to reach
and interact. Their names and phones numbers shall be updated and provided to the
concerned sub-divisions, divisions and circle office.
The Contractors engineers shall be available, should be able to reach places on the KNNLs
canal network quickly and well connected to provide any details, photographs,
demonstration, changes in configuration, remote video calls and access to machines at any
given point in time.
The contractors site office will be located at logistically convenient and central location. All
inventories shall be recorded and inventory made available from the central stores.
10
Canals.
Page 4-58 of 69
Description
at and is
layered into Zones, Circles, Divisions
and Subheadquart
softwar
ers
on
e Divisions.
operations/configurati
ons.
It is necessary to train the specific units
based on:
What to do with the data as relevant to the
Training the HQ, divisional and users, the
way to use reports, the alarms, threshold
levels, the
substa
divisional
ff
on the deviations, forecasts and analysis.
equipments and data
use.
0 Making changes to user access, roles, organization structure, transfer of users and
jurisdiction.
0 The Engineers will be trained on how to generate reports in case manual report
generation and submission is required. Setting of automated distribution or
submission of reports based on the
Automated Water accounting using online volumetric flow meters in KNNL Canals.
59 of 69
Page 4-
4.5
11
TELEMETRY
GSM/GRP
S
an
d
Sl.
No.
Requirem
ent
Type
Canal
s.
Page 5-60 of 69
an Servic
d
e Description
12
preventive,
corrective,
This requires onsite
spares period
cleaning or
and
ic
checks.
maintena servic
nce
e
for a period of 60
MAINTENANCE
months.
(60
months)
includin watc
g
h
and
ward.
paid under maintenance charge on monthly basis to the service provider and
ensure that the connectivity is always established 24 x 7.
The maintenance work also includes, identifying the Failure of SIM card,
replacement of SIM and restarting of the field electronics.
necessary.
Field Engineers at site: The field engineers have to respond to the on-off
season, the continuous calls from AEs and AEEs on the instrument not
responding, no data from the software or instruments, wrong data transmission
or instruments being hampered by vandals, etc. The engineers shall respond to
complaints of abnormal readings, so that they reach the sites and clear
KNNL ICB Procurement of Goods and Services
Supply
Automated Water accounting using online volumetric flow meters in KNNL Canals.
61 of 69
Page 5-
the sensors or a regular cleaning of the electronics box and the wire
connectors.
Field Engineers phone number and stay location along with address is
communicated appropriately to all concerned officer for them to access when
required.
Annual maintenance of the hardware, accessories, and software supplied shall
have to be under
annual maintenance contract during the warranty period and for at least 5
years after successful
installation and commissioning. This should include preventive, corrective and
calibration
maintenance activities, deploying staff at the site, and spares supply in order to control and
minimize downtime and maximize data availability on a continuous basis.
Such as:
0Spares of equipments/items equivalent to 5% of the item value will be
stocked as spares and will be the responsibility of the vendor during the
beginning of maintenance period of 5 years and the required tools and
manpower are to be deployed for immediate resolution of problems if any.
0The maintenance team shall have three (3) dedicated mobile phone
numbers, in order to reach the maintenance team during emergency or a
breakdown. The phones should have good 5 mp main camera for taking
pictures and for documentation purpose and front camera for video
conversation and remote assistance. Should have the necessary
connection to enable video calls.
0Photographic evidence of all work completed, damages, replacements or
service works carried shall be submitted immediately in electronic and
paper form to the concerned officer incharge.
0At the field level: cleaning the field sensors, fixing any electrical, electronic
and software issues or problems immediately without impacting the water
delivery operations.
0Providing the required manpower and maintenance tools, procedures, and
expertise for immediate resolution of problems if any.
0Round the clock support to be available at the location near to the
installation.
0Issues shall be fixed within 48 hours normally and if there are critical
issues, the issue will be fixed within 24 hours complete with replacement
of parts if necessary.
0Breakdown issues will be categorized as major or minor based on the
corrective actions required. Major issues will be closed within 48 hours and
minor within 24 hours. The criticality of the issue on the operations shall
be assessed and categorized as critical and no-critical based on the impact
on water delivery operations. The critical issues will be reported to the
sub-division and divisional heads.
0The maintenance schedule for preventive and calibrations has to be
maintained by the contractor and adhered to, in concurrence with the subdivision and divisional heads.
antennas, the batteries and damages to the enclosure units. All of this requires
continuous replacements.
Signal cables: All the sites shall have underground signal cables and no cables
will be exposed or seen running between the sensors and the electronics. If
exposed or damaged the same shall be
KNNL ICB Procurement of Goods and Services
Supply
Automated Water accounting using online volumetric flow meters in KNNL Canals.
62 of 69
Page 5-
Regular Checks: The sensors and the electronics shall send signals of
vegetation or weed growth or disturbance caused due to debris settling near the
site. This requires maintenance personnel to go to the site and physically clear
the debris in order to let the sensors work in proper manner. In some cases, the
sensors and electronics may stop sending signals, this happens if there is
damage to the antenna that sends and receives signals, or battery is not
charging due to cloudy sky, or vandals have broken open and stolen the battery
or the sensor itself has been damaged by vandals or stolen.
for
additional
data
capturing
and
Automated Water accounting using online volumetric flow meters in KNNL Canals.
63 of 69
Page 7-
interference.
0 Preventive and breakdown maintenance of computing hardware uninterrupted
power supply.
0 Regular data back up and securing data.
On the server software, changes in SMS receiving mobile numbers, new number
addition, deleting old numbers are part of the work.
Internet connection at the server end: The data from the field stations arrive
to the server via the server internet connection. Further the server also allows
users to access the application, the data and the reports via the internet. This
internet connection has to be of high bandwidth and reliable too, running under
observation 24x7. Any stoppage will create further cascading issues which again
has to be brought back to normal condition by the system administrators.
SMS: The SMS sent to AEs, AEEs, EEs and the higher officers is through a SMS
service provider, this is an independent agency which has to be paid on monthly
basis.
6 Warranty
1. Unless otherwise stated to the contrary, all equipment supplied
shall have warranty against Manufacturing Defects for a period
of 12 (Twelve) Months, after having been delivered to and
accepted at the final destination as indicated in the GCC 28.3
and SCC. Any part of the equipment that may become defective
or does not perform according to the Specifications as offered
within the warranty period shall be repaired or replaced free of
charge.
2. The warranty shall not cover repair and/or replacement of the
Instruments/Systems due to vandalism, theft or other damages
due to natural disaster or Act Of God.
3. The software/Hardware product should be under warranty for
five year from the date of supply and installation.
4. The Supplier shall provide necessary Software updates free of
cost during the warranty/guarantee period.
7 Spares to be supplied
Supply of 5% quantity of spares. The bidder should submit spares of all the
supplied equipments, with minimum stock of spares for Transit time, Non contact
type Surface velocity flow meter, at any given
KNNL ICB Procurement of Goods and Services
Supply
Canal
s.
Page 9-64 of 69
point in time during the contract period, and shall be t the employer at
submitted o the
commencement of O&M period. All accessories such as solar panel, cables,
connectors, DC-DC converters, Batteries, Telemetry system, modems, converters,
lugs, fuses, switches, controls, relays, protection isolators, antennas, brackets,
mounting accessories, etc shall also be available to make a quick replacement in
case of any of those are found to be not functioning or underperforming. The
bidder should hand over same number of spares in working condition to KNNL at
the end of O&M Period. Since the components are bidder specific, the same shall
be elaborated by the bidder in its bid.
8 Insurance to be submitted
As per Insurance coverage rules of Machineries and Equipments and as per normal
tender Condition for irrigation projects in Karnataka - The Contractor shall provide
necessary insurance in terms approved by the Employer to cover the installations in
the joint names of the Employer and the Contractor and a copy/copies of the
policy/policies shall be furnished to the Employer within one month from the award
of the Contract.
A insurance for the complete installations including the flow meters, electronics,
power supply equipment, telemetry, sensors, cables, and other items, which forms
part of the commissioned installation housed in the security shed equipped with
locking-unlocking facility, as well as the sensors and cables exposed outside.
The insurance shall cover the risks of vandalism, theft, damages due to canal breach,
canal bank collapse, natural disaster, etc.
All thefts and vandalism shall be detected immediately with the safety measure
taken and communicated to the concerned officers. The watch and ward shall protect
the installations against vandalism and thefts.
9 Drawings/data
The Contractor shall submit the following drawings/Data :
1. Foundation drawings indicating the cable entries, cable trenches,
foundation bolts etc.
2. Schematic diagram of the complete measurement, data logging,
transmission, and updates in the software database system.
3. Detailed schematic diagrams of all protection and security features.
4. Cabling and wiring diagram cubicles and interconnections between the
electronic components or device. Ferrule numbers, device numbers,
grouping for cable take offs etc., shall be distinctly shown.
5. Dimensional outline diagram and special mounting arrangement if any,
of each type of device or electronic component.
6. Individual internal wiring diagram of all devices and elementary wiring
diagram for internal wiring.
Automated Water accounting using online volumetric flow meters in KNNL Canals.
10-65 of 69
Page
Automated Water accounting using online volumetric flow meters in KNNL Canals.
10-66 of 69
Page
Supply
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 11-67 of 69
Description
Quanti
ty
of Goods
(Durati
on
months
,
or
Related Services
As per Section VI
Schedule
of supply.
The supply of all the
materials
Delive
ry
Sched
ule
Locatio
n
(Maximu
m
Completion
in distance
in Date
kilomete
Relat
rs
from the for
ed
cumulative)
100
signin
g
the
the relevant
Divisions/Subcontra
ct
Divisions, covering
the items
document.
7 and 8 shall be
completed.
port of
Entry
India)
Servic
in es
Delive Sha
ry
ll At site to the 29-Mar-2017
be
Respec
completed tive
SubDivisio
within
24 ns
and
month
Divisio
s
of ns.
in the schedule of
supplies to
Requi Arriva
red
l
radia Date of
l Goods or
As per Section VI
Schedule
All
Sites
of supply.
In the sites which
have canal
lining or sites with
stable
Sites
shall
At the Field
be sites and
29-Mar-2017
thos ar prepare an Cent Monitorin
d ral
g
e
e d
comple
and
control
read
stations.
y
in ted
All
pe
Upp
within
24 sites
as
r
er
Tung
a
months
lengt
th good
hs,
e
s
servic as
es
described
Section VI in of Upper
Bha
Tung
Bha
/ dra
and dra
/ signing the a
in Tungab
the ha
contrac
Tungabhadra /
t.
SLIS.
sectio 4.1. 4.1.2 4.1.3 dra /
n
1,
,
, SLIS.
pe
As
r Within
Comm month
un
s
signin
ication g
fro
contra
m
ct.
Engine
er
InCharge
.
Sit
es
in
Gondhi
an
d
Vijayan
a
gar
a
Canals.
Canals.
All balance
24 locations
of
the
Page 11-68 of
69
29-Mar-2017
Automated Water accounting using online volumetric flow meters in KNNL Canals.
Page 11-69 of 69
Drawings to be attached
Supply
Page69of100
SectionVII.GeneralConditionsofContract
TableofClauses
1.
............................................................................................................................................
Definitions....................................................................................................................... 71
2.
............................................................................................................................................
ContractDocuments.................................................................................................... 72
3.
............................................................................................................................................
CorruptPractices..........................................................................................................72
4.
............................................................................................................................................
Interpretation.................................................................................................................73
5.
............................................................................................................................................
Language......................................................................................................................... 74
6..........................................................................................................................................Joint
Venture,ConsortiumorAssociation.......................................................................75
7.
............................................................................................................................................
Eligibility......................................................................................................................... 75
8.
............................................................................................................................................
Notices.............................................................................................................................. 75
9.
............................................................................................................................................
GoverningLaw..............................................................................................................75
10.SettlementofDisputes........................................................................................75
11.ScopeofSupply.................................................................................................... 76
12.Delivery...................................................................................................................76
13.SuppliersResponsibilities................................................................................76
14.PurchasersResponsibilities.............................................................................76
15.ContractPrice.......................................................................................................76
16.TermsofPayment................................................................................................77
17.TaxesandDuties.................................................................................................. 77
18.PerformanceSecurity.........................................................................................77
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page70of100
19.Copyright................................................................................................................78
20.ConfidentialInformation...................................................................................78
21.Subcontracting.....................................................................................................79
22.SpecificationsandStandards............................................................................79
23.PackingandDocuments.....................................................................................80
24.Insurance................................................................................................................80
25.Transportation.....................................................................................................80
26.InspectionsandTests..........................................................................................80
27.LiquidatedDamages............................................................................................82
28.Warranty................................................................................................................82
29.PatentIndemnity..................................................................................................83
30.LimitationofLiability.........................................................................................84
31.ChangeinLawsandRegulations.................................................................... 84
32.ForceMajeure.......................................................................................................84
33.ChangeOrdersandContractAmendments.................................................85
34.ExtensionsofTime...............................................................................................86
35.Termination...........................................................................................................86
36.Assignment.............................................................................................................87
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page71of100
1.Definitions
1.1Thefollowingwordsandexpressionsshallhavethemeanings
herebyassignedtothem:
(a)
ContractmeanstheAgreemententeredintobetween
thePurchaserandtheSupplier,togetherwiththe
ContractDocumentsreferredtotherein,includingall
attachments,appendices,andalldocumentsincorporated
byreferencetherein.
(b)
ContractDocumentsmeansthedocumentslistedin
theAgreement,includinganyamendmentsthereto.
(c)
ContractPricemeansthepricepayabletotheSupplier
asspecifiedintheAgreement,subjecttosuchadditions
andadjustmentstheretoordeductionstherefrom,asmay
bemadepursuanttotheContract.
(d)
Daymeanscalendarday.
(e)
DeliverymeansthetransferoftheGoodsfromthe
SuppliertothePurchaserinaccordancewiththeterms
andconditionssetforthintheContract.
(f)
CompletionmeansthefulfillmentoftheRelated
ServicesbytheSupplierinaccordancewiththeterms
andconditionssetforthintheContract.
(g)
EligibleCountriesmeansthecountriesandterritories
eligibleaslistedinSectionV.
(h)
GCCmeanstheGeneralConditionsofContract.
(i)
Goodsmeansallofthecommodities,rawmaterial,machin
eryandequipment,and/orothermaterialsthattheSupplieris
requiredtosupplytothePurchaserundertheContract.
(j)
PurchasersCountryisthecountryspecifiedin the
SpecialConditionsofContract(SCC).
(k)
PurchasermeanstheentitypurchasingtheGoodsand
RelatedServices,asspecifiedintheSCC.
(l)
RelatedServicesmeanstheservicesincidentaltothe
supplyofthegoods,suchasinsurance,installation,
trainingandinitialmaintenanceandothersimilar
obligationsoftheSupplierundertheContract.
(m)
SCCmeanstheSpecialConditionsofContract.
(n)
Subcontractormeansanynaturalperson,private or
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page72of100
governmententity,oracombinationoftheabove,
including
itslegalsuccessorsorpermittedassigns,towhomanypart
oftheGoodstobesuppliedorexecutionofanypartofthe
RelatedServicesissubcontractedbytheSupplier.
(o)
Suppliermeansthenaturalperson,privateorgovernment
entity,oracombinationoftheabove,whosebidto
performtheContracthasbeenacceptedbythePurchaser
andisnamedassuchintheAgreement,andincludesthe
legalsuccessorsorpermittedassignsoftheSupplier.
(p)
2. Contract
2.1
Documents
3. Corrupt
Practices
3.1
TheADBistheAsianDevelopmentBank.
TheSite,whereapplicable,meanstheplacenamedinthe
(q) SCC.
Subjecttotheorderofprecedencesetforthin
Agreement,
the
all
documentsformingtheContract(andallpartsthereof)are
intended
tobecorrelative,complementary,andmutuallyexplanatory.
ADBs
Anticorruption
Policy requiresborrowers (including
as
beneficiariesofADBfinanced activity), aswell
bidders,
suppliers,andcontractorsunderADBfinancedcontracts,
observethehigheststandardofethicsduringtheprocurement
andexecutionofsuchcontracts.Inpursuanceofthispolicy,
theADB:
(a)
defines,forthepurposesofthisprovision,thetermsset
forthbelowasfollows:
(i)
corruptpracticemeanstheoffering,giving,
receiving,orsoliciting,directlyorindirectly,anything
ofvaluetoinfluenceimproperlytheactionsof
another
party;
(ii)
fraudulent
practicemeansany act or omission,
including a misrepresentation, that knowinglyor
recklessly misleads, or attempts to mislead, a party to
obtain a financial or other benefit or to avoid an
obligation;
(iii)coercivepracticemeansimpairingorharming,or
threateningtoimpairorharm,directlyorindirectly,any
partyorthepropertyofthepartytoinfluenceimproperly
theactionsofaparty;
(iv) collusivepracticemeansanarrangementbetweentwoor
morepartiesdesignedtoachieveanimproperpurpose,
includinginfluencingimproperlytheactionsofanother
party;
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page73of100
(2) willrejectaproposalforawardifitdeterminesthatthebidder
recommended for award has, directly or through an agent,
engagedincorrupt,fraudulent,collusive,orcoercivepracticesin
competingfortheContract;
(3) willcanceltheportionofthefinancingallocatedtoacontractif
itdeterminesatanytimethatrepresentativesoftheborroweror
of a beneficiary of ADBfinancing engaged in corrupt,
fraudulent, collusive, or coercive practices during the
procurement or the execution of that contract, without the
borrower having taken timely and appropriate action
satisfactorytoADBtoremedythesituation;and
(4) willsanctionafirmoranindividual,atanytime,inaccordance
withADBsAnticorruptionPolicyandIntegrityPrinciplesand
Guidelines (both as amended from time to time), including
declaringineligible,eitherindefinitelyorforastatedperiodof
time, to participate in ADBfinanced or ADBadministered
activities or to benefit from an ADBfinanced or ADB
administeredcontract,financiallyorotherwise,ifitatanytime
determinesthatthefirmorindividualhas,directlyorthrough
anagent,engagedincorrupt,fraudulent,collusive,orcoercive
orotherprohibitedpractices.
32 The Supplier shall permit the ADB to inspect the Suppliers
accountsandrecordsrelatingtotheperformanceoftheSupplierand
to have them audited by auditors appointed by the ADB, if so
requiredbytheADB.
4. Interpretation4.1Ifthecontextsorequiresit,singularmeanspluralandvice
versa.
42 Incoterms
(1) Themeaningofanytradetermandtherightsandobligations
ofpartiesthereundershallbeasprescribedbyIncoterms.
(2) EXW,CIF,CIP,andothersimilarterms,shallbegoverned
bytherulesprescribedinthecurrenteditionofIncoterms,
publishedbytheInternationalChamberofCommerceatthe
dateoftheInvitationforBidsorasspecifiedintheSCC.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page74of100
4.3
EntireAgreement
TheContractconstitutestheentireagreementbetweenthe
PurchaserandtheSupplierandsupersedesallcommunications,
negotiationsandagreements(whetherwrittenororal)of
partieswithrespecttheretomadepriortothedateofContract.
4.4
Amendment
NoamendmentorothervariationoftheContractshallbevalid
unlessitisinwriting,isdated,expresslyreferstotheContract,
andissignedbyadulyauthorizedrepresentativeofeachparty
thereto.
4.5
4.6
Nonwaiver
(a)
SubjecttoGCCSubClause4.5(b)below,norelaxation,
forbearance,delay,orindulgencebyeitherpartyin
enforcinganyofthetermsandconditionsofthe
Contractorthegrantingoftimebyeitherpartytothe
othershallprejudice,affect,orrestricttherightsofthat
partyundertheContract,neithershallanywaiverby
eitherpartyofanybreachofContractoperateaswaiver
ofanysubsequentorcontinuingbreachofContract.
(b)
Anywaiverofapartysrights,powers,orremedies
undertheContractmustbeinwriting,dated,andsigned
byanauthorizedrepresentativeofthepartygranting
suchwaiver,andmustspecifytherightandtheextentto
whichitisbeingwaived.
Severability
IfanyprovisionorconditionoftheContractisprohibitedor
renderedinvalidorunenforceable,suchprohibition,invalidity
orunenforceabilityshallnotaffectthevalidityor
enforceabilityofanyotherprovisionsandconditionsofthe
Contract.
5.Language
5.1
TheContractaswellasallcorrespondenceanddocuments
relatingtotheContractexchangedbytheSupplierandthe
Purchaser,shallbewritteninthelanguagespecifiedinthe
SCC.Supportingdocumentsandprintedliteraturethatarepartof
the Contract may be in another language provided they are
accompaniedbyanaccuratetranslationoftherelevantpassagesin
thelanguagespecifiedintheSCC,inwhichcase,
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page75of100
forpurposesofinterpretationoftheContract,thistranslationshall
govern.
5.2TheSuppliershallbearallcostsoftranslationtothegoverning
languageandallrisksoftheaccuracyofsuchtranslation.
6.
JointVenture,
Consortium
orAssociation
6.1
UnlessotherwisespecifiedintheSCC,iftheSupplierisajoint
venture,consortium,orassociation,allofthepartiesshallbe
jointlyandseverallyliabletothePurchaserforthefulfillment
oftheprovisionsoftheContractandshalldesignateoneparty
toactasaleaderwithauthoritytobindthejointventure,
consortium,orassociation.Thecompositionortheconstitution
ofthejointventure,consortium,orassociationshallnotbe
alteredwithoutthepriorconsentofthePurchaser.
7.
Eligibility
7.1
TheSupplieranditsSubcontractorsshallhavethenationality
ofaneligiblecountry.ASupplierorSubcontractorshallbe
deemedtohavethenationalityofacountryifitisacitizenor
constitutedorincorporated,andoperatesinconformitywith
theprovisionsofthelawsofthatcountry.
7.2
AllGoodsandRelatedServicestobesuppliedunderthe
ContractandfinancedbytheADBshallhavetheiroriginin
EligibleCountries.ForthepurposeofthisClause,origin
meansthecountrywherethegoodshavebeengrown,mined,
cultivated,produced,manufactured,orprocessed;orthrough
manufacture,processing,orassembly,anothercommercially
recognizedarticleresultsthatdifferssubstantiallyinitsbasic
characteristicsfromitsimportedcomponents.
8.1
AnyNoticegivenbyonepartytotheotherpursuanttothe
ContractshallbeinwritingtotheaddressspecifiedintheSCC.
Theterminwritingmeanscommunicatedinwritten
form
withproofofreceipt.
8.2
ANoticeshallbeeffectivewhendeliveredorontheNotices
effectivedate,whicheverislater.
9.1
TheContractshallbegovernedbyandinterpretedin
accordancewiththelawsofthePurchaserscountry,unless
otherwisespecifiedintheSCC.
8.
9.
Notices
Governing
Law
10. Settlementof
Disputes
10.1 ThePurchaserandtheSuppliershallmakeeveryeffortto
resolveamicablybydirectinformalnegotiationany
disagreementordisputearisingbetweenthemunder
orin
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page76of100
connectionwiththeContract.
10.2Ifthepartiesfailtoresolvesuchadisputeordifferencebymutual
consultationwithintwentyeight(28)daysfromthecommencement
ofsuchconsultation,eitherpartymayrequirethatthedisputebe
referredforresolutiontotheformalmechanismsspecifiedinthe
SCC.
11. Scopeof11.1SubjecttotheSCC,theGoodsandRelatedServicestobe
Supply
suppliedshallbeasspecifiedinSectionVI,Scheduleof
Supply.
11.2UnlessotherwisestipulatedintheContract,theScopeofSupply
shall include all such items not specifically mentioned in the
ContractbutthatcanbereasonablyinferredfromtheContractas
beingrequiredforattainingDeliveryandCompletionoftheGoods
andRelatedServicesasifsuchitemswereexpresslymentionedin
theContract.
12. Delivery12.1SubjecttoGCCSubClause33.1,theDeliveryoftheGoods
andCompletionoftheRelatedServicesshallbeinaccordancewith
theDeliveryandCompletionSchedulespecifiedintheSectionVI,
ScheduleofSupply.Thedetailsofshippingandotherdocumentsto
befurnishedbytheSupplierarespecifiedintheSCC.
13.Suppliers13.1TheSuppliershallsupplyalltheGoodsandRelatedServices
ResponsibilitiesincludedintheScopeofSupplyinaccordancewithGCCClause11,
andtheDeliveryandCompletionSchedule,asper
GCCClause12.
14.Purchasers14.1WheneverthesupplyofGoodsandRelatedServicesrequires
ResponsibilitiesthattheSupplierobtainpermits,approvals,andimportandotherlicenses
fromlocalpublicauthorities,thePurchasershall,ifsorequiredbytheSupplier,makeitsbest
efforttoassisttheSupplierincomplyingwithsuchrequirementsinatimelyand
expeditiousmanner.
14.2ThePurchasershallpayallcostsinvolvedintheperformanceofits
responsibilities,inaccordancewithGCCSubClause14.1.
15. Contract15.1TheContractPriceshallbeasspecifiedintheAgreement
Price
subjecttoanyadditionsandadjustmentsthereto,ordeductions
therefrom,asmaybemadepursuanttotheContract.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page77of
100
15.2 PriceschargedbytheSupplierfortheGoodsdeliveredandthe
RelatedServicesperformedundertheContractshallnotvary
fromthepricesquotedbytheSupplierinitsbid,withthe
exceptionofanypriceadjustmentsauthorizedintheSCC.
16. Termsof
Payment
16.1 TheContractPriceshallbepaidasspecifiedintheSCC.
16.2 TheSuppliersrequestforpaymentshallbemadetothe
Purchaserinwriting,accompaniedbyinvoicesdescribing,as
appropriate,theGoodsdeliveredandRelatedServices
performed,andbythedocumentssubmittedpursuanttoGCC
Clause12anduponfulfillmentofalltheobligationsstipulated
intheContract.
16.3 PaymentsshallbemadepromptlybythePurchaser,nolater
thansixty(60)daysaftersubmissionofaninvoiceorrequest
forpaymentbytheSupplier,andthePurchaserhasacceptedit.
16.4 Thecurrencyorcurrenciesinwhichpaymentsshallbemadeto
theSupplierunderthisContractshallbespecifiedintheSCC.
17. Taxesand
Duties
17.1 ForgoodssuppliedfromoutsidethePurchaserscountry,the
Suppliershallbeentirelyresponsibleforalltaxes,stamp
duties,licensefees,andothersuchleviesimposedoutsidethe
Purchaserscountry.
17.2For goods supplied from within the Purchasers country, the
Suppliershallbeentirelyresponsibleforalltaxes,duties,license
fees, etc.,incurred untildelivery of the contracted Goods to the
Purchaser.
17.3Ifanytaxexemptions,reductions,allowancesorprivilegesmaybe
availabletotheSupplierinthePurchasersCountry,thePurchaser
shalluseitsbesteffortstoenabletheSuppliertobenefitfromany
suchtaxsavingstothemaximumallowableextent.
18. Performance18.1TheSuppliershall,withintwentyeight(28)daysofthe
Security
notificationofContractaward,provideaPerformanceSecurity
forthedueperformanceoftheContractintheamountsand
currenciesspecifiedintheSCC.
182TheproceedsofthePerformanceSecurityshallbepayabletothe
Purchaser as compensation for any loss resulting from the
SuppliersfailuretocompleteitsobligationsundertheContract.
183ThePerformanceSecurityshallbedenominatedinthecurrenciesof
theContract,orinafreelyconvertiblecurrency
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page78of100
acceptabletothePurchaser,andshallbeinoneoftheforms
stipulatedbythePurchaserintheSCC,orinanotherform
acceptabletothePurchaser.
19. Copyright
20. Confidential
Information
18.4ThePerformanceSecurityshallbedischargedbythePurchaser
andreturnedtotheSuppliernotlaterthantwentyeight(28)
daysfollowingthedateofcompletionoftheSuppliers
performanceobligationsundertheContract,includingany
warrantyobligations,unlessspecifiedotherwiseintheSCC.
19.1 Thecopyrightinalldrawings,documents,andothermaterials
containingdataandinformationfurnishedtothePurchaserby
theSupplierhereinshallremainvestedintheSupplier,or,if
theyarefurnishedtothePurchaserdirectlyorthroughthe
Supplierbyanythirdparty,includingsuppliersofmaterials,
thecopyrightinsuchmaterialsshallremainvestedinsuch
thirdparty.
20.1 ThePurchaserandtheSuppliershallkeepconfidentialand
shallnot,withoutthewrittenconsentoftheotherpartyhereto,
divulgetoanythirdpartyanydocuments,data,orother
informationfurnisheddirectlyorindirectlybytheotherparty
heretoinconnectionwiththeContract,whethersuch
informationhasbeenfurnishedpriorto,duringorfollowing
completionorterminationoftheContract.Notwithstanding
theabove,theSuppliermayfurnishtoitsSubcontractorsuch
documents,data,andotherinformationitreceivesfromthe
PurchasertotheextentrequiredfortheSubcontractorto
performitsworkundertheContract,inwhicheventthe
SuppliershallobtainfromsuchSubcontractoranundertaking
ofconfidentialitysimilartothatimposedontheSupplierunder
GCCClause20.
20.2ThePurchasershallnotusesuchdocuments,data,andother
informationreceivedfromtheSupplierforanypurposes
unrelatedtotheContract.Similarly,theSuppliershallnotuse
suchdocuments,data,andotherinformationreceivedfromthe
Purchaserforanypurposeotherthanthedesign,procurement,
orotherworkandservicesrequiredfortheperformanceofthe
Contract.
20.3 TheobligationofapartyunderGCCSubClauses20.1and
20.2above,however,shallnotapplytoinformationthat:
(a)
thePurchaserorSupplierneedtosharewiththeADBor
otherinstitutionsparticipatinginthefinancingofthe
Contract;
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page79of100
2) noworhereafterentersthepublicdomainthroughnofaultof
thatparty;
3) canbeproventohavebeenpossessedbythatpartyatthe
timeofdisclosureandwhichwasnotpreviouslyobtained,
directlyorindirectly,fromtheotherparty;or
(4) otherwise lawfully becomes available to that party from a
thirdpartythathasnoobligationofconfidentiality.
20.4The above provisions of GCC Clause 20 shall not in any way
modifyanyundertakingofconfidentialitygivenbyeitherofthe
partiesheretoprior to the dateof theContract in respect of the
Supplyoranypartthereof.
20.5The provisions of GCC Clause 20 shall survive completion or
termination,forwhateverreason,oftheContract.
21. Subcontracting21.1TheSuppliershallnotifythePurchaserinwritingofall
subcontractsawardedundertheContractifnotalreadyspecifiedin
theBid.SubcontractingshallinnoeventrelievetheSupplierfrom
anyofitsobligations,duties,responsibilities,orliabilityunderthe
Contract.
212SubcontractsshallcomplywiththeprovisionsofGCCClauses3
and7.
22.Specifications22.1TechnicalSpecificationsandDrawings
andStandards
1) The Supplier shall ensure that the Goods and Related
Servicescomplywiththetechnicalspecificationsandother
provisionsoftheContract.
2) TheSuppliershallbeentitledtodisclaimresponsibilityfor
anydesign,data,drawing,specificationorotherdocument,
oranymodificationthereofprovidedordesignedbyoron
behalfofthePurchaser,bygivinganoticeofsuchdisclaimer
tothePurchaser.
3) TheGoodsandRelatedServicessuppliedunderthisContract
shall conform to the standards mentioned in Section VI,
Schedule of Supply and, when no applicable standard is
mentioned,thestandardshallbeequivalentorsuperiortothe
officialstandardswhoseapplicationis
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page80of100
appropriatetothecountryoforiginoftheGoods.
22.2 WhereverreferencesaremadeintheContracttocodesand
standardsinaccordancewithwhichitshallbeexecuted,the
editionortherevisedversionofsuchcodesandstandardsshall
bethosespecifiedintheSectionVI,ScheduleofSupply.
DuringContractexecution,anychangesinanysuchcodesand
standardsshallbeappliedonlyafterapprovalbythePurchaser
andshallbetreatedinaccordancewithGCCClause33.
23.Packingand
Documents
23.1 TheSuppliershallprovidesuchpackingoftheGoodsasis
requiredtopreventtheirdamageordeteriorationduringtransit
totheirfinaldestination,asindicatedintheContract.During
transit,thepackingshallbesufficienttowithstand,without
limitation,roughhandlingandexposuretoextreme
temperatures,saltandprecipitation,andopenstorage.Packingcase
sizeandweightsshalltakeintoconsideration,whereappropriate,
the remoteness of the final destination of the Goods and the
absenceofheavyhandlingfacilitiesatallpointsintransit.
23.2Thepacking,marking,anddocumentationwithinandoutsidethe
packagesshallcomplystrictlywithsuchspecialrequirementsas
shallbeexpresslyprovidedforintheContract,includingadditional
requirements, if any, specified in the SCC, and in any other
instructionsorderedbythePurchaser.
24. Insurance24.1UnlessotherwisespecifiedintheSCC,theGoodssupplied
undertheContractshallbefullyinsured,inafreelyconvertible
currency from an eligible country, against loss or damage
incidental to manufacture or acquisition, transportation, storage,
anddelivery,inaccordancewiththeapplicableIncotermsorinthe
mannerspecifiedintheSCC.
25.Transportation25.1UnlessotherwisespecifiedintheSCC,obligationsfortransportationof
theGoodsshallbeinaccordancewiththeIncotermsspecifiedin
SectionsVI,ScheduleofSupply.
26.Inspections26.1TheSuppliershallatitsownexpenseandatnocosttotheandTests
Purchasercarryoutallsuchtestsand/orinspectionsoftheGoodsandRelatedServicesasare
specifiedinSectionsVI,
ScheduleofSupply.
262Theinspectionsandtestsmaybeconductedonthepremisesofthe
Supplier or its Subcontractor, at point of delivery, and/or at the
final destination of the Goods, or in another place in the
PurchaserscountryasspecifiedintheSCC.SubjecttoGCC
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page81of100
SubClause26.3,ifconductedonthepremisesoftheSupplierorits
Subcontractor, all reasonable facilities and assistance, including
accesstodrawingsandproductiondata,shallbefurnishedtothe
inspectorsatnochargetothePurchaser.
263ThePurchaseroritsdesignatedrepresentativeshallbeentitledto
attendthetestsand/orinspectionsreferredtoinGCCSubClause
26.2, provided that the Purchaser bear all of its own costs and
expenses incurred in connection with such attendance including,
butnotlimitedto,alltravelingandboardandlodgingexpenses.
264Whenever the Supplier is ready to carry out any such test and
inspection,itshallgiveareasonableadvancenotice,includingthe
placeandtime,tothePurchaser.TheSuppliershallobtainfromany
relevantthirdpartyormanufactureranynecessarypermissionor
consenttoenablethePurchaseroritsdesignatedrepresentativeto
attendthetestand/orinspection.
265ThePurchasermayrequiretheSuppliertocarryoutanytestand/or
inspectionnotrequiredbytheContractbutdeemednecessaryto
verifythatthecharacteristicsandperformanceoftheGoodscomply
with the technical specifications, codes and standards under the
Contract, provided that the Suppliers reasonable costs and
expensesincurredinthecarryingoutofsuchtestand/orinspection
shallbeaddedtotheContractPrice.Further,ifsuchtestand/or
inspection impedes the progress of manufacturing and/or the
SuppliersperformanceofitsotherobligationsundertheContract,
dueallowancewillbemadeinrespectoftheDeliveryDatesand
CompletionDatesandtheotherobligationssoaffected.
266TheSuppliershallprovidethePurchaserwithareportoftheresults
ofanysuchtestand/orinspection.
267ThePurchasermayrejectanyGoodsoranypartthereofthatfailto
pass any test and/or inspection or do not conform to the
specifications. The Supplier shall either rectify or replace such
rejected Goods or parts thereof ormake alterationsnecessaryto
meetthespecificationsatnocosttothePurchaser,andshallrepeat
thetestand/orinspection,atnocosttothePurchaser,upongivinga
noticepursuanttoGCCSubClause26.4.
268The Supplier agrees that neither the execution of a test and/or
inspectionoftheGoodsoranypartthereof,northeattendanceby
the Purchaser or its representative, nor the issue of any report
pursuanttoGCCSubClause26.6,shallreleasetheSupplierfrom
anywarrantiesorotherobligationsunderthe
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page82of100
Contract.
27.Liquidated
Damages
28.Warranty
27.1
ExceptasprovidedunderGCCClause32,iftheSupplierfails
todeliveranyoralloftheGoodsorperformtheRelated
ServiceswithintheperiodspecifiedintheContract,the
Purchasermaywithoutprejudicetoallitsotherremediesunder
theContract,deductfromtheContractPrice,asliquidated
damages,asumequivalenttothepercentagespecifiedinthe
SCCoftheContractPriceforeachweekorpartthereofof
delayuntilactualdeliveryorperformance,uptoamaximum
deductionofthepercentagespecifiedintheSCC.Oncethe
maximumisreached,thePurchasermayterminatethe
ContractpursuanttoGCCClause35.
28.1 TheSupplierwarrantsthatalltheGoodsarenew,unused,and
ofthemostrecentorcurrentmodels,andthattheyincorporate
allrecentimprovementsindesignandmaterials,unless
providedotherwiseintheContract.
28.2SubjecttoGCCSubClause22.1,theSupplierfurtherwarrants
thattheGoodsshallbefreefromdefectsarisingfromanyact
oromissionoftheSupplierorarisingfromdesign,materials,
andworkmanship,undernormaluseintheconditions
prevailinginthecountryoffinaldestination.
28.3 UnlessotherwisespecifiedintheSCC,thewarrantyshall
remainvalidfortwelve(12)monthsaftertheGoods,orany
portionthereofasthecasemaybe,havebeendeliveredtoand
acceptedatthefinaldestinationindicatedintheSCC,orfor
eighteen(18)monthsafterthedateofshipmentorloadingin
thecountryoforigin,whicheverperiodconcludesearlier.
28.4 ThePurchasershallgiveNoticetotheSupplierstatingthe
natureofanysuchdefectstogetherwithallavailableevidence
thereof,promptlyfollowingthediscoverythereof.The
Purchasershallaffordallreasonableopportunityforthe
Suppliertoinspectsuchdefects.
28.5 UponreceiptofsuchNotice,theSuppliershall,withinthe
periodspecifiedintheSCC,expeditiouslyrepairorreplacethe
defectiveGoodsorpartsthereof,atnocosttothePurchaser.
28.6 If having been notified, the Supplier fails to remedy the defect
withintheperiodspecifiedintheSCC,thePurchasermayproceed
totakewithinareasonableperiodsuchremedialactionasmaybe
necessary,attheSuppliersriskandexpenseandwithoutprejudice
toanyotherrightswhichthePurchaser
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page83of100
mayhaveagainsttheSupplierundertheContract.
29.Patent29.1TheSuppliershall,subjecttothePurchaserscompliancewith
IndemnityGCCSubClause29.2,indemnifyandholdharmlessthePurchaserand
itsemployeesandofficersfromandagainstanyandallsuits,actionsoradministrative
proceedings,claims,demands,losses,damages,costs,andexpensesofanynature,including
attorneysfeesandexpenses,whichthePurchasermaysufferasaresultofanyinfringementor
allegedinfringementofanypatent,utilitymodel,registereddesign,trademark,copyright,or
otherintellectualpropertyrightregisteredorotherwiseexisting
atthedateoftheContractbyreasonof:
1) theinstallationoftheGoodsbytheSupplierortheuseofthe
GoodsinthecountrywheretheSiteislocated;and
2) the sale in any country of the products produced by the
Goods.
SuchindemnityshallnotcoveranyuseoftheGoodsoranypart
thereofotherthanforthepurposeindicatedbyortobereasonably
inferredfromtheContract,neitheranyinfringementresultingfrom
theuseoftheGoodsoranypartthereof,oranyproductsproduced
therebyinassociationorcombinationwithanyotherequipment,
plant, or materials not supplied by the Supplier, pursuant to the
Contract.
292Ifanyproceedingsarebroughtoranyclaimismadeagainstthe
PurchaserarisingoutofthemattersreferredtoinGCCSubClause
29.1, the Purchaser shall promptly give the Supplier a notice
thereof, and the Supplier may at its own expense and in the
Purchasers name conduct such proceedings or claim and any
negotiationsforthesettlementofanysuchproceedingsorclaim.
293IftheSupplierfailstonotifythePurchaserwithintwentyeight(28)
daysafterreceiptofsuchnoticethatitintendstoconductanysuch
proceedingsorclaim,thenthePurchasershallbefreetoconduct
thesameonitsownbehalf.
294ThePurchasershall,attheSuppliersrequest,affordallavailable
assistancetotheSupplierinconductingsuchproceedingsorclaim,
andshallbereimbursedbytheSupplierforallreasonableexpenses
incurredinsodoing.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page84of100
29.5ThePurchasershallindemnifyandholdharmlesstheSupplierand
itsemployees,officers,andSubcontractorsfromandagainstany
and all suits, actions or administrative proceedings, claims,
demands, losses, damages, costs, and expenses of any nature,
including attorneys fees and expenses, which the Supplier may
sufferasaresultofanyinfringementorallegedinfringementofany
patent, utility model, registered design, trademark, copyright, or
otherintellectualpropertyrightregisteredorotherwiseexistingat
thedateoftheContractarisingoutoforinconnectionwithany
design, data, drawing, specification, or other documents or
materialsprovidedordesignedbyoronbehalfofthePurchaser.
30. Limitationof30.1Exceptincasesofgrossnegligenceorwillfulmisconduct:
Liability
(1) neitherpartyshallbeliabletotheotherpartyforanyindirect
or consequential loss or damage, loss of use, loss of
production,orlossofprofitsorinterestcosts,providedthat
this exclusion shall not apply to any obligation of the
SuppliertopayliquidateddamagestothePurchaser;and
(2) the aggregate liability of the Supplier to the Purchaser,
whetherundertheContract,intort,orotherwise,shallnot
exceedtheamountspecifiedintheSCC,providedthatthis
limitationshallnotapplytothecostofrepairingorreplacing
defectiveequipment,ortoanyobligationoftheSupplierto
indemnifythePurchaserwithrespecttopatentinfringement.
31. Changein
Lawsand
Regulations
32. Force
31.1UnlessotherwisespecifiedintheContract,ifafterthedateof
theInvitationforBids,anylaw,regulation,ordinance,orderor
bylawhavingtheforceoflawisenacted,promulgated,
abrogated,orchangedintheplaceofthePurchaserscountry
wheretheSiteislocated(whichshallbedeemedtoinclude
anychangeininterpretationorapplicationbythecompetent
authorities)thatsubsequentlyaffectstheDeliveryDateand/or
theContractPrice,thensuchDeliveryDateand/orContract
Priceshallbecorrespondinglyincreasedordecreased,tothe
extentthattheSupplierhastherebybeenaffectedinthe
performanceofanyofitsobligationsundertheContract.
Notwithstandingtheforegoing,suchadditionalorreducedcost
shallnotbeseparatelypaidorcreditedifthesamehasalready
beenaccountedforinthepriceadjustmentprovisionswhere
applicable,inaccordancewithGCCClause15.
32.1TheSuppliershallnotbeliableforforfeitureofits
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page85of100
Majeure
PerformanceSecurity,liquidateddamages,orterminationfor
defaultifandtotheextentthatitsdelayinperformanceor
otherfailuretoperformitsobligationsundertheContractisthe
resultofaneventofForceMajeure.
32.2ForpurposesofthisClause,ForceMajeuremeansaneventor
situationbeyondthecontroloftheSupplierthatisnotforeseeable,
isunavoidable,anditsoriginisnotduetonegligenceorlackof
careonthepartoftheSupplier.Sucheventsmayinclude,butnot
belimitedto,actsofthePurchaserinitssovereigncapacity,warsor
revolutions, fires, floods, epidemics, quarantine restrictions, and
freightembargoes.
32.3If a Force Majeure situation arises, the Supplier shall promptly
notify the Purchaser in writing of such condition and the cause
thereof.UnlessotherwisedirectedbythePurchaserinwriting,the
Supplier shall continue to perform its obligations under the
Contract as far as is reasonably practical, and shall seek all
reasonablealternativemeansforperformancenotpreventedbythe
ForceMajeureevent.
33. Change33.1ThePurchasermayatanytimeordertheSupplierthrough
Ordersand
NoticeinaccordanceGCCClause8,tomakechangeswithin
Contract
thegeneralscopeoftheContractinanyoneormoreofthe
Amendments
following:
(a)
drawings,designs,orspecifications,whereGoodstobe
furnishedundertheContractaretobespecifically
manufacturedforthePurchaser;
(b)
themethodofshipmentorpacking;
(c)
theplaceofdelivery;and
(d)
theRelatedServicestobeprovidedbytheSupplier.
33.2 Ifanysuchchangecausesanincreaseordecreaseinthecost
of,orthetimerequiredfor,theSuppliersperformanceofany
provisionsundertheContract,anequitableadjustmentshallbe
madeintheContractPriceorintheDeliveryandCompletion
Schedule,orboth,andtheContractshallaccordinglybe
amended. AnyclaimsbytheSupplierforadjustmentunder
thisClausemustbeassertedwithintwentyeight(28)days
fromthedateoftheSuppliersreceiptofthePurchasers
changeorder.
33.3 PricestobechargedbytheSupplierforanyRelatedServices
thatmightbeneededbutwhichwerenotincludedinthe
Contractshallbeagreeduponinadvancebythepartiesand
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page86of100
shallnotexceedtheprevailingrateschargedtootherpartiesby
theSupplierforsimilarservices.
34. Extensionsof
Time
34.1 IfatanytimeduringperformanceoftheContract,theSupplier
oritsSubcontractorsshouldencounterconditionsimpeding
timelydeliveryoftheGoodsorcompletionofRelatedServices
pursuanttoGCCClause12,theSuppliershallpromptlynotify
thePurchaserinwritingofthedelay,itslikelyduration,andits
cause.AssoonaspracticableafterreceiptoftheSuppliers
notice,thePurchasershallevaluatethesituationandmayatits
discretionextendtheSupplierstimeforperformance,in
whichcasetheextensionshallberatifiedbythepartiesby
amendmentoftheContract.
34.2 ExceptincaseofForceMajeure,asprovidedunderGCC
Clause32,adelaybytheSupplierintheperformanceofits
DeliveryandCompletionobligationsshallrendertheSupplier
liabletotheimpositionofliquidateddamagespursuanttoGCC
Clause27,unlessanextensionoftimeisagreedupon,pursuant
toGCCSubClause34.1.
35. Termination
35.1 TerminationforDefault
(a)
ThePurchaser,withoutprejudicetoanyotherremedy
forbreachofContract,byNoticeofdefaultsenttothe
Supplier,mayterminatetheContractinwholeorinpart:
(i)
iftheSupplierfailstodeliveranyorallofthe
GoodswithintheperiodspecifiedintheContract,
orwithinanyextensionthereofgrantedbythe
PurchaserpursuanttoGCCClause34;or
(ii)iftheSupplierfailstoperform
obligationundertheContract.
anyother
(b)
IntheeventthePurchaserterminatestheContractin
wholeorinpart,pursuanttoGCCClause35.1(a),the
Purchasermayprocure,uponsuchtermsandinsuch
mannerasitdeemsappropriate,GoodsorRelated
Servicessimilartothoseundeliveredornotperformed,
andtheSuppliershallbeliabletothePurchaserforany
additionalcostsforsuchsimilarGoodsorRelated
Services.However,theSuppliershall
continue
performanceoftheContracttotheextentnotterminated.
(c)
iftheSupplier,inthejudgmentofthePurchaserhas
engagedincorrupt,fraudulent,collusive,orcoercive
practices,asdefinedinGCCClause3,incompetingfor
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page87of
100
orinexecutingtheContract.
35.2 TerminationforInsolvency
ThePurchasermayatanytimeterminatetheContractby
givingNoticetotheSupplieriftheSupplierbecomesbankrupt
orotherwiseinsolvent.Insuchevent,terminationwillbe
withoutcompensationtotheSupplier,providedthatsuch
terminationwillnotprejudiceoraffectanyrightofactionor
remedythathasaccruedorwillaccruethereaftertothe
Purchaser.
35.3 TerminationforConvenience
(a)
ThePurchaser,byNoticesenttotheSupplier,may
terminatetheContract,inwholeorinpart,atanytime
foritsconvenience.TheNoticeofterminationshall
specifythatterminationisforthePurchasers
convenience,theextenttowhichperformanceofthe
SupplierundertheContractisterminated,andthedate
uponwhichsuchterminationbecomeseffective.
(b)
TheGoodsthatarecompleteandreadyforshipment
withintwentyeight(28)daysaftertheSuppliersreceipt
oftheNoticeofterminationshallbeacceptedbythe
PurchaserattheContracttermsandprices.Forthe
remainingGoods,thePurchasermayelect:
(i)
Tohaveanyportioncompletedanddeliveredat
theContracttermsandprices;and/or
(ii)tocanceltheremainderandpaytotheSupplieran
agreedamountforpartiallycompletedGoodsand
RelatedServicesandformaterialsandparts
previouslyprocuredbytheSupplier.
36.Assignment
36.1 NeitherthePurchasernortheSuppliershallassign,inwholeor
inpart,theirobligationsunderthisContract,exceptwithprior
writtenconsentoftheotherparty.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page88of100
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page89of100
SectionVIII.SpecialConditionsofContract
ThefollowingSpecialConditionsofContract(SCC)shallsupplementtheGeneralConditions
ofContract(GCC).Wheneverthereisaconflict,theprovisionshereinshallprevailoverthose
intheGCC.
GCC1.1(j)
GCC1.1(k)
ThePurchaserscountryis:
India
ThePurchaseris:KarnatakaNeeravariNigamLimited
(KNNL),Karnatakastate,
India
GCC1.1(q)
TheSitesare:
BhadraProjectandUpperTungacanals
Tungabhadra,VijayanagaraandSingatalurcanals
GCC4.2(a)
TheversionofIncotermsshallbe:2010
GCC5.1
Thelanguageshallbe:English
GCC6.1
Thecompaniesindividualsorfirmsinajointventure,consortiumor
associationshallbejointlyandseverallyliable.
GCC8.1
Fornotices,thePurchasersaddressshallbe:
OfficeoftheExecutiveEngineer,
KarnatakaNeeravariNigamLimited(KNNL),
No.4DivisionBRLBCBhadravathi,
Shivamogga,Karnatakastate,India
Telephone:++9108282271063,
Fax;++9108282271063
Email:eeknnlbdvt@yahoo.co.in
GCC9.1
Thegoverninglawshallbe:India
GCC10.2
Theformalmechanismfortheresolutionofdisputesshallbe:settledby
arbitrationinaccordancewiththeprovisionofTheUnitedNations
CommissiononInternationalTradeLaw(UNCITRAL)ArbitrationRules
GCC11.1
Thescopeofsupplyshallbedefinedin:SectionVI,scheduleofsupply
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page90of100
DetailsofshippinganddocumentstobefurnishedbytheSuppliershallbe
GCC12.1
asfollows:
ForGoodsfromwithinthePurchaserscountryasperIncotermEXW;
UpondeliveryoftheGoodstothetransporter,theSuppliershallnotify
thePurchaserandsendthefollowingdocumentstothePurchaser:
(a)2copiesoftheSuppliersinvoiceshowingthedescriptionofthe
Goods,quantity,unitprice,taxexemption(ifany)andtotalamount;
(b)deliverynote,railwayreceipt,ortruckreceipt;
(c)ManufacturersorSupplierswarrantycertificate;
(d)inspectioncertificateissuedbythenominatedinspectionagency,and
theSuppliersfactoryinspectionreport;and
(e)certificateoforigin.
(f)InsuranceCertificate
ThePurchaser,shallreceivetheabovedocumentsbeforethearrivalofthe
Goodsand,ifnotreceived,theSupplierwillberesponsibleforany
consequentexpenses.
ForGoodssuppliedfromabroadasperIncotermsCIF;
Uponshipment,theSuppliershallnotifythePurchaserandtheInsurance
Companythefulldetailsoftheshipment,includingContractnumber,
descriptionofGoods,quantity,thevessel,thebillofladingnumberand
date,portofloading,dateofshipment,portofdischarge,etc.The
SuppliershallsendthefollowingdocumentstothePurchaser,withacopy
totheInsuranceCompany:
(a)2copiesoftheSuppliersinvoiceshowingthedescriptionofthe
Goods,quantity,unitprice,andtotalamount;
(b)originalandonecopyofthenegotiable,clean,onboardbilloflading
markedfreightprepaidand2copiesofnonnegotiablebilloflading;
(c)2copiesofthepackinglistidentifyingcontentsofeachpackage;
(d)insurancecertificate;
(e)ManufacturersorSupplierswarrantycertificate;
(f)inspectioncertificate,issuedbythenominatedinspectionagency,and
theSuppliersfactoryinspectionreport;and
(g)certificateoforigin.
ThePurchasershallreceivetheabovedocumentsatleastoneweekbefore
arrivaloftheGoodsattheportorplaceofarrivaland,ifnotreceived,the
Supplierwillberesponsibleforanyconsequentexpenses.
GCC15.2
Thepriceadjustmentshallbe:notapplicable
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page91of100
GCC16.1
Thetermsofpaymentshallbe:
ForGoodsandRelatedServicessuppliedfromwithinthePurchasers
country;
(a)AdvancePayment:Ten(10)percentoftheTotalContractPricewithin
twentyeight(28)daysofsigningoftheContract.Paymentshallbemade
providedtheSupplierpresentsarequestforpaymentaccompaniedbyan
AdvancePaymentSecurityintheformofabankguaranteeforanamount
equaltotheamountofthepaymentwhichshallbevaliduntiltheGoods
aredelivered.ThesecurityshallbeintheformasspecifiedinSectionIX,
ContractForms.
(b)OnDelivery:ThePurchasershallpaytheSuppliereighty(80)percent
oftheContractPriceoftheGoodsshippedthroughirrevocableconfirmed
letterofcreditopenedinfavoroftheSupplierinabankinitscountry
undertheADBcommitmentprocedure,uponsubmissionofdocuments
specifiedinSCCClause12.1.
(c)OnAcceptance:Ten(10)percentoftheContractPriceofGoods
receivedshallbepaidwithintwentyeighty(28)daysofreceiptofthe
totalGoodsuponsubmissionofaclaimsupportedbytheacceptance
certificateissuedbyThePurchaser.
ForGoodsandRelatedServicessuppliedfromoutsidethe
Purchaserscountry:
(a)AdvancePayment:Ten(10)percentoftheTotalContractPricewithin
twentyeight(28)daysofsigningoftheContract.Paymentshallbemade
providedtheSupplierpresentsarequestforpaymentaccompaniedbyan
AdvancePaymentSecurityintheformofabankguaranteeforanamount
equaltotheamountofthepayment,whichshallbevaliduntiltheGoods
aredelivered.ThesecurityshallbeintheformasspecifiedinSectionIX,
ContractForms.
(b)OnShipment:ThePurchasershallpaytheSuppliereighty(80)percent
oftheContractPriceoftheGoodsshippedthroughirrevocableconfirmed
letterofcreditopenedinfavoroftheSupplierinabankinitscountry
undertheADBcommitmentprocedure,uponsubmissionofdocuments
specifiedinSCCClause12.1.
(c)OnAcceptance:Ten(10)percentoftheContractPriceofGoods
receivedshallbepaidwithintwentyeighty(28)daysofreceiptofthe
totalGoodsuponsubmissionofaclaimsupportedbytheacceptance
certificateissuedbythePurchaser.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page92of100
ForRelatedInstallationandCommissioningServices.
Surveying, Construction of Security shed, Installation and
Commissioning,crossverificationandcalibration,InsuranceandCentral
MonitoringCenteroperationwithinitialdatacapturingServices
(a)OnCompletionofitemwiseRelatedServices:ThePurchasershallpaythe
Suppliereighty(80)percentoftheContractPricefortheServicescompleted
including the Security Shed construction, Surveying, installation, securing,
testingofinstallationfunctionsasper
specifications,
Commissioning,CalibrationandCrossVerification,
Provisionof
Insurance,InstallationandCommissioningofCentral
MonitoringCenter,WaterUserCooperativeSocietykiosks.
TraininganddataincentralServerwithanaverageoverallflowthrough
eachofthevolumetricflowmeasurementsiteisrecordedintheserverand
has over 95% accuracy and continuously functions for a period of 1
month.
(b)OnCompletionoftheabove:Twenty(20)percentoftheContractPriceof
ServicesCompletedshallbepaidwithintwentyeighty(28)daysofreceiptof
thetotalServicesuponsubmissionofaclaimsupportedbytheacceptance
certificateissuedbyThePurchaser.
ForAnnualMaintenanceContract
Attheendofthesuccessfulmaintenanceofeveryquarterofayear.25%of
thatyearsContractPriceofAnnualmaintenancecompletedshallbethepaid
within twentyeighty (28) days of receipt of the total AMC Services upon
submissionofaclaimsupportedbytheacceptancecertificateissuedbyThe
Purchaser.
GCC16.4
Thecurrenciesforpaymentsshallbe:bidcurrencies
GCC16.5Paymentofthecontractpriceshallbemadeinthecurrencyorcurrenciesinwhich
thebidpriceisexpressedinthebidofthesuccessfulbidder
GCC18.1TheSuppliershallprovideaPerformanceSecurityof10%percentoftheContract
Price. The Performance Securityshall be denominated in proportion to the
amountandcurrencyofthecontractprice.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page93of100
GCC18.3
ThetypesofacceptablePerformanceSecuritiesare:Abankguarantee
issuedbyareputablebanklocatedinthepurchaserscountryorabroad,in
theformatincludedinSectionIX,contractsforms,oracashiersor
certifiedcheck,orcash.Iftheinstitutionissuingtheguaranteeislocated
outsideIndia,theyshallhaveacorrespondentfinancialinstitutionlocated
inIndiatomaketheguaranteeenforceable.
GCC18.4
DischargeofPerformanceSecurityshalltakeplace:PursuanttoGCCsub
clause18.4,afterdeliveryandacceptanceofthegoods,75%amountof
theperformancesecurityshallbereleasedinaccordancewithGCC28.3.
Remaining25%amountoftheperformancesecurityshallbereleased
aftercompletionofwarrantyperiodspecifiedinGCCclauseno.28.3.
GCC23.2
Thepacking,markinganddocumentationwithinandoutsidethepackages
shallbe:
1.Manufacturersbrandname/trademark
2.Purchasername:KNNL
3. Size
4. Inspectionmark
5.Monthandyearofmanufacture
6.BatchNumberandQualityMark
GCC24.1
Theinsurancecoverageshallbeinaccordancewith:PursuanttoGCC,
subclause24.1,thesuppliermustinsuretheGoodsinanamountequalto
110percentoftheCIF,orEXWpriceoftheGoodsfromWarehouseto
WarehouseonAllRisksbasis,includingWarRisksandStrikes.
GCC25.1
ObligationsfortransportationoftheGoodsshallbeinaccordancewith:
Incoterms2010
GCC26.2
TestsandInspectionsspecifiedinSectionVI,ScheduleofSupply,shall
becarriedoutatthefollowingtimesormilestones,andplaces:Testand
InspectionstobecarriedoutaspertherelevantcodesofBureauofIndian
StandardsoranyInternationalStandardwhichisequivalentorhigher.
GCC27.1
Theliquidateddamageshallbe:0.5%oftheContractpriceperweekor
partthereof
GCC27.1
Themaximumpriceofliquidateddamagesshallbe:10%ofthecontract
price.
GCC28.3
TheperiodofvalidityoftheWarrantyshallbe:InaccordancewithGCC
clauseno.28.3.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page94of100
GCC28.5TheSuppliershallcorrectanydefectscoveredbytheWarrantywithin:15daysof
beingnotifiedbythePurchaseroftheoccurrenceofsuchdefects.
GCC30.1
Theamountofaggregateliabilityshallbe:100%ofthecontractPrice.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page95of100
SectionIX.ContractForms
TableofForms
Agreement....................................................................................................................... 94
PerformanceSecurity.................................................................................................. 97
AdvancePaymentSecurity.........................................................................................98
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page96of100
Agreement
THISAGREEMENTmadethe________dayof________________________,_____,between
______________________________________of__________________________
(hereinafterthePurchaser),oftheonepart,and__________________________________
of______________________________(hereinaftertheSupplier),oftheotherpart:
WHEREASthePurchaserinvitedbidsforcertainGoodsandRelatedServices,viz.,
____________________________________________________________________ and has
acceptedaBidbytheSupplierforthesupplyofthoseGoodsandRelatedServicesinthesumof
________________________________________________________ (hereinafter the Contract
Price).
NOWTHISAGREEMENTWITNESSETHASFOLLOWS:
1. InthisAgreementwordsandexpressionsshallhavethesamemeaningsasarerespectively
assignedtothemintheContractreferredto.
2. Thefollowingdocumentsshallbedeemedtoformandbereadandconstruedaspartof
thisAgreement,viz.:
(1) thePurchasersNotificationtotheSupplierofAwardofContract;
(2) the Bid Submission Sheet and the Price Schedules submitted by the
Supplier;
(3) theSpecialConditionsofContract;
(4) theGeneralConditionsofContract;
(5) theScheduleofSupply;and
(6) bidaddendumsandprebidminutes
ThisContractshallprevailoverallotherContractdocuments.Intheeventofanydiscrepancyor
inconsistencywithintheContractdocuments,thenthedocumentsshallprevailintheorderlisted
above.
3. InconsiderationofthepaymentstobemadebythePurchasertotheSupplierasindicated
inthisAgreement,theSupplierherebycovenantswiththePurchasertoprovidetheGoods
andRelatedServicesandtoremedydefectsthereininconformityinallrespectswiththe
provisionsoftheContract.
4. ThePurchaserherebycovenantstopaytheSupplierinconsiderationoftheprovisionof
theGoodsandRelatedServicesandtheremedyingofdefectstherein,theContractPriceor
suchothersumasmaybecomepayableundertheprovisionsoftheContractatthetimes
andinthemannerprescribedbytheContract.
INWITNESSwhereofthepartiesheretohavecausedthisAgreementtobeexecutedinaccordance
withthelawsof________________________ontheday,monthandyearindicatedabove.
Signedby________________________________________________(forthePurchaser)
Signedby__________________________________________________(fortheSupplier)
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page97of100
PerformanceSecurity
Date:
ContractNameandNo.:
To:
WHEREAS_______________________________________(hereinaftertheSupplier)has
undertaken,pursuanttoContractNo.____________dated________________,_______to
supply__________________________________________(hereinaftertheContract).
ANDWHEREASithasbeenstipulatedbyyouintheaforementionedContractthattheSupplier
shallfurnishyouwithasecurity____________________issuedbyareputableguarantorforthe
sumspecifiedthereinassecurityforcompliancewiththeSuppliersperformanceobligationsin
accordancewiththeContract.
ANDWHEREAStheundersigned_____________________________________________
______________________,legallydomiciledin________________________________
____________________________________________, (hereinafter the Guarantor ), have
agreedtogivetheSupplierasecurity:
THEREFOREWEherebyaffirmthatweareGuarantorsandresponsibletoyou,onbehalfofthe
Supplier,uptoatotalof____________________________________________________
andweundertaketopayyou,uponyourfirstwrittendemanddeclaringtheSuppliertobein
defaultundertheContract,withoutcavilorargument,anysumorsumswithinthelimitsof
______________________asaforesaid,withoutyourneedingtoproveortoshowgroundsor
reasonsforyourdemandorthesumspecifiedtherein.
Thissecurityisvaliduntilthe___________________dayof__________________,_____.
Name
Inthecapacityof
Signed
Dulyauthorizedtosignthesecurityforandonbehalfof
Date
Page98of100
AdvancePaymentSecurity
Date:
ContractNameandNo.:
To:
In accordance with the payment provision included in the Contract, in relation to advance
payments, _________________________________________________ (hereinafter called the
Supplier)shalldepositwiththePurchaserasecurityconsistingof
____________________, to guarantee its proper and faithful performance of the obligations
imposedbysaidClauseoftheContract,intheamountof___________________________.
We, the undersigned ________________________________________________, legally
domiciled in __________________________________________________ (hereinafter the
Guarantor),asinstructedbytheSupplier,agreeunconditionallyandirrevocablytoguaranteeas
primaryobligorandnotassuretymerely,thepaymenttothePurchaseronitsfirstdemandwithout
whatsoeverrightofobjectiononourpartandwithoutitsfirstclaimtotheSupplier,intheamount
notexceeding__________________________________
_________________________________________________________.
Thissecurityshallremainvalidandinfulleffectfromthedateoftheadvancepaymentreceived
bytheSupplierundertheContractuntil_________________________,_______.
Name
Inthecapacityof
Signed
Dulyauthorizedtosignthesecurityforandonbehalfof
Date
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page99of100
ANNEXII
Form.
ICBNo:KNNLTelemetry1/KNNLFMTICB2
InternationalCompetitivebidsforautomatedwateraccountingusingonlinevolumetricflow
meters,climatestationsinKNNLupperTunga/Bhadra/Gondhi/Tungabhadra/SLIS/
Vijayanagaracanalnetwork.supply,installation,testing,commissioningandmaintenance
of timeofflight volumetric discharge measurement meters for main canals, non contact
open channel type volumetric discharge measurement meters for branches and
distributaries,withremotemeasurement,datatransmissionandcentralizedmonitoring,and
informationsharingfacilityonturnkeybasisfor5years.
(Declaration regarding customs/excise duty exemption for materials/ construction equipment
boughtforthework)
(BiddersNameandAddress)
Name:
Address:
Contact:
To.
TheExecutiveEngineer
KarnatakaNeeravariNigamLimited(KNNL),
No.4DivisionBRLBCBhadravathi,
Shivamogga,Karnatakastate,India
DearSir:
Ref:KNNLTelemetry1
CertificateforImport/ProcurementofGoods/ConstructionEquipment
1. Weconfirmthatwearesolelyresponsibleforobtainingcustoms/excisedutywaiverswhichwe
have considered in our bid and in case of failure to receive such waivers for reasons
whatsoever,theEmployerwillnotcompensateus.
2. WearefurnishingbelowtheinformationrequiredbytheEmployerforissueofthenecessary
certificatesintermsoftheGovernmentofIndiaCentralExciseNotificationNo.108/95and
CustomsNotificationNo.84/97and85/99.
ADBKNNLICBProcurementofGoodsandServices
SingleStage:TwoEnvelope
Page100of100
3. Thegoods/constructionequipmentforwhichcertificatesarerequiredareasunder:
Stat
Items Make/BrandName
Capacity Qua Value e
whether Remarks
wil
[where
ntit
it
l
be regarding
applicab y
procured
justification for
le]
locally
or thequantity and
imported[ifso theirusage
in
fro
m
which works
country]
Goods
[a]
[b]
[c]
4. Weagreethatnomodificationtotheabovelistispermittedafterbidsareopened.
5. Weagreethatthecertificatewillbeissuedonlytotheextentconsideredreasonableby
the Employer for the work, based on the Bill of Quantities and the construction
programmeandmethodologyasfurnishedbyusalongwiththebid.
6. Weconfirmthattheabovegoodswillbeexclusivelyusedfortheconstructionofthe
aboveworkandconstructionequipmentwillnotbesoldorotherwisedisposedofin
anymannerforaperiodoffiveyearsfromthedateofacquisition.
Date:___________________
(Signature)____________________
Place:__________________
(PrintedName)_________________
(Designation)
__________________
(CommonSeal)________________
Thiscertificatewillbeissuedwithin60daysofsigningofcontractandnosubsequentchanges
willbepermitted.
ADBKNNLICBProcurementofGoodsandServices