Anda di halaman 1dari 8

Document TitleGo to marketo to Market Proposaol

UNIT TESTING

UNIT TEST SCRIPT


Test ID
Test
Description
Test
Environment

LP_PA_UT_05

Confirmation
DEV - 401
Version Control

Sr. No.
1

Version Number
1.0

Pre-Requisites

Author
Mr Ravindra Bollapalli

Comments

1) Configure Actions: Confirmation, Maintain Master data , Maintain Organization structure


2) Regular payroll cycle configuration including configuration of payroll master data, configuration of work schedules
3) Configuration of time quotas, Authorization access to Employee master data and Organization structure.
4) UGR=AE, MOLGA=AE in the User parameter settings. Cost centre master data, Bank Master data should have been loaded

YASH Technologies

Confidential

Page 1 of 8

Document TitleGo to marketo to Market Proposaol

UNIT TESTING

TEST CASE
Step
No.

Business Process
step Description

SAP_ECC Menu

Description of the

Expected Result

Select
Confirmation
Action from the
Personnel Actions
Menu, Key in the
Confirmation Date
and Click on
Execute

Human Resources
Personnel Management
Administration HR
Master Data
Transaction Code PA40 Personnel Actions

Perform Hire Action

The Actions infotype


should be displayed for
data entry

Check the details,


select the reason
and save the
Infotype

Transaction code
remains the same for the
whole process

Save details in IT 0000


(Actions)

Organizational
Assignment Infotype will
be displayed for data
entry

If required Key in
Personnel Subarea, Select the
default Business
Area available,
Position and click

Transaction code
remains the same for the
whole process

Enter details in IT 0001


(Organizational
Assignment)

Contract Elements
Infotype will be displayed
for data entry

YASH Technologies

Confidential

Actual
Results/Output
Result

Pass/
Fail

Comments

Page 2 of 8

UNIT TESTING

Document TitleGo to marketo to Market Proposaol

the save button

Select the Contract


type from the given
list and press
enter, then key in
the accrual start
date, Cycle
frequency, Ticket
class, Maximum
dependants
covered, Employee
tickets per cycle,
Dependant tickets
per cycle and click
the savebutton

Transaction code
remains the same for the
whole process

Employee is
successfully
Confirmed in the
system

Transaction code
remains the same for the
whole process

Enter details in IT 0016


(Contract Elements)

PA40 Initial screen is


displayed

PA40 Initial screen is


displayed

ECUTION (Print Name, Sign and Date)


Sr. No

Tester Name

1
2

Ravindra Bollapalli

YASH Technologies

Tester Signature

Confidential

Date

Pass/ Fail

15-01-2014

PASS

Comments

Page 3 of 8

Document TitleGo to marketo to Market Proposaol

UNIT TESTING

3
4

TEST CONCLUSION (Please document Pass or Fail)


POST-EXECUTION REVIEW AND APPROVAL (Print Name, Sign and Date)
Sr. No

Approver Name

Approver Signature

Date

Pass/ Fail

Comments

1
2
3

YASH Technologies

Confidential

Page 4 of 8

Document TitleGo to marketo to Market Proposaol

UNIT TESTING

ANNEXURE

Step No.: 01
Annexure No.: 01

OR

YASH Technologies

Confidential

Page 5 of 8

Document TitleGo to marketo to Market Proposaol

Double-click

1)
2)
3)
4)

UNIT TESTING

to start the transaction or enter Transaction code in the command button as shown

Select the current plan version.


Type the Orgunit no ( this method is used to mainly creation of Orgunit with external Ranges no.)
Select the Object ( it like Orgunit we call it as C)
Select the New Button

YASH Technologies

Confidential

Page 6 of 8

Document TitleGo to marketo to Market Proposaol

1)
2)
3)
4)

UNIT TESTING

Enter the Job no


Select the Object
Check for the dates (start date and End date of the This Object)
Press Create.

YASH Technologies

Confidential

Page 7 of 8

Document TitleGo to marketo to Market Proposaol

UNIT TESTING

1) Give the short aberration of the Job


2) Give the Full description of the job
3) Save the record.

YASH Technologies

Confidential

Page 8 of 8

Anda mungkin juga menyukai