Anda di halaman 1dari 5

The proposed project of extending the current cardio products portfolio has duration

of 65 business days.
The most challenging and most time consuming part of the project was the
marketing research since it required a detailed market survey from around the
country and from specialized cardio doctors (see fig.1).

Fig. 1
Within this period of time we collected opinions and surveys about the peoples
needs for a new cardio product that has not only to suffice their needs but also
exceed them.
Based on this milestone we managed to give birth to our own product based on
customers needs having a competitive advantage.
From research to production was a small step. We managed in 16 days to get the
package artwork, pill size, number of pill in a package done and the pill to be
approved by CNAS(see fig. 2).

Although its a short period of time the job was challenging considering the strong
competition and the finicky way of being of the Romanian customer.
The next logical step to take was to bring the magic pill into country.
We decided on choosing the most suitable supplier for the job and proceeded on
signing on the legal agreements. We had to appeal to an insurance company so we
can transport safely our products into the country.
After we got ourselves hands on the product, we had to establish the next shipping
orders and sign the legal contracts for the delivery terms.
Now we have to take into consideration the large amount of pills that well be
brought into country.
We had to take care of the storage problem. We established that the new upcoming
waves of pills should only be stored for 1 day for their quality control check then
sent to hospitals or pharmacies through our distributors (see fig.3).

The second most time and resource consuming job was to establish the price quota.
Since we are working with local WHS subsidiaries and Pharmacies Chains tend to
establish their price, we had to come with a competitive price package.
The toughest mission was to negotiate with pharmacies chains representatives to
display our product within the upcoming period in their shops we can develop our
retail performance (see fig. 4).

After finishing all the planned steps the project was a success, all the deadlines
were met and we managed to implement the project without any issues.

Project owner:
The Project Owner is ultimately accountable for the success or failure of the project
and has to ensure that the project is focused on achieving its business objectives
and delivering the forecast benefits. The Project Owner has to ensure that the
project gives value for money and adopts a cost effective approach which balances
the demands of the business, users and suppliers. Throughout the project the
Project Owner is responsible for the business case and needs to be able to take a
balanced view of the project on behalf of the wider organization.
The Project Owner runs the project from day to day on behalf. The Project Owner
ensures that the project deliverables are of the required quality, are capable of
delivering the benefits defined in the business case, and produced within the agreed
time and cost.
The responsibilities of the Project Owner include:

directing the project team

managing the project plan

maintaining the risk register, issue and change control logs

Procurement & Insurance Expert:


His role is to research alternatives, weigh the trade-off between quality and price,
and negotiate with vendors.
All businesses conduct procurement activity, but the total cost, efficiency, and
effectiveness of this aspect of the operation varies widely.
These professionals manage vendor relatioships and oversee order placement,
including of raw materials. In our case the procurement specialists also tracks
overall spending and is charged with improving bidding processes. Among the other
job duties of this professional are included price negotiations, purchase order
creation, order tracking and management and price dispute resolutions.
The ultimate responsibility for the procurement specialist is to find quality goods or
services at an acceptable price that meet the organizations needs. The degree to
which this can be done effectively and at an acceptable cost plays a role in the
organizations spending efficiencies and overall financial performance.

Conclusion
The project was a great success considering that all the milestones were reached
within the mentioned time frame and also that we managed to get in the budget
proposed for the project and also save money.
Considering the success of the project we can learn from the mistakes that were
made so we can establish a know-how base and well also maintain the
relationships between project teams with other contributors that helped during the
project in order to keep a strong collaboration for future projects.