AI 01313001
Preparation beech P19 for
transportation
AIRCRAFT GENERAL
Aviation Maintenance Technician school, BONAIRE
Name/Group:
Type:
(Research, practical ...etc)
..............................................
..............................................
..............................................
..............................................
...
...
Remarks
Task
1. Reason/ goal
Give the students the chance during removal/installation the engines and wings from
the aircraft to become familiar with the construction of an aircraft.
Important note: The check list, the discrepancy list and the release statement has to
be filled in, in writing. Nice and readable. This will have its influence on your grade.
ALSO; YOU MUST USE ALL YOU HAVE LEARN IN JEPP CH 17 A&B
AIRCRAFT GENERAL
2. Hypothesis
- The student must c/o a 100 hours inspection on the aircraft and log all
discrepancies found, after installation of wings, empennage and engines. The
student must write down the problem, the parts needed to fix the problem and the
maintenance manual reference.
- The student must by using the installation manual install the engine, wings and
empennage on the aircraft, carry out the necessary paperwork and prepare the
aircraft for flight.
AIRCRAFT GENERAL
5. 50 inspection checklist
BEST AIRWAYS
50HRS INSPECTION CHECKLIST
Aircraft reg:
Hours: 260
Station.
Date:
Inspector:
Sign:
INSP.
DES.
PROPELLER
Cycles:
Lic. No.
ITEM
AIRCRAFT GENERAL
AIRCRAFT GENERAL
6. Discrepancy list
BEST AIRWAYS
INSPECTION DISCREPANCY LIST
Aircraft reg: Pj- ray
Station.
280
Hours:
Cycles:
Date:
Sign:
AIRCRAFT GENERAL
Date:
Technician:
sign:
Date:
Technician:
sign:
Date:
Technician:
MINTENANCE RELEASE
sign:
PARTS REPLACED
Part name:
Part number
AIRCRAFT GENERAL
AIRCRAFT GENERAL