ITEM
EXAMPLE APPLICATIONS
Evaluation of Production
Log Surveys in Multi-Layer
Reservoirs
Non-Conventional PTA
Applications for NonConventional Hydrocarbon
Resources
Estimation of Material
Balance OGIP in Real
Time
Reservoir Limits Test
Analysis
survey to assess relative kh, skin of each contributing layer in both production and injection
wells.
Identify underperforming perforated layer(s) requiring remedial stimulation treatment.
Determine implications of inter-layer cross-flow.
Apply MDT TM test tool to generate sufficient reservoir pressure drawdown to cause
dissociation of natural gas hydrates; evaluate the resultant pressure response
Analyse injection/fall-off behaviour of fracture CBM wells to assess fracture half-length and
effective permeability to water in the presence of a mobile gas phase
Analyse flow/build-up data from fractured oil shales to estimate possible range of OOIP
Analyse both production rate and flowing data in real time using a variety of advanced
decline type-curves to estimate OGIP, expected reserves and reservoir parameters
(kh,skin) in depletion-type gas pools without having to shut-in wells
Estimate most likely gas-in-place figure based on differences in extrapolated static pressure
between successive shut-ins on extended production tests.
Estimate size/shape of reservoir from pseudo-steady state analysis of extended drawdown
period.
Assessment of Injection
Well
Behaviour
Analyse long-term water injection performance, including thermal fracturing effects and
Evaluation of Well
Stimulations
Evaluation of Naturally
Fractured/Karsted
Carbonate Reservoirs
Modified Isochronal and
Multi-Point Gas Test
Interpretation
Drill Stem Test
Interpretation (Both
Conventional and Closed
Chamber)
volume compressibility between two or more wells believed to be in the same reservoir.
fracture closure during a fall-off
Apply Hall plot technique to assess most likely factors which have contributed to changes
Identify by-passed oil/gas pay on tests which recovered only oil cut mud or gas TSTM.
Quantify expected stabilised oil/gas deliverability following removal of drilling damage.