ABB PT S.p.A. U.O.

Adda

PREVENTIVE MAINTENANCE GUIDE

2GJA600065 (E) / rev. 2 / 12.2004

Type PASS M00

ABB

The operational safety of the PASS M00 main components CB, DS, ES, CT, is not affected by any
external impact (such as dirt , humidity etc.) with the exception of the bushings.
On the module we use bushings with an internal cylinder in glass fiber impregnated in epoxy resin,
keeping outside vanes melded on the cylinder: therefore we have a product qualified for use in
polluted environment and in presence of rain .
So our PASS M00 module requires virtually no maintenance for a long time.
The prescribed activities are :
a) periodical inspections
b) preventive maintenance
c) revision
On the attached table (Tab 1) is scheduled an overall view of the activities and the duration for annual
activity.
On instructions chapter are descripted all the activities in detail.
a) Periodical inspection
Functional and visual inspection are carried out without open the gas compartments.
Every one/two years we advise for a visual inspection (with the module in service) :
bushings
check of SF6 density device and relevant indication
recording the number of circuit breaker operations
tightness of LCC doors gaskets
general check of the components : position indicators, connectors , cables , equipotential
connections , earthing circuit . None of the auxiliary equipment must be worn or
overheated and must be no vibration on the relays.
At the end of the first year we advise to retighten screw joints related to anchor bolts and
earthing connection and check the absence of corrosion or deterioration of components.
b) Preventive Maintenance
The preventive Maintenance activities of the PASS M00 is carried out with the module out of
service.
It is performed reaching one of the following conditions:
*) after 5000 mechanical operations
*) when the number of short-circuits is approaching the listed values:
n[number of operations]
I [kA] short-circuit current

3000
1.25

1200
2

160
5

*) after 20 year of service.

2GJA600065 (E) / rev. 2 / 12.2004

2/8

40
10

20
15

10
20

8
25

5
31.5

We advise for:
check of alarms, trips blocks and check of pressure gauge condition
check of humidity level in the SF6 compartments
check and lubrication of disconnecting switch drives mechanism and inspection of tightness of
covers gaskets
check and lubrication of circuit breaker drive mechanism and inspection of tightness of covers
gaskets
repetition of commissioning mechanical test
visual inspection of contacts and CB chamber condition
check of contact resistance of main circuit
absence of corrosion or deterioration of components
check and retighten screw joints
c) Revision
The revision of the PASS M00 is carried out with the module out of service.
It is performed reaching one of the following conditions:
*) after 10000 mechanical operations
*) after 30 year of service.
*) when the number of short-circuits is approaching the above mentioned values
The general revision foresees at 30TH year is carried out with the replacement of PASS
module with one previously reconditioned in order to reduce the outage time

2GJA600065 (E) / rev. 2 / 12.2004

3/8

PASS: PREVENTIVE MAINTENANCE PLAN (periodic inspection - general overhaul)


Component

Activity
DESCRIPTION
bushings
visual check of bushing
visual check of SF6 density device
SF6 enclosure
checks of alarms, and blocks trips
SF6 pressure gauge check
SF6 humidity level check
check and lubrication of drive
mechanism
disconnecting switch mechanical test
visual inspection of contacts
recording of number of operations
circuit breaker
check and lubrication of drive
mechanism
mechanical test
visual inspection of contacts and
CB chamber
main circuit
measurement of contact resistance
tightness of gaskets (doors)
control cubicle
general check
heater function
steel frame and
corrosion on outer material
earthings
retighten screw joints
all components
visual check
duration of annual activity (day)

Exp
is os
is
is
os
os
os
os

A1
A1
A2
A2
A2
A2

Timing [years]
1
2
3
4
5
6
7
8
9 10 11 12 13 14 15 16 17 18 19
yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes
yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes

os A2
os ABB
is
A1 yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes
os A2

yes
yes

os

yes
yes
yes
yes
yes

os

is
is

yes
yes
yes
yes

os A2
os ABB

is
is
is

20
yes
yes
yes
yes
yes
yes

A2
A1
A2
A1
A1

yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes
yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes
yes
yes
yes
yes
yes
yes
yes
yes
yes

A2
A1 yes
0.25 0.25

yes
0.2
5

yes
yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes
0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 1+1(#)
5
5
5
5
5
5 5
5
5
5
5 5
55
5

NOTE
Activity
is = in service
os = out of service
Experience required A1 = unskilled personnel
A2 = Skilled personnel
(#) = the general revision foresees at 30TH year is carried out with the replacement of PASS module with one previously reconditioned in order to reduce the outage
time

2GJA600065 (E) / rev. 2 / 12.2004

4/8

Instructions:
Maintenance type A: Periodical inspection: module in-service
Record the checking result
Inspection type
Visual inspection of bushing
Check of SF6 density device
Recording the number of circuit breaker operations
Tightness of doors gaskets
General check of the components

Retighten screw joints related to anchor bolts and


earthing connection

2GJA600065 (E) / rev. 2 / 12.2004

Timing/tools/personnel
Every year or two years
Tools needed: telescope
Unskilled personnel
Every year or two years
Tools needed: reference values on SLD
Unskilled personnel
Every year or two years
No tools needed
Unskilled personnel
Every year or two years
No tools needed
Unskilled personnel
Every year or two years
No tools needed
Unskilled personnel
End of the first year
Tools needed: dynamometric key, module layout
Skilled personnel

5/8

Instructions
Standing on land check on all sides the condition of
sheds
Record the value seen on the device and compare it
with the reference value
Record the number of circuit breaker operations
reported on counter located on LCC
Open the door of
condition

LCC and check the gasket

Check positon indicators, connectors, cables,


equipotential connections, earthing circuit. None of
the auxiliary equipment must be worn or overheated
and must be no vibration on the relays.
Check the tighten of anchor bolts and earthing
connection and retighten if necessary

Maintenance type B: Preventive Maintenance: module out of service


Inspection type
Check of alarms, trips and blocks and check of pressure
gauge condition

Timing/tools/personnel
Every 20 years
Tools needed: SF6 gas bottle, pression gauge sample,
thermometer
Skilled personnel

Check of humidity level in the SF6 compartments

Every 20 years
Tools needed: hygrometer
Skilled personnel
Every 20 years
No tools needed
Skilled personnel
Every 20 years
No tools needed
Skilled personnel
Every 20 years
Tools needed: recording tool, routine test report
Skilled personnel
Every 20 years
Tools needed: special tools
ABB personnel
Every 20 years
Tools needed: microhommeter, routine test report
Skilled personnel

Check lubrication of gear box of disconnecting switch


drive and inspection of tightness of covers gaskets
Check lubrication of circuit breaker drive mechanism and
inspection of tightness of covers gaskets
Repetition of commissioning mechanical test
Visual inspection of contacts and CB chamber condition
Check of contact resistance of main circuit

Absence of corrosion or deterioration of components


Check and retighten screw joints

2GJA600065 (E) / rev. 2 / 12.2004

Every 20 years
No tools needed
Unskilled personnel
Every 20 years
Tools needed: dynamometric key, module layout
Skilled personnel
6/8

Instructions
Make pression go up and down to check the alarm
trip and blocks function. Compare the pression gauge
sample with the module pression gauge. Taking into
account that sample device is not compensated it must
be converted with ambient temperature. Disassemble
the density monitor unscrewing the 4 screws and
disconnect the plug connector and connect with
special tool the density monitor out going to SF6
bottle
Connect the hygrometer to Dilo Valve, check and
record the humidity value. See also FD217
Open the cover of DS Drive box and lubricate
necessary
Open the cover of CB Driver box and lubricate
necessary
Repeat the times measurement
Disassemble internal part of pole enclosure and
disassemble CB chamber looking at contacts
condition
Following the instruction of standard IEC 694 (IEC
62271-1):
Injection of test current > 100 A
The measured resistance shall not exceed the
resistance value measured in factory during routine
test.
This reference value is reported on test report
External visual check. Anti-rust painting if needed
Check the screw joints and retighten if necessary

Maintenance type C: Revision: module out of service


Inspection type
Revision

Timing/tools/personnel
Every 30 years
Tools needed: various
ABB personnel

Instructions
Complete module revision and substitution or worn
parts

Note 1: all tools mentioned are not supplied, customer must provide them.
Note 2: where ABB personnel is indicated we suggest that maintenance is made by our service division.

2GJA600065 (E) / rev. 2 / 12.2004

7/8

AB B

2GJA600065 (E) / rev. 2 / 12.2004

2GJA600065 (E)

ABB PT S.p.A
U.O. Adda
Via Pavia, 3
26900 Lodi - Italy
tel. +39 0371 452.1
fax. +39 0371 452.222
e-mail : abb-adda.itadd@it.abb.com
internet : http://www.abb.com/it
8/8