1
2
Test instruction
Test procedure
3
4
Document Summary
Document Issue Number
1.0.0
Document Status
release
Document Type
Test Instruction
Document Champion
Document Author
Petra Mauer
Release Date
17-Oct-2007
Retention Time
This document follows the regular retention rules for Alcatel-Lucent Germany
Document Number:
Issue:
1.0.0
Author:
Petra Mauer
Print Date:
10/19/2007
Page:
1 of 9
CONTENTS
Overview
1.1
List of Changes
Test flow
10
11
Document Number:
Issue:
1.0.0
Author:
Petra Mauer
Print Date:
10/19/2007
Page:
2 of 9
12
Overview
13
1.1
List of Changes
14
All changes incorporated compared with previous versions, incl. Reason for change (e.g. CAR).
Version
Date
Affected chapter
V1.0.0
17-Oct-2007
Initial version
all
15
Document Number:
Issue:
1.0.0
Author:
Petra Mauer
Print Date:
10/19/2007
Page:
3 of 9
16
Test flow
17
2.1
18
19
20
Note:
2.1.1
The manual Grounding Test has to be done before the BTS is connected to the power
supply.
Isolation
21
PURPOSE
22
23
PREPARATION
24
25
RRH that is isolated from its external power source(s) and other lines
MEASUREMENT
26
27
28
29
30
31
Check resistance between the DC supply input terminal and chassis ground, using handheld
multimeter or similar. Perform the same measurement between supply return and chassis ground.
The values should be greater than 1M.
DC Return
Chassis
Ground
DC Supply
32
33
34
Figure: 1
Document Number:
Issue:
1.0.0
Author:
Petra Mauer
Print Date:
10/19/2007
Page:
4 of 9
35
2.1.2
36
PURPOSE
37
38
Check for continuity between the designated grounding point of the BTS and any dead metal part
equipped.
39
PREPARATION
40
BTS that is isolated from its external power source(s) and other lines
41
MEASUREMENT
42
43
Check resistance with handheld multimeter or similar between chassis ground and the test point of
each unit equipped. The test points for the units are shown in figure below.
44
45
46
47
48
Amplifier
PSU (Power Supply)
Filter
FTR (radio)
49
Chassis
Ground
50
51
52
Figure: 2
Document Number:
Issue:
1.0.0
Author:
Petra Mauer
Print Date:
10/19/2007
Page:
5 of 9
53
Test point
Power Supply
Chassis
Ground
54
55
Figure: 3
56
57
Test point
Filter
Chassis
Ground
58
59
60
Figure: 4
Document Number:
Issue:
1.0.0
Author:
Petra Mauer
Print Date:
10/19/2007
Page:
6 of 9
61
2.2
62
63
64
Note:
2.2.1
The manual Grounding Test has to be done before the BTS is connected to the power
supply.
Isolation
65
PURPOSE
66
67
PREPARATION
68
RRH that is isolated from its external power source(s) and other lines
69
70
MEASUREMENT
71
72
73
74
75
76
Check resistance between the DC supply input terminal and chassis ground, using handheld
multimeter or similar. Perform the same measurement between supply return and chassis ground.
The values should be greater than 1M.
DC Return
DC Supply
Chassis
Ground
77
78
79
Figure: 5
Document Number:
Issue:
1.0.0
Author:
Petra Mauer
Print Date:
10/19/2007
Page:
7 of 9
80
2.2.2
81
PURPOSE
82
83
Check for continuity between the designated grounding point of the BTS and any dead metal part
equipped.
84
PREPARATION
85
BTS that is isolated from its external power source(s) and other lines
86
MEASUREMENT
87
88
Check resistance with handheld multimeter or similar between chassis ground and the test point of
each unit equipped. The test points for the units are shown in figure below.
89
90
91
92
93
Filter
Amplifier
FTR (radio)
PSU (Power Supply)
94
Chassis
Ground
95
96
97
Figure: 6
98
Document Number:
Issue:
1.0.0
Author:
Petra Mauer
Print Date:
10/19/2007
Page:
8 of 9
99
Chassis
Ground
100
101
102
Figure: 7
103
Document Number:
Issue:
1.0.0
Author:
Petra Mauer
Print Date:
10/19/2007
Page:
9 of 9