PREFACE

BuildingRegulationshadbeeninusebyvariousMunicipalAdministrationsfromaboutthe1940s,andin
1960,thethenWestAfricanBuildingResearchInstitute(WABRI)published,aPartIIIoftheCodedealing
withloads,tobeusedincivilengineeringstructures.
Bytheearly1970stheCodeandBuildingRegulationswereobviouslyoutofdateandtheBuildingand
Road Research Institute (BRRI) of the Council for Scientific and Industrial Research (CSIR) decided to
produceadraftdocument,fordiscussion,modificationanduseasabasisforafinalCodetoaddressthe
redundancyoftheearlierdocuments.
TheeffortwasundertakenbyDr.K.AmonooNeizerandPart3and4oftheDraftCodewaspublishedin
1977,followedbytheParts1,2and5by1988.
Withchangesinlandusepatterns,materialsandconstructionmethodsandlocalgovernmentstructure,
the Ministry of Works and Housing had produce, a document National Building Regulations, 1996
which was gazetted as LI 1630. This document was to improve upon the Building Regulations of the
ColonialtimesandtocomplementtheBRRIDraftBuildingCode.
The present effort is to produce a Draft Building Code which will take in, all the requirements of the
existing building regulations and the BRRI Draft Building Code and be in tune with requirements of a
building code to answer current land use patterns, materials for construction, construction methods,
constructionmanagementpractices,safetyandenergyefficientuseofresources.
This document, the Draft Ghana Building Code (2012) has been compiled under the auspices of the
MinistryofWaterResources,WorksandHousing(MWRWH)withfundingfromtheUNDP,throughthe
NationalDisasterManagementOrganization(NADMO).
A technical committee made up of representatives of relevant stakeholding institutions (as given
below)compiledthedocument,usingtheBRRIDraftBuildingCode,thenationalBuildingCodesofIndia
(2005)andCanadaastemplates.

ACKNOWLEDGEMENT
ThesupportoftheUnitedNationsDevelopmentProgramme(UNDP),theMWRWH,NADMO,theCSIR
BRRIandDr.K.AmonooNeizeraregratefullyacknowledged.


DRAFTGHANABUILDINGCODE(2012)TECHNCIALCOMMITTEE

Chairman Ing.JohnTettey

MinistryofWaterResources,Works

andHousing(MWRWH)

Organization

Representative(s)

MWRWH
Ing.JohnTettey
1.

2.

3.

4.

CSIRBuilding and Road Research


Institute(CSIRBRRI)

GhanaStandardsAuthority(GSA)

GhanaInstitutionofGeoScientists

Surv.LouisLawerteh

Arch.C.PobeeAbbey

Ing.K.A.SolomonAyeh
Surv.E.OseiTutu

Ing.WilliamNimako
Mr.EricAcheampong

Rev.Fr.SamuelWood

5.

GhanaInstitutionofSurveyors

Surv.G.A.Atieku

6.

GhanaInstituteofArchitects

Arch.OseiKwameAgyemang

7.

GhanaInstitutionofEngineers

Ing.SethAttipoeDenya

8.

GhanaInstitutionofPlanners

Mr.SylvesterAddaPwalia

9.

GhanaNationalFireService

DavidSamAfful

10.

ElectricityCompanyofGhana

Arc.TeiOkletey

11.

12.

13.

Ministry of Local Government and


RuralDevelopment(MLGRD)

Architectural and Engineering


ServicesLimited(AESL)

National Disaster Management


Organization(NADMO)

Consultants

Mrs.LevinaOwusu

Arch.EricAnsah

Mr.JosephAnkrah

Mr.P.Y.Amoako

Ing.K.A.SolomonAyeh
Ing.DrK.AmonooNeizer

GuidetotheUseoftheCode
TheGhanaBuildingCodecontainsregulationswhichcanbeimmediatelyadoptedorenactedforuseby
variousdepartments,metropolitan,municipalanddistrictassemblies,privateandpublicbodies.Itlays
downasetofminimumregulationsdesignedtoprotectthesafetyofthepublicwithregardtostructural
efficiency,firehazardsandhealthaspectsofbuildings.Solongasthesebasicrequirementsaremet,the
choice of materials and methods of design and construction is left to the ingenuity of the building
professionals. The Code achieves the foregoing by covering aspects of administrative regulations;
development control rules and general building requirements; stipulations regarding structural loads
and design; materials; building services; measures to ensure safety of workers and the public during
constructionandrulesforerectionofsignsandoutdoordisplaystructures.
Aswithotherbuildingcodes,thiscodeisnotintendedtobeatextbookonbuildingdesign;adviceupon
whichshouldbesoughtfromprofessionalsources.
ThepresentCodeisamodificationoftheBRRIDraftBuildingCodeinthefollowingareas:
1) A summary of definitions as contained in various Parts of the Code, with reference to where
suchdefinitionswillbefound.

2) Anewsection(Part4)onDevelopmentControlRulesandGeneralBuildingRequirements.

3) A new section (Part 8) on acceptable materials for use in building in Ghana and standards by
whichtheywillbeassessed.

4) Anewsection(Part9)onBuildingServices.

5) AnewsectiononEnergyEfficiencyandSustainability(Part10),settingouttherequirementsand
recommendations for the energy efficient use of service appliances and other equipment
installedinbuildings.ThecontentsofthissectionareextensivelyexpandedoninPart9.

6) Anewsection(Part11)onHealth,SafetyandtheEnvironment.

ThearrangementofthepresentCodeandBRRIDraftBuildingCodeareshowninTable1.

Table1:

Comparisonofcontentsof1988and2012BuildingCodes

BRRIBuildingCode(1988)

DraftGhanaBuildingCode(2012)

Part
1

Title

Title

Part

Administration

ScopeandDefinition

UseandOccupancy

Administration

UseandOccupancy

DevelopmentControl,
Rulesandgeneral
buildingrequirements

StructuralLoads
andProcedures

Foundations

Structuralloadsanddesign

HousingandSmallBuildings

Foundations

Housing,SmallandRuralBuildings

MaterialsandStandards

BuildingServices

10

11

EnergyEfficiencyandSustainability
ConstructionalPractices,Safetyand
theEnvironment

NumberingSystemofCode
A decimal numbering system has been used throughout the Code. The first number (or the first two
numbersinPart9)indicatesthePartoftheCode.ThesecondnumberindicatesthesectioninthePart,
thethird,thesubsectionandthefourththeArticleinthesubsection.Anarticlemayfurtherbebroken
intosentences(indicatedbynumbersinbrackets)andsentencesfurtherdividedintoclausesandsub
clauses.Theseareillustratedasfollows:
3.

Part

3.5

Section

3.5.1

Subsection

3.5.1.6

Article

3.5.1.6(1)

Sentence

3.5.1.6(1)(e)

Clause

3.5.1.6(1)(e)(i)

Subclause

Abbreviations
GSGhanaStandards
GHASGhanaHighwayAuthorityStandards
GBCGhanaBuildingCode
BSBritishStandards
BSENBritishEuropeanStandards
ISIndianStandards

TABLE OF CONTENTS OF CODE

PART1

SCPOEANDDEFINITIONS21

PART2

ADMINISTRATION

28

PART3

USEANDOCCUPANCY

126

PART4

DEVELOPMENTCONTROLRULESANDGENERAL

BUILDINGREQUIREMENTS

82

PART5

STRUCTURALLOADSANDDESIGN

42

PART6

FOUNDATIONS

13

PART7

HOUSINGANDSMALLBUILDINGS

66

PART8

MATERIALSANDSTANDARDS

PART9

BUILDINGSERVICES

413

PART10

ENERGYEFFICIENCYANDSUSTAINABILITY

PART11

CONSTRUCTIONALPRACTICES,SAFETYANDTHEENVIRONMENT

NO. OF PAGES

98

PART1:DEFINITIONS
1.0 SCOPE
1.1ThisCodeorbylawmaybecitedastheGhanaBuildingCode(2012)
1.2ThisCodeappliestothedesign,constructionandoccupancyofnewbuildings,andthealteration,
reconstruction,demolition,removal,relocationandoccupancyofexistingbuildingsandtheservices
withinthesebuildings.
2.0DEFINITIONSOFWORDSANDPHRASES
2.1ThispartliststhetermsappearinginallParts/SectionsoftheGhanaBuildingCode(2012).Theterms
havebeenarrangedinalphabeticalorder.TheParts/Sectionsinwhichthesetermsareappearing,have
beenindicatedagainsttheterms.

Part5/Section5.9

Access(Exit)Part2/Section1.2

ApparatusPart9.2/Section2.1

AccesspanelPart9.6/Section2.1

AppliancePart9.2/Section2.1

AccessoryPart9.2/Section2.1

AppliancevalvePart9.7/Section2

AccessoryusePart2/Section1.2

ApproachFunnelPart4/AppendixA

AerodromeReferencePoint(ARP)

ApprovedPart2/Section1.2

Part4/AppendixA

AtmosphericpressurePart9.3/Section2

AgingPart4/AppendixE

AudibleFrequencyRangePart9.4/Section2

AirconditioningPart9.3/Section1.2

AutomaticrescuedevicePart9.5/Section2

AirgapPart9.6/Section2

AuthorityhavingjurisdictionPart1/Sect.1.2

AirvalvePart9.6/Section2

AvailableheadPart9.6/Section2

AlterationPart2/Section1.2

AWeightedSoundPressure,PA

Altitude()Part9.1/Section2.1

Part9.4/Section2

AmbientNoisePart9.4/Section2

AWeightedSoundPressureLevel

Angleofattack/incidence()

Part9.4/Section2
8

Azimuth()Part9.1/Section2.1

Part9.6/Section2.1

Branchventilatingpipe(BVP)

Part9.6/Section2.1

BackflowPart9.6/Section2.1

Branchwastepipe(BWP)

Backflowpreventiondevice

Part9.6/Section2.1

Part9.6/Section2.1

Breadth(b)Part5/Section5.9

BackgroundnoisePart9.4/Section2

BreakinPart9.4/Section2

BackupPart9.6/Section2.1

BreakoutPart9.4/Section2

BalconyPart4/Section2.1

Brightnessratioorcontrast

BalusterPart9.5/Section2

Part9.1/Section2.1

BalustradePart9.5/Section2

BroadbandnoisePart9.4/Section2

BarrelPart9.6/Section2.1

BufferPart9.5/Section2

BasePart9.6/Section2.1

BuildingPart2/Section1.2

BasementorcellarPart4/Section2.1

Buildingdrain,combined

BasementstoreyPart3/Section1.2

Part9.6/Section2.1

BatteryoffixturesPart9.6/Section2.1

Buildingdrain,sanitary

BeddingPart9.6/Section2.1

Part9.6/Section2.1

BenchingPart9.6/Section2.1

Buildingdrain,storm

BottomcarrunbyPart9.5/Section2

Part9.6/Section2.1

Bottomcounterweightrunby

Building,heightofPart2/Section1.2

Part9.5/Section2

BuildinglinePart2/Section1.2

BranchPart9.6/Section2.1

BuildingsRelatedIllnesses(BRI)

Branchsoilpipe(BSP)

Part9.3/Section2

Part9.6/Section2.1

BuildingsewerPart9.6/Section2.1

Branchsoilwastepipe(BSWP)

BuildingsubdrainPart9.6/Section2.1
9

BuildingtrapPart9.6/Section2.1

ChairPart9.6/Section2.1

BunchedPart9.2/Section2.1

ChannelPart9.6/Section2.1

ChutePart9.6/Section2.1

CabinPart4/Section2.1

CisternPart9.6/Section2.1

CablePart9.2/Section2.1

CleaningeyePart9.6/Section2.1

Cable,armouredPart9.2/Section2.1

CleardesignskyPart9.1/Section2.1

Cable,flexiblePart9.2/Section2.1

ClearwastewaterPart9.6/Section2.1

Cable,metalsheathedPart9.2/Section2.1

CleatPart9.2/Section2.1

Cable,PVCsheathedinsulated

ColourRenderingIndex(CRI)

Part9.2/Section2.1

Part9.1/Section2.1

Cable,weatherproofPart9.2/Section2.1

CollectionchamberPart9.6/Section2.1

Cable,XLPEPart9.2/Section2.1

CommonstairwayPart7/Section7.2.1

CallindicatorPart9.5/Section2

CommunicationpipePart9.6/Section2.1

Candela(c/d)Part9.1/Section2.1

CompartmentPart3/Section1.2

CarbodyworkPart9.5/Section2

Compartmentwallandcompartmentfloor

CardoorelectriccontactPart9.5/Section2

Part3/Section1.2

CarframePart9.5/Section2

Conductor,aerialPart9.2/Section2.1

CarplatformPart9.5/Section2

Conductor,barePart9.2/Section2.1

CarpetareaPart4/Section2.1

Conductor,earthedPart9.2/Section2.1

CeilingrosePart9.2/Section2.1

Conductor,insulatedPart9.2/Section2.1

CircuitPart9.2/Section2.1

Conductorofacableorcore

CircuitbreakerPart9.2/Section2.1

Part9.2/Section2.1

Circuit,finalsubPart9.2/Section2.1

ConnectionPart9.6/Section2.1

CentralfieldPart9.1/Section2.1

ConnectorPart9.2/Section2.1

CesspoolPart9.6/Section2.1

Connectorboxorjointbox
10

Part9.2/Section2.1

Connectorforportableappliances

DampsituationPart9.2/Section2.1

Part9.2/Section2.1

DaylightareaPart9.1/Section2.1

ConstructionequipmentPart11/Section4.2.1

DaylightfactorPart9.1/Section2.1

ConsumerPart9.6/Section2.1

DaylightpenetrationPart9.1/Section2.1

ConsumerspipePart9.6/Section2.1

DeadPart9.2/Section2.1

ConsumersterminalsPart9.2/Section2.1

DeadloadsPart5/Section2.1

ControlPart9.5/Section2

DecibelsPart9.4/Section2

ConversionPart2/Section1.2

DeepmanholePart9.6/Section2.1

CookingalcovePart4/Section2.1

DeflectorsheavePart9.5/Section2

Cord,flexiblePart9.2/Section2.1

DensityPart4/Section2.1

CoreofacablePart9.2/Section2.1

Depth(D)Part5/Section5.9

CorrelatedColourTemperature(CCT)

DepthofmanholePart9.6/Section2.1

Part9.1/Section2.1

DetachedbuildingPart4/Section2.1

CourtyardPart4/Section2.1

DevelopmentPart2/Section1.2

CounterweightPart9.5/Section2.1

DewpointtemperaturePart9.3/Section2

CoverPart9.6/Section2.1

DiameterPart9.6/Section2.1

CoveredareaPart4/Section2.1

DirectsolarilluminancePart9.1/Section2.1

CrossconnectionPart9.6/Section2.1

DirectearthingsystemPart9.2/Section2.1

CrosstalkPart9.4/Section2

DirecttapPart9.6/Section2.1

CrownoftrapPart9.6/Section2.1

DisabilitiesofIncoordination

Customers/consumersconnection

Part4/AppendixE

Part9.7/Section2

Distance area /Resistance area (for earth


electrodeonly)Part9.2/Section2.1

CutoutPart9.1/Section2.1

Discrimination/OvercurrentDiscrimination
11

Part/Section2.1

Earthleakagecircuitbreakersystem

DoorPart3/Section1.2,Part9.5/Section2

Part9.2/Section2.1

DoorcloserPart9.5/Section2

EarthquakeloadsPart5/Section2.1

DooroperatorPart9.5/Section2

Effective Perceived Noise Level in decibels


(EPNdB)Part9.4/Section2

DowntaketapPart9.6/Section2.1
DrainPart2/Section1.2
Drainventilatingpipe(DVP)
Part9.6/Section2.1
DrainagePart2/Section1.2
DrainageworkPart9.6/Section2.1
DropconnectionPart9.6/Section2.1
DropmanholePart9.6/Section2.1
DrybulbtemperaturePart9.3/Section2
DuctsystemPart9.3/Section2
DumpwaitersPart9.5/Section2
Dwellingunit/TenementPart4/Section2.1
DynamicPressureofwindPart5/Section5.9

EffectiveopeningPart9.6/Section2.1
EffectiveFrontalarea(Ae)Part5/Section5.9
Electricalandmechanicalinterlock
Part9.5/Section2
Electromechanicallock
Part9.5/Section2
ElementofstructurePart3/Section1.2
ElementofsurfaceareaPart5/Section5.9
ElevationorReducedlevelPart4/AppendixA
Emergencystoppushorswitch
Part9.5/Section2
Encloseddistributionboard
Part9.2/Section2.1
EnthalpyPart9.3/Section2

EarthPart9.2/Section

Equivalent continuous Aweighted sound


pressurelevel,LAeg.TPart9.4/Section2

Earthcontinuityconductor

Equivalentsoundabsorptionareaofaroom

Part9.2/Section2.1

Part9.4/Section2

EarthelectrodePart9.2/Section2.1

EscalatorPart9.5/Section2

EarthfaultPart9.2/Section2.1

EscalatorinstallationsPart9.5/Section2

EarthingleadPart9.2/Section2.1

EscalatorlandingPart9.5/Section2
12

EscalatorlandingzonePart9.5/Section2

FloorAreaRatio(FAR)Part4/Section2

EscalatormachinePart9.5/Section2

FloorholePart11/Section4.2.1

ExitPart4/Section2.1

FloorlevelingswitchPart9.5/Section2

ExposedmetalPart9.2/Section2.1

FlooropeningPart11/Section4.2.1

ExternallynoncombustiblePart3/Section1.2

FloorselectorPart9.5/Section2

ExternalReflectedComponent(ERC)

FloorstoppingswitchPart9.5/Section2

Part9.1/Section2.1

FlushingcisternPart9.6/Section2.1

EvaporativeaircoolingPart9.3/Section2

FormationPart9.6/Section2.1

Forcecoefficient(Cf)Part5/Section5.9

FreefieldlevelPart9.4/Section2

FaadelevelPart9.4/Section2

Frenchdrain/rubbledrain

FeedcisternPart9.6/Section2.1

Part9.6/Section2.1

FiredamperPart9.3/Section2

FrequencyPart9.4/Section2

FireseparationPart4/Section2

FusePart9.2/Section2.1

FireseparationwallPart9.3/Section2

FuseelementPart9.2/Section2.1

FirestopPart3/Section1.2

FiresurvivalcablePart9.2/Section2.1

Fitting,lightingPart9.2/Section2.1

GalleryPart4/Section2.1

FittingsPart9.6/Section2.1

Garage,privatePart4/Section2.1

FixtureunitPart9.6/Section2.1

Garage,publicPart4/Section2.1

FixtureunitdrainagePart9.6/Section2.1

GasfitterPart9.7/Section2

FlameproofenclosurePart9.2/Section2.1

GearedmachinePart9.5/Section2

FlameretardantcablePart9.2/Section2.1

GearlessmachinePart9.5/Section2

FloatoperatedvalvePart9.6/Section2.1

GeneralwashingplacePart9.6/Section2.1

FloorPart4/Section2

GeyserPart9.6/Section2.1
13

GlarePart9.1/Section2.1

HighwayauthorityPart9.6/Section2.1

GlobalWarmingPotential(GWP)

HoistingbeamPart9.5/Section2

Part9.3/Section2

HorizontalpipePart9.6/Section2.1

GoodsliftPart9.5/Section2

HospitalliftPart9.5/Section2

GroundroughnessPart5/Section5.9

HotwatertankPart9.6/Section2.1

GroundstoreyPart3/Section1.2

HydronicsystemsPart9.3/Section2

GrouphousingPart4/Section2.1

GuardrailingPart11/Section4.2.1

GuiderailsPart9.5/Section2

IlluminancePart9.1/Section2.1

GuiderailsfixingPart9.5/Section2

Impactsoundpressurelevel,Li

GuiderailsshoePart9.5/Section2

Part9.4/Section2

GullychamberPart9.6/Section2.1

Imposed(Live)loadsPart5/Section5.2

GullytrapPart9.6/Section2.1

IndoorAirQuality(IAQ)Part9.3/Section2

IndoorambientnoisePart9.4/Section2

InflammablePart9.2/Section2.1

HabitableroomPart4/Section2.1

Infiltration/exfiltrationPart9.3/Section2

Harmonics(currentandvoltage)

InletPart9.6/Section2.1

Part9.2/Section2.1

InsertionLoss(LIL)Part9.4/Section2

HaunchingPart9.6/Section2.1

InspectionchamberPart9.6/Section2.1

Heelrestbend/duckfootbend

Installation(electrical),ofbuildings

Part9.6/Section2.1

Part9.2/Section2.1

HearingdisabilitiesPart4/AppendixE

InsulatedPart9.2/Section2.1

Heightofbuilding(H)Part3/Section1.2

Insulation,basicPart9.2/Section2.1

Part5/Section5.9

Insulation,doublePart9.2/Section2.1

HighaltitudesPart9.6/Section2.1

Insulation(electrical)Part9.2/Section2.1
14

Insulation,reinforcedPart9.2/Section2.1

LiftPart4/Section2.1

Insulation,supplementary

LiftcarPart9.5/Section2

Part9.2/Section2.1

LiftlandingPart9.5/Section2

InterceptorPart9.6/Section2.1

LiftmachinePart9.5/Section2

Interceptormanhole/interceptorchamber

LiftpitPart9.5/Section2

Part9.6/Section2.1

LiftwellPart9.5/Section2

InternalReflectedComponent(IRC)

LiftwellenclosurePart9.5/Section2

Part9.1/Section2.1

LightOutputRatio(LOR)/Efficiency()

InvertPart9.6/Section2.1

Part9.1/Section2.1

LinkedswitchPart9.2/Section2.1

Live/AlivePart9.2/Section2.1

JunctionpipePart9.6/Section2.1

Live(Imposed)loadsPart5/Section2.1

Locations,industrialPart9.2/Section2.1

LaggingPart9.6/Section2.1

Locations,nonindustrialPart9.2/Section2.1

LandingcallpushPart9.5/Section2

LoftPart4/Section2.1

LandingdoorPart9.5/Section2

Lumen(lm)Part9.1/Section2.1

LandingzonePart9.5/Section2

LuminancePart9.1/Section2.1

LedgePart4/Section2.1

Luminousflux()Part9.1/Section2.1

Length(l)Part5/Section5.9

LevellingdevicesPart9.5/Section2

LevellingzonePart9.5/Section2

Mainsoilpipe(MSP)Part9.6/Section2.1

Licensed
Architect/Engineer/Structural
Engineer/Supervisor/TownPlanner

Mainsoilandwastepipe(MSWP)

Part2/Section1.2
LicensedplumberPart9.6/Section2.1

Part9.6/Section2.1
MaintenanceFactor(d)Part9.1/Section2.1
Mainventilatingpipe(MVP)
15

Part9.6/Section2.1

NotionalwidthPart7/Section7.2.1

Mainwastepipe(MWP)Part9.6/Section2.1

ManholePart9.6/Section2.1

ManholechamberPart9.6/Section2.1

Occupancy/UsegroupPart2/Section1.2

MaterialhandlinghoistPart11/Section4.2.1

OccupierPart2/Section1.2

MeridianPart9.1/Section2.1

OctavebandPart9.4/Section2

MezzaninefloorPart4/Section2.1

OffsetPart9.6/Section2.1

MiniaturecircuitbreakerPart9.2/Section2.1

OpencarportPart3/Section1.2

Multipleearthedneutralsystem

OpenspacePart4/Section2.1

Part9.2/Section2.1

Openspace,frontPart4/Section2.1

Openspace,rearPart4/Section2.1

Openspace,sidePart4/Section2.1

NeutralconductorPart9.2/Section2.1

OperationPart9.5/Section2

NoisePart9.4/Section2

OperatingdevicePart9.5/Section2

NoiseExposureForecast(NEF)

OperationalconstructionPart2/Section1.2

Part9.4/Section2

OrientationofbuildingsPart9.1/Section2.1

NoiseRating(NR)Part9.4/Section2

OverheadbeamsPart9.5/Section2

NoiseReductionCoefficient(NRC)

OverspeedgovernorPart9.5/Section2

Part9.4/Section2

OwnerPart2/Section1.2

NonAmbulatoryDisabilities

OzoneDepletionPotential(ODP)

Part4/AppendixE

Part9.3/Section2

NonservicelatrinePart9.6/Section2.1

NormalizedImpactSoundPressureLevel,Ln

ParallelstepPart7/Section7.2.1

Part9.4/Section2

ParapetPart4/Section2.1

NorthandSouthpointsPart9.1/Section2.1

ParkingspacePart4/Section2.1
16

PartitionPart4/Section2.1

PositiveventilationPart9.3/Section2

Percentilelevel,LAN,TPart9.4/Section2

PotablewaterPart9.6/Section2.1

PassengerliftPart9.5/Section2

PremisesPart9.6/Section2.1

PeriodofsupplyPart9.6/Section2.1

PressurecoefficientPart5/Section5.9

PeripheralfieldPart9.1/Section2.1

PressureregulatorPart9.7/Section2

PermitPart2/Section1.2

PrivatestaircasePart7/Section7.2.1

Permittedlimitofunprotectedarea

ProtectedshaftPart3/Section1.2

Part3/Section1.2

PsychrometryPart9.3/Section2

PilerigPart11/Section4.2.1

PsychrometricchartPart9.3/Section2

PilotPart9.7/Section2

PuffventilationPart9.6/Section2.1

PinknoisePart9.4/Section2

PuretonePart9.4/Section2

PipesystemPart9.6/Section2.1

PurgePart9.7/Section2

PipeworkPart9.6/Section2.1

PitchlinePart7/Section7.2.1

PlatformPart11/Section4.2.1

QualifiedinstallingagencyPart9.7/Section2

PlenumPart9.3/Section2

PlinthPart4/Section2.1

PlinthareaPart4/Section2.1

Ramps,Rampswithgradients

PlugPart9.1/Section2.1

Part4/AppendixE

PlumbingPart9.6/Section2.1
PlumbingsystemPart9.6/Section2.1
Point(inwiring)Part9.1/Section2.1
PorchPart4/Section2.1
Positionand/ordirectionindicator
Part9.5/Section2

Ratedload(lift)Part9.5/Section2
Ratedload(escalator)Part9.5/Section2
Ratedspeed(lift)Part9.5/Section2
Ratedspeed(escalator)Part9.5/Section2
Ratinglevel,LAr,TrPart9.4/Section2
RecirculatedairPart9.3/Section2
17

ReflectedglarePart9.1/Section2.1

SanctionedplanPart2/Section1.2

Reflectionfactor(Reflectance)

SanitaryappliancesPart9.6/Section2.1

Part9.1/Section2.1

ScaffoldPart11/Section4.2.1

RefrigerantPart9.3/Section2

SemiAmbulatoryDisabilities

RelativehumidityPart9.3/Section2

Part4/AppendixE

RelevantboundaryPart3/Section1.2

SemidetachedbuildingPart4/Section2.1

RiserPart9.7/Section2

SeparatingwallPart3/Section1.2

Residualcurrentcircuitbreaker

ServicePart9.2/Section2.1

Part9.2/Section2.1

ServicelatrinePart9.6/Section2.1

ResidualheadPart9.6/Section2.1

ServiceliftPart9.5/Section2

RetiringcamPart9.5/Section2

ServicepipePart9.6/Section2.1

RopingmultiplePart9.5/Section2

ServiceroadPart2/Section1.2

ReturnairPart9.3/Section2

Serviceshutoffvalve(isolationvalve)

RevealPart9.1/Section2.1

Part9.7/Section2

Reverberationtime,TPart9.4/Section2

SetbacklinePart2/Section1.2

RoadPart2/Section1.2

SewerPart9.6/Section2.1

RoadlinePart2/Section1.2

ShadefactorPart9.3/Section2

RoomheightPart2/Section1.2

SheavePart9.5/Section2

RoomIndex(kr)Part9.1/Section2.1

SickBuildingSyndrome(SBS)

Rowhousing/rowtypebuilding

Part9.3/Section2

Part4/Section2.1

SightDisabilitiesPart4/AppendixE

SitePart2/Section1.2

Site,cornerPart4/Section2.1

SaddlePart9.6/Section2.1

Site,depthofPart4/Section2.1

SafetygearPart9.5/Section2

Site,doublefrontagePart4/Section2.1
18

Site,interiorortandemPart4/Section2.1

StandardizedImpactSoundPressureLevel,LnT

SkyComponent(SC)Part9.1/Section2.1

Part9.4/Section2

SlackropeswitchPart9.5/Section2

StandardizedLevelDifference,DnT

Slophopper(slopsink)Part9.6/Section2.1

Part9.4/Section2

SmokedamperPart9.3/Section2

StaticpressurePart9.3/Section2

SoakawayPart9.6/Section2.1

StopcockPart9.6/Section2.1

SocketoutletPart9.2/Section2.1

StoptapPart9.6/Section2.1

Soffit(crown)Part9.6/Section2.1

StoragetankPart9.6/Section2.1

SoilappliancesPart9.6/Section2.1

StoreyPart4/Section2.1

SoilpipePart9.6/Section2.1

Storey,topmostPart4/Section2.1

SoilwastePart9.6/Section2.1

StreetPart2/Section1.2

SolarloadPart9.1/Section2.1

StreetlevelorgradePart2/Section1.2

SoundPart9.4/Section2

StreetlinePart2/Section1.2

SoundExposureLevel,LAEPart9.4/Section2

StructurebornenoisePart9.4/Section2

SoundpowerPart9.4/Section2

SubsoilwaterPart9.6/Section2.1

SoundPowerLevel,LWPart9.4/Section2

SubsoilwaterdrainPart9.6/Section2.1

Soundpressure,pPart9.4/Section2

SullagePart9.6/Section2.1

SoundPressureLevel,LPPart9.4/Section2

SupplyairPart9.3/Section2

SoundreceiverPart9.4/Section2

Supplyandreturnairgrillsanddiffusers

SoundreductionIndex,RPart9.4/Section2

Part9.3/Section2

SoundsourcePart9.4/Section2

SupplypipePart9.6/Section2.1

SpectrumPart9.4/Section2

SupportsPart9.6/Section2.1

SpeechInterferenceLevel(SIL)

SurfacewaterPart9.6/Section2.1

Part9.4/Section2

SurfacewaterdrainPart9.6/Section2.1

StaircoverPart4/Section2.1

SuspensionropesPart9.5/Section2
19

SwitchPart9.2/Section2.1

TransientsoundPart9.4/Section2

SwitchboardPart9.2/Section2.1

TransitionalAreaPart4/AppendixA

SwitchdisconnectorsPart9.2/Section2.1

TrapPart9.6/Section2.1

SwitchdisconnectorfusePart9.2/Section2.1

TravelPart9.5/Section2

SwitchgearPart9.2/Section2.1

SystemsofdrainagePart9.6/Section2.1

UnprotectedareaPart3/Section1.2

UnsafebuildingPart2/Section1.2

UsablewallspacePart9.2/Section2.1

TaperedstepsPart7/Section7.2.1

UtilizationFactor(CoefficientoUtilization)()

TerminalslowdownswitchPart9.5/Section2

Part9.1/Section2.1

Terminalstoppingswitchnormal

Part9.5/Section2

Terminalstoppingdevicefinal

Ventstack/VentpipePart9.6/Section2.1

Partb9.5/Section2

VentsystemPart9.6/Section2.1

ThermaltransmittancePart9.3/Section2

VerandahPart4/Section2.1

ThermalenergystoragePart9.3/Section2

VerticalpipePart9.6/Section2.1

ThirdoctavebandPart9.4/Section2

VibrationisolationPart9.4/Section2

ThresholdofhearingPart9.4/Section2

VisualfieldPart9.1/Section2.1

ToabutPart4/Section2.1

VolumetoPlotAreaRatio(VPR)

ToeboardPart11/Section4.2.1

Part4/Section2.1

ToerectPart2/Section1.2

Voltage,ExtraHigh(EHT)Part9.2/Section2.1

Topography(orography)Part5/Section5.9

Voltage,ExtraLow(ELV)Part9.2/Section2.1

TotalheadroomPart9.5/Section2

Voltage,High(HT,HV)Part9.2/Section2.1

TowerlikestructuresPart4/Section2.1

Voltage,Low(LV)Part9.2/Section2.1

TradeeffluentPart9.6/Section2.1

Voltage,Medium(MV)Part9.2/Section2.1
20

WeightedStandardizedImpactSoundPressure
Level,LnT,wPart9.4/Section2
WeightedStandardizedLevelDifference,DnT,w

Walk,WalksPart4/AppendixE
Part9.4/Section2

WallholePart11/Section4.2.1
WallopeningPart11/Section4.2.1

Weighted Normalized Impact Sound Pressure


Level,Ln,wPart9.4/Section2

WarningpipePart9.6/Section2.1

WetbulbtemperaturePart9.3/Section2

WashoutvalvePart9.6/Section2.1

WhitenoisePart9.4/Section2

WasteappliancePart9.6/Section2.1

Width(w)Part5/Section5.9

WastepipePart9.6/Section2.1

WindloadsPart5/Section2.1

Wastewater(sullage)Part9.6/Section2.1

WindowPart4/Section2.1

Watercloset(WC)Part4/Section2.1

WorkingplanePart9.1/Section2.1

WaterconditioningPart9.3/Section2
WaterhardnessPart9.3/Section2
Watermain(streetmain)Part9.6/Section2.1
WateroutletPart9.6/Section2.1
WatersealPart9.6/Section2.1
WatersupplysystemPart9.6/Section2.1
WaterworksPart9.6/Section2.1
WavelengthPart9.4/Section2
WeatherproofPart9.2/Section2.1
WeightedLevelDifference,DW
Part9.4/Section2
WeightedSoundReductionIndex,RW
Part9.4/Section2

21

Anda mungkin juga menyukai