Pearl GTL

Project
Shell Project No: HP-3000-QAT
Project Document Number: T- 4.234.573

Purchase Order Number:

2MH127

Tag/Item Number(s):

N/A

Unit(s):

ASU

PCWBS:

LINDE ENGINEERING

Contractor Project No:


Project Rev.: B

Page 2 of 5

5887

QATAR SHELL GTL PROJECT (PEARL)


C2 AIR SEPARATION UNITS CONSTRUCTION

15.03.2008

Ready for construction

SB

UA

ZG

RFC

26.01.2008

Ready for construction

SB

UA

MC/ZG

RFC

25.11.07

Company comments implemented

IU

UA/IO

MC

CCI

02.10.07

Issued for company comments

UA

IO

ZG

ICC

19.09.07

Issued for review

UA

IO

ZG

IFR

18.09.07

Issued for internal review

UA

IO

ZG

IIR

Date

Description

GAMA
Rev.
No.

Project
Rev
No.

Prepared Checked Approved


By
By
By
ORIGINATOR

Status

Document Title:
LINDE ENGINEERING
AG

ITP FOR SITE PREPARATION AND EARTH WORKS


Document No.

Contractor

Gama Qatar Co. W. L. L.

LOC 470
GAM

ITP

QAC

GTL

021

Org.
Code

Doc.
Type

Disc.
Code

Geogr.
Area

Seq.
No

Rev.
No

Project Document Number: T-4.234.573

Vendor Code

Rev No: B

Document No: GAM-ITP-QAC-GTL-021

C2 ASU PEARL GTL PROJECT

INSPECTION AND TEST PLAN


Site Preparation and Earthworks (FSI)
S.

GAMA QATAR

I: INSPECTION / TEST
Item

Activity

E. Not Used

X. LINDE QC

R: DOCUMENT REVIEW

Characteristic to be Verified

C.

DATE: 15.03.08 REV. F

PEARL GTL

S: SURVEILANCE

Control Procedure
Reference

H: HOLD POINT. W:

Responsible Party

Fill Material
1.0

a) Classification of Soil
b) Particle Size Distribution
c) Optimum Moisture
Content

: Every 1000 m
/one pile

A. FUGRO (TPI)

T-13.376.490

Laboratory

Acceptance
Criteria

As per ASTM:
D422 and BS
1377
As per ASTM:
D 1557

WITNESS
Verifying Documents

Lab Reports

Water
a) Chlorides
2.0

b) Sulphates

Once a day/any source change

T-13.376.490

BS 6068 and
BS3148

Lab reports &


Source Certificate

T.13.376.490;T.13.377.360

QC Engineer

Latest RFC & No


cracks & voids

Surveyor Report
GAM-QCR-QACGTL-001/006/008

T-13.376.490

Laboratory & Site


Engineer

Area Free from


Deleterious
Material & as
Specification

c) Ph
d)Total Solids

3.0

4.0

T-4.234.573

Excavation(FSI)

a) Soil condition of excavated


bottom
b) Excavation completed and
approved for next activity

Fill (In situ)

a) Visual inspection prior


backfilling and scarifying the top
150 mm of sub grade
b) Area free of deleterious
material prior to backfilling
c) Adjacent below ground
structure correctly coated and
protected in accordance with
project specification

REV-B

Checklist No
GAM-QCR-QACGTL-007

PAGE 4 of 5

C2 ASU PEARL GTL PROJECT.

Document No: GAM-ITP-QAC-GTL-021

INSPECTION AND TEST PLAN

Site Preparation and Earthworks(FSI)


S.

GAMA QATAR
I: INSPECTION / TEST

E. Not Used

R: DOCUMENT REVIEW

Item

Activity

5.0

Soil density (compaction)


and layer thickness(FSI)

Type (A): Every 300 m2


Type (B): Every750 m2
Type (c): Every400 m3

Final Elevation Checks

Level of Final Grade


Elevation

6.0

T-4.234.573 REV-B

X. LINDE QC

Characteristic to be Verified

C.

PEARL GTL

S: SURVEILANCE

Control Procedure
Reference

DATE: 15.03.08 REV.F

Responsible Party

A. THIRD PARTY (TPI)

H: HOLD POINT. W:
Acceptance
Criteria

T-13.376.490;T.13.377.360

Laboratory

As per Project
Specification and
ASTM D2922,
D3017, D556 and
D216

T-13.376.490

Surveyor & Site


Engineer

Latest Project
RFC
Drawings for final
grade levels

WITNESS
Verifying Documents

Lab report
GAM-QCR-QACGTL-003

Surveyor Report
GAM-QCR-QACGTL-006

S/R

PAGE 5 of 5