Georgia
US Army Corps
of Engineers
Savannah District
ATTENTION OF:
Contracting Division
Execution Branch
SUBJECT: MATOC Request for Proposal for Task Order Request Number W912HN-09-X1813, Booker Range Renovation and Modernization, Ft Benning, GA
1. In accordance with Local Clause 52.216-4008, Multiple Award Fair Opportunity Task and
Delivery Order Contracts, subject project is being offered to all Offerors in the MATOC pool, as
identified below, giving each fair opportunity to compete for this action by issuance of this
Request for Proposal (RFP) letter. Any Offeror who does not wish to be considered for this
particular task order is requested to notify this office in writing, within seven (7) calendar days of
receipt of this letter, indicating reason for non-participation. Those who do wish to compete must
submit a proposal by the date and time indicated in paragraph 12 below, and in accordance with
the criteria specified herein.
Brantley Construction Services, LLC
Attn: Sidney Brantley
8300 Dorchester Road
Charleston, SC 29419-2903
Email: christina@brantleyconstruction.com & GBrantley@BrantleyConstruction.com
Phone: 843-552-0150
Leebcor Services, LLC
Attn: John Karafa
5400 Discovery Park Blvd Ste 104
Williamsburg, Virginia 23188-2882
Email: john.karafa@leebcor.com & jon@leebcor.com
Phone: 747-220-5577
Team Construction, LLC
Attn: Melissa A Leifheit
101-A Middle Street
Jacksonville, NC 28546-6798
Email: mleifheit@militaryandfederal.com & milfedestimating@earthlink.net
Phone: 910-353-3797
Triune-Beck Joint Venture
Attn: Vince Fudzie
1807 Ross Avenue, Suite 500
Dallas, TX 75201-8006
Email: vfudzie@tmvllc.us & THill@tmvllc.us
Phone: 214-503-0549
100 M Flat Range Renovation to existing targets and berms to set the conditions for new work.
New work will consist of a covered firing line and a bleacher enclosure.
50 M Flat Range Renovation to existing targets and berms to set the conditions for new work.
New work will consist of a covered firing line and a bleacher enclosure.
Bid Schedule B:
Construct a Classroom Bldg. 6,500 sf. which will have 5,000 sf to accommodate 100 soldiers in
a single classroom, a Cadre Office and Conference Room. Building shall have a separate
cleaning station / area approximately 1,500 sf with entrance doors from the inside and outside.
Building shall support infrastructure for 10 x cleaning station tables made of stainless steel
(government furnished) for standing operation. Building shall have proper industrial ventilation
and 10 x air hoses along the back wall tied into a ~ 700 gallon air compressor (placed outside of
the building and government furnished). Building shall have lighting.
Construct 25' x 50' concrete pad for Arms Room vault and ARMAGs which may be located
opposite side of road to fall in line with current communication lines.
7. This Request for Proposal has two Bid Schedules. Offerors may propose on one or both of
the Bid Schedules. Each Bid Schedule will be evaluated independently. The Contracting Officer
may award a separate task order for the work in each Bid Schedule to more than one Contractor
if it is most advantageous to the Government or the Contracting Officer may award the work in
both Bid Schedules to the same offeror through award of a single task order.
Bid Schedule A (Booker Ranges): The construction magnitude for this Bid Schedule (Booker
Ranges) is between $1.0 million and $5.0 million dollars. The Contracting Officer will award a
task order for this work to the lowest priced offeror. Award will be based on price alone.
In accordance with FAR Clause 52.217-5, Evaluation of Options, the Government will evaluate
offers for Bid Schedule A for award purposes by adding the total price for all options to the total
price for the basic requirement. Evaluation of options will not obligate the Government to
exercise the option(s).
Bid Schedule B (Booker Range Classroom/Pad): The construction magnitude for Bid Schedule B
(Booker Range Classroom/Pad) is between $500,000 and $1.0 million. :
The Government will evaluate proposals submitted for this task order using a best value trade-off
evaluation methodology. Technical representatives shall review all proposals and provide the
Contracting Officer with a written technical analysis of each Offerors proposal. The Contracting
Officer, in conjunction with the Project Delivery Team (PDT), will review these analyses for
correctness and completeness. Upon conclusion of this review, proposals and factors will be
rated by the Contracting Officer using the adjectival descriptions shown at Appendix C, Ratings
and Definitions. The following Factors are identified as applicable Bid Schedule B:
FACTOR 1: Building Function and Aesthetics.
In conduct of this evaluation process the Government has established the following relative order
of importance:
PRICE is more important than ALL NON-COST FACTORS when combined.
FACTOR 1: Building Function and Aesthetics: This factor is of less importance than Price.
BASIS OF AWARD for Bid Schedule B: Proposals must meet the criteria stated in this RFP in
order to be eligible for award, to include responsiveness and technical acceptability. In order to
determine which proposal represents the best value for award of the work in Bid Schedule B, the
Government will compare proposals to one another. The Government will award the Task Order
to the Offeror whose technical submittal and price proposal for the Task Order contains the
combination of those criteria described in this document and its associated Appendices and the
technical specifications which offers the best value to the Government. Best value will be
determined by a comparative assessment of proposals against all criteria in this RFP.
The Government reserves the right to accept other than the lowest priced offer for award of a
task order for the work in Bid Schedule B. The right is also reserved to reject any and all offers
for this Bid Schedule. After review by the Contracting Officer and Project Delivery Team, the
task order shall be awarded for the work in Bid Schedule B to the contractor whose proposal
offers the best value to the Government.
8. In accordance with FAR Clause 52.228-1, Bid Guarantee, Offerors are required to submit a
bid bond with the proposal. A separate Bid Guarantee must be submitted for each Bid Schedule.
A single Bid Guarantee may not be submitted for both Bid schedules. The Bid Guarantee shall
be 20% of the bid price or $3 Million, whichever is less. Bid bonds must be submitted in original
form and contain original signatures. Photocopied, facsimile, scanned or otherwise mechanically
reproduced bid bonds will not be accepted. Failure to submit a proper bid bond may be cause for
rejection of an Offerors proposal.
9. Wage Decision GA120179 dated 8/24/2012 GA179 (Attachment1 and 2) applies to all CLINs
of the attached Bid Schedule A and Bid Schedule B; with the exception of CLIN 0001 in Bid
Schedule A, Erosion Control and Sediment Control Plan Implementation for Booker Range.
Wage Decision GA120071 dated 8/24/2012 GA71 applies to CLIN 0001 ONLY in the
attached Bid Schedule A. Offerors are reminded that wage determinations are subject to change
prior to award. All proposed pricing shall include the most current wage rates. All offerors are
encouraged to review wage rates established by the Department of Labor prior to submitting
proposals.
10. In accordance with FAR Clause 52.237-2, Site Visit (Construction), a site visit was held on
30 Aug 2012, 1000 hours beginning at the Booker Range located on 1st Division Road near
the intersection of Ivy Road and 1st Division Road, Ft. Benning GA. POCs are Eddie
Culpepper at 706-617-4047 and John McLain 706-905-1402.
11. In accordance with FAR Provision 52.222-23, Notice of Requirement for Affirmative Action
to Ensure Equal Employment Opportunity for Construction, minority participation goals are
29.6% for each trade and female participation goal is 6.9%.
12. Proposals shall be organized and tabbed in accordance with Appendix A, General Proposal
Submission and Tabbing Requirements and Appendix B, Proposal Factors and Submission
Requirements. Proposals shall be signed by a duly authorized official of the Offerors company
and are required no later than 12:00 PM local time on Wednesday, September 12, 2012. Refer
to Appendix A for numbers of copies. Proposals shall be submitted in accordance with the
following instructions:
ELECTRONIC PROPOSAL SUBMISSION, TO INCLUDE E-MAIL AND FACSIMILE
TRANSMISSIONS, IS NOT AUTHORIZED.
HAND CARRIED PROPOSAL SUBMISSION, except for delivery by Federal Express
and United Parcel Service, IS NOT AUTHORIZED.
Proposals must be delivered by U.S. Mail, including U.S. Express Mail, Federal Express or
United Parcel Service.
All proposals must be clearly identified with the contractors name and address. To ensure
timely and proper handling, the lower left corner of the outermost wrapper should indicate the
following:
Request for Proposal No: W912HN-09-X-1813
Due Date of Proposal: 12 September 2012
Time by which Proposals are due: 12:00 pm (Local Time)
Title of Project: Booker Range, Ft Benning, GA
Proposals must be addressed as indicated below.
U.S. Army Engineer District, Savannah
ATTN: CECT-SAS-E (Shannon Anthony)
100 West Oglethorpe Avenue
Savannah, Georgia 31401-3640
The date and time of delivery established by commercial carriers is not the official time of
receipt by the Government. Security Guards posted at the loading dock entry for the building do
not receive proposals and will contact Mailroom personnel. Once Mailroom personnel are
available, the proposal will be processed by the Security Guards using established security
procedures and subsequently picked up by Mailroom personnel. After receipt by the Mailroom
personnel, a record will be made of the receipt of the proposal. Completion of these actions will
constitute delivery of the proposal by the date and time designated for receipt of proposals.
Offerors are responsible for allowing sufficient time for the proposal to be processed for
receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date
and time designated for receipt of proposals.
The Government will not be responsible for proposals delivered to any location or to anyone
other than those designated to receive proposals on its behalf. Offerors are responsible for
ensuring that proposals are submitted so as to reach the office designated for receipt of proposals.
Offerors are responsible for allowing sufficient time for the proposal to be physically received
and processed by Mailroom personnel in accordance with the information provided.
13. Offerors shall acknowledge all revisions to the RFP issued prior to the due date for the
submission of proposals in writing via a cover letter accompanying the proposal, unless
instructed to do otherwise by the Contracting Officer.
For all revisions to the RFP issued after the submission of proposals, the offerors shall
acknowledge the revision in writing, at the time and place directed by the Contracting Officer in
the revision letter.
14. In accordance with FAR Clause 52.215-1, Instructions to OfferorsCompetitive
Acquisitions, the Government reserves the right to make award without discussions. Therefore,
Offerors should submit their best technical and price terms in their initial offer and not
automatically assume that they will have an opportunity to participate in discussions, if later
determined to be in the best interests of the Government, or to submit a revised offer.
Discussions, if held, may be held with only the highest rated Offerors or Offeror.
15. In accordance with clause 52.249-4001 I TIME EXTENSIONS FOR UNUSUALLY
SEVERE WEATHER (APR 1991 OCE)
(a) This provision specifies the procedure for the determination of time extensions for
unusually severe weather in accordance with the contract clause entitled DEFAULT (FIXED
PRICE CONSTRUCTION). In order for the Contracting Officer to award a time extension
under this clause, the following conditions must be satisfied:
(1) The weather experienced at the project site during the contract period must be found to be
unusually severe, that is, more severe than the adverse weather anticipated for the project
location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project.
The delay must be beyond the control and without the fault or negligence of the Contractor.
(b) The following schedule of monthly anticipated adverse weather delays is based on National
Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and
will constitute the base line for monthly weather time evaluations. The Contractor's progress
schedule must reflect these anticipated adverse weather delays in all weather dependent
activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORKDAYS BASED ON 5-DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
9
8
6
4
4
6
9
7
5
3
4
8
(c) Upon acknowledgment of the Notice to Proceed and continuing through-out the contract,
the Contractor will record on the daily Contractor Quality Control report the occurrence of
adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay
days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled
workday. The number of actual adverse weather delay days shall include days impacted by
actual adverse weather (even if adverse weather occurred in previous month), be calculated
chronologically from the first to the last day in each month, and be recorded as full days. If the
number of actual adverse weather delay days exceeds the number of days anticipated in
paragraph (b) above, the Contracting Officer will convert any qualifying delays to calendar days,
giving full consideration for equivalent fair weather workdays, and issue a modification in
accordance with the contract clause entitled DEFAULT (FIXED PRICE CONSTRUCTION).
16. If you have any questions, please contact Shannon Anthony at (912) 652-5161.
Sincerely,
Attachments(s)
1. Bid Price Schedule A
2. Bid Price Schedule B
3. Wage Decision
Russette F. Hazelwood
Contracting Officer
Enclosure(s)
1. Appendix A
2. Appendix B
3. Appendix C
4. Appendix D
ATTACHMENT 1
BID SCHEDULE A
W912HN-09-X-1813
Booker Ranges
Fort Benning, GA
____________________________________________________________________________________
Item
Unit
Line Item
No.
Description
Quantity Unit Price
Amount______
0001
XXX
$________________
0002
0003
LS
XXX
$________________
LS
XXX
$________________
LS
XXX
$________________
LS
XXX
$________________
LS
XXX
$________________
LS
XXX
$________________
LS
XXX
$________________
LS
XXX
$________________
0004
0005
0006
0007
0008
0009
$_______________
$__________________
NOTE NO. 1. The total Contract Duration for the work in this Schedule will not exceed 365
Calendar Days. There will be a separate UXO contract (separate contract action) that will be
executed concurrently with this construction contract. CLINs 0001 through 0009 will be
impacted by UXO removal. Work stoppage will be coordinated in advance and will not exceed
90 calendar days of total delay. The Contract Duration includes an additional 90 calendar days
for this delay. Work can proceed on all areas not impacted by UXO or the UXO removal
contractor. UXO clearance may take up to 180 calendar days from the date of this task order award.
NOTE NO. 2. Offers providing less than 90 calendar days for Government acceptance after the
date offers are due will not be considered and will be rejected.
NOTE NO. 3. The statutory cost limitation for Contract Line Item Numbers (CLINs) 003, 005,
007, and 0009 is $750,000. Offers that exceed this limit for the individual CLINs will be
rejected even if the total for the Schedule is within the construction magnitude.
NOTE NO. 4. All modifications to proposals are to be submitted on copies of the latest Contract
Line Item (CLIN) schedules as issued in the Request for Proposal or the latest amendment
thereto. In lieu of indicating additions/deductions to line items, all Offerors shall state revised
prices for each item.
NOTE NO. 5. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure
to do so will disqualify the Offeror.
NOTE NO. 6. The Government may require the Contractor to perform the work identified as
Option 1, Option 2, Option 3 and Option 4 at the prices stated in the CLIN Schedule. The
Contracting Officer may exercise the Options upon award and/or by written notice to the
Contractor within 90 calendar days after the date issuance of the Notice to Proceed by the
Contracting Officer. The Option items will be performed within the base contract performance
period.
NOTE NO. 7. LIQUIDATED DAMAGES will be assessed at $662.96 per day.
NOTE NO. 8. By separate bid schedule, the Booker Range Classroom/Pad is being solicited and
awarded concurrently with this contract action. The Contractor will plan for the possibility of
coordination with the awardee of a separate task order because that contractor will be working
adjacent to the construction limits of this task order. The coordination required will included, but is
not limited to, site access, contractor lay down, material delivery, worker access, and equipment
movement. Coordination will be made through the Administrative Contracting Officer (ACO) and
Contracting Officers Representative (COR).
ATTACHMENT 2
BID SCHEDULE B
W912HN-09-X-1813
Booker Range Classroom/Pad
Fort Benning, GA
____________________________________________________________________________________
Item
Unit
Line Item
No.
Description
Quantity Unit Price
Amount______
0001
LS
XXX
$________________
LS
XXX
$________________
LS
XXX
$________________
LS
XXX
$________________
0002
10
$_______________
NOTE NO. 1. The total Contract Duration for this work will not exceed 270 Calendar Days.
NOTE NO. 2. Offers providing less than 90 calendar days for Government acceptance after the
date offers are due will not be considered and will be rejected.
NOTE NO. 3. The construction magnitude for SRM funded CLIN NUMBERs 0001-0002 is
between $500,000 and $1.0 million. The statutory cost limitation for Contract Line Item
Numbers (CLINs) 0001B and 0002B Combined is $750,000. Offers that exceed this limit for the
individual CLINs will be rejected even if the total for the Schedule is within the construction
magnitude.
NOTE NO. 4. To better facilitate the receipt and proposal process, all modifications to proposals
are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in
the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line
items, all Offerors shall state their revised prices for each item.
NOTE NO. 5. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure
to do so will disqualify the Offeror.
NOTE NO. 6. LIQUIDATED DAMAGES will be assessed at $662.96 per day.
NOTE NO. 7. By separate bid schedule, the Booker Ranges contract is being solicited and awarded
concurrently with this contract action. The Contractor will plan for the possibility of coordination
with the awardee of a separate task order because that contractor will be working adjacent to the
construction limits of this task order. The coordination required will included, but is not limited to,
site access, contractor lay down, material delivery, worker access, and equipment movement.
Coordination will be made through the Coordination will be made through the Administrative
Contracting Officer (ACO) and Contracting Officers Representative (COR).
11
ATTACHMENT 3
Wage Decision
General Decision Number: GA120179 08/24/2012
GA179
Publication Date
01/06/2012
06/01/2012
08/03/2012
08/24/2012
ASBE0048-001 04/01/2012
Rates
Fringes
Fringes
8.09
12
Fringes
Operating Engineers:
Boom (over 15 tons), Crane
(over 10 tons), Drill,
Forklift (15 tons and
over), and Hoist (two drum).$ 23.30
11.60
Bulldozer, Boom (15 tons
and under), Compactor,
Excavator, Forklift (under
15 tons), Hoist (one
drum), Loader, and Scraper..$ 21.47
11.60
Crane (over 120 tons).......$ 24.30
11.60
Crane (over 250 tons).......$ 25.30
11.60
Oiler.......................$ 19.13
11.60
---------------------------------------------------------------* IRON0387-001 08/01/2012
Rates
Fringes
Fringes
Fringes
BRICKLAYER.......................$ 11.65
0.17
0.00
9.77
0.21
0.00
0.21
LABORER:
Common or General......$
8.74
0.00
LABORER:
Pipelayer..............$
8.00
0.00
13
2.30
OPERATOR:
Backhoe...............$
9.08
0.00
OPERATOR:
Grader/Blade..........$
9.00
0.24
OPERATOR:
Mechanic..............$ 17.95
0.00
OPERATOR:
Roller................$ 10.88
0.00
1.35
1.03
0.00
2.27
3.18
0.00
14
15
be:
*
*
*
*
16
GA71
17
Modification Number
0
1
Publication Date
01/06/2012
08/24/2012
ELEC0613-010 09/01/2010
Chattahoochee, Marion and Muscogee Counties
Rates
ELECTRICIAN......................$ 29.00
Fringes
8.09
FOOTNOTES:
High time on water tanks, steeples, TV or radio
towers, smoke stacks & silos, where the electrical work
performed extends twenty-five (25) feet above the base of
these specified structures: $3.00 per hour additional. Work
performed above three hundred (300) feet of the above
described structures: $4.00 per hour additional. Work on
the above structures above twenty-five (25) feet from a
spider or bosun chair: $6.00 per hour additional. Work on
bar joists, walk logs, exposed steel & swinging scaffolds
when the surface the worker stands or sits on exceeds
twenty-five (25) feet above solid floor & the worker is
subject to free fall: $1.00 per hour additional. Work of a
similar nature above fifty(50) feet: $3.00 per hour
additional.
---------------------------------------------------------------ELEC1316-007 09/01/2011
Crawford, Houston and Monroe Counties
Rates
Fringes
ELECTRICIAN......................$ 22.60
9.14
---------------------------------------------------------------ENGI0474-006 07/01/2011
Chattahoochee, Houston and Marion Counties
Rates
Fringes
Operating Engineers:
Bulldozer...................$ 21.97
11.80
Forklift, 15 tons and over..$ 23.80
11.80
Forklift, under 15 tons.....$ 21.97
11.80
---------------------------------------------------------------ENGI0926-008 07/01/2010
18
Fringes
Operating Engineers:
Bulldozer and Forklift......$ 22.45
11.18
---------------------------------------------------------------* PAIN0193-003 08/01/2012
Rates
Fringes
Fringes
CARPENTER........................$ 13.02
1.49
1.08
2.04
LABORER:
Common or General......$
9.00
0.00
LABORER:
Pipelayer..............$ 10.07
0.00
OPERATOR:
Backhoe/Excavator.....$ 12.63
0.00
OPERATOR:
Crane.................$ 17.05
3.44
OPERATOR:
Grader/Blade..........$ 14.16
0.27
OPERATOR:
Loader................$ 13.65
1.78
OPERATOR:
Piledriver............$ 10.63
0.48
OPERATOR:
Roller................$
9.75
0.19
OPERATOR:
Trackhoe..............$ 11.00
1.10
19
20
21
22
ENCLOSURE 1
APPENDIX A
GENERAL PROPOSAL SUBMISSION AND TABBING REQUIREMENTS
W912HN-09-X-1813
Booker Range
Fort Benning, GA
1. VOLUME I: Shall be submitted in hardcopy only (One original).
TAB A Schedule A, Bid Price Schedule.
Schedule B, Bid Price Schedule
TAB B- Bid Bonds (original only)
2. VOLUME II: Shall be submitted in hardcopy and electronic copy (CD-ROM) (Original,
plus two (2) copies and one (1) copy on CD-ROM).
Electronic Requirements: Written portions of the proposal should be in MS Word, or
Adobe Acrobat PDF. The electronic version shall be a single file tabbed in the same order as the
hard copy. Drawings should be in Adobe Acrobat PDF. Any portion of the proposal not available
in electronic format, i.e. cut sheets, should be scanned in Adobe Acrobat PDF format. The CDROM must be clearly labeled by solicitation number, project name, installation, and Offerors
name. In the event of any conflict between the electronic submission and the hard copy
submission, the hard copy submission will govern and will be the material upon which the
Government bases its evaluation and ultimately, its decision.
TAB C - FACTOR 1: BUILDING FUNCTION AND AESTHETICS applies to only to
items on Bid Schedule B (Booker Range Classroom/Pad) only as a Design Build approach
applies to these CLINs.
The technical data criteria specified for each factor identified herein and as desribed in
Appendix B shall be submitted as part of the proposal. All alternate designs shall be graphically
described on separate drawings from the basic proposal.
Manufacturers catalog sheets that are submitted, as part of the proposal, will be used to
evaluate offers based on their qualitative features and risk to the Government. It is expected that
some specific models and capacities may not be indicated at the time of proposal submission.
However, manufacturers, product features, product lines, and models can be proposed and
qualitative and risk evaluations can and will be made by the Government. Those manufacturers,
product features, product lines, and models are to be included in the final design documents and
will be incorporated into the construction contract.
Failure to submit all the data required by the RFP, this Appendix and Appendix B may be
cause for determining a proposal incomplete and, therefore, not considered for award.
23
ENCLOSURE 2
Appendix B
Proposal Factors and Submission Requirements
W912HN-09-X-1813
Booker Range, Ft. Benning
Offerors are reminded that this Appendix is intended to provide a comprehensive list of potential
factors and corresponding submission and evaluation criteria. However, as the Government
identifies the need for other potential factors, this list is subject to revision as needed. Please
refer to the RFP letter for identification of the specific factors that may apply to the instant task
order under consideration.
FACTOR 1: BUILDING FUNCTION AND AESTHETICS (Applies to Bid Schedule B
(Booker Range Classrooms/Pad) Only.
SUBMISSION REQUIREMENTS:
1.1 Presentation Drawings:
1.1.1 Presentation Exterior Elevations of each facility clearly noting proposed materials and
colors.
1.1.2 At least one (1) Exterior Perspective Rendering (may be CADD rendering) for each facility
type included in the contract. Rendering should be at least 11 x 17 in order to show a detailed
perspective view of the building.
1.1.3 Schematic floor plans for each floor of each facility.
1.2 Technical Approach Narratives.
1.2.1 Provide technical approach narratives, both qualitative and quantitative, defining the
elements of the proposal. Preface the narratives with a design concepts narrative, providing the
design rationale and basis of the proposal.
1.2.2 Minimum Space and Facility Size. Describe the spaces provided for each facility, in
accordance with the Statement of Work. As a minimum, include a tabulation of the net square
footage for rooms, zones, or other areas, the total gross square footage for each floor of each
facility, and the total gross square footage for each facility to clearly demonstrate compliance
with the project requirements and/or specifications. See the sample Format for Table of Facilities
and Format for Table of Spaces at Attachments 3 and 4, respectively.
1.2.3 Architectural Theme and Materials. This narrative shall be no longer than 3 typewritten
pages. Describe the architectural themes of the various facilities and spaces which demonstrate
how the proposal achieves the results desired by the Statement of Work. Narrative should
address how the selection of materials and colors enhances the exterior and interior aesthetics of
24
the facilities and improves the living and/or working conditions for the populations who will
utilize the facilities. This narrative is not intended to be a material listing, but to explain/reflect
how the selections were made and how they address the requirements.
1.3 Evaluation Criteria.
1.3.1 Building Functional Arrangement: This element considers the overall functional layout
(Floor Plan) and interaction of the spaces in the facilities as well. This element considers the
planning and design of the spaces with respect to working conditions and the operations of the
facility. The following criteria will be considered in the evaluation of the functional arrangement
of the various facilities:
1.3.1.1 How well the floor plan responds to the Functional Relationship requirements described
in the Statement of Work.
1.3.1.2 How well the floor plan and space arrangement facilitate work flow and access necessary
to successfully operate this facility in accordance with its mission.
1.3.1.3 Do the facilities provide acceptable life safety and fire safety measures?
1.3.1.4 Do the proposed plans demonstrate compliance with the mandatory requirements for
circulation, furnishings (e.g., for UEPHs, will the required furniture fit in the rooms?),
equipment, and other specifically identified items in the Statement of Work?
1.3.1.5 Building Aesthetics: This element considers the overall appeal of the facility and the
desire that both the interior and exterior of the facilities present a professional, attractive
appearance. The following will be considered under this area:
1.3.2 Exterior Considerations: As Applicable
1.3.2.1 Proposals shall be evaluated on design of facades, roof lines, delineation of entrances,
proportions of fenestration in relation to elevations, shade and shadow effects, materials,
textures, exterior color schemes.
1.3.2.2 Is the building scale and proportion complimentary of the adjacent structures? Is the
building an attractive addition to the Installation? How well does the building harmonize with its
environment, including surrounding facilities?
1.3.3 Interior Considerations: As Applicable
1.3.3.1 Are the proposed colors and material finishes conducive to the working environment of
the facility?
1.3.3.2 For administrative areas, does the interior design provided establish a positive working
environment?
25
1.3.3.3 Has the proposal addressed/provided for natural and artificial light in the living and
working spaces and is the arrangement of fenestration and lighting fixtures in the spaces
conducive to furniture placement and space usage?
1.3.3.4 Do the proposed ceiling material, elevation, and design enhance the environment?
1.3.3.5 Has support item placement been considered and addressed in the proposal to enhance
the environment? For example: placement of supply/exhaust devices, placement of electrical
panels, placement of exhaust fans, etc.
1.3.3.6 Does the proposal provide for acoustic control of noise from service/support spaces to
administrative areas?
1.3.4 Minimum Space and Facility Size
1.3.4.1 The proposal must include all the mandatory spaces in response to the requirements set
forth in the Statement of Work. Proposals will be evaluated on compliance with these
requirements.
1.3.4.2 Proposals shall identify any individual areas which are less than the required areas and
describe how such deviation would enhance the building function.
1.3.4.3 Individual areas may slightly exceed the requirements, so long as building function is not
compromised elsewhere and as long as the overall square footage is not greater than that as
described in the Statement of Work.
Price
2. Submission Requirements:
2.1 Pricing shall be completed and submitted on the Task Order Pricing Schedule
Schedule A and Schedule B of the RFP.
2.2 Evaluation Criteria: Price analysis will be performed to determine if proposed prices
are fair and reasonable as well as to assure offeror understanding of the work and ability to
execute task order at price proposed. The evaluation will determine the extent to which the price
proposal is consistent with the requirements of the RFP, to include statutory limitations.
Historical price information, competitive price information, the Independent Government
Estimate (IGE), or any other pricing tool as necessary will be utilized in making this
determination. Offerors are advised that any offer wherein pricing is deemed unfair,
unreasonable or unrealistic may be rendered ineligible for award.
26
ENCLOSURE 3
APPENDIX C
RATINGS AND DEFINITIONS
W912HN-09-X-1813
Booker Range, Ft. Benning
Evaluation factor ratings will be determined and assigned by the Contracting Officer using the
adjectival descriptions contained herein. Upon assessment of individual factor ratings, the
Contracting Officer will then determine and assign the appropriate overall rating for the proposal
using these same adjectival descriptions. Offerors are reminded that as each technical factor is
evaluated an assessment of performance risk is also made as it relates to present and past work
performed under the existing umbrella contract, and the Offerors ability to successfully perform
the requested task order. (Applies to Bid Schedule B (Booker Range Classrooms/Pad) Only.)
OUTSTANDING Proposal meets requirements and indicates an exceptional approach and
understanding of the requirements. Strengths far outweigh any weaknesses. Risk of
unsuccessful performance is very low.
GOOD - Proposal meets requirements and indicates a thorough approach and understanding
of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of
unsuccessful performance is very low.
ACCEPTABLE - Proposal meets requirements and indicates an adequate approach and
understanding of the requirements. Strengths and weaknesses are offsetting or will have little
or no impact on contract performance. Risk of unsuccessful performance is no worse than
moderate.
MARGINAL Proposal does not clearly meet requirements and has not demonstrated an
adequate approach and understanding of the requirements. The proposal has one or more
weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
UNACCEPTABLE Proposal does not meet requirements and contains one or more
deficiencies. Proposal is unawardable.
27
ENCLOSURE 4
APPENDIX D
BUILDING FUNCTION AND AESTHETICS
SAMPLE FORMAT FOR TABLE OF FACILITIES
W912HN-09-X-1813
Booker Range, Ft. Benning
(Applies to Bid Schedule B (Booker Range Classrooms/Pad) Only.
FACILITY
REQUIREMENTS
(2)
(1)
Net SF
Gross SF
PROPOSAL
PROVIDED
(3)
Net SF
Gross SF
DIFFERENCE
(+/-)
(4)
Net SF
NOTES/REMARKS
(5)
Gross SF
Notes:
(1) Facility column shall identify building, e.g. Tactical Equipment Maintenance Facility (TEMF), Company
Operations Facility (COF) Headquarters Facility (HQ), etc. Where different designs are offered for the same overall
building type, each different design shall be identified and tabulated separately.
(2) Complete these columns directly from information in the request for proposal. If the Request for Proposal is silent
on net square feet for a particular facility, leave this blank.
(3) Complete these columns directly from the information in your proposal.
(4) This column represents the mathematical difference between the proposal and the requirements. + differences
represent areas above the Request for Proposal requirements and differences represent areas below the
requirements. Offerors are cautioned that exceeding the statutory limitations on building size will cause a proposal
to be considered non-compliant.
(5) This column is provided to allow the Offerors to place additional relevant information with respect to building area.
28
FACILITY: _____________________
SPACE
DESIGNATION
(1)
REQUIREMENTS
MIN REQUIRED
(2)
SF
PROPOSAL
PROVIDED
DIFFERENCE
(+/-)
NOTES/REMARKS
(3)
SF
(4)
SF
(5)
Notes:
(1) The Offeror shall list all spaces within the identified facility in this column.
(2) The Offeror shall complete this column by taking the information directly from the Request for Proposal Statement
of Work. Where a particular space does not have a specific requirement, this column may be left blank.
(3) The Offeror shall complete this column directly from the information contained in the proposal.
(4) This column represents the mathematical difference between the proposal and the requirements. + differences
represent areas above the requirements and differences represent areas below the requirements.
(5) This column is provided to allow the Offerors to place additional relevant information with respect to spaces
provided.
(6) Where multiple facilities of the same type (e.g. Dining Facility, UEPH, etc) are included in a single contract, each
facility shall be identified in a separate table.
29
W912HN-09-X-1813
11
32
33
35
42
45
45
50
57
57
62
74
78
78
00
01.00
00
26
00
00.00
00.10
00
20.00
23
35
19
00
23
10
10
10
10
*1 SUMMARY OF WORK
*1 PROJECT SCHEDULE
*1 SUBMITTAL PROCEDURES
*1 GOVERNMENTAL SAFETY REQUIREMENTS
*1 SOURCES FOR REFERENCE PUBLICATIONS
*1 QUALITY CONTROL
*1 QUALITY CONTROL SYSTEM (QCS)
*1 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
*1 ENVIRONMENTAL PROTECTION
*1 TEMPORARY STORM WATER POLLUTION CONTROL
*1 RECYCLED / RECOVERED MATERIALS
CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
*1 CLOSEOUT SUBMITTALS
*1 OPERATION AND MAINTENANCE DATA
*1 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00
*1 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05
05
05
05
12
30
40
50
00
00
00
13
*1
*1
*1
*1
STRUCTURAL STEEL
STEEL DECKS
COLD-FORMED METAL FRAMING
MISCELLANEOUS METAL FABRICATIONS
*1 ROUGH CARPENTRY
11
42
53
54
60
61
92
13
13
24
50
00
14.00 20
00
*1
*1
*1
*1
*1
*1
*1
BITUMINOUS DAMPPROOFING
METAL WALL PANELS
FABRIC COVER STRUCTURE
TPO THERMOPLASTIC SINGLE-PLY ROOFING
FLASHING AND SHEET METAL
STEEL STANDING SEAM ROOFING
JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13
08 91 00
DIVISION 09 - FINISHES
09 90 00
13 12 50
W912HN-09-X-1813
DIVISION 26 - ELECTRICAL
26 20 00
26 41 01.00 10
26 51 00
DIVISION 31 - EARTHWORK
31 00 00
*1 EARTHWORK
DIVISION 33 - UTILITIES
33 40 00
33 70 02.00 10
W912HN-09-X-1813
SECTION 01 11 00A
*1 SUMMARY OF WORK
08/11
PART 1
1.1
1.1.1
GENERAL
WORK COVERED BY CONTRACT DOCUMENTS
Project Description
Location
The work shall be located at the existing Booker Range, Fort Benning,
Georgia. The exact location will be shown by the Contracting Officer.
1.2
OCCUPANCY OF PREMISES
Before work is started, the Contractor shall arrange with the Contracting
Officer a sequence of procedure, means of access, space for storage of
materials and equipment, and use of approaches.
Contractor shall coordinate with Range Division thru Contracting Officer
for work due to proximity of this range with other active houses in the
area.
1.3
EXISTING WORK
1.4
a.
b.
1.5
W912HN-09-X-1813
GOVERNMENT-INSTALLED WORK
The Government will install range equipment after the Contractor has turned
over the completed project to the Government. Contractor shall coordinate
with Government for target carriers that will be Government installed to
ensure the attachment to contractor installed structure..
1.7
PRODUCTS
Not used.
PART 3
EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00
W912HN-09-X-1813
GENERAL
REFERENCES
ER 1-1-11
1.2
SUBMITTALS
QUALITY ASSURANCE
PRODUCTS
Not Used
PART 3
3.1
EXECUTION
GENERAL REQUIREMENTS
W912HN-09-X-1813
Use the approved Project Schedule to measure the progress of the work and
to aid in evaluating time extensions. Make the schedule cost loaded and
activity coded. The schedule will provide the basis for all progress
payments. If the Contractor fails to submit any schedule within the time
prescribed, the Contracting Officer may withhold approval of progress
payments until the Contractor submits the required schedule.
3.1.2
Default Terms
Use the schedule as the basis for determining contract earnings during each
update period and therefore the amount of each progress payment. Lack of
an approved schedule update, or qualified scheduling personnel, will result
in the inability of the Contracting Officer to evaluate contract earned
value for the purposes of payment. Failure of the Contractor to provide
all required information will result in the disapproval of the preliminary,
initial and subsequent schedule updates. In the event schedule revisions
are directed by the Contracting Officer and those revisions have not been
included in subsequent revisions or updates, the Contracting Officer may
hold retainage up to the maximum allowed by contract, each payment period,
until such revisions to the Project Schedule have been made. Activity cost
loading shall be reasonable, as determined by the Contracting Officer. The
aggregate value of all activities coded to a contract CLIN shall equal the
value of the CLIN on the Schedule.
3.3
The computer software system utilized to produce and update the Project
SECTION 01 32 01.00 10
W912HN-09-X-1813
Use the Critical Path Method (CPM) of network calculation to generate the
Project Schedule. Prepare the Project Schedule using the Precedence
Diagram Method (PDM).
3.3.2
Activity Durations
Reasonable activity durations are those that allow the progress of ongoing
activities to be accurately determined between update periods. Less than 2
percent of all non-procurement activities shall have Original Durations
(OD) greater than 20 work days or 30 calendar days. Procurement activities
are defined herein.
3.3.2.2
Procurement Activities
Mandatory Tasks
W912HN-09-X-1813
Government Activities
Show Government and other agency activities that could impact progress.
These activities include, but are not limited to: approvals, inspections,
utility tie-in, Government Furnished Equipment (GFE) and Notice to Proceed
(NTP) for phasing requirements.
3.3.2.5
Assign Work Area code to activities based upon the work area in which the
activity occurs. Define work areas based on resource constraints or space
constraints that would preclude a resource, such as a particular trade or
craft work crew, from working in more than one work area at a time due to
restraints on resources or space. Examples of Work Area Coding include
different areas within a floor of a building, different floors within a
building, and different buildings within a complex of buildings.
Activities shall not have more than one Work Area Code. Not all activities
are required to be Work Area coded. A lack of Work Area coding will
indicate the activity is not resource or space constrained.
SECTION 01 32 01.00 10
3.3.2.7
(MODF)
W912HN-09-X-1813
Code all activities to the CLIN on the Contract Line Item Schedule to which
the activity belongs. An activity shall not contain more than one CLIN
Item Code. CLIN Item code all activities, even when an activity is not
cost loaded.
3.3.2.9
Assign Phase of Work Code to all activities based upon the phase of work in
which the activity occurs. Code activities to a Construction Phase. Code
fast track construction phases proposed by the Contractor to allow
filtering and organizing the schedule by fast track design and construction
packages. If the contract specifies construction phasing with separately
defined performance periods, identify a Construction Phase Code to allow
filtering and organizing the schedule accordingly. Each activity shall be
identified with a single project phase and have only one Phase of Work code.
3.3.2.10
Assign Category of Work Code to all Activities based upon the category of
work to which the activity belongs. Category of Work Code must include,
but is not limited to: construction submittal approvals, Acceptance,
Procurement, Fabrication, Delivery, Weather Sensitive Installation,
Non-Weather Sensitive Installation, Start-Up, Test and Turnover. Assign a
Category of Work Code to each activity. Each activity shall have only one
Category of Work Code.
3.3.2.11
SECTION 01 32 01.00 10
3.3.3
W912HN-09-X-1813
The schedule interval shall extend from NTP date to the required contract
completion date. The contract completion activity (End Project) shall
finish based on the required contract duration in the accepted contract
proposal, as adjusted for any approved contract time extensions. The first
scheduled work period shall be the day after NTP is received by the
Contractor. Schedule activities on a calendar to which the activity
logically belongs. Activities may be assigned to a 7 day calendar when the
contract assigns calendar day durations for the activity such as a
Government Acceptance activity. If the Contractor intends to perform
physical work less than seven days per week, schedule the associated
activities on a calendar with non-work periods identified including
weekends and holidays. Assign the Category of Work Code - Weather
Sensitive Installation to those activities that are weather sensitive.
Original durations must account for anticipated normal adverse weather.
The Government will interpret all work periods not identified as non-work
periods on each calendar as meaning the Contractor intends to perform work
during those periods.
3.3.3.1
The schedule shall start no earlier than the date on which the NTP was
acknowledged. Include as the first activity in the project schedule an
activity called "Start Project"( or NTP). The "Start Project" activity
shall have an "ES" constraint date equal to the date that the NTP was
acknowledged, and a zero day duration.
3.3.3.2
SECTION 01 32 01.00 10
3.3.4
W912HN-09-X-1813
Start Phase
Include as the first activity for a project phase an activity called "Start
Phase X" where "X" refers to the phase of work. The "Start Phase X"
activity shall have an "ES" constraint date equal to the date on which the
NTP was acknowledged, and a zero day duration.
3.3.4.2
End Phase
Include as the last activity for a project phase an activity called "End
Phase X" where "X" refers to the phase of work. The "End Phase X" activity
shall have an "LF" constraint date equal to the specified completion date
for that phase and a zero day duration.
3.3.4.3
Include a hammock type activity for each project phase called "Phase X"
where "X" refers to the phase of work. The "Phase X" hammock activity
shall be logically tied to the earliest and latest activities in the phase.
3.3.5
Do not automatically update Actual Start and Finish dates with default
mechanisms that may be included in the scheduling software. Activity
Actual Start (AS) and Actual Finish (AF) dates assigned during the updating
process shall match those dates provided from Contractor Quality Control
Reports. Failure of the Contractor to document the AS and AF dates on the
Daily Quality Control report for every in-progress or completed activity,
and failure to ensure that the data contained on the Daily Quality Control
reports is the sole basis for schedule updating shall result in the
disapproval of the Contractor's updated schedule and the inability of the
Contracting Officer to evaluate Contractor progress for payment purposes.
Updating of the percent complete and the remaining duration of any activity
shall be independent functions. Disable program features which calculate
one of these parameters from the other.
3.3.6
Out-of-Sequence Progress
Activities that have progressed before all preceding logic has been
satisfied (Out-of-Sequence Progress) will be allowed only on a case-by-case
basis subject to approval by the Contracting Officer. Propose logic
corrections to eliminate all out of sequence progress or justify not
changing the sequencing for approval prior to submitting an updated project
schedule. Correct out of sequence progress that continues for more than
two update cycles by logic revision, as approved by the Contracting Officer.
3.3.7
Lag durations contained in the project schedule shall not have a negative
value. Do not use Start to Finish (SF) relationships.
SECTION 01 32 01.00 10
3.3.8
W912HN-09-X-1813
Calculation Mode
Milestones
The schedule must include milestone activities for each significant project
event including but not limited to: milestone activities for each fast
track design package released for construction; design complete;
foundation/substructure construction complete; superstructure construction
complete; building dry-in or enclosure complete to allow the initiation of
finish activities; permanent power complete; and building systems
commissioning complete.
3.4
Provide the submissions as described below. The data CD, reports, and
network diagrams required for each submission are contained in paragraph
SUBMISSION REQUIREMENTS.
3.4.1
SECTION 01 32 01.00 10
42 calendar days
and realistic
the entire contract
reasonable level of
3.4.3
W912HN-09-X-1813
Use the activity coding structure defined in the Standard Data Exchange
Format (SDEF) in ER 1-1-11, Appendix A. This exact structure is mandatory,
even if some fields are not used. A template SDEF compatible schedule
backup file (sdef.prx) is available on the QCS website:
http://rms.usace.army.mil/. The SDEF format is as follows:
SDEF Format
Field
Description
WRKP
RESP
AREA
MODF
BIDI
PHAS
Phase of Work
CATW
Category of Work
FOW1
10
FOW2
10
10
FOW3
10
3.5
SUBMISSION REQUIREMENTS
Submit the following items for the Preliminary Schedule, Initial Schedule,
and every Periodic Schedule Update throughout the life of the project:
3.5.1
Data CD's
Provide two sets of data CD's containing the project schedule in the backup
format. Each CD shall also contain all previous update backup files. File
medium shall be CD. Label each CD indicating the type of schedule
(Preliminary, Initial, Update), full contract number, Data Date and file
name. Each schedule shall have a unique file name as determined by the
Contractor.
SECTION 01 32 01.00 10
3.5.2
W912HN-09-X-1813
Narrative Report
Provide a Narrative Report with the Preliminary, Initial, and each Periodic
Update of the project schedule, as the basis of the progress payment
request. The Narrative Report shall include: a description of activities
along the 2 most critical paths where the total float is less than or equal
to 20 work days, a description of current and anticipated problem areas or
delaying factors and their impact, and an explanation of corrective actions
taken or required to be taken. The narrative report is expected to
communicate to the Government, the Contractor's thorough analysis of the
schedule output and its plans to compensate for any problems, either
current or potential, which are revealed through that analysis. Identify
and explain why any activities that, based their calculated late dates,
should have either started or finished during the update period but did not.
3.5.3
Include only those project schedule changes in the schedule submission that
have been previously approved by the Contracting Officer. The Narrative
Report shall specifically reference, on an activity by activity basis, all
changes made since the previous period and relate each change to
documented, approved schedule changes.
3.5.4
Schedule Reports
The format, filtering, organizing and sorting for each schedule report
shall be as directed by the Contracting Officer. Typically reports shall
contain: Activity Numbers, Activity Description, Original Duration,
Remaining Duration, Early Start Date, Early Finish Date, Late Start Date,
Late Finish Date, Total Float, Actual Start Date, Actual Finish Date, and
Percent Complete. The following lists typical reports that will be
requested. One or all of these reports may be requested for each schedule
submission.
3.5.4.1
Activity Report
Logic Report
W912HN-09-X-1813
Network Diagram
The network diagram is required for the Preliminary, Initial and Periodic
Updates. The network diagram shall depict and display the order and
interdependence of activities and the sequence in which the work is to be
accomplished. The Contracting Officer will use, but is not limited to, the
following conditions to review compliance with this paragraph:
3.5.5.1
Continuous Flow
Diagrams shall show a continuous flow from left to right with no arrows
from right to left. Show the activity number, description, duration, and
estimated earned value on the diagram.
3.5.5.2
Show dates on the diagram for start of project, any contract required
interim completion dates, and contract completion dates.
3.5.5.3
Critical Path
Banding
S-Curves
Earnings curves showing projected early and late earnings and earnings to
date.
3.6
Conduct periodic schedule update meetings for the purposes of reviewing the
Contractor's proposed out of sequence corrections, determining causes for
delay, correcting logic, maintaining schedule accuracy and determining
earned value. Meetings shall occur at least monthly within five days of
the proposed schedule data date and after the Contractor has updated the
schedule with Government concurrence respecting actual start dates, actual
finish dates, remaining durations and percent complete for each activity it
intend to status. Provide a computer with the scheduling software loaded
and a projector during the meeting which allows all meeting participants to
view the proposed schedule update during the meeting.
The meeting and
resultant approvable schedule update shall be a condition precedent to a
formal submission of the update as described in SUBMISSION REQUIREMENTS and
to the submission of an invoice for payment. The meeting will be a working
interactive exchange which will allow the Government and the Contractor the
opportunity to review the updated schedule on a real time and interactive
basis. The Contractor's authorized scheduling representative will
SECTION 01 32 01.00 10
W912HN-09-X-1813
Status of Activities
Update information, including Actual Start Dates (AS), Actual Finish Dates
(AF), Remaining Durations (RD), and Percent Complete shall be subject to
the approval of the Government prior to the meeting. As a minimum, address
the following items on an activity by activity basis during each progress
meeting.
3.6.2.1
Accurately show the status of the AS and/or AF dates for each activity
currently in-progress or completed since the last update. The Government
may allow an AF date to be assigned with the percent complete less than
100% to account for the value of work remaining but not restraining
successor activities. Only assign AS dates when actual progress occurs on
an activity.
3.6.2.2
Remaining Duration
Percent Complete
Update the percent complete for each activity started, based on the
realistic assessment of earned value. Activities which are complete but
for remaining minor punch list work and which do not restrain the
initiation of successor activities may be declared 100 percent complete.
To allow for proper schedule management, cost load the correction of punch
list from Government pre-final inspection activity(ies) not less than 1
percent of the total contract value, which activity(ies) may be declared
100 percent complete upon completion and correction of all punch list work
identified during Government pre-final inspection(s).
3.6.2.4
Logic Changes
W912HN-09-X-1813
Other Changes
Justification of Delay
The project schedule shall clearly display that the Contractor has used, in
full, all the float time available for the work involved with this
request. The Contracting Officer's determination as to the number of
allowable days of contract extension shall be based upon the project
schedule updates in effect for the time period in question, and other
factual information. Actual delays that are found to be caused by the
Contractor's own actions, which result in a calculated schedule delay, will
not be a cause for an extension to the performance period, completion date,
or any interim milestone date.
3.7.2
Submission Requirements
b.
c.
d.
3.7.3
W912HN-09-X-1813
DIRECTED CHANGES
If the NTP is issued for changes prior to settlement of price and/or time,
submit proposed schedule revisions to the Contracting Officer within 2
weeks of the NTP being issued. The Contracting Officer will approve
proposed revisions to the schedule prior to inclusion of those changes
within the project schedule. If the Contractor fails to submit the
proposed revisions, the Contracting Officer may furnish the Contractor with
suggested revisions to the project schedule. Include these revisions in
the project schedule until revisions are submitted, and final changes and
impacts have been negotiated. If the Contractor has any objections to the
revisions furnished by the Contracting Officer, advise the Contracting
Officer within 2 weeks of receipt of the revisions. Regardless of the
objections, continue to update the schedule with the Contracting Officer's
revisions until a mutual agreement in the revisions is reached. If the
Contractor fails to submit alternative revisions within 2 weeks of receipt
of the Contracting Officer's proposed revisions, the Contractor will be
deemed to have concurred with the Contracting Officer's proposed
revisions. The proposed revisions will then be the basis for an equitable
adjustment for performance of the work.
3.9
a.
Meet weekly with the Government (or as otherwise mutually agreed to)
between the meetings described in paragraph PERIODIC SCHEDULE UPDATE
MEETINGS for the purpose of jointly reviewing the actual progress of
the project as compared to the as planned progress and to review
planned activities for the upcoming two weeks. The then current and
approved schedule update shall be used for the purposes of this meeting
and for the production and review of reports. The Contractor's Project
Manager and the Authorized Representative of the Contracting Officer
shall attend. The weekly progress meeting will address the status of
RFI's, RFP's and Submittals.
b.
c.
The Government and the Contractor shall jointly review the reports. If
it appears that activities on the longest path(s) which are currently
driving the calculated completion date (driving activities), are not
progressing satisfactorily and therefore could jeopardize timely
project completion, corrective action must be taken immediately.
Corrective action includes but is not limited to: increasing the number
of work crews; increasing the number of work shifts; increasing the
number of hours worked per shift; and determining if Government
responsibility coded activities require Government corrective action.
SECTION 01 32 01.00 10
3.10
W912HN-09-X-1813
OWNERSHIP OF FLOAT
Float available in the schedule, at any time, shall not be considered for
the exclusive use of either the Government or the Contractor.
3.11
Download and upload the schedule data into the Resident Management System
(RMS) prior to RMS databases being transferred to the Government and is
considered to be additional supporting data in a form and detail required
by the Contracting Officer pursuant to FAR 52.232-5 - Payments under
Fixed-Price Construction Contracts. The receipt of a proper payment
request pursuant to FAR 52.232-27 - Prompt Payment for Construction
Contracts is contingent upon the Government receiving both acceptable and
approvable hard copies and electronic export from QCS of the application
for progress payment.
-- End of Section --
SECTION 01 32 01.00 10
W912HN-09-X-1813
SECTION 01 33 00A
*1 SUBMITTAL PROCEDURES
05/11
PART 1
1.1
GENERAL
SUMMARY
DEFINITIONS
Submittal Descriptions (SD)
SECTION 01 33 00
W912HN-09-X-1813
SECTION 01 33 00
W912HN-09-X-1813
SECTION 01 33 00
W912HN-09-X-1813
Approving Authority
Work
SUBMITTALS
SUBMITTAL CLASSIFICATION
Government Approved G
W912HN-09-X-1813
Information Only
PREPARATION
Transmittal Form
Use the attached sample transmittal form (ENG Form 4025) for submitting
both Government approved and information only submittals in accordance with
the instructions on the reverse side of the form. These forms are included
in the QCS software that the Contractor is required to use for this
contract. Properly complete this form by filling out all the heading blank
spaces and identifying each item submitted. Exercise special care to
ensure proper listing of the specification paragraph and sheet number of
the contract drawings pertinent to the data submitted for each item.
1.6
1.6.1
QUANTITY OF SUBMITTALS
Number of Copies of SD-02 Shop Drawings
a.
b.
c.
d.
1.6.4
SECTION 01 33 00
1.6.6
W912HN-09-X-1813
Submit three copies of O&M Data to the Contracting Officer for review and
approval.
1.6.7
Number of Copies of SD-01 Preconstruction Submittals and SD-11
Closeout Submittals
Unless otherwise specified, submit three sets of administrative submittals.
1.7
VARIATIONS
Considering Variations
Proposing Variations
SECTION 01 33 00
1.8.3
W912HN-09-X-1813
SUBMITTAL REGISTER
Column (d): Lists each submittal description (SD No. and type,
e.g. SD-02 Shop Drawings) required in each specification section.
Column (e): Lists one principal paragraph in specification
section where a material or product is specified. This listing is
only to facilitate locating submitted requirements. Do not
consider entries in column (e) as limiting project requirements.
1.9.1
SECTION 01 33 00
1.9.2
W912HN-09-X-1813
SCHEDULING
b.
c.
d.
1.11
W912HN-09-X-1813
b.
c.
Review Notations
b.
c.
d.
1.12
DISAPPROVED SUBMITTALS
W912HN-09-X-1813
APPROVED SUBMITTALS
APPROVED SAMPLES
incorporated in the
which may be damaged
expense, upon
also be returned to
WITHHOLDING OF PAYMENT
Payment for materials incorporated in the work will not be made if required
approvals have not been obtained.
1.16
STAMPS
Stamps used by the Contractor on the submittal data to certify that the
submittal meets contract requirements is to be similar to the following:
SECTION 01 33 00
SECTION 01 33 00
W912HN-09-X-1813
W912HN-09-X-1813
________________________________________________________________________
|
CONTRACTOR
|
|
|
|
(Firm Name)
|
|
|
|
|
|
|
| _____ Approved
|
|
|
|
|
| _____ Approved with corrections as noted on submittal data and/or
|
| attached sheets(s)
|
|
|
|
|
|
|
| SIGNATURE: __________________________________________________________ |
|
|
| TITLE: ______________________________________________________________ |
|
|
| DATE: _______________________________________________________________ |
|
|
|________________________________________________________________________|
PART 2
PRODUCTS
Not Used
PART 3
EXECUTION
Not Used
-- End of Section --
SECTION 01 33 00
CONTRACT NO.
SUBMITTAL REGISTER
TITLE AND LOCATION
CONTRACTOR
A
C
T
I
V
I
T
Y
T
R
A
N
S
M
I
T
T
A
L
N
O
(a)
S
P
E
C
N
O
S
E
C
T
ITEM SUBMITTED
P
A
R
A
G#
R
A
P
H
(b)
(c)
(d)
(e)
DESCRIPTION
C
L
A
S
S
I
F
I
C
A
T
I
O
N
1.10
1.7
1.8
1.7.1
1.6.1.4
G
G
G
G
CONTRACTOR
ACTION
O
R
A
C
T
I
O
N
A
/
E
R
E
V
W
R
(f)
3.4
CONTRACTOR:
SCHEDULE DATES
G
O
V
T
SUBMIT
(g)
APPROVAL MATERIAL
NEEDED
NEEDED
BY
BY
(h)
(i)
APPROVING AUTHORITY
A
C
T
I
O
N
DATE FWD
TO APPR
AUTH/
C
O
D
E
DATE
OF
ACTION
(j)
(k)
(m)
(n)
MAILED
TO
CONTR/
C
O
D
E
DATE
OF
ACTION
DATE RCD
FRM APPR
AUTH
REMARKS
(o)
(p)
(q)
(r)
A
A
A
A
1.12
1.12.2
1.12.3
1.9
1.9
1.14
1.4
3.3.1
G RO
G RO
1.7
G RO
1.3.2
1.3.2
PREVIOUS EDITION IS OBSOLETE
PAGE 1 OF 15 PAGES
CONTRACT NO.
SUBMITTAL REGISTER
TITLE AND LOCATION
CONTRACTOR
A
C
T
I
V
I
T
Y
T
R
A
N
S
M
I
T
T
A
L
N
O
(a)
S
P
E
C
N
O
S
E
C
T
ITEM SUBMITTED
P
A
R
A
G#
R
A
P
H
(b)
(c)
(d)
(e)
01 57 23
01 74 19
01 78 00
SUBMITTAL FORM,Jan 96
DESCRIPTION
CONTRACTOR:
SCHEDULE DATES
G
O
V
T
C
L
A
S
S
I
F
I
C
A
T
I
O
N
CONTRACTOR
ACTION
O
R
A
C
T
I
O
N
A
/
E
R
E
V
W
R
(f)
SUBMIT
(g)
APPROVAL MATERIAL
NEEDED
NEEDED
BY
BY
(h)
(i)
APPROVING AUTHORITY
A
C
T
I
O
N
DATE FWD
TO APPR
AUTH/
C
O
D
E
DATE
OF
ACTION
(j)
(k)
(m)
(n)
MAILED
TO
CONTR/
C
O
D
E
DATE
OF
ACTION
DATE RCD
FRM APPR
AUTH
REMARKS
(o)
(p)
(q)
(r)
1.3
2.1.3
1.6
1.7
1.3.2
1.7.1
1.7.5
1.4
1.5
1.5
1.5
1.7.1
1.9
1.3.1
PREVIOUS EDITION IS OBSOLETE
PAGE 2 OF 15 PAGES
CONTRACT NO.
SUBMITTAL REGISTER
TITLE AND LOCATION
CONTRACTOR
A
C
T
I
V
I
T
Y
T
R
A
N
S
M
I
T
T
A
L
N
O
(a)
S
P
E
C
N
O
S
E
C
T
ITEM SUBMITTED
P
A
R
A
G#
R
A
P
H
(b)
(c)
(d)
(e)
01 78 00
02 41 00
03 30 00
SUBMITTAL FORM,Jan 96
DESCRIPTION
CONTRACTOR:
SCHEDULE DATES
G
O
V
T
C
L
A
S
S
I
F
I
C
A
T
I
O
N
CONTRACTOR
ACTION
O
R
A
C
T
I
O
N
A
/
E
R
E
V
W
R
(f)
1.6
1.11
1.11
G
G
1.11
G RO
1.2.1
1.7
G RO
G RO
1.6.2.1
1.6.2.3
G RO
SUBMIT
(g)
APPROVAL MATERIAL
NEEDED
NEEDED
BY
BY
(h)
(i)
APPROVING AUTHORITY
A
C
T
I
O
N
DATE FWD
TO APPR
AUTH/
C
O
D
E
DATE
OF
ACTION
(j)
(k)
(m)
(n)
MAILED
TO
CONTR/
C
O
D
E
DATE
OF
ACTION
DATE RCD
FRM APPR
AUTH
REMARKS
(o)
(p)
(q)
(r)
2.4.7
2.4.10
2.4.9
2.1.2
2.1.3
2.4.3.3
2.4.1
2.4.1.4
2.3.3
2.6
2.7
PREVIOUS EDITION IS OBSOLETE
PAGE 3 OF 15 PAGES
CONTRACT NO.
SUBMITTAL REGISTER
TITLE AND LOCATION
CONTRACTOR
A
C
T
I
V
I
T
Y
T
R
A
N
S
M
I
T
T
A
L
N
O
(a)
S
P
E
C
N
O
S
E
C
T
ITEM SUBMITTED
P
A
R
A
G#
R
A
P
H
(b)
(c)
(d)
(e)
03 30 00
SUBMITTAL FORM,Jan 96
DESCRIPTION
CONTRACTOR:
SCHEDULE DATES
G
O
V
T
C
L
A
S
S
I
F
I
C
A
T
I
O
N
CONTRACTOR
ACTION
O
R
A
C
T
I
O
N
A
/
E
R
E
V
W
R
(f)
SUBMIT
(g)
APPROVAL MATERIAL
NEEDED
NEEDED
BY
BY
(h)
(i)
APPROVING AUTHORITY
A
C
T
I
O
N
DATE FWD
TO APPR
AUTH/
C
O
D
E
DATE
OF
ACTION
(j)
(k)
(m)
(n)
MAILED
TO
CONTR/
C
O
D
E
DATE
OF
ACTION
DATE RCD
FRM APPR
AUTH
REMARKS
(o)
(p)
(q)
(r)
2.3.4
2.5
1.6.2.1
1.5
2.4.6
2.2.1
2.4.10.3
3.14.2
2.1.1
1.8.1
2.3.2
G RO
1.6.4.1
1.6.4.2
1.6.4.2
1.6.4.3
G RO
1.6.4.4
3.12.2.3
3.12.2.5
3.12.2.4
2.3.2
2.3.2
PAGE 4 OF 15 PAGES
CONTRACT NO.
SUBMITTAL REGISTER
TITLE AND LOCATION
CONTRACTOR
A
C
T
I
V
I
T
Y
T
R
A
N
S
M
I
T
T
A
L
N
O
(a)
S
P
E
C
N
O
S
E
C
T
ITEM SUBMITTED
P
A
R
A
G#
R
A
P
H
(b)
(c)
(d)
(e)
03 30 00
05 12 00
05 30 00
SUBMITTAL FORM,Jan 96
DESCRIPTION
CONTRACTOR:
SCHEDULE DATES
G
O
V
T
C
L
A
S
S
I
F
I
C
A
T
I
O
N
CONTRACTOR
ACTION
O
R
A
C
T
I
O
N
A
/
E
R
E
V
W
R
(f)
SUBMIT
(g)
APPROVAL MATERIAL
NEEDED
NEEDED
BY
BY
(h)
(i)
APPROVING AUTHORITY
A
C
T
I
O
N
DATE FWD
TO APPR
AUTH/
C
O
D
E
DATE
OF
ACTION
(j)
(k)
(m)
(n)
MAILED
TO
CONTR/
C
O
D
E
DATE
OF
ACTION
DATE RCD
FRM APPR
AUTH
REMARKS
(o)
(p)
(q)
(r)
1.8.2
1.6.4.2
1.6.4.3
2.5.8
1.6.2.2
1.6.1
G RO
G RO
2.4
2.3.1
2.2.5
2.3.2
2.4
2.2
2.1
2.2
1.6.2.3
1.3.5
2.3.4.1
PREVIOUS EDITION IS OBSOLETE
PAGE 5 OF 15 PAGES
CONTRACT NO.
SUBMITTAL REGISTER
TITLE AND LOCATION
CONTRACTOR
A
C
T
I
V
I
T
Y
T
R
A
N
S
M
I
T
T
A
L
N
O
(a)
S
P
E
C
N
O
S
E
C
T
ITEM SUBMITTED
P
A
R
A
G#
R
A
P
H
(b)
(c)
(d)
(e)
05 30 00
05 40 00
SUBMITTAL FORM,Jan 96
DESCRIPTION
CONTRACTOR:
SCHEDULE DATES
G
O
V
T
C
L
A
S
S
I
F
I
C
A
T
I
O
N
CONTRACTOR
ACTION
O
R
A
C
T
I
O
N
A
/
E
R
E
V
W
R
(f)
SUBMIT
(g)
APPROVAL MATERIAL
NEEDED
NEEDED
BY
BY
(h)
(i)
APPROVING AUTHORITY
A
C
T
I
O
N
DATE FWD
TO APPR
AUTH/
C
O
D
E
DATE
OF
ACTION
(j)
(k)
(m)
(n)
MAILED
TO
CONTR/
C
O
D
E
DATE
OF
ACTION
DATE RCD
FRM APPR
AUTH
REMARKS
(o)
(p)
(q)
(r)
2.3.4.2
2.3.4.3
2.2
1.3.1
2.1.6
2.1.5
2.2.12
1.3.2
2.3.10
1.3.3
1.3.3
1.3.3
1.3.1
1.3.3
1.3.4.1
1.3.4.2
1.6.1
G RO
2.1
1.6.2
G RO
PAGE 6 OF 15 PAGES
CONTRACT NO.
SUBMITTAL REGISTER
TITLE AND LOCATION
CONTRACTOR
A
C
T
I
V
I
T
Y
T
R
A
N
S
M
I
T
T
A
L
N
O
(a)
S
P
E
C
N
O
S
E
C
T
ITEM SUBMITTED
P
A
R
A
G#
R
A
P
H
(b)
(c)
(d)
(e)
05 40 00
06 10 00
07 11 13
07 42 13
SUBMITTAL FORM,Jan 96
DESCRIPTION
CONTRACTOR:
SCHEDULE DATES
G
O
V
T
C
L
A
S
S
I
F
I
C
A
T
I
O
N
CONTRACTOR
ACTION
O
R
A
C
T
I
O
N
A
/
E
R
E
V
W
R
(f)
SUBMIT
(g)
APPROVAL MATERIAL
NEEDED
NEEDED
BY
BY
(h)
(i)
APPROVING AUTHORITY
A
C
T
I
O
N
DATE FWD
TO APPR
AUTH/
C
O
D
E
DATE
OF
ACTION
(j)
(k)
(m)
(n)
MAILED
TO
CONTR/
C
O
D
E
DATE
OF
ACTION
DATE RCD
FRM APPR
AUTH
REMARKS
(o)
(p)
(q)
(r)
1.4
3.1.1
G
2.2.2
2.1.4
1.4.5
1.9.3
1.7
1.3
1.5.3
1.5.4
G
G
1.5.4.1
1.8
G
G
PAGE 7 OF 15 PAGES
CONTRACT NO.
SUBMITTAL REGISTER
TITLE AND LOCATION
CONTRACTOR
A
C
T
I
V
I
T
Y
T
R
A
N
S
M
I
T
T
A
L
N
O
(a)
S
P
E
C
N
O
S
E
C
T
ITEM SUBMITTED
P
A
R
A
G#
R
A
P
H
(b)
(c)
(d)
(e)
07 42 13
SUBMITTAL FORM,Jan 96
DESCRIPTION
Installation Drawings
SD-03 Product Data
Wall Panels
Factory Color Finish
Closure Materials
Pressure Sensitive Tape
Sealants and Caulking
Galvanizing Repair Paint
Enamel Repair Paint
Aluminized Steel Repair Paint
Accessories
Accessories
SD-04 Samples
Wall Panels
Fasteners
Metal Closure Strips
Color chart
SD-05 Design Data
Wind load design analysis
SD-06 Test Reports
Leakage Tests
Wind Load Tests
Coating
Chalking
Seismic Tests
SD-07 Certificates
C
L
A
S
S
I
F
I
C
A
T
I
O
N
2.2.2
2.2.3
1.5.5
2.5.4.4
2.5.4.1
1.5.3.1
1.5.3.1
CONTRACTOR
ACTION
O
R
A
C
T
I
O
N
A
/
E
R
E
V
W
R
(f)
1.5.1.1
CONTRACTOR:
SCHEDULE DATES
G
O
V
T
SUBMIT
(g)
APPROVAL MATERIAL
NEEDED
NEEDED
BY
BY
(h)
(i)
APPROVING AUTHORITY
A
C
T
I
O
N
DATE FWD
TO APPR
AUTH/
C
O
D
E
DATE
OF
ACTION
(j)
(k)
(m)
(n)
MAILED
TO
CONTR/
C
O
D
E
DATE
OF
ACTION
DATE RCD
FRM APPR
AUTH
REMARKS
(o)
(p)
(q)
(r)
1.5.5
2.5
2.2.2
1.5.3.1
2.5.3
G
G
G
G
1.5.1.2
3.7.2
1.3.2
2.2.3.6
2.2.3.6
1.3.2
G
G
G
G
G
PAGE 8 OF 15 PAGES
CONTRACT NO.
SUBMITTAL REGISTER
TITLE AND LOCATION
CONTRACTOR
A
C
T
I
V
I
T
Y
T
R
A
N
S
M
I
T
T
A
L
N
O
(a)
S
P
E
C
N
O
S
E
C
T
ITEM SUBMITTED
P
A
R
A
G#
R
A
P
H
(b)
(c)
(d)
(e)
07 42 13
07 53 24
SUBMITTAL FORM,Jan 96
DESCRIPTION
Coil Stock
Fasteners
Galvanizing Repair Paint
Enamel Repair Paint
SD-08 Manufacturers Instructions
Installation
SD-09 Manufacturers Field
Reports
Manufacturer's Field Reports
SD-11 Closeout Submittals
Warranty
Maintenance Instructions
20 year 'No Dollar Limit' warranty
for labor and material
SD-02 Shop Drawings
Floor and Roof Plan Drawing
Load Calculations and Reactions
Attachment Details to the
Foundation of Structure
Bracing Details
Fabric Fastening Details
SD-03 Product Data
Fabric Sheet
Fasteners and Plates
SD-11 Closeout Submittals
Warranty
C
L
A
S
S
I
F
I
C
A
T
I
O
N
G
G
G
G
3.3
3.8.1
1.8
1.5.6
1.8.1
G
G
CONTRACTOR
ACTION
O
R
A
C
T
I
O
N
A
/
E
R
E
V
W
R
(f)
1.5.3.1
1.5.3.1
1.5.3.1
1.5.3.1
CONTRACTOR:
SCHEDULE DATES
G
O
V
T
SUBMIT
(g)
APPROVAL MATERIAL
NEEDED
NEEDED
BY
BY
(h)
(i)
APPROVING AUTHORITY
A
C
T
I
O
N
DATE FWD
TO APPR
AUTH/
C
O
D
E
DATE
OF
ACTION
(j)
(k)
(m)
(n)
MAILED
TO
CONTR/
C
O
D
E
DATE
OF
ACTION
DATE RCD
FRM APPR
AUTH
REMARKS
(o)
(p)
(q)
(r)
1.3.1
1.3.1
1.3.1
1.3.1
1.3.1
PAGE 9 OF 15 PAGES
CONTRACT NO.
SUBMITTAL REGISTER
TITLE AND LOCATION
CONTRACTOR
A
C
T
I
V
I
T
Y
T
R
A
N
S
M
I
T
T
A
L
N
O
(a)
S
P
E
C
N
O
S
E
C
T
ITEM SUBMITTED
P
A
R
A
G#
R
A
P
H
(b)
(c)
(d)
(e)
DESCRIPTION
Maintenance Instructions
SD-02 Shop Drawings
Covering on flat, sloped, or
curved surfaces
Gutters
Downspouts
Gravel stops and fascias
Drip edge
SD-11 Closeout Submittals
Quality Control Plan
07 61 14.00 20 SD-02 Shop Drawings
Roofing
SD-03 Product Data
Roofing panels
Attachment clips
Closures
Accessories
Fasteners
Sealants
Insulation
warranty
SD-04 Samples
panel
SD-05 Design Data
Design calculations
SD-06 Test Reports
CONTRACTOR:
SCHEDULE DATES
G
O
V
T
C
L
A
S
S
I
F
I
C
A
T
I
O
N
CONTRACTOR
ACTION
O
R
A
C
T
I
O
N
A
/
E
R
E
V
W
R
(f)
SUBMIT
(g)
APPROVAL MATERIAL
NEEDED
NEEDED
BY
BY
(h)
(i)
APPROVING AUTHORITY
A
C
T
I
O
N
DATE FWD
TO APPR
AUTH/
C
O
D
E
DATE
OF
ACTION
(j)
(k)
(m)
(n)
MAILED
TO
CONTR/
C
O
D
E
DATE
OF
ACTION
DATE RCD
FRM APPR
AUTH
REMARKS
(o)
(p)
(q)
(r)
07 53 24
07 60 00
SUBMITTAL FORM,Jan 96
3.1.25
3.1.17
3.1.18
3.1.15
3.1.16
G
G
G
G
3.5
1.2.5
2.1
2.3
2.4.1
2.4
2.4.2
2.4.3
1.7
2.1
1.5
PAGE 10 OF 15 PAGES
CONTRACT NO.
SUBMITTAL REGISTER
TITLE AND LOCATION
CONTRACTOR
A
C
T
I
V
I
T
Y
T
R
A
N
S
M
I
T
T
A
L
N
O
(a)
S
P
E
C
N
O
S
E
C
T
ITEM SUBMITTED
P
A
R
A
G#
R
A
P
H
(b)
(c)
(d)
(e)
DESCRIPTION
CONTRACTOR:
SCHEDULE DATES
G
O
V
T
C
L
A
S
S
I
F
I
C
A
T
I
O
N
CONTRACTOR
ACTION
O
R
A
C
T
I
O
N
A
/
E
R
E
V
W
R
(f)
SUBMIT
(g)
APPROVAL MATERIAL
NEEDED
NEEDED
BY
BY
(h)
(i)
APPROVING AUTHORITY
A
C
T
I
O
N
DATE FWD
TO APPR
AUTH/
C
O
D
E
DATE
OF
ACTION
(j)
(k)
(m)
(n)
MAILED
TO
CONTR/
C
O
D
E
DATE
OF
ACTION
DATE RCD
FRM APPR
AUTH
REMARKS
(o)
(p)
(q)
(r)
3.6
1.3.3
1.6.6
1.6.3
1.6.4
2.1
3.3
2.1
2.2
2.3
2.4
3.3.6
2.1
2.1
2.7
2.7
G
G
G
G
2.9
PREVIOUS EDITION IS OBSOLETE
PAGE 11 OF 15 PAGES
CONTRACT NO.
SUBMITTAL REGISTER
TITLE AND LOCATION
CONTRACTOR
A
C
T
I
V
I
T
Y
T
R
A
N
S
M
I
T
T
A
L
N
O
(a)
S
P
E
C
N
O
S
E
C
T
ITEM SUBMITTED
P
A
R
A
G#
R
A
P
H
(b)
(c)
(d)
(e)
08 11 13
08 91 00
09 90 00
26 20 00
SUBMITTAL FORM,Jan 96
DESCRIPTION
2.1
2.7
CONTRACTOR:
SCHEDULE DATES
G
O
V
T
C
L
A
S
S
I
F
I
C
A
T
I
O
N
CONTRACTOR
ACTION
O
R
A
C
T
I
O
N
A
/
E
R
E
V
W
R
(f)
SUBMIT
(g)
APPROVAL MATERIAL
NEEDED
NEEDED
BY
BY
(h)
(i)
APPROVING AUTHORITY
A
C
T
I
O
N
DATE FWD
TO APPR
AUTH/
C
O
D
E
DATE
OF
ACTION
(j)
(k)
(m)
(n)
MAILED
TO
CONTR/
C
O
D
E
DATE
OF
ACTION
DATE RCD
FRM APPR
AUTH
REMARKS
(o)
(p)
(q)
(r)
G
G
2.9
G
1.4
1.5
2.2
1.4
1.5
G
G
2.1
G
G
2.15
2.34
2.14
2.15.3
2.12
PREVIOUS EDITION IS OBSOLETE
PAGE 12 OF 15 PAGES
CONTRACT NO.
SUBMITTAL REGISTER
TITLE AND LOCATION
CONTRACTOR
A
C
T
I
V
I
T
Y
T
R
A
N
S
M
I
T
T
A
L
N
O
(a)
S
P
E
C
N
O
S
E
C
T
ITEM SUBMITTED
P
A
R
A
G#
R
A
P
H
(b)
(c)
(d)
(e)
DESCRIPTION
CONTRACTOR:
SCHEDULE DATES
G
O
V
T
C
L
A
S
S
I
F
I
C
A
T
I
O
N
CONTRACTOR
ACTION
O
R
A
C
T
I
O
N
A
/
E
R
E
V
W
R
(f)
SUBMIT
(g)
APPROVAL MATERIAL
NEEDED
NEEDED
BY
BY
(h)
(i)
APPROVING AUTHORITY
A
C
T
I
O
N
DATE FWD
TO APPR
AUTH/
C
O
D
E
DATE
OF
ACTION
(j)
(k)
(m)
(n)
MAILED
TO
CONTR/
C
O
D
E
DATE
OF
ACTION
DATE RCD
FRM APPR
AUTH
REMARKS
(o)
(p)
(q)
(r)
26 20 00
SUBMITTAL FORM,Jan 96
3.5.2
3.5.5
3.5.4
1.3
2.2
2.1
1.6.1
2.1.6
1.9.1
1.9.2
1.6.4.3
3.3
3.5
1.6.3
G RO
G RO
3.9
1.6.1.2
G RO
PAGE 13 OF 15 PAGES
CONTRACT NO.
SUBMITTAL REGISTER
TITLE AND LOCATION
CONTRACTOR
A
C
T
I
V
I
T
Y
T
R
A
N
S
M
I
T
T
A
L
N
O
(a)
S
P
E
C
N
O
S
E
C
T
ITEM SUBMITTED
P
A
R
A
G#
R
A
P
H
(b)
(c)
(d)
(e)
31 00 00
32 11 23
32 16 13
32 92 19
33 40 00
SUBMITTAL FORM,Jan 96
DESCRIPTION
CONTRACTOR:
SCHEDULE DATES
G
O
V
T
C
L
A
S
S
I
F
I
C
A
T
I
O
N
CONTRACTOR
ACTION
O
R
A
C
T
I
O
N
A
/
E
R
E
V
W
R
(f)
SUBMIT
(g)
APPROVAL MATERIAL
NEEDED
NEEDED
BY
BY
(h)
(i)
APPROVING AUTHORITY
A
C
T
I
O
N
DATE FWD
TO APPR
AUTH/
C
O
D
E
DATE
OF
ACTION
(j)
(k)
(m)
(n)
MAILED
TO
CONTR/
C
O
D
E
DATE
OF
ACTION
DATE RCD
FRM APPR
AUTH
REMARKS
(o)
(p)
(q)
(r)
3.18
2.1
3.18
1.4
1.6
1.6.2.4
G RO
G RO
2.1
3.8
2.5.3
2.4
2.2.3
2.1
2.7
3.3
PAGE 14 OF 15 PAGES
CONTRACT NO.
SUBMITTAL REGISTER
TITLE AND LOCATION
CONTRACTOR
A
C
T
I
V
I
T
Y
T
R
A
N
S
M
I
T
T
A
L
N
O
(a)
S
P
E
C
N
O
S
E
C
T
ITEM SUBMITTED
P
A
R
A
G#
R
A
P
H
(b)
(c)
(d)
(e)
33 40 00
DESCRIPTION
CONTRACTOR:
SCHEDULE DATES
G
O
V
T
C
L
A
S
S
I
F
I
C
A
T
I
O
N
CONTRACTOR
ACTION
O
R
A
C
T
I
O
N
A
/
E
R
E
V
W
R
(f)
SUBMIT
(g)
APPROVAL MATERIAL
NEEDED
NEEDED
BY
BY
(h)
(i)
APPROVING AUTHORITY
A
C
T
I
O
N
DATE FWD
TO APPR
AUTH/
C
O
D
E
DATE
OF
ACTION
(j)
(k)
(m)
(n)
MAILED
TO
CONTR/
C
O
D
E
DATE
OF
ACTION
DATE RCD
FRM APPR
AUTH
REMARKS
(o)
(p)
(q)
(r)
2.1
2.1.10
3.8
2.7
3.7.5
2.3.7
1.4.1
1.4.2
2.2
2.1
3.2
3.12
3.12.13
2.1
PAGE 15 OF 15 PAGES
W912HN-09-X-1813
SECTION 01 35 26A
*1 GOVERNMENTAL SAFETY REQUIREMENTS
02/12
PART 1
1.1
GENERAL
REFERENCES
ASSE/SAFE A10.34
ASSE/SAFE Z359.1
ASME B30.3
ASME B30.5
ASME B30.8
NFPA 51B
NFPA 70E
EM 385-1-1
29 CFR 1910
W912HN-09-X-1813
29 CFR 1910.146
29 CFR 1926
29 CFR 1926.1400
29 CFR 1926.16
Rules of Construction
29 CFR 1926.500
Fall Protection
CPL 2.100
1.2
DEFINITIONS
b.
c.
e.
(1) Death, regardless of the time between the injury and death, or the
length of the illness;
(2) Days away from work (any time lost after day of injury/illness
onset);
(3) Restricted work;
(4) Transfer to another job;
(5) Medical treatment beyond first aid;
(6) Loss of consciousness; or
(7) A significant injury or illness diagnosed by a physician or other
licensed health care professional, even if it did not result in
(1) through (6) above.
f.
g.
W912HN-09-X-1813
SUBMITTALS
1.4
REGULATORY REQUIREMENTS
W912HN-09-X-1813
1.5.1
Personnel Qualifications
1.5.1.1
The SSHO must meet the requirements of EM 385-1-1 section 1 and ensure that
the requirements of 29 CFR 1926.16 are met for the project. Provide a
Safety oversight team that includes a minimum of one (1) person at each
project site to function as the Site Safety and Health Officer (SSHO). The
SSHO or an equally-qualified Designated Representative/alternate shall be
at the work site at all times to implement and administer the Contractor's
safety program and government-accepted Accident Prevention Plan. The
SSHO's training, experience, and qualifications shall be as required by
EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER
(SSHO), and all associated sub-paragraphs.
A Competent Person shall be provided for all of the hazards identified in
the Contractor's Safety and Health Program in accordance with the accepted
Accident Prevention Plan, and shall be on-site at all times when the work
that presents the hazards associated with their professional expertise is
being performed. Provide the credentials of the Competent Persons(s) to
the the Contracting Officer for acceptance in consultation with the Safety
Office.
1.5.1.1.1
The Contractor Quality Control Person can be the SSHO on this project.
1.5.1.2
Crane Operators
Personnel Duties
1.5.2.1
Conduct daily safety and health inspections and maintain a written log
which includes area/operation inspected, date of inspection, identified
hazards, recommended corrective actions, estimated and actual dates of
corrections. Attach safety inspection logs to the Contractors' daily
quality control report.
b.
c.
SECTION 01 35 26
Maintain
W912HN-09-X-1813
d.
e.
f.
g.
h.
Meetings
1.5.3.1
Preconstruction Conference
a.
b.
c.
d.
1.6
W912HN-09-X-1813
referenced in the APP in the applicable APP element and made site-specific.
The Government considers the Prime Contractor to be the "controlling
authority" for all work site safety and health of the subcontractors.
Contractors are responsible for informing their subcontractors of the
safety provisions under the terms of the contract and the penalties for
noncompliance, coordinating the work to prevent one craft from interfering
with or creating hazardous working conditions for other crafts, and
inspecting subcontractor operations to ensure that accident prevention
responsibilities are being carried out. The APP shall be signed by the
person and firm (senior person) preparing the APP, the Contractor, the
on-site superintendent, the designated site safety and health officer, the
Contractor Quality control Manager, and any designated CSP or CIH.
Submit the APP to the Contracting Officer 15calendar days prior to the date
of the preconstruction conference for acceptance. Work cannot proceed
without an accepted APP.
Once accepted by the Contracting Officer, the APP and attachments will be
enforced as part of the contract. Disregarding the provisions of this
contract or the accepted APP will be cause for stopping of work, at the
discretion of the Contracting Officer, until the matter has been rectified.
Once work begins, changes to the accepted APP shall be made with the
knowledge and concurrence of the Contracting Officer, project
superintendent, SSHO and quality control manager. Should any severe hazard
exposure, i.e. imminent danger, become evident, stop work in the area,
secure the area, and develop a plan to remove the exposure and control the
hazard. Notify the Contracting Officer within 24 hours of discovery.
Eliminate/remove the hazard. In the interim, take all necessary action to
restore and maintain safe working conditions in order to safeguard onsite
personnel, visitors, the public (as defined by ASSE/SAFE A10.34,) and the
environment.
Copies of the accepted plan will be maintained at the Contracting Officer's
office and at the job site.
Continuously reviewed and amended the APP, as necessary, throughout the
life of the contract. Incorporate unusual or high-hazard activities not
identified in the original APP as they are discovered.
1.6.1
EM 385-1-1 Contents
W912HN-09-X-1813
charts based on calculated list and trim. The amount of list and trim
shall be within the crane manufacturer's requirements.
b.
c.
1.7
The Activity Hazard Analysis (AHA) format shall be in accordance with USACE
EM 385-1-1, Section 1. Submit the AHA for review at least 15 calendar days
prior to the start of each phase. Format subsequent AHAs as amendments to
the APP. The analysis should be used during daily inspections to ensure the
implementation and effectiveness of the activity's safety and health
controls.
The AHA list will be reviewed periodically (at least monthly) at the
Contractor supervisory safety meeting and updated as necessary when
procedures, scheduling, or hazards change.
Develop the activity hazard analyses using the project schedule as the
basis for the activities performed. Any activities listed on the project
schedule will require an AHA. The AHAs will be developed by the
contractor, supplier or subcontractor and provided to the prime contractor
for submittal to the Contracting Officer.
1.8
b.
1.9
SECTION 01 35 26
1.11
1.11.1
W912HN-09-X-1813
Notify the Contracting Officer as soon as practical, but no more than four
hours after any accident meeting the definition of Recordable Injuries or
Illnesses or High Visibility Accidents, property damage equal to or greater
than $2,000, or any weight handling equipment accident. Within
notification include contractor name; contract title; type of contract;
name of activity, installation or location where accident occurred; date
and time of accident; names of personnel injured; extent of property
damage, if any; extent of injury, if known, and brief description of
accident (to include type of construction equipment used, PPE used, etc.).
Preserve the conditions and evidence on the accident site until the
Government investigation team arrives on-site and Government investigation
is conducted.
1.11.2
Accident Reports
a.
b.
1.11.3
Crane Reports
Certificate of Compliance
SECTION 01 35 26
1.12
W912HN-09-X-1813
HOT WORK
Submit and obtain a written permit prior to performing "Hot Work" (welding,
cutting, etc.) or operating other flame-producing/spark producing devices,
from the Fire Division. A permit is required from the Explosives Safety
Office for work in and around where explosives are processed, stored, or
handled. CONTRACTORS ARE REQUIRED TO MEET ALL CRITERIA BEFORE A PERMIT IS
ISSUED. Provide at least two (2) twenty (20) pound 4A:20 BC rated
extinguishers for normal "Hot Work". All extinguishers shall be current
inspection tagged, approved safety pin and tamper resistant seal. It is
also mandatory to have a designated FIRE WATCH for any "Hot Work" done at
this activity. The Fire Watch shall be trained in accordance with NFPA 51B
and remain on-site for a minimum of 30 minutes after completion of the task
or as specified on the hot work permit.
When starting work in the facility, require personnel to familiarize
themselves with the location of the nearest fire alarm boxes and place in
memory the emergency Fire Division phone number. ANY FIRE, NO MATTER HOW
SMALL, SHALL BE REPORTED TO THE RESPONSIBLE FIRE DIVISION IMMEDIATELY.
1.13
Streets, walks, and other facilities occupied and used by the Government
shall not be closed or obstructed without written permission from the
SECTION 01 35 26
W912HN-09-X-1813
Contracting Officer.
1.15
Secure outside equipment and materials and place materials that could
be damaged in protected areas.
b.
c.
1.16
PRODUCTS
Not used.
PART 3
EXECUTION
3.1
CONSTRUCTION AND OTHER WORK
3.1.1
Hazardous Material Exclusions
Notwithstanding any other hazardous material used in this contract,
radioactive materials or instruments capable of producing
ionizing/non-ionizing radiation (with the exception of radioactive material
and devices used in accordance with USACE EM 385-1-1 such as nuclear
density meters for compaction testing and laboratory equipment with
radioactive sources) as well as materials which contain asbestos, mercury
or polychlorinated biphenyls, di-isocynates, lead-based paint are
prohibited. The Contracting Officer, upon written request by the
Contractor, may consider exceptions to the use of any of the above excluded
materials. Low mercury lamps used within fluorescent lighting fixtures are
allowed as an exception without further Contracting Officer approval.
Notify the Radiation Safety Officer (RSO) prior to excepted items of
radioactive material and devices being brought on base.
3.1.2
The design should have identified materials such as PCB, lead paint, and
friable and non-friable asbestos and other OSHA regulated chemicals (i.e.
29 CFR Part 1910.1000). If additional material, not indicated, that may be
hazardous to human health upon disturbance during construction operations
is encountered, stop that portion of work and notify the Contracting
Officer immediately. Within 14 calendar days the Government will determine
if the material is hazardous. If material is not hazardous or poses no
danger, the Government will direct the Contractor to proceed without
change. If material is hazardous and handling of the material is necessary
to accomplish the work, the Government will issue a modification pursuant
to "FAR 52.243-4, Changes" and "FAR 52.236-2, Differing Site Conditions."
SECTION 01 35 26
3.2
W912HN-09-X-1813
Ensure that each employee is familiar with and complies with these
procedures and USACE EM 385-1-1, Section 12, Control of Hazardous Energy.
3.4
Training
Enforce use of the fall protection equipment and systems designated for
each specific work activity in the Fall Protection and Prevention Plan
and/or AHA at all times when an employee is exposed to a fall hazard.
Protect employees from fall hazards as specified in EM 385-1-1, Section
21. In addition to the required fall protection systems, safety skiff,
personal floatation devices, life rings etc., are required when working
above or next to water in accordance with USACE EM 385-1-1, Paragraphs 21.N
through 21.N.04. Personal fall arrest systems are required when working
from an articulating or extendible boom, swing stages, or suspended
platform. In addition, personal fall arrest systems are required when
operating other equipment such as scissor lifts if the work platform is
capable of being positioned outside the wheelbase. The need for tying-off
in such equipment is to prevent ejection of the employee from the equipment
during raising, lowering, or travel. Fall protection must comply with
29 CFR 1926.500, Subpart M, USACE EM 385-1-1 and ASSE/SAFE A10.32.
3.4.2.1
W912HN-09-X-1813
b.
3.4.4
Design, install and use guardrails and safety nets in accordance with
EM 385-1-1 and 29 CFR 1926 Subpart M.
3.4.6
When personal fall arrest systems are used, ensure that the mishap victim
can self-rescue or can be rescued promptly should a fall occur. Prepare a
Rescue and Evacuation Plan and include a detailed discussion of the
following: methods of rescue; methods of self-rescue; equipment used;
training requirement; specialized training for the rescuers; procedures for
requesting rescue and medical assistance; and transportation routes to a
medical facility. Include the Rescue and Evacuation Plan within the
Activity Hazard Analysis (AHA) for the phase of work, in the Fall
Protection and Prevention (FP&P) Plan, and the Accident Prevention Plan
(APP).
SECTION 01 35 26
3.5
3.5.1
W912HN-09-X-1813
EQUIPMENT
Material Handling Equipment
a.
b.
c.
3.5.2
a.
b.
c.
Comply with ASME B30.5 for mobile and locomotive cranes, ASME B30.22
for articulating boom cranes, ASME B30.3 for construction tower cranes,
and ASME B30.8 for floating cranes and floating derricks.
d.
e.
f.
g.
h.
i.
j.
k.
l.
Side
W912HN-09-X-1813
Written reports listing the load test procedures used along with any
repairs or alterations performed on the crane shall be available for
review by Contracting Officer personnel.
n.
Certify that all crane operators have been trained in proper use of all
safety devices (e.g. anti-two block devices).
3.5.3
USE OF EXPLOSIVES
Explosives shall not be used or brought to the project site without prior
written approval from the Contracting Officer. Such approval shall not
relieve the Contractor of responsibility for injury to persons or for
damage to property due to blasting operations.
Storage of explosives, when permitted on Government property, shall be only
where directed and in approved storage facilities. These facilities shall
be kept locked at all times except for inspection, delivery, and withdrawal
of explosives.
3.6
EXCAVATIONS
Utility Locations
SECTION 01 35 26
3.7
W912HN-09-X-1813
ELECTRICAL
3.9.1
Comply
29 CFR
29 CFR
permit
a.
b.
c.
SECTION 01 35 26
W912HN-09-X-1813
SECTION 01 42 00A
*1 SOURCES FOR REFERENCE PUBLICATIONS
08/10
PART 1
1.1
GENERAL
REFERENCES
ORDERING INFORMATION
Internet:
W912HN-09-X-1813
http://www.flexibleduct.org
Internet:
W912HN-09-X-1813
http://www.aatcc.org
SECTION 01 42 00
W912HN-09-X-1813
W912HN-09-X-1813
Germantown, MD 20875-0210
Ph:
301-972-1700
Fax: 301-540-8004
E-mail: alsc@alsc.org
Internet:
http://www.alsc.org
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
1819 L Street, NW, 6th Floor
Washington, DC 20036
Ph:
202-293-8020
Fax: 202-293-9287
E-mail: info@ansi.org
Internet: http://www.ansi.org/
AMERICAN NURSERY & LANDSCAPE ASSOCIATION (ANLA)
1000 Vermont Ave NW
Suite 300
Washington, DC 20005
Ph:
202-789-2900
Fax: 202-789-1893
E-mail: aflynn@anla.org
Internet: http://www.anla.org
AMERICAN PETROLEUM INSTITUTE (API)
1220 L Street, NW
Washington, DC 20005-4070
Ph:
303-397-7993
Fax: 303-397-2740
E-mail: greg.kallio@ihs.com
Internet: http://www.api.org
AMERICAN RAILWAY ENGINEERING AND MAINTENANCE-OF-WAY ASSOCIATION
(AREMA)
10003 Derekwood Lane, Suite 210
Lanham, MD 20706
Ph:
301-459-3200
Fax: 301-459-8077
Internet: http://www.arema.org
AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)
1711 Arlingate Lane
P.O. Box 28518
Columbus, OH 43228-0518
Ph:
800-222-2768; 614-274-6003
Fax: 614-274-6899
E-mail: webmaster@asnt.org
Internet: http://www.asnt.org
AMERICAN SOCIETY FOR QUALITY (ASQ)
600 North Plankinton Avenue
Milwaukee, WI 53203
-orP.O. Box 3005
Milwaukee, WI 53201-3005
Ph:
800-935-2231; 414-272-8575
Fax: 414-272-1734
E-mail: help@asq.org
Internet: http://www.asq.org
SECTION 01 42 00
W912HN-09-X-1813
W912HN-09-X-1813
Tacoma, WA 98466-5333
Ph:
253-565-6600
Fax: 253-565-7265
E-mail: help@apawood.org
Internet: http://www.apawood.org
ARCHITECTURAL WOODWORK INSTITUTE (AWI)
46179 Westlake Drive, Suite 120
Potomac Falls, VA 20165
Ph:
571-323-3636
Fax: 571-323-3630
E-mail: info@awinet.org
Internet: http://www.awinet.org
ARCNET TRADE ASSOCIATION (ATA)
E-M-mail: info@arcnet.com
Internet: http://www.arcnet.com/index.htm</URL
ASM INTERNATIONAL (ASM)
9639 Kinsman Road
Materials Park, OH 44073-0002
Ph: 440-338-5151
Fax: 440-338-4634
E-mail: memberservicecenter@asminternational.org
Internet:
http://asmcommunity.asminternational.org/portal/site/www/Home/
ASME INTERNATIONAL (ASME)
Three Park Avenue, M/S 10E
New York, NY 10016-5990
Ph:
800-854-7179 or 800-843-2763
Fax: 212-591-7674
E-mail: infocentral@asme.org
Internet: http://www.asme.org
ASPHALT INSTITUTE (AI)
Research Park Drive
P.O. Box 14052
Lexington, KY 40512-4052
Ph:
859-288-4960
Fax: 859-288-4999
E-mail: info@asphaltinstitute.org
Internet: http://www.asphaltinstitute.org
ASPHALT ROOFING MANUFACTURER'S ASSOCIATION (ARMA)
529 14th Street, NW
Washington D.C. 20045
Ph: 202-207-0917
Fax: 202-223-9741
Internet: http://www.asphaltroofing.org
ASSOCIATED AIR BALANCE COUNCIL (AABC)
1518 K Street, NW
Washington, DC 20005
Ph:
202-737-0202
Fax: 202-638-4833
E-mail: info@aabc.com
Internet: http://www.aabchq.com
SECTION 01 42 00
W912HN-09-X-1813
SECTION 01 42 00
W912HN-09-X-1813
SECTION 01 42 00
W912HN-09-X-1813
W912HN-09-X-1813
Internet: http://www.cganet.com
CONCRETE REINFORCING STEEL INSTITUTE (CRSI)
933 North Plum Grove Road
Schaumburg, IL 60173-4758
Ph:
847-517-1200 or 800-328-6306
Fax: 847-517-1206
Internet: http://www.crsi.org/
CONCRETE SAWING AND DRILLING ASSOCIATION (CSDA)
11001 Danka Way North, Suite 1
St Petersburg, FL 33716
PH: 727-577-5004
Fax: 727-577-5012
E-mail: info@csda.org
Internet: http://www.csda.org
SECTION 01 42 00
W912HN-09-X-1813
W912HN-09-X-1813
Fax: 561-395-8557
E-mail: e-mail@egsa.org
Internet: http://www.egsa.org
ELECTRONIC COMPONENTS ASSOCIATION (ECA)
2500 Wilson Blvd.
Suite 310
Arlington, VA 22201
Ph: 703-907-8024
E-mail: emikoski@ecaus.org
Internet: http://www.ecaus.org
ELECTRONIC INDUSTRIES ALLIANCE (EIA)
2500 Wilson Boulevard
Arlington, VA 22201-3834
Ph: 703-907-7500
Fax: 703-907-7501
E-mail: infor@ecaus.org
Internet: http://www.eia.org
ELECTROSTATIC DISCHARGE ASSOCIATION (ESD)
7900 Turin Road, Building 3
Rome, NY 13440-2069
Ph:
315-339-6937
Fax: 315-339-6793
E-mail: info@esda.org
http://www.esda.org/
ENERGY INSTITUTE (EI)
Publications Team
Energy Institute
61 New Cavendish Street
London
W1G 7AR, UK
Ph: +44 (0)20 7467 7100
Fax: +44 (0)20 7255 1472
Internet:
http://www.energyinstpubs.org.uk/cgi-bin/open.cgi?page=index
U.S. DEPARTMENT OF ENERGY (DOE)
1000 Independance Ave. SW
Washington, DC 20585
Ph: 800-342-5363
Fax: 202-586-4403
E-mail: dmteam@hq.doe.gov
Internet: http://www.eh.doe.gov/
ETL TESTING LABORATORIES (ETL)
Intertek Testing Services, ETL SEMKO
70 Codman Hill Road
Boxborough, MA 01719
Ph:
978-263-2662
Fax: 978-263-7086
E-mail: info@etlsemko.com
Internet: http://www.intertek-etlsemko.com
EUROPEAN COMMITTEE FOR STANDARDIZATION (CEN/CENELEC)
CEN
Avenue Marnix 17
SECTION 01 42 00
W912HN-09-X-1813
B-1000 Brussels
Ph: 32-2-550-08-11
Fax: 32-2-550-08-19
E-mail: infodesk@cenorm.be
Internet: http://www.cenorm.be
EXPANSION JOINT MANUFACTURERS ASSOCIATION (EJMA)
25 North Broadway
Tarrytown, NY 10591
Ph: 914-332-0040
Fax: 914-332-1541
E-mail: inquiries@ejma.org
Internet: http://www.ejma.org
FEDERAL ENERGY REGULATORY COMMISSION (FERC)
888 First Street, NE
Washington, DC 20426
Ph: 202-502-6088
E-mail: customer@ferc.gov
Internet: http://www.ferc.gov/default.asp
FLAT GLASS MARKETING ASSOCIATION (FGMA)
White Lakes Professional Bldg.
3310 Harrison St.
Topeka, KS 66611-2279
Ph: 913-266-7013
Fax: 913-266-0272
FLUID CONTROLS INSTITUTE (FCI)
1300 Sumner Avenue
Cleveland, OH 44115
Ph:
216-241-7333
Fax: 216-241-0105
E-mail: fci@fluidcontrolsinstitute.org
Internet: www.fluidcontrolsinstitute.org
FLUID SEALING ASSOCIATION (FSA)
994 Old Eagle School Rd. #1019
Wayne, PA 19087
Ph: 610-971-4850
E-mail: info@fluidsealing.com
Internet: www.fluidsealing.com
FM GLOBAL (FM)
270 Central Avenue
P.O. Box 7500
Johnston, RI 02919
Ph:
401-275-3000 ext. 1945
Fax: 401-275-3029
E-mail: servicedesk.myrisk@fmglobal.com
Internet: http://www.fmglobal.com
FOREST STEWARDSHIP COUNCIL (FSC)
212 Third Avenue North
Suite 280
Minneapolis, MN 55401
Ph:
612-353-4511
Fax: 612-208-1565
E-mail: info@fscus.org
SECTION 01 42 00
Internet:
W912HN-09-X-1813
http://www.fscus.org
W912HN-09-X-1813
Fax: 202-872-4324
E-mail: greenseal@greenseal.org
Internet: http://www.greenseal.org
GREENGUARD ENVIRONMENTAL INSTITUTE (GEI)
2211 Newmarket Parkway, Suite 110
Marietta, GA 30067
Ph: 800-427-9681
Fax: 770-980-0072
E-mail: info@greenguard.org
Internet: http://www.greenguard.org/
GYPSUM ASSOCIATION (GA)
6525 Belcrest Road, Suite 480
Hyattsville, MD 20782
Ph:
301-277-8686
Fax: 301-277-8747
E-mail: info@gypsum.org
Internet: http://www.gypsum.org
HARDWOOD PLYWOOD AND VENEER ASSOCIATION (HPVA)
1825 Michael Faraday Dr.
Reston, VA 20190
Ph:
703-435-2900
Fax: 703-435-2537
E-mail: hpva@hpva.org
Internet: http://www.hpva.org
HEAT EXCHANGE INSTITUTE (HEI)
1300 Sumner Avenue
Cleveland, OH 44115-2851
Ph:
216-241-7333
Fax: 216-241-0105
E-mail: hei@heatexchange.org
Internet: http://www.heatexchange.org
HOIST MANUFACTURERS INSTITUTE (HMI)
8720 Red Oak Boulevard, Suite 201
Charlotte, NC 28217
Ph: 704-676-1190
Fax: 704-676-1199
E-mail: hmi@mhia.org
Internet: http://www.mhia.org/psc/PSC_Products_Hoists.cfm
H.P. WHITE LABORATORY (HPW)
3114 Scarboro Road
Street, MD 21154
Ph: 410-838-6550
Fax: 410-838-2802
E-mail: info@hpwhite.com
Internet: http://www.hpwhite.com
HYDRAULIC INSTITUTE (HI)
6 Campus Drive, First Floor North
Parsippany, NJ 07054-4406
Ph:
973-267-9700
Fax: 973-267-9055
E-mail: webmaster@pumps.org
Internet: http://www.pumps.org
SECTION 01 42 00
W912HN-09-X-1813
W912HN-09-X-1813
Washington, DC 20005-3438
Ph:
202-289-0222
Fax: 202-289-7722
E-mail: ite_staff@ite.org
Internet: http://www.ite.org
INTERNATIONAL AIR TRANSPORT ASSOCIATION (IATA)
703 Waterford Way (NW 62nd Avenue), Suite 600
Miami, FL 33126
Ph:
305-264-7772
Fax: 305-264-8088
Internet: http://www.iata.org
INSTITUTE OF CLEAN AIR COMPANIES (ICAC)
1730 M Street NW, Suite 206
Washington, DC 20036-4535
Ph:
202-457-0911
Fax: 202-331-1388
E-mail: icacinfo@icac.com
Internet: http://www.icac.com
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
445 Hoes Lane or 2001 L Street, NW. Suite 700
Piscataway, NJ 08855-1331 or Washington, DC 20036-4910 USA
Ph:
732-981-0060 or 800-701-4333
Fax: 732-562-6380
E-mail: onlinesupport@ieee.org or ieeeusa@ieee.org
Internet: http://www.ieee.org
INSTITUTE OF ENVIRONMENTAL SCIENCES AND TECHNOLOGY (IEST)
Arlington Place One or 2340 South Arlington Heights Rd. Suite 100
Arlington Heights, IL 60005-4516
Ph: 847-981-0100
Fax: 847-981-4130
E-mail: iest@iest.org
Internet: http://www.iest.org
INSTRUCTIONS AND STANDARDS FOR NAVBASE GUANTANAMO BAY CUBA
(COMNAVBASEGTMOINST)
Address Not Available
INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)
P.O. Box 1568
Carrollton, GA 30112
Ph:
1 800 447 3352
Fax: 1 303 397 2599
E-mail: global@ihs.com
Internet: http://www.icea.net
INSULATING GLASS MANUFACTURERS ALLIANCE (IGMA)
27 N. Wacker Dr. Suite 365
Chicago, IL 60606-2800
Ph:
613-233-1510
Fax:
613-482-9436
E-mail: info@igmaonline.org
Internet: http://www.igmaonline.org
SECTION 01 42 00
W912HN-09-X-1813
SECTION 01 42 00
W912HN-09-X-1813
W912HN-09-X-1813
E-mail: info@iwca.org
Internet: http://www.iwca.org
THE INTERNET ENGINEERING TASK FORCE (IETF)
IETF, Internet Society
48377 Fremont Blvd., Suite 117
Fremont, California 94538
Ph: 510-492-4080
Fax: 510-492-4001
E-mail: ietf-info@ietf.org
Internet: http://www.rfc-editor.org/
ITALIAN LAWS AND DECREES (D.M.)
Internet: http://www.nyulawglobal.org/globalex/Italy2.htm
KITCHEN CABINET MANUFACTURERS ASSOCIATION (KCMA)
1899 Preston White Drive
Reston, VA 20191-5435
Ph:
703-264-1690
Fax: 703-620-6530
E-mail: info@kcma.org
Internet: http://www.kcma.org
L.H. BAILEY HORTORIUM (LHBH)
Dept of Plant Biology
c/o Cornell University
412 Mann Library Building
Ithaca, NY 14853
Ph: 607-255-4477(Dr. William L.Crepet)
Internet: http://www.plantbio.cornell.edu/Hort.html
LONMARK INTERNATIONAL (LonMark)
550 Meridan Ave.
San Jose, CA 95126
Ph: 408-938-5266
Fax: 408-790-3838
E-mail: info@lonmark.org
Internet: http://www.lonmark.org
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
127 Park Street, NE
Vienna, VA 22180
Ph:
703-281-6613
Fax: 703-281-6671
E-mail: info@mss-hq.com
Internet: http://www.mss-hq.com
MAPLE FLOORING MANUFACTURERS ASSOCIATION (MFMA)
111 Deer Lake Road, Suite 100
Deerfield, IL 60015
Ph:
847-480-9138
Fax: 847-480-9282
E-mail: mfma@maplefloor.org
Internet: http://www.maplefloor.org
MARBLE INSTITUTE OF AMERICA (MIA)
28901 Clemens Road, Suite 100
Cleveland, OH 44145
SECTION 01 42 00
W912HN-09-X-1813
Ph:
440-250-9222
Fax: 440-250-9223
E-mail: info@marble-institute.com
Internet: http://www.marble-institute.com
MASTER PAINTERS INSTITUTE (MPI)
2800 Engleton Avenue
Burnaby, BC CANADA V5C 6G7
Ph: 604-298-7578
Fax: 604-298-7571
E-mail: info@paintinfo.com,jody@mpi.net,bgl@mpi.net
Internet: http://www.paintinfo.com/mpi
MATERIAL HANDLING INDUSTRY OF AMERICA INC (MHIA)
8720 Red Oak Blvd., Suite 201
Charlotte, NC 28717-3992
Ph: 704-676-1190
Fax: 704-676-1199
Internet: http://www.mhia.org
METAL BUILDING MANUFACTURERS ASSOCIATION (MBMA)
1300 Sumner Avenue
Cleveland, OH 44115-2851
Ph:
216-241-7333
Fax: 216-241-0105
E-mail: mbma@mbma.com
Internet: http://www.mbma.com
MIDWEST INSULATION CONTRACTORS ASSOCIATION (MICA)
16712 Elm Circle
Omaha, NE 68130
Ph:
800-747-6422
Fax: 402-330-9702
E-mail: mica@tconl.com
Internet: http://www.micainsulation.org
MIDWEST ROOFING CONTRACTORS ASSOCIATION (MRCA)
4840 Bob Billings Parkway, Suite 1000
Lawrence, Kansas 66049-3862
Ph: 785-843-4888 or 800-497-6722
Fax: 785-843-7555
E-mail: mrca@mrca.org
Internet: General Information: http://www.mrca.org
MONORAIL MANUFACTURERS ASSOCIATION (MMA)
8720 Red Oak Boulevard, Suite 201
Charlotte, NC 28217
Ph: 704-676-1190
Fax: 704-676-1199
E-mail: mma@mhia.org
Internet: http://www.mhia.org/mma
NACE INTERNATIONAL (NACE)
1440 South Creek Drive
Houston, TX 77084-4906
Ph:
281-228-6200
Fax: 281-228-6300
E-mail: firstservice@nace.org
Internet: http://www.nace.org
SECTION 01 42 00
W912HN-09-X-1813
Internet:
W912HN-09-X-1813
http://www.ncrp.com
W912HN-09-X-1813
Milwaukee, WI 53222-3219
Ph:
414-778-3344
Fax: 414-778-3361
E-mail: nfpa@nfpa.com
Internet: http://www.nfpa.com
NATIONAL HARDWOOD LUMBER ASSOCIATION (NHLA)
6830 Raleigh LaGrange Road
Memphis, TN 38184-0518
Ph:
901-377-1818
E-mail: info@nhla.com
Internet: http://www.natlhardwood.org
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES
(NICET)
1420 King Street
Alexandria, VA 22314-2794
Ph: 888-476-4238 (1-888 IS-NICET)
E-mail: tech@nicet.org
Internet: http://www.nicet.org
NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)
Mail Stop C-34
4676 Columbia Parkway
Cincinnati, OH 45226
Ph: 513-533-8611
Fax: 513-533-8285
E-mail: nioshdocket@cdc.gov
Internet: http://www.cdc.gov/nchs/products.htm
NATIONAL INSTITUTE OF JUSTICE (NIJ)
National Law Enforcement and Corrections Technology Center
2277 Research Boulevard - Mailstop 8J
Rockville, MD 20850
Ph:
800-248-2742
Fax: 301-519-5149
E-mail: asknlectc@nlectc.org
Internet: http://www.justnet.org
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
100 Bureau Drive
Stop 1070
Gaithersburg, MD 20899-1070
Ph: 301-975-NIST (6478
E-mail: inquiries@nist.gov
Internet: http://www.nist.gov
W912HN-09-X-1813
W912HN-09-X-1813
Ithaca, NY 14852-4557
Ph:
607-255-7654
Fax: 607-254-8770
E-mail: nraes@cornell.edu
Internet: http://www.nraes.org
NORTH AMERICAN INSULATION MANUFACTURERS ASSOCIATION (NAIMA)
44 Canal Center Plaza, Suite 310
Alexandria, VA 22314
Ph:
703-684-0084
Fax: 703-684-0427
E-mail: online form
Internet: http://www.naima.org
NORTHEASTERN LUMBER MANUFACTURERS ASSOCIATION (NELMA)
272 Tuttle Road
Cumberland, ME 04021
Ph:
207-829-6901
Fax: 207-829-4293
E-mail: barbara@nelma.org
Internet: http://www.nelma.org
NORTHWEST AIR POLLUTION AUTHORITY (NWAPA)
1600 2nd Street
Mt. Vernon, WA 98273-5202
Ph: 360-428-4627 or 800-622-4627
Fax: 360-428-1620
E-mail: info@nwcleanair.org
NSF INTERNATIONAL (NSF)
789 North Dixboro Road
P.O. Box 130140
Ann Arbor, MI 48113-0140
Ph:
734-769-8010 or 800-NSF-MARK
Fax: 734-769-0109
E-mail: info@nsf.org
Internet: http://www.nsf.org
OLYMPIC AIR POLLUTION CONTROL AUTHORITY (OAPCA)
2940-B Limited Lane NW
Olympia, WA 98502
Ph:
360-586-1044
Fax: 360-491-6308
E-mail: jkelly@oapca.org
Internet: www.orcaa.org/contact-us/
ORGANISATION FOR ECONOMIC CO-OPERATION AND DEVELOPMENT (OECD)
2, rue Andre Pascal
F-75775 Paris Cedex 16, France
Ph:
+ 33 1 45 24 82 00
Fax: 33 1 45 24 85 00
E-mail: bookshop@oecd.org
Internet: http://www.oecd.org
U.S. Contact Center
OECD Washington Center
2001 L Street, NW, Suite 650
Washington, DC 20036-4922
Ph:
202-785-6323
Fax: 202-785-0350
SECTION 01 42 00
E-mail:
W912HN-09-X-1813
washington.contact@oecd.org
W912HN-09-X-1813
W912HN-09-X-1813
Fax: 510-452-8001
Internet: http://www.scs1.com
SCREEN MANUFACTURERS ASSOCIATION (SMA)
2850 South Ocean Boulevard, Suite 114
Palm Beach, FL 33480-6205
E-mail: jvsawyers@home-shield.com (Jeff Sawyers)
Internet: http://www.smainfo.org
SEMICONDUCTOR EQUIPMENT AND MATERIALS INTERNATIONAL (SEMI)
3081 Zanker Road
San Jose, CA 95134
Ph: 408-943-6900
Fax: 408-428-9600
E-mail: semihq@semi.org
Internet: http://www.semi.org
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
4201 Lafayette Center Drive
Chantilly, VA 20151-1219
Ph:
703-803-2980
Fax: 703-803-3732
E-mail: info@smacna.org
Internet: http://www.smacna.org
SINGLE PLY ROOFING INDUSTRY (SPRI)
411 Waverley Oaks Road, Suite 331B
Waltham, MA 02452
Ph: 781-647-7026
Fax: 781-647-7222
E-mail: info@spri.org
Internet: http://www.spri.org
SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)
400 Commonwealth Drive
Warrendale, PA 15096-0001
Ph:
724-776-4970
Fax: 724-776-0790
E-mail: customerservice@sae.org
Internet: http://www.sae.org
SOCIETY OF MOTION PICTURE AND TELEVISION ENGINEERS (SMPTE)
3 Baker Avenue, 5th Floor
White Plains, New York 10601
Ph: 914-761-1100
Fax: 914-761-3115
E-mail: smpte@smpte.org
Internet: http://www.smpte.org
SPRAY POLYURETHANE FOAM ALLIANCE (SPFA)
4400 Fair Lakes Court, Suite 105
Fairfax, VA 22033
Ph: 800-523-6154
Fax: THIS IS OK
E-mail: Fill out a form online
Internet: http://www.sprayfoam.org
SECTION 01 42 00
W912HN-09-X-1813
W912HN-09-X-1813
SECTION 01 42 00
W912HN-09-X-1813
W912HN-09-X-1813
Fax: 847-649-5678
E-mail: info@turfgrasssod.org
Internet: http://www.turfgrasssod.org
UNDERWRITERS LABORATORIES (UL)
2600 N.W. Lake Road
Camas, WA 98607-8542
Ph: 877-854-3577
Fax: 360-817-6278
E-mail: CEC.us@us.ul.com
Internet: http://www.ul.com/
UNI-BELL PVC PIPE ASSOCIATION (UBPPA)
2711 Villa Creek Drive, Suite 1000
Dallas, TX 75234
Ph:
972-243-3902
Fax: 972-243-3907
E-mail: info@uni-bell.org
Internet: http://www.uni-bell.org
U.S. AIR FORCE (USAF)
Air Force Publishing Distribution Center
E-mail: afdpo-ppl@pentagon.af.mil
Internet: http://www.e-publishing.af.mil/
U.S. AIR FORCE TECHNICAL ORDERS (TO)
Air Force Logistics Command, ATTN: D.A.D.
Wright-Patterson Air Force Base, OH 45433
U.S. ARMY (DA)
U.S. Army Publishing Directorate
Ph: 314-592-0910
Fax: 314-592-0923
Internet: http://www.apd.army.mil
U.S. ARMY CENTER FOR HEALTH PROMOTION AND PREVENTIVE MEDICINE
(USACHPPM)
5158 Blackhawk Road
Aberdeen Proving Ground, MD 21010-5403
Ph: 800-222-9698
Fax: 1 (410) 436-7142
E-mail: chppmhhc@AMEDD.ARMY.MIL
Internet: http://chppm-www.apgea.army.mil
U.S. ARMY CORPS OF ENGINEERS (USACE)
Order CRD-C DOCUMENTS from:
Headquarters Points of contact
441 G Street NW
Washington, DC 20314-1000
Ph:
202-761-0011
E-mail: hq-publicaffairs@.usace.army.mil
Internet: http://www.wes.army.mil/SL/MTC/handbook.htm
Order Other Documents from:
USACE Publications Depot
Attn: CEHEC-IM-PD
2803 52nd Avenue
Hyattsville, MD 20781-1102
Ph: 301-394-0081
Fax: 301-394-0084
SECTION 01 42 00
W912HN-09-X-1813
E-mail: pubs-army@usace.army.mil
Internet: http://www.usace.army.mil/publications
or
http://www.hnd.usace.army.mil/techinfo/engpubs.htm
U.S. ARMY RESEARCH, DEVELOPMENT, AND ENGINEERING COMMAND (EA)
Attn: Public Affairs/G-5; Bldg. E5101/223
Aberdeen Proving Ground, MD 21010-5423
Ph: 410-671-5770
Internet: http://www.rdecom.army.mil
U.S. ARMY ENVIRONMENTAL CENTER (USAEC)
5179 Hoadley Road
Aberdeen Proving Ground, MD 21010-5401
Internet: http://aec.army.mil/usaec
Order from:
National Technical Information Service (NTIS)
5301 Shawnee Road
Alexandria, VA 22312
Ph:
703-605-6050 or 1-888-584-8332
Fax: 703-605-6900
E-mail: info@ntis.gov
U.S. BUREAU OF RECLAMATION (BOR)
Denver Federal Center
P.O. Box 25007
Denver, CO 80225
Ph: 303-445-2072
Fax: 303-445-6303
Internet: http://www.usbr.gov
Order from:
National Technical Information Service (NTIS)
5301 Shawnee Road
Alexandria, VA 22312
Ph:
703-605-6050 or 1-888-584-8332
Fax: 703-605-6900
E-mail: info@ntis.gov
Internet: http://wwwsee above
U.S. Code
Office of the Law Revision Counsel
Internet: http://uscode.house.gov/lawrevisioncounsel.shtml
U.S. DEFENSE INFORMATION SYSTEMS AGENCY (DISA)
Washington, DC 20305-2000
Internet:http://www.disa.mil
U.S. DEFENSE INTELLIGENCE AGENCY (DIA)
Defense Intelligence Analysis Center (DIAC)
MacDill Boulevard and Luke Avenue
Bolling AFB, MD
PH: 202-231-2838
E-mail: sea0131@dia.mil
Internet: http://www.dia.mil
U.S. DEFENSE LOGISTICS AGENCY (DLA)
Andrew T. McNamara Building
8725 John J. Kingman Road
Fort Belvoir, VA 22060-6221
Ph: 1-877-352-2255 or 703-767-5525
SECTION 01 42 00
W912HN-09-X-1813
W912HN-09-X-1813
W912HN-09-X-1813
W912HN-09-X-1813
E-mail: info@usgbc.org
Internet: http://www.usgbc.org
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
General Services Administration
1800 F Street, NW
Washington, DC 20405
Ph: 202-501-0800
Internet: www.GSA.gov
Obtain documents from:
Acquisition Streamlining and Standardization Information System
(ASSIST)
Department of Defense Single Stock Point (DODSSP)
Document Automation and Production Service (DAPS)
Building 4/D
700 Robbins Avenue
Philadelphia, PA 19111-5094
Ph:
215-697-6396 - for account/password issues
Internet: http://assist.daps.dla.mil/online/start/; account
registration required
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
8601 Adelphi Road
College Park, MD 20740-6001
Ph: 866-272-6272
Fax: 301-837-0483
E-mail: contactcenter@gpo.gov
Internet: http://www.archives.gov
Order documents from:
Superintendent of Documents
U.S.Government Printing Office (GPO)
732 North Capitol Street, NW
Washington, DC 20401
Ph:
202-512-1800
Fax: 202-512-2104
E-mail: contactcenter@gpo.gov
Internet: http://www.gpoaccess.gov
U.S. NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC)
1322 Patterson Ave. SE, Suite 1000
Washington Navy Yard, DC 20374
Ph:
757-322-4200
Fax: 757-322-4416
Internet: http://www.navfac.navy.mil
U.S. NAVAL FACILITIES ENGINEERING SERVICE CENTER (NFESC)
401 Industry Road, Suite 500
Louisville, KY 40208
Ph: 502-638-4400
Fax: 502-638-4300
E-mail: contact@nstcenter.com
Internet: http://www.nfesc.navy.mil
U.S. NAVAL SEA SYSTEMS COMMAND (NAVSEA)
Commander Naval Sea Systems Command
1333 Isaac Hull Ave., SE
Washington Navy Yard, DC 20376-1080
Ph:
202-781-0000
E-mail: navsea_publicqueries@navy.mil
SECTION 01 42 00
W912HN-09-X-1813
Internet:
W912HN-09-X-1813
http://www.wdma.com
PRODUCTS
Not Used
PART 3
EXECUTION
Not used
-- End of Section --
SECTION 01 42 00
W912HN-09-X-1813
GENERAL
REFERENCES
ASTM E329
1.2
PAYMENT
PRODUCTS
Not Used
PART 3
3.1
EXECUTION
GENERAL REQUIREMENTS
W912HN-09-X-1813
b.
c.
d.
e.
f.
g.
h.
i.
W912HN-09-X-1813
Acceptance of Plan
Notification of Changes
After acceptance of the CQC Plan, notify the Contracting Officer in writing
of any proposed change. Proposed changes are subject to acceptance by the
Contracting Officer.
3.3
COORDINATION MEETING
The requirements for the CQC organization are a CQC System Manager and
sufficient number of additional qualified personnel to ensure safety and
contract compliance. The Safety and Health Manager must receive direction
and authority from the CQC System Manager and serve as a member of the CQC
staff. Personnel identified in the technical provisions as requiring
specialized skills to assure the required work is being performed properly
will also be included as part of the CQC organization. The Contractor's
CQC staff must maintain a presence at the site at all times during progress
of the work and have complete authority and responsibility to take any
action necessary to ensure contract compliance. The CQC staff will be
subject to acceptance by the Contracting Officer. Provide adequate office
space, filing systems and other resources as necessary to maintain an
effective and fully functional CQC organization. Promptly complete and
furnish all letters, material submittals, shop drawing submittals,
schedules and all other project documentation to the CQC organization. The
CQC organization shall be responsible to maintain these documents and
records at the site at all times, except as otherwise acceptable to the
Contracting Officer.
SECTION 01 45 00.00 10
3.4.2
W912HN-09-X-1813
CQC Personnel
Experience Matrix
Area
Qualifications
Civil
Electrical
Structural
Architectural
SECTION 01 45 00.00 10
W912HN-09-X-1813
Experience Matrix
Area
Qualifications
Environmental
Submittals
Additional Requirement
Organizational Changes
Maintain the CQC staff at full strength at all times. When it is necessary
to make changes to the CQC staff, revise the CQC Plan to reflect the
changes and submit the changes to the Contracting Officer for acceptance.
3.5
CONTROL
Preparatory Phase
b.
SECTION 01 45 00.00 10
W912HN-09-X-1813
c.
Check to assure that all materials and/or equipment have been tested,
submitted, and approved.
d.
e.
f.
g.
h.
i.
Check to ensure that the portion of the plan for the work to be
performed has been accepted by the Contracting Officer.
j.
k.
3.6.2
Initial Phase
b.
c.
d.
e.
f.
Verify
W912HN-09-X-1813
the exact location of initial phase for future reference and comparison
with follow-up phases.
g.
3.6.3
The initial phase should be repeated for each new crew to work onsite,
or any time acceptable specified quality standards are not being met.
Follow-up Phase
TESTS
Testing Procedure
b.
Verify that facilities and testing equipment are available and comply
with testing standards.
c.
d.
e.
Record results of all tests taken, both passing and failing on the CQC
report for the date taken. Specification paragraph reference, location
where tests were taken, and the sequential control number identifying
the test. If approved by the Contracting Officer, actual test reports
may be submitted later with a reference to the test number and date
taken. Provide an information copy of tests performed by an offsite or
commercial test facility directly to the Contracting Officer. Failure
to submit timely test reports as stated may result in nonpayment for
related work performed and disapproval of the test facility for this
contract.
SECTION 01 45 00.00 10
3.7.2
W912HN-09-X-1813
Testing Laboratories
3.7.2.1
Capability Check
Capability Recheck
If the selected laboratory fails the capability check, the Contractor will
be assessed a charge of $500 to reimburse the Government for each
succeeding recheck of the laboratory or the checking of a subsequently
selected laboratory. Such costs will be deducted from the contract amount
due the Contractor.
3.7.3
Onsite Laboratory
COMPLETION INSPECTION
Punch-Out Inspection
Conduct an inspection of the work by the CQC Manager near the end of the
work, or any increment of the work established by a time stated in the
SPECIAL CONTRACT REQUIREMENTS Clause, "Commencement, Prosecution, and
Completion of Work", or by the specifications. Prepare and include in the
CQC documentation a punch list of items which do not conform to the
approved drawings and specifications, as required by paragraph
DOCUMENTATION. Include within the list of deficiencies the estimated date
by which the deficiencies will be corrected. Make a second inspection the
CQC System Manager or staff to ascertain that all deficiencies have been
corrected. Once this is accomplished, notify the Government that the
facility is ready for the Government Pre-Final inspection.
3.8.2
Pre-Final Inspection
The Government will perform the pre-final inspection to verify that the
facility is complete and ready to be occupied. A Government Pre-Final
Punch List may be developed as a result of this inspection. Ensure that
all items on this list have been corrected before notifying the Government,
so that a Final inspection with the customer can be scheduled. Correct any
items noted on the Pre-Final inspection in a timely manner. These
inspections and any deficiency corrections required by this paragraph must
be accomplished within the time slated for completion of the entire work or
any particular increment of the work if the project is divided into
increments by separate completion dates.
3.8.3
W912HN-09-X-1813
DOCUMENTATION
b.
c.
d.
e.
f.
g.
h.
i.
j.
W912HN-09-X-1813
the date covered by the report, except that reports need not be submitted
for days on which no work is performed. As a minimum, prepare and submit
one report for every 7 days of no work and on the last day of a no work
period. All calendar days must be accounted for throughout the life of the
contract. The first report following a day of no work will be for that day
only. Reports must be signed and dated by the CQC System Manager. Include
copies of test reports and copies of reports prepared by all subordinate
quality control personnel within the CQC System Manager Report.
3.10
SAMPLE FORMS
NOTIFICATION OF NONCOMPLIANCE
SECTION 01 45 00.00 10
W912HN-09-X-1813
GENERAL
Contract Administration
The Government will use the Resident Management System for Windows (RMS) to
assist in its monitoring and administration of this contract. The
Contractor must use the Government-furnished Construction Contractor Module
of RMS, referred to as QCS, to record, maintain, and submit various
information throughout the contract period. The Contractor module, user
manuals, updates, and training information can be downloaded from the RMS
web site (www.rmssupport.com). This joint Government-Contractor use of RMS
and QCS will facilitate electronic exchange of information and overall
management of the contract. QCS provides the means for the Contractor to
input, track, and electronically share information with the Government in
the following areas:
Administration
Finances
Quality Control
Submittal Monitoring
Scheduling
Import/Export of Data
1.1.1
For ease and speed of communications, both Government and Contractor will,
to the maximum extent feasible, exchange correspondence and other documents
in electronic format. Correspondence, pay requests and other documents
comprising the official contract record will also be provided in paper
format, with signatures and dates where necessary. Paper documents will
govern, in the event of discrepancy with the electronic version.
1.1.2
Other Factors
QCS SOFTWARE
W912HN-09-X-1813
SYSTEM REQUIREMENTS
The following is the minimum system configuration that the Contractor must
have to run QCS:
QCS and Quality Assurance System (QAS) System
Hardware
IBM-compatible PC with 1000 MHz Pentium or higher processor
256+ MB RAM for workstation / 512+ MB RAM for server
1 GB hard drive disk space for sole use by the QCS system
Compact Disk (CD) Reader 8x speed or higher
SVGA or higher resolution monitor (1024x768, 256 colors)
Mouse or other pointing device
Windows compatible printer. (Laser printer must have 4 MB+ of RAM)
Connection to the Internet, minimum 56k BPS
Software
MS Windows 2000, XP, Vista or Windows 7
QAS-Word Processing software: MS Word 2000 or newer
Latest version of: Netscape Navigator, Microsoft Internet
Explorer, or other browser that supports HTML 4.0 or higher
Electronic mail (E-mail) MAPI compatible
Virus protection software that is regularly upgraded with all
issued manufacturer's updates
1.4
1.4.1
RELATED INFORMATION
QCS User Guide
After contract award, download instructions for the installation and use of
QCS from the Government RMS Internet Website. In case of justifiable
difficulties, the Government will provide the Contractor with a CD-ROM
containing these instructions.
1.4.2
The use of QCS will be discussed with the Contractor's QC System Manager
during the mandatory CQC Training class.
1.5
CONTRACT DATABASE
W912HN-09-X-1813
DATABASE MAINTENANCE
Establish, maintain, and update data in the QCS database throughout the
duration of the contract at the Contractor's site office. Submit data
updates to the Government (e.g., daily reports, submittals, RFI's, schedule
updates, payment requests, etc.) using the Government's SFTP repository
built into QCS export function. If permitted by the Contracting Officer,
e-mail or CD-ROM may be used instead of E-mail (see Paragraph DATA
SUBMISSION VIA CD-ROM). The QCS database typically includes current data
on the following items:
1.6.1
1.6.1.1
Administration
Contractor Information
Subcontractor Information
Contain within the database the name, trade, address, phone numbers, and
other required information for all subcontractors. A subcontractor must be
listed separately for each trade to be performed. Assign each
subcontractor/trade a unique Responsibility Code, provided in QCS. Within
14 calendar days of receipt of QCS software from the Government, deliver
subcontractor administrative data in electronic format.
1.6.1.3
Correspondence
Equipment
Management Reporting
SECTION 01 45 00.10 10
1.6.1.6
W912HN-09-X-1813
Exchange all Requests For Information (RFI) using the Built-in RFI
generator and tracker in QCS.
1.6.2
1.6.2.1
Finances
Pay Activity Data
Include within the QCS database a list of pay activities that the
Contractor must develop in conjunction with the construction schedule. The
sum of all pay activities must be equal to the total contract amount,
including modifications. Group pay activities Contract Line Item Number
(CLIN); the sum of the activities must equal the amount of each CLIN. The
total of all CLINs equals the Contract Amount.
1.6.2.2
Payment Requests
Prepare all progress payment requests using QCS. Complete the payment
request worksheet, prompt payment certification, and payment invoice in
QCS. Update the work completed under the contract, measured as percent or
as specific quantities, at least monthly. After the update, generate a
payment request report using QCS. Submit the payment request, prompt
payment certification, and payment invoice with supporting data using the
Government's SFTP repository built into QCS export function. If permitted
by the Contracting Officer, e-mail or a CD-ROM may be used. A signed paper
copy of the approved payment request is also required, which will govern in
the event of discrepancy with the electronic version.
1.6.3
QCS includes the means to produce the Daily CQC Report. The Contractor may
use other formats to record basic QC data. However, the Daily CQC Report
generated by QCS must be the Contractor's official report. Summarize data
from any supplemental reports by the Contractor and consolidate onto the
QCS-generated Daily CQC Report. Submit daily CQC Reports as required by
Section 01 45 00.00 10 QUALITY CONTROL. Electronically submit reports to
the Government within 24 hours after the date covered by the report. Also
provide the Government a signed, printed copy of the daily CQC report.
1.6.3.2
Deficiency Tracking.
W912HN-09-X-1813
Government's QA punch list items will be included in its export file to the
Contractor. Regularly update the correction status of both QC and QA punch
list items.
1.6.3.3
QC Requirements
Maintain scheduled and actual dates and times of preparatory and initial
control meetings in QCS.
1.6.3.5
Accident/Safety Reporting
Features of Work
Hazard Analysis
Use QCS to develop a hazard analysis for each feature of work included in
the CQC Plan. Address any hazards, or potential hazards, that may be
associated with the work.
1.6.4
Submittal Management
SECTION 01 45 00.10 10
1.6.5
W912HN-09-X-1813
Schedule
Import/Export of Data
QCS includes the ability to export Contractor data to the Government and to
import submittal register and other Government-provided data from RMS, and
schedule data using SDEF.
1.7
IMPLEMENTATION
File Medium
CD-ROM Labels
File Names
The files will be automatically named by the QCS software. The naming
convention established by the QCS software must not be altered.
1.9
Update the QCS database each workday. At least monthly, generate and
submit an export file to the Government with schedule update and progress
payment request. As required in Contract Clause "Payments", at least one
week prior to submittal, meet with the Government representative to review
the planned progress payment data submission for errors and omissions.
Make all required corrections prior to Government acceptance of the export
file and progress payment request. Payment requests accompanied by
SECTION 01 45 00.10 10
W912HN-09-X-1813
NOTIFICATION OF NONCOMPLIANCE
PRODUCTS
Not Used
PART 3
EXECUTION
Not Used
-- End of Section --
SECTION 01 45 00.10 10
W912HN-09-X-1813
SECTION 01 50 00A
*1 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
08/09
PART 1
1.1
GENERAL
SUMMARY
Requirements of this Section apply to, and are a component of, each section
of the specifications.
1.2
REFERENCES
NFPA 70
MUTCD
1.3
SUBMITTALS
Prior to the start of work, submit a site plan showing the locations and
dimensions of temporary facilities (including layouts and details,
equipment and material storage area (onsite and offsite), and access and
haul routes, avenues of ingress/egress to the fenced area and details of
the fence installation. Identify any areas which may have to be graveled
to prevent the tracking of mud. Indicate if the use of a supplemental or
other staging area is desired. Show locations of safety and construction
fences, site trailers, construction entrances, trash dumpsters, temporary
sanitary facilities, and worker parking areas.
SECTION 01 50 00
PART 2
W912HN-09-X-1813
2.1
PRODUCTS
2.1.1
TEMPORARY SIGNAGE
Bulletin Board
Construct sign with a face sheet of 4 by 8-foot exterior grade plywood, 1/2
inch thick, mounted on a substantial frame of treated lumber. Provide one
coat of lead-free alkyd primer paint and two coats of exterior type white
enamel to frame and sign. Erect signs within 15 days after receipt of the
notice to proceed. Correct the data required by the safety sign daily,
with light colored metallic or non-metallic numerals.
2.2
2.2.1
At contractors expense construct access and haul roads necessary for proper
prosecution of the work under this contract. Construct with suitable
grades and widths; sharp curves, blind corners, and dangerous cross traffic
are be avoided. Provide necessary lighting, signs, barricades, and
distinctive markings for the safe movement of traffic. The method of dust
control, although optional, must be adequate to ensure safe operation at
all times. Location, grade, width, and alignment of construction and
hauling roads are subject to approval by the Contracting Officer. Lighting
must be adequate to assure full and clear visibility for full width of haul
road and work areas during any night work operations.
2.2.2
Temporary Wiring
Provide temporary wiring in accordance with NFPA 241 and NFPA 70, Article
305-6(b), Assured Equipment Grounding Conductor Program. Include frequent
inspection of all equipment and apparatus.
PART 3
3.1
EXECUTION
EMPLOYEE PARKING
SECTION 01 50 00
3.2
3.2.1
W912HN-09-X-1813
a.
b.
The point at which the Government will deliver such utilities. Pay all
costs incurred in connecting, converting, and transferring the
utilities to the work. Make connections, including providing meters;
and providing transformers; and make disconnections.
3.2.3
Advance Deposit
Before completion of the work and final acceptance of the work by the
Government, notify the Contracting Officer, in writing, 5 working days
before termination is desired. The Government will take a final meter
reading, disconnect service, and remove the meters. Then remove all the
temporary distribution lines, meter bases, and associated paraphernalia.
Pay all outstanding utility bills before final acceptance of the work by
the Government.
SECTION 01 50 00
3.2.6
W912HN-09-X-1813
Sanitation
a. Provide and maintain within the construction area minimum
field-type sanitary facilities approved by the Contracting Officer and
periodically empty wastes into a municipal, district, or station
sanitary sewage system, or remove waste to a commercial facility.
Obtain approval from the system owner prior to discharge into any
municipal, district, or commercial sanitary sewer system. Any
penalties and / or fines associated with improper discharge will be the
responsibility of the Contractor. Coordinate with the Contracting
Officer and follow station regulations and procedures when discharging
into the station sanitary sewer system. Maintain these conveniences at
all times without nuisance. Include provisions for pest control and
elimination of odors. Government toilet facilities will not be
available to Contractor's personnel.
3.2.7
Telephone
Make arrangements and pay all costs for telephone facilities desired.
3.2.8
Fire Protection
TRAFFIC PROVISIONS
Maintenance of Traffic
a.
b.
c.
3.3.2
Protection of Traffic
Maintain and protect traffic on all affected roads during the construction
period except as otherwise specifically directed by the Contracting
Officer. Measures for the protection and diversion of traffic, including
the provision of watchmen and flagmen, erection of barricades, placing of
lights around and in front of equipment the work, and the erection and
maintenance of adequate warning, danger, and direction signs, will be as
required by the State and local authorities having jurisdiction. Protect
SECTION 01 50 00
W912HN-09-X-1813
the traveling public from damage to person and property. Minimize the
interference with public traffic on roads selected for hauling material to
and from the site. Investigate the adequacy of existing roads and their
allowable load limit. Contractor is responsible for the repair of any
damage to roads caused by construction operations.
3.3.3
Do not interfere with the peak traffic flows preceding and during normal
operations without notification to and approval by the Contracting Officer.
3.3.4
Dust Control
Safety
Appearance of Trailers
a.
b.
3.4.4
a.
W912HN-09-X-1813
Security Provisions
Take necessary precautions to ensure that roof openings and other critical
openings in the building are monitored carefully. Take immediate actions
required to seal off such openings when rain or other detrimental weather
is imminent, and at the end of each workday. Ensure that the openings are
completely sealed off to protect materials and equipment in the building
from damage.
3.4.6.1
PLANT COMMUNICATION
Whenever the Contractor has the individual elements of its plant so located
that operation by normal voice between these elements is not satisfactory,
the Contractor must install a satisfactory means of communication, such as
telephone or other suitable devices and made available for use by
Government personnel.
3.7
As soon as practicable, but not later than 15 days after the date
established for commencement of work, furnish and erect temporary project
safety fencing at the work site. The safety fencing must be a high
visibility orange colored, high density polyethylene grid or approved
equal, a minimum of 42 inches high, supported and tightly secured to steel
posts located on maximum 10 foot centers, constructed at the approved
location. Maintain the safety fencing during the life of the contract and,
upon completion and acceptance of the work, will become the property of the
Contractor and be removed from the work site.
SECTION 01 50 00
3.8
W912HN-09-X-1813
CLEANUP
SECTION 01 50 00
W912HN-09-X-1813
GENERAL
REFERENCES
Pesticide Programs
40 CFR 260
40 CFR 261
40 CFR 262
40 CFR 279
40 CFR 302
40 CFR 355
40 CFR 68
1.2
1.2.1
General
DEFINITIONS
Environmental Pollution and Damage
SECTION 01 57 20.00 10
1.2.2
W912HN-09-X-1813
Environmental Protection
The term "Land Application" for discharge water implies that the Contractor
must discharge water at a rate which allows the water to percolate into the
soil. No sheeting action, soil erosion, discharge into storm sewers,
discharge into defined drainage areas, or discharge into the "waters of the
United States" must occur. Land Application must be in compliance with all
applicable Federal, State, and local laws and regulations.
1.2.7
Pesticide
Pests
SECTION 01 57 20.00 10
1.2.9
W912HN-09-X-1813
Surface Discharge
The term "Surface Discharge" implies that the water is discharged with
possible sheeting action and subsequent soil erosion may occur. Waters
that are surface discharged may terminate in drainage ditches, storm
sewers,creeks, and/or "waters of the United States" and would require a
permit to discharge water from the governing agency.
1.2.10
All waters which are under the jurisdiction of the Clean Water Act, as
defined in 33 CFR 328.
1.2.11
Wetlands
GENERAL REQUIREMENTS
Minimize environmental pollution and damage that may occur as the result of
construction operations. The environmental resources within the project
boundaries and those affected outside the limits of permanent work must be
protected during the entire duration of this contract. Comply with all
applicable environmental Federal, State, and local laws and regulations.
Any delays resulting from failure to comply with environmental laws and
regulations will be the Contractor's responsibility.
1.4
SUBCONTRACTORS
PAYMENT
No separate payment will be made for work covered under this section.
Payment of fees associated with environmental permits, application, and/or
notices obtained by the Contractor, and payment of all fines/fees for
violation or non-compliance with Federal, State, Regional and local laws
and regulations are the Contractor's responsibility. All costs associated
with this section must be included in the contract price.
1.6
SUBMITTALS
SECTION 01 57 20.00 10
1.7
W912HN-09-X-1813
Compliance
Contents
Include in the environmental protection plan, but not limit it to, the
following:
a.
b.
c.
d.
e.
An erosion and sediment control plan which identifies the type and
location of the erosion and sediment controls to be provided. The plan
must include monitoring and reporting requirements to assure that the
control measures are in compliance with the erosion and sediment
control plan, Federal, State, and local laws and regulations. A Storm
Water Pollution Prevention Plan (SWPPP) may be substituted for this
plan.
f.
SECTION 01 57 20.00 10
W912HN-09-X-1813
g.
h.
Work area plan showing the proposed activity in each portion of the
area and identifying the areas of limited use or nonuse. Plan should
include measures for marking the limits of use areas including methods
for protection of features to be preserved within authorized work areas.
i.
j.
k.
(1)
(2)
(3)
(4)
(5)
(6)
(2)
W912HN-09-X-1813
the disposal plan. Submit the report for the previous quarter on
the first working day after the first quarter that non-hazardous
solid waste has been disposed and/or diverted (e.g. the first
working day of January, April, July, and October).
(3)
(4)
l.
m.
n.
o.
SECTION 01 57 20.00 10
1.7.3
W912HN-09-X-1813
Appendix
PROTECTION FEATURES
and
NOTIFICATION
PRODUCTS
NOT USED
SECTION 01 57 20.00 10
PART 3
3.1
W912HN-09-X-1813
EXECUTION
ENVIRONMENTAL PERMITS AND COMMITMENTS
LAND RESOURCES
Mark the areas that need not be disturbed under this contract prior to
commencing construction activities. Mark or fence isolated areas within
the general work area which are not to be disturbed. Protect monuments and
markers before construction operations commence. Where construction
operations are to be conducted during darkness, any markers must be visible
in the dark. The Contractor's personnel must be knowledgeable of the
purpose for marking and/or protecting particular objects.
3.2.2
Landscape
Trees, shrubs, vines, grasses, land forms and other landscape features
indicated and defined on the drawings to be preserved must be clearly
identified by marking, fencing, or wrapping with boards, or any other
approved techniques. Restore landscape features damaged or destroyed
during construction operations outside the limits of the approved work area.
3.2.3
W912HN-09-X-1813
facilities will be made only when approved. Erosion and sediment controls
must be provided for onsite borrow and spoil areas to prevent sediment from
entering nearby waters. Temporary excavation and embankments for plant
and/or work areas must be controlled to protect adjacent areas.
3.3
WATER RESOURCES
Wetlands
AIR RESOURCES
Particulates
Odors
Sound Intrusions
Burning
SECTION 01 57 20.00 10
3.5
W912HN-09-X-1813
Solid Wastes
W912HN-09-X-1813
evaporation. Manage and store fuel, lubricants and oil in accordance with
all Federal, State, Regional, and local laws and regulations. Used
lubricants and used oil to be discarded must be stored in marked
corrosion-resistant containers and recycled or disposed in accordance with
40 CFR 279, State, and local laws and regulations. Storage of fuel on the
project site will be in accordance with all Federal, State, and local laws
and regulations.
3.5.5
Waste Water
3.6
3.8
a.
b.
c.
d.
W912HN-09-X-1813
BIOLOGICAL RESOURCES
Qualifications
Application
SECTION 01 57 20.00 10
3.11
W912HN-09-X-1813
MILITARY MUNITIONS
The Contractor will clean up all areas used for construction in accordance
with Contract Clause: "Cleaning Up". Unless otherwise instructed in
writing by the Contracting Officer, obliterate all signs of temporary
construction facilities such as haul roads, work area, structures,
foundations of temporary structures, stockpiles of excess or waste
materials, and other vestiges of construction prior to final acceptance of
the work. The disturbed area must be graded, filled and the entire area
seeded unless otherwise indicated.
-- End of Section --
SECTION 01 57 20.00 10
W912HN-09-X-1813
SECTION 01 57 23A
*1 TEMPORARY STORM WATER POLLUTION CONTROL
04/08
PART 1
1.1
GENERAL
REFERENCES
(2004) Geosynthetics
ASTM D4491
ASTM D4533
ASTM D4632
ASTM D4751
ASTM D4873
1.2
SYSTEM DESCRIPTION
The controls and measures required of the Contractor are described below.
1.3.1
Stabilization Practices
1.3.1.1
W912HN-09-X-1813
Unsuitable Conditions
Burnoff
a.
b.
Submit a Storm Water Notice of Intent for NPDES coverage under the
general permit for construction activities and a Storm Water Pollution
Prevention Plan (SWPPP) for the project to the Contracting Officer
prior to the commencement of work. The SWPPP shall meet the
requirements of the State of GA general permit for storm water
discharges from construction sites. Submit the SWPPP along with any
required Notice of Intents, Notice of Termination, and appropriate
permit fees, via the Contracting Officer, to the appropriate State
agency for approval, a minimum of 14 calendar days prior to the start
of any land disturbing activities. Maintain an approved copy of the
SWPPP at the construction on-site office, and continually update as
regulations require, to reflect current site conditions. Include
within the SWPPP:
(1)
(2)
(3)
(4)
(5)
W912HN-09-X-1813
1.3.3
Structural Practices
Silt Fences
Sediment Basins
a.
b.
1.4
SUBMITTALS
SECTION 01 57 23
W912HN-09-X-1813
Identify, store and handle filter fabric in accordance with ASTM D4873.
PART 2
2.1
2.1.1
PRODUCTS
COMPONENTS FOR SILT FENCES
Filter Fabric
Provide geotextile that complies with the requirements of ASTM D4439, and
consists of polymeric filaments which are formed into a stable network such
that filaments retain their relative positions. The filament shall consist
of a long-chain synthetic polymer composed of at least 85 percent by weight
of ester, propylene, or amide, and contains stabilizers and/or inhibitors
added to the base plastic to make the filaments resistant to deterioration
due to ultraviolet and heat exposure. Provide synthetic filter fabric that
contains ultraviolet ray inhibitors and stabilizers to assure a minimum of
six months of expected usable construction life at a temperature range of 0
to 120 degrees F. The filter fabric shall meet the following requirements:
TEST PROCEDURE
STRENGTH REQUIREMENT
ASTM D4632
Trapezoid Tear
ASTM D4533
55 lbs. min.
Permittivity
ASTM D4491
0.2 sec-1
ASTM D4751
20-100
2.1.2
Use steel posts for fence construction. Steel posts (standard "U" or "T"
section) utilized for silt fence construction, shall have a minimum weight
SECTION 01 57 23
W912HN-09-X-1813
EXECUTION
INSTALLATION OF SILT FENCES
Extend silt fences a minimum of 16 inches above the ground surface without
exceeding 34 inches above the ground surface. Provide filter fabric from a
continuous roll cut to the length of the barrier to avoid the use of
joints. When joints are unavoidable, splice together filter fabric at a
support post, with a minimum 6 inch overlap, and securely sealed. Excavate
trench approximately 4 inches wide and 4 inches deep on the upslope side of
the location of the silt fence. The 4 by 4 inch trench shall be backfilled
and the soil compacted over the filter fabric. Remove silt fences upon
approval by the Contracting Officer.
3.2
INSPECTIONS
General
Inspect disturbed areas of the construction site, areas that have not been
finally stabilized used for storage of materials exposed to precipitation,
stabilization practices, structural practices, other controls, and area
where vehicles exit the site at least once every seven (7) calendar days
and within 24 hours of the end of any storm that produces 0.5 inches or
more rainfall at the site. Conduct inspections at least once every month
where sites have been finally stabilized.
SECTION 01 57 23
3.3.2
W912HN-09-X-1813
Inspections Details
Inspect disturbed areas and areas used for material storage that are
exposed to precipitation for evidence of, or the potential for, pollutants
entering the drainage system. Observe erosion and sediment control
measures identified in the Storm Water Pollution Prevention Plan to ensure
that they are operating correctly. Inspect discharge locations or points
to ascertain whether erosion control measures are effective in preventing
significant impacts to receiving waters. Inspect locations where vehicles
exit the site for evidence of offsite sediment tracking.
3.3.3
Inspection Reports
SECTION 01 57 23
W912HN-09-X-1813
SECTION 01 62 35A
*1 RECYCLED / RECOVERED MATERIALS
07/06
PART 1
1.1
GENERAL
REFERENCES
1.2
OBJECTIVES
Products other than those designated by EPA are still being researched and
are being considered for future Comprehensive Procurement Guideline (CPG)
designation. It is recommended that these items, when incorporated in the
work under this contract, contain the highest practicable percentage of
recycled or recovered materials, provided specified requirements are also
met.
SECTION 01 62 35
W912HN-09-X-1813
1.5
EPA LISTED ITEMS USED IN CONDUCT OF THE WORK BUT NOT INCORPORATED IN
THE WORK
There are many products listed in 40 CFR 247 which have been designated or
proposed by EPA to include recycled or recovered materials that may be used
by the Contractor in performing the work but will not be incorporated into
the work. These products include office products, temporary traffic
control products, and pallets. It is recommended that these
non-construction products, when used in the conduct of the work, contain
the highest practicable percentage of recycled or recovered materials and
that these products be recycled when no longer needed.
PART 2
TITLE
Not Used
PART 3
TITLE
Not Used
-- End of Section --
SECTION 01 62 35
W912HN-09-X-1813
SECTION 01 74 19
CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01/07
PART 1
1.1
GENERAL
REFERENCES
1.2
MANAGEMENT
SUBMITTALS
W912HN-09-X-1813
MEETINGS
1.6
a.
Pre-bid meeting.
b.
[Preconstruction][Pre-demolition] meeting.
c.
d.
b.
c.
d.
e.
f.
W912HN-09-X-1813
h.
i.
j.
k.
l.
RECORDS
COLLECTION
Separate, store, protect, and handle at the site identified recyclable and
SECTION 01 74 19
W912HN-09-X-1813
Waste products and materials that are recyclable shall be separated from
trash and sorted as described below into appropriately marked separate
containers and then transported to the respective recycling facility for
further processing. Deliver materials in accordance with recycling or
reuse facility requirements (e.g., free of dirt, adhesives, solvents,
petroleum contamination, and other substances deleterious to the recycling
process). Separate materials into the following category types as
appropriate to the project waste and to the available recycling and reuse
programs in the project area:
a.
b.
Asphalt.
c.
d.
Metal (e.g. banding, stud trim, ductwork, piping, rebar, roofing, other
trim, steel, iron, galvanized, stainless steel, aluminum, copper, zinc,
lead brass, bronze).
(1)
Ferrous.
(2)
Non-ferrous.
e.
f.
Debris.
g.
h.
Paper.
i.
(1)
Bond.
(2)
Newsprint.
(3)
Plastic.
SECTION 01 74 19
(1)
Type 1:
(2)
Type 2:
(3)
Type 3:
(4)
Type 4:
(5)
Type 5:
Polypropylene (PP).
(6)
Type 6:
Polystyrene (PS).
(7)
j.
Gypsum.
k.
l.
Carpet.
m.
Ceiling tiles.
n.
Insulation.
o.
Beverage containers.
p.
[_____].
1.8.2
W912HN-09-X-1813
Co-Mingled Method.
Other Methods.
Other methods proposed by the Contractor may be used when approved by the
Contracting Officer.
1.9
DISPOSAL
Reuse.
SECTION 01 74 19
1.9.2
W912HN-09-X-1813
Recycle.
Waste materials not suitable for reuse, but having value as being
recyclable, shall be made available for recycling. All fluorescent lamps,
HID lamps, and mercury-containing thermostats removed from the site shall
be recycled. Arrange for timely pickups from the site or deliveries to
recycling facilities in order to prevent contamination of recyclable
materials.
[1.10.3
Compost
Waste.
Return
Set aside and protect misdelivered and substandard products and materials
and return to supplier for credit.
PART 2
PRODUCTS
Not used.
PART 3
EXECUTION
Not used.
-- End of Section --
SECTION 01 74 19
W912HN-09-X-1813
SECTION 01 78 00A
*1 CLOSEOUT SUBMITTALS
08/11
PART 1
1.1
GENERAL
REFERENCES
1.2
SUBMITTALS
This paragraph
W912HN-09-X-1813
One set of electronic CADD files in the specified software and format
revised to reflect all bid amendments will be provided by the Government at
the preconstruction conference for projects requiring CADD file record
drawings.
1.3.1.2
The actual location, kinds and sizes of all sub-surface utility lines.
In order that the location of these lines and appurtenances may be
determined in the event the surface openings or indicators become
covered over or obscured, show by offset dimensions to two permanently
fixed surface features the end of each run including each change in
direction on the record drawings. Locate valves, splice boxes and
similar appurtenances by dimensioning along the utility run from a
reference point. Also record the average depth below the surface of
each run.
b.
c.
SECTION 01 78 00
W912HN-09-X-1813
d.
e.
f.
g.
h.
i.
j.
(2)
(3)
(4)
(5)
(6)
(7)
The Modification Delta size shall be 1/2 inch diameter unless the
area where the circle is to be placed is crowded. Smaller size
circle shall be used for crowded areas.
1.3.1.3
Drawing Preparation
SECTION 01 78 00
1.3.1.4
W912HN-09-X-1813
(2)
(3)
b.
c.
When final revisions have been completed, show the wording "RECORD
DRAWINGS / AS-BUILT CONDITIONS" followed by the name of the Contractor
in letters at least 3/16 inch high on the cover sheet drawing. Mark
all other contract drawings either "Record" drawing denoting no
revisions on the sheet or "Revised Record" denoting one or more
revisions. Date original contract drawings in the revision block.
d.
W912HN-09-X-1813
Payment
No separate payment will be made for record drawings required under this
contract, and all costs accrued in connection with such drawings are
considered a subsidiary obligation of the Contractor.
1.3.2
Description
1.3.3
Where Used
Furnish final approved project shop drawings 30 days after transfer of the
completed facility.
1.3.4
SECTION 01 78 00
1.4
W912HN-09-X-1813
a.
b.
Supply five items of each part for spare parts inventory. Provision of
spare parts does not relieve the Contractor of responsibilities listed
under the contract guarantee provisions.
1.5
PREVENTATIVE MAINTENANCE
b.
1.6
1.7
1.7.1
W912HN-09-X-1813
WARRANTY MANAGEMENT
Warranty Management Plan
b.
Furnish with each warranty the name, address, and telephone number of
each of the guarantor's representatives nearest to the project location.
c.
d.
Name of item.
Model and serial numbers.
Location where installed.
Name and phone numbers of manufacturers or suppliers.
Names, addresses and telephone numbers of sources of spare parts.
Warranties and terms of warranty. Include one-year overall
warranty of construction, including the starting date of warranty
of construction. Items which have extended warranties must be
indicated with separate warranty expiration dates.
(7) Cross-reference to warranty certificates as applicable.
(8) Starting point and duration of warranty period.
(9) Summary of maintenance procedures required to continue the
warranty in force.
(10) Cross-reference to specific pertinent Operation and Maintenance
manuals.
(11) Organization, names and phone numbers of persons to call for
warranty service.
SECTION 01 78 00
W912HN-09-X-1813
(12) Typical response time and repair time expected for various
warranted equipment.
e.
f.
g.
1.7.2
Performance Bond
In the event the Contractor fails to commence and diligently pursue any
construction warranty work required, the Contracting Officer will have
the work performed by others, and after completion of the work, will
charge the remaining construction warranty funds of expenses incurred
by the Government while performing the work, including, but not limited
to administrative expenses.
b.
c.
1.7.3
Pre-Warranty Conference
W912HN-09-X-1813
b.
c.
d.
Code 1-Doors
(1) Overhead doors not operational, causing a security, fire, or
safety problem.
(2) Interior, exterior personnel doors or hardware, not functioning
properly, causing a security, fire, or safety problem.
Code 3-Doors
(1) Overhead doors not operational.
(2) Interior/exterior personnel doors or hardware not functioning
properly.
Code 1-Electrical
(1) Power failure (entire area or any building operational after 1600
hours).
(2) Security lights
(3) Smoke detectors
Code 2-Electrical
(1) Power failure (no power to a room or part of building).
(2) Receptacle and lights (in a room or part of building).
Code 3-Electrical
Street lights.
Code 1-Gas
(1) Leaks and breaks.
(2) No gas to family housing unit or cantonment area.
Code 1-Heat
SECTION 01 78 00
(1)
(2)
W912HN-09-X-1813
2-Plumbing
Flush valves not operating properly.
Fixture drain, supply line to commode, or any water pipe leaking.
Commode leaking at base.
Code 3 -Plumbing
Leaky faucets.
Code
(1)
(2)
(3)
3-Interior
Floors damaged.
Paint chipping or peeling.
Casework.
Warranty Tags
At the time of installation, tag each warranted item with a durable, oil
and water resistant tag approved by the Contracting Officer. Attach each
tag with a copper wire and spray with a silicone waterproof coating. Also,
submit two record copies of the warranty tags showing the layout and
design. The date of acceptance and the QC signature must remain blank
until the project is accepted for beneficial occupancy. Show the following
information on the tag.
Type of
product/material
Model number
Serial number
Contract number
SECTION 01 78 00
W912HN-09-X-1813
1.8
Configuration
CLEANUP
The Contractor shall keep the work area clean and remove all unneeded
SECTION 01 78 00
W912HN-09-X-1813
PRODUCTS
Not Used
PART 3
EXECUTION
Not Used
-- End of Section --
SECTION 01 78 00
W912HN-09-X-1813
SECTION 01 78 23A
*1 OPERATION AND MAINTENANCE DATA
07/06
PART 1
1.1
GENERAL
SUBMISSION OF OPERATION AND MAINTENANCE DATA
Package Quality
Documents must be fully legible. Poor quality copies and material with
hole punches obliterating the text or drawings will not be accepted.
1.1.2
Package Content
Changes to Submittals
W912HN-09-X-1813
to the
O&M Database
Develop a database from the O&M manuals that contains the information
required to start a preventative maintenance program.
1.2
1.2.1
Operating Instructions
Safety Precautions
List personnel hazards and equipment or product safety precautions for all
operating conditions.
1.2.1.2
Operator Prestart
Include procedures required to install, set up, and prepare each system for
use.
1.2.1.3
Normal Operations
Emergency Operations
Environmental Conditions
SECTION 01 78 23
1.2.2
W912HN-09-X-1813
Preventive Maintenance
Lubrication Data
b.
c.
1.2.2.2
SECTION 01 78 23
1.2.3.4
W912HN-09-X-1813
Include step-by-step procedures and a list required tools and supplies for
removal, replacement, disassembly, and assembly of components, assemblies,
subassemblies, accessories, and attachments. Provide tolerances,
dimensions, settings and adjustments required. Instructions shall include
a combination of text and illustrations.
1.2.3.5
Include lists of
repair to ensure
delays. Special
locations. List
obtain.
1.2.4
Appendices
Manufacturer's Instructions
Parts Identification
W912HN-09-X-1813
Warranty Information
List and explain the various warranties and clearly identify the servicing
and technical precautions prescribed by the manufacturers or contract
documents in order to keep warranties in force. Include warranty
information for primary components such as the compressor of air
conditioning system.
1.2.5.6
Contractor Information
Provide a list that includes the name, address, and telephone number of the
General Contractor and each Subcontractor who installed the product or
equipment, or system. For each item, also provide the name address and
telephone number of the manufacturer's representative and service
organization that can provide replacements most convenient to the project
site. Provide the name, address, and telephone number of the product,
equipment, and system manufacturers.
1.3
b.
c.
d.
Floor
SECTION 01 78 23
W912HN-09-X-1813
(2)
Room number
(3)
Room name
(4)
(5)
(6)
(7)
(8)
Minimum cfm
(9)
Maximum cfm
e.
Full print out of all schedules and set points after testing and
acceptance of the system.
f.
g.
h.
1.4
Data Package 1
a.
Safety precautions
b.
Cleaning recommendations
c.
d.
Warranty information
e.
Contractor information
f.
1.4.2
Data Package 2
a.
Safety precautions
b.
Normal operations
c.
Environmental conditions
d.
Lubrication data
e.
f.
Cleaning recommendations
SECTION 01 78 23
g.
h.
i.
j.
Parts identification
k.
Warranty information
l.
Contractor information
1.4.3
W912HN-09-X-1813
Data Package 3
a.
Safety precautions
b.
Operator prestart
c.
d.
Normal operations
e.
Emergency operations
f.
Environmental conditions
g.
Lubrication data
h.
i.
Cleaning recommendations
j.
k.
l.
m.
n.
o.
p.
q.
Parts identification
r.
Warranty information
s.
t.
u.
Contractor information
1.4.4
a.
Data Package 4
Safety precautions
SECTION 01 78 23
W912HN-09-X-1813
b.
Operator prestart
c.
d.
Normal operations
e.
Emergency operations
f.
g.
Environmental conditions
h.
Lubrication data
i.
j.
Cleaning recommendations
k.
l.
m.
n.
o.
p.
q.
r.
s.
Parts identification
t.
Warranty information
u.
v.
w.
x.
Contractor information
1.4.5
Data Package 5
a.
Safety precautions
b.
Operator prestart
c.
d.
Normal operations
e.
Environmental conditions
SECTION 01 78 23
W912HN-09-X-1813
f.
g.
h.
i.
j.
k.
l.
m.
Manufacturer's instructions
n.
o.
Parts identification
p.
q.
Warranty information
r.
s.
Contractor information
PART 2
PRODUCTS
Not Used
PART 3
EXECUTION
Not Used
-- End of Section --
SECTION 01 78 23
W912HN-09-X-1813
SECTION 02 41 00A
*1 DEMOLITION
05/10
PART 1
1.1
GENERAL
REFERENCES
AASHTO T 180
1.2
1.2.1
PROJECT DESCRIPTION
Demolition/Deconstruction Plan
General Requirements
W912HN-09-X-1813
Weather Protection
Trees
Protect trees within the project site which might be damaged during
demolition, and which are indicated to be left in place, by a 6 foot high
fence. Erect and secure fence at the drip line of individual trees or
follow the outer perimeter of branches or clumps of trees. Replace any
tree designated to remain that is damaged during the work under this
contract with like-kind or as approved by the Contracting Officer.
1.3.4
Utility Service
Facilities
BURNING
The use of burning at the project site for the disposal of refuse and
debris will not be permitted .
SECTION 02 41 00
1.5
W912HN-09-X-1813
QUALITY ASSURANCE
PROTECTION
Protection of Personnel
Before, during and after the demolition work continuously evaluate the
condition of the structure being demolished and take immediate action to
protect all personnel working in and around the project site. No area,
section, or component of floors, roofs, walls, columns, pilasters, or other
structural element will be allowed to be left standing without sufficient
bracing, shoring, or lateral support to prevent collapse or failure while
workmen remove debris or perform other work in the immediate area.
1.9
RELOCATIONS
1.10
W912HN-09-X-1813
EXISTING CONDITIONS
Before beginning any demolition or deconstruction work, survey the site and
examine the drawings and specifications to determine the extent of the
work. Record existing conditions in the presence of the Contracting
Officer showing the condition of structures and other facilities adjacent
to areas of alteration or removal. Photographs sized 4 inch will be
acceptable as a record of existing conditions. Include in the record the
elevation of the top of foundation walls, finish floor elevations, possible
conflicting electrical conduits, plumbing lines, alarms systems, the
location and extent of existing cracks and other damage and description of
surface conditions that exist prior to before starting work. It is the
Contractor's responsibility to verify and document all required outages
which will be required during the course of work, and to note these outages
on the record document. Submit survey results.
PART 2
2.1
PRODUCTS
FILL MATERIAL
a.
b.
c.
PART 3
3.1
Soil classification
AASHTO M 145
Moisture-density relations
EXECUTION
EXISTING FACILITIES TO BE REMOVED
Structures
a.
b.
3.1.2
W912HN-09-X-1813
3.1.2.1
General Requirements
DISPOSITION OF MATERIAL
Title to Materials
Except for salvaged items specified in related Sections, and for materials
or equipment scheduled for salvage, all materials and equipment removed and
not reused or salvaged, shall become the property of the Contractor and
shall be removed from Government property. Title to materials resulting
from demolition and deconstruction, and materials and equipment to be
removed, is vested in the Contractor upon approval by the Contracting
Officer of the Contractor's demolition, deconstruction, and removal
procedures, and authorization by the Contracting Officer to begin
demolition and deconstruction. The Government will not be responsible for
the condition or loss of, or damage to, such property after contract
award. Showing for sale or selling materials and equipment on site is
prohibited.
3.4
CLEANUP
Remove debris and rubbish from basement and similar excavations. Remove
and transport the debris in a manner that prevents spillage on streets or
adjacent areas. Apply local regulations regarding hauling and disposal.
3.5
3.5.1
W912HN-09-X-1813
SECTION 02 41 00
W912HN-09-X-1813
SECTION 03 30 00A
*1 CAST-IN-PLACE CONCRETE
11/10
PART 1
1.1
GENERAL
REFERENCES
ACI/MCP-2
ACI/MCP-3
ACI/MCP-4
SECTION 03 30 00
W912HN-09-X-1813
ASTM C 1240
ASTM C 1260
ASTM C 156
ASTM C 1567
ASTM C 171
ASTM C 172
ASTM C 231
ASTM C 233
ASTM C 260
ASTM C 295
ASTM C 309
ASTM C 311
W912HN-09-X-1813
ASTM C 330
ASTM C 567
ASTM C 618
ASTM C 920
ASTM C 932
ASTM C 989
ASTM D 1557
ASTM D 1751
SECTION 03 30 00
W912HN-09-X-1813
ASTM D 1752
ASTM D 5759
ASTM D 6690
ASTM D 7116
ASTM E 1745
ASTM E 329
FS SS-S-200
SECTION 03 30 00
W912HN-09-X-1813
1.2
a.
b.
"Exposed to public view" means situated so that it can be seen from eye
level from a public location after completion of the building. A
public location is accessible to persons not responsible for operation
or maintenance of the building.
c.
d.
1.3
SUBMITTALS
W912HN-09-X-1813
SECTION 03 30 00
W912HN-09-X-1813
Fly ash
Pozzolan
Ground granulated blast-furnace slag
Aggregates
Compressive strength tests
Unit weight of structural lightweight concrete
Air Content
Slump
Air Entrainment
Forest Stewardship Council (FSC) Certification
SD-08 Manufacturer's Instructions
Fly ash
Ground granulated blast-furnace slag
Submit mill certificates for Steel Bar according to the
paragraph entitled, "Fabrication," of this section.
Provide certificates for concrete that are in accordance with
the paragraph entitled, "Classification and Quality of Concrete,"
of this section. Provide certificates that contain project name
and number, date, name of Contractor, name of concrete testing
service, source of concrete aggregates, material manufacturer,
brand name of manufactured materials, material name, values as
specified for each material, and test results. Provide
certificates for Welder Qualifications that are in accordance with
the paragraph entitled, "Qualifications for Welding Work," of this
section.
MODIFICATION OF REFERENCES
W912HN-09-X-1813
Reinforcement
QUALITY ASSURANCE
1.6.1
1.6.1.1
Design Data
Formwork Calculations
Drawings
Shop Drawings
Reinforcing Steel
Control Submittals
Curing Concrete Elements
Pumping Concrete
Submit proposed materials and methods for pumping concrete. Submittal must
include mix designs, pumping equipment including type of pump and size and
material for pipe, and maximum length and height concrete is to be pumped.
1.6.3.3
Submit Material Safety Data Sheets (MSDS) for all materials that are
regulated for hazardous health effects. Prominently post the MSDS at the
construction site.
SECTION 03 30 00
1.6.4
W912HN-09-X-1813
Test Reports
1.6.4.1
Submit copies of laboratory test reports showing that the mix has been
successfully tested to produce concrete with the properties specified and
that mix must be suitable for the job conditions. Include mill test and
all other test for cement, silica fume, aggregates, and admixtures in the
laboratory test reports. Provide maximum nominal aggregate size, gradation
analysis, percentage retained and passing sieve, and a graph of percentage
retained verses sieve size. Submit test reports along with the concrete
mix design. Obtain approval before concrete placement.
1.6.4.2
Submit test results in accordance with ASTM C 618 for fly ash and
pozzolan. Submit test results performed within 6 months of submittal
date. Submit manufacturer's policy statement on fly ash use in concrete.
1.6.4.3
Submit test results in accordance with ASTM C 989 for ground granulated
blast-furnace slag. Submit test results performed within 6 months of
submittal date. Submit manufacturer's policy statement on slag use in
concrete.
1.6.4.4
Aggregates
ENVIRONMENTAL REQUIREMENTS
SECTION 03 30 00
W912HN-09-X-1813
W912HN-09-X-1813
PRODUCTS
MATERIALS FOR FORMS
Wood Forms
Provide plywood that conforms to NIST PS 1, B-B, concrete form, not less
than 5/8-inch thick.
2.1.1.2
Provide plywood that conforms to NIST PS 1, B-B, high density form overlay,
not less than 5/8-inch thick.
2.1.2
Plastic Forms
Carton Forms
Steel Forms
The use of wire alone is prohibited. Provide form ties and accessories
that do not reduce the effective cover of the reinforcement.
2.2.1
Polyvinylchloride Waterstops
W912HN-09-X-1813
CONCRETE
2.3.1
Location
All areas
f'c
ASTM C 33/C 33M
(Min. 28Maximum
Range
Day Comp.
Nominal
of
Strength) Aggregate
Slump
(psi)
(Size No.)
(inches)
4000 psi
57
Maximum
WaterCement
Air
Ratio
Entr.
(by weight) (percent)
0.45
W912HN-09-X-1813
strengths.
2.3.1.2
Ready-Mix Concrete
Provide burlap cloth cover for curing concrete made from jute or kenaf,
weighing 10 ounces plus or minus 5 percent per square yard when clean and
dry, conforming to ASTM C 171, Class 3; or cover may be cotton mats as
approved.
2.3.3.2
Moisture-Retaining Cover
Provide waterproof paper cover for curing concrete conforming to ASTM C 171,
regular or white, or polyethylene sheeting conforming to ASTM C 171, or
polyethylene-coated burlap consisting of a laminate of burlap and a white
opaque polyethylene film permanently bonded to the burlap; burlap must
conform to ASTM C 171, Class 3, and polyethylene film must conform to
ASTM C 171. When tested for water retention in accordance with ASTM C 156,
weight of water lost 72 hours after application of moisture retaining
covering material must not exceed 0.039 gram per square centimeter of the
mortar specimen surface.
SECTION 03 30 00
2.3.3.3
W912HN-09-X-1813
Provide liquid type compound conforming to ASTM C 309, Type 1, clear, Type
1D with fugitive dye for interior work and Type 2, white, pigmented for
exterior work.
2.4
MATERIALS
2.4.1
Cement
ASTM C 150/C 150M, Type I or II or ASTM C 595/C 595M, Type blended cement
except as modified herein. Provide blended cement that consists of a
mixture of ASTM C 150/C 150M, Type II, cement and one of the following
materials: ASTM C 618 pozzolan or fly ash, ASTM C 989 ground granulated
blast-furnace slag. For portland cement manufactured in a kiln fueled by
hazardous waste, maintain a record of source for each batch. Supplier must
certify that no hazardous waste is used in the fuel mix or raw materials.
For exposed concrete, use one manufacturer for each type of cement, ground
slag, fly ash, and pozzolan.
2.4.1.1
2.
3.
2.4.1.2
25 percent
Portland Cement
Provide cement that conforms to ASTM C 150/C 150M, Type I, IA, II, or IIA.
Use one brand and type of cement for formed concrete having exposed-to-view
finished surfaces.
2.4.2
Water
Minimize the amount of water in the mix. The amount of water must not
exceed 45 percent by weight of cementitious materials (cement plus
SECTION 03 30 00
W912HN-09-X-1813
Aggregates
ASTM C 33/C 33M, except as modified herein. Furnish aggregates for exposed
concrete surfaces from one source. Provide aggregates that do not contain
any substance which may be deleteriously reactive with the alkalies in the
cement.
Fine and coarse aggregates must show expansions less than 0.08 percent at
16 days after casting when testing in accordance with ASTM C 1260. Should
the test data indicate an expansion of 0.08 percent or greater, reject the
aggregate(s) or perform additional testing using ASTM C 1567 using the
Contractor's proposed mix design. In this case, include the mix design low
alkali portland cement and one of the following supplementary cementitious
materials:
1.
2.
3.
ASTM C 330.
2.4.3.3
W912HN-09-X-1813
Nonshrink Grout
Admixtures
Air-Entraining
ASTM C 260.
2.4.5.2
ASTM C 494/C 494M, Type F and Type G (HRWR retarding admixture) and
ASTM C 1017/C 1017M.
2.4.5.3
Pozzolan
Vapor Barrier
10 mil thickness.
Use water-based curing compounds, sealers, and coatings with low (maximum
160 grams/liter, less water and less exempt compounds) VOC content.
Consider the use of water based or vegetable or soy based curing agents in
lieu of petroleum based products. Consider agents that are not toxic and
emit low or no Volatile Organic Compounds (VOC). Consider the use of
admixtures that offer high performance to increase durability of the finish
product but also have low toxicity and are made from bio-based materials
such as soy, and emit low levels of Volatile Organic Compounds (VOC).
2.4.7.1
Impervious Sheeting
Pervious Sheeting
AASHTO M 182.
2.4.7.3
SECTION 03 30 00
2.4.8
W912HN-09-X-1813
ASTM D 1751, ASTM D 1752, cork or 100 percent post-consumer paper meeting
ASTM D 1752 (subparagraphs 5.1 to 5.4). Material must be 1/2 inch thick,
unless otherwise indicated.
2.4.9.1
Joint Sealants
Use concrete penetrating sealers with a low (maximum 100 grams/liter, less
water and less exempt compounds) VOC content.
2.4.10.1
Waterstops
Provide waterstops that are flat dumbbell type, not less than 3/16 inch for
widths up to 5 inches, and not less than 3/8 inch for widths 5 inches and
over.
Provide waterstops made of rubber and that conform to ASTM D 1752.
2.4.10.4
SECTION 03 30 00
2.5
W912HN-09-X-1813
REINFORCEMENT
2.5.1
Reinforcing Bars
Provide weldable reinforcing bars that conform to ASTM A 706/A 706M and
ASTM A 615/A 615M and Supplement S1, Grade 60, except that the maximum
carbon content must be 0.55 percent.
2.5.2
Wire
Steel Wire
Provide dowels for load transfer in floors of the type, design, weight, and
dimensions indicated. Provide dowel bars that are plain-billet steel
conforming to ASTM A 615/A 615M, Grade 40. Provide dowel pipe that is
steel conforming to ASTM A 53/A 53M.
2.5.6
Supports include bolsters, chairs, spacers, and other devices necessary for
proper spacing, supporting, and fastening reinforcing bars and wire fabric
in place.
Provide wire bar type supports conforming to ACI/MCP-3, ACI/MCP-4 and
CRSI 10MSP.
Legs of supports in contact with formwork must be hot-dip galvanized, or
plastic coated after fabrication, or stainless-steel bar supports.
SECTION 03 30 00
2.6
W912HN-09-X-1813
2.6.1
BONDING MATERIALS
Concrete Bonding Agent
EXECUTION
EXAMINATION
PREPARATION
General
3.2.2
W912HN-09-X-1813
100
100
95
Formwork
Complete and approve formwork. Remove debris and foreign material from
interior of forms before start of concrete placing.
3.2.5
Set edge forms or bulkheads and intermediate screed strips for slabs to
obtain indicated elevations and contours in finished slab surface and must
be strong enough to support vibrating bridge screeds or roller pipe screeds
if nature of specified slab finish requires use of such equipment. Align
concrete surface to elevation of screed strips by use of strike-off
templates or approved compacting-type screeds.
3.2.6
3.3
W912HN-09-X-1813
FORMS
General
Coating
Reshoring
Reshore concrete elements where forms are removed prior to the specified
time period. Do not permit elements to deflect or accept loads during form
SECTION 03 30 00
W912HN-09-X-1813
Reuse
Give rough form finish concrete formed surfaces that are to be concealed by
other construction, unless otherwise specified.
Form facing material for standard rough form finish must be the specified
concrete form plywood or other approved form facing material that produces
concrete surfaces equivalent in smoothness and appearance to that produced
by new concrete form plywood panels.
For concrete surfaces exposed only to the ground, undressed, square-edge,
1-inch nominal thickness lumber may be used. Provide horizontal joints
that are level and vertical joints that are plumb.
3.3.7
Give smooth form finish concrete formed surfaces that are to be exposed to
view or that are to be covered with coating material applied directly to
concrete or with covering material bonded to concrete, such as
waterproofing, dampproofing, painting, or other similar coating system.
Form facing material for standard smooth finish must be the specified
overlaid concrete form plywood or other approved form facing material that
is nonreactive with concrete and that produce concrete surfaces equivalent
in smoothness and appearance to that produced by new overlaid concrete form
plywood panels.
Maximum deflection of form facing material between supports and maximum
deflection of form supports such as studs and wales must not exceed 0.0025
times the span.
Provide arrangement of form facing sheets that are orderly and symmetrical,
and sheets that are in sizes as large as practical.
Arrange panels to make a symmetrical pattern of joints. Horizontal and
vertical joints must be solidly backed and butted tight to prevent leakage
and fins.
3.3.8
Form Ties
W912HN-09-X-1813
after removal of exterior parts must be at least 1-1/2 inches back from
concrete surface. Provide form ties that are free of devices that leave a
hole larger than 7/8 inch or less than 1/2 inch in diameter in concrete
surface. Form ties fabricated at the project site or wire ties of any type
are not acceptable.
3.3.9
After placing concrete, forms must remain in place for the time periods
specified in ACI/MCP-4. Do not remove forms and shores (except those used
for slabs on grade and slip forms) until the client determines that the
concrete has gained sufficient strength to support its weight and
superimposed loads. Base such determination on compliance with one of the
following:
a. The plans and specifications stipulate conditions for removal of forms
and shores, and such conditions have been followed, or
b. The concrete has been properly tested with an appropriate ASTM standard
test method designed to indicate the concrete compressive strength, and
the test results indicate that the concrete has gained sufficient
strength to support its weight and superimposed loads.
Prevent concrete damage during form removal.
after removal.
3.3.10.1
Forms may be removed earlier than specified if ASTM C 39/C 39M test results
of field-cured samples from a representative portion of the structure
indicate that the concrete has reached a minimum of 85 percent of the
design strength.
3.4
WATERSTOP SPLICES
FORMED SURFACES
Preparation of Form Surfaces
SECTION 03 30 00
3.5.2
W912HN-09-X-1813
Tolerances
As-Cast Form
ACI/MCP-2. Provide bars, wire fabric, wire ties, supports, and other
devices necessary to install and secure reinforcement. Reinforcement must
not have rust, scale, oil, grease, clay, or foreign substances that would
reduce the bond. Rusting of reinforcement is a basis of rejection if the
effective cross-sectional area or the nominal weight per unit length has
been reduced. Remove loose rust prior to placing steel. Tack welding is
prohibited.
3.6.1
General
Vapor Barrier
Provide beneath the on-grade concrete floor slab. Use the greatest widths
and lengths practicable to eliminate joints wherever possible. Lap joints
a minimum of 12 inches and tape or cement joints. Remove torn, punctured,
or damaged vapor barrier material and provide with new vapor barrier prior
to placing concrete. Concrete placement must not damage vapor barrier
material.
3.6.3
Reinforcement Supports
Splicing
Future Bonding
SECTION 03 30 00
3.6.6
W912HN-09-X-1813
Cover
Place and secure anchors and bolts, pipe sleeves, conduits, and other such
items in position before concrete placement. Plumb anchor bolts and check
location and elevation. Temporarily fill voids in sleeves with readily
removable material to prevent the entry of concrete.
3.6.8
Construction Joints
Fabrication
W912HN-09-X-1813
Placing Reinforcement
W912HN-09-X-1813
conform to ACI/MCP-3.
Bending of reinforcing bars partially embedded in concrete is permitted
only as specified in ACI/MCP-3 and ACI/MCP-4.
3.6.12
Measuring
Mixing
ASTM C 94/C 94M and ACI/MCP-2. Machine mix concrete. Begin mixing within
30 minutes after the cement has been added to the aggregates. Place
concrete within 90 minutes of either addition of mixing water to cement and
aggregates or addition of cement to aggregates if the air temperature is
less than 84 degrees F. Reduce mixing time and place concrete within 60
minutes if the air temperature is greater than 84 degrees F except as
follows: if set retarding admixture is used and slump requirements can be
met, limit for placing concrete may remain at 90 minutes.
Dissolve
admixtures in the mixing water and mix in the drum to uniformly distribute
the admixture throughout the batch.
3.7.3
Transporting
PLACING CONCRETE
Place concrete as soon as practicable after the forms and the reinforcement
have been inspected and approved. Do not place concrete when weather
conditions prevent proper placement and consolidation; in uncovered areas
during periods of precipitation; or in standing water. Prior to placing
SECTION 03 30 00
W912HN-09-X-1813
concrete, remove dirt, construction debris, water, snow, and ice from
within the forms. Deposit concrete as close as practicable to the final
position in the forms. Do not exceed a free vertical drop of 3 feet from
the point of discharge. Place concrete in one continuous operation from
one end of the structure towards the other. Position grade stakes on 10
foot centers maximum in each direction when pouring interior slabs and on
20 foot centers maximum for exterior slabs.
3.8.1
Footing Placement
Vibration
Pumping
W912HN-09-X-1813
for testing at both the point of delivery to the pump and at the discharge
end.
3.8.4.1
Cold Weather
Hot Weather
Follow-up
W912HN-09-X-1813
machine. Do not insert vibrator into lower courses of concrete that have
begun to set. At each insertion, limit duration of vibration to time
necessary to consolidate concrete and complete embedment of reinforcement
and other embedded items without causing segregation of concrete mix.
Do not start placing of concrete in supporting elements until concrete
previously placed in columns and walls is no longer plastic and has been in
place a minimum of 2 hours.
3.8.9
Bonding
W912HN-09-X-1813
3.9.1
Defects
Surfaces not otherwise specified must be finished with wood floats to even
surfaces. Finish must match adjacent finishes.
3.9.3
3.9.3.1
Formed Surfaces
Tolerances
Provide for surfaces not exposed to public view. Patch these holes and
defects and level abrupt irregularities. Remove or rub off fins and other
projections exceeding 0.25 inch in height.
3.9.3.3
Finish
W912HN-09-X-1813
Scratched
Floated
Steel Troweled
Use for floors intended as walking surfaces and for reception of floor
coverings . First, provide a floated finish. Next, the finish must be
power troweled two times, and finally hand troweled. The first troweling
after floating needs to produce a smooth surface which is relatively free
of defects but which may still show some trowel marks. Perform additional
trowelings done by hand after the surface has hardened sufficiently. The
final troweling is done when a ringing sound is produced as the trowel is
moved over the surface. Thoroughly consolidate the surface by the hand
troweling operations. The finished surface must be essentially free of
trowel marks and uniform in texture and appearance. The finished surface
must produce a surface level to within 1/4 inch in 10 feet. On surfaces
intended to support floor coverings, remove any defects of sufficient
magnitude to show through the floor covering by grinding.
3.10.1.5
Nonslip Finish
3.10.1.6
W912HN-09-X-1813
Broomed
Concrete Walks
Curbs
Splash Blocks
SECTION 03 30 00
3.11.1
W912HN-09-X-1813
General
Protect freshly placed concrete from premature drying and cold or hot
temperature and maintain without drying at a relatively constant
temperature for the period of time necessary for hydration of cement and
proper hardening of concrete.
Start initial curing as soon as free water has disappeared from surface of
concrete after placing and finishing. Keep concrete moist for minimum 72
hours.
Final curing must immediately follow initial curing and before concrete has
dried. Continue final curing until cumulative number of hours or fraction
thereof (not necessarily consecutive) during which temperature of air in
contact with the concrete is above 50 degrees F has totaled 168 hours.
Alternatively, if tests are made of cylinders kept adjacent to the
structure and cured by the same methods, final curing may be terminated
when the average compressive strength has reached 70 percent of the 28-day
design compressive strength. Prevent rapid drying at end of final curing
period.
3.11.2
Moist Curing
Prevent water
Ponding or Immersion
Continually immerse the concrete throughout the curing period. Water must
not be more than 50 degrees F less than the temperature of the concrete.
For temperatures between 40 and 50 degrees F, increase the curing period by
50 percent.
3.11.2.2
Apply water uniformly and continuously throughout the curing period. For
temperatures between 40 and 50 degrees F, increase the curing period by 50
percent.
3.11.2.3
Pervious Sheeting
Completely cover surface and edges of the concrete with two thicknesses of
wet sheeting. Overlap sheeting 6 inches over adjacent sheeting. Provide
sheeting that is at least as long as the width of the surface to be cured.
During application, do not drag the sheeting over the finished concrete nor
over sheeting already placed. Wet sheeting thoroughly and keep
continuously wet throughout the curing period.
3.11.2.4
Impervious Sheeting
Wet the entire exposed surface of the concrete thoroughly with a fine spray
of water and cover with impervious sheeting throughout the curing period.
Lay sheeting directly on the concrete surface and overlap edges 12 inches
minimum. Provide sheeting not less than 18 inches wider than the concrete
surface to be cured. Secure edges and transverse laps to form closed
joints. Repair torn or damaged sheeting or provide new sheeting. Cover or
wrap columns, walls, and other vertical structural elements from the top
down with impervious sheeting; overlap and continuously tape sheeting
joints; and introduce sufficient water to soak the entire surface prior to
SECTION 03 30 00
W912HN-09-X-1813
completely enclosing.
3.11.3
Application
The curing periods are required to be not less than one-fourth of those
specified for portland cement, but in no case less than 72 hours.
3.11.6
Curing Periods
SECTION 03 30 00
3.11.7
W912HN-09-X-1813
Curing Methods
SECTION 03 30 00
3.11.9
W912HN-09-X-1813
3.12.1
Sampling
Testing
Slump Tests
ASTM C 143/C 143M. Take concrete samples during concrete placement. The
maximum slump may be increased as specified with the addition of an
approved admixture provided that the water-cement ratio is not exceeded.
Perform tests at commencement of concrete placement, when test cylinders
are made, and for each batch (minimum) or every 20 cubic yards (maximum) of
concrete.
SECTION 03 30 00
3.12.2.2
W912HN-09-X-1813
Temperature Tests
Test the concrete delivered and the concrete in the forms. Perform tests
in hot or cold weather conditions (below 50 degrees F and above 80 degrees F
) for each batch (minimum) or every 20 cubic yards (maximum) of concrete,
until the specified temperature is obtained, and whenever test cylinders
and slump tests are made.
3.12.2.3
ASTM C 39/C 39M. Make five test cylinders for each set of tests in
accordance with ASTM C 31/C 31M. Take precautions to prevent evaporation
and loss of water from the specimen. Test two cylinders at 7 days, two
cylinders at 28 days, and hold one cylinder in reserve. Take samples for
strength tests of each mix design of concrete placed each day not less than
once a day, nor less than once for each 160 cubic yards of concrete, nor
less than once for each 5400 square feet of surface area for slabs or
walls. For the entire project, take no less than five sets of samples and
perform strength tests for each mix design of concrete placed. Each
strength test result must be the average of two cylinders from the same
concrete sample tested at 28 days. If the average of any three consecutive
strength test results is less than f'c or if any strength test result falls
below f'c by more than 450 psi, take a minimum of three ASTM C 42/C 42M
core samples from the in-place work represented by the low test cylinder
results and test. Concrete represented by core test is considered
structurally adequate if the average of three cores is equal to at least 85
percent of f'c and if no single core is less than 75 percent of f'c.
Retest locations represented by erratic core strengths. Remove concrete
not meeting strength criteria and provide new acceptable concrete. Repair
core holes with nonshrink grout. Match color and finish of adjacent
concrete.
3.12.2.4
Air Content
ASTM C 173/C 173M or ASTM C 231 for normal weight concrete . Test
air-entrained concrete for air content at the same frequency as specified
for slump tests.
3.12.2.5
Perform test
SECTION 03 30 00
W912HN-09-X-1813
WASTE MANAGEMENT
Mixing Equipment
Crush and reuse hardened, cured waste concrete as fill or as a base course
for pavement.
3.13.3
Reinforcing Steel
SECTION 03 30 00
3.13.4
W912HN-09-X-1813
Other Waste
JOINTS
Construction Joints
Make and locate joints not indicated so as not to impair strength and
appearance of the structure, as approved. Locate construction joints as
follows:
a. In walls at not more than 60 feet in any horizontal direction; at
top of footing; at top of slabs on ground; at top and bottom of door
and window openings or where required to conform to architectural
details; and at underside of deepest beam or girder framing into wall
b. In columns or piers, at top of footing; at top of slabs on ground;
and at underside of deepest beam or girder framing into column or pier
c. Near midpoint of spans for supported slabs, beams, and girders
unless a beam intersects a girder at the center, in which case
construction joints in girder must offset a distance equal to twice the
width of the beam. Make transfer of shear through construction joint
by use of inclined reinforcement.
d. In slabs on ground, so as to divide slab into areas not in excess of
1,200 square feet
Provide keyways at least 1-1/2-inches deep in construction joints in walls
and slabs and between walls and footings; approved bulkheads may be used
for slabs.
Joints must be perpendicular to main reinforcement.
continued across construction joints.
3.14.2
Reinforcement must be
Waterstops
W912HN-09-X-1813
Isolation and control joints which are to receive finish flooring material
must be sealed with joint sealing compound after concrete curing period.
Slightly underfill groove with joint sealing compound to prevent extrusion
of compound. Remove excess material as soon after sealing as possible.
Sealing is not required for isolation and control joints to be covered with
finish flooring material. Groove must be left ready to receive filling
material that is provided as part of finish floor covering work.
3.15
3.15.1
Anchorage devices and embedded items required for other work that is
attached to, or supported by, set and build in cast-in-place concrete as
part of the work of this section, using setting drawings, instructions, and
directions for work to be attached thereto.
3.15.2
CONCRETE CONVEYING
Transfer of Concrete At Project Site
SECTION 03 30 00
3.16.2
W912HN-09-X-1813
SECTION 03 30 00
W912HN-09-X-1813
SECTION 05 12 00A
*1 STRUCTURAL STEEL
11/10
PART 1
1.1
GENERAL
REFERENCES
AISC 303
AISC 325
AISC 326
AISC 810
ANSI/AISC 341
ANSI/AISC 360
AWS D1.1/D1.1M
W912HN-09-X-1813
ASTM A 325
ASTM A 490
ASTM A 501
ASTM A 563
ASTM A 6/A 6M
ASTM C 827
ASTM F 1554
ASTM F 436
ASTM F 844
ASTM F 959
W912HN-09-X-1813
SSPC Paint 25
SSPC SP 3
SYSTEM DESCRIPTION
SUBMITTALS
G, RO
G, RO
W912HN-09-X-1813
together with the actual test results for the supplied fasteners.
SD-07 Certificates
Steel
Bolts, nuts, and washers
Welding procedures and qualifications
1.4
SEISMIC PROVISIONS
QUALITY ASSURANCE
1.6.1
Drawing Requirements
Certifications
Erection Plan
Prior to welding, submit certification for each welder stating the type of
welding and positions qualified for, the code and procedure qualified
under, date qualified, and the firm and individual certifying the
qualification tests. If the qualification date of the welding operator is
more than one-year old, the welding operator's qualification certificate
shall be accompanied by a current certificate by the welder attesting to
the fact that he has been engaged in welding since the date of
certification, with no break in welding service greater than 6 months.
SECTION 05 12 00
W912HN-09-X-1813
PRODUCTS
STEEL
2.1.1
Structural Steel
2.1.3
Steel Pipe
Structural Steel
Bolts
ASTM A 325, Type 1. The bolt heads and the nuts of the supplied fasteners
must be marked with the manufacturer's identification mark, the strength
grade and type specified by ASTM specifications.
2.2.1.2
Nuts
ASTM A 563, Grade and Style for applicable ASTM bolt standard recommended.
2.2.1.3
Washers
ASTM F 436 washers for ASTM A 325 and ASTM A 490 bolts.
2.2.2
2.2.2.1
Nuts
ASTM A 563, Grade and Style as specified in the applicable ASTM bolt
standard.
2.2.2.3
Washers
SECTION 05 12 00
2.2.3
W912HN-09-X-1813
Foundation Anchorage
2.2.3.1
Anchor Bolts
ASTM F 1554.
2.2.3.2
Anchor Nuts
Anchor Washers
ASTM F 844.
2.2.3.4
ASTM F 959.
2.3
2.3.1
AWS D1.1/D1.1M.
2.3.2
Non-Shrink Grout
Grout shall be
AWS D1.1/D1.1M.
2.4
SHOP PRIMER
GALVANIZING
FABRICATION
Markings
concentrations.
2.6.2
W912HN-09-X-1813
Shop Primer
Cleaning
SSPC SP 6/NACE No.3, except steel exposed in spaces above ceilings, attic
spaces, furred spaces, and chases that will be hidden to view in finished
construction may be cleaned to SSPC SP 3 when recommended by the shop
primer manufacturer. Maintain steel surfaces free from rust, dirt, oil,
grease, and other contaminants through final assembly.
2.6.2.2
Primer
Apply primer to a minimum dry film thickness of 2.0 mil except provide the
Class B coating for slip critical joints in accordance with the coating
manufacturer's recommendations. Repair damaged primed surfaces with an
additional coat of primer.
2.7
DRAINAGE HOLES
EXECUTION
FABRICATION
W912HN-09-X-1813
INSTALLATION
3.3
ERECTION
a.
STORAGE
Material shall be stored out of contact with the ground in such manner and
location as will minimize deterioration.
3.4
CONNECTIONS
ASTM A 307 bolts shall be tightened to a "snug tight" fit. "Snug tight" is
the tightness that exists when plies in a joint are in firm contact. If
firm contact of joint plies cannot be obtained with a few impacts of an
impact wrench, or the full effort of a man using a spud wrench, contact the
Contracting Officer for further instructions.
3.4.2
High-Strength Bolts
ASTM A 325 and ASTM A 490 bolts shall be fully tensioned to 70 percent of
their minimum tensile strength.
Bolts shall be installed in connection
holes and initially brought to a snug tight fit. After the initial
tightening procedure, bolts shall then be fully tensioned, progressing from
the most rigid part of a connection to the free edges.
3.4.2.1
ASTM F 959. Where possible, the LIW shall be installed under the bolt
head and the nut shall be tightened. If the LIW is installed adjacent to
the turned element, provide a flat ASTM F 436 washer between the LIW and
nut when the nut is turned for tightening, and between the LIW and bolt
head when the bolt head is turned for tightening. In addition to the LIW,
provide flat ASTM F 436 washers under both the bolt head and nut when
ASTM A 490 bolts are used.
SECTION 05 12 00
3.5
W912HN-09-X-1813
GAS CUTTING
WELDING
Field Priming
GALVANIZING REPAIR
Perform field tests, and provide labor, equipment, and incidentals required
for testing, except that electric power for field tests will be furnished
as set forth in Division 1. The Contracting Officer shall be notified in
writing of defective welds, bolts, nuts, and washers within 7 working days
of the date of weld inspection.
3.9.1
3.9.1.1
Welds
Visual Inspection
W912HN-09-X-1813
Nondestructive Testing
Load indicator washers shall be tested in place to verify that they have
been compressed sufficiently to provide the 0.015 inch gap when the load
indicator washer is placed under the bolt head and the nut is tightened,
and to provide the 0.005 inch gap when the load indicator washer is placed
under the turned element, as required by ASTM F 959.
3.9.3
3.9.3.1
High-Strength Bolts
Testing Bolt, Nut, and Washer Assemblies
Test a minimum of 3 bolt, nut, and washer assemblies from each mill
certificate batch in a tension measuring device at the job site prior to
the beginning of bolting start-up. Demonstrate that the bolts and nuts,
when used together, can develop tension not less than the provisions
specified in ANSI/AISC 360, depending on bolt size and grade. The bolt
tension shall be developed by tightening the nut. A representative of the
manufacturer or supplier shall be present to ensure that the fasteners are
properly used, and to demonstrate that the fastener assemblies supplied
satisfy the specified requirements.
3.9.3.2
Inspection
SECTION 05 12 00
3.9.3.3
W912HN-09-X-1813
Testing
ASTM A 143/A 143M for steel products hot-dip galvanized after fabrication.
-- End of Section --
SECTION 05 12 00
W912HN-09-X-1813
SECTION 05 30 00A
*1 STEEL DECKS
05/10
PART 1
1.1
GENERAL
REFERENCES
AISI SG03-3
AWS D1.3/D1.3M
ASTM D 1056
W912HN-09-X-1813
Rubber
ASTM D 1149
ASTM D 746
ASTM E 84
FM GLOBAL (FM)
FM APP GUIDE
FM DS 1-28
SDI DDMO3
SDI DDP
SDI MOC2
UFC 3-301-01
1.2
SUBMITTALS
SECTION 05 30 00
W912HN-09-X-1813
Cant Strips
Ridge and Valley Plates
Metal Closure Strips
SD-03 Product Data
Accessories
Deck Units
Galvanizing Repair Paint
Joint Sealant Material
Mechanical Fasteners
Welder Qualifications
Welding Equipment
Welding Rods and Accessories
Welding Procedures
Fire Safety
Wind Storm Resistance
1.3
1.3.1
QUALITY ASSURANCE
Deck Units
SECTION 05 30 00
1.3.2
W912HN-09-X-1813
Regulatory Requirements
1.3.4.1
Fire Safety
Test roof deck as a part of a roof deck construction assembly of the type
used for this project, listing as fire classified in the UL Bld Mat Dir, or
listing as Class I construction in the FM APP GUIDE, and so labeled.
1.3.4.2
Fabrication Drawings
Deliver deck units to the site in a dry and undamaged condition. Store and
handle steel deck in a manner to protect it from corrosion, deformation,
and other types of damage. Do not use decking for storage or as working
platform until units have been fastened into position. Exercise care not
to damage material or overload decking during construction. Must not
exceed the design live load. The maximum uniform distributed storage load.
Stack decking on platforms or pallets and cover with weathertight
ventilated covering. Elevate one end during storage to provide drainage.
Maintain deck finish at all times to prevent formation of rust. Repair
deck finish using touch-up paint. Replace damaged material.
SECTION 05 30 00
1.5
W912HN-09-X-1813
1.5.1
Properties of metal roof deck sections must comply with engineering design
width as limited by the provisions of AISI D100.
1.5.2
Allowable Loads
Indicate total uniform dead and live load for detailing purposes.
PART 2
2.1
2.1.1
PRODUCTS
MATERIALS
Steel Sheet
Flat rolled carbon steel sheets of structural quality, thickness not less
than indicated inch meeting the requirements of AISI SG03-3, except as
modified herein.
2.1.2
Steel Coating
Mixes
2.1.4
SECTION 05 30 00
W912HN-09-X-1813
ACCESSORIES
Adjusting Plates
End Closures
Partition Closures
Provide closures for closing voids above interior walls and partitions that
are perpendicular to the direction of the configurations. Provide rubber,
plastic, or sheet steel closures above typical partitions.
2.2.4
Where deck is cut for passage of pipes, ducts, columns, etc., and deck is
to remain exposed, provide a neatly cut sheet metal collar to cover edges
of deck. Do not cut deck until after installation of supplemental supports.
2.2.5
Hanger
Provide clips or loops for utility systems of one or more of the following
types:
a.
b.
d.
2.2.7
W912HN-09-X-1813
Mechanical Fasteners
FABRICATION
2.3.1
Roof Deck
Conform to ASTM A 792/A 792M or ASTM A 1008/A 1008M for deck used in
conjunction with insulation and built-up roofing. Fabricate roof deck
units of the steel design thickness required by the design drawings and
galvanized in conformance with ASTM A 653/A 653M, G90 coating class .
2.3.1.1
Form Deck
Conform to ASTM A 653/A 653M or ASTM A 1008 for deck used as formwork for
concrete. Fabricate form deck of the steel design thickness required by
the design drawings. Paint with one coat of manufacture's standard
paint.
SECTION 05 30 00
2.3.3
W912HN-09-X-1813
Venting
Touch-Up Paint
After roof decking installation, wire brush, clean, and touchup paint the
scarred areas on top and bottom surfaces of metal roof decking. The
scarred areas include welds, weld scars, bruises, and rust spots. Touchup
galvanized surfaces with galvanizing repair paint. Touchup painted
surfaces with repair paint of painted surfaces.
PART 3
3.1
EXECUTION
EXAMINATION
INSTALLATION
Install steel deck units in accordance with SDI 31 approved shop drawings.
Place units on structural supports, properly adjusted, leveled, and aligned
at right angles to supports before permanently securing in place. Damaged
deck and accessories including material which is permanently stained or
contaminated, deformed, or with burned holes shall not be installed.
Extend deck units over three or more supports unless absolutely
impractical. Report inaccuracies in alignment or leveling to the
Contracting Officer and make necessary corrections before permanently
anchoring deck units. Locate deck ends over supports only. Ends of floor
deck may be lapped or butted. Do not use unanchored deck units as a work
or storage platform. Permanently anchor units placed by the end of each
working day. Do not support suspended ceilings, light fixtures, ducts,
utilities, or other loads by steel deck unless indicated. Distribute loads
by appropriate means to prevent damage.
3.2.1
Attachment
Welding
W912HN-09-X-1813
Fastening
Openings
Cut or drill all holes and openings required and be coordinated with the
drawings, specifications, and other trades. Frame and reinforce openings
through the deck in conformance with SDI DDP. Reinforce holes and openings
6 to 12 inch across by 0.0474 inch thick steel sheet at least 12 inch wider
and longer than the opening and be fastened to the steel deck at each
corner of the sheet and at a maximum of 6 inch on center. Reinforce holes
and openings larger than 12 inch by steel channels or angles installed
perpendicular to the steel joists and supported by the adjacent steel
joists. Install steel channels or angles perpendicular to the deck ribs
and fasten to the channels or angles perpendicular to the steel joists.
3.2.3
Deck Damage
Accessory Installation
Adjusting Plates
End Closures
Provide end closure to close open ends of cells at columns, walls, and
openings in deck.
3.2.4.3
Provide for closing voids between cells over partitions that are
perpendicular to direction of cells. Provide a one-piece closure strip for
partitions 4 inch nominal or less in thickness and two-piece closure strips
for wider partitions. Provide sheet metal closures above fire-rated
partitions at both sides of partition with space between filled with
fiberglass insulation. Provide flexible rubber closures above
acoustic-rated partitions at both sides of partition with space between
SECTION 05 30 00
W912HN-09-X-1813
Hangers
Space devices so as to
Concrete Work
Provide plates to be fusion welded to top surface of roof decking. Lap end
joints a minimum 3 inch. For valley plates, provide endlaps to be in the
direction of water flow.
3.6
Provide closure strips at open, uncovered ends and edges of the roof
decking and in voids between roof decking and top of walls and partitions
where indicated. Install closure strips in position in a manner to provide
a weathertight installation.
3.7
Upon completion of the deck, sweep surfaces clean and prepare for
installation of the roofing.
SECTION 05 30 00
3.8
3.8.1
W912HN-09-X-1813
Inspect the decking top surface for distortion after installation. For
roof decks not receiving concrete, verify distortion by placing a straight
edge across three adjacent top flanges. The maximum allowable gap between
the straight edge and the top flanges is 1/16 inch; when gap is more than
1/16 inch, provide corrective measures or replacement. Reinspect decking
after performing corrective measures or replacement.
-- End of Section --
SECTION 05 30 00
W912HN-09-X-1813
SECTION 05 40 00A
*1 COLD-FORMED METAL FRAMING
05/10
PART 1
1.1
GENERAL
REFERENCES
AISI SG03-3
ASTM A 370
SECTION 05 40 00
W912HN-09-X-1813
ASTM C 1513
ASTM C 955
ASTM E 329
ASTM F 1941
ASTM F 1941M
1.2
SUBMITTALS
W912HN-09-X-1813
SD-07 Certificates
Load-bearing cold-formed metal framing
Mill certificates or test reports from independent testing
agency, qualified in accordance with ASTM E 329, showing that the
steel sheet used in the manufacture of each cold-formed component
complies with the minimum yield strengths and uncoated steel
thickness specified. Test reports shall be based on the results
of three coupon tests in accordance with ASTM A 370.
Welds
Certified copies of welder qualifications test records showing
qualification in accordance with AWS D1.3/D1.3M.
1.3
Include top and bottom tracks, bracing, fastenings, and other accessories
necessary for complete installation. Framing members shall have the
structural properties indicated. Where physical structural properties are
not indicated, they shall be as necessary to withstand all imposed loads.
Design framing in accordance with AISI SG03-3.
1.5
a.
MAXIMUM DEFLECTION
Exterior Studs:
Deflection Criteria
Exterior Finish
L/240
Metal Panels
Wall deflections shall be computed on the basis that studs withstand all
lateral forces independent of any composite action from sheathing materials.
Studs abutting windows or louvers shall also be designed not to exceed 1/4
inch maximum deflection.
b.
Roof Rafters:
L/240 - Live load only
SECTION 05 40 00
1.6
W912HN-09-X-1813
1.6.1
QUALITY ASSURANCE
Drawing Requirements
PRODUCTS
STEEL STUDS, JOISTS, TRACKS, BRACING, BRIDGING AND ACCESSORIES
Framing components shall comply with ASTM C 955 and the following.
2.1.1
Galvanized steel, ASTM A 653/A 653M, SS Grade 50, G60 ; or carbon steel,
ASTM A 1011/A 1011M, Grade 50, painted.
2.1.2
Studs and Joists of 18 Gage (0.0478 Inch) and Lighter, Track, and
Accessories (All Gages): Galvanized steel, ASTM A 653/A 653M, SS, Grade 50
33,000 psi G60; or carbon steel, ASTM A 1008/A 1008M, Grade C, painted.
2.1.3
MARKINGS
An ICC number.
b.
Manufacturer's identification.
c.
d.
e.
2.3
CONNECTIONS
W912HN-09-X-1813
as appropriate.
2.4
PAINT
PLASTIC GROMMETS
EXECUTION
FASTENING
Welds
Screws
Anchors
Anchors shall be of the type, size, and location shown on the drawings.
3.1.4
Powder-Actuated Fasteners
INSTALLATION
Tracks
Studs
Cut studs square and set with firm bearing against webs of top and bottom
tracks. Position studs vertically in tracks and space as indicated in
design. Do not splice studs. Provide at least two studs at jambs of doors
SECTION 05 40 00
W912HN-09-X-1813
and other openings 2 feet wide or larger. Provide jack studs over
openings, as necessary, to maintain indicated stud spacing. Provide
tripled studs at corners, positioned to receive interior and exterior
finishes. Fasten studs to top and bottom tracks by welding or screwing
both flanges to the tracks. Framed wall openings shall include headers and
supporting components as shown on the drawings. Headers shall be installed
in all openings that are larger than the stud spacing in a wall. In
curtain wall construction, provide for vertical movement where studs
connect to the structural frame. Provide horizontal bracing in accordance
with the design calculations and AISI SG03-3, consisting of, as a minimum,
runner channel cut to fit between and welded to the studs or hot- or
cold-rolled steel channels inserted through cutouts in web of each stud and
secured to studs with welded clip angles. Bracing shall be not less than
the following:
LOAD
3.2.3
HEIGHT
BRACING
Up to 10 feet
Over 10 feet
Axial load
Up to 10 feet
Over 10 feet
Locate each joist or rafter directly above a stud. Provide doubled joists
under parallel partitions wherever partition length exceeds 1/2 of joist
span. Joists shall have at least 2.50 inches of bearing on steel, 4 inches
on masonry, and shall be reinforced over bearings where required to prevent
web crippling. Splice joists over bearings only. Lap and weld splices as
indicated. Provide manufacturer's standard bridging which shall not be
less than the following:
CLEAR SPAN
Up
14
20
26
to
to
to
to
14
20
26
32
BRIDGING
feet
feet
feet
feet
Erection Tolerances
Framing members which will be covered by finishes such as wallboard,
plaster, or ceramic tile set in a mortar setting bed, shall be within
the following limits:
(1) Layout of walls and partitions:
position;
(2)
(3)
Studs:
SECTION 05 40 00
b.
W912HN-09-X-1813
(3)
Studs:
-- End of Section --
SECTION 05 40 00
W912HN-09-X-1813
SECTION 05 50 13A
*1 MISCELLANEOUS METAL FABRICATIONS
05/10
PART 1
1.1
GENERAL
REFERENCES
ASSE/SAFE A10.3
ASME B18.2.2
ASME B18.21.1
ASME B18.6.2
ASME B18.6.3
ASTM A 307
SECTION 05 50 13
W912HN-09-X-1813
ASTM A924/A924M
ASTM C 1513
ASTM D 1187
ASTM E 488
SSPC SP 3
SECTION 05 50 13
1.2
W912HN-09-X-1813
SUBMITTALS
1.3
PRODUCTS
MATERIALS
Structural Carbon Steel
Structural Tubing
Steel Pipe
Gratings
a.
Anchor Bolts
ASTM A 307. Where exposed, shall be of the same material, color, and
finish as the metal to which applied.
SECTION 05 50 13
2.1.7.1
W912HN-09-X-1813
Expansion Anchors
b.
2.1.7.2
ASME B18.2.1, type and grade best suited for the purpose.
2.1.7.3
Toggle Bolts
ASME B18.2.1.
2.1.7.4
Screws
Washers
FABRICATION FINISHES
Galvanizing
Galvanize
Repair damaged surfaces with galvanizing repair method and paint conforming
to ASTM A 780/A 780M or by application of stick or thick paste material
specifically designed for repair of galvanizing, as approved by Contracting
Officer. Clean areas to be repaired and remove slag from welds. Heat
surfaces to which stick or paste material is applied, with a torch to a
temperature sufficient to melt the metallics in stick or paste; spread
molten material uniformly over surfaces to be coated and wipe off excess
SECTION 05 50 13
W912HN-09-X-1813
material.
2.2.4
2.2.4.1
Surface Preparation
Blast clean surfaces in accordance with SSPC SP 6/NACE No.3. Surfaces that
will be exposed in spaces above ceiling or in attic spaces, crawl spaces,
furred spaces, and chases may be cleaned in accordance with SSPC SP 3 in
lieu of being blast cleaned. Wash cleaned surfaces which become
contaminated with rust, dirt, oil, grease, or other contaminants with
solvents until thoroughly clean. Steel to be embedded in concrete shall be
free of dirt and grease. Do not paint or galvanize bearing surfaces,
including contact surfaces within slip critical joints, but coat with rust
preventative applied in the shop.
PART 3
3.1
EXECUTION
GENERAL INSTALLATION REQUIREMENTS
WORKMANSHIP
Provide miscellaneous metalwork that is well formed to shape and size, with
sharp lines and angles and true curves. Drilling and punching shall
produce clean true lines and surfaces. Provide continuous welding along
the entire area of contact except where tack welding is permitted. Do not
tack weld exposed connections of work in place and ground smooth. Provide
a smooth finish on exposed surfaces of work in place and unless otherwise
approved, flush exposed riveting. Mill joints where tight fits are
required. Corner joints shall be coped or mitered, well formed, and in
true alignment. Accurately set work to established lines and elevations
and securely fastened in place. Install in accordance with manufacturer's
installation instructions and approved drawings, cuts, and details.
3.3
SECTION 05 50 13
3.4
W912HN-09-X-1813
BUILT-IN WORK
Form for anchorage metal work built-in with concrete or masonry, or provide
with suitable anchoring devices as indicated or as required. Furnish metal
work in ample time for securing in place as the work progresses.
3.5
WELDING
FINISHES
Dissimilar Materials
SECTION 05 50 13
W912HN-09-X-1813
SECTION 06 10 00A
*1 ROUGH CARPENTRY
02/12
PART 1
1.1
GENERAL
REFERENCES
AF&PA T101
AWPA M6
APA E445
APA F405
APA L870
APA S350
ASME B18.2.1
ASME B18.2.2
ASME B18.5.2.1M
ASME B18.5.2.2M
ASME B18.6.1
W912HN-09-X-1813
ASTM A307
ASTM A653/A653M
ASTM D6007
ASTM E1333
ASTM F 547
FM GLOBAL (FM)
FM 4435
ICC IBC
NHLA Rules
W912HN-09-X-1813
CID A-A-1924
CID A-A-1925
WWPA G-5
1.2
SUBMITTALS
SECTION 06 10 00
W912HN-09-X-1813
plywood
SD-07 Certificates
Certificates of grade
Manufacturer's certificates (approved by an American Lumber
Standards approved agency) attesting that lumber and material not
normally grade marked meet the specified requirements.
Certificate of Inspection for grade marked material by an American
Lumber Standards Committee (ALSC) recognized inspection agency
prior to shipment.
Preservative treatment
SD-10 Operation and Maintenance Data
Take-back program
Include contact information, summary of procedures, and the
limitations and conditions applicable to the project. Indicate
manufacturer's commitment to reclaim materials for recycling
and/or reuse.
1.3
Mark each piece of framing and board lumber or each bundle of small pieces
of lumber with the grade mark of a recognized association or independent
inspection agency. Such association or agency shall be certified by the
Board of Review, American Lumber Standards Committee, to grade the species
used. Surfaces that are to be exposed to view shall not bear grademarks,
stamps, or any type of identifying mark. Hammer marking will be permitted
on timbers when all surfaces will be exposed to view.
1.4.2
Plywood
W912HN-09-X-1813
APA L870.Surfaces that are to be exposed to view shall not bear grademarks
or other types of identifying marks.
1.4.3
Preservative-Treated Plywood
ALSC PS 20 for dressed sizes of yard and structural lumber. Lumber shall
be surfaced four sides. Size references, unless otherwise specified, are
nominal sizes, and actual sizes shall be within manufacturing tolerances
allowed by the standard under which the product is produced. Other
measurements are IP or SI standard.
1.6
MOISTURE CONTENT
b.
1.7
PRESERVATIVE TREATMENT
Treat
a.
b.
0.40 pcf intended for ground contact and fresh water use. 0.60 pcf
intended for Ammoniacal Copper Quaternary Compound (ACQ)-treated
foundations. 0.80 to 1.00 pcf intended for ACQ-treated pilings. All
wood shall be air or kiln dried after treatment. Specific treatments
shall be verified by the report of an approved independent inspection
agency, or the AWPA Quality Mark on each piece. Do not incise surfaces
of lumber that will be exposed. Brush coat areas that are cut or
drilled after treatment with either the same preservative used in the
treatment or with a 2 percent copper naphthenate solution. All lumber
and woodwork shall be preservative treated. The following items shall
be preservative treated:
1.
2.
Wood sills, soles, plates, furring, and sleepers that are less than
24 inches from the ground, furring and nailers that are set into
SECTION 06 10 00
W912HN-09-X-1813
Nailers, edge strips, crickets, curbs, and cants for roof decks.
1.8.1
QUALITY ASSURANCE
Certificates of Grade
PRODUCTS
MATERIALS
Engineered Wood Products
LUMBER
Structural Lumber
Any of the species and grades listed in AF&PA T101 that have allowable
unit stresses in pounds per square inch (psi) not less than 1050 Fb, 700
Ft, 780 Fc, with 1,200,000 E.
Other stress graded or dimensioned items
such as blocking, carriages, and studs shall be standard or No. 2 grade
except that studs may be Stud grade.
2.2.2
Framing Lumber
Framing lumber such as studs, plates, caps, collar beams, cant strips,
bucks, sleepers, nailing strips, and nailers and board lumber such as
subflooring and wall and roof sheathing shall be one of the species listed
in the table below. Minimum grade of species shall be as listed.
Finger-jointed lumber may be used in the same applications as solid lumber
of an equivalent species and grade, provided the finger-jointed lumber
meets all the requirements of the certification and the quality control
programs of the rules writing agency having jurisdiction and all applicable
requirements of DOC/NIST PS56.
SECTION 06 10 00
W912HN-09-X-1813
Species
Framing
Board Lumber
Aspen, Douglas
Fir-Larch,
Douglas Fir
South, Engelmann
Spruce-Lodgepole
Pine, Engelmann
Spruce, Hem-Fir,
Idaho White
Pine, Lodgepole
Pine, Mountain
Hemlock,
Mountain
Hemlock-Hem-Fir,
Ponderosa
Pine-Sugar Pine,
Ponderosa
Pine-Lodgepole
Pine, Subalpine
Fir, White
Woods, Western
Woods, Western
Cedars, Western
Hemlock
All Species:
Standard
Light Framing
or No. 3
Structural
Light Framing
(Stud Grade
for 2x4
nominal size,
10 feet and
shorter)
All Species:
No. 3 Common
WCLIB 17 standard
grading rules
Douglas
Fir-Larch,
Hem-Fir,
Mountain
Hemlock, Sitka
Spruce, Western
Cedars, Western
Hemlock
All Species:
Standard
Light Framing
or No. 3
Structural
Light Framing
(Stud Grade
for 2x4
nominal size,
10 feet and
shorter)
All Species:
Standard
SECTION 06 10 00
W912HN-09-X-1813
Species
Framing
Board Lumber
All Species:
Standard
Light Framing
or No. 3
Structural
Light Framing
(Stud Grade
for 2x4
nominal size,
10 feet and
shorter)
No. 2 Boards
No. 2 Common
No. 2 Common
All Species:
Standard
Light Framing
or No. 3
Structural
Light Framing
(Stud Grade
for 2x4
nominal size,
10 feet and
shorter)
All Species:
No. 3 Common
except
Standard for
Eastern White
and Northern
Pine
All Species:
Standard
Light Framing
or No. 3
Structural
Light Framing
(Stud Grade
for 2x4
nominal size,
10 feet and
shorter)
Construction
Heart
Redwood
SECTION 06 10 00
W912HN-09-X-1813
Species
Framing
Board Lumber
Cypress
No. 2
Dimension
No. 2 Common
2.3
APA L870, APA S350, APA E445, and APA F405 respectively.
2.3.1
Wall Sheathing
2.3.1.1
Plywood
OTHER MATERIALS
2.4.1
2.4.1.1
Blocking
Adhesives
ROUGH HARDWARE
2.5.1
W912HN-09-X-1813
Anchor Bolts
Expansion Shields
ASME B18.2.1.
2.5.5
Wood Screws
ASME B18.6.1.
2.5.6
ASTM F 547, size and type best suited for purpose; staples shall be as
recommended by the manufacturer of the materials to be joined. For
sheathing and subflooring, length of nails shall be sufficient to extend 1
inch into supports. In general, 8-penny or larger nails shall be used for
nailing through 1 inch thick lumber and for toe nailing 2 inch thick
lumber; 16-penny or larger nails shall be used for nailing through 2 inch
thick lumber. Nails used with treated lumber and sheathing shall be
hot-dipped galvanized in accordance with ASTM A153/A153M. Nailing shall be
in accordance with the recommended nailing schedule contained in AF&PA T10.
Where detailed nailing requirements are not specified, nail size and
spacing shall be sufficient to develop an adequate strength for the
connection. The connection's strength shall be verified against the nail
capacity tables in AF&PA T101. Reasonable judgment backed by experience
shall ensure that the designed connection will not cause the wood to
split. If a load situation exceeds a reasonable limit for nails, a
specialized connector shall be used.
2.5.7
Metal anchors, 1/8 by 1-1/4 inch steel, 12 inches long, with ends bent 2
inches. Anchors shall be screwed to the backs of bucks and built into
masonry or concrete. Locate 8 inches above sills and below heads and not
more than 24 inches intermediately between.
Anchorage of bucks to steel
framing shall be as necessary to suit the conditions.
2.5.8
SECTION 06 10 00
PART 3
3.1
W912HN-09-X-1813
EXECUTION
INSTALLATION
MISCELLANEOUS
3.2.1
Provide roof nailing strips for roof decks as indicated. Apply nailing
strips in straight parallel rows in the direction and spacing indicated.
Strips shall be surface applied.
a.
b.
3.2.1.2
Provide at perimeter of roof, around openings through roof, and where roofs
abut walls, curbs, and other vertical surfaces. Except where indicated
otherwise, nailers shall be 6 inches wide and the same thickness as the
insulation. Anchor nailers securely to underlying construction. Anchor
perimeter nailers in accordance with FM 4435. Strips shall be grooved as
indicated for edge venting; install at walls, curbs, and other vertical
surfaces with a 1/4 to 1/2 inch air space.
3.2.1.3
Provide wood saddles or crickets, cant strips, and wood nailers bolted to
tops of concrete or masonry curbs as indicated, specified, or necessary and
of lumber or 3/4 inch thick exterior plywood.
3.2.2
Wood Blocking
Provide proper sizes and shapes at proper locations for the installation
SECTION 06 10 00
W912HN-09-X-1813
and attachment of wood and other finish materials, fixtures, equipment, and
items indicated or specified.
3.2.3
Wood Grounds
Provide for fastening wood trim, finish materials, and other items to
plastered walls and ceilings. Install grounds in proper alignment and true
with an 8 foot straightedge.
3.2.4
Wood Furring
Provide where shown and as necessary for facing materials specified. Except
as shown otherwise, furring strips shall be nominal one by 3, continuous,
and spaced 16 inches o.c. Erect furring vertically or horizontally as
necessary. Nail furring strips to masonry.
Do not use wood plugs.
Provide furring strips around openings, behind bases, and at angles and
corners. Furring shall be plumb, rigid, and level and shall be shimmed as
necessary to provide a true, even plane with surfaces suitable to receive
the finish required. Form furring for offsets and breaks in walls or
ceilings on 1 by 4 wood strips spaced 16 inches o.c.
3.2.5
Shear Walls
WASTE MANAGEMENT
-- End of Section --
SECTION 06 10 00
W912HN-09-X-1813
SECTION 07 11 13A
*1 BITUMINOUS DAMPPROOFING
08/11
PART 1
1.1
GENERAL
REFERENCES
ASTM C728
ASTM D1187/D1187M
ASTM D1227
ASTM D41/D41M
ASTM D4263
ASTM D449
1.2
SUBMITTALS
SECTION 07 11 13
PART 2
W912HN-09-X-1813
2.1
PRODUCTS
ASPHALT
ASPHALT PRIMER
ASTM D41/D41M.
2.3
2.3.1
SURFACE PROTECTION
Protection Board
EXECUTION
SURFACE PREPARATION
Remove or cut form ties and repair all surface defects as required in
Section 03 30 00 CAST-IN-PLACE CONCRETE. Clean concrete and masonry
surfaces to receive dampproofing of foreign matter and loose particles.
Apply dampproofing to clean dry surfaces. Moisture test in accordance with
ASTM D4263. If test indicates moisture, allow a minimum of 7 additional
days after test completion for curing. If moisture still exists, redo test
until substrate is dry.
3.1.1
Metal Surfaces
Metal surfaces shall be dry and be free of rust, scale, loose paint, oil,
grease, dirt, frost and debris.
3.2
Before starting the dampproofing work, the surrounding areas and surfaces
shall be protected from spillage and migration of dampproofing material
onto other work. Drains and conductors shall be protected from clogging
with dampproofing material.
SECTION 07 11 13
3.3
W912HN-09-X-1813
APPLICATION
Surface Priming
Hot-Application Method
Apply two mop coats of hot coal-tar pitch or two mop coats of hot asphalt
to surfaces. Apply mop coats uniformly using not less than 25 pounds of
coal-tar pitch or 20 pounds of asphalt per 100 square feet for each coat.
Do not heat asphalt above 450 degrees F. Do not heat coal tar pitch above
400 degrees F. Have kettlemen in attendance at all times during heating to
ensure that maximum temperature specified is not exceeded. Apply hot
asphalt bitumen or coal tar pitch and fully bond to primed surface.
Provide finished surface that is smooth, lustrous, and impervious to
moisture. Recoat dull or porous spots.
3.3.3
Cold-Application Method
3.3.3.1
Fibrous Asphalt
Emulsion-Based Asphalt
Primer:
b.
Fibrated Dampproofing:
2 gallons per 100 square feet, cold-applied
with spray, brush or trowel.
c.
Non-fibrated Dampproofing:
2 gallons per 100 square feet,
cold-applied with spray, brush or trowel.
SECTION 07 11 13
3.4
W912HN-09-X-1813
PROTECTIVE COVERING
Protect dampproofed surfaces against which backfill will be placed with one
layer of 15 pound saturated felt conforming to the requirements specified
herein. Use asphalt-saturated felt where the dampproofing material is
asphalt and use coal-tar-saturated felt where the dampproofing material is
coal-tar pitch. Embed felts in the second coating of bitumen and lap edges
and ends not less than one inch .
-- End of Section --
SECTION 07 11 13
W912HN-09-X-1813
SECTION 07 42 13A
*1 METAL WALL PANELS
05/11
PART 1
1.1
GENERAL
REFERENCES
AAMA 800
ANSI/AISC 341
AISI SG03-3
AWS A5.1/A5.1M
AWS D1.1/D1.1M
AWS D1.2/D1.2M
W912HN-09-X-1813
ASTM A36/A36M
ASTM A424/A424M
ASTM A463/A463M
ASTM A606/A606M
ASTM A653/A653M
ASTM A755/A755M
ASTM A780/A780M
ASTM A924/A924M
ASTM B117
ASTM C286
ASTM C920
ASTM D1056
ASTM D1308
ASTM D1654
W912HN-09-X-1813
ASTM D2244
ASTM D2247
ASTM D2794
ASTM D3359
ASTM D3363
ASTM D4214
ASTM D4587
ASTM D522
ASTM D523
ASTM D5894
ASTM D610
ASTM D714
ASTM D822
ASTM D968
ASTM E1592
ASTM E283
W912HN-09-X-1813
ASTM E72
ASTM E84
ASTM G 152
ASTM G 153
PEI CG-3
SMACNA 1793
DEFINITIONS
Metal Wall Panel: Metal wall panels, attachment system components and
accessories necessary for a complete weather-tight wall system.
1.3
Factory color finished, galvanized metal wall panel system with concealed
fastening attachment. Panel profile must be smooth face recessed bead snap
SECTION 07 42 13
W912HN-09-X-1813
A1008/A1008M
A123/A123M
A36/A36M
A424/A424M, ASTM C286, PEI 1001, PEI CG-3 for Porcelain and Ceramic
Enameling
ASTM A653/A653M
ASTM A463/A463M for aluminum coated steel sheet
ASTM A606/A606M
ASTM A755/A755M for metallic coated steel sheet for exterior coil
pre-painted applications.
ASTM A780/A780M for repair of damage or uncoated areas of hot-dipped
galvanized coating.
ASTM A924/A924M for metallic coated steel sheet
ASTM D522 for applied coatings
UL Bld Mat Dir
1.3.2
Structural Performance
Maximum calculated fiber stress must not exceed the allowable value in the
AISI or AA manuals; a one third overstress for wind is allowed. Midspan
deflection under maximum design loads is limited to L/180. Contract
drawings show the design wind loads and the extent and general assembly
details of the metal siding. Contractor must provide design for members
and connections not shown on the drawings. Siding panels and accessories
must be the products of the same manufacturer.
Provide metal wall panel assemblies complying with the load and stress
requirements in accordance with ASTM E1592. Wind Load force due to wind
action governs the design for panels.
Wall systems and attachments are to resist the wind loads as determined by
ASTM E72 and ASCE 7 in the geographic area where the construction will take
place, in pounds per square foot. Submit five copies of wind load tests
and seismic tests to the Contracting Officer.
Provide metal wall panel assembly for seismic conditions complying with the
applicable requirements of ANSI/AISC 341.
1.3.3
Air Infiltration
Air leakage must conform to the limits through the wall assembly area when
tested according to ASTM E283.
1.3.4
1.4
W912HN-09-X-1813
SUBMITTALS
Manufacturer; G
Installation Contractor; G
Welders; G
G
W912HN-09-X-1813
QUALITY ASSURANCE
Pre-Installation Conference
b.
c.
Sustainable acquisition
d.
Approved Warranty
SECTION 07 42 13
W912HN-09-X-1813
e.
f.
g.
h.
i.
j.
k.
l.
m.
n.
o.
Wall panel observation and repair procedures after metal wall panel
installation. Provide detailed written instructions including copies
of Material Safety Data Sheets for maintenance and repair materials,
and manufacturer's maintenance instructions.
1.5.1.1
Installation Drawings
Wind design analysis must include wall plan delineating dimensions and
attachment patterns for each zone. Wind design analysis must be prepared
and sealed by Licensed Project Engineer in the geographic area where the
construction will take place.
1.5.2
Qualification of Manufacturer
Certify that metal wall panel system manufacturer has a minimum of five (5)
SECTION 07 42 13
W912HN-09-X-1813
Manufacturer's Certificates
Single Source
Obtain each type of metal wall panels, clips, closure materials and other
accessories from the standard products of the single source from a single
manufacturer to operate as a complete system for the intended use.
1.5.6
Deliver and protect package components, sheets, metal wall panels, and
other manufactured items to prevent damage or deformation during
transportation and handling.
Unload, store, and erect metal wall panels in a manner to prevent bending,
SECTION 07 42 13
W912HN-09-X-1813
PROJECT CONDITIONS
Field Measurements
Weather Limitations
WARRANTY
PRODUCTS
FABRICATION
Unless approved otherwise, fabricate and finish metal wall panels and
accessories at the factory to greatest extent possible, by manufacturer's
standard procedures and processes and as necessary to fulfill indicated and
specified performance requirements. Comply with indicated profiles and
with dimensional and structural requirements.
Provide panel profile, including major ribs and intermediate stiffening
ribs, if any, for full length of panel. Fabricate metal wall panel side
SECTION 07 42 13
W912HN-09-X-1813
Form exposed sheet metal accessories that are without excessive oil
canning, buckling, and tool marks and that are true to line and levels
indicated, with exposed edges folded back to form hems.
b.
End Seams: fabricate nonmoving end seams with flat-lock seams. Form
seams and seal with epoxy seam sealer. Rivet joints for additional
strength.
c.
d.
e.
2.2
2.2.1
PANEL MATERIALS
Steel Sheet
Roll-form steel wall panels to the specified profile, with fy= 40 ksi, 24
gauge and depth as indicated. Material must be plumb and true, and within
the tolerances listed:
a.
b.
c.
2.2.2
1.
2.
3.
Comply with NAAMM AMP 500 for recommendations for applying and designating
SECTION 07 42 13
W912HN-09-X-1813
Metal Preparation
Prime Coating
Roll coat the finish coating over the primer by roll coating to dry film
thickness of 0.80 plus 5 mils (3.80 plus 0.50 mils for Vinyl Plastisol) for
a total dry film thickness of 1.00 plus 0.10 mils (4.00 plus 0.10 mils for
Vinyl Plastisol). Oven-cure finish coat.
2.2.2.4
Apply a wash-coat on the reverse side over the primer by roll coating to a
dry film thickness of 0.30 plus 0.05 mils for a total dry film thickness of
0.50 plus 0.10 mils. Oven-cured the wash coat.
2.2.2.5
Color
Physical Properties
W912HN-09-X-1813
FASTENERS
2.4.1
2.4.1.1
General
Exposed Fasteners
Hidden Fasteners
Screws
Rivets
Attachment Clips
SECTION 07 42 13
2.5
W912HN-09-X-1813
ACCESSORIES
2.5.1
General
All accessories must be compatible with the metal wall panels. Sheet metal
flashing, trim, metal closure strips, caps and similar metal accessories
must not be less than the minimum thickness specified for the wall panels.
Exposed metal accessories/finishes to match the panels furnished, except as
otherwise indicated. Molded foam rib, ridge and other closure strips must
be non-absorbent closed-cell or solid-cell synthetic rubber or pre-molded
neoprene to match configuration of the panels.
2.5.2
Joint Sealants
Sealants and Caulking
Provide approved gun type sealants for use in hand- or air-pressure calking
guns at temperatures above 4 degrees C (or frost-free application at
temperatures above 10 degrees F with minimum solid content of 85 percent of
the total volume. Sealants must dry with a tough, durable surface skin
which permit remaining soft and pliable underneath, providing a
weather-tight joint. No migratory staining is permitted on painted or
unpainted metal, stone, glass, vinyl, or wood.
Prime all joints receiving sealants with a compatible one-component or
two-component primer as recommended by the wall panel manufacturer.
2.5.4.2
Shop-Applied
Field-Applied
Provide pressure sensitive tape sealant, 100 percent solid with a release
paper backing; permanently elastic, non-sagging, non-toxic and non-staining
as approved by the wall panel manufacturer.
SECTION 07 42 13
2.6
W912HN-09-X-1813
2.6.1
Shop fabricate sheet metal flashing and trim where practicable to comply
with recommendations in SMACNA 1793 that apply to design, dimensions,
metal, and other characteristics of item indicated. Obtain field
measurements for accurate fit before shop fabrication.
Fabricate sheet metal flashing and trim without excessive oil canning,
buckling, and tool marks and true to line and levels indicated, with
exposed edges folded back to form hems.
2.7
Repair paint for color finish enameled wall panel must be compatible paint
of the same formula and color as the specified finish furnished by the wall
panel manufacturer. Provide 3 quarts of repair paint matching the
specified wall panels.
PART 3
3.1
EXECUTION
EXAMINATION
PREPARATION
Provide full length metal wall panels, from sill to eave as indicated,
unless otherwise indicated or restricted by shipping limitations. Anchor
metal wall panels and other components of the Work securely in place, with
SECTION 07 42 13
W912HN-09-X-1813
provisions for thermal and structural movement in accordance with MBMA MBSM.
Erect wall panel system in accordance with the approved erection drawings,
the printed instructions and safety precautions of the manufacturer.
Sheets are not to be subjected to overloading, abuse, or undue impact.
Bent, chipped, or defective sheets shall not be applied.
Sheets must be erected true and plumb and in exact alignment with the
horizontal and vertical edges of the building, securely anchored, and with
the indicated eave, and sill.
Work is to allow for thermal movement of the wall panel, movement of the
building structure, and to provide permanent freedom from noise due to wind
pressure.
Field cutting metal wall panels by torch is not permitted.
3.3.1
Anchor Clips
Anchor metal wall panels and other components of the Work securely in
place, using manufacturer's approved fasteners according to manufacturers'
written instructions.
3.3.3
Metal Protection
Joint Sealers
Install gaskets, joint fillers, and sealants where indicated and where
required for weatherproof performance of metal wall panel assemblies.
Provide types of gaskets, fillers, and sealants indicated or, if not
indicated, types recommended by metal wall panel manufacturer.
3.4
FASTENER INSTALLATION
Anchor metal wall panels and other components of the Work securely in
place, using manufacturer's approved fasteners according to manufacturers'
written instructions.
3.5
3.5.1
SECTION 07 42 13
W912HN-09-X-1813
Metal Flashing
Closures
WORKMANSHIP
Make lines, arises, and angles sharp and true. Free exposed surfaces from
visible wave, warp, buckle, and tool marks. Fold back exposed edges neatly
to form a 1/2 inch hem on the concealed side. Make sheet metal exposed to
the weather watertight with provisions for expansion and contraction.
Make surfaces to receive sheet metal plumb and true, clean, even, smooth,
dry, and free of defects and projections which might affect the
application. For installation of items not shown in detail or not covered
by specifications conform to the applicable requirements of SMACNA 1793.
Provide sheet metal flashing in the angles formed where roof decks abut
walls, curbs, ventilators, pipes, or other vertical surfaces and wherever
indicated and necessary to make the work watertight.
3.7
3.7.1
ACCEPTANCE PROVISIONS
Erection Tolerances
Erect metal wall panels straight and true with plumb vertical lines
correctly lapped and secured in accordance with the manufacturer's written
SECTION 07 42 13
W912HN-09-X-1813
instructions.
3.7.2
Leakage Tests
Repairs to Finish
b.
All materials are properly stored, handled and protected from damage.
Damaged materials are removed from the site.
c.
d.
e.
f.
The proper number, type, and spacing of attachment clips and fasteners
are installed.
g.
h.
W912HN-09-X-1813
SECTION 07 42 13
W912HN-09-X-1813
SECTION 07 53 24A
*1 FABRIC COVER STRUCTURE
08/12
PART 1
1.1
GENERAL
REFERENCES
ASTM A325
ASTM A490
ASTM A500
1.2
SECTION 07 53 24
W912HN-09-X-1813
SUBMITTALS
1.3.1
Shop Drawings
Floor and roof plan drawing depicting load calculations and reactions and
attachment Details to the Foundation of Structure and Bracing Details, and
fabric fastening details as applicable.
1.4
1.4.1
QUALITY ASSURANCE
Qualification of Manufacturer
SECTION 07 53 24
1.4.2
W912HN-09-X-1813
Structural Loads
The structure shall be designed in accordance with the local building codes
and appropriate standards using methodology from ASCE 7-05 for the minimum
design loads. The Manufacturer will submit a full Structural Load Report
prepared by an independent third party professional engineer licensed in
Georgia with at least 10 years of experience in fabric covered buildings,
certifying that this shelter meets the requirements of the applicable
building codes. Refer to drawing S-001 for design criteria and codes.
All design calculations and drawings shall be submitted to the owner for
approval before commencing fabrication. The structure shall be designed to
withstand a three second gust of 95 mph using an Importance Factor of 1.0
and Exposure C as a minimum. The structure shall be designed to withstand
the following snow loads:
a. Ground Snow Load: 5 p.s.f
The structures framework shall be able to meet design requirements without
regard to the tension of the fabric cover panels.
The structure's cover panels shall not be designed to function as a
structural or bracing member.
1.4.3
Roof Loads
Wind Loads
Truss Steel
The truss chords and webbing shall be fabricated from pre-galvanized clear
coated steel. The main structure shall consist of welded open web arch
truss with parallel truss chords. Sheared, flattened or distorted tubing
may not be used in the trusses.
All steel tubing used in the structure must have the following minimum
structural and mechanical properties:
ASTM A500: Grade B, Fy= 46 ksi.
All steel plates and tabs and lugs shall be fabricated from hot dipped
galvanized material and have the following minimum structural and
mechanical properties:
SECTION 07 53 24
W912HN-09-X-1813
Rainfall
Pre-Construction Conference
b.
c.
d.
e.
f.
Safety requirements.
Storage
Store and protect materials from damage and weather in accordance with
manufacturer's printed instructions, except as specified otherwise. Keep
materials clean and dry. Store and maintain adhesives, sealants, primers
and other liquid materials above 60 degrees F. Insulated hot boxes or
other enclosed warming devices must be required in cold weather. Mark and
SECTION 07 53 24
W912HN-09-X-1813
remove damaged materials from the site. Use pallets to support and canvas
tarpaulins to completely cover material materials stored outdoors. Do not
use polyethylene as a covering. Locate materials temporarily stored on the
roof in approved areas, and distribute the load to stay within the live
load limits of the roof construction. Remove unused materials from the
roof at the end of each days work.
1.5.3
Handling
Prevent damage to edges and ends of roll materials. Do not install damaged
materials in the work. Select and operate material handling equipment so
as not to damage materials or applied roofing. Do not use materials
contaminated by exposure or moisture. Remove contaminated materials from
the site. When hazardous materials are involved, adhere to the special
precautions of the manufacturer. Adhesives may contain petroleum
distillates and may be extremely flammable; prevent personnel from
breathing vapors, and do not use near sparks or open flame.
PART 2
2.1
2.1.1
PRODUCTS
MATERIALS
Structural Frames
Electrical
Fabric Memebrane
Truss Steel
The truss chords and webbing shall be fabricated from pre-galvanized clear
coated steel. The main structure shall consist of welded open web arch
truss with parallel truss chords. Sheared, flattened or distorted tubing
may not be used in the trusses.
SECTION 07 53 24
2.1.5
2.1.5.1
W912HN-09-X-1813
Hardware
Bolts
All bolts used at truss connections, wind post connections, purlins and
horizontal braces shall be galvanized ASTM A325 or ASTM A490. All bolts
shall be installed and securely tightened as per AISC requirements.
2.1.5.2
Cable Assemblies
Wind bracing cables shall consist of galvanized "aircraft cable" and shall
be tensioned per specifications on the drawings using forged turnbuckles of
a size appropriate for the cable used in each application. Cable clamps
shall be dropped forged. Thimbles shall be used in each cable termination.
Cables will be terminated at each end of each "X". All cable terminations
shall be to tabs or plates welded to arch truss chords. In no case shall
the cables be terminated by passing around a frame member.
2.1.6
Purlin Bracing
Connecting Joints
W912HN-09-X-1813
weather tight shell over the framework. In order to provide for a good
finished appearance and to insure weather tightness, the membrane shall
be assembled and tensioned, in a manner to eliminate wrinkles in hot
and cold temperatures.
b. The structure shall be clad with Polyester membrane manufactured by an
approved and reputable supplier. The polyester membrane shall be
waterproof and free from defects. All roof, walls, end walls, and
connecting sections shall be weather tight. The material must be UV
stabilized and flame retardant and meet the requirements of NFPA 701.
The fabric shall be covered by a 10- year warranty and have a life
expectancy of more than 15 years.
c. Cladding Membrane- Structure covers shall be fabricated from PVC coated
polyester fabric manufactured by an approved and reputable supplier.
Laminated materials are not acceptable for use as the outer membrane.
Polyethylene or HDPE materials are not acceptable. Approved cover
material manufacturers include: Seamen, Mehler, Ferrari and Naizil.
Other cover material manufacturers may be considered and must be able
to demonstrate ten years experience with PVC coated fabrics used on
structures similar in use and loads to that contemplated here.
d. The membrane panels shall be fabricated using RF (radio frequency)
welding. The use of thermal welding to fabricate the membrane panels is
not acceptable.
e. Overlap fabric welds shall be tiled with the upper panel on top of the
lower panel.
f. The membrane shall be tensioned with load rated hardware which is plated
or hot dip galvanized so as to prevent corrosion. Hardware attached to
the foundation shall allow full and free rotation of the foundation
connection to avoid fatigue failure of threaded assemblies.
2.1.12
The cover system shall be designed such that adjoining panels are supplied
with overlap joints to allow the panels to be sealed together. Membrane
shall maintain a minimum of 175 lbs/inch connection.
2.1.12.2
The cover system will be provided with a mechanical tensioning system that
allows the membrane to be fully tensioned around the structure perimeter.
The system will be designed such that the membrane can be tightly and
neatly secured over the structural frame and such that the system has
remaining range of adjustment.
SECTION 07 53 24
2.1.12.3
W912HN-09-X-1813
The structure supplier will provide all materials and methods necessary to
fully tension and seal the membrane material around all doors, ventilation
and other openings, as well as around the structure perimeter below the
main tensioning system. This seal shall provide a neat and finished
appearance and eliminate any loose membrane cladding that could otherwise
be damaged by flapping or abrasion. The membrane base skirt shall be
supplied and attached as the base perimeter to allow a reasonable seal
against air and water intrusion (when required).
The membrane shall not be designed to function as a structural member such
that, should any damage to or penetrations of the membrane occur, the
integrity of the structural framework shall not be affected.
PART 3
3.1
EXECUTION
MATERIALS
All materials used in structures shall be new, without defects and free of
repairs. The quality of the materials used shall be such that the
structure is in conformance with performance requirements specified herein.
3.2
CORROSION PROTECTION
WELDING
All welders shall be AWS certified and shall perform welding in Accordance
with AWS Standards. All welded components shall be prepared prior to the
finish coating.
3.4
WORKMANSHIP
MANUFACTURER
MATERIAL DELIVERY
The building system materials shall be delivered to the project site during
normal business hours on weekdays. The Installation contractor will provide
adequate workers and equipment to promptly unload, inspect and accept
material delivery.
SECTION 07 53 24
3.7
W912HN-09-X-1813
HANDLING
INSTALLATION
-- End of Section --
SECTION 07 53 24
W912HN-09-X-1813
SECTION 07 54 50A
*1 TPO THERMOPLASTIC SINGLE-PLY ROOFING
08/09
PART 1
1.1
GENERAL
Section Includes
Thermoplastic Single-Ply Roofing
Roof Insulation.
1.2
Related Sections
Section 07 60 00 FLASHING AND SHEET METAL
1.3
REFERENCES
ASTM D 1179
1.4
DEFINITIONS
Roofing Terminology: Refer to ASTM D 1179 and the glossary of the National
Roofing Contractors Association (NRCA) Roofing and Waterproofing Manual for
definitions of roofing terms related to this section
1.5
PERFORMANCE REQUIREMENTS
Provide an installed roofing membrane and base flashing system that does
not permit the passage of water, and will withstand the design pressures
calculated in accordance with the most current revision of ASCE 7.
Provide all primary roofing materials that are physically and chemically
compatible when installed in accordance with manufacturers current
application requirements
1.6
SUBMITTALS
SECTION 07 54 50
W912HN-09-X-1813
1.7
QUALITY ASSURANCE
Manufacturer Qualifications: Manufacturer shall provide a roofing
system that meets or exceeds all criteria listed in this section
Installer Minimum Qualifications:
Installer shall be classified as a Master Select Contractor as
defined and certified by TPO manufacturer.
Installer shall be classified as an Approved Contractor as defined
and certified by TPO manufacturer.
Source Limitations: Components listed shall be provided by a single
manufacturer or approved by the primary roofing manufacturer
Final Inspection: Manufacturer's representative shall provide a
comprehensive final inspection after completion of the roof system.
All application errors shall be addressed and final punch list completed
1.8
PRE-INSTALLATION CONFERENCE
REGULATORY REQUIREMENTS
W912HN-09-X-1813
PROJECT CONDITIONS
Weather:
Proceed with roofing only when existing and forecasted weather
conditions permit.
Ambient temperatures shall be above 45 degrees F (7.2 degrees C) when
heat welding, applying hot asphalt or water based adhesives.
1.12
WARRANTY
PRODUCTS
INSULATION
As indicated on drawings.
As indicated on drawings.
ROOF BOARD
MEMBRANE MATERIALS
Color:
2.4
W912HN-09-X-1813
Tan
ACCESSORIES
Plates and Fasteners
Standard Screws: Standard duty alloy steel insulation fastener with CR-10
coating with a .215" diameter thread. Factory Mutual Standard 4470
Approved, #3 Phillips head for use on steel and wood decks
2.6
FLASHING ACCESSORIES
EXECUTION
EXAMINATION
A. Verify that the surfaces and site conditions are ready to receive
work.
B.
Verify that the deck surfaces are dry and free of ice or snow.
E. Verify that all roof openings or penetrations through the roof are
solidly set, and that all flashings are tapered.
3.2
SUBSTRATE PREPARATION
A.
3.3
Steel Deck:
1. Metal decks shall be a minimum uncoated thickness of 22 gauge
(0.8 mm) and shall have a G-90 galvanized finish on all panels.
GENERAL INSTALLATION
SECTION 07 54 50
3.4
W912HN-09-X-1813
GENERAL INSULATION
A. Do not apply roof insulation or roofing until all other work trades
have completed jobs that require them to traverse the deck on foot or
with equipment.
B.
MEMBRANE APPLICATION
A.
Fully Adhered:
1. Place membrane so that wrinkles and buckles are not formed.
Any wrinkles or buckles must be removed from the sheet prior to
permanent attachment. Roof membrane shall be fully adhered
immediately after it is rolled out, followed by welding to
adjacent sheets.
2. Overlap roof membrane a minimum of 3" for side laps and 3" for
end laps.
3.
4.
Use full width rolls in the field and perimeter region of roof.
W912HN-09-X-1813
FLASHINGS
A. All penetrations shall be at least 2 feet (610 mm) from the curbs,
walls, and edges to provide adequate space for proper flashing.
B. Flash all perimeter, curb, and penetration conditions with coated
metal, membrane flashing, and flashing accessories as appropriate to
the site condition.
C. All coated metal and membrane flashing corners shall be reinforced
with preformed corners or non-reinforced membrane.
D.
W912HN-09-X-1813
General
A.
3.7
Roof Edges
1. Roof edge flashings are applicable for gravel stop and drip
edge conditions as well as for exterior edges of parapet walls.
2. Flash roof edges with metal flanges nailed 4 inches (102 mm)
O.C. to pressure-treated wood nailers. Where required, hot-air
weld roof membrane to coated metal flanges.
3. When the fascia width exceeds 4 inches (102 mm), coated metal
roof edging must be attached with a continuous cleat to secure the
lower fascia edge. The cleat must be secured to the building no
less than 12 inches (305 mm) O.C.
4. Alternatively, roof edges may be flashed with a 2-piece snap
on fascia system, adhering the roof membrane to a metal cant and
face nailing the membrane 8" on center prior to installing a
snap-on fascia.
5. Flash roof edge scuppers with a coated metal insert that is
mechanically attached to the roof edge and integrated as a part of
the metal edging.
ROOF PROTECTION
A. Protect all partially and fully completed roofing work from other
trades until completion.
B. Whenever possible, stage materials in such a manner that foot
traffic is minimized over completed roof areas.
C. When it is not possible to stage materials away from locations
where partial or complete installation has taken place, temporary
walkways and platforms shall be installed in order to protect all
completed roof areas from traffic and point loading during the
application process.
C. Temporary tie-ins shall be installed at the end of each workday and
removed prior to commencement of work the following day.
3.8
CLEAN-UP
A. All work areas are to be kept clean, clear and free of debris at
all times.
B. Do not allow trash, waste, or debris to collect on the roof.
items shall be removed from the roof on a daily basis.
These
W912HN-09-X-1813
MAINTENANCE
A. Inspections to the roof shall be performed annually by a roof
contractor.
B. Submit copies of the roof inspection form, accompanying photographs
(a minimum of 6 photos showing the condition of the roof and critical
details), and a record of all roofing system maintenance to the
contracting office and the roofing manufacturer within sixty (60) days
of the anniversary date of the completion of the roofing system.
Annual roof inspections must be started within the first two (2) years
of the guarantee term.
-- End of Section --
SECTION 07 54 50
W912HN-09-X-1813
SECTION 07 60 00A
*1 FLASHING AND SHEET METAL
08/08
PART 1
1.1
GENERAL
REFERENCES
ASTM B221
ASTM D1784
ASTM D4586
1.2
GENERAL REQUIREMENTS
SUBMITTALS
W912HN-09-X-1813
Gutters; G
Downspouts; G
Gravel stops and fascias; G
Drip edge; G
Indicate thicknesses, dimensions, fastenings and anchoring
methods, expansion joints, and other provisions necessary for
thermal expansion and contraction. Scaled manufacturer's catalog
data may be submitted for factory fabricated items.
SD-11 Closeout Submittals
Quality Control Plan
Submit for sheet metal work in accordance with paragraph entitled
"Field Quality Control."
1.4
PRODUCTS
MATERIALS
Do not use lead, lead-coated metal, or galvanized steel. Use any metal
listed by SMACNA Arch. Manual for a particular item, unless otherwise
specified or indicated. Conform to the requirements specified and to the
thicknesses and configurations established in SMACNA Arch. Manual for the
materials. Different items need not be of the same metal, except that if
copper is selected for any exposed item, all exposed items must be copper.
Furnish sheet metal items in 8 to 10 foot lengths. Single pieces less than
8 feet long may be used to connect to factory-fabricated inside and outside
corners, and at ends of runs. Factory fabricate corner pieces with minimum
12 inch legs.
2.1.1
Drainage
Do not use copper for an exposed item if drainage from that item will pass
over exposed masonry, stonework or other metal surfaces. In addition to
the metals listed in Table I, lead-coated copper may be used for such items.
SECTION 07 60 00
2.1.3
W912HN-09-X-1813
ASTM A653/A653M.
2.1.3.1
Finish
2.1.4.1
Finish
ASTM B221.
2.1.6
ASTM D1784, Type II, Grade 1, Class 14333-D, 0.075 inch minimum thickness.
2.1.7
Fasteners
Use the same metal or a metal compatible with the item fastened.
stainless steel fasteners to fasten dissimilar materials.
PART 3
3.1
3.1.1
Use
EXECUTION
INSTALLATION
Workmanship
Make lines and angles sharp and true. Free exposed surfaces from visible
wave, warp, buckle, and tool marks. Fold back exposed edges neatly to form
a 1/2 inch hem on the concealed side. Make sheet metal exposed to the
weather watertight with provisions for expansion and contraction.
Make surfaces to receive sheet metal plumb and true, clean, even, smooth,
dry, and free of defects and projections. For installation of items not
shown in detail or not covered by specifications conform to the applicable
requirements of SMACNA 1793, Architectural Sheet Metal Manual. Provide
sheet metal flashing in the angles formed where roof decks abut walls,
curbs, ventilators, pipes, or other vertical surfaces and wherever
indicated and necessary to make the work watertight. Join sheet metal
items together as shown in Table II.
SECTION 07 60 00
3.1.2
W912HN-09-X-1813
Nailing
Cleats
Provide cleats for sheet metal 18 inch and over in width. Space cleats
evenly not over 12 inch on center unless otherwise specified or indicated.
Unless otherwise specified, provide cleats of 2 inch wide by 3 inch long
and of the same material and thickness as the sheet metal being installed.
Secure one end of the cleat with two nails and the cleat folded back over
the nailheads. Lock the other end into the seam. Where the fastening is
to be made to concrete or masonry, use screws and drive in expansion
shields set in concrete or masonry. Pretin cleats for soldered seams.
3.1.4
Seams
Straight and uniform in width and height with no solder showing on the face.
3.1.5.1
Flat-lock Seams
Lap Seams
Not less than 3 inch wide; provide minimum one inch movement within the
joint. Completely fill the joints with the specified sealant, applied at
not less than 1/8 inch thick bed.
3.1.5.4
Standing Seams
Not less than one inch high, double locked without solder.
3.1.5.5
Flat Seams
SECTION 07 60 00
3.1.6
3.1.6.1
W912HN-09-X-1813
Aluminum
Do not allow aluminum surfaces in direct contact with other metals except
stainless steel, zinc, or zinc coating. Where aluminum contacts another
metal, paint the dissimilar metal with a primer followed by two coats of
aluminum paint. Where drainage from a dissimilar metal passes over
aluminum, paint the dissimilar metal with a non-lead pigmented paint.
3.1.6.3
Metal Surfaces
Paint surfaces that may become repeatedly wet and in contact with metal
with two coats of aluminum paint or a coat of heavy-bodied bituminous paint.
3.1.7
Provide expansion and contraction joints at not more than 32 foot intervals
for aluminum and at not more than 40 foot intervals for other metals.
Provide an additional joint where the distance between the last expansion
joint and the end of the continuous run is more than half the required
interval. Space joints evenly. Join extruded aluminum gravel stops and
fascias by expansion and contraction joints spaced not more than 12 feet
apart.
3.1.8
Base Flashing
Extend up vertical surfaces of the flashing not less than 8 inch and not
less than 4 inch under the roof covering. Where finish wall coverings form
a counterflashing, extend the vertical leg of the flashing up behind the
applied wall covering not less than 6 inch. Overlap the flashing strips
with the previously laid flashing not less than 3 inch. Fasten the strips
at their upper edge to the deck. Horizontal flashing at vertical surfaces
must extend vertically above the roof surface and fastened at their upper
edge to the deck a minimum of 6 inch on center with hex headed, galvanized
shielded screws a minimum of 2-inch lap of any surface. Solder end laps
and provide for expansion and contraction. Extend the metal flashing over
crickets at the up-slope side of vertical surfaces extending through
sloping roofs, the metal flashings. Extend the metal flashings onto the
roof covering not less than 4.5 inch at the lower side of vertical surfaces
extending through the roof decks. Install and fit the flashings so as to
be completely weathertight. Provide factory-fabricated base flashing for
interior and exterior corners.
3.1.9
Prefabricate in the shapes and sizes indicated and in lengths not less that
8 feet. Extend flange at least 4 inch onto roofing. Provide
SECTION 07 60 00
W912HN-09-X-1813
Provide a metal drip edge, designed to allow water run-off to drip free of
underlying construction, at eaves and rakes prior to the application of
roofing shingles. Apply directly on the wood deck at the eaves and over
the underlay along the rakes. Extend back from the edge of the deck not
more than 3 inch and secure with compatible nails spaced not more than 10
inch on center along upper edge.
3.1.11
Gutters
Downspouts
Terminations
Splash Pans
SECTION 07 60 00
3.1.14
W912HN-09-X-1813
Eave Flashing
Except as specified or indicated otherwise, cover and flash all minor flat,
sloped, or curved surfaces with metal sheets of the material used for
flashing; maximum size of sheets, 16 by 18 inch. Fasten sheets to
sheathing with metal cleats. Lock seams and solder. Lock aluminum seams
as recommended by aluminum manufacturer. Provide an underlayment of
roofing felt for all sheet metal covering.
3.2
PAINTING
CLEANING
REPAIRS TO FINISH
Establish and maintain a Quality Control Plan for sheet metal used in
conjunction with roofing to assure compliance of the installed sheet
metalwork with the contract requirements. Remove work that is not in
compliance with the contract and replace or correct. Include quality
control, but not be limited to, the following:
a.
b.
c.
3.5.1
Procedure
W912HN-09-X-1813
TABLE I.
ZincCoated
Stainless
Steel,
Sheet Metal Items
Aluminum,
Steel,
U.S.
Inch
Inch
Std.
Gage
___________________________________________________________________________
Covering on minor flat,
pitched or curved
surfaces ............
Downspouts and
leaders .............
Downspout clips
and anchors .........
.040
.018
.032
.015
24
.040 clip
.125 anchor
Downspout straps,
2-inch ..............
.060
.050
Flashings:
Base ................
.040
.018
24
.075
.050
.050
.018
.025
24
-
.032
.032
.015
.015
24
24
.032
1 inch by
.080 inch
(c)
1 inch by
.037 inch
.015
24
Steel, Zinc-Coated
Steel and
Stainless
Steel
Aluminum
Remarks
______________________________________________________________________
Joint cap
for
building
1.25 inch
single lock,
standing
1.25 inch
single lock,
standing
SECTION 07 60 00
- - -
W912HN-09-X-1813
Steel, Zinc-Coated
Steel and
Stainless
Steel
Aluminum
Remarks
______________________________________________________________________
expansion
seam, cleated
seam, cleated
joint at
roof
Flashings
Base
One inch
3 inch lap
for expansion
joint
One inch
flat locked,
soldered; sealed;
3 inch lap for
expansion joint
Aluminum producer's
recommended hard
setting sealant for
locked aluminum
joints. Fill
each metal
expansion joint
with a joint
sealing compound
compound.
Eave
Same as base
flashing.
Edge
strip
Butt
Butt
- - -
Gravel
stops:
Extrusions
- - -
Sheet,
smooth
Gutters
Aluminum producers
recommended hard
setting sealant for
locked aluminum
joints.
(a)
W912HN-09-X-1813
Steel, Zinc-Coated
Steel and
Stainless
Steel
Aluminum
Remarks
______________________________________________________________________
recommended sealant.
(b)
SECTION 07 60 00
W912HN-09-X-1813
GENERAL
REFERENCES
ASTM A1011/A1011M
ASTM A36/A36M
ASTM A653/A653M
ASTM A792/A792M
ASTM B117
ASTM D1654
ASTM D2244
ASTM D2247
SECTION 07 61 14.00 20
W912HN-09-X-1813
ASTM D4214
ASTM D522
ASTM D523
ASTM D714
ASTM D968
ASTM E1592
ASTM G 152
ASTM G 153
1.2
1.2.1
DEFINITIONS
Field-Formed Seam
Seams of panels so configured that when adjacent sheets are installed the
seam is sealed utilizing mechanical or hand seamers. Crimped (45 degree
bend), roll formed (180 degree bend), double roll formed (2 - 180 degree
bends), and roll and lock systems are types of field-formed seam systems.
1.2.2
Panels so configured that the male and female portions of the seam
interlock through the application of foot pressure or tamping with a
mallet. Snap-on cap configurations are a type of snap together system.
1.2.3
Pre-Formed
Field-Formed
SECTION 07 61 14.00 20
1.2.5
W912HN-09-X-1813
Roofing System
SYSTEM DESCRIPTION
1.3.1
Design Requirements
a.
b.
c.
Snap together type systems shall have a capillary break and a positive
side lap locking device. Field-formed seam type systems shall be
mechanically locked closed by the manufacturer's locking tool. The
seam shall include a continuous factory applied sealant when required
by the manufacturer to withstand the wind loads specified.
d.
Roof panel anchor clips shall be concealed and designed to allow for
longitudinal thermal movement of the panels, except where specific
fixed points are indicated. Provide for lateral thermal movement in
panel configuration or with clips designed for lateral and longitudinal
movement.
1.3.2
Design Conditions
Wind Uplift
The design uplift pressures for the roof system shall be computed and
applied using a basic wind speed of 95 miles per hour (mph). Roof system
and attachments shall resist the wind loads, in pounds per square foot
(psf) per the structural drawings.
The design uplift force for each connection assembly shall be that pressure
given for the area under consideration, multiplied by the tributary load
area of the connection assembly, and multiplied by the appropriate factor
of safety, as follows:
a.
3.0
b.
SECTION 07 61 14.00 20
2.25
1.3.2.2
W912HN-09-X-1813
Thermal Movement
Deflection
Structural Performance
SUBMITTALS
W912HN-09-X-1813
Sealants
Insulation, including joint sealing measures for vapor barrier
facing
Sample warranty certificate; G
Submit for materials to be provided. Submit data sufficient to
indicate conformance to specified requirements.
SD-04 Samples
Roofing panel
For color selection, submit 2 by 4 inch metal samples in color,
finish and texture specified.
SD-05 Design Data
Design calculations
SD-06 Test Reports
Field Inspection; G
Submit manufacturer's technical representative's field
inspection reports as specified in paragraph entitled
"Manufacturer's Field Inspection."
Structural performance tests
Finish tests
SD-07 Certificates
Manufacturer's Technical Representative's Qualifications
Statement of Installer's Qualifications
Submit documentation from roofing manufacturer proving the
manufacturer's technical representative meets below specified
requirements. Include name, address, telephone number, and
experience record.
Submit documentation proving the installer is factory-trained,
has the specified experience, and authorized by the manufacturer
to install the products specified.
Coil stock compatibility; G
Provide certification of coil compatibility with roll forming
machinery to be used for forming panels without warping, waviness,
and rippling not part of panel profile; to be done without damage,
abrasion or marking of finish coating.
SD-08 Manufacturer's Instructions
Installation manual; G
SECTION 07 61 14.00 20
W912HN-09-X-1813
DESIGN CALCULATIONS
QUALITY ASSURANCE
Preroofing Conference
After submittals are received and approved but before roofing and
insulation work, including associated work, is performed, the Contracting
Officer will hold a preroofing conference to review the following:
a.
b.
c.
d.
Safety requirements
W912HN-09-X-1813
Manufacturer
Installer's Qualifications
Single Source
The term "appearance of base metal" refers to the metal coating on steel.
Panels shall meet the following test requirements:
a.
Formability Test: When subjected to a 180 degree bend over a 1/8 inch
diameter mandrel in accordance with ASTM D522, exterior coating film
shall show only slight microchecking and no loss of adhesion.
b.
c.
d.
W912HN-09-X-1813
After the 2000 -hour weatherometer test, exterior coating color change
shall not exceed 2 NBS units when measured in accordance with ASTM D2244
test procedure.
e.
Salt Spray Test: Withstand a salt spray test for a minimum of 1000
hours in accordance with ASTM B117, including the scribe requirement in
the test. Immediately upon removal of the panel from the test, the
coating shall receive a rating of 8, few blisters in field as
determined by ASTM D714; and an average rating of 7, 1/16 inch failure
at scribe, as determined by ASTM D1654. Rating Schedule No. 1.
f.
g.
h.
i.
WARRANTY
Deliver, store, and handle preformed panels, bulk roofing products and
other manufactured items in a manner to prevent damage or deformation.
SECTION 07 61 14.00 20
1.8.1
W912HN-09-X-1813
Delivery
Storage
Handling
PRODUCTS
ROOFING PANELS
Panels shall have interlocking ribs for securing adjacent sheets. System
for securing the roof covering to structural framing members shall be
concealed clip fastening system with no fasteners penetrating the panels
except at the ridge or eave, rakes, penetrations, and end laps. Backing
plates and ends of panels at end laps shall be predrilled or prepunched;
factory prepare ends of panels to be lapped by trimming part of seam,
die-setting or swaging ends of panels. Length of sheets shall be
sufficient to cover the entire length of any unbroken roof slope when such
slope is 30 feet or less. When length of run exceeds 30 feet, each sheet
in the run shall extend over two or more spans. Sheets longer than 30 feet
may be furnished if approved by the Contracting Officer. Width of sheets
shall provide not less than 12 inches of coverage in place. Height of
corrugations of adjacent roof sheets shall be not less than 1.75 inches
(nominal). Make provisions for expansion and contraction at either ridge
or eave, consistent with the type of system to be used. Panels from coil
stock shall be formed without warping, waviness or ripples not part of the
panel profile and shall be free of damage to the finish coating system.
2.1.1
Material
SECTION 07 61 14.00 20
2.1.2
W912HN-09-X-1813
Texture
Finish
INTERMEDIATE SUPPORTS
ATTACHMENT CLIPS
ACCESSORIES
Closures
Rib Closures
SECTION 07 61 14.00 20
2.4.1.2
W912HN-09-X-1813
Ridge Closures
Metal-clad foam or metal closure with foam secondary closure matching panel
configuration for installation on surface of roof panel between panel ribs
at ridge and headwall roof panel flashing conditions and terminations.
Foam material shall not absorb water.
2.4.2
Fasteners
Screws
Not smaller than No. 14 diameter if self-tapping type and not smaller than
No. 12 diameter if self-drilling and self-tapping.
2.4.2.2
Bolts
Not smaller than 1/4 inch diameter, shouldered or plain shank as required,
with proper nuts.
2.4.2.3
Fasteners for use with explosive actuated tools shall have a shank diameter
of not smaller than 0.145 inch with a shank length of not smaller than 1/2
inch for fastening to steel and not smaller than one inch for fastening to
concrete.
2.4.2.5
Rivets
Blind rivets shall be stainless steel with 1/8 inch nominal diameter shank.
Rivets shall be threaded stem type if used for other than the fastening of
trim. Rivets with hollow stems shall have closed ends.
2.4.3
Sealants
SECTION 07 61 14.00 20
2.4.4
W912HN-09-X-1813
EXECUTION
EXAMINATION
INSTALLATION
Roof Panels
Apply roofing panels with the standing seams parallel to the slope of the
roof. Provide roofing panels in longest practical lengths from ridge to
eaves (top to eaves on shed roofs), with no transverse joints except at the
junction of ventilators, curbs, skylights, chimneys, and similar openings.
Install flashing to assure positive water drainage away from roof
penetrations. Locate panel end laps such that fasteners do not engage
supports or otherwise restrain the longitudinal thermal movement of
panels. Form field-formed seam type system seams in the field with an
automatic mechanical seamer approved by the manufacturer. Attach panels to
the structure with concealed clips incorporated into panel seams. Clip
attachment shall allow roof to move independently of the structure, except
at fixed points as indicated.
SECTION 07 61 14.00 20
3.3.2
W912HN-09-X-1813
Flashings
Flashing Fasteners
CLEANING
W912HN-09-X-1813
squares of total roof area with the exception that follow-up inspections of
previously noted deficiencies or application errors shall be performed as
requested by the Contracting Officer. Each inspection visit shall include
a review of the entire installation to date. After each inspection, a
report, signed by the manufacturer's technical representative, shall be
submitted to the Contracting Officer noting the overall quality of work,
deficiencies and any other concerns, and recommended corrective actions in
detail. Notify Contracting Officer a minimum of 2 working days prior to
site visit by manufacturer's technical representative.
3.7
COMPLETED WORK
Completed work shall be plumb and true without oil canning, dents, ripples,
abrasion, rust, staining, or other damage detrimental to the performance or
aesthetics of the completed roof assembly.
SECTION 07 61 14.00 20
3.8
W912HN-09-X-1813
FORM ONE
FORM 1
1.
Contract Number:
2.
3.
4.
Deck/Substrate Type:
5.
6.
7.
Insulation Manufacturer:
8.
Vapor Retarder:
9.
( )Yes
( )No
From_______________
To_______________
Date:
Inspector's Signature
Date:
_________________________
-- End of Section --
SECTION 07 61 14.00 20
W912HN-09-X-1813
SECTION 07 92 00A
*1 JOINT SEALANTS
01/07
PART 1
1.1
GENERAL
REFERENCES
ASTM D1056
ASTM D2452
ASTM D2453
1.2
SUBMITTALS
W912HN-09-X-1813
ENVIRONMENTAL CONDITIONS
QUALITY ASSURANCE
1.5.1
Verify that each of the sealants are compatible for use with joint
substrates.
1.5.2
Joint Tolerance
Mock-Up
SPECIAL WARRANTY
PRODUCTS
SEALANTS
Provide sealant that has been tested and found suitable for the substrates
to which it will be applied.
2.1.1
Interior Sealant
Location(s) and
COLOR
a.
Match adjacent
wall color
b.
Match adjacent
wall color
SECTION 07 92 00
W912HN-09-X-1813
LOCATION
COLOR
Interior locations, not otherwise indicated
Match adacent
or specified, where small voids exist between wall color
materials specified to be painted.
c.
2.1.2
Exterior Sealant
For joints in vertical surfaces, provide ASTM C920, Type S or M, Grade NS,
Class 25, Use NT. For joints in horizontal surfaces, provide ASTM C920,
Type S or M, Grade P, Class 25, Use T. Provide location(s) and color(s) of
sealant as follows:
LOCATION
COLOR
a.
Match adjacent
wall color
e.
Gray
f.
g.
Match adjacent
wall
i.
Match adjacent
wall color
j.
Match adjacent
wall color
color
2.1.3
b.
2.2
COLOR
Gray
Gray
PRIMERS
BOND BREAKERS
2.4
W912HN-09-X-1813
BACKSTOPS
Rubber
Conform to ASTM D1056, Type 2, closed cell, Class A , Grade , round cross
section for cellular rubber sponge backing.
2.5
CAULKING
CLEANING SOLVENTS
EXECUTION
SURFACE PREPARATION
Clean surfaces from dirt frost, moisture, grease, oil, wax, lacquer, paint,
or other foreign matter that would tend to destroy or impair adhesion.
Remove oil and grease with solvent. Surfaces must be wiped dry with clean
cloths. When resealing an existing joint, remove existing caulk or sealant
prior to applying new sealant. For surface types not listed below, contact
sealant manufacturer for specific recommendations.
3.1.1
Steel Surfaces
Where surfaces have been treated with curing compounds, oil, or other such
materials, remove materials by sandblasting or wire brushing. Remove
laitance, efflorescence and loose mortar from the joint cavity.
SECTION 07 92 00
3.1.4
W912HN-09-X-1813
Wood Surfaces
SEALANT PREPARATION
APPLICATION
Joint Width-To-Depth Ratios
Acceptable Ratios:
JOINT WIDTH
JOINT DEPTH
Minimum
Maximum
1/4 inch
1/2 of
width
1/4 inch
Equal to
width
1/4 inch
1/4 inch
1/4 inch
Equal to
width
1/2 inch
5/8 inch
(As recommended by sealant
manufacturer)
b.
3.3.2
Place masking tape on the finish surface on one or both sides of a joint
cavity to protect adjacent finish surfaces from primer or sealant smears.
Remove masking tape within 10 minutes after joint has been filled and
tooled.
3.3.3
Backstops
Install backstops dry and free of tears or holes. Tightly pack the back or
bottom of joint cavities with backstop material to provide a joint of the
depth specified. Install backstops in the following locations:
a.
Where indicated.
b.
W912HN-09-X-1813
Width-to-Depth Ratios".
3.3.4
Primer
Bond Breaker
Sealants
Protect areas adjacent to joints from sealant smears. Masking tape may be
used for this purpose if removed 5 to 10 minutes after the joint is filled.
3.4.2
Final Cleaning
b.
-- End of Section --
SECTION 07 92 00
W912HN-09-X-1813
SECTION 08 11 13A
*1 STEEL DOORS AND FRAMES
02/10
PART 1
1.1
GENERAL
REFERENCES
ASTM A879/A879M
ASTM A924/A924M
ASTM C578
ASTM C591
ASTM C612
ASTM D2863
SECTION 08 11 13
W912HN-09-X-1813
SDI/DOOR 113
SDI/DOOR A250.11
SDI/DOOR A250.6
SDI/DOOR A250.8
1.2
SUBMITTALS
W912HN-09-X-1813
PRODUCTS
STANDARD STEEL DOORS
2.1.1.1
Provide custom hollow metal doors where nonstandard steel doors are
indicated. At the Contractor's option, custom hollow metal doors may be
provided in lieu of standard steel doors. Door size(s), design(s),
materials, construction, gages, and finish shall be as specified for
standard steel doors and shall comply with the requirement of NAAMM HMMA HMM.
Fill all spaces in doors with insulation. Close top and bottom edges with
steel channels not lighter than 16 gage. Close tops of exterior doors
flush with an additional channel and seal to prevent water intrusion.
Prepare doors to receive hardware specified on the drawings. Doors shall be
1-3/4 inch thick, unless otherwise indicated.
2.3
INSULATION CORES
2.4
W912HN-09-X-1813
a.
b.
c.
Mineral board:
Welded Frames
Form stops and beads from 20 gage steel. Provide for glazed and other
openings in standard steel frames. Secure beads to frames with oval-head,
countersunk Phillips self-tapping sheet metal screws or concealed clips and
fasteners. Space fasteners approximately 12 to 16 inch on center. Miter
molded shapes at corners. Butt or miter square or rectangular beads at
corners.
2.4.3
Anchors
Wall Anchors
Provide at least three anchors for each jamb. For frames which are more
than 7.5 feet in height, provide one additional anchor for each jamb for
each additional 2.5 feet or fraction thereof.
a.
b.
c.
2.4.3.2
Floor Anchors
Provide floor anchors drilled for 3/8 inch anchor bolts at bottom of each
SECTION 08 11 13
W912HN-09-X-1813
jamb member.
2.5
WEATHERSTRIPPING
HARDWARE PREPARATION
FINISHES
Factory-Primed Finish
Fabricate exterior scheduled doors and frames from hot dipped zinc coated
steel, alloyed type, that complies with ASTM A924/A924Mand ASTM A653/A653M.
The coating weight shall meet or exceed the minimum requirements for
coatings having 0.4 ounces per square foot, total both sides, i.e., A40.
Repair damaged zinc-coated surfaces by the application of zinc dust paint.
Thoroughly clean and chemically treat to insure maximum paint adhesion.
Factory prime as specified in SDI/DOOR A250.8.
2.7.3
Finished doors and frames shall be strong and rigid, neat in appearance,
and free from defects, waves, scratches, cuts, dents, ridges, holes, warp,
and buckle. Molded members shall be clean cut, straight, and true, with
joints coped or mitered, well formed, and in true alignment. Dress exposed
welded and soldered joints smooth. Design door frame sections for use with
the wall construction indicated. Corner joints shall be well formed and in
true alignment. Conceal fastenings where practicable.
SECTION 08 11 13
PART 3
3.1
3.1.1
W912HN-09-X-1813
EXECUTION
INSTALLATION
Frames
Set frames in accordance with SDI/DOOR A250.11. Plumb, align, and brace
securely until permanent anchors are set. Anchor bottoms of frames with
expansion bolts or powder-actuated fasteners. Build in or secure wall
anchors to adjoining construction.
3.1.2
Doors
PROTECTION
Protect doors and frames from damage. Repair damaged doors and frames
prior to completion and acceptance of the project or replace with new, as
directed. Wire brush rusted frames until rust is removed. Clean
thoroughly. Apply an all-over coat of rust-inhibitive paint of the same
type used for shop coat.
3.3
CLEANING
SECTION 08 11 13
W912HN-09-X-1813
SECTION 08 91 00A
*1 METAL WALL LOUVERS
05/11
PART 1
1.1
GENERAL
REFERENCES
AMCA 511
AAMA 2603
1.2
SUBMITTALS
and blemishes.
1.4
W912HN-09-X-1813
DETAIL DRAWINGS
COLOR SAMPLES
Colors of finishes for wall louvers and door louvers shall closely
approximate colors indicated. Where color is not indicated, submit the
manufacturer's standard colors to the Contracting Officer for selection.
PART 2
2.1
PRODUCTS
MATERIALS
2.1.1
Aluminum Sheet
ASTM B209, alloy 3003 or 5005 with temper as required for forming.
2.2
Weather resistant type, with bird screens and made to withstand a wind load
of not less than 30 pounds per square foot. Wall louvers shall bear the
AMCA certified ratings program seal for air performance and water
penetration in accordance with AMCA 500-D and AMCA 511. The rating shall
show a water penetration of 0.20 or less ounce per square foot of free area
at a free velocity of 800 feet per minute.
2.2.1
Formed of steel sheet not thinner than 16 U.S. gage, or aluminum sheet not
less than 0.08 inch thick.
2.2.2
For aluminum louvers, provide 1/2 inch square mesh, 14 or 16 gage aluminum
or 1/4 inch square mesh, 16 gage aluminum bird screening. Mount screens in
removable, rewirable frames of same material and finish as the louvers.
2.3
Provide stainless steel screws and fasteners for aluminum louvers and
zinc-coated or stainless steel screws and fasteners for steel louvers.
Provide other accessories as required for complete and proper installation.
2.4
FINISHES
2.4.1
Aluminum
Organic Coating
Clean and prime exposed aluminum surfaces. Provide a baked enamel finish
conforming to AAMA 2603, with total dry film thickness not less than 0.8 mil,
SECTION 08 91 00
W912HN-09-X-1813
EXECUTION
INSTALLATION
Wall Louvers
Aluminum
Where aluminum contacts metal other than zinc, paint the dissimilar metal
with a primer and two coats of aluminum paint.
3.2.3
Metal
Wood
Paint wood or other absorptive materials that may become repeatedly wet and
in contact with metal with two coats of aluminum paint or a coat of
heavy-bodied bituminous paint.
-- End of Section --
SECTION 08 91 00
W912HN-09-X-1813
SECTION 09 90 00A
*1 PAINTS AND COATINGS
05/11
PART 1
1.1
GENERAL
REFERENCES
ASTM D4444
ASTM D523
ASTM D6386
MPI 23
MPI 47
MPI 48
MPI 79
MPI 9
MPI 94
SECTION 09 90 00
W912HN-09-X-1813
SSPC QP 1
SSPC SP 1
SSPC SP 2
SSPC SP 3
SSPC VIS 1
SSPC VIS 3
Air Contaminants
SUBMITTALS
W912HN-09-X-1813
that will review the submittal for the Government. The following shall be
submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
The current MPI, "Approved Product List" which lists paint by brand, label,
product name and product code as of the date of contract award, will be
used to determine compliance with the submittal requirements of this
specification. The Contractor may choose to use a subsequent MPI "Approved
Product List", however, only one list may be used for the entire contract
and each coating system is to be from a single manufacturer. All coats on
a particular substrate must be from a single manufacturer. No variation
from the MPI Approved Products List is acceptable.
Samples of specified materials may be taken and tested for compliance with
specification requirements.
SD-02 Shop Drawings
Submit color stencil codes
SD-03 Product Data
Coating; G
Sealant
SD-04 Samples
Color; G
Submit manufacturer's samples of paint colors.
color samples to color scheme as indicated.
1.3
1.3.1
Cross reference
APPLICATOR'S QUALIFICATIONS
Contractor Qualification
Submit the name, address, telephone number, FAX number, and e-mail address
of the contractor that will be performing all surface preparation and
coating application. Submit evidence that key personnel have successfully
performed surface preparation and application of coatings on a minimum of
three similar projects within the past three years. List information by
individual and include the following:
a.
b.
SECTION 09 90 00
W912HN-09-X-1813
1.3.2
SSPC QP 1 Certification
QUALITY ASSURANCE
1.4.1
The Contracting Officer may choose up to two coatings that have been
delivered to the site to be tested at no cost to the Government. Take
samples of each chosen product as specified in the paragraph "Sampling
Procedures." Test each chosen product as specified in the paragraph
"Testing Procedure." Products which do not conform, shall be removed from
the job site and replaced with new products that conform to the referenced
specification. Testing of replacement products that failed initial testing
shall be at no cost to the Government.
1.4.1.1
Sampling Procedure
The Contracting Officer will select paint at random from the products that
have been delivered to the job site for sample testing. The Contractor
shall provide one quart samples of the selected paint materials. The
samples shall be taken in the presence of the Contracting Officer, and
labeled, identifying each sample. Provide labels in accordance with the
paragraph "Packaging, Labeling, and Storage" of this specification.
1.4.1.2
Testing Procedure
SECTION 09 90 00
W912HN-09-X-1813
Submit name, address, telephone number, FAX number, and e-mail address of
the independent third party laboratory selected to perform testing of
coating samples for compliance with specification requirements. Submit
documentation that laboratory is regularly engaged in testing of paint
samples for conformance with specifications, and that employees performing
testing are qualified. If the Contractor chooses MPI to perform the Batch
Quality Conformance testing, the above submittal information is not
required, only a letter is required from the Contractor stating that MPI
will perform the testing.
1.5
1.5.1
REGULATORY REQUIREMENTS
Environmental Protection
Lead Content
Do not use coatings having a lead content over 0.06 percent by weight of
nonvolatile content.
1.5.3
Chromate Content
Asbestos Content
Mercury Content
Silica
Human Carcinogens
Materials shall not contain ACGIH 0100 confirmed human carcinogens (A1) or
suspected human carcinogens (A2).
1.6
1.7
W912HN-09-X-1813
Toxic Materials
b.
29 CFR 1910.1000.
c.
1.8
ENVIRONMENTAL CONDITIONS
Coatings
b.
1.9
1.9.1
b.
c.
W912HN-09-X-1813
1.9.1.1
Exterior Painting
Interior Painting
b.
1.9.2
Painting Excluded
b.
c.
d.
e.
1.9.3
b.
(2)
(3)
(2)
(3)
SECTION 09 90 00
1.9.4
1.9.4.1
W912HN-09-X-1813
Coating
DFT or dft
Dry film thickness, the film thickness of the fully cured, dry paint or
coating.
1.9.4.5
DSD
EPP
EXT
INT
micron / microns
SECTION 09 90 00
1.9.4.10
W912HN-09-X-1813
mil / mils
mm
MPI system of defining gloss. Seven (7) gloss levels (G1 to G7) are
generically defined under the Evaluation sections of the MPI Manuals.
Traditionally, Flat refers to G1/G2, Eggshell refers to G3, Semigloss
refers to G5, and Gloss refers to G6.
Gloss levels are defined by MPI as follows:
Gloss Level
Description
Units at 60
degrees
Units at 85
degrees
G1
Matte or Flat 0 to 5
10 max
G2
Velvet
0 to 10
10 to 35
G3
Eggshell
10 to 25
10 to 35
G4
Satin
20 to 35
35 min
G5
Semi-Gloss
35 to 70
G6
Gloss
70 to 85
G7
High Gloss
The MPI coating system number in each Division found in either the MPI
Architectural Painting Specification Manual or the Maintenance Repainting
Manual and defined as an exterior (EXT/REX) or interior system (INT/RIN).
The Division number follows the CSI Master Format.
1.9.4.14
Paint
REX
SECTION 09 90 00
1.9.4.16
W912HN-09-X-1813
RIN
PRODUCTS
MATERIALS
EXECUTION
PROTECTION OF AREAS AND SPACES NOT TO BE PAINTED
a.
b.
Surfaces With More Than 20 Percent Rust, Mill Scale, and Other Foreign
Substances: Clean entire surface in accordance with SSPC SP 6/NACE No.3
/SSPC SP 12/NACE No.5 WJ-3SSPC SP 10/NACE No. 2/SSPC SP 12/NACE No.5
WJ-2.
3.2.2
For tool cleaned surfaces, the requirements are stated in SSPC SP 2 and
SSPC SP 3. As a visual reference, cleaned surfaces shall be similar to
photographs in SSPC VIS 3.
For abrasive blast cleaned surfaces, the requirements are stated in
SSPC SP 7/NACE No.4, SSPC SP 6/NACE No.3, and SSPC SP 10/NACE No. 2. As a
visual reference, cleaned surfaces shall be similar to photographs in
SSPC VIS 1.
For waterjet cleaned surfaces, the requirements are stated in
SSPC SP 12/NACE No.5. As a visual reference, cleaned surfaces shall be
similar to photographs in SSPC VIS 4/NACE VIS 7.
SECTION 09 90 00
3.2.3
W912HN-09-X-1813
Galvanized Surfaces
a.
New Galvanized Surfaces With Only Dirt and Zinc Oxidation Products:
Clean with solvent, steam, or non-alkaline detergent solution in
accordance with SSPC SP 1. If the galvanized metal has been passivated
or stabilized, the coating shall be completely removed by brush-off
abrasive blast. New galvanized steel to be coated shall not be
"passivated" or "stabilized" If the absence of hexavalent stain
inhibitors is not documented, test as described in ASTM D6386, Appendix
X2, and remove by one of the methods described therein.
b.
c.
3.2.4
Remove chalk, mildew, and other loose material by washing with a solution of
1/2 cup trisodium phosphate, 1/4 cup household detergent, one quart 5
percent sodium hypochlorite solution and 3 quarts of warm water.
3.3
3.3.1
a.
c.
d.
W912HN-09-X-1813
e.
Cracks and Nailheads: Set and putty stop nailheads and putty cracks
after the prime coat has dried.
f.
g.
3.4
3.4.1
(1)
(2)
Open Joints and Other Openings: Fill with whiting putty, linseed
oil putty. Sand smooth after putty has dried.
(3)
Prime Coat For New Exterior Surfaces: Prime coat frames, and trim
before wood becomes dirty, warped, or weathered.
APPLICATION
Coating Application
a.
b.
c.
d.
3.4.2
W912HN-09-X-1813
Paints of
Two-Component Systems
Coating Systems
Systems by Substrates: Apply coatings that conform to the respective
specifications listed in the following Tables:
Table
EXTERIOR
Division 3.
Division 4.
Division 5.
Division 6.
Division 9.
Division 10. Exterior Cloth Coverings and Bituminous Coated Surfaces Paint
Table
INTERIOR
Division 3.
Division 4.
Division 5.
Division 6.
Division 10. Interior Plaster, Gypsum Board, Textured Surfaces Paint Table
b.
c.
d.
SECTION 09 90 00
e.
3.5
W912HN-09-X-1813
(1)
(2)
(3)
Apply specified ferrous metal primer on the same day that surface is
cleaned, to surfaces that meet all specified surface preparation
requirements at time of application.
b.
c.
d.
Surface Previously Coated with Epoxy or Urethane: Apply MPI 101, 1.5
mils DFT immediately prior to application of epoxy or urethane coatings.
e.
Pipes and Tubing: The semitransparent film applied to some pipes and
tubing at the mill is not to be considered a shop coat, but shall be
overcoated with the specified ferrous-metal primer prior to application
of finish coats.
f.
3.6
PAINT TABLES
All DFT's are minimum values. Use only materials having a minimum MPI
"Environmentally Friendly" rating based on VOC (EPA Method 24) content
levels. Acceptable products are listed in the MPI Green Approved Products
List, available at http://www.specifygreen.com/APL/ProductIdxByMPInum.asp.
3.6.1
DIVISION 5:
SECTION 09 90 00
DIVISION 5:
1.
W912HN-09-X-1813
Alkyd
Intermediate: MPI 94
Topcoat: MPI 94
5.25 mils
Intermediate: MPI 9
Topcoat: MPI 9
5.25 mils
B.
1.
Alkyd
System DFT:
Intermediate: MPI 94
Topcoat: MPI 94
5.25 mils
3.6.2
Intermediate: MPI 9
Topcoat: MPI 9
5.25 mils
DIVISION 5:
SECTION 09 90 00
DIVISION 5:
W912HN-09-X-1813
MPI 23
System DFT:
Intermediate: MPI 47
Topcoat: MPI 47
5.25 mils
MPI 23
System DFT:
Intermediate: MPI 48
Topcoat: MPI 48
5.25 mils
-- End of Section --
SECTION 09 90 00
W912HN-09-X-1813
SECTION 13 12 50A
*1 ANGLE FRAME BLEACHERS
05/11
PART 1
1.1
GENERAL
References
ASTM A 325
ASTM B 209
1.2
SUBMITTALS
SECTION 13 12 50
PART 2
2.1
W912HN-09-X-1813
PRODUCTS
GENERAL
Section includes:
1.
2.2
2.2.1
PERFORMANCE REQUIREMENTS
Design Loads
1. Design to withstand, with or without live loads, the horizontal and
uplift pressures due to the wind based on the most current revision of
ASCE 7.
2. Live Load - Seat and foot boards: Not less than 120 lbs per lineal
foot.
3. Horizontal swaying force - parallel to the length of the seats: 24
lbs per lineal foot.
4. Guard rails: Vertical load of 100 per lineal foot and a horizontal
thrust of 50 per square foot acting outwardly at the top of the rail.
2.3
2.3.1
QUALITY ASSURANCE
Manufacturer Qualifications
Installer Qualifications
Regulatory Requirements
PROJECT CONDITIONS
SECTION 13 12 50
2.6
W912HN-09-X-1813
WARRANTY
Duration
MATERIALS
Steel
Aluminum
2.8
2.8.1
Hardware
1.
2.
3.
1 3/4 inch by 1 3/4 inch welded steel angle frame spaced no greater than 6
feet centers and cross-braced to laterally support adjacent frames.
2.8.3
2 1/2 inch by 2 inch by 3/16 inch meeting loading requirements and for
strength.
2.8.4
Cross Bracing
Structural aluminum angle 1 3/4 inch by 1 3/4 inch by 3/16 inch, bolted at
ends and centers to the adjacent frame.
2.8.5
Decking
W912HN-09-X-1813
Seating
2.8.6.1
Bench
Guardrails/Handrails
1. 1 5/8" 0.D. anodized aluminum pipe with end plugs and elbows at
corners. Secure to angle rail posts with galvanized fasteners.
2. Furnish on sides of the bleacher including stairs, ramps, portals
and landings.
3. Provide guardrails at the back and sides of the bleacher 42 inches
high measured above the center of the seat board surface.
4. Install guardrails at least 42 inches above the elevated front
footrests.
5. 2 inch by 9 gauge galvanized chain link fencing fastened with
aluminum ties and galvanized tension bars and aluminum rail clamps on
all sides of the bleacher.
6.
2.8.8
Stairs
Fence and Pipe Rail System that conforms to applicable codes as shown on
the Contract Drawings.
2.8.9
1.
2.
Anchoring
2.9
FINISHES
Galvanized Finish.
2.9.2
W912HN-09-X-1813
EXAMINATION
PREPARATION
INSTALLATION
PROTECTION
SECTION 13 12 50
W912HN-09-X-1813
SECTION 26 20 00A
*1 INTERIOR DISTRIBUTION SYSTEM
08/08
PART 1
1.1
GENERAL
REFERENCES
ASTM B8
ASTM D709
IEEE 81
IEEE C2
ANSI C12.7
ANSI C80.1
ANSI C80.3
NEMA 250
NEMA FU 1
NEMA ICS 1
NEMA ICS 6
SECTION 26 20 00
W912HN-09-X-1813
NEMA KS 1
NEMA TC 2
NEMA TC 3
NEMA WD 1
NEMA WD 6
NEMA Z535.4
NFPA 70E
NFPA 780
UL 1
UL 1242
UL 20
UL 360
UL 4248
UL 467
UL 486A-486B
UL 486C
UL 489
W912HN-09-X-1813
UL 498
UL 50
UL 510
UL 514B
UL 6
UL 651
UL 67
UL 797
UL 83
UL 869A
UL 870
UL 943
1.2
DEFINITIONS
SUBMITTALS
W912HN-09-X-1813
Circuit breakers
Switches
SD-06 Test Reports
600-volt wiring test
Grounding system test
Transformer tests
Ground-fault receptacle test
1.4
QUALITY ASSURANCE
1.4.1
Regulatory Requirements
Standard Products
Alternative Qualifications
Products having less than a 2-year field service record will be acceptable
if a certified record of satisfactory field operation for not less than
6000 hours, exclusive of the manufacturers' factory or laboratory tests, is
furnished.
1.4.2.2
WARRANTY
W912HN-09-X-1813
PRODUCTS
MATERIALS AND EQUIPMENT
2.2.1.1
ANSI C80.1, UL 6.
2.2.2
UL 1.
2.2.5.1
UL 360.
2.2.6
Threaded-type.
2.2.6.2
SECTION 26 20 00
2.3
W912HN-09-X-1813
Volume greater than 100 cubic inches, UL 50, hot-dip, zinc-coated, if sheet
steel.
2.4
Wires and cables shall meet applicable requirements of NFPA 70 and UL for
type of insulation, jacket, and conductor specified or indicated. Wires
and cables manufactured more than 12 months prior to date of delivery to
site shall not be used.
2.4.1
Conductors
Conductors No. 8 AWG and larger diameter shall be stranded. Conductors No.
10 AWG and smaller diameter shall be solid. Conductor sizes and capacities
shown are based on copper, unless indicated otherwise. All conductors
shall be copper.
2.4.1.1
Aluminum Conductors
Minimum size for branch circuits shall be No. 12 AWG; for Class 1
remote-control and signal circuits, No. 14 AWG; for Class 2 low-energy,
remote-control and signal circuits, No. 16 AWG; and for Class 3 low-energy,
remote-control, alarm and signal circuits, No. 22 AWG.
2.4.2
Color Coding
Insulation
Bonding Conductors
ASTM B1, solid bare copper wire for sizes No. 8 AWG and smaller diameter;
SECTION 26 20 00
W912HN-09-X-1813
ASTM B8, Class B, stranded bare copper wire for sizes No. 6 AWG and larger
diameter.
2.5
DEVICE PLATES
Provide UL listed, one-piece device plates for outlets to suit the devices
installed.
2.7
2.7.1
SWITCHES
Toggle Switches
Disconnect Switches
FUSES
Fuses
Fuseholders
UL 198M, Class T for zero to 1,200 amperes, 300 volts; and zero to 800
amperes, 600 volts.
SECTION 26 20 00
2.9
W912HN-09-X-1813
RECEPTACLES
Weatherproof Receptacles
UL 943, duplex type for mounting in standard outlet box. Device shall be
capable of detecting current leak of 6 milliamperes or greater and tripping
per requirements of UL 943 for Class A GFCI devices. Provide screw-type,
side-wired wiring terminals.
2.10
PANELBOARDS
Enclosure
W912HN-09-X-1813
shall be mounted on hinges that expose only the hinge roll to view when the
door is closed. Each door shall be fitted with a combined catch and lock,
except that doors over 24 inches long shall be provided with a three-point
latch having a knob with a T-handle, and a cylinder lock. Two keys shall
be provided with each lock, and all locks shall be keyed alike.
Finished-head cap screws shall be provided for mounting the panelboard
fronts on the cabinets.
2.10.2
Panelboard Buses
Support bus bars on bases independent of circuit breakers. Main buses and
back pans shall be designed so that breakers may be changed without
machining, drilling, or tapping. Provide isolated neutral bus in each
panel for connection of circuit neutral conductors. Provide separate
ground bus identified as equipment grounding bus per UL 67 for connecting
grounding conductors; bond to steel cabinet.
2.10.3
Circuit Breakers
Multipole Breakers
MANUFACTURER'S NAMEPLATE
WARNING SIGNS
Provide warning signs for flash protection in accordance with NFPA 70E and
SECTION 26 20 00
W912HN-09-X-1813
WIREWAYS
UL 870. Material shall be steel galvanized 16 gauge for heights and depths
up to 6 by 6 inches, and 14 gauge for heights and depths up to 12 by 12
inches. Provide in length required for the application with screw- cover
NEMA 3R enclosure per NEMA ICS 6.
2.16
ANSI C12.7. Provide NEMA Type 3R, box-mounted socket, ringless, having
jaws compatible with requirements of a class: Flint Electric EMC self
contained watthour meter. Provide gray plastic closing cover and bypass
links. Provide manufacturers standard enclosure color unless otherwise
indicated.
2.17
EXECUTION
INSTALLATION
Underground Service
SECTION 26 20 00
3.1.2.1
W912HN-09-X-1813
Labels
Wiring Methods
Pull Wire
Install pull wires in empty conduits. Pull wire shall be plastic having
minimum 200-pound force tensile strength. Leave minimum 36 inches of slack
at each end of pull wire.
3.1.4
Conduit Installation
3.1.4.1
a.
b.
c.
Do not use in areas subject to severe physical damage including but not
limited to equipment rooms where moving or replacing equipment could
physically damage the EMT.
d.
3.1.4.2
a.
3.1.4.3
SECTION 26 20 00
3.1.4.5
W912HN-09-X-1813
PVC, Type-EPC 40, galvanized rigid steel or steel IMC. Underground portion
shall be encased in minimum of 3 inches of concrete and shall be installed
minimum 18 inches below slab or grade.
3.1.4.6
Conduit Support
Fasten conduits to sheet metal boxes and cabinets with two locknuts where
required by NFPA 70, where insulated bushings are used, and where bushings
cannot be brought into firm contact with the box; otherwise, use at least
minimum single locknut and bushing. Locknuts shall have sharp edges for
digging into wall of metal enclosures. Install bushings on ends of
conduits, and provide insulating type where required by NFPA 70.
SECTION 26 20 00
3.1.4.10
W912HN-09-X-1813
Flexible Connections
Provide flexible steel conduit between 3 and 6 feet in length for recessed
and semirecessed lighting fixtures; for equipment subject to vibration,
noise transmission, or movement. Install flexible conduit to allow 20
percent slack. Minimum flexible steel conduit size shall be 1/2 inch
diameter. Provide liquidtight flexible conduit in wet and damp locations
for equipment subject to vibration, noise transmission, or movement.
Provide separate ground conductor across flexible connections.
3.1.5
Provide boxes in wiring and raceway systems wherever required for pulling
of wires, making connections, and mounting of devices or fixtures. Boxes
for metallic raceways shall be cast-metal, hub-type when located in wet
locations, when surface mounted on outside of exterior surfaces, and when
specifically indicated. Boxes in other locations shall be sheet steel.
Each box shall have volume required by NFPA 70 for number of conductors
enclosed in box. Boxes for mounting lighting fixtures shall be minimum 4
inches square, or octagonal, except that smaller boxes may be installed as
required by fixture configurations, as approved. Boxes for use in
masonry-block shall be square-cornered, tile-type, or standard boxes having
square-cornered, tile-type covers. Provide gaskets for cast-metal boxes
installed in wet locations and boxes installed flush with outside of
exterior surfaces. Provide separate boxes for flush or recessed fixtures
when required by fixture terminal operating temperature; fixtures shall be
readily removable for access to boxes unless ceiling access panels are
provided. Support boxes and pendants for surface-mounted fixtures on
suspended ceilings independently of ceiling supports. Fasten boxes and
supports with bolts and expansion shields on concrete or brick, with toggle
bolts on hollow masonry units, and with machine screws or welded studs on
steel. In open overhead spaces, cast boxes threaded to raceways need not be
separately supported except where used for fixture support sheet metal
boxes directly from building structure or by bar hangers.
When
penetrating reinforced concrete members, avoid cutting reinforcing steel.
3.1.5.1
Boxes
Boxes for other than lighting fixture outlets shall be minimum 4 inches
square, except that 4 by 2 inch boxes may be used where only one raceway
enters outlet. Telecommunications outlets shall be a minimum of 4 inches
square by 2 1/8 inches deep. Mount outlet boxes flush in finished walls.
3.1.5.2
Pull Boxes
Mounting Heights
3.1.7
W912HN-09-X-1813
Conductor Identification
Marking Strips
Splices
Electrical Penetrations
W912HN-09-X-1813
Ground Rods
Grounding Connections
b.
3.1.11.3
Resistance
W912HN-09-X-1813
Test wiring rated 600 volt and less to verify that no short circuits or
accidental grounds exist. 3.5.3
Ground-Fault Receptacle Test
Test ground-fault receptacles with a "load" (such as a plug in light) to
verify that the "line" and "load" leads are not reversed.
3.5.4
SECTION 26 20 00
W912HN-09-X-1813
GENERAL
REFERENCES
NFPA 780
UL 467
UL 96
UL 96A
UL Electrical Constructn
1.2
SUBMITTALS
W912HN-09-X-1813
QUALITY ASSURANCE
PRODUCTS
STANDARD PRODUCTS
MATERIALS
2.2.1
General Requirements
Copper
Aluminum
Aluminum shall not be allowed except for use above ground on fabric covered
SECTION 26 41 01.00 10
W912HN-09-X-1813
structures.
2.2.3
Air Terminals
Ground Rods
Connectors
EXECUTION
EXAMINATION
After becoming familiar with all details of the work, verify all dimensions
in the field, and advise the Contracting Officer of any discrepancy before
performing the work. No departures shall be made without the prior
approval of the Contracting Officer.
3.2
INTEGRAL SYSTEM
3.2.1
General Requirements
Air Terminals
Air terminal design and support shall be in accordance with NFPA 780.
Terminals shall be rigidly connected to, and made electrically continuous
with, roof conductors by means of pressure connectors or crimped joints of
T-shaped malleable metal and connected to the air terminal by a dowel or
SECTION 26 41 01.00 10
W912HN-09-X-1813
threaded fitting. Air terminals at the ends of the structure shall be set
not more than 2 feet from the ends of the ridge or edges and corners of
roofs. Spacing of air terminals less than 2 feet in height on ridges,
parapets, and around the perimeter of buildings with flat roofs shall not
exceed 20 feet. On large, flat or gently sloping roofs, as defined in
NFPA 780, air terminals shall be placed at points of the intersection of
imaginary lines dividing the surface into rectangles having sides not
exceeding 50 feet in length. Air terminals shall be secured against
overturning either by attachment to the object to be protected or by means
of a substantial tripod or other braces permanently and rigidly attached to
the building or structure. Metal projections and metal parts of buildings
and other metal objects that do not contain hazardous materials and that
may be struck but not appreciably damaged by lightning, need not be
provided with air terminals. However, these metal objects shall be bonded
to the lightning conductor through a metal conductor of the same unit
weight per length as the main conductor.
3.2.1.2
Roof Conductors
Down Conductors
W912HN-09-X-1813
Ground Connections
Grounding Electrodes
Metal Roofs
Metal roofs which are in the form of sections insulated from each other
shall be made electrically continuous by bonding. Air terminals shall be
connected to, and made electrically continuous with, the metal roof as well
as the roof conductors and down conductors. Ridge cables and roof
conductors shall be bonded to the roof at the upper and lower edges of the
roof and at intervals not to exceed 100 feet. The down conductors shall be
bonded to roof conductors and to the lower edge of the metal roof. Where
the metal of the roof is in small sections, the air terminals and down
conductors shall have connections made to at least four of the sections.
All connections shall have electrical continuity and have a surface contact
of at least 3 square inch.
SECTION 26 41 01.00 10
3.2.3
W912HN-09-X-1813
INSPECTION
SECTION 26 41 01.00 10
W912HN-09-X-1813
SECTION 26 51 00A
*1 INTERIOR LIGHTING
07/07
PART 1
1.1
GENERAL
REFERENCES
IEEE C2
IEEE C62.41.1
IEEE C62.41.2
NEMA C136.10
W912HN-09-X-1813
Testing
NEMA LL 1
Energy Star
UL 773
UL 773A
UL 935
1.2
RELATED REQUIREMENTS
DEFINITIONS
a.
b.
Average life is the time after which 50 percent will have failed and 50
percent will have survived under normal conditions.
c.
Total harmonic distortion (THD) is the root mean square (RMS) of all
the harmonic components divided by the total fundamental current.
1.4
1.4.1
SYSTEM DESCRIPTION
Lighting Control System
SECTION 26 51 00
1.5
W912HN-09-X-1813
SUBMITTALS
1.6
1.6.1
QUALITY ASSURANCE
Fluorescent Electronic Ballasts
W912HN-09-X-1813
Regulatory Requirements
Standard Products
Alternative Qualifications
Products having less than a 2-year field service record will be acceptable
if a certified record of satisfactory field operation for not less than
6000 hours, exclusive of the manufacturers' factory or laboratory tests, is
furnished.
1.6.3.2
Energy Efficiency
Comply with National Energy Policy Act and Energy Star requirements for
lighting products. Submit documentation for Energy Star qualifications for
equipment provided under this section. Submit data indicating lumens per
watt efficiency and color rendition index of light source.
1.7
WARRANTY
SECTION 26 51 00
1.7.1
W912HN-09-X-1813
Environmental Data
PRODUCTS
FLUORESCENT LIGHTING FIXTURES
UL 1598.
2.1.1
Ballast shall comply with UL 935, NEMA ANSLG C82.11, NFPA 70, and
CEC Title 24 unless specified otherwise. Ballast shall be 100 percent
electronic high frequency type with no magnetic core and coil
components. Ballast shall provide transient immunity as recommended by
IEEE C62.41.1 and IEEE C62.41.2. Ballast shall be designed for the
wattage of the lamps used in the indicated application. Ballasts shall
be designed to operate on the voltage system to which they are
connected.
b.
c.
d.
e.
SECTION 26 51 00
W912HN-09-X-1813
f.
g.
h.
i.
j.
2.1.1.1
a.
b.
Input wattage.
2.1.2
a.
1.
2.
3.
4.
Fluorescent Lamps
T-8 rapid start low mercury lamps shall be rated 32 watts (maximum),
2800 initial lumens (minimum), CRI of 75 (minimum), color temperature
of 3500 K, and an average rated life of 20,000 hours. Low mercury
lamps shall have passed the EPA Toxicity Characteristic Leachate
Procedure (TCLP) for mercury by using the lamp sample preparation
procedure described in NEMA LL 1.
SWITCHES
Toggle Switches
PHOTOCELL SWITCH
W912HN-09-X-1813
EQUIPMENT IDENTIFICATION
Manufacturer's Nameplate
Labels
Lamp diameter code (T-4, T-5, T-8, T-12), tube configuration (twin,
quad, triple), base type, and nominal wattage for fluorescent and
compact fluorescent luminaires.
b.
c.
Correlated color temperature (CCT) and color rendering index (CRI) for
all luminaires.
All markings related to lamp type shall be clear and located to be readily
visible to service personnel, but unseen from normal viewing angles when
lamps are in place. Ballasts shall have clear markings indicating
multi-level outputs and indicate proper terminals for the various outputs.
2.5
EXECUTION
INSTALLATION
Electrical installations shall conform to IEEE C2, NFPA 70, and to the
requirements specified herein.
3.1.1
Lamps
Lamps of the type, wattage, and voltage rating indicated shall be delivered
to the project in the original cartons and installed just prior to project
completion. Lamps installed and used for working light during construction
shall be replaced prior to turnover to the Government if more than 15
percent of their rated life has been used. Lamps shall be tested for
proper operation prior to turn-over and shall be replaced if necessary with
new lamps from the original manufacturer. Provide 10 percent spare lamps
of each type from the original manufacturer.
3.1.2
Lighting Fixtures
Set lighting fixtures level with ceiling and walls, in alignment with
SECTION 26 51 00
W912HN-09-X-1813
Ballasts
3.1.3.1
-- End of Section --
SECTION 26 51 00
W912HN-09-X-1813
SECTION 31 00 00A
*1 EARTHWORK
08/08
PART 1
1.1
GENERAL
REFERENCES
AASHTO T 224
ASTM C33/C33M
ASTM D1140
ASTM D1556
ASTM D1557
ASTM D1883
ASTM D2487
ASTM D422
W912HN-09-X-1813
Soils
ASTM D4318
ASTM D6938
ASTM D698
EPA SW-846.3-3
1.2
1.2.1
DEFINITIONS
Satisfactory Materials
Unsatisfactory Materials
Degree of Compaction
W912HN-09-X-1813
sieve, express the degree of compaction for material having more than 30
percent by weight of their particles retained on the 3/4 inch sieve as a
percentage of the maximum density in accordance with AASHTO T 180 and
corrected with AASHTO T 224. To maintain the same percentage of coarse
material, use the "remove and replace" procedure as described in NOTE 8 of
Paragraph 7.2 in AASHTO T 180.
1.2.5
Topsoil
Material suitable for topsoils obtained from offsite areas is defined as:
Natural, friable soil representative of productive, well-drained soils in
the area, free of subsoil, stumps, rocks larger than one inch diameter,
brush, weeds, toxic substances, and other material detrimental to plant
growth. Amend topsoil pH range to obtain a pH of 5.5 to 7.
1.2.6
Hard/Unyielding Materials
Rock
Unstable Material
Unstable materials are too wet to properly support the utility pipe,
conduit, or appurtenant structure.
1.2.9
1.2.9.1
Select granular material consist of materials classified as GW, GP, SW, SP,
by ASTM D2487 where indicated. The liquid limit of such material must not
exceed 35 percent when tested in accordance with ASTM D4318. The
plasticity index must not be greater than 12 percent when tested in
accordance with ASTM D4318, and not more than 35 percent by weight may be
finer than No. 200 sieve when tested in accordance with ASTM D1140.
1.2.9.2
SECTION 31 00 00
1.2.10
W912HN-09-X-1813
Expansive Soils
Expansive soils are defined as soils that have a plasticity index equal to
or greater than 12 when tested in accordance with ASTM D4318.
1.3
SYSTEM DESCRIPTION
Subsurface soil boring logs are shown on the drawings . These data
represent the best subsurface information available; however, variations
may exist in the subsurface between boring locations.
1.3.1
Classification of Excavation
Common Excavation
Include common excavation with the satisfactory removal and disposal of all
materials not classified as rock excavation.
1.3.1.2
Rock Excavation
Blasting
1.3.3
W912HN-09-X-1813
SUBMITTALS
PRODUCTS
REQUIREMENTS FOR OFFSITE SOILS
Test offsite soils brought in for use as backfill for Total Petroleum
Hydrocarbons (TPH), Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and
full Toxicity Characteristic Leaching Procedure (TCLP) including
ignitability, corrosivity and reactivity. Backfill shall contain a maximum
of 100 parts per million (ppm) of total petroleum hydrocarbons (TPH) and a
maximum of 10 ppm of the sum of Benzene, Toluene, Ethyl Benzene, and Xylene
(BTEX) and shall pass the TCPL test. Determine TPH concentrations by using
EPA 600/4-79/020 Method 418.1. Determine BTEX concentrations by using
EPA SW-846.3-3 Method 5030/8020. Perform TCLP in accordance with
EPA SW-846.3-3 Method 1311. Provide Borrow Site Testing for TPH, BTEX and
TCLP from a composite sample of material from the borrow site, with at
least one test from each borrow site. Within 24 hours of conclusion of
physical tests, submit 2 copies of test results, including calibration
curves and results of calibration tests. Do not bring material onsite
until tests have been approved by the Contracting Officer.
2.2
W912HN-09-X-1813
minimum width, color coded as specified below for the intended utility with
warning and identification imprinted in bold black letters continuously
over the entire tape length. Warning and identification to read, "CAUTION,
BURIED (intended service) LINE BELOW" or similar wording. Provide
permanent color and printing, unaffected by moisture or soil.
Warning Tape Color Codes
2.2.1
Red:
Electric
Orange:
Green:
Sewer Systems
Provide Bedding material and rock conforming to GA DOT State Standard for
construction indicated.
2.4.1
Bedding Material
Rock
W912HN-09-X-1813
2.50. Do not permit the inclusion of more than trace 1 percent quantities
of dirt, sand, clay, and rock fines.
2.5
EXECUTION
STRIPPING OF TOPSOIL
GENERAL EXCAVATION
SECTION 31 00 00
3.2.2
W912HN-09-X-1813
Drainage Structures
Drainage
Provide for the collection and disposal of surface and subsurface water
encountered during construction. Completely drain construction site during
periods of construction to keep soil materials sufficiently dry. Construct
storm drainage features (ponds/basins) at the earliest stages of site
development, and throughout construction grade the construction area to
provide positive surface water runoff away from the construction activity
and provide temporary ditches, swales, and other drainage features and
equipment as required to maintain dry soils. When unsuitable working
platforms for equipment operation and unsuitable soil support for
subsequent construction features develop, remove unsuitable material and
provide new soil material as specified herein. It is the responsibility of
the Contractor to assess the soil and ground water conditions presented by
the plans and specifications and to employ necessary measures to permit
construction to proceed.
3.2.4
Bottom Preparation
SECTION 31 00 00
3.2.4.2
W912HN-09-X-1813
Underground Utilities
Structural Excavation
Ensure that footing subgrades have been inspected and approved by the
Contracting Officer prior to concrete placement. Excavate to bottom of
pile cap prior to placing or driving piles, unless authorized otherwise by
the Contracting Officer. Backfill and compact over excavations and changes
in grade due to pile driving operations to 95 percent of ASTM D698 maximum
density.
3.3
W912HN-09-X-1813
SHORING
General Requirements
Submit a Shoring and Sheeting plan for approval 15 days prior to starting
work. Submit drawings and calculations, certified by a registered
professional engineer, describing the methods for shoring and sheeting of
excavations. Finish shoring, including sheet piling, and install as
necessary to protect workmen, banks, adjacent paving, structures, and
utilities. Remove shoring, bracing, and sheeting as excavations are
backfilled, in a manner to prevent caving.
3.5.2
Geotechnical Engineer
GRADING AREAS
Where indicated, divide work into grading areas within which satisfactory
excavated material will be placed in embankments, fills, and required
backfills. Do not haul satisfactory material excavated in one grading area
to another grading area except when so directed in writing. Place and
grade stockpiles of satisfactory as specified. Keep stockpiles in a neat
and well drained condition, giving due consideration to drainage at all
times. Clear, grub, and seal by rubber-tired equipment, the ground surface
at stockpile locations; separately stockpile excavated satisfactory and
unsatisfactory materials. Protect stockpiles of satisfactory materials
from contamination which may destroy the quality and fitness of the
SECTION 31 00 00
W912HN-09-X-1813
Frozen Material
SECTION 31 00 00
3.10
W912HN-09-X-1813
3.10.1
Provide buried utility lines with utility identification tape. Bury tape
12 inches below finished grade; under pavements and slabs, bury tape 6
inches below top of subgrade.
3.10.2
Place backfill adjacent to any and all types of structures, and compact to
at least 90 percent laboratory maximum density for cohesive materials or 95
percent laboratory maximum density for cohesionless materials, to prevent
wedging action or eccentric loading upon or against the structure. Prepare
ground surface on which backfill is to be placed and provide compaction
requirements for backfill materials in conformance with the applicable
portions of paragraphs GROUND SURFACE PREPARATION. Finish compaction by
sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers,
vibratory compactors, or other approved equipment.
3.11.1
Trench Backfill
Replace unyielding material removed from the bottom of the trench with
select granular material or initial backfill material.
3.11.1.2
W912HN-09-X-1813
Final Backfill
Fill the remainder of the trench, except for special materials for
roadways, railroads and airfields, with satisfactory material. Place
backfill material and compact as follows:
a. Sidewalks, Turfed or Seeded Areas and Miscellaneous Areas: Deposit
backfill in layers of a maximum of 12 inches loose thickness, and
compact it to 85 percent maximum density for cohesive soils and 90
percent maximum density for cohesionless soils. Do not permit
compaction by water flooding or jetting. Apply this requirement to all
other areas not specifically designated above.
3.11.2
SPECIAL REQUIREMENTS
Rip-Rap Construction
Bedding Placement
Stone Placement
W912HN-09-X-1813
with lines and grades indicated. Distribute larger rock fragments, with
dimensions extending the full depth of the rip-rap throughout the entire
mass and eliminate "pockets" of small rock fragments. Rearrange individual
pieces by mechanical equipment or by hand as necessary to obtain the
distribution of fragment sizes specified above.
3.13
3.13.1
EMBANKMENTS
Earth Embankments
SUBGRADE PREPARATION
Proof Rolling
Construction
SECTION 31 00 00
3.14.3
W912HN-09-X-1813
Compaction
FINISHING
Place a capillary water barrier under concrete floor and area-way slabs
grade directly on the subgrade and compact with a minimum of two passes of
a hand-operated plate-type vibratory compactor.
3.15.3
PLACING TOPSOIL
SECTION 31 00 00
3.17
W912HN-09-X-1813
TESTING
One test per 500 cubic yards stockpiled or in-place source material.
Determine gradation of fill and backfill material in accordance with ASTM
D422 or ASTM D1140.
3.17.2
In-Place Densities
a. One test per 2500 square feet, or fraction thereof, of each lift of
fill or backfill areas compacted by other than hand-operated machines.
b. One test per 100 square feet, or fraction thereof, of each lift of
fill or backfill areas compacted by hand-operated machines.
3.17.3
SECTION 31 00 00
3.17.4
W912HN-09-X-1813
Moisture Contents
Perform tests for each type material or source of material including borrow
material to determine the optimum moisture and laboratory maximum density
values. One representative test per 500 cubic yards of fill and backfill,
or when any change in material occurs which may affect the optimum moisture
content or laboratory maximum density.
3.17.6
SECTION 31 00 00
W912HN-09-X-1813
SECTION 32 11 23A
*1 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE
08/08
PART 1
1.1
GENERAL
REFERENCES
AASHTO T 224
ASTM C127
ASTM C128
ASTM C131
ASTM C136
ASTM C88
ASTM D1556
ASTM D1557
W912HN-09-X-1813
ASTM D2487
ASTM D422
ASTM D4318
ASTM D5821
ASTM D6938
ASTM D75/D75M
ASTM E11
1.2
DEFINITIONS
Degree of Compaction
SYSTEM DESCRIPTION
All plant, equipment, and tools used in the performance of the work will be
subject to approval before the work is started and shall be maintained in
satisfactory working condition at all times. Submit a list of proposed
equipment, including descriptive data. Provide adequate equipment having
the capability of producing the required compaction, meeting grade
SECTION 32 11 23
W912HN-09-X-1813
SUBMITTALS
QUALITY ASSURANCE
Sampling and testing are the responsibility of the Contractor and performed
by a testing laboratory approved in accordance with Section 01 45 00.00 10
QUALITY CONTROL. Work requiring testing will not be permitted until the
testing laboratory has been inspected and approved. Test the materials to
establish compliance with the specified requirements; perform testing at
the specified frequency. The Contracting Officer may specify the time and
location of the tests. Furnish copies of test results to the Contracting
Officer within 24 hours of completion of the tests.
1.5.1
Sampling
Tests
Sieve Analysis
Make sieve analysis in conformance with ASTM C117 and ASTM C136. Sieves
shall conform to ASTM E11. Particle-size analysis of the soils shall also
be completed in conformance with ASTM D422.
1.5.2.2
Determine liquid limit and plasticity index in accordance with ASTM D4318.
1.5.2.3
Moisture-Density Determinations
Determine the laboratory maximum dry density and optimum moisture content
in accordance with ASTM D1557.
SECTION 32 11 23
1.5.2.4
W912HN-09-X-1813
Submit certified copies of test results for approval not less than 30
days before material is required for the work.
b.
Submit calibration curves and related test results prior to using the
device or equipment being calibrated.
c.
Submit copies of field test results within 24 hours after the tests are
performed.
1.5.2.5
Wear Test
Perform wear tests on GCA course material in conformance with ASTM C131.
1.5.2.6
Soundness
Testing Frequency
1.5.3.1
Initial Tests
Perform one of each of the following tests, on the proposed material prior
to commencing construction, to demonstrate that the proposed material meets
all specified requirements when furnished. If materials from more than one
source are going to be utilized, this testing shall be completed for each
source.
a.
Sieve Analysis.
b.
c.
Moisture-density relationship.
d.
Wear.
e.
Soundness.
1.5.3.2
In Place Tests
Perform each of the following tests on samples taken from the placed and
compacted GCA. Samples shall be taken and tested at the rates indicated.
a.
W912HN-09-X-1813
b.
c.
Perform liquid limit and plasticity index tests at the same frequency
as the sieve analysis.
d.
1.5.4
Approval of Material
Select the source of the material 30 days prior to the time the material
will be required in the work. Tentative approval of material will be based
on initial test results. Final approval of the materials will be based on
sieve analysis, liquid limit, and plasticity index tests performed on
samples taken from the completed and fully compacted course(s).
1.6
ENVIRONMENTAL REQUIREMENTS
PRODUCTS
AGGREGATES
Coarse Aggregate
b.
2.1.1.1
GCA coarse aggregate shall not show more than 40 percent loss when
subjected to the Los Angeles abrasion test in accordance with ASTM C131.
SECTION 32 11 23
W912HN-09-X-1813
GCA coarse aggregate shall not exhibit a loss greater than 18 percent
weighted average, at five cycles, when tested for soundness in magnesium
sulfate, or 12 percent weighted average, at five cycles, when tested in
sodium sulfate in accordance with ASTM C88. The amount of flat and
elongated particles shall not exceed 20 percent for the fraction retained
on the 1/2 inch sieve nor 20 percent for the fraction passing the 1/2 inch
sieve. A flat particle is one having a ratio of width to thickness greater
than 3; an elongated particle is one having a ratio of length to width
greater than 3. In the portion retained on each sieve specified, the
crushed aggregate shall contain at least 90 percent by weight of crushed
pieces having two or more freshly fractured faces determined in accordance
with ASTM D5821. When two fractures are contiguous, the angle between
planes of the fractures must be at least 30 degrees in order to count as
two fractured faces. Crushed gravel shall be manufactured from gravel
particles 90 percent of which by weight are retained on the maximum size
sieve listed in TABLE 1.
2.1.2
Fine Aggregate
Gradation Requirements
GRADATION OF AGGREGATES
TABLE 1.
W912HN-09-X-1813
GRADATION OF AGGREGATES
EXECUTION
GENERAL REQUIREMENTS
When the GCA is constructed in more than one layer, clean the previously
constructed layer of loose and foreign matter by sweeping with power
sweepers or power brooms, except that hand brooms may be used in areas
where power cleaning is not practicable. Provide adequate drainage during
the entire period of construction to prevent water from collecting or
standing on the working area. Provide line and grade stakes as necessary
for control. Grade stakes shall be in lines parallel to the centerline of
the area under construction and suitably spaced for string lining.
3.2
STOCKPILING MATERIAL
SECTION 32 11 23
3.4
W912HN-09-X-1813
INSTALLATION
Mixing the Materials
Placing
Grade Control
The finished and completed base course shall conform to the lines, grades,
and cross sections shown. Underlying material(s) shall be excavated and
prepared at sufficient depth for the required base course thickness so that
the finished base course and the subsequent surface course will meet the
designated grades.
SECTION 32 11 23
3.5.4
W912HN-09-X-1813
Compaction
Thickness
Finishing
The surface of the top layer of base course shall be finished after final
compaction by cutting any overbuild to grade and rolling with a
steel-wheeled roller. Thin layers of material shall not be added to the
top layer of base course to meet grade. If the elevation of the top layer
of base course is 1/2 inch or more below grade, then the top layer should
be scarified to a depth of at least 3 inches and new material shall be
blended in and compacted to bring to grade. Adjustments to rolling and
finishing procedures shall be made as directed to minimize segregation and
degradation, obtain grades, maintain moisture content, and insure an
acceptable base course. Should the surface become rough, corrugated,
uneven in texture, or traffic marked prior to completion, the
unsatisfactory portion shall be scarified, reworked and recompacted or it
shall be replaced as directed.
3.5.7
Smoothness
The surface of the top layer shall show no deviations in excess of 3/8 inch
when tested with a 12 foot straightedge. Take measurements in successive
positions parallel to the centerline of the area to be paved. Measurements
SECTION 32 11 23
W912HN-09-X-1813
TRAFFIC
MAINTENANCE
SECTION 32 11 23
W912HN-09-X-1813
SECTION 32 16 13A
*1 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
04/08
PART 1
GENERAL
1.1
REFERENCES
The publications listed below form a part of this specification to the
extent referenced. The publications are referred to within the text by the
basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 182
ASTM C171
ASTM C172/C172M
ASTM C173/C173M
ASTM C231/C231M
ASTM C309
ASTM C31/C31M
ASTM C920
ASTM D1752
ASTM D5893/D5893M
SECTION 32 16 13
1.2
1.2.1
W912HN-09-X-1813
SYSTEM DESCRIPTION
General Requirements
Provide plant, equipment, machines, and tools used in the work subject to
approval and maintained in a satisfactory working condition at all times.
The equipment shall have the capability of producing the required product,
meeting grade controls, thickness control and smoothness requirements as
specified. Use of the equipment shall be discontinued if it produces
unsatisfactory results. The Contracting Officer shall have access at all
times to the plant and equipment to ensure proper operation and compliance
with specifications.
1.2.2
Slip form paver or curb forming machine, will be approved based on trial
use on the job and shall be self-propelled, automatically controlled,
crawler mounted, and capable of spreading, consolidating, and shaping the
plastic concrete to the desired cross section in 1 pass.
1.3
SUBMITTALS
ENVIRONMENTAL REQUIREMENTS
Placing During Cold Weather
Do not place concrete when the air temperature reaches 40 degrees F and is
falling, or is already below that point. Placement may begin when the air
temperature reaches 35 degrees F and is rising, or is already above 40
degrees F. Make provisions to protect the concrete from freezing during
the specified curing period. If necessary to place concrete when the
temperature of the air, aggregates, or water is below 35 degrees F,
placement and protection shall be approved in writing. Approval will be
contingent upon full conformance with the following provisions. The
underlying material shall be prepared and protected so that it is entirely
free of frost when the concrete is deposited. Mixing water and aggregates
shall be heated as necessary to result in the temperature of the in-place
concrete being between 50 and 85 degrees F. Methods and equipment for
heating shall be approved. The aggregates shall be free of ice, snow, and
frozen lumps before entering the mixer. Covering and other means shall be
provided for maintaining the concrete at a temperature of at least 50
degrees F for not less than 72 hours after placing, and at a temperature
above freezing for the remainder of the curing period.
SECTION 32 16 13
1.4.2
W912HN-09-X-1813
PRODUCTS
CONCRETE
Air Content
Slump
The concrete slump shall be 2 inches plus or minus 1 inch where determined
in accordance with ASTM C143/C143M.
2.2
2.2.1
Burlap
Contraction joint filler for curb and gutter shall consist of hard-pressed
fiberboard.
SECTION 32 16 13
2.5
W912HN-09-X-1813
JOINT SEALANTS
FORM WORK
Design and construct form work to ensure that the finished concrete will
conform accurately to the indicated dimensions, lines, and elevations, and
within the tolerances specified. Forms shall be of wood or steel,
straight, of sufficient strength to resist springing during depositing and
consolidating concrete. Wood forms shall be surfaced plank, 2 inches
nominal thickness, straight and free from warp, twist, loose knots, splits
or other defects. Wood forms shall have a nominal length of 10 feet.
Radius bends may be formed with 3/4 inch boards, laminated to the required
thickness. Steel forms shall be channel-formed sections with a flat top
surface and with welded braces at each end and at not less than two
intermediate points. Ends of steel forms shall be interlocking and
self-aligning. Steel forms shall include flexible forms for radius
forming, corner forms, form spreaders, and fillers. Steel forms shall have
a nominal length of 10 feet with a minimum of 3 welded stake pockets per
form. Stake pins shall be solid steel rods with chamfered heads and
pointed tips designed for use with steel forms.
2.6.1
Sidewalk Forms
Sidewalk forms shall be of a height equal to the full depth of the finished
sidewalk.
PART 3
3.1
EXECUTION
SUBGRADE PREPARATION
The subgrade shall be constructed to the specified grade and cross section
prior to concrete placement. Subgrade shall be placed and compacted in
conformance with Section 31 00 00 EARTHWORK.
3.1.1
Sidewalk Subgrade
The subgrade shall be tested for grade and cross section with a template
extending the full width of the sidewalk and supported between side forms.
3.1.2
Maintenance of Subgrade
FORM SETTING
Set forms to the indicated alignment, grade and dimensions. Hold forms
rigidly in place by a minimum of 3 stakes per form placed at intervals not
to exceed 4 feet. Corners, deep sections, and radius bends shall have
additional stakes and braces, as required. Clamps, spreaders, and braces
shall be used where required to ensure rigidity in the forms. Forms shall
be removed without injuring the concrete. Bars or heavy tools shall not be
used against the concrete in removing the forms. Any concrete found
SECTION 32 16 13
W912HN-09-X-1813
Sidewalks
Set forms for sidewalks with the upper edge true to line and grade with an
allowable tolerance of 1/8 inch in any 10 foot long section. After forms
are set, grade and alignment shall be checked with a 10 foot straightedge.
Forms shall have a transverse slope as indicated. Side forms shall not be
removed for 12 hours after finishing has been completed.
3.3
3.3.1
Place concrete in the forms in one layer. When consolidated and finished,
the sidewalks shall be of the thickness indicated. After concrete has been
placed in the forms, a strike-off guided by side forms shall be used to
bring the surface to proper section to be compacted. The concrete shall be
consolidated by tamping and spading or with an approved vibrator, and the
surface shall be finished to grade with a strike off.
3.3.2
Concrete Finishing
After straightedging, when most of the water sheen has disappeared, and
just before the concrete hardens, finish the surface with a wood or
magnesium float or darby to a smooth and uniformly fine granular or sandy
texture free of waves, irregularities, or tool marks. A scored surface
shall be produced by brooming with a fiber-bristle brush in a direction
transverse to that of the traffic, followed by edging.
3.3.3
All slab edges, including those at formed joints, shall be finished with an
edger having a radius of 1/8 inch. Transverse joint shall be edged before
brooming, and the brooming shall eliminate the flat surface left by the
surface face of the edger. Corners and edges which have crumbled and areas
which lack sufficient mortar for proper finishing shall be cleaned and
filled solidly with a properly proportioned mortar mixture and then
finished.
3.3.4
Finished surfaces shall not vary more than 5/16 inch from the testing edge
of a 10-foot straightedge. Permissible deficiency in section thickness
will be up to 1/4 inch.
3.4
SIDEWALK JOINTS
W912HN-09-X-1813
Expansion joints shall be formed with 1/2 inch joint filler strips. Joint
filler in expansion joints surrounding structures and features within the
sidewalk may consist of preformed filler material conforming to ASTM D1752
or building paper. Joint filler shall be held in place with steel pins or
other devices to prevent warping of the filler during floating and
finishing. Immediately after finishing operations are completed, joint
edges shall be rounded with an edging tool having a radius of 1/8 inch, and
concrete over the joint filler shall be removed. At the end of the curing
period, expansion joints shall be cleaned and filled with cold-applied
joint sealant. Joint sealant shall be gray or stone in color. The joint
opening shall be thoroughly cleaned before the sealing material is placed.
Sealing material shall not be spilled on exposed surfaces of the concrete.
Concrete at the joint shall be surface dry and atmospheric and concrete
temperatures shall be above 50 degrees F at the time of application of
joint sealing material. Excess material on exposed surfaces of the
concrete shall be removed immediately and concrete surfaces cleaned.
3.5
3.5.1
General Requirements
Protect concrete against loss of moisture and rapid temperature changes for
at least 7 days from the beginning of the curing operation. Protect
unhardened concrete from rain and flowing water. All equipment needed for
adequate curing and protection of the concrete shall be on hand and ready
for use before actual concrete placement begins. Protection shall be
provided as necessary to prevent cracking of the pavement due to
temperature changes during the curing period.
3.5.1.1
Mat Method
SECTION 32 16 13
3.5.1.2
W912HN-09-X-1813
The entire exposed surface shall be wetted with a fine spray of water and
then covered with impervious sheeting material. Sheets shall be laid
directly on the concrete surface with the light-colored side up and
overlapped 12 inches when a continuous sheet is not used. The curing
medium shall not be less than 18-inches wider than the concrete surface to
be cured, and shall be securely weighted down by heavy wood planks, or a
bank of moist earth placed along edges and laps in the sheets. Sheets
shall be satisfactorily repaired or replaced if torn or otherwise damaged
during curing. The curing medium shall remain on the concrete surface to
be cured for not less than 7 days.
3.5.1.3
Backfilling
After curing, debris shall be removed and the area adjoining the concrete
shall be backfilled, graded, and compacted to conform to the surrounding
area in accordance with lines and grades indicated.
SECTION 32 16 13
3.5.3
W912HN-09-X-1813
Protection
Submit copies of all test reports within 24 hours of completion of the test.
3.6.1
General Requirements
Perform the inspection and tests described and meet the specified
requirements for inspection details and frequency of testing. Based upon
the results of these inspections and tests, take the action and submit
reports as required below, and any additional tests to insure that the
requirements of these specifications are met.
3.6.2
3.6.2.1
Concrete Testing
Strength Testing
Air Content
Slump Test
Two slump tests shall be made on randomly selected batches of each class of
concrete for every 250 cubic yards, or fraction thereof, of concrete placed
during each shift. Additional tests shall be performed when excessive
variation in the workability of the concrete is noted or when excessive
crumbling or slumping is noted along the edges of slip-formed concrete.
SECTION 32 16 13
3.6.3
W912HN-09-X-1813
Thickness Evaluation
Surface Evaluation
High Areas
In areas not meeting surface smoothness and plan grade requirements, high
areas shall be reduced either by rubbing the freshly finished concrete with
carborundum brick and water when the concrete is less than 36 hours old or
by grinding the hardened concrete with an approved surface grinding machine
after the concrete is 36 hours old or more. The area corrected by grinding
the surface of the hardened concrete shall not exceed 5 percent of the area
of any integral slab, and the depth of grinding shall not exceed 1/4 inch.
Pavement areas requiring grade or surface smoothness corrections in excess
of the limits specified above shall be removed and replaced.
3.7.3
Appearance
SECTION 32 16 13
W912HN-09-X-1813
SECTION 32 92 19A
*1 SEEDING
10/06
PART 1
1.1
GENERAL
REFERENCES
ASTM D4427
ASTM D4972
DOA SSIR 42
1.2
1.2.1
DEFINITIONS
Stand of Turf
RELATED REQUIREMENTS
SUBMITTALS
SECTION 32 92 19
W912HN-09-X-1813
1.5.1
Delivery
1.5.1.1
Seed Protection
Protect from drying out and from contamination during delivery, on-site
storage, and handling.
1.5.1.2
Storage
1.5.2.1
Topsoil
Handling
Do not plant when the ground is frozen, muddy, or when air temperature
exceeds 90 degrees Fahrenheit.
1.7
1.7.1
TIME LIMITATIONS
Seed
Apply seed within twenty four hours after seed bed preparation.
SECTION 32 92 19
PART 2
2.1
W912HN-09-X-1813
PRODUCTS
SEED
2.1.1
Classification
Planting Dates
Planting Season
2.1.3
Planting Dates
Season 1
February 15 - August 31
Season 2
September 1 - February 14
Seed Purity
Botanical
Name
Min.
Percent
Pure Seed
Common
Name
2.1.4
Min. Percent
Germination
and Hard Seed
90
90
Max.
Percent
Weed Seed
70
70
2
2
Variety
Season 1
Bermuda Grass
75
Season 2
Annual Ryegrass
75
Temporary Seeding
Annual Ryegrass
75
TOPSOIL
On-Site Topsoil
SECTION 32 92 19
2.2.2
W912HN-09-X-1813
Off-Site Topsoil
Composition
7 to 17 percent
4 to 12 percent
70 to 82 percent
5.5 to 7.0
600 ppm maximum
SOIL CONDITIONERS
Lime
Peat
Natural product of peat moss derived from a freshwater site and conforming
to ASTM D4427. Shred and granulate peat to pass a 1/2 inch mesh screen and
condition in storage pile for minimum 6 months after excavation.
2.3.3
Sand
Composted Derivatives
Ground bark, nitrolized sawdust, humus or other green wood waste material
free of stones, sticks, and soil stabilized with nitrogen and having the
following properties:
2.3.4.1
Particle Size
95
80
Nitrogen Content
0.7
SECTION 32 92 19
W912HN-09-X-1813
1.0
FERTILIZER
Granular Fertilizer
Contractor shall test the soil through the local agriculture county
extension service office, and obtain fertilizer recommendation. For
bidding purposes, use the following:
Synthetic, granular controlled release fertilizer containing the following
minimum percentages, by weight, of plant food nutrients:
10 percent available nitrogen
10 percent available phosphorus
10 percent available potassium
2.4.2
Hydroseeding Fertilizer
MULCH
Mulch shall be free from noxious weeds, mold, and other deleterious
materials.
2.5.1
Straw
Hay
WATER
SECTION 32 92 19
2.7
W912HN-09-X-1813
Net shall be heavy, twisted jute mesh, weighing approximately 1.22 pounds
per linear yard and 4 feet wide with mesh openings of approximately 1 inch
square.
2.7.4
Hydrophilic Colloids
EXECUTION
PREPARATION
3.1.1
EXTENT OF WORK
Topsoil
3.1.1.3
W912HN-09-X-1813
SEEDING
3.2.1
Immediately before seeding, restore soil to proper grade. Do not seed when
ground is muddy frozen snow covered or in an unsatisfactory condition for
seeding. If special conditions exist that may warrant a variance in the
above seeding dates or conditions, submit a written request to the
Contracting Officer stating the special conditions and proposed variance.
Apply seed within twenty four hours after seedbed preparation. Sow seed by
approved sowing equipment. Sow one-half the seed in one direction, and sow
remainder at right angles to the first sowing.
3.2.2
Hydroseeding
First, mix water and fiber. Wood cellulose fiber, paper fiber, or recycled
paper shall be applied as part of the hydroseeding operation. Fiber shall
be added at 1,000 pounds, dry weight, per acre. Then add and mix seed and
fertilizer to produce a homogeneous slurry. Seed shall be mixed to ensure
broadcasting at the rate of 1500 pounds per 1000 acres.
When
hydraulically sprayed on the ground, material shall form a blotter like
cover impregnated uniformly with grass seed. Spread with one application
with no second application of mulch.
3.2.3
3.2.3.1
Mulching
Hay or Straw Mulch
Hay or straw mulch shall be spread uniformly at the rate of 2 tons per acre.
Mulch shall be spread by hand, blower-type mulch spreader, or other
approved method. Mulching shall be started on the windward side of
relatively flat areas or on the upper part of steep slopes, and continued
uniformly until the area is covered. The mulch shall not be bunched or
clumped. Sunlight shall not be completely excluded from penetrating to the
ground surface. All areas installed with seed shall be mulched on the same
day as the seeding. Mulch shall be anchored immediately following
SECTION 32 92 19
W912HN-09-X-1813
spreading.
3.2.3.2
Mechanical Anchor
Non-Asphaltic Tackifier
Rolling
Immediately after seeding, firm entire area except for slopes in excess of
3 to 1 with a roller not exceeding 65 pounds for each foot of roller width.
If seeding is performed with cultipacker-type seeder or by hydroseeding,
rolling may be eliminated.
3.2.5
Watering
Immediately after turfing, protect area against traffic and other use.
3.4
3.4.1
Vertical Mowing
SECTION 32 92 19
3.4.3
W912HN-09-X-1813
Overseeding
RESTORATION
damaged
Keep
one paved
work in
-- End of Section --
SECTION 32 92 19
W912HN-09-X-1813
SECTION 33 40 00A
*1 STORM DRAINAGE UTILITIES
02/10
PART 1
1.1
GENERAL
REFERENCES
ASTM A48/A48M
ASTM A536
ASTM B26/B26M
ASTM C231/C231M
ASTM C270
ASTM C32
ASTM C443
ASTM C478
ASTM C55
ASTM C62
W912HN-09-X-1813
ASTM C76
ASTM C923
ASTM D1557
ASTM D1751
ASTM D1752
ASTM D2167
ASTM D2321
ASTM D3212
ASTM D6938
1.2
SUBMITTALS
SECTION 33 40 00
W912HN-09-X-1813
Resin Certification
Pipeline Testing
Hydrostatic Test on Watertight Joints
Determination of Density
Frame and Cover for Gratings
1.3
1.3.1
Handling
PRODUCTS
PIPE FOR CULVERTS AND STORM DRAINS
Pipe for culverts and storm drains shall be of the sizes indicated and
shall conform to the requirements specified.
2.1.1
Concrete Pipe
PVC Pipe
MISCELLANEOUS MATERIALS
Concrete
W912HN-09-X-1813
Mortar
Mortar for pipe joints, connections to other drainage structures, and brick
or block construction shall conform to ASTM C270, Type M, except that the
maximum placement time shall be 1 hour. The quantity of water in the
mixture shall be sufficient to produce a stiff workable mortar. Water
shall be clean and free of harmful acids, alkalies, and organic
impurities. The mortar shall be used within 30 minutes after the
ingredients are mixed with water. The inside of the joint shall be wiped
clean and finished smooth. The mortar head on the outside shall be
protected from air and sun with a proper covering until satisfactorily
cured.
2.2.3
Brick
Brick shall conform to ASTM C62, Grade SW; ASTM C55, Grade S-I or S-II; or
ASTM C32, Grade MS. Mortar for jointing and plastering shall consist of
one part portland cement and two parts fine sand. Lime may be added to the
mortar in a quantity not more than 25 percent of the volume of cement. The
joints shall be filled completely and shall be smooth and free from surplus
mortar on the inside of the structure. Brick structures shall be plastered
with 1/2 inch of mortar over the entire outside surface of the walls. For
square or rectangular structures, brick shall be laid in stretcher courses
with a header course every sixth course. For round structures, brick shall
be laid radially with every sixth course a stretcher course.
2.2.4
Conform to ASTM C478. Joints between precast concrete risers and tops
shall be made with flexible watertight, rubber-type gaskets meeting the
requirements of paragraph JOINTS.
2.2.5
Joints
2.2.6.1
a.
b.
W912HN-09-X-1813
2.2.6.2
STEEL LADDER
Steel ladder shall be provided where the depth of the storm drainage
structure exceeds 12 feet. These ladders shall be not less than 16 inches
in width, with 3/4 inch diameter rungs spaced 12 inches apart. The two
stringers shall be a minimum 3/8 inch thick and 2-1/2 inches wide. Ladders
and inserts shall be galvanized after fabrication in conformance with
ASTM A123/A123M.
2.4
RESILIENT CONNECTORS
EXECUTION
EXCAVATION FOR PIPE CULVERTS, STORM DRAINS, AND DRAINAGE STRUCTURES
SECTION 33 40 00
3.1.1
W912HN-09-X-1813
Trenching
The width of trenches at any point below the top of the pipe shall be not
greater than the outside diameter of the pipe plus 12 inches to permit
satisfactory jointing and thorough tamping of the bedding material under
and around the pipe. Sheeting and bracing, where required, shall be placed
within the trench width as specified, without any overexcavation. Where
trench widths are exceeded, redesign with a resultant increase in cost of
stronger pipe or special installation procedures will be necessary. Cost
of this redesign and increased cost of pipe or installation shall be borne
by the Contractor without additional cost to the Government.
3.1.2
Removal of Rock
BEDDING
The bedding surface for the pipe shall provide a firm foundation of uniform
density throughout the entire length of the pipe.
3.2.1
Plastic Pipe
Bedding for PVC and PE pipe shall meet the requirements of ASTM D2321.
Bedding, haunching, and initial backfill shall be either Class IB or II
material.
SECTION 33 40 00
3.3
W912HN-09-X-1813
PLACING PIPE
TYPE OF PIPE
Plastic (PVC & HDPE)
MAXIMUM ALLOWABLE
DEFLECTION (%)
5
Laying shall proceed upgrade with spigot ends of bell-and-spigot pipe and
tongue ends of tongue-and-groove pipe pointing in the direction of the flow.
3.4
JOINTING
3.4.1
3.4.1.1
DRAINAGE STRUCTURES
Manholes and Inlets
3.5.2
W912HN-09-X-1813
BACKFILLING
Backfilling Pipe in Trenches
After the pipe has been properly bedded, selected material from excavation
or borrow, at a moisture content that will facilitate compaction, shall be
placed along both sides of pipe in layers not exceeding 6 inches in
compacted depth. The backfill shall be brought up evenly on both sides of
pipe for the full length of pipe. The fill shall be thoroughly compacted
under the haunches of the pipe. Each layer shall be thoroughly compacted
with mechanical tampers or rammers. This method of filling and compacting
shall continue until the fill has reached an elevation equal to the
midpoint (spring line) of RCP or has reached an elevation of at least 12
inches above the top of the pipe for flexible pipe. The remainder of the
trench shall be backfilled and compacted by spreading and rolling or
compacted by mechanical rammers or tampers in layers not exceeding 6 inches.
Tests for density shall be made as necessary to ensure conformance to the
compaction requirements specified below. Where it is necessary, in the
opinion of the Contracting Officer, that sheeting or portions of bracing
used be left in place, the contract will be adjusted accordingly.
Untreated sheeting shall not be left in place beneath structures or
pavements.
3.7.2
For pipe placed in fill sections, backfill material and the placement and
compaction procedures shall be as specified below. The fill material shall
be uniformly spread in layers longitudinally on both sides of the pipe, not
exceeding 6 inches in compacted depth, and shall be compacted by rolling
parallel with pipe or by mechanical tamping or ramming. Prior to
commencing normal filling operations, the crown width of the fill at a
height of 12 inches above the top of the pipe shall extend a distance of
not less than twice the outside pipe diameter on each side of the pipe or
12 feet, whichever is less. After the backfill has reached at least 12
inches above the top of the pipe, the remainder of the fill shall be placed
and thoroughly compacted in layers not exceeding 6 inches. Use select
granular material for this entire region of backfill for flexible pipe
installations.
3.7.3
SECTION 33 40 00
3.7.4
W912HN-09-X-1813
Compaction
3.7.4.1
General Requirements
Minimum Density
Backfill over and around the pipe and backfill around and adjacent to
drainage structures shall be compacted at the approved moisture content to
the following applicable minimum density, which will be determined as
specified below.
a.
3.7.5
Under unpaved or turfed traffic areas, density shall not be less than
90 percent of maximum density for cohesive material and 95 percent of
maximum density for cohesionless material.
Determination of Density
PIPELINE TESTING
Post-Installation Inspection
W912HN-09-X-1813
-- End of Section --
SECTION 33 40 00
W912HN-09-X-1813
GENERAL
REFERENCES
ASTM B 117
ASTM B 3
ASTM B 8
ASTM D 1654
IEEE C2
ANSI C119.1
ANSI C80.1
SECTION 33 70 02.00 10
ANSI/NEMA FB 1
W912HN-09-X-1813
UL 1242
UL 467
UL 486A-486B
UL 514A
UL 6
UL 651
1.2
SYSTEM DESCRIPTION
Items provided under this section shall be specifically suitable for the
following service conditions.
a.
b.
c.
Frequency 60
1.3
SUBMITTALS
W912HN-09-X-1813
W912HN-09-X-1813
QUALITY ASSURANCE
Detail Drawings
b.
W912HN-09-X-1813
1.4.2
(1)
(2)
As-Built Drawings
PRODUCTS
STANDARD PRODUCT
SECTION 33 70 02.00 10
2.2
W912HN-09-X-1813
NAMEPLATES
2.2.1
General
CORROSION PROTECTION
2.3.1
2.3.1.1
Hardware
Equipment
Equipment and component items, including but not limited to ferrous metal
luminaries not hot-dip galvanized or porcelain enamel finished, shall be
provided with corrosion-resistant finishes which shall withstand 120 hours
of exposure to the salt spray test specified in ASTM B 117 without loss of
paint or release of adhesion of the paint primer coat to the metal surface
in excess of 1/16 inch from the test mark. The scribed test mark and test
evaluation shall be in accordance with ASTM D 1654 with a rating of not
less than 7 in accordance with TABLE 1, (procedure A). Cut edges or
otherwise damaged surfaces of hot-dip galvanized sheet steel or mill
galvanized sheet steel shall be coated with a zinc rich paint conforming to
the manufacturer's standard.
2.4
CABLES
Low-Voltage Cables
Cables shall be rated 600 volts and shall conform to the requirements of
NFPA 70, and must be UL listed for the application or meet the applicable
section of either ICEA or NEMA standards.
2.4.1.1
Conductor Material
Insulation
Insulation shall be in accordance with NFPA 70, and shall be UL listed for
the application or meet the applicable sections of either ICEA, or NEMA
standards.
2.4.1.3
Jackets
SECTION 33 70 02.00 10
2.4.1.4
W912HN-09-X-1813
In Duct
2.5.1
Low-voltage cable splices and terminations shall be rated at not less than
600 Volts. Splices in conductors No. 10 AWG and smaller shall be made with
an insulated, solderless, pressure type connector, conforming to the
applicable requirements of UL 486A-486B. Splices in conductors No. 8 AWG
and larger shall be made with noninsulated, solderless, pressure type
connector, conforming to the applicable requirements of UL 486A-486B.
Splices shall then be covered with an insulation and jacket material
equivalent to the conductor insulation and jacket. Splices below grade or
in wet locations shall be sealed type conforming to ANSI C119.1 or shall be
waterproofed by a sealant-filled, thick wall, heat shrinkable,
thermosetting tubing or by pouring a thermosetting resin into a mold that
surrounds the joined conductors.
2.6
Metallic Conduit
Nonmetallic Ducts
2.6.2.1
Direct Burial
Compounds for sealing ducts and conduit shall have a putty-like consistency
workable with the hands at temperatures as low as 35 degrees F, shall
neither slump at a temperature of 300 degrees F, nor harden materially when
exposed to the air. Compounds shall adhere to clean surfaces of fiber or
plastic ducts; metallic conduits or conduit coatings; concrete, masonry, or
lead; any cable sheaths, jackets, covers, or insulation materials; and the
common metals. Compounds shall form a seal without dissolving, noticeably
changing characteristics, or removing any of the ingredients. Compounds
shall have no injurious effect upon the hands of workmen or upon materials.
2.7
2.7.1
Ground rods shall be copper-clad steel conforming to UL 467 not less than
3/4 inch in diameter by 10 feet in length. Sectional type rods may be
used.
SECTION 33 70 02.00 10
2.7.2
W912HN-09-X-1813
Grounding Conductors
EXECUTION
EXAMINATION
After becoming familiar with details of the work, verify dimensions in the
field, and advise the Contracting Officer of any discrepancy before
performing any work.
3.2
INSTALLATION REQUIREMENTS
Conformance to Codes
3.3.1
3.3.1.1
Direct-Burial
Trenching
Cable Burial
SECTION 33 70 02.00 10
3.3.1.3
W912HN-09-X-1813
Other Requirements
Cable Markers
Markers shall be located near the ends of cable runs, at each cable joint
or splice, at approximately every 500 feet along cable runs, and at changes
in direction of cable runs. In addition to markers, a 5 mil, brightly
colored plastic tape not less than 3 inches in width and suitably inscribed
at not more than 10 feet on centers, or other approved dig-in warning
indication, shall be placed approximately 12 inches below finished grade
levels of trenches.
3.4
CONNECTIONS TO FACILITIES
GROUNDING
Grounding Electrodes
W912HN-09-X-1813
c.
Additional electrodes
additional electrodes
conductors to achieve
electrodes will be up
feet apart.
3.5.2
FIELD TESTING
General
Safety
Provide and use safety devices such as rubber gloves, protective barriers,
and danger signs to protect and warn personnel in the test vicinity.
Replace any devices or equipment which are damaged due to improper test
procedures or handling.
3.6.3
Ground-Resistance Tests
W912HN-09-X-1813
b.
c.
3.6.4
b.
c.
3.7
ACCEPTANCE
Final acceptance of the facility will not be given until the Contractor has
successfully completed all tests and after all defects in installation,
material or operation have been corrected.
-- End of Section --
SECTION 33 70 02.00 10
The subject Site is located within the Booker Range 75th Ranger Regiment on the Fort
Benning Army Installation Base. More specifically, the Site is situated along the southern
side of 1st Division Road, approximately 1- miles west of its intersection with Lindsey
Creek Parkway in Fort Benning, Chattahoochee County, Georgia.
The Site improvements will consist of the construction of various lightly-loaded structures
including: a latrine facility; enhancement of an existing classroom structure; various bleacher
enclosures; overhead cover structures; a berm and concrete overhang as well as an access
roadway. Based on provided information, minimal cuts and/or fills will be required during
mass grading and construction.
The soil test borings encountered fill/disturbed soils and naturally occurring Coastal Plain
soils, extending to their respective termination depths ranging from 10 to 35 feet below the
ground surface. The encountered soils were described as silty sands (SM), poorly graded
sands (SP), clayey sands (SC) and clayey silts (ML) with Standard Penetration Test (SPT)
values ranging from 4 to 45 blows per foot (bpf). Groundwater, partially weathered rock
(PWR) and/or auger refusal material (rock) were not encountered in any of the soil test
borings to their respective termination depths.
Based on the initial results of the Level III Soil Survey performed for the Latrine Septic
Field, a percolation rate of 45 minutes per inch is recommended for use in the design of the
Latrine. Due to a perched water table restriction at a depth of 45-inches, we recommend that
the bottom trench depth for the septic field system does not exceed 21-inches. Additionally,
the soils are further identified as Hydrologic Group C.
Fill/disturbed soils were encountered in the upper 3 to 6 feet throughout the area of
exploration, with the exception of Borings B-4 and B-5 (located adjacent to the existing berm
in the central portion of the Site). The encountered fill/disturbed soils appeared to be free of
organic debris and trash; however, poor consistency soils (SPT values of 8 bpf or less) were
encountered in the upper 5 feet within Borings B-6, B-7 and B-8. Poor consistency soils will
require in-place densification and/or removal, recompaction and proofrolling prior to
construction of footings, building slabs, pavement sections and/or additional fill placement.
Based on the boring data, our analyses and after completion of the recommended subgrade
preparation, the various lightly-loaded structures may be supported on shallow foundation
systems, bearing on approved soil subgrades. For the design of the shallow foundation
systems, a maximum allowable net bearing pressure of 2,500 pounds per square foot may be
used.
Building slabs may be supported directly on naturally occurring Coastal Plain soils or well
compacted structural fill. Provided the slab subgrade is prepared in accordance with our
recommendations, a subgrade modulus reaction (K) of 100 pounds per cubic inch (pci,
pounds per square inch per inch of deflection) may be used for slab design. Placing a 4 to 6inch layer of compacted crushed aggregate base (meeting the requirements of GDOT Section
815) directly beneath the building slabs will increase the moduli of subgrade reactions (K) to
120 and 140 pci, respectively.
To reduce the possibility of shear failure, wall bearing and column foundations should be
designed with a minimum width of 18 and 24 inches, respectively. According to the
Department of Defense Structural Load Data obtained from UFC-3-310-01 (Table C.1), the
frost penetration depth for Fort Benning Military Base in Georgia is estimated at 0 to
6-inches; however, we recommend that the exterior wall bearing and column foundations be
designed with a minimum embedment depth of 18 inches. The interior foundations should be
designed with a minimum embedment depth of 12 inches. The embedment depth should be
measured from the base of the foundation to lowest adjacent outside grade.
The recommended lateral earth pressure parameters for design of below grade/concrete
retaining walls in naturally occurring Coastal Plain soils or structural fill are as follows:
Earth Pressure
Coefficient
At-Rest (KO)
Active (KA)
Passive (KP)
These values assume that the wall has horizontal backfill and no surcharge loads such as
from adjacent structures. A moist soil unit weight of 120 pounds cubic foot, a phi angle of 28
degrees, and a sliding coefficient of friction equal to 0.53 may be used in the design of
retaining walls. The equivalent fluid densities above do not include a safety factor; however,
a factor of safety of 1.5 may be used for the passive earth pressure and coefficient of friction.
Based on the known geological features of the Coastal Plain soils, the site data, and as per
Section 1613.5.2 of the 2006 International Building Code, it is our opinion that the Site Class
definition for the site is D. In addition, the United States Geologic Survey (USGS)
Earthquake Hazards Program on-line latitude/longitude search (Earthquake Ground Motion
Parameter Java Application Version 5.0.9a) was utilized to review the mapped coefficients
based on site location. Based on these sources, a value of 15.0 and 7.0 percent relative to the
acceleration of gravity (g) for Ss and S1, respectively, are recommended.