01_E
METHODSTATEMENT
Rev.1
SYSTEM:AIRCONDITIONING
Issued 12/1/53
PM6.01_E
Page1of4
PM6.01_E
METHODSTATEMENT
Rev.1
SYSTEM:AIRCONDITIONING
Issued 12/1/53
I) Install pressure gauges, flow switch, flow meter, thermometer and accessories.
j) After installation, check visual appearance and mechanical security.
k) Check the cleanliness and freedom from obstruction.
2.3
a)
b)
c)
d)
e)
f)
g)
h)
i)
Installation of insulation
Check the surface area of chiller to be applied with insulation
Check the thickness of insulation required.
Check the Cleanliness and freedom from obstruction of the surface
Draw the sector on the insulation sheet and cut it.
Apply adhesive on the surface and wrap insulation
Apply adhesive at the edge of insulation for adjacent insulation sheet.
Check the cleanliness
Temporary protect by plastic sheet
Installation of insulation for chiller shall be made by specialists
3. Quality Controls
Preparing and installation work shall be perform in according with approved shop drawing and
acceptance by inspection and check list as per attachment
PM6.01_E
Page2of4
PM6.01_E
METHODSTATEMENT
Rev.1
SYSTEM:AIRCONDITIONING
Issued 12/1/53
PM6.01_E
Page3of4
PM6.01_E
METHODSTATEMENT
Rev.1
SYSTEM:AIRCONDITIONING
Issued 12/1/53
DESCRIPTION
1.
1.1
Material
Chiller
- Unit No.
- Type
- Capacity
- Model
Vibration Isolator
- Type
- Model
Installation
- Erase & Mounting point
- Dimension & Connection
- Insulation
1.2
2.
Ref
Date
REV.NO.
INSPECTION AND TEST REQUIRED
STATUS
SATISFIED
UNSATISFIEDDD
Physical Check
Physical Check
Physical Check
Physical Check
Physical Check
Physical Check
Physical Check
Measuring & Physical Check
Measuring & Physical Check
Note
Approved by :
Signature
Name
Date
Inspected By :
Signature
Name
Date
PM6.01_E
Page4of4