NOTES ON

CV 102 BASIC CIVIL ENGINEERING


(for internal circulation only)

DEPARTMENT OF CIVIL ENGINEERING


NATIONAL INSTITUTE OF TECHNOLOGY
TIRUCHIRAPPALLI 620 015

CV 102 BASIC CIVIL ENGINEERING

Properties and uses of construction materials such as stones, bricks, cement, concrete and
steel. Site selection for building Components of Building- foundations Shallow and Deep
foundations brick and stone masonry plastering lintels, beams and columns roofs.
Roads Classification of rural and urban roads pavement materials Traffic signs and road
markings Traffic signals.
Surveying- Classification Chain survey Ranging Compass survey Exhibition of
different survey equipments.
Water supply Quality of water wastewater treatment unit their functional utility Need
for conservation of water.

Text Books:
1. Building Construction by Sushil Kumar
2. Building Materials by S.C. Rangwala

Reference:
Lecture Notes prepared by the Department of Civil Engineering/ NITT

TABLE OF CONTENTS

I Building Materials
Stones
Brick
Cement
Concrete
Steel
II Building Components
Site Selection for Building
Foundation
Masonry
Plastering
Lintels
Columns
Slabs
Beams
Roofs
III Services
Roads
Surveying
Environmental Engineering

UNIT I
BUILDING MATERIALS
STONES
Stone is a naturally available material of construction and is obtained from rocks.
Classification of Rocks
Rocks are classified in following three ways
1. Geological Classification
2. Physical Classification
3. Chemical Classification
1. Geological Classification
Based on the mode of formation, the rocks are classified as:
i. Igneous Rocks
ii. Sedimentary Rocks
iii. Metamorphic Rocks
i. Igneous Rocks: These rocks are formed by the cooling of molten rocky material called
magma which is inside the earth's surface. If the magma cools at a considerable depth from
earth's surface then it is called Plutonic rock. The cooling is slow and hence these rocks
possess coarsely grained crystalline structure. eg. Granite.
If the magma cools at a relatively shallow depth from earth's surface then it is called
Hyperbyssal rocks. The cooling is quick and hence these rocks possess finely grained
crystalline structure eg. Dolerite.
If the magma cools at earth's surface than it is called volcanic rocks. The cooling is very rapid
and hence these rocks possess extremely fine grained structure. eg. Basalt.
ii. Sedimentary Rocks: Sedimentary rocks are formed by the deposition of products of
weathering on the pre-existing rock. All the products of weathering are u1timately carried
away from their place of origin by the agents of wind, rain, frost, etc. eg. Sandstone,
Limestone, Gypsum, Gravel etc
iii. Metamorphic Rocks: When the pre-existing rocks (i.e. Igneous and Sedimentary rocks)
are subject to great heat and pressure, they are changed in character and forms metamorphic
rocks. eg. Slate, Marble, Gneisses.
2. Physical Classification
Based on general structure the rocks are classified as
i) Stratified Rocks
ii) Un Stratified Rocks
iii) Foliated Rocks.
i) Stratified Rocks: These rocks possess planes of stratification and such rocks can easily be
split up along these planes. eg. Sedimentary Rocks.

ii)Unstratified Rocks: These rocks do not exhibit any definite layers or strata. The structure
of these rocks may be crystalline, granular or compact granular. eg. Igneous rocks.
iii) Foliated Rocks: These rocks have a tendency to be split up in a definite direction only.
eg. Metamorphic Rocks.
3. Chemical Classification
Based on chemical constituents, the rocks are classified as
i) Silicious Rocks
ii) Argillaceous Rocks
iii)Calcareous Rocks.
i) Silicious Rocks: In these rocks, Silica is the main constituent. eg. Granite Quartzites etc.
ii) Argillaceous Rocks: In these rocks, clay or argil is the main constituent. eg. Slates,
Laterites etc.
iii) Calcareous Rocks: In these rocks, Calcium Carbonate is the main constituent eg. Lime
stones, Marbles etc.
Tests for Stones
The following are the tests conducted on stones to decide construction work
1.
2.
3.
4.
5.
6.
7.
8.

Impact test
Crushing strength test
Attrition test
Hardness Test
Water absorption test
Freezing and thawing test
Microscopic test
Smith's test

1. Impact test: In this test, a cylinder of diameter 25 mm and height 25 mm is taken out
from the sample of stone. A steel hammer of wt 2 Kg is allowed to fall axially on the cylinder
from 1cm height for first blow, 2 cm height for second blow etc. Blow at which the specimen
breaks is noted. If it is nth blow, n represents the toughness index of stone.
2. Crushing Strength test: In this test, a cube of stone is tested in a compression testing
machine. The rate of loading is 4.0 N / mm2 per minute. The maximum load at which the
stone crushes is noted.
Crushing Strength of the stone = Max load / Area of bearing face of the stone
3. Attrition test: In this test, some known weight of stone pieces are taken and put in the
Deval's attrition test cylinder. The cylinder is rotated about its horizontal axis for 5 hrs at the
rate of 30 RPM. Then the contents in the cylinder are sieved by 1.5 mm sieve. The quantity
of material which is retained on the sieve is weighed.
Initial Weight
Percentage of Wear =

Loss in Weight

x 100

4. Hardness Test: In this test, a cylinder of stone diameter 25 mm and height 25 mm is


placed in Dorrys testing machine and pressed with a pressure of 12.5 N. The annular steel
disc of the machine is rotated at a speed of 28 RPM. During rotation coarse sand of standard
specification is sprinkled on the top of disc. After 1000 revolutions, the specimen is taken out
and weighed. The coefficient of hardness is given by the formula
Loss in weight in g
Coefficient of hardness = 20 3
5. Water absorption test: In this test, a stone of known weight is immersed in water for
24 hrs. Then it is weighed again after 24 hrs and the percentage absorption of water should
not exceed 0.6
6. Freezing and thawing test: In this test specimen of stone is placed in freezing mixture
at12c for 24 hours and it is then warmed at atmospheric temperature. The procedure is
repeated for several times and the behavior of stone is noted.
7. Microscopic test: In this test, thin sections of stone are taken and they are examined in a
microscope to study various properties like grain size, mineral constituents etc.
8. Smiths test: In this test, clear water is taken in a test and pieces of stones are placed in it.
The tube is vigorously stirred. If the water becomes dirty it indicates the stone contains
earthy matter.
Qualities of Good Building Stone
A good building stone should have the following qualities:
1. The crushing strength of stone should be greater than 100 N/mm2.
2. Stones must be decent in appearance and be of uniform colour.
3. Stones must be durable. Their natural bed must be perpendicular to the direction
of pressure.
4. Stones should be easily carved and dressed.
5. Fracture should be sharp and clear.
6. For a good building stone, co-efficient of hardness should not be below 14. It
should be hard enough to resist wear and tear.
7. It must have a wear less than 3 percent.
8. It must be fire resistant.
9. It should not contain quarry sap which is nothing but moisture present in the
stones.
10. It must have a specific gravity of greater than 2.7.
11. It must have a compact, fine, crystalline structure, strong and durable.
12. The toughness index must not be less than 13.
13. It must be acid resistant and free form any soluble matter.
14. When a stone is immersed in water for 24 hrs, the percentage absorption by
weight should not exceed 0.6

Uses of Stones
1. Stones are used as basic material for concrete, moorum of roads, calcareous
cements etc.
2. Stones are used in the construction of foundation, walls, columns, lintels, arches,
roofs etc.
3. Stones are used to cover floor of buildings of various types such as residential,
commercial, industrial etc.
4. Stones are adopted to form paving of roads and foot paths.
5. Stones are converted to form basic materials for concrete, moorum of roads,
artificial stones, hollow blocks, etc.
6. Stones are also used as ballast for railway track.
7. Stones are used as flux in blast furnace.
8. Stone blocks are used in the construction of bridges, piers, abutments retaining
wall, dams etc.
9. In modern days, polished stone panels are used as cladding for architectural
purposes and also polished stone slabs are replacing the dining table tops in
residential houses and restaurants.

BRICKS
Bricks are artificial blocks manufactured from tempered clay into standard sizes. They are
extensively used for building construction. Bricks are very popular because of their easy
availability, economy, strength, durability, reliability and insulating properties.
Bricks are manufactured from Earth containing alumina (20 to 30%) Silica (50 to 60%), Iron
Oxide (5 to 6%) and small quantities of lime and magnesia.
Manufacture of Bricks
Manufacture of bricks involves the following operations
1. Preparation of brick earth
2. Moulding
3. Drying
4. Burnings
1. Preparation of Brick Earth
Clay to be used for the manufacture of the bricks has to be prepared carefully. This includes
the following operations
Removal of loose soil: The top layer of loose soil should be removed for a depth of 20 cm. It
should not be used for preparation of bricks as it contains lot of impurities.
Digging, spreading and cleaning: The earth removed from below 20 cm is spread on a level
ground. All undesirable materials like grass, roots, gravel etc are removed.
Weathering: The spread earth is left as such for a few weeks to allow the clay to mellow
Blending: This consists of mixing the clay with suitable ingredients by turning up and down
many times.
Tempering: This is done to make the whole mass of clay, homogenous and plastic. This is
done by trampling under feet by men or cattle in a Pug mill when bricks are required on large
scale.
A Pug Mill is a conical iron tub provided with a vertical iron shaft. Numbers of horizontal
arms with several cutting blades are attached to this shaft. The brick earth is put inside the
pug mill and the shaft is revolved by bullocks or steam, diesel or electric power. The rotation
of the shaft causes the breaking up of lumps and clods of clay. The clay gets pugged and
tempered.
2. Moulding
The pugged brick earth is then moulded into shape in moulds. Moulding can be done on the
ground or on top of a table, either by hand or machine.

Ground Moulding: A piece of ground is selected, levelled and plastered. Fine sand is
sprinkled and then the mould is placed on top of it. The tempered clay is taken in hand and
dashed into the mould till the mould gets filled with clay. Excess earth is removed. Then the

mould is removed slowly and carefully leaving the moulded brick on the ground.
Table Moulding: In this the moulder stands near a table and the moulding is done on top of
the table. The moulder can mould 500 to 1000 bricks per day.
Machine Moulding: Hard, Strong clay can be moulded by this method. This is adopted when
a large number of bricks have to be moulded. There is a variety of moulding machine in the
Western Country. In India the Central Building Research Institute, Roorkee has developed a
hand operated earth moulding machine. The thoroughly pugged brick earth is pushed under
pressure through an opening whose length and breadth is equal to the length and breadth of
brick.
The pushed out p1astic bank is cut to the desired thickness of bricks by wires, fitted in a
frame at distances equal to the brick thickness. The machine moulded bricks have sharp
edges and corner, smooth external surface and uniform texture.
3. Drying
After the bricks are moulded, they are, dried. This is done on specially prepared drying beds
which must be higher than the surrounding ground. Bricks are dried for a period of 7 to 14
days. During drying this must be protected from wind, rain and direct sun.
4. Burning
After drying the bricks area burned in kilns of clamps to make them harder, stronger, denser,
less absorbent and more durable.
Burning in Clamps: A clamp is an arrangement where the bricks and fuel are arranged in
alternate layers. A floor is prepared and the fuel is first spread at slope of 15. The fuel
consists of wooden piece, cow dung, straw, waste paper etc., On top of this layer the raw
bricks are placed. Then another layer, of 75cm. thick fuel is spread. Thus alternate layer of
brick and fuel are arranged to a height of 3 to 4 cm. Then entire clamp is plastered on all the
sides and top and filled with earth cover to conserve the heat. The bricks are burnt for a
period of one or two months and then cooled for the same period. After cooling the burnt
bricks are removed.
Burning in Kilns: When large number of bricks have to be burnt Kiln are adopted. Kilns are
of two types
1. Intermittent Kilns and
2. Continuous Kilns
In intermittent Kilns the loading firing cooling and unloading are done one after the other and
not simultaneously whereas in continuous these operations are carried out without any
interruptions.
A kiln is an enclosure made of thick walls and provided with doors for loading and unloading
operations. Arrangements are made to carry and circulate hot air and gases through the body
of the kiln by providing flues. The kiln is provided with a roof. Among the various types of
kilns adopted the Hoffmans Kiln is very popular, it can produce about 2,000 to 25,000 burnt
bricks per day.

Merits and demerits of Clamp and Kiln burning of Bricks


Clamp Burning:
1. It is a temporary structure
2. Initial cost is low
3. Amount of fuel used is low and hence economical
4. Continuous supervision is not necessary
5. Quality of bricks is poor. Only 60% is of First Class variety.
6. Firing cannot be regulated
7. It takes a long time for burning and cooling the bricks (3 to 6 months).
8. Used when small number of bricks required at a time. Each clamp can
turnout one lakh bricks at a time.
9. There is large amount of wastage of heat from the hot gases.
Kiln Burning:
1. It is a permanent structure
2. Initial cost is higher
3. Fuel cost is higher
4. Constant supervision is necessary
5. Quality of bricks turned out is good. 90% first class bricks
6. Time of firing is only 24 hours and cooling is 12 days.
7. It is yielding about 25,000 bricks per clay
8. Heat of hot gases is utilized in heating bricks to be burnt.
Size and Weight of Bricks
The Indian Standards Institution, New Delhi has specified, standard bricks of 19cm x 9cm x
9cm with 1cm thick mortar joints. This standard brick weight is 3kg.
Classification of Bricks
Bricks are classified as under
1. First class bricks: Table moulded edges are clear, square straight. Used for superior
works.
2. Second class bricks: Ground moulded burnt in kilns surface not smooth and edges not
regular used where the bricks work will be plastered.
3. Third c1ass bricks: Ground moulded not hard rough surface and edges are also not sharp
and regular. Used for unimportant and temporary constructions.
4. Fourth class bricks: These are over burnt bricks dark in colour and irregular. Used as
aggregates for concrete foundations, floors, roads etc.
Characteristics of Good Bricks
A good brick should satisfy the following essential qualities
1. Colour should be uniform. Colour should be red. Well burnt and sound bricks have
these colours.
2. The bricks should have even surfaces free from flaw or cracks and should have
sharp well defined edges.
3. These should be so hard that no impression should be left when scratched with
finger nails.
4. These should produce clear ringing sound when struck against each other.
5. No brick should absorb more than 15% of its weight of water when kept immersed
10

in for 24 hours.
6. No brick should have a crushing strength less than 3.5 N/mm2.
7. On breaking the surface it should show a bright homogeneous and compact surface
free from voids
8. A brick soaked in water should not show any deposit of white salts on drying in
shade.
9. When dropped flat from a height of 1m the brick should not break.
10. Bricks should not conduct most heat and they should be sound proof.
Testing of Bricks
For deciding the suitability of bricks the following tests are to be conducted.
1. Absorption test: A brick is taken and it is weighed dry. It is then immersed in water for a
period of 16 hours. It is weighted again and the difference in weight indicates the amount of
water absorbed by the brick. It should not, in any case, exceed 20 percent of weight of dry
brick.
2. Crushing strength test: Crushing strength of a brick is found out dry by placing it in
compression testing machine. It is pressed till it breaks. Minimum crushing strength of
bricks is 3.5 N/mm2and for superior bricks; it may vary from 7.0 to 14.0 N/mm2
3. Soundness test: In this test, two bricks are taken and they are struck with each other.
Bricks should not break and a clear ringing sound should be produced.
4. Hardness test: In this test, a scratch is made on brick surface with the help of a finger nail.
If no impression is left on the surface then the brick is treated to be sufficiently hard.
5. Test for presence of soluble salts: Soluble salts, if present in bricks, will cause
efflorescence on the surface of bricks. For finding out the presence of soluble salts in a brick,
it is immersed in water for 24 hours. It is then taken out and allowed to dry in shade.
Absence of grey or white deposits cover about 10 percent surface, the efflorescence is said to
be slight and it is considered as moderate, when the white deposits cover about 50 percent of
surface, the efflorescence becomes heavy and it is treated as serious, when such deposits are
converted into powdery mass.

11

CEMENT
It is the product which is obtained by burning and crushing to powder a well proportioned
mixture of calcareous and argillaceous materials. It was introduced in 1824 by Joseph Asp
Din a brick layer of Leeds, England. After hardening it resembles in colour to the stone
quarried near Portland in England, so it is named after that as Portland cement.
It is available in different varieties and the selection of variety depends upon the condition,
strength and the type of structure.
Raw materials required for manufacture of cement are:
1. Calcareous and
2. Argillaceous material
Calcareous Materials: Calcareous materials are those materials which contain calcium or
lime as their main constituents such as lime stone, chalk etc.
Argillaceous Materials: Argillaceous materials are those materials which contain alumina as
their main constituents such as shale, laterite etc. It provides the required proportion of silica,
clay, oxide of iron to the cement.
Proportion of mixing
The ingredients are generally mixed in the ratio of two parts of Calcareous materials and one
part argillaceous material. Limestone and shale are first crushed and then they are mixed
either in wet state or in dry state by grounding them together. The mixture is then burnt in a
rotary kiln at a temperature between 1400C and l500C. Pulverized coal, gas or oil being
used as the fuel. The clinker so obtained is first cooled and then gypsum (3 to 4%) is added
and it is grounded to the required fineness.
Main chemical Ingredients of Cement (Raw Stage)
Sl. No.

Ingredient

Composition

Percentage

Lime

CaO

60 to 67

Silica

Sio2

17 to 25

Iron Oxide

Fe2O3

0.5 to 6

Alumina

Al2O3

3 to 8

Gypsum or Calcium Sulphate

CaSO4

3 to 4

Magenisum Oxide

MgO

0.1 to 4

Sulphur Trioxide

SO3

1 to 3

Alkalies such as soda

NaOK2O

0.1 to 1

Functions and Effects of Various Ingredients


Lime: It makes the cement sound and provides strength to the cement. Excess of it in original
form causes the cement to expand and disintegrate.

12

Silica: It provides strength to the cement. In excess it slows down the setting of cement.
Alumina: It provides quick setting property to the cement. In excess it weakens the strength
of cement.
Calcium Sulphate (Gypsum): It helps in increasing the initial setting time of cement.
Iron Oxide: It provides colour, hardness and strength to the cement.
Magnesium Oxide: It provides colour and hardness to the cement. Excess of it in free state
makes the cement unsound.
Sulphur Trioxide: In small quantity it makes the cement sound and in excess it makes the
cement unsound.
Alkalies: In excess it causes efflorescence.
Final compounds of Cement
Sl.
No.
1

Formula

Abbreviation

Range

Dicalcium silicate

2(CaO)SiO2

C2 S

21 to 45%

Tricalcium silicate

3(CaO)SiO2

C3 S

25 to 50%

Tricalcium Aluminate

3(CaO)Al2O3

C3 A

5 to 11%

Tetra Calcium Aluminum


Ferrite
Other Constituents and
Gypsum

4(CaO)Al2O3
Fe2O3

C4AF

9 to 14%

C2S
1.
2.
3.
4.

Compound

8%

It hydrates slowly.
It hardens more slowly
It provides ultimate strength to the cement.
It has more resistance to chemica1 attack.

C3S
1. It hydrates more rapidly.
2. It develops early strength.
3. It generates heat more rapidly and has less resistance to chemical attack.
C3A
1. It is fast reacting with large amount of heat generation.
2. It causes initial setting of cement.
3. It is weak against sulphate attack.

13

C4AF
1. It is comparatively inactive.
2. It has poor cementing value.
3. It is slow in reaction with small heat generation.

Properties of Cement
Fineness: It is the degree of grinding of cement. The rate of reaction depends upon the
fineness of grinding i.e. it increases with the fineness and vice versa, causing early setting and
greater heat which is the main cause of cracks due to expansion and contraction. A coarser
particle settles down in concrete causing bleeding. It is measured in terms of percentage
weight retained, on BIS Sieve No.9 after 15 minutes sieving. For accurate measurement it is
measured by surface area, air permeability method and the unit is cm2/gram of cement.
Setting Time: Setting of cement is the phenomenon by virtue of which the green cement
changes into hard mass. Initial setting is a stage in the process of hardening after which any
crack that may appear will not reunite and the completion of this process is, known as final
setting time. The time between water is added in cement and initial setting takes place is
known as Initial Setting Time.
In order that the concrete may be placed in position conveniently, initial setting time of
cement should be sufficient and after lying the hardening should be rapid so that structure can
be available for use early in time. Cement should not loose its plasticity till the various
operations of mixing, transporting and placing are complete. Hence this time is generally kept
not less than 30 minutes.
Strength: The quality of concrete and cement is always judged by strength and that is only
by compressive strength because cement is weak in tension and for it steel reinforcement is
always provided. For this purpose cement and standard sand are mixed in the ratio of 1:3 and
sand should be as per BIS 650 -1966 i.e. Standard Leighton Buzzard sand. It is light greyish
white in colour.
Soundness: Free lime and magnesia present in cement makes the cement unsound by
increasing the volume after setting. Because when water is mixed with free lime it
disintegrates. So these compounds should be present within limits. It is generally measured
by Le-Chatelier method or by Autoclave method.
Heat of Hydration: Setting of cement is due to chemical reactions between cement and
water and this process is known as Hydration. As, this reaction is exothermal process, so
sufficient heat is generated and this process continues for an indefinite period at a
diminishing rate. This heat causes unequal expansion in mass concrete structure such as
dams, retaining walls etc. For such works low heat cement is always recommended. It is
always measured in calories/gram unit.
Different Types of Cement
1. Ordinary Portland cement.
2. Rapid Hardening Portland cement
3. Low Heat Portland cement
14

4. Portland Blast Furnace slag cement


5. Portland Sulphate resistant cement
6. Air entraining portland cement
7. White and coloured cement
8. High Alumina cement
9. Pozzoana cement
10. Oil well cement
11. Quick setting cement
12. Expanding cement
1. Ordinary Portland Cement: It is also known as Normal setting cement. It is general
purpose cement suitable for all purpose. It is used in Road pavements, buildings, culverts,
water pipes etc. In the other sense it is used every where except in places where special
properties of other types are required. Out of the total consumption of different types of
cement 90% of this type is used.
2. Rapid Hardening Cement: Its manufacturing process is same as that of ordinary cement
except chemical composition, degree of grinding and temperature of burning. It contains less
quantity of C2S and more quantity of C3S. It is generally used where high early strength is
required and so it is some times called as High Early Strength Portland cement.
It is used by concrete product manufactures, highway pavements which are to be opened
early for road traffic and in cold weather concreting due to its high heat of hydration
development.
3. Low Heat Portland Cement: This cement is so called because it develops low heat at the
time of hydration. It contains C3A and; C3S in less quantity because they develop early heat.
It develops strength quite late and so not advised to concrete structures as it requires
shuttering and curing, for a longer period. It is generally used in massive concrete structures
such as dams, bridge, abutments, retaining walls etc.
4. Blast Furnace Slag Cement: As the name indicates in this cement granulated blast
furnace slag is grained along with cement clinkers. Percentage of slag varies from 25 to 65%.
It is cheaper as compared to ordinary cement because waste product is used in it. It can also
be used in massive concrete such as dams, bridges etc. It has a1so the capacity to resist
sulphate bearing soils, and water. Hence good for use in marine structures and construction in
marshy areas.
5. Sulphate Resistant Portland Cement: It contains very low percentage of C3A and C4AF.
Because when C3A and C4AF come in contact with sulphates they form sulpho aluminates
causing swelling and disintegration. It is used in canal lining, construction of pipe lines and
culverts etc.
6. Air Entraining Portland Cement: It is ordinary Portland cement mixed with small
quantities or air entertaining materials during grinding. The diameter of air bubbles varies
from 0.075 mm and 1.25 mm. On account of air bubbles the strength of cement is reduced.
Air bubbles are permitted only up to 3 to 4 percentage, as these reduce 10 to 15% strength of
cement. Air entraining materials are Dorex Resin, Vinsol, Resin, oils and Fats etc. These
should be 0.01% to 0.05% by weight of cement. This cement is more plastic and workable
15

causing less segregation and bleeding in concrete. It makes the concrete more resistant to
freezing. It. also reduces the water requirement and has high resistance to weather. This
cement is generally used in making insulated walls, roof slabs, and light weight concrete and
the concrete which is subjected to freezing and thawing.
7. White and Coloured Cement: In it white chalk and china clay are used instead of lime
stone and clay as these are having low percentage of Iron Oxide i.e.1 %. Oil is used as fuel to
avoid contamination o coal ash. It is 3 to 4 times costlier than ordinary cement. It is used for
decorative floorings. Bridge railings, traffic curbs and aerodrome markings.
For coloured cement suitable pigments varying from 5 to 10% free from soluble salts are
added during grinding. Iron oxide gives Red, Yellow and Brown colour. Chromium dioxide
gives green and cobalt Blue gives blue coloured cement is used for decorations only such as
Terrazzo Floor finishes swimming pools etc.
8. High Alumina Cement: It contains 35% to 45% of aluminates Bauxite and chalk or lime
stone are mixed dry and heated till they melt and on cooling they form clinkers. These
clinkers are then grounded to the required fineness. It is dark in colour and initial setting time
varies from 3 to 6 hrs and final setting takes place with in 2 hours of the Initial set. Its setting
times are controlled by the rate of cooling of the fused product. It is highly resistant to heat
and the strength is more. It is high resistant to attack of sulphates. It gives high heat of
hydration and, is also costlier than ordinary Portland cement. It is used in structures subjected
to the action of sea water, chemical and sulphate bearing water. It is generally used for
chemical plants and in lining of furnaces. It can also be used in cold weather concreting.
9. Pozzolana Cement: Pozzolana is a naturally occurring material such as volcanic ash or
Pumice stone or an artificial product such as burnt clay or shale containing siliceous and
aluminous mineral substances. As per BIS 1489-1967, the proportion of pozzolana material
varies from 10 to 25% by weight of cement. It increases the workability, reduces heat of
hydration, and increases the water tightness. It also offers greater resistance against sulphatic
action and sea water. It is used in the construction of massive concrete structures such as
dams, bridge abutments and retaining wall etc. This cement has been also used in Bhakra
Nangal Dam.
10. Oil Well Cement: As the name indicates, it is used for cementing; oil wells. It is used at
greeter depth under high temperature and pressure. As approximately 3 hrs are required to,
pump the cement to fill the space between steel tube lining and wall of the well, so it should
not set during this period. Iron Oxide is so adjusted that all the alumina is converted into
C4AF and sc proportion of C3A is very small, high increases the setting time of cement and
also hardens quickly after setting. It protects the oil well causing from corrosion and also help
in supporting the oil well casing and thus reduce the tension, in steel pipes. It also fills up the
porous strata preventing water or gas from gaining access in the oil bearing strata.
11. Quick Setting Cement: It has less proportion of CaSO4 (Gypsum) or a small % of
aluminium sulphate is added at the time of grinding. It is grounded much finer than ordinary
Portland cement. Its initial setting time is 5 minutes and final setting time is 30 minutes. It is
used for concreting under or in running water and only in special circumstances as it gives
very little time for mixing

16

.
12. Expanding Cement: As per the name, its volume increases on hardening. It takes about
15 days-for the expansion to occur fully but the time can be controlled by curing. The upper
limit of expansion is 1%. The agent which causes expansion is Calcium Sulpho Aluminate
(3CaOA12O33CaSO4) which is formed by the presence of calcium sulphate with Calcium
Oxide present in cement in sufficient quantity.
Field Tests on Cement:
1.
2.
3.
4.

The colour of cement should be uniform gray with light greenish shade.
Cement should feel smooth when touched.
If hand is inserted in a bag of cement it should feel cool not warm.
If a small quantity of cement is thrown in a bucket of water, it should sink and
should not float on the surface.
5. Cement should be free from any hard lumps.
A sample meant for testing shall be drawn from at least 12 different bags or barrels or
containers or from 12 different positions in a heap if cement is loose. Chemical composition
of cement should be checked for B. I. S. specifications.
Laboratory Tests on Cement:
1. Fineness of Cement: 100 gm of cement is weighed accurately and placed on IS: sieve No.
9 (90 micron). Any air lumps are broken using fingers. Now gentle sieving is done
continuously for fifteen minutes. The residue left is weighed. This shall not exceed 10% by
weight of the sample of cement special methods have been devised in which it is possible to
estimate the particle size distribution. This is estimated in terms of the specific surface, i.e.,
the surface area per unit weight.
2. Consistency: This is a test conducted to estimate the quantity of water to be mixed in
cement to form a paste of normal consistency for use in other tests. 300 gms of cement should
be weighed. To this about 25% of water should be mixed. The paste obtained should be filled
in the mould of the Vicat apparatus. The interval of time between the instant of adding water
to the dry cement and the instant of commencement of filling the mould is called the time of
gauging.
The plunger, the biggest of the three needles 10 mm. diameter, is lowered gently on to the
paste in the mould. Now the settlement of the plunger is noted. If the settlement is between 5
and 7 mm from the bottom of the mould the amount of water added is correct. If this
condition is not satisfied, the test must be again repeated changing the percentage of water
until the stipulated extend of penetration of the plunger is reached.
Let

W1 = Weight of cement taken for the test.


W2 = Weight of water added corresponding to the condition of the stipulated extent of
penetration of the plunger.
Percentage of water, Pa

W2
X 100%
W1

3. Test for Setting Time: The object of this test is to make a distinction between normal
setting and quick setting types of cement end also to detect deterioration due to storage.

17

Weigh 300 gm of cement and add Pa percentage of water (which is the percentage of water
required to have normal consistency. See test for consistency.) The paste obtained after
mixing is filled in the mould.1. In the Vicat apparatus, attach the needle of square section, i.e.
1 mm X 1 mm to the Vicat rod. Lower the system so that the needle just touches the surface
of the paste and gently release. Find out if the needle pierces into the paste fully. If it does,
again release the needle on the paste after a few seconds and again observe whether the
needle pierces fully into the paste. This is repeated till the needle does not pierce into the
paste completely. Now the interval of time between this instant and the instant at which water
was added to the cement is called the initial setting time.

Fig.1.1 Vicat Apparatus


Now change the needle to the third one which has a projecting sharp point in the centre with
an annular attachment. Now release this needle as before on the same paste. The needle as
well as the attachment will make their impressions on the paste. Repeat this process till only
the needle makes the impression but not the attachment. The interval of time between this
instant and the instant at which the water was added is called the final setting time. Vicat
Apparatus is shown in figure.1.1.

18

CONCRETE
Concrete is the most versatile material for all types of construction works and has been used
for innumerable construction works, either as plain concrete or as reinforced cement concrete
or as precast concrete, or prestressed concrete or in many other forms. In building industry,
the concrete is mainly used for purposes, viz., foundations, columns, beams, slabs, stair cases,
lintels, doors, window frames, sun-shades, storage tanks, etc. The various constituents of
concrete are cement, water, fine aggregate, and coarse, aggregates. In Reinforced Cement
Concrete Steel is also used.
Cement: Properties and various types of cement have already been discussed previously
Aggregate: These are the inert or chemically inactive materials which form the bulk of
cement concrete. These aggregates are bound together by means of cement. The aggregates
are classified into two categories, Fine and coarse.
The material which is passed through 4.75mm size sieve is termed as fine Aggregate. Usually
natural river sand, issued as a fine aggregate. But at places where river sand is not available
crushed stone may be used as a fine aggregate.
The material which is retained on 4.75 mm size B. S. test sieve termed as a coarse aggregate.
Broken stone is generally used as a coarse aggregate. The nature of work decides the
maximum size of coarse aggregate. For thin slabs and walls the maximum size of coarse
aggregate should be limited to one-third the thickness of the concrete section.
The aggregate to be used for cement concrete work should be hard, durable and clean. The
aggregate should be completely free from lumps of clay, organic and vegetable matter, fine
dust etc. The presence of a11 such debris prevents adhesion of aggregates and hence, reduces
the strength of concrete.
Water: Water which is used for making concrete should be clean and free from harmful
impurities such as oil, alkali, acid etc. In general water which is fit for drinking should be
used for making concrete.
Grades of Concrete
Concrete as per IS 456 2000 is classified into three groups as ordinary concrete, Standard
concrete and High strength concrete. M10, M15 and M20 are ordinary concrete, M25, M30,
M35, M40, M45, M50 and M55 are grouped as Standard concrete and M60, M70, M75 and
M80 are grouped under High strength concrete. The letter M refers to the mix and the
number indicates the specified compressive strength of that mix at 28 days expressed in
N/mm2. For lean concrete bases and simple foundations for masonry walls M5 and M7.5
grades of concrete may be used. These mixes need not be designed. Grades of concrete lesser
than M20 are not to be used in RCC work. For general guidance, the nominal mix proportions
(volume ratio) correspond approximately to the different grades as follows:
M 5 - 1:5:10
M 7.5- 1:4:8

19

M 10 - 1:3:6
M 15 - 1:2:4
M 20 - 1:1.5:3
M 25 - 1:1:2
Gain of strength with age
The concrete develops strength with continued hydration. The rate of gain of strength is faster
to start with and the rate gets reduced with age. It is customary to assume the 28 days
strength as the full strength of concrete. Actually concrete develops strength beyond 28 days
also. The variation of strength with age is shown in Figure.1.2.
Minimum Age of member with full

Age Factor

design stress is expected (months)


1.00

1.10

1.15

12

1.20
STRENGTH OF STANDARD SPECIMEN

Rapid
hardening

40

30

20
Ord. portland
or
PBFS

10

14

DAYS

Fig.1.2 Gain in compressive strength with age


Strength of Concrete
Strength of concrete is its resistance to rupture. It may be measured in number of ways, such
as strength in compression, in tension, in shear or in flexure. All these indicate strength with
reference to a particular method of testing .The compressive strength of concrete is generally
determined by testing cubes or cylinders made in laboratory or field. The size of the mould
should be 150mm x150mm x150mm.Based on the compressive strength only the concrete is
graded. The strength of the concrete is mainly depend on the following factors
1. Quality of materials and grading of the aggregates
2. Water

20

3.
4.
5.
6.

Water cement ratio


Cement content
Age of concrete; and
Methods of mixing, placing, compacting and curing.

Workability of concrete
The concrete should have sufficient workability. The workability of concrete indicates the
ease with which it can be mixed, placed and compacted. The degree of workability (decided
by slump test) for different forms of concrete work is specified. Generally, the strength
decreases with increase in degree of workability and vice verse.
Slump Test
Slump test is the most commonly used method of measuring workability of concrete which
can be employed either in the laboratory or at site of work. It is not a suitable method for very
wet or very dry concrete. The slump cone is as shown in Fig.1.3.
The mould is placed on a smooth, horizontal, rigid and non absorbent surface. The mould is
then placed in four layers, each approximately height of the mould. Each layer is tamped
25 times by the tamping rod taking care to distribute the stroke evenly over the cross section.
After the four layers are filled in side the cone, mould is removed from the concrete
immediately by raising it slowly and carefully in a vertical direction. This allows the concrete
to subside. This subsidence is referred as slump of concrete.

All dimensions in Centimeters


Fig 1.3 Slump Cone
Durability of Concrete
The concrete possesses a high durability value, it is not much affected by atmospheric
actions. On the contrary, with the age, the concrete goes on hardening, there by increasing in
strength. It is this property, which gives this material a distinct place among the building
materials.
21

Water Cement Ratio


The strength of concrete depends upon the quantity and quality of its ingredients i.e. cement,
aggregate and water. General assumption is that strength of concrete directly depends up on
the quantity of cement. If cement is more, strength will be more but this assumption is not
correct because strength of concrete also depends upon water cement ration.
Water cement ratio is generally defined as the ratio of volume or weight of mixing water to
that of cement in a concrete mix. It is expressed in liters of water required per bag of cement
50 kg. The relation between strength and water/ cement ratio of concrete is as shown in
Fig.1.4.

Fig.1.4 Relation between strength and water/ cement ratio


Operations in Concreting
The following processes are involved in making concrete to achieve desired strength and
durability.
1. Storing of material (Cement, aggregate)
2. Batching of material (By volume, by weight)
3. Mixing of concrete (By hand, by machine)
4. Transportation of concrete.
5. Placing of concrete.
6. Curing of concrete

22

1. Storing of Material
Cement: It is a fine powder and also hygroscopic in nature i.e. it absorbs moisture from air or
free water and starts setting. So it should be protected from dampness. Hence the water
houses constructed for its storage must fulfill the basic requirements.
Trying the level best and keeping all precautions, strength of cement reduces on long storage.
Every effort should be made to store it for lesser time. Cement stored for long time should be
checked before its use. It has also been observed that by the passage of time, stressed cement
recapture its strength up to certain extent.
Aggregates: For achieving proper quality of concrete, it is essential that aggregate should be
free from deleterious materials, organic matters such as tree leaves, vegetable wastes, animal
refuse etc. It should also not be coated with mud, silt or clay as these reduces the bond
between cement paste and aggregate particles. It should have uniform moisture content and
proper grading of aggregates.
2. Batching of Materials
Batching means measurement of ingredients of concrete for proper mixing. Normally
such a quantity is mixed in one batch, which can be transported, placed and compacted with
in time i.e. before initial set takes place. Batching is of two types.
1. Volume Batching.
2. Weight Batching.
Measurement of Cement: Cement is always measured by weight. This is because its volume
differs considerably by the way of container is filled in. A batch of concrete should always
consume full number of bags. For this purpose weight, of cement bag is taken as 50 kg.
Measurement of Water: Water is generally measured by volume because its weight can not
be easily calculated. Measuring of water by volume is easy and automatic. Measuring device
can be easily made. Generally water in the field is measured by buckets or tin, cans but this
method is not accurate.
Measurement of Aggregate by Volume: For these purpose generally wooden boxes of
capacity equivalent or part of one cement bag i.e. 35 liters are used. These boxes are known
as Petties or Farmas or Gauge Box.
Weigh Batching: As per the name, ingredients of concrete are measured by weight. This is
more accurate and is generally used where high quality concrete is required. As described
earlier generally one cement bag or its multiple is the basic unit. In this system allowance for
water present in aggregate is made, but bulking has no effect.
3. Mixing of Concrete
i) Hand Mixing
ii) Machine Mixing.

23

i) Hand Mixing: It is adopted for small works where quantity of concrete required is small.
In it various ingredients of concrete are mixed by hand.
ii) Machine Mixing: For producing large quantity of concrete at a faster rate and at lesser
cost, machine mixing is adopted. The machine used for mixing concrete is known as
concrete mixer.
1. Continuous mixer
2. Batch type mixer.
Continuous mixer: It mixes and delivers concrete just as a steady stream of concrete, till it
is in operation. This type of mixers is not so common in use in India.
Batch type mixer: Mixes and discharge each loads of material separately. These are of two
types.
1. Tilting mixers.
2. Non-Tilting or Rotary Mixers.
Tilting Mixer: It has a conical drum which revolves about an inclined axis of 50 with
horizontal. The drum can be brought into different positions for charging, mixing and
discharging. In small mixers the materials are charged directly and in mixers of large
capacities loading skips are used. The mixed concrete is generally discharged on iron sheets.
Blades are fixed, in the internal surface of the rotating drum.
Non-Tilting Type: It is also known as rotary type mixer. It has a drum revolving about
horizontal axis and cylindrical in shape. It has an opening on both sides one for charging and
other for discharging. For charging loading skip is used which is fed with the help of wire
ropes and for discharging chutes are used.
4. Transportation of concrete:
As the initial setting time of cement is generally 30 minutes, hence mixing, transportation,
placing and compaction should be completed with in this time. In no case this time should not
exceed one hour after initial setting time.
When transportation time required is more, than it should be kept agitated and in summer
season it should be kept cool. In no case there should be any loss of water during
transportation.

5. Placing of Concrete:
As for as possible concrete should be placed in single thickness. In case of deep sections,
concrete should be placed in successive horizontal layers and proper care should be taken to
develop enough bond between successive layers. Concrete should be placed as soon as
possible. But in no case, it should be placed after 30 minutes of its preparation. During

24

placing it should be seen that all edges and corners of concrete surface remain unbroken,
sharp and straight in line.
6. Curing of Concrete:
Concrete surfaces are kept wet for a certain period after placing the concrete. This is termed
as Curing of Concrete. The period of curing depends on the type of cement and nature of
work. For ordinary Portland cement, the curing period is 7 to 14 days. If rapid hardening
cement is used, curing period can be considerably reduced. It can be done by spraying and
ponding of water or covering the concrete with moist earth, sand, or wet gunny bags.
Types of Concrete
The following are the various types of concrete in use.
1. Plain Cement Concrete
2. Reinforced Cement Concrete
3. Pre Stressed Concrete
4. Light Weight Concrete
5. No-Fines Concrete
6. Pre-Cast Concrete
7. Fiber Reinforced Concrete
1. Plain Cement Concrete
It is a mixture of cement, sand pebbles or crushed rock and water. It possesses the following
important properties.
i) It is free from corrosion
ii) It has a high compressive strength
iii) It blinds rapidly with steel
iv) It forms a hard surface, capable of resisting abrasions.
v) It has a tendency to shrink. It can be minimized by curing
vi) It has a tendency to be porous.
2. Reinforced Cement Concrete
Plain cement concrete is strong in compression but weak in tension. To make this efficiency
better steel bars known as reinforcement are embedded in concrete. This is known as
reinforced cement concrete (RCC).
3. Pre-stressed Concrete
In this type of concrete, high tensile steel wires are used as reinforcement instead of mild
steel bars. There are two types of prestressing namely

25

i) Pre-tensioning and
ii) Post tensioning.
i) Pre-tensioning: In pre-tensioning method, the wires are initially stressed and the concrete
is cast in the moulds built around the wires. The wires released after the concrete attain its
strength. The tendency of the wires to return to their original length sets up a compression in
concrete, which helps the concrete to resists more tensile stress.
ii) Post-tensioning: In post tensioning the wires are placed inside the concrete and then
stressed. The use of prestressed concrete results in saving of concrete and steel to the extent
of 50% and 80% respectively compared to RCC.
4. Light Weight Concrete
They are produced from a wide variety of both natural earth substance and fly ash. It mainly
consists of cement, aggregates of loose porosity, steel and water. The bulk density of this
concrete varies from 500 to 1800 kg/m3 whereas the bulk density of ordinary concrete is
about 2300 kg/m3.
Advantages:
i) Its weight is less
ii) It has better insulating and fire resisting properties
iii) It saves the cost of material handling because of its lightness.
iv) It has a high water absorption property
v) Local industrial waste can be economically utilized to prepare this type of concrete.
vi) The use of light weight concrete results in the reduction of cost to the extend of
about 30 to 40% or so.
5. No-fines Concrete
It consists of cement, coarse aggregate and water. Thus fine aggregate or sand is eliminated.
This concrete has been adopted for cast-in-situ external load bearing walls of single and multi
storey houses, small retaining walls etc.,
The advantages are.
i) It possesses better insulating properties
ii) The unit weight of no-fines concrete is about 2/3 of the unit weight of conventional
concrete.
iii) There is direct saving in material requirements as the concrete does not require sand.
iv) The drying shrinkage is low
v) As there is absence of capillary passages, there is no transmission of water by
Capillary action.

26

6. Precast Concrete
Precast concrete is manufactured in a factory and the transmitted to the site. The advantages
are:
i) The pre-cast articles may be given the desired shape and finish with accuracy.
ii) The labour required in the manufacturing process of pre-cast units can be easily
trained.
iii) Concrete of superior quality is produced
iv) The pre-cast structures can be dismantled when required and they can then be
suitably used elsewhere.
v) The work can be completed in short time.
7. Fiber Reinforced Concrete (FRC)
It mainly consists of cement, fiber, sand and water. Asbestos, glass, nylon or coconut fibers
have been tried as alternative to steel. The advantages are:
a)

It has thin sections

b)

Production rate is less

c)

More durable

d)

Less maintenance cost

27

STEEL
Steel is probably the most versatile commonly used structural material. Steel is used to a
large extent in modern multi-storied buildings. Steel is used as reinforcing bars/wires for
concrete since concrete is weak in tension. Structural steel is available in various forms and
shapes and it is being used for various structural components.
Physical Properties of Mild Steel
1.
2.
3.
4.
5.

Mass density
Youngs Modulus
Modulus of Rigidity
Poissons Ratio
Coefficient of thermal expansion

=
=
=
=
=

7850 Kg/m3
2.04 x 105 N/mm2
0.785 x 105 N/mm2
0.25 0.3
12 x 10-6 per c

Reinforcement Steel
Steel reinforcement is of following types
1. Mild Steel bars (MS)
2. High strength deformed bars / rolled twisted bars (HSD / RTS)
3. High tensile bars
Normally in all types of structural elements High Strength Deformed bars are used as main
reinforcement. For distribution bars mild steel is being used. Reinforcement steel is
characterized by its yield strength and ultimate tensile strength. Stress strain behavior is
studied by conducting simple tension test and various salient points are noted to determine
the strength.
Reinforcement bars are available in various nominal sizes. Mild steel (Grade I) and (Grade II)
are available in the following nominal sizes 5,6,8,10,12,16,20 mm diameter which has the
yield stress of 250 N/mm2 and minimum ultimate tensile stress as 410 N/mm2. Diameters 22,
25,28,32,36,40,45,50 are also available which has yield stress as 240 N/mm2.
High strength deformed bars / wires are available in the following nominal sizes:
6,8,10,12,16,18,20,22,25,28,32,36,40,45,&50 with the characteristic strength 415 N/mm2 and
500 N/mm2.
Structural Steel
Various shapes and sections are used for building works. Most of them are made by rolling.
The common types of sections used in structural steel work are shown in Fig..1.5

28

Fig.1.5 Sections in Steel


Plates: Plates may be of any size or thickness. Common uses of plates in building
construction are as webs and flanges of deep beams, column flanges, column base, etc.
Flats: These are rolled as in the case of plate but are much longer in lengths and have shorter
widths. The widths vary form 18mm to 50 mm. The minimum and maximum thickness vary
from 3mm to 80 mm. Flats are costlier than plates but are put to a considerable use in
building construction. Flat section may have one rounded side with greater thickness than the
remaining section and this is called bulb ball. These are used only in specific instances.
Angles: Angle sections are widely used in steel trusses. Most common types are angles with
equal legs and with unequal legs and are designated by ISA width and height of legs of
angles. The equal angles vary form 20 mm x 20mm to 200mm x 200mm in size and 3mm to
5mm in thickness. The term 20mm x 20mm denotes that the width of legs is 20mm overall.
Unequal angles vary in size from 20mm x 30mm to 220mm x 100mm and thickness from
4mm to 20mm. Special angles with a square toe, round backed, acute, square root and bulb
types are also available. These are used to a limited extent in special constructional features
T-Sections:These are used for roof trusses and for certain built up columns. They are
designated by the width of the stem, width of the table and by the thickness. The standard
sizes vary form 40mm x 40mm to 150mm x 150mm with thickness from 6mm to 8mm.
Special T-Sections with bulbs etc. are also used to some extent.
Channels:Channels are mainly used for beams, columns and top and bottom chord members

29

of truss. They are designated by the depth, flange width and weight per unit length. The size
varies form 50mm x 75mm x 3kg to 420mm x 100mm x 30kg. Whenever stronger channels
of lesser depth are required, these are specially cast with greater thickness than given by the
standards. ISI handbook gives the following four series of channel sections. The only series
that is available in India is ISMC.
Indian Standard Junior Channels (ISJC)
Indian Standard Light Channels (ISLC)
Indian Standard Medium Weight Channels (ISMC)
Indian Standard Special Channels (ISSC)
Joists: Rolled Steel Joists or I-Sections are most commonly used for beams and columns.
They are denoted by the flange with, overall depth and weight per meter run. The British
Standard Joists Section varies in size form 7 cm x 4cm to 60 cm x 17 cm. In U.S.A. I-sections
have vary wide flanges are used. ISI handbook gives the following five series of Beam
Sections. The only series that is available in India is ISMB.
Indian Standard Junior Beams (ISJB)
Indian Standard Light Beams (ISLB)
Indian Standard Medium Weight Beams (ISMB)
Indian Standard Wide Flange Beams (ISWB)
Indian Standard H Beams (ISHB)
Miscellaneous Sections: Z-Sections, rail-sections, troughs, bars etc. are used to a limited
extent in steel work for a building.

30

UNIT II
BUILDING COMPONENTS
SITE SELECTION FOR BUILDINGS
The following general principles should be borne in mind in the selection of a site:
1. The site should serve its purpose
2. The site should be located in a fully developed or a fast developing area with
transporting facilities.
3. The plot should be in a locality where the various facilities like (a) Community
services such as police and fire protection, clearing of waste and street cleaning; (b)
Utility services such as water supply, gas, electricity and drainage; (c) Amenities such
as schools, hospitals, libraries, recreation, telephone etc.; (d) shopping facilities and
(e) means of transport; are available.
4. The proportions of plot to be built-up, vacant spaces to be left in front and sides,
heights of buildings, etc., should be in accordance with local byelaws.
5. The site should not be irregular in shape or having any sharp corners.
6. The site should be situated on a elevated place.
7. The soil strata should be of good bearing capacity.
8. The situation of the site should be such as to ensure unobstructed natural light and air.
9. The site should be available in a locality where natural beauty and manmade
environment create healthy living and working conditions.
10. The site should be away from quarries, kilns, factories etc.,
11. The legal and financial aspects should be given due consideration before the purchase
of the plot.
12. The site should be abandoned under adverse circumstances such as (a) unhealthy,
noisy or crowded localities; (b) proximity to rivers carrying heavy loads, badly
maintained drains and Nallahs; (c) Reclaimed soil or water lagged areas, subject to
submergence or settlement; and (d) Industrial vicinities having smoke and obnoxious
odour.
Classification of Buildings
Buildings can be classified as
1.
2.
3.
4.
5.
6.

Residential buildings
Educational buildings
Institutional buildings
Commercial buildings
Assembly buildings
Industrial buildings

The topography of the region, the hydrological conditions at site and the type of soil
prevalent in the site are to be ascertained before selecting a site. Proximity to essential
services and the presence of schools, hospitals and temples as well as recreation facilities
such as libraries, parks and swimming pools, shopping areas are to be considered.
Transportation facilities for passengers and goods should also be ascertained. For industrial
buildings availability of raw materials in the nearby areas offers advantages.

31

Residential buildings are to be planned considering the following points:


1. Orientation
2. Aspect
3. Privacy
4. Grouping
5. Circulation
6. Furnishing
7. Sanitation
8. Ventilation
9. Flexibility
10. Landscaping
11. Economy
Maximum benefit is derived from nature if the buildings are properly oriented. The
residential building should be oriented in the direction in which the wind blows most of the
time. The orientation is also dependent on the layout of existing roads and buildings in the
locality.
Doors and windows should be positioned so as to get maximum lighting, breeze and view of
the landscape. Privacy inside the house is achieved by proper placing of windows. Privacy
outside the house is achieved by growing trees and creepers. The rooms should serve their
utility. The surrounding area should be clean and also free from noise pollution. The doors
and windows should be placed opposite to each other to ensure maximum ventilation. The
rooms should be selected in such a way that rooms originally designed for a specific purpose
can serve other purposes also. The floor space should be optimally used with lesser areas for
circulation and staircase.
Components of Buildings
Any building has two parts the superstructure and the substructure. The various components
of the superstructure are
1. Masonry units such as walls and columns
2. Floors
3. Doors, windows and other openings
4. Roof structures
5. Elevators, ramps and
6. Building finishes
The various components of buildings are shown in Fig.2.1.

32

Fig. 2.1 Components of Building

33

FOUNDATION
Foundation is that part of the substructure or lower portion of the building which safely
transmits the load of the superstructure to the soil beneath it and the sides of the wall.
The bearing capacity of soil is defined as the maximum load per unit area, which the soil can
support without yielding. Any foundation constructed, should be safe with respect to bearing
capacity and settlement consideration. In designing the foundation, the safe bearing capacity
of the soil which is the ultimate bearing capacity reduced by a factor of safety should be
considered.
Types of Foundations
Foundations can be broadly divided into two categories
1. Shallow foundations and
2. Deep foundations.
Generally if the depth to width ratio of the foundation is less than 1, then it is known as a
shallow foundation and if it is greater than 1, it is known as deep foundation.
Shallow Foundation
The various types of shallow foundations are as follows:
1.
2.
3.
4.
5.
6.
7.
8.

Wall footing
Isolated footing
Combined footing
Inverted arch footing
Continuous footing
Cantilever footing
Grillage foundation
Raft or Mat foundation

1. Wall Footing
This footing is provided throughout the length of the wall and may be either stepped or
single. E.g. Load bearing walls. These are used for light structures. Wall Footing is as
shown in Figure. 2.2.
Plinth Level

Floor Level

G.L.
Footings
in
Foundation

Wall
Earth Filling
Concrete in
Foundation

Fig 2.2 Wall Footing

34

Footing

2. Isolated or Column Footing


This footing supports individual columns. It may be simple, stepped or sloped footing. These
are shown in Figures 2.3 and 2.4.
20cm

Column

15 cm
offset

Distributors
Concrete
in
Foundation
Main rods

Fig.2.3 Simple Footing

Fig.2.4 Stepped and Sloped Footings


3. Combined Footing
A combined footing supports two or more columns in a row. If the columns carry equal
loads, then a rectangular shaped footing can be provided. If there are unequal loads and if
space limitations are present, then trapezoidal footing can be constructed. Generally,
reinforced concrete is used to construct these footings. The shape of the combined footing is
designed in such a way that the center of gravity of the resultant area coincides with the
center of gravity of the loads. Combined footing is as shown in Figure.2.5.

35

Columns

Columns
Footing

Elevation

Elevation
Footing

Plan
Rectangular Combined Footing

Plan
Trapezoidal Combined Footing

Fig. 2.5 Combined Footings


4. Inverted Arch Footing
Inverted arches (Figure 2.6) are constructed at the base between two walls. It is constructed
on soft soils of low bearing capacity when the depth of foundation provided is less. The arch
action causes outward pressure and hence the end columns must be strong enough. This type
of foundation is suitable for bridges, reservoirs and tanks.

Piers

Inverted Arch
Fig. 2.6 Inverted Arch Footing
5. Continuous Footing
This consists of a single continuous reinforced concrete slab supporting three or more
columns in a row. This prevents differential settlement in the structure. Continuous Footing
is as shown in Figure 2.7

36

Columns

Footing

Columns
Fig. 2.7Continuous Footing
6. Strap or Cantilever Footing
Strap footings (Figure 2.8) are also known as cantilever footings. These consist of two or
more individual footing connected by a beam called as strap. When the distance between the
columns is great, trapezoidal footings, if provided are narrow and hence strap footings are
provided. The strap beam does not have any contact with the soil. The column loads are
transferred into the soil uniformly.

External
Column

Internal
Column

Strap

Concrete
Base
Fig.2.8 Strap or Cantilever Footing
7. Grillage Foundation
The grillage footing transfers heavy loads from steel columns to the foundation, which
transfers it to the soil of low, bearing capacity. Steel joints in single or double tress are
provided. The steel joints are held in place by pipe separators and nuts are completely
embedded in concrete of minimum 15 cm to prevent corrosion. This type of foundation can
be constructed for a single column or more than one column. The grillage foundation is
shown in Figure 2.9.

37

Fig. 2.9 Grillage Foundation


8. Raft or Mat Foundation
In regions where the allowable bearing capacity is low and the soil is of a highly
compressible nature and the loads from the superstructure on the columns is more, then the
footing area is more than half the building area, it is economical and safe to use raft
foundations covering the whole area. The use of raft foundation minimizes differential
settlement. The weight of the soil excavated is almost equal to that of the raft. The raft
consists of reinforced concrete beams with a relatively thin slab underneath. The hydrostatic
uplift is also counteracted by the presence of raft foundations. Raft foundation is as shown in
Figure 2.10.

38

Main Beam
Secondary
Beam

Columns

Slab

Secondary Beam

Main Beam

Columns

Fig. 2.10 Raft or Mat Foundation


Deep Foundation
In such types of footings, the depth is very large compared to its width and these may
be classified as pile foundations, piers and well foundations.
Pile Foundations
Piles are used under the following situations.
1. The live load and dead load coming from the structure is very heavy and the
distribution of load on soil is uneven.
2. The Construction of grillage or raft foundation is not economical.
3. The subsoil water level fluctuates appreciably.
4. The structure is situated on sea-shore or river bed and there is scouring action
of water (Marine Structures)
5. In places where canals, deep servers are to be constructed in future.
Classification of piles
Piles are classified based on function as below
1. End bearing piles
2. Friction piles
3. Compaction piles
4. Sheet pile
5. Batter pile
6. Fender pile
7. Under reamed pile
1. End bearing piles
They are penetrated through soft soil and rest on a hard bed. These piles can act as columns
or piers. The friction component from the sides of the pile is less as compared to the end
bearing capacity. End Bearing Piles are as shown in Figure 2.11.

39

Soft Soil

Fig. 2.11 End Bearing Piles


2. Friction piles
In this type of piles, the frictional resistance offered by the soil on the sides of the pile
counteracts the load acting on the pile. The load from the superstructure is transmitted
through the pile to the soil on the sides. Friction piles are as shown in Figure 2.12.

Fig. 2.12 Friction Piles


3. Compaction piles
These piles are used to densify loose granular soils. As the piles are driven, the soilsurrounding item gets compacted. Compaction piles are as shown in Figure 2.13.

Fig. 2.13 Compaction Piles

40

r Pile
Batte

Sheet Pile

Fender Pile

Fig. 2.14 Sheet, Batter and Fender Piles


4. Sheet piles
These piles are thin members of steel or timber used in waterfront structures. They can
reduce sup age and uplift under hydraulic structures. These Piles are as shown in the Figure
2.14.
5. Batter piles
These are inclined piles existing lateral loads. These Piles are as shown in the Figure 2.14.
6. Fender piles
These protect the structures against impact from ships and other floating objects. These Piles
are as shown in the Figure 2.14.
7. Under reamed piles
The stem of such piles has one or more bulls known as under ream which increase the
bearing capacity of the pile and also resist uplift. Under reamed Piles are as shown in the
Figure 2.15.

Fig. 2.15 Under Reamed Piles


41

Classification based on the materials and composition


1. Cement concrete piles
Cement concrete piles possess excellent compressive strength. These piles can be reinforced
or prestressed. They can be divided into following two groups- pre-cast concrete piles
and cast in-situ concrete piles
2. Pre-cast concrete piles
These piles are manufactured in factory. They may be tapered or parallel sided. They may
be square, octagonal or round in shape. The precast concrete piles are generally used for a
maximum design load of about 80 tons. They may be reinforced to withstand handling
stresses. The concrete in the piles should be controlled concrete and should correspond to
M20 grade.
3. Cast in-situ concrete piles
In this type a bore is dug into the ground by inserting a casing,. This bore is then filled with
cement concrete after placing reinforcement, if any. They may be either cased cast in-situ
concrete piles or encased cast in-situ concrete piles depending upon whether the casing is
kept in position or is withdrawn.
4. Timber piles
Timber piles are prepared from trunks of trees. They may be circular or square. They are 30
to 50 cm in diameter with a length not exceeding 20 items its top width. At the bottom, a cast
iron shoe is provided and at the top, a steel plate is fixed. If a group of timber piles is
driven, the top of each member of the group is brought at the same level and then a concrete
cap is provided to have a common platform. They have small bearing capacity, and are not
permanent unless treated. It is very difficult or even impossible to drive these piles into hard
stratum.
5. Steel piles
Steel piles are used in the following three different forms.
H Piles ; Box Piles and Tube Piles
6. Sand piles
These piles are formed by making holes in the ground and then filling them by sand. The top
of the sand piles is filled with concrete to prevent the sand to come upwards due to lateral
pressure. They are easy to construct and can be used irrespective of any position of water
table. They are not suitable for loose or wet soils or where there is a danger of scour. They
are also not suitable in regions subjected to frequent earthquakes.
7. Composite piles
A composite pile is formed when it is a combination either of a bored pile and a driven pile or
of driven piles of two different materials. They are suitable where the upper part of a pile is
to project above the water table. They are economical and easy to construct.

42

MASONRY
Brick Work In Cement Mortar
Masonry may be defined as the construction of building bounded together with mortar. The
building unit known as in walls may be stones, bricks or precast blocks of concrete. Bricks
are used as the building units or building blocks in brick masonry. Masonry is normally used
for construction of foundations, walls, columns and other structural components of buildings.
The basic advantage masonry construction lies in the fact that they are load-bearing
structures. It performs a variety of functions, such as
1.
2.
3.
4.

Supporting loads
Subdividing space
Providing thermal and acoustic insulation
Affording fire and weather protection etc.

Mortar
It is the pasty material formed by the addition of water mixture composed of fine aggregate
(sand or surkhi) material (cement or lime), which may be handled with a trowel Mortar unites
the individual bricks together. Generally the following types of mortar are in use:
1. Mud mortar
2. Lime mortar
3. Lime surkhi mortar
4. Cement mortar and
5. Cement lime mortar or lime- cement- mortar
Terms Used in Brick Masonry
Course: A complete layer of bricks laid on the same called a course and its thickness is equal
to the thickness of one mortar joint.
Frog : Depressions provided in the face of the brick.
Bed: The bottom surface of the brick when it is laid flat is called bed.
Stretcher: The side surface of bricks visible in elevation when the brick is laid flat is called
the stretcher (19 cm x 9 cm).
Header: The end face of the brick when it is laid flat is as header (9cm x 9cm)
Bed joint: The horizontal mortar joints between two successive courses are known as bed
joints.
Perpend: These are the joints between bricks either in longitudinal or cross directions.
Bat: The brick which is cut across its width is called as bat
Closer: The brick which is cut across its length is called as closer.
Principles in Brick Masonry Construction

43

i) Good brick masonry should utilize bricks which are sound, hard, well burnt, and
tough with uniform colour, shape and size.
ii) The brick should be compact, homogeneous and free from holes, cracks, flaws, airbubbles and stone lumps. These bricks should be properly soaked in water for at
least two hours before use.
iii) In the brick work, the bricks should be laid on their beds with the frogs pointing
upwards.
iv) The brick courses should be laid truly horizontal and should have truly vertical,
joints.
v) As far as possible the use of brick-bats should be discouraged.
vi) As far as possible the brick walls should be raised uniformly with proper bond.
Generally the height of brick masonry construction in a day should be less than l.5
m. The maximum difference in rise of the wall between the different portions
should not be more than one metre.
vii) When the mortar is green, the face joints should be raked to a depth of 12 to 19 mm
in order to have a proper key for plastering or pointing to be done.
viii) In order to ensure continuous bond between the old and the new, the walls should be
stopped with a. toothed end.
ix) Finished brickwork in lime mortar should be cured for a period of 2 to 3 weeks.
This period can be reduced to 1 to 2 weeks in case of brickwork with cement
mortar.
x) In order to carry out the brickwork at higher level single scaffolding is used.
Bonds in Brick Masonry
Bonding is a process of arrangement of bricks and mortars to tie them together in a mass of
brickwork. It should have a minimum of vertical joints in any part of the work. It is a weak
portion of brickwork and should not be continuous in two successive courses. A wall having
continuous vertical joints shall act as independent column. Hence load on wall shall not be
uniformly distributed. A more strong and durable brick masonry construction will not have
continuous vertical joints. It shall distribute load on a wider area and thereby minimise the
tendency to settle. The various types of bonds are explained.
Types of Bond
1.
2.
3.
4.

Stretcher bond
Header bond
English bond
Flemish bond

1. Stretcher bond
In this type of bond (Figure 2.16), all the bricks are laid with their lengths in the direction of
the wall. This pattern is used for walls having thickness of 9 cm only. For greater thickness of
walls, this arrangement is not at all practicable.

44

Fig. 2.16 Stretcher bond


2. Header bond
In this type of bond (Figure 2.17) all the bricks are laid with their ends towards the face of the
wall. This type of arrangement is suitable for walls, which are one brick thick. This is a1so
suitable for the construction of curved wall and footings for better load distributions.

Fig. 2.17 Header bond


3. English bond
In this type of bond alternate courses of headers and stretchers are laid. It is necessary to
place the queen closer after first header in the heading course for breaking the joints
vertically as shown in Figure 2.18. English bond construction requires the following points to
be kept in view.
i)
ii)
iii)
iv)
v)
vi)

A quoin closer must be provided after the quoin header. A header course should never
start with a quoin closer.
Each alternate header should be centrally placed over a stretcher.
Continuous vertical joint should not be allowed except at stopped end.
In case of the wall thickness equivalent to an even number of half bricks the wall shall
present similar appearance of both the faces.
In case of the wall thickness equivalent to an odd number of, half bricks, the same
courses shall have stretchers on one and header on the other.
Only headers should be used for the hearting of the thicker walls.

45

vii)

The joints on the header course should be made thinner than those in the stretcher
course. This is because of the fact that the number of vertical joints in the stretcher
course are half the number of joints in the header course.

Fig 2.18 English Bond-One Brick Thick Wall

4. Double Flemish bond


In this bond alternate headers and stretchers are laid in each course. This type of bond: is
better in appearance than the English bond. The facing and back are of the same appearance.
The Brick bats are used in case of walls having thickness equivalent to odd number of half
bricks. The queen closer is placed next to the quoin header in alternate, courses in order to
break the continuity of the vertical joints. Double Flemish Bonds are as shown in Figure 2.19

Fig.2.19 Double Flemish bond

46

Comparison between English Bond and Double Flemish Bond


English Bond

Double Flemish Bond

More compact and stronger for walls having Less compact and stronger
thickness more then 1 1/2 bricks.
No pleasing appearance of the facing.

Better appearance of the facing

No strict supervision and skill required for Good workmanship and careful supervision
its construction
is required
More costlier than double Flemish bond
Cheaper in cost because number of brick
bats are used

47

STONE MASONRY
Stone masonry is made of stone units bonded together with mortar.
Classification of Stone Masonry
Depending upon the arrangement of stones in the construction, it can be classified as follows:

Stone Masonry

Rubble Masonry

Ashlar Masonry

1. Random rubble masonry

1. Ashlar fine

a) Coarsed
b) Uncoarsed
2. Square rubble masonry

2. Ashlar rough tooled

a) Coarsed
b) Uncoarsed
3. Polygonal rubble masonry

3. Ashlar rock or quarry faced

4. Flint rubble masonry

4. Ashlar chamfered

5. Dry rubble masonry

5. Ashlar block in course

RUBBLE MASONRY
In this type of masonry, stones of irregular sizes and shapes are used. The stones, as obtained
from quarry, are taken for use in the same form or they are broken and shaped in suitable
sizes by means of hammer as the work proceeds.
Random rubble masonry:
1. In this type of masonry, the stones used are of widely different sizes. This is the
roughest and cheapest form of stone masonry.
2. In coarsed random rubble masonry, the masonry work is carried out in courses
such that the stones in a particular course are of equal heights, as shown in figure.
3. In uncoarsed random rubble masonry, courses are not maintained regularly. The
larger stones are laid first and the spaces between them are then filled up by means
of spells as shown in Figure 2.20

48

Uncoarsed Random Rubble Masonry

Coarsed Random Rubble Masonry

Fig. 2.20 Random Rubble Masonry


Square rubble masonry
In this type of masonry stones having straight bed and sides are used. The stones are usually
squared and brought to a hammer dressed or straight cut finish.
In the coursed squared rubble masonry, the work is carried out in courses of varying depth. In
the uncoursed squared rubble masonry, the different sizes of stones having straight edges and
sides are arranged on face in several irregular patterns.
Flint rubble masonry
In this type of rubble masonry, stones used are flints or cobbles. These are irregularly shaped
modules of silica. The stones are extremely hard. But they are brittle and therefore they
break easily. The face arrangement may be either coarse or uncoarsed as shown in Figure
2.21

Fig. 2.21 Flint Rubble Masonry


Dry rubble masonry
In this type of masonry mortar is not used in the joints. This type of construction is the
cheapest and requires more skill in construction. This may be used for non-load bearing walls
such as compound wall etc.

49

ASHLAR MASONRY
In this type of construction, no irregular stones are used. The stones used in this masonry are
rectangular blocks and are all dressed finely with chisel. The courses are not necessarily of
the same height. It may vary from 25 to 30 cm. Following are the different types of ashlar
masonry as shown in Figure 2.22

Fig.2.22 Ashlar Fine Masonry


Ashlar rough tooled masonry
In this type of ashlar masonry the beds and sides are finely chisel-dressed. But the face is
made rough by means of tools. A strip, about 25 mm wide and made by means of a chisel is
provided around the perimeter of the rough dressed face of each stone.
Ashlar rock or quarry faced masonry
In this type of ashlar masonry, a strip about 25 mm wide and made by means of chisel is
provided around the perimeter of every stones as in case of rough-tooled ashlar masonry. But
the remaining portion of the face is left in the same form as received from quarry.
Ashlar chamfered masonry
In this type of ashlar masonry, the strip is provided as above. But it is chamfered or bevelled
at an angle of 45 degrees by means of a chisel for a depth of about 25 mm. Ashlar Chamfered
Masonry is as shown in Figure 2.23

Fig.2.23 Ashlar Chamfered Masonry

50

Ashlar block-in-coarse masonry


This is combination of rubble masonry and Ashlar masonry. In this type of masonry, the face
work is provided with rough tooled or hammer dressed stones and backing of the wall may
made in rubble masonry.
Points to be observed in the construction of stone masonry
The following points should be kept in mind during the construction of stone masonry.
1.
2.
3.
4.
5.
6.
7.
8.
9.

Stones should be strong, rough and hard


Each stone should be well watered before use
All the stones should be laid on their natural bed
Proper bond should be maintained; formation of vertical joints should be avoided.
Small stone pieces should be used for facing.
The wall should be raised uniformly throughout its length.
Stones should be dressed properly according to the type of masonry.
Mortar should be in proper proportion.
After the construction is over the whole masonry work should be kept wet for at
least 2 to 4 weeks.

Comparison between Stone Masonry and Brick Masonry


1. Cost of stone masonry work is more, as it requires more skilled labour.
2. Due to various sizes and shapes of stone, complicated lifting devices are required
in the construction. But bricks having regular shape and uniform size, can be
moved easily by manual labour.
3. In the case of brick masonry any mortar can be used, but in the case of stone
masonry mortars other than cement will not be having any bond with the stone
surface.
4. In the case of stone masonry, the dead weight is more because it is comparatively
heavy, for the same reason, it is suitable for under water construction.
5. Stone work is stronger than brick work.
6. Thinner walls are not possible in stone masonry.
7. Bricks resist fire better than stones. In case of fire, stone easily disintegrates.
8. In the case of brick masonry, mortar joints are thin and uniform due to their
uniform size and shape, and hence the structure becomes more durable with less
consumption of mortar. But in the case of stone work, - pointing is necessary.
9. It is easy to provide connections and openings in case of brick work.
10. Brick work is less water tight than stone work, bricks absorb moisture from
atmosphere and dampness can enter the building. Hence plastering is essential, as
extra expenditure to brick work.
11. By stone masonry architectural and massive effects can be developed, hence it is
used for constructing temples, monumental works, bridges etc. Bricks are used,
due to their light weight, in residential and commercial building works.

51

PLASTERING
Plastering is the process of covering rough surfaces of wal1s, columns, ceilings and other
building components; with thin coat, of plastic mortars to form a smooth durable surface. The
coating of plastic material mortar is termed as plaster. Plastering on external exposed' surface
is known as rendering.
Objects of Plastering
Plastering is done to achieve the following purposes
1. To protect the external surfaces against penetration of rain water and other
atmospheric agencies.
2. To give smooth surface in which dust and dirt cannot lodge.
3. To give decorative effect.
4. To protect surfaces against vermin.
5. To conceal inferior defective workmanship.
Requirements of Good Plaster
1. It should adhere to the background and should remain adhered during all variations in
seasons and other atmosphere conditions.
2. It should be hard and durable.
3. It should possess good workability.
4. It should be possible to apply it during all weather conditions.
5. It should be cheap.
6. It should effectively check penetration of moisture.
The type of plaster depends upon
1.
2.
3.
4.
5.

Availability of binding materials


Durability requirements
Finishing requirements
Atmospheric conditions and variations in weather
Location of surface

The types of mortars commonly used for plastering are


1. Lime Mortar
2. Cement Mortar
3. Lime Cement Mortar
1. Lime Mortar
Lime used for plastering may be either fat lime or hydraulic lime. However, fat lime is
preferred since it yields good putty after slaking. Hydraulic lime contains particles which
slake very slowly as it comes in contact with atmospheric moisture, slaking may even
continue for 6 to 8 months. If unslaked particles remain in such a plaster, balusters are formed
during the process of slow slaking. Thus the plastered surface gets damaged. Hydraulic lime
yields harder and stronger surface.

52

If hydraulic lime is used for plastering, it should be ground dry with sand. It is then-left for 2
to 3 weeks and then reground before use. Fat lime on the other hand, is slaked wet. The mix
proportion varies from 1:3 to 1:4 for fat lime and 1:2 for hydraulic or Kanker lime. The
binding properties of lime mortar can be improved by adding gugal at the rate of about 1.6 kg
per cubic metre of mortar. The adhesive and tensile properties of lime mortar can further be
improved by mixing chipped hemp at the rate of about 1 kg per cubic metre of mortar. Such a
treatment prevents the formation of tensile cracks on the plastered surface.
2. Cement Mortar
Cement mortar is the best mortar for external plastering work since it is practically nonabsorbent. It is also preferred to lime plaster in bathrooms etc. and in damp climates. Cement
mortar is much stronger than lime mortar. The mix proportion may vary from 1:4 to: 1::6.
Sand used for plastering should be clean coarse and regular. Before mixing water, dry mixing
is thoroughly done. When water is mixed, the mortar should be used within 30 minutes of
mixing well, before initial setting takes place.
3. Lime Cement Mortar
Lime cement mortar contains properties of both the lime mortar as well as cement mortar.
Cement mortar as such does not possess sufficient plasticity. Addition of lime to it imparts
plasticity resulting in smooth plastered surface. Mix proportions generally used are
1: l: 6 (cement: lime: sand) 1: 1: 8 or 1:2:8. Generally, fat lime is used.

53

LINTELS
A lintel is a horizontal structural member/spanning opening, to support the load of the
structure coming over it. It is used to span the openings for doors, windows, and corridors. Its
function is similar to that of an arch. As the construction of lintels is much simpler than the
construction of arch it is becoming more popu1ar these days. The following types of lintels
are commonly used.
1. Wooden lintel
2. Brick lintel (Arches)
3. Stone lintel
4. Steel lintel
5. RCC lintel
1. Wooden Lintels
Wooden lintels are the oldest type of lintels and now days, also they are used in hilly areas
where timber is available. The sound and hard timber like teak is used over the opening and
masonry is constructed over it. A timber is easily liable to catch fire. Only good quality
timber with a coal of suitable preservative should be used as lintels. One piece of timber or a
built up section may be used as a linte1. The ends of the lintels rest on a mortar on the walls
for a minimum width of 15 cm. Wooden lintels are very strong and hence a relieving
masonry arch is constructed over it when the load coming over it is, considerably more. If it
is used in ill ventilated places, it is liable for decay.
2. Brick Lintels
Brick lintels are used for small openings, generally exceeding 1 metre span, and, light loads.
They are built up, hard, well-burnt, copper-coloured, and free from cracks and straight edged
bricks. The depth of the lintel varies from to 10 cm to 20 cm depending upon the span. A
centering or timber supporting is required to construct brick lintel. When lintels are
constructed to span over large opening, mild reinforcing bars are used with rich cement
mortar. It is known as reinforced brick lintel.
3. Stone Lintels
Stone lintels are used in stone masonry structures and buildings faced with stones. It may be
constructed of a single piece or more than one piece. Its use is restricted to monumental
buildings or in hilly areas due to high cost and weakness in withstanding excessive transverse
stresses. The least thickness of the stone lintel is about 7.5 cm and as a thumb rule the
thickness is taken as at least 1 mm per one cm length of the opening.
4. Steel Lintels
Steel ang1es are used for spanning smal1 openings and rolled steel joints are used for heavy
loading and large spans. Some times, a combination of two or more joists is used. Tube
separators are used to keep the Rolled Steel Joists in the required positions. The system may
be embedded in cement concrete to protect steel, from fire and corrosion.

54

5. RCC Lintels
They are economical and simple in construction, and are commonly used these days. RCC
lintels are more durable, strong and fire-resistant. It consists of a rectangular or square
concrete section reinforced with mild steel bars. It can be pre-cast or cast-in-situ. Precast
RCC lintels are preferred for small spans up to 2 m. Pre-cast lintels increase the speed of the
construction and quality control is better in this case. The top of the precast lintels should be
marked by paint to facilitate placing of the lintels in the correct position. For cast-in- situ
lintels, a centering is erected. The reinforcement is placed and then concrete is poured,
compacted and cured. Generally 1:2:4 concrete is used in the construction of lintels. The
depth of lintel and the amount of the reinforcement is governed by the intensity of load, the
type of support and the span. When RCC lintels are used, there is no need of providing any
relieving arch. RCC Lintels are as shown in Figure 2.24

Fig.2.24 RCC Lintels


Loads on Lintels
A lintel carries the weight of the wall constructed over it. It has been found that the weight of
the wall enclosed in a triangle with a base equal to the effective span of the lintel and the side
angle of 60. This consideration is based on the assumption that if a lintel falls, the amount of
brickwork which would collapse with it would probably be something between a semicircular arch and an equilateral triangle. It can be a1so be assumed that the same effect will
be produced if the loading of the lintel is evenly distributed over a length equal to the
effective span and for a height equal to half the effective span of the lintel. The above
contention is only valid when the lintel is placed in the middle of the wall.

55

COLUMNS
RCC Columns
Reinforced concrete columns may be constructed in square, rectangular, hexagonal, or
circular shapes. Longitudinal reinforcements are provided to take up the major load coming
over the columns. Lateral ties are provided to keep the main reinforcement in position and to
take up the shrinkage and; temperature stresses. They also provide lateral rigidity which
checks the buckling of the longitudinal bars. These ties may be provided in the form of spiral.
The spiral lateral ties are advantageous as they provide extra strength to the column. Columns
at the corner of buildings may have "L" shape. The longitudinal bars should not be less than
0.8 percent and not more than 8 percent of the cross sectional area of the column. Generally
the diameter of the bar is not more than 6 mm and not less than 10 mm. The minimum
concrete cover provided around the bar is 4 cm. The pitch of the letera1 ties is not more than
30 cm or the least dimension of the column or four times the diameter of the longitudinal bar.
The volume of the lateral reinforcing steel should not be less than 4 percent of the total
volume of column. Various types of RCC columns are shown in Fig.2.25

Fig.2.25 RCC Columns


First of all, the longitudinal bars and lateral ties are fixed in the position and then shuttering is
erected. With the aid of suitable fillets, the gap between bars and the shuttering maintained so
as to have suitable concrete cover. Concrete is poured into it and well compacted. Again the
shuttering is provided for the second stage and concreting is done as usual. This process of
casting is continued till the full column is complete but rate of casting is not more than 2
meters height per hour. The concreting in the column should be stopped a few centimeters
below the level of the beams running into the columns. This portion of the column is
concreted with the beam.
Concrete should be placed carefully when the columns extend for several storey. The section
of the columns in upper storey may be reduced as they have to carry lesser loads. But the
centre lines of co1umns must coincide accurately for various columns of different storeys.

56

This should be checked at each stage of the construction. The steel reinforcement from the
column in the lower storey is bent such that they are accommodated in the column of the top
floor.
Steel Columns
Steel columns have many advantages over cast iron and other metal columns. They are more
dependable and- safe. A steel column may be damaged in a collision badly bent out of 1ine
and still support its load without collapsing if that load does not approach the critical load for
the columns.
Types of steel columns are illustrated in Figure 2.26. Struts of one or two angles are used for
compression member in roof trusses, light towers and lattice girders. The two angles of a
double angle strut riveted together by rivets driven through washers placed between the two
angles at intervals of 1.2 to 2.0 meters, or at such, interval that the unsupported l/r of one
angle does not exceed l/r for the whole strut. Two or four angles starred and connected by
batter plates spaced at intervals of 1 to 1.3 meters are sometimes used to support light loads.
Latticed columns made up of channel angles connected by, lattice bars are often used where
light loads are to be supported on long columns.
Rolled H-columns are available in depths ranging from 15 to 40 cm and are now commonly
used instead of built-up columns in steel skeleton construction. Built-up columns are usually
of H-shaped section although columns with two or more webs are not uncommonly used in
building frames. Top chord sections of heavy trusses are usual unsymmetrical and are made
up of two rolled or built-up channel sections and cover plate. The bottom side of the section
is latticed. Columns for bents are sometimes made up of a pair channels and an I-beam with
batten plates at intervals of 1.3 meters connecting the flanges of the channels.
Columns made up of four angles and a web plate is commonly used in mill building bents.
Battened columns in which two components of a column are connected only by batten plate
are certainly inferior to latticed columns and should be avoided if a continuous plate or
latticing can be used instead.

57

Fig.2.26 Types of Steel Columns

58

SLABS
A slab is a structural element with its thickness being small compared to the other two
dimensions. Most of the slabs in construction are rectangular in plan and can be divided into
two categories.

One way slabs, simply supported, cantilevered or continuous bending in one direction
only.
Two way slabs, simply supported, cantilevered or continuous in two directions.

One Way Slab


One way slabs span in one direction only and may have simply supported or clamped edges
or edges over which the slab is continuous. These edges are perpendicular to the direction of
the span. Along the other two edges either the supports do not exist or are so far apart they
carry practically no load from the slab and hence do not contribute towards the moment and
shear in the slab in any significant measure. The assumption is that of unidirectional bending
in the direction of the span. It is as shown in Figure 2.27

Fig.2.27 Simply Supported One Way Slab


Two Way Slab:
The term two-way slab may be attributed to such cases in which the load is carried in more
than one direction.

59

BEAMS
A beam is a structural member subjected to a system of external forces at right angles to its
axis. The various types of beams are shown in Figure 2.28
In general the beams can be classified as follows:
1) Cantilever Beam
2) Simply supported beam
3) Over hanging beam
4) Rigidly fixed beam
5) Continuous beam
1. Cantilever beam: A beam fixed in one end and free at the other is called as cantilever
beam.
2. Simply supported beam: A beam supported or resting freely on walls or columns at it
both ends, is known as simply supported beam.
3. Over hanging beam: A beam having its end portion extended beyond the support is
known as an over hanging beam.
4. Rigidly Fixed Beam: A beam whose both ends, are rigidly fixed in walls is known as
rigidly fixed beam or built-in beam.
5. Continuous Beam: A beam supported on more than two supports is known as a
continuous beam. It mayor may not be an over hanging beam.

Fig.2.28 Types of Beams

60

Types of Loading
1. Concentrated or point toad
2. Uniformly distributed load and
3. Uniformly varying load
Span of the Beam
The horizontal distance between the supporting walls is known as clear span of the beam. The
horizontal distance between the lines of action of the supporting walls is known as effective
span.

61

ROOFS
Roof may be defined as a covering provided over the top of a building with a view to keep
out rain, snow, sun and wind and to protect the building from the adverse effect of these
elements. A roof basically consists of roof covering materials supported on structural
elements installed on the building top. The structural elements may be trusses, portals, flat
slab, shell, dome or space frame whereas the roof covering material may be thatch, wooden
singles, tiles, slates, A.C. sheets, G.I sheets etc. Roof is considered to be one of the important
items of work in a building and due attention should therefore be paid in the matter of
selection of the type of roof and the method of construction. Components and Details of
lateral and vertical bracing are as shown in Figure 2.29 and Figure 2.30 respectively.

Fig.2.29 Components of a Roof Truss

62

Fig.2.30 Details of Vertical and Lateral Bracings


Classification
Roofs may classified as
1. Pitched or Sloping Roofs
2. Flat Roofs
3. Curved Roofs
1. Pitched Roof
It is the most common form of roof and is generally regarded as the cheapest alternative for
covering a structure. Pitched roofs are almost always constructed in wood or steel. Wooden
pitched roof consists of a system of joists, rafters and purlins arranged in the form of a
triangular shaped support known as truss. The lower ends of the rafter rest upon the wall
plates and at their upper end they are connected to a common ridge piece.
In pitched roof a slope of less than 1 in 3 is generally not considered satisfactory from
drainage point of view. In areas of heavy snow fall, steeper slopes of say 1 to or 1:1 are
provided to reduce the incidence of snow load on the roof.
The slope of the roof varies according to the span, the climatic conditions of the site, the
nature of the covering material and other similar factors.
Roof Covering for Pitched Roofs
Roof covering is provided over the form-work of roof structure to act as a barrier for the rain,
sun, wind or other such elements. The selection of covering material depends upon various
factors such as availability of material, its initial cost and cost of maintenance, appearance
and durability. The various types of roof covering are

63

a.
b.
c.
d.
e.
f.

Thatch covering
Shingles
Tiles
Asbestos-cement sheets
Galvanized corrugated iron sheets
Slates

Of the above types of roof coverings the Asbestos-cement sheets (A.C.sheets) and
Galvanized iron sheets are commonly used.
Asbestos-Cement Sheets
Asbestos is a silky fibrous material found in veins in metamorphosed volcanic rocks.
Asbestos cement roofing sheets are available as corrugated roofing sheets, wall boards.
Rainwater gutters and felts. The A.C. sheets are fixed with smooth surface uppermost to
wood or steel purlins. The purlins are placed at a maximum spacing of 1.375 meters by
drilling holes on crowns.
Galvanized Iron Sheets
Galvanized iron sheets are available in box, plain and corrugated forms. The purpose of
corrugations is to impart additional strength to the tin sheets. The iron sheets are protected
against fusing in wet weather by galvanizing with zinc. The sheets are fixed to purlins
spaced at 2 metre centre and are held in position by means of coach screws using bitumen
washers.
Steel Roof Trusses
Steel roof trusses are designed in such a way that the various members are in either tension or
compression. The type of the truss depends on
i)
ii)
iii)

Span
Roof slope
Covering material

The various types of steel trusses depending upon the span and arrangements of various
members of truss are shown in Figure 2.31(a) and 2.31(b)

64

Fig.2.31 (a) Various Types of Roof Trusses

65

Fig.2.31 (b) Various Types of Roof Trusses

66

2. Flat Roofs
Where the rainfall is low, flat roofing is preferred over sloping roof. A gentle slope is given
to the surface for the free flow of rainwater.
Madras Terraced Roof
This is a type of flat roof commonly used in Tamilnadu. The procedure of construction of this
type of roof is as follows:
1. Teakwood joists are placed on Rolled Steel Joists with a furring piece between the joists
and rolled steel joists. The furring is placed sloping and it gives necessary slope to the
flat roof.
2. A course of specially prepared terrace bricks ism laid diagonally across the joists .The
size of brick is generally 150 mm x 75 mm x 25 mm and they are placed on edge in lime
cement mortar
3. After the brick course has set a course of brick bat concrete is laid. The thickness of this
course is about 75 mm and it consists of three parts of brick bats, one part of gravel and
sand and 50 % lime mortar by volume.
4. The concrete is well rammed for three days and allowed to set.
5. Flat tiles are then laid over the layer of concrete. The tiles are laid in two courses making
the thickness of about 50 mm. Alternatively China Mosaic pieces may be used in place
of place of flat tiles.
6. Finally the surface of the roof is finished by three coats of plaster as shown in Figure
2.32. The surface is rubbed and polished and it is given a slope of 1 in 30.

Fig. 2.32 Madras Terraced Roof

67

In Madras Terrace Roofing as well as RCC. roofing 100% water tightness cannot be
achieved. However on top of the roofing, about 10 cm. thick lime surkhi concrete is laid and
two layers of flat tiles are laid to make the roof water tight.
Advantages of Flat Roofs
1. The construction of roof is simplified.
2. It is easier to make a flat roof as fire proof than a sloping roof.
3. The roof area can be utilized for roof gardens, drying yards, etc. The terrace can
conveniently be used for sleeping in hot season.
4. The construction work of upper floors can easily be started. In case of a pitched roof,
the entire roof is to be removed and is to be replaced by a new floor under such
circumstances.
5. A flat roof is found to be economical than a pitched roof.
Disadvantages
1. Flat roofs cannot be used for long spans.
2. Cracks are developed on the surface of the roof, when the variation in temperature is
high.
3. Pockets of water are formed on the surface of the roof, if slopes are not sufficient.
This leads to the leakage of the roof.
4. At places where rainfall is heavy, flat roofs are not desirable.
3. Curved Roofs
These are just the modification of pitched roofs and are frequently used to cover large areas.
Shell Roofs and Domes are the variety of Curved Roofs. They are used in factories, and
monuments. They are constructed of timber or RCC. Shell roof are of two types. They are
north light shell roof (Figure 2.33) and Barrel vault shell roof (Figure 2.34).

Fig. 2.33 North light shell roof

68

Fig.2.34 Barrel vault shell roof

Dome is a rounded vault forming a roof. It is useful when then roof is to be provided on
circular brickwork or regular polygon shape walls. Curved roofs pleasing in appearance and
economical as less steel and concrete are required because of arch action.

69

UNIT III
SERVICES
ROADS

Role of Transportation
Transportation contributes to the economic, industrial, social and cultural development of any
country. Transportation is vital for the economic development of any region since every
commodity produced whether it is food, clothing, industrial products or medicine needs
transport at production and distribution stages. The inadequate transportation facilities retard
the process of socio economic development of the country.
Economic activity and Transport

Production or supply
Consumption for human wants or demand

Social Effects of Transportation


Sectionalism and transportation
Concentration of population into urban area
Aspect of safety, law and order
Advantages of Transportation
1. Transportation is for advancement of the community.
2. Transportation is essential for the economic prosperity and general
development of the country, and
3. Transportation is essential for strategic movement in emergency for defence of
the country and to maintain better law and order.
Different Modes of Transportation

Roadways or Highways
Railways
Waterways
Airways
Ropeways
Pipelines
Belt conveyors

Characteristics of Road Transport


The Characteristics of road transport are briefly listed here:

70

(i) Roads are used by various types of road vehicles, like passenger cars, buses, trucks, two
and three wheeled automobiles, pedal cycles and animal drawn vehicles trucks, etc. But
railway tracks are used only by rail locomotives and wagons, waterways are used by only
ships and boats.
(ii) Road transport requires a relatively small investment for government. Motor vehicles are
much cheaper than other carriers like rail locomotives and wagons, water and air carriers.
Construction and maintenance of roads is also cheaper than that of railway tracks, docks,
harbors an airports.
(iii) Road transport offers a complete freedom to road users to transfer the vehicle from one
lane to another and from one road to another according to the need and convenience. This
flexibility of changes in location, direction, speed and timings of travel is not available to
other modes of transport.
(iv) In particular, for short distance travel, road transport saves time. Trains stop at junctions
and main stations for comparatively longer time.
(v) Speed of movement is directly related with the severity of the accident. The road safety
decreases with increasing dispersion in speed. Road transport is subjected to a high degree of
accidents due to the flexibility offered to the road users. Derailment of railway locomotives
and air crash of air planes are also not uncommon. They are in fact more disastrous.
(vi) Road transport is the only means of transport that offers itself to the whole community
alike.

CLASSIFICATION OF ROADS
Types of Roads
The different types of roads are classified into two categories depending on whether they can
be used during different seasons of the year.
1. All-weather roads and
2. Fair-weather roads
All weather roads are those which are negotiable during all weathers, except at major river
crossings where interruption to traffic is permissible up to a certain extent. The road
pavements which are negotiable only during fair weather are called fair weather roads; on
these roads, the traffic may be interrupted during monsoon season at causeways where
streams may overflow across the road.
Based on the type of the carriage way or the road pavement, the roads are classified as:
Paved roads, if they are provided with a hard pavement course which should be at
least a water bound macadam (WBM) layer
Unpaved roads, if they are not provided with a hard pavement course of at least a
WBM layer. Thus earth roads and gravel roads may be called unpaved roads.

71

Based on the type of pavement surfacing provided, the road types are divided classified
as:
Surfaced roads which are provided with a bituminous or cement concrete surfacing
Unsurfaced roads which are not provided with bituminous or cement concrete
surfacing. The roads provided with bituminous surfacing are also called black-topped
roads.
Methods of Classification of Roads
The roads are generally classified on the following basis:
Traffic volume
Load transported or tonnage
Location and function
The classification based on traffic volume or tonnages have been arbitrari1y fixed by
different agencies and there may not be a common agreement regarding the limits for each
classification group. Based on the traffic volume the roads are classified as heavy, medium
and light traffic roads. These terms are relative and so the limits under each class should be
clearly defined and expressed as vehicles per day etc. Likewise the classification based on
load or tonnage is also relative and the roads may be classified as class I, II etc. or class A, B
etc. and the limits may be expressed as tonnes per day.
The classification based on location and function should be therefore a more acceptable
classification for a country as they may be defined clearly.
Classification of Road System by Nagpur Road Plan
The Nagpur Road Plan classified the roads in India based on location and function into the
following five categories
1.
2.
3.
4.
5.

National Highways (NH)


State Highways (SH)
Major District Roads (MDR)
Other District Roads (ODR)
Village Roads (VR)

1. National Highways
National Highways are main highways running through the length and breadth of India,
connecting major ports, foreign highways, capitals of large states and large industrial and
tourist centres including roads required for strategic movements for the defense of India.
2. State Highways
State Highways are arterial roads of a state, connecting up with the national highways of
adjacent states, district head quarters and important cities within the state and serving as the
main arteries for traffic to and from district roads.

72

3. Major District Roads


Major District Roads are important roads within a district serving areas of production and
markets and connecting those with each other or with the main highways of a district. The
MDR has lower speed and geometric design specifications than NH/SH.
4. Other District Roads
Other District Roads are roads serving rural areas of production and providing them with
outlet to market centres, taluk head quarters, block development head quarters or other main
roads. These are of lower design specifications than MDR
5. Village Roads
Village Roads are roads connecting villages or groups of villages with each other to the
nearest road of a higher category.

Modified Classification of Road System by Third Road Development Plan, 1981-2001


The roads in the country are now classified into three classes, for the purpose of transport
plannings, functional identification, earmarking administrative jurisdictions on a road
network viz:
1. Primary system
2. Secondary system
3. Tertiary system or rural roads
The Primary system consists of two categories of roads:
Expressways
National Highways (NH)
Express ways are a separate class of highways with superior facilities and design standards
and are meant, as through routes having very high volume of traffic. The expressways are to
be, provided with divided carriageways, controlled access, grade separations at cross roads
and fencing. These highways should permit only fast moving vehicles. Expressways may he
owned by the Central Government or a State Government, depending on whether the route is
a National Highway or State Highway.
The Secondary system consists of two categories of roads:

State Highways (SH)


Major District Roads (MDR)

The Tertiary system are rural roads and these, consist of two categories of roads:
Other District Roads (ODR)
Village Roads (VR)
The definitions of NH, SH, MDR, ODR and VR are the same as given under classification of
roads by Nagpur Road Plan.

73

Classification of Urban Roads


Urban roads, other than expressways are classified, as:
1.
2.
3.
4.

Arterial
Sub-arterial
Collector street
Local Street

1. Arterial
An arterial is a street for through-traffic, usually on a continuous route. The arterial system
connects existing or proposed expressway systems to provide for distribution and collection
of through traffic from sub-arterial and collector-street systems. For efficient movement of
through traffic, continuity of the arterials is essential. Parking, loading and unloading
activities are restricted and regulated. Pedestrians are allowed to cross only at intersections.
2. Sub-arterial
A sub-arterial is a street primarily for carrying through-traffic, usually on a continuous route,
but has less traffic mobility.
3. Collector Street
A collector street collects and distributes traffic from and to local streets and also provides
access to arterial streets. These may be located in residential neighbourhood, business and
industrial areas. There are few parking restrictions except during peak hours in collector
streets.
4. Local Streets
A street primarily for access to residences and business areas is called a local street. Most of
the streets in urban areas either originate from or terminate on these streets. Local streets may
be residential, commercial or industrial, depending on the main use of the adjoining land.
They allow unrestricted parking and pedestrian movement.
HIGHWAY CROSS-SECTIONAL ELEMENTS
The cross sectional elements of roads are shown in the Figure. 3.1

Fig.3.1 Cross Sectional Elements of a Road

74

Right of Way
The right of way is the width of the land to be acquired for road purposes, keeping in view
future requirements. The width of land depends on the class of highway as well as terrain.

Roadway Width
The width of roadway is the width of formation at the top and is equal to the width of
carriage-way plus the width of shoulders on either side of the carriage-way.

Width of Carriage-way
The central paved width of road for vehicular traffic is called carriage-way. In general, 3.75
m is considered desirable for a road having single lane for vehicles of maximum width 2.44
m. For pavements having two or more lanes, width of 3.5 m per lane is considered sufficient.

Shoulder width
The portions of the roadway between the outer edges and the edges of the carriage-way are
called shoulders. They serve the following functions:

provide lateral stability


provide parking space in emergency
provide space for emergency repairs of vehicles
provide additional space for vehicles while overtaking other vehicles

Camber
The rise given to the centre of carriageway with reference to its edge is called camber. It is
provided to drain away the rain water from the surface of pavement as quickly as possible.

TYPES OF PAVEMENT STRUCTURE


Based on the structural behaviour, pavements are generally classified into two categories:
1. Flexible pavements
2. Rigid pavements
Flexible Pavements
Flexible pavements are those, which on the whole have low or negligible flexural strength
and are rather flexible in their structural action under the roads. A typical flexible layer
consists of the following as shown in Figure.3.2

75

Fig. 3.2 Flexible pavement


Subgrade
It is the foundation layer, to support the load coming on the pavement. Since the entire load
surface is ultimately transmitted to the subgrade, it should never be overstressed. Therefore it
is desirable that the top layer of 0.5 m of the subgrade should be well compacted at optimum
moisture content.
Sub-base course
Purpose of the sub-base course is to permit the road of relatively thick pavement at a low
cost. Economy is the essential item in the design. Locally available material should be used.
eg. natural gravels, stabilized soil. If the soils and drainage conditions are good, the sub-base
may be omitted. Purpose of sub-base are
1.
2.
3.
4.

Increase the structural support for the base & surface courses.
Improve drainage
Eliminate frost heave and salt heave
Prevent the base and surface courses from being affected detrimentally by the poor
qualities of the under laying soil. IRC recommends a minimum thickness of 10 cm
for flexible pavements.

Base Course
That portion of the roadway superstructure which lies immediately under the wearing course
or pavement. The purpose of the base course in flexible pavement is to provide a stress
distributing medium which will spread the load applied to the surface so that shear and
consolidation deformation will not take place in the sub-grade. It also increases load
supporting capacity of the pavement.
Rigid pavement
A rigid pavement may consist of concrete slab directly over a base course as shown in
Figure.3.3. They have good flexural strength or rigidity. Example of the rigid pavement is the
cement concrete road.

76

Fig.3.3 Rigid pavement


Wearing Course
The purpose of the wearing course are given below
Wheels of vehicle are in actual contact. Purpose is to provide a smooth riding
surface that will resist destructive pressure exerted by the traffic.
Should prevent or minimize penetration of surface water into the road bed.
Properly designed wearing course adds appreciable strength to the entire road
structure materials - low cost surfaces - bituminous or cement
HIGHWAY MATERIALS
1.
2.
3.
4.
5.

Sub grade Soil


Stone Aggregates
Bituminous Materials
Bituminous Paving Mixes
Portland Cement and Cement Concrete

1. Subgrade Soil
Soil mainly consists of mineral matter formed by the disintegration of rocks, by the action of
water, frost, temperature, pressure or by plant or animal life. This subgrade soil is an integral
part of the road pavement structure as it provides the support to the pavement. Compacted
soil an stabilized soil are often used in sub-base or base course of highway pavements
Desirable Properties
The desirable properties of soil as a highway material are

Stability
Incompressibility
Permanency of strength
Minimum changes in volume and stability under adverse weather conditions
of weather and ground water
Good drainage
Ease of compaction

77

2. Aggregates
Aggregates are the major component used in road making. It is used in granular bases and
sub-bases, bituminous courses and in cement concrete pavements. A study of the types of
aggregates, their properties and tests is of great importance to a highway engineer.

Desirable Properties
The desirable properties of aggregates as a highway material are
Strength: The aggregates to be used in road construction should be sufficiently strong to
withstand the stresses due to traffic wheel load.
Hardness: The aggregates should to hard enough to resist the wear due to abrasive action of
traffic.
Toughness: The aggregates should have sufficient resistance to impact or toughness due to
moving wheel loads.
Durability: The aggregates should resist disintegration due to the action of weather. The
property of the stones to withstand the adverse action of weather may be called soundness.
Shape of Aggregates: The aggregates may be rounded, angular, cubical, flaky or elongated
shape of particles. The flaky and elongated particles will have less strength and durability
when compared with cubical, angular or rounded particles of the same stone.
Adhesion with Bitumen: The aggregates must have less affinity with water when compared
with bituminous materials; otherwise the bituminous coating on the aggregate will be stripped
off in presence of water.
Tests on aggregates
The common tests on road aggregates in India are:
Aggregate Impact Test
Los Angles Abrasion Test
Aggregate Crushing Test
Water Absorption Test and Bulk Specific Gravity Test
Flakiness Index Test
Aggregate Polishing Test
Stripping Test
3. Bituminous Materials
Bitumen is defined as a viscous liquid, or a solid, consisting essentially of hydrocarbons and
their derivatives, which is soluble in carbon disulphide. It is substantially non-volatile and
softens gradually when heated. It is black or brown in colour and possesses water proofing
and adhesive properties. It is obtained by refinery process from petroleum, in which case it is
known as petroleum Bitumen. It is also found as a natural deposit, in which case it is
known as native bitumen or natural bitumen.
78

The viscosity of bitumen is reduced some times by a volatile diluent; this material is called
cutback.
Properties of Bitumen
For satisfactory performance as a road material, bitumen should have the following desirable
properties:

It should be fluid enough at the time of mixing to coat all the surfaces of the
aggregates evenly to a thin film. Fluidity is achieved either by heating or by cuttingback with a thin flux or by emulsifying the bitumen
It should have low temperature susceptibility, or in other words, it should exhibit
little change in viscosity with change in temperature.
The bitumen should have a good amount of volatiles in it and is should not lose them
excessively when subjected to higher temperature. This will ensure its durability
The bitumen should be ductile and brittle
The bitumen should be capable of being heated to the temperatures at which it can be
easily mixed without any fire hazards
The bitumen should have good affinity to the aggregates and should not be stripped
off in the continued presence of water

TRAFFIC CONTROL DEVICES


The various aids and devices used to control regulate and guide traffic are
1. Traffic signs
2. Markings
3. Signals
Traffic Signs
The Traffic signs should be backed by law in order to make them useful and effective. They
perform a number of functions such as

Give timely warning of hazardous situations when they are not self evident
Are of great help in regulating traffic by imparting message to the drivers about the
need to stop, give way and limit their speeds.
Give information regarding highway routes, directions and points of interest

In view of the above, traffic signs occupy a significant place in traffic engineering. They are
mounted on fixed or portable supports and are placed on the side of the loads.
Importance of Traffic Signs
Traffic signs are provided to warn, direct and guide road users. They are in- the form of
symbols or inscriptions. They are mounted on fixed or portable supports and are placed on
the side of roads.

79

The various traffic signs are classified as:


1. Warning or cautionary signs
2. Regulatory or mandatory signs
3. Informatory and guiding signs
1. Warning or Cautionary Signs
These signs are used to caution the drivers about certain hazardous conditions ahead shown in
Figure.3.4. These signals warn the driver so that he can take the desired precaution.

`
Fig.3.4 Warning signs
The boards on which the cautionary signs are displayed have been standardized by IRC. An
equilateral triangular board of 450 mm side is supported on a post of height 2.75 m above
ground level up to the base of the triangle. A rectangular plate of 450 x 400 mm is placed 150
mm below the base of the triangle on which the sign is written.
2. Regulatory or Mandatory Signs
These signs are used to inform road users certain rules and regulations which have to be
observed for safe and free flow of traffic. The violation of these signs is a legal offence.
Some of the mandatory signs included are shown in Figure.3.5

Dead slow
No turn
Speed limit
Over taking prohibited

80

Sound horn prohibited


Parking prohibited

Fig. 3.5 Mandatory signs


The size, shape and details of traffic signs have been standardized by IRC. A regulatory sign
has to be displayed on a red disc 600 mm in diameter and installed at a height of 2.8 m above
ground level up to the centre of the disc. It carries a rectangular definition plate between the
circular discs.
3. Informatory or Guiding Signs
These signs are provided for route identification, direction to travelers and such other
information a traveler requires in order to reach his destination. Examples of informatory
signs are (shown in Figure.3.6)

Route marker sign


Road junction approach
End of speed limit
Road name sign

Fig.3.6 Informatory signs

81

Route marker signs are erected ahead of intersections and such other points that may be
considered necessary to guide the through traffic.
Road Markings
Road markings are used as a means of controlling and guiding traffic. They are highly
important on roads and intersections as they promote road safety and bring about smooth and
harmonious flow of traffic along guided paths of travel. They also serve to supplement the
messages conveyed by road signals and signs. In some cases, they are used alone to convey
certain regulation, information or warning that cannot otherwise be effectively made known
to the road users
Types of Road Markings
Road markings are basically of two types:
Carriageway markings and
Object markings.
As the name implies, the former type of markings are those that are applied to the
carriageway itself. The latter type covers markings on objects such as abutment, piers, kerbs,
traffic islands, culvert headwalls, etc.
Carriageway Markings
1. Centre line
2. Traffic lane line
3. No-overtaking zone markings
4. Pavement edge lines.
5. Carriageway width reduction transition markings
6. Obstruction approach markings.
7. Stop lines.
8. Pedestrian crossings
9. Cyclist crossings
10. Route direction arrows etc.
11. Word messages.
12. Markings at approaches to intersections.
13. Parking space limits,
14. Bus stops.
A few markings are explained
1. Centre Lines
The purpose of the markings is to guide the driver and separate the stream of traffic moving
in opposite directions. These markings may be solid lines or broken lines according to the
type of the road. An example is shown below (Figure.3.7)

82

Fig.3.7 Centre line marking


2. Traffic Lane Lines
These markings divide the carriageways into separate lanes on either side of the centre line.
This helps to regulate the traffic into proper lanes (Figure.3.8).

Fig.3.8 Traffic lane marking


3. Pedestrian Crossings
These markings are provided at important intersections to facilitate pedestrians to cross a
road (Figure. 3.11).

Fig 3.9 Pedestrian crossings

OBJECT MARKING

Objects within the carriageway

83

Kerb marking for visibility


Kerb marking for parking restriction
Objects adjacent to the carriageway

Object Markings within the Carriageway


The object marking for obstruction within the carriageway shall be marked not less than five
alternating black and white stripes of 100mm width. The stripes shall slope downwards at an
angle of 45 towards the side of the obstruction on which the traffic passes.
Where vertical clearance of an overhead bridge is less than the prescribed minimum, the
available clearance is marked on the structure. Vertical stripes are also marked on the face of
the wall.
Objects Adjacent to the Carriageway
Some objects such as abutments and subway piers, which are adjacent to the carriageway,
should be marked with alternate white and black diagonal stripes sloping downwards.
Object Markings on Kerbs
Kerbs of all islands should be painted with alternate black and white stripes of 0.5m width or
a chequered black and white design of the same width. The two designs are showed in
Figure.3.10

Fig. 3.10 Kerb marking


Marking Indicating parking restrictions
Kerbs on carriageway marking shall be used to show where parking is prohibited. The
marking should be continuous yellow line covering the top and face of kerb or the
carriageway close to it. Details of road markings are available
General Principles of Longitudinal Pavement Markings
1. Solid lines are restrictive in nature and it is an Offence to cross or straddle such a line.
84

2. Broken lines are restrictive in character, and vehicles can cross such a line provided
this can be done with safety.
3. When a combination of a solid and broken lines is used: in countries where the traffic
moves to the left (right), a vehicle should not cross the continuous line adjacent to and
to the left (right) of a broken line on the right (left) of the lane in which it is moving.
4. Double lines indicate maximum restrictions
Material and Colour
The material commonly employed for pavement, curb and object marking is paint.
Alternative materials such as strips of steel, rubber or plastic, reflecting or non-reflecting
studs, permanently fixed white or coloured stones, inlaid concrete blocks etc. are also used in
certain situations.
The commonly used colours for road are white and yellow. The usage of these colours in
India is, summarised below
Colour of Road markings as per Indian Practice
Colour
White
Yellow
Alternate bands of
white and black

Uses
All carriageway markings except those intended for parking
restrictions
Markings intended for parking restrictions
Continuous centre and barrier line markings
Kerb and object markings

Traffic Signals
Traffic signals are provided at road intersections. These signals are provided to control, warn
and guide the traffic. Traffic signals serve the following purposes

improves safety and efficiency of movement of vehicular traffic and


pedestrians
maintains orderly flow of traffic
reduces accidents in general
provides nearly continuous movement of traffic
more economical than manual control
stops heavy traffic to allow slow moving traffic to cross the road safely

Generally a traffic signal is composed of three lenses, arranged vertically one above the other
with red lens on top, yellow or amber in the middle and a green lens at the bottom. These
lenses are illuminated by an independent light source from behind.
The shape of traffic control signal is circular having 200 mm visible diameter. The height at
which the signals are usually installed varies from 2.4 to 3 m. The signals are located on the
left hand side of the road as near the stop-line as possible. This is the primary signal. If an
additional signal is placed on the departure side of the intersection on the right side, it is
called a secondary signal.

85

The normal sequence of traffic signal is red, amber-green-amber- red and so on. Following
are the indications given by colours of signal (Figure.3.11)

Red : Vehicle must stop


Amber : Light about to change
Green : Vehicle can proceed.

Fig. 3.11 Traffic signal


The time lapsed from the beginning of red to a particular side to the beginning of next red to
the same side is called a cycle.
Stopping or go signal will be given to a particular stream each time. Thus, in each cycle,
different streams will have different times for being given green/red, based on the volume.
The number of such operations in cycle containing red-amber-green is known as a phase.
When there are series of signals on a city road, there should be a proper co-ordination of the
signal system to provide a green wave.

86

SURVEYING
Surveying is the art of determining the relative positions of points on, above or beneath the
surface of the earth by means of direct or indirect measurements of distance, direction and
elevation. It also includes the art of establishing points by predetermined angular and linear
measurements. The application of surveying requires skill as well as the knowledge of
mathematics, physics, and to some extent, astronomy.
In surveying, all measurements of lengths are horizontal, or else are subsequently reduce to
horizontal distances. The object of a survey is to prepare plan or map so that it may represent
the area on a horizontal plane. A plane or map is the horizontal projection of an area and
shows only horizontal distances of the points. Vertical distances between the points are,
however, shown by contour lines, or some other methods. Vertical distances are usually
represented by means of vertical sections drawn separately.
Primarily, surveying can be divided into two classes:
1. Plane surveying
2. Geodetic surveying.
Plane Surveying
It is that type of surveying in which the mean surface of the earth is considered as a plane and
the spheroid shape is neglected. All triangles formed by survey lines are considered
as plane triangles. The level line is considered as straight and all plumb lines are considered
parallel. In everyday life we are concerned with small portions of earths surface and the
above assumptions seem to be reasonable in light of the fact that the length of an arc 12
kilometers long in the earths surface is only 1 cm greater than the subtended chord and
further that the difference between the sum of the angles is only one second for a triangle at
the earths surface having an area of 195 sq.km.
Geodetic Surveying
It is that type of surveying in which the shape of the earth is taken into account. All lines
lying in the surface are curved lines and the triangles are spherical triangles. It, therefore,
involves spherical trigonometry. All Geodetic surveys include work of longer magnitude and
high degree of precision. The object of geodetic survey is to determine the precise position on
the surface of the earth, of a system of widely distant points which form control stations to
which surveys of less precision may be referred.

87

CLASSIFICATION
Surveys may be classified under headings which define the uses or purpose of the resulting
maps.
a) Classification based upon the nature of the field survey
1. Land surveying
(i) Topographical Surveys
This consists of horizontal and vertical location of certain points by linear and angular
measurements and is made to determine the natural features of a country such as rivers,
streams, lakes, woods, hills, etc., and such artificial features as roads, railways, canals,
towns and villages.
(ii) Cadastral Surveys
Cadastral surveys are made incident to the fixing of property lines, the calculation of land
area, or the transfer of land property from one owner to another. They are also made to fix
the boundaries of municipalities and of state and federal jurisdictions.
(iii) City Surveying
They are made in connection with the construction of streets, water supply systems, sewer
and other works.
2. Marine or Hydrographic Survey
Marine or hydrographic survey deals with bodies of water for purposes of navigation,
water the work consists in measurements of discharge of streams, making topographic
survey of shores and banks, taking and locating soundings to determine the depth of water
and observing the fluctuations of the ocean tide.
3. Astronomical Survey
The astronomical survey offers the survey means of determining the absolute location of
any point of the earth. This consists in observations to the heavenly bodies such as the sun
or any fixed star.
b)

Classification based on the object of survey

1. Engineering Survey
This is undertaken for the determination of quantities or to afford sufficient data for the
designing of engineering works such as roads and reservoirs, or those connected with sewage
disposal or water supply.
2. Military Survey
This is used for determining points of strategic importance.
3. Mine Survey
This is used for the exploring mineral wealth.
4. Geological Survey
This is used for determining different strata in the earths crust.
5. Archaeological Survey
This is used for unearthing relics of antiquity.

88

c) Classification based on instruments used


An alternative classification may be based upon the instruments or methods employed, the
chief types being
1.
2.
3.
4.
5.
6.
7.
8.
9.

Chain Survey
Theodolite survey
Traverse Survey
Triangulation Survey
Tacheometric Survey
Plane table Survey
Photographic Survey
Aerial Survey and
Remote Sensing

The accuracy of the survey depends its usefulness., the degree of accuracy needed will vary
with the purpose of the survey. Accuracy of a survey depends on several factors that may be
grouped as personal, instrumental, climatic and celestial.
Chain surveying
Surveying with the chain is the art of measuring portions of earths surface with the aid of
chain alone and representing the same on a reduced scale so as to bring out the portion
vividly under the eye. This type of surveying is suitable for surveys of small extent on open
ground to secure data for exact description of the boundaries of a piece of land or to take
some details.
Chaining
Chaining is term which is used to denote measuring distance either with the help of a chain or
tape and is the most accurate method of making direct measurements. For work of ordinarily
precision, a chain can be used, but for higher precision a tape or special bar can be used. The
distances determined by chaining form the basis of all surveying. No matter how accurately
angles may be measured, the survey can be no more precise than the chaining.
Instruments for Chaining
The various instruments used for the determination of the length of line by chaining are as
follows:
1. Chain or tape
2. Arrows
3. Pegs
4. Ranging rods
5. Offset rods
6. Plasterers laths and whites and
7. Plumb bob
1. Chain
Chains are formed of straight links of galvanized mild steel wire bent into rings at the ends
and joined each other by three small circular or oval wire rings. These rings offer flexibility
to the chain. The ends of the chain are provided with brass handle at each end with swivel
joint, so that the chain can be turned without twisting. The length of a link is the distance

89

between the centers of two consecutive middle rings, while the length of the chain is
measured from the outside of one handle to the outside of the other handle.
Following are various types of chains in common use:
(i)
Metric Chains
(ii)
Gunters Chain or Surveyors Chain
(iii)
Engineers Chain
(iv)
Revenue Chain
(v)
Steel band or band Chain
Metric Chains
After the introduction of metric units in India, the metric chains are widely used. Metric
chains generally available in lengths of 5,10,20, and 30 meters.IS:1492-1970 covers the
requirements of metric surveying chains Fig 3.12 shows the details of a metric chain
To enable the readings of fractions of a chain without much difficulty, tallies are fixed at
every meter length for chain of 5 m and 10 m lengths and every five meter length of chain of
20 m and 30 m lengths. In case of 20 m and 30 m chains, small brass rings are provided at
every meter length, except where tallies are attached. To facilitate holding of arrows in
position with the handle of the chain, a groove is cut on the outside surface of the handle. The
tallies used for marking distances in the metric chains are marked with the letter m in the
order to distinguish them from non metric chains. The length of chain, 5 m, 10 m, 20 m, or
30 m as the case may be, are engraved on both the handles to indicate the length and also to
distinguish the chains from non-metric chains.

Fig 3.12 Metric Chain


2. TAPES
Tapes are used for more accurate measurements and are classed according to the material of
which they are made, such as follows:
(i)
Cloth or linen tape
(ii)
Metallic tape
(iii)
Steel tape
(iv)
Invar tape
Cloth or Linen Tape
Cloth tapes of closely woven linen, 12 to 15 mm wide varnished to resist moisture, are Light
and flexible and many be used for taking comparatively rough and subsidiary measurements
such as offsets. A cloth tape is commonly available in lengths of 10 meters, 20 meters, 25
90

meters , and in 33 ft.,50ft.,66ft., and 100 ft. The end of the tape is provided with small brass
ring whose length is included in the total length of the tape. A cloth tape is rarely used for
making accurate measurements, because of the following reasons: (i) it is easily affected by
moisture or dampness and thus shrinks; (ii) its length gets altered by stretching (iii) it is likely
to twist and tangle ; (iv) it is not strong . Before winding up the tape in the case, it should be
cleaned and dried.
Metallic Tape
A metallic tape is made of varnished strip of waterproof linen interwoven with small brass,
copper or bronze wires and does not stretch as easily as a cloth a cloth tape. Since metallic
tapes are light and flexible and are not easily broken, they are particularly useful in crosssectioning and in some methods of topography where small errors in length of the tape are of
no consequences. Metallic tapes are made in lengths of 2, 5, 10, 20, 30 and 50 meters.
In the case of tapes of 10, 20, 30 and 50 m lengths a metal ring is attached to the outer ends
and fastened to it by a metal strip of the same width as the tape. This metal strip protects the
tape, and at the same time inspectors stamp can be put on it. In addition to the brass ring, the
outer ends of these tapes are reinforced by a strip of leather or suitable plastic material of the
same width as the tape, for a length of at least 20 cm. Tapes of 10, 20, 30 and 50 metre
lengths are supplied in a metal or leather case fitted with a winding device.
Steel Tape
Steel tapes vary in quality and accuracy of graduation, but even a poor steel tape is generally
superior to a cloth or metallic tape for most of the linear measurements that are made in
surveying. A steel tape consists of a light strip of width 6 to 10 mm and is more accurately
graduated. Steel tapes are available in lengths of 1, 2, 10, 30 and 50 meters. The tapes of 10,
20, 30 and 50 metre lengths are provided with a brass ring at the outer end, fastened to it by a
metal strip of the same width as the tape, The length of the tape includes the metal ring. It is
wound in a well- sewn leather case or a corrosion resisting metal case, having a suitable
winding device. Tapes of longer length more than 30 m are wound on metal reel.
A steel tape is a delicate instrument and is very light, and therefore, cannot withstand rough
usage. The tape should be wiped clean and dry after using, and should be oiled with a little
mineral oil, so that it does not get rusted.
Arrows
Arrows or marking pins are made up of stout steel wire, and generally, 10 arrows are supplied
with a chain. An arrow is inserted into the ground after every chain measured on the ground.
Arrows are made up of good quality hardened and tempered steel wire 4 mm in diameter and
are black enameled. The length of arrow may vary from 25 cm to 50 cm. The most common
length being 40 cm, one end of the arrow is made sharp and other end is bent into a loop or
circle for facility of carrying. Arrow is shown in the figure 3.13.

91

Fig.3.13 Arrow
Pegs
Wooden pegs are used to mark the positions of the stations or terminal points of a survey line.
They are made of stout timber, generally 2.5 cm or 3 cm square and 15 cm long, tapered at
the end. They are driven in the ground with the help of a wooden hammer and kept about 4
cm projecting above the surface.
Ranging Rods
Ranging rods have a length of either 2 m or 3 m, the 2 metre length being more common.
They are shod at the bottom with a heavy iron point, and are painted in alternative bands of
black and white or red and white or black, red and white in succession, each band being 20
cm deep so that on occasion the rod can be used for rough measurements of short lengths.
Ranging rods are used to range some intermediate points in the survey line. They are circular
or octagonal in cross section of 3 cm nominal diameter, made of well-seasoned, straight
grained timber. The rods are almost invisible at a distance of about 200 meteres; hence when
used on long lines each rod should have a red, white or yellow flag, about 30 to 50 cm square,
tied on near its top. Ranging Rod is shown in the figure 3.14.

92

Fig.3.14 Ranging rod


Ranging Poles
Ranging poles are similar to ranging rods except that they are longer and of greater diameter
and are used in case of very long lines. Generally, they are not pointed, but in all cases they
are provided with a large flag. Their length may vary from 4 to 8 meters and diameter from 6
to 10 cm. The foot of each pole is sunk about .5 m in to the ground, the pole being set quite
vertical by aid of a plump bob.
Offset Rods
An offset rod is similar to a ranging rod and has a length of 3 m. They are round wooden
rods, shod with pointed iron shoe at one end, and provided with a notch or a hook at the
either. The hook facilities provide pulling and pushing the chain through hedges and other
obstructions. The rod is mainly used for measuring rough offsets nearby. It has also two
narrow slots passing through the center of the section, and set right angles to one another, at
the eye level, for aligning the offset line.
Ranging out survey lines
While measuring the length of the survey line or chain line, the chain or the tape must be
stretched straight along the line joining its two terminal stations. If the length of the line is
less than the length of the chain, there will be no difficulty, in doing so. If, however, the
length of the line exceeds the length of the chain, some intermediate points will have to be
established in line with the two terminal points before chaining is started. The process of
fixing or establishing such intermediate points is known as ranging.
There are two methods of ranging
(i) Direct ranging
(ii) Indirect ranging.

93

(i) Direct Ranging


Direct ranging is done when two ends of the survey lines are inter visible. In such cases,
ranging either can be done by eyes or through some optical instrument such as a line arranger
or a theodolite.
(ii) Indirect Ranging or Reciprocal Ranging
Indirect or Reciprocal ranging is restored to when both the ends of the survey lines are not
inter visible either due to high intervening ground or due to long distance between them. In
such case, ranging is done indirectly by selecting two intermediate points M1 and N1 very
near to the chain line (by judgment) in such a way that from M1, both N1 and B are visible
and from N1 both M1 and A are visible.
Two surveyors station themselves at M1 andN1 with ranging rods. The person at M1 then
directs the person at N1 to move to a new position at N2 in line with M1b. The person at N1
in line with M1B. The persons at N2 then direct the person at M1 to move to a new position
M2 in line with N2A. Thus, the two persons are now at M2 and N2 which are nearer to the
chain line than the positions M1 and N1. The process is repeated till the points M and N are
located in such away that the person at M finds the person at N in line with MB, and the
person at N finds the person at N finds person at M in the line with NA. After having
established M and N, other points can be fixed by directed ranging. This method is done as
shown in the figure 3.15.

Fig 3.15 Reciprocal Ranging


Error due to incorrect chain
If the length of the chain used in measuring length of the line is not equal to the true length or
the designated length, the measured length of the line will not be correct and suitable

94

correction will have to be applied. If the chain is too long, the measured distance will be less.
The error will, therefore, be negative and the correction is positive. Similarly, if the chain is
too short, the measured distance is more, the error will positive and the correction will be
negative.
Let L = True or designated length of the chain or tape.
L = Incorrect (or actual) length of the chain or tape used
(i) Correction to measured length
Let l = measured length of the line
l = actual or true length of the line.
Then, true length of line = measured length of line x L
L
l = l [L/L]
..(3.1)
(ii)Correction to area
Let

A = measured (or computed) area of the ground


A = actual or true area of the ground

Then, true area = measured area x [L/L] 2


.
A = A (L/L)2

or

Alternatively, L/L = L + L
--------------L
Where
L = error in length of chain
Let
L/L = e

= 1+

L/L

Therefore A = (L/L) 2 x A= (1+e) 2 x A


But (1+e)2

=1+2e +e2
=1+2e, if e is small

Therefore
A = (1+2e) A
Compass Surveying
Chain can be used when the area to be surveyed is comparatively small and is fairly flat.
However, when large areas are involved, methods of chain surveying alone are not sufficient
and convenient. In such cases, it becomes essential to use some sort of instrument which
enables angles or directions of the survey lines to be observed. In engineering practice,
following are the instruments used for such measurements.

95

(a) Instruments for the direct measurements of directions


(i)
Surveyors Compass
(ii)
Prismatic Compass
(b) Instruments for the measurements of angles
(i)
sextant
(ii)
Theodolite
Traverse Survey
Traversing is that type of survey in which a number of connected survey lines from the
framework and the directions and lengths of the survey lines are measured with the help
respectively. When the lines form a circuit which ends at the starting point, it is known as
closed traverse.
Units of angle measurement
An angle is the difference in direction of two intersecting lines. There are three popular
system of angular measurement
(a) Sexagesimal system : 1 circumference
= 360
1 degree
= 60
1 minute
= 60
(b) Centesimal system : 1 circumference
= 400
1 grad
= 100
( c ) Hours system

1 centigrade
1 circumference
1 hour
1 minute

= 100
= 24
= 60
= 60

The segmental system is widely used in united states, Great Britain, India and other parts of
the world. More complete tables graduated according to the system. However, due to facility
in computation and interpolation, the celestial system is mostly used in astronomy and
navigation.
BEARINGS AND ANGLES
The direction of a survey line can either be established (a) with relation to each other, or (b)
with relation to any meridian. The first will give the angle between two lines while the
second will give the bearing of the line.
Bearing: Bearings of a line is its direction relative to a given meridian. A meridian is any
direction such as (1) True meridian (2) Magnetic meridian (3) Arbitrary Meridian.
True Meridian: True Meridians through a point is the line in which a plane ,passing that
point and the north and south poles, intersects with surface of the earth. It, thus passes
through the true north and south. The direction of true meridian through a point can be
established by astronomical observations.

96

True Bearing: True bearings of a line is the horizontal angle which it makes with the true
meridian through one of the extremities of the line. Since the direction of true meridian
through a point remains fixed, the true bearing of a line is a constant quality
Magnetic Meridian: Magnetic meridian through a point is the direction shown by a freely
floating and balanced magnetic needle free from all other attractive forces. The direction of
magnetic meridian can be established with the help of a magnetic compass.
Magnetic Bearing: The magnetic bearing of a line is the horizontal angle.
Which it makes with the magnetic meridian passing through one of the extremities of the line.
A magnetic compass is used to measure it
Arbitrary Meridian: Arbitrary meridian is any convenient direction towards a permanent
and prominent mark or signal, such as a church spire or top of a chimney. Such meridians are
used to determine the relative position of line in a small area.
Arbitrary Bearing: Arbitrary bearing of a line is the horizontal angle which it makes with any
arbitrary meridian passing through one of the extremities. A theodolite or sextant is used to
measure it
Designation of Bearings
The common system of notaion of bearings are :
(a) The whole circle bearing system (W.C.B.) or Azimuthal system
(b) The Quadrantal bearing (Q.B.) system
The whole Circle Bearing System : (Azimuthal System)
In this system, the bearing of a line is measured with magnetic north in clockwise direction.
The value of the bearing thus varies from 0 to 360 . Prismatic compass is graduated on this
system. In India and UK., the W.C.B. is measured clockwise with magnetic north.

Fig. 3.16 W.C.B. system

97

Referring to the Fig 3.16 the W.C.B. of AB is 1 of AC is 2, of AD is 3 and of AF is 4.


(a) The Quadrantal Bearing System : (Reduced bearing)
In this system, the bearing of a line is measured eastward or westward from north of a line is
measured eastward or westward from north or south, which ever is nearer. Thus, both North
and south are used as reference meridians and the directions can be either clockwise or
anticlockwise depending upon the position of the line. In this system, therefore the quadrant,
in which the line lies, will have to be mentioned. These bearings are observed by surveyors
compass.
Referring figure. 3.17 the Q.B. of the line AB is and is written as N E, the bearing being
measured with reference to north meridian (since it is nearer ), towards East. The bearing of
AC is and is written as SE, it being measured with reference of south and in anticlockwise
direction towards East. Similarly, the bearings of AD and AF are respectively S W and
NW.
Thus, in the Quadrantal system, the reference meridians are prefixed and the direction of
measurement (Eastward or Westward) is affixed to the numerical value of the bearing. The
Q.B. of a line varies from 0 to 90. The bearings of this system are known as Reduced
Bearings (R.B.)

Fig.3.17 Q.B. systems


CONVERSION OF BEARINGS FROM ONE SYSTEM TO THE OTHER
The bearing of the line can be very easily converted from one system to the other, with the
aid of a diagram. Referring to fig. 3.16 the conversion of W.C.B. into can be expressed in the
following table:

98

Conversion of W.C.B. into R.B.


Line

W.C.B. between

Rule for R.B.

Quadrant

AB
AC
AD
AF

0 and 90
90 and 180
180 and 270
270 and 360

R.B.=W.C.B.
R.B.=180-W.C.B.
R.B.=W.C.B.-180
R.B.=360-W.C.B.

NE
SE
SW
NW

Similarly, referring to figure 3.17 the conversion of R.B. into W.C.B. can be expressed into
the following table:
Conversion of R.B. into W.C.B.
Line
AB
AC
AD
AF

R.B.
NE
SE
SW
N W

Rule for W.C.B.


W.C.B. =R.B.
W.C.B.= 180 R.B.
W.C.B.=180 +R.B.
W.C.B.=360-R.B.

W.C.B. between
0 and 90
90 and 180
180 and 270
270 and 360

FORE AND BACK BEARING


The bearing of line, whether expressed in W.C.B. system or in Q.B. system, differs according
as the observation is made from one end of the line or from the other. If the bearing of a line
AB is measured from A towards B, it is known as forward bearing or Fore Bearing (F.B). if
the bearing as backward bearing or Back Bearing (B.B), since it is measured in backward
direction.

Fig 3.18 Fore and Back Bearings


Considering first the W.C.B. system and referring to figure. 3.18.a the back bearing of line
AB is and fore bearing of AB is . Evidently =180+. Similarly, from figure3.18.b the
back bearing CD is and fore bearing , hence, = -180. Thus, in general it can be stated
that B.B= F.B+180, using plus sign when F.B is less than 180 and minus sign when F.B is
greater than 180.

99

Fig 3.19 Fore and Back Bearings


Again, considering the Q.B. system and referring to figure3.19.a the fore bearing of line AB
is N E and there fore, the bck bearing is equal to S W. Similarly from figure 3.19.b the
fore bearing of the line CD is S W and back bearing is equal to N E. Thus, it can be stated
that to convert the fore bearing to back bearing, it is only necessary to change the cardianal
points by substituting N for S, and E for W and vice versa, the numerical value of the bearing
remaining the same.
CALCULATION OF ANGLES FROM BEARINGS
Knowing the bearing of two lines, the angle between the two can very easily be calculated
with the help of a diagram,

Fig.3.20 Calculation of angles from bearings


Ref. to figure 3.20, the included angle between the lines AC and AB = 2 - 1
= F.B of one line F.B. of the other line, both bearings being measured from a common point
A. Ref. figure 3.21, the angle =(180+ 1)- 2 =B.B. of previous line F.B. of next line.

100

Fig.3.21 Calculation of angles from bearings


Let us consider the quadrantal bearing .Referring to figure 3.21(a) in which both the bearings
have been measured to the same side of common meridian, the included angle = 2- 1. In
figure3.21 (b), both the bearings have been measured to the opposite sides of the common
meridian, and included angle = 1+2. In figure 3.21(c) both the bearings have been
measured to the same side of different meridians and the included angle =180( 2+ 1). In
figure3.21 (d) both the bearings have been measured to the opposite sides of the different
meridians, and angle = 180-( 1- 2).
CALCULATION OF BEARINGS FROM ANGLES
In case of a traverse in which included angles between successive lines have been measured,
the bearings of the line can be calculated provided the bearing of the line is also measured.

Fig.3.22 Calculation of bearings from angle


Referring to figure3.22 let , , , are the included angles measured clockwise from back
stations and 1 be the measured bearing of the line AB.
Therefore
The bearing of the next line BC =180( 2+ 1)
The bearing of the next line CD = 3 = 2 + - 180
The bearing of the next line DE = 4 = 3 + - 180
The bearing of the next line EF = 5 = 4 + + 180
As is evident from Figure 3.22 ( 1 + ) , ( 2 + ), and ( 3 + ) are more than 180 while (
4 + ) is less than 180 . Hence in order to calculate the bearing of the next line, the
following statement can be made.

101

Add the measured clockwise angles to the bearing of the previous line. If the sum is more
than 180, deduct 180. If the sum is less than 180, add 180
In a closed traverse, clockwise angles will be obtained if we proceed round the traverse in the
anti clockwise direction

102

ENVIRONMENTAL ENGINEERING

Water supply subsystem


The nature of the water source commonly determines the planning, design, and operation of
the collection, purification, transmission, and distribution works. The diagram of a water
supply system is given in Figure.3.23. The two major sources used to supply community and
industrial needs are referred to as surface water and groundwater. Streams, lakes, and rivers
are the surface water sources. Groundwater sources are those pumped from wells. The source
in each case determines the type of collection works and the type of treatment works. The
pipe network in the city is called the distribution system. The pipes themselves are often
referred to as water mains. Water in the mains generally is kept at a pressure between 200 and
860 kilopascals (kpa). Excess water produced by the treatment plant during periods of low
demand (usually the night time hours) is held in a storage reservoir. The storage reservoir
may be elevated or it may be at ground level. The stored water is used to meet high demand
during the day. Storage compensates for changes in demand and allows a smaller treatment
plant to be built. It also provides emergency backup in case of a fire.
Population and water-consumption patterns are the prime factors that govern the quality of
water required and hence the source and the whole composition of the water resources
system. One of the first steps in the selection of a suitable water supply source is determining
the demand that will be placed on it. The essential elements of water demand include average
daily water daily consumption and peak rate of demand. Average daily water consumption
must be estimated for two reasons:

to determine the ability of water source to meet continuing demands over critical
periods when surface flows are low or groundwater table at a minimum elevations
for purposes of estimating quantities of stored water that would satisfy demands
during these critical periods.

The peak demand rates must be estimated in order to determine plumbing and pipe sizing,
pressure losses, and storage requirements necessary to supply sufficient water during periods
of peak water demand.
Many factors influences water use for given system. For example, the mere fact that water
under pressure is available stimulates its use, often excessively, for watering lawns and
gardens, for washing automobiles, for operating air conditioning equipments and for
performing many other activities at home and in industry.
The following factors have been found to influence water consumption in a major way
1. Industrial activity
2. Meterage
3. System management
4. Standard of living
5. Climate
The following factors are also influence water consumption to a lesser degree: extent of
sewerage, system pressure, water price, and availability of private wells.

103

Fig.3.23 Water Supply Subsystem


The influence of industry is to increase per capita water demand. Small rural and suburban
communities will use less water per person than industrialized communities. Industry is
probably the largest single factor influencing per capita water use.
The second most important factor in water use is whether individual consumers have water
meters. Meterage imposes a sense of responsibility not found in residences and businesses.
This sense of responsibility reduces per capita water consumption because customers repair
leaks and make more conservative water-use decisions almost regardless of price. Because
water is so cheap, price is not much of a factor.
Following meterage closely is the aspect called system management. If the water distribution
system is well managed, per capita water consumption is less than if it is not well managed.
Well managed systems are those in which the managers know when and where leaks in the
water mains occur and have them repaired promptly.
Industrial activity, meterage, and system management are most significant factors controlling
water consumption than are either the standard of living or the climate. The rational for the

104

latter two factors is straightforward. Per capita water use increases with an increased standard
of living. Highly developed countries use much more water than the less developed countries.
Likewise, higher socio economic status implies grater per capita water use, where as areas of
high rainfall experiences lower water use.
Water Quality
Precipitation in the form of rain, hail, or select contains very few impurities. It may contain
trace amounts of mineral matter, gases, and other substances as it forms and falls through the
earths atmosphere. The precipitation, however, has virtually no bacterial content.
Once precipitation reaches the earths surface, many opportunities are presented for the
introduction of mineral and organic substances, micro organisms, and other forms of
pollution (contamination). When water runs over or through the ground surface, it may pick
up particles of soil. This is noticeable in the water as cloudiness or turbidity.
It also picks up particles of organic matter and bacteria. As surface water seeps downward
into the soil and through the underlying material to the water table, most of the suspended
particles are filtered out. This natural filtration may be partially effective in removing bacteria
and other particulate materials. However, the chemical character tics of the water may change
and vary widely when it comes in contact with mineral deposits. As surface water seeps down
to the water table, it dissolves some of the minerals contained in the soil and rocks.
Groundwater, therefore, often contains more dissolved minerals than surface water.
Standards of Purified Water
The physical, chemical and bacteriological standards for water is suggested by the following
agencies
1. Indian Council of Medical Research (I.C.M.R) Committee.
2. World Health Organization (W.H.O) International.
3. United States Public Health Society (U.S.P.H.S).
4. American Water works Association (A.W.W. A).
5. Environmental Hygiene Committee.
The physical and chemical quality of water should not exceed the limits shown in the table
below as per WHO standards and as per IS:10500-1983. The bacteriological quality is given
by MPN (Most Probable Number) index and in treated water supply system MPN index
should be 0/100 ml.
Physical and Chemical standards of potable water (IS: 10500 1983)
S.No

Charecteristics

Acceptable

Cause for rejection

Turbidity (units on J.T.U scale)

2.5

10

2.5

Colour(Units of platinum Cobalt 5.0


scale)
Taste and odour
Unobjectionable

pH

6.5 to 9.2

7.0 to 8.5

105

Unobjectionable

500

1500

Total dissolved solids


(mg/l)
Total hardness as CaCo3(mg/l)

200

600

Chlorides (as cl)

200

1000

200

400

Sulphates(asSo4)
___(mg/l)
Fluorides (as F) (mg/l)

1.0

1.5

10

Nitrates (as No3)

45

45

11

Calcium (as Ca) (mg/l)

75

200

12

Magnesium(mg/l)

Not less than 30

150

13

Iron ( as Fe) (mg/l)

0.1

1.0

14

Mangsnese (mg/l)

0.05

0.5

15

Copper (as Cu) (mg/l)

0.05

1.5

16

Zinc (mg/l)

5.0

15.0

17

Phenolic compounds (mg/l)

0.001

0.002

18

Anionic detergents as MABS

0.2

1.0

19

Mineral oil (mg/l)

0.01

0.3

20
21

Toxic Materials
Arsenic (as As) (mg/l)
Cadmium (mg/l)

0.05
0.01

0.05
0.01

22

Chromium (mg/l)

0.05

0.05

23

Cynides (mg/l)

0.05

0.05

24

Lead (mg/l)

0.1

0.1

25

Selenium (mg/l)

0.01

0.01

26

Mercury (mg/l)

0.001

0.001

27

0.2

28

Polynuclear
aromatic hydrocarbons PAH
Gross alpha activity

3 pci/l

3 pci/l

29

Gross Beta activity

30 pci/l

30 pci/l

Physical Characteristics
Turbidity: The presence of suspended material such as clay, silt, finely divided organic
material, plankton, and other particulate material in water is known as turbidity. The unit of
measure is a Turbidity unit (TU) or Nephlometric Turbidity unit (NTU). It is determined by
reference to a chemical mixture that produces a reproducible refraction of light. Turbidities in
excess of 5 TU are easily detectable in a glass of water and are usually objectionable for
aesthetic reasons.

106

Clay or other inert suspended particles in drinking-g water may not adversely affect health,
but water containing such particles may require treatment to make it suitable for its intended
end use. Following a rainfall, variations in the groundwater turbidity may be considered as
indication of surface or other introduced pollution.
Color: Dissolved organic material from decaying vegetarian and certain inorganic matter
cause color in water. Occasionally, excessive blooms of algae or the growth of aquatic
microorganisms may be also imparting color. While color itself is not usually objectionable
from the standpoint of health, its presence is aesthetically objectionable and suggests that the
water needs appropriate treatment.
Taste and odor: Taste and odor in water can be caused by foreign matter such as organic
compounds, inorganic salts or dissolved gases. These materials may come from domestic,
agricultural, or natural sources. Drinking water should be free from any objectionable taste to
odor at point of use.
Temperature: The most desirable drinking waters are consistently cool and do not have
temperature fluctuations of more than a few degrees. Groundwater and surface water from
mountains areas generally meet these crates. Most individuals find that water having a
temperature between 10 -15 c is most palatable.
Chemical Characteristics
Chloride: Most waters contain some chloride. The amount present can be caused by the
leaching of marine sedimentary deposits or by pollution from sea water, bring, or industrial or
domestic wastes. Chloride concentrations in excess of about 250 mg/L usually produce a
noticeable taste in drinking water. Domestic water should contain less than 100 mg/L of
chloride. In some areas, it may be necessary to use water with chloride content in excess of
100 mg/L. in these cases, all of the other criteria for water purity must be met.
Fluorides: In some areas, water sources contain natural fluorides. Where the concentrations
approach optimum levels, beneficial health effects have been observed. In such areas the
incidence of dental caries has been found to be below the levels observed in areas without
natural fluorides. The optimum fluoride level for a given area depends upon the air
temperature, since temperature greatly influences the amount of water people drink.
Excessive fluorides in drinking water supplies may produce Florosis (mottling) of teeth,
which increases as the optimum fluoride level is exceeded. State local health departments
should be consulted for their recommendations.
Iron: Small amounts of iron frequently are present in water because of the large amount of
iron in the geologic materials. The presence of iron in water is considered objectionable
because it imparts a brownish color to laundered goods and affects the taste of beverage such
as tea and coffee.
Lead: Exposure of body to lead, however brief, can be seriously damaging to health.
Prolonged exposure to relatively small quantities may result in serious illness or death. Lead
taken into the body in quantities in excess of certain relatively low and normal limits is a
cumulative poison.

107

Manganese: Manganese imparts a brownish color to water and to cloth that is washed in it .It
flavors coffee and tea with a medicinal taste.
Sodium: The presence of sodium in water can affect persons suffering from heart, kidney, or
circulatory ailments. When a strict sodium-free diet is recommended, any water should be
regarded with suspicion. Home water softeners may be of particular concern because they
add large quantities of sodium to the water
Sulphate : Waters containing high concentrations of sulphate, caused by the leaching of
natural deposits of magnesium sulphate (Epsom salts ) or sodium sulfate (Glaubers salt),
may be undesirable because of their laxative effects.
Zinc: Zinc is found in some natural waters, particularly in areas where zinc ore deposits have
been mined. Zinc is not considered detrimental to health, but it will impart an undesirable
taste to drinking water.
Toxic inorganic substances: Nitrates (NO3), Cyanides (CN), and heavy metals constitute the
major classes of inorganic substances of health concern. Methemoglobinemia (infant
cyanosis or blue baby syndrome) has occurred in infants who have been given water or fed
formula prepared with water having high concentrations of nitrate. CN ties up with the
hemoglobin sites that bind oxygen to red blood cells. This results in oxygen deprivation. A
characteristic symptom is that the patient has a blue skin color. This condition is called
cyanosis. CN causes chronic effect on the thyroid and central nervous system. The toxic
heavy metals include arsenic (As), barium (Ba), Cadmium (Cd), Chromium (Cr), Lead (Pb),
mercury(Hg), Selenium(Se), and Silver(Ag),. The heavy metals have a wide range of effects.
They may be acute poisons (As and Cr for example), or they may produce chronic disease
(Pb, Cd, and Hg for example).
Microbiological Characteristics
Water for drinking and cooking purposes must be made free from disease-producing
organisms (pathogens). These organisms include viruses, bacteria, protozoa, and helminthes
(worms). Some organisms which cause disease in people originate with the fecal discharges
of infected individuals. Others are from fecal discharge of animals.
Unfortunately, the specific disease-producing organisms present in water are not identified.
The techniques for comprehensive bacteriological examination are complex and timeconsuming. It has been necessary to develop tests that indicate the relative degree of
contamination in terms of microorganisms of the coli form group. This grouping includes two
genera Escherichia coli and Aerobater aerogenes. The name of the group is derived from the
world colcon. While E.Coli are common inhabitants of the intestinal tract, Aerobacter are
common in the soil, on leaves, and on grain; on occasion they cause urinary tract infections.
The test for these microorganisms, called the Total Coli form Test, was selected for the
following recessions:
The group of organisms normally inhabits the intestinal tracts of humans and other
mammals. Thus, the presence of coli forms is an indication of fecal contamination
Even in acutely ill individuals, the number of coli form organisms excreted in the
feces outnumbers the disease-producing organisms by several orders of magnitude.
The large numbers of coliform make them easier to calculate than disease producing
organisms.

108

The coliforms group of organisms survives in natural waters for relatively long
periods of time, but does not reproduce effectively in this environment. Thus, the
presence of coli form in water implies fecal contamination rather than growth of the
organisms because of favorable environmental pathogens. This means that the
absence of coli forms is a reasonably safe indicator that pathogens are not present.
The coli form group of organisms is relatively easy to culture. Thus, laboratory
technicians can perform the test without expensive equipment.

Current research indicates that testing for Escherichia Coli specifically may be warranted.
Some agencies prefer the examination for E.Coli as a better indicator of biological
contamination than total coli forms.
WASTE WATER MANAGEMENT SYSTEM
In general water which is consumed by the consumers, becomes a waste water. The
consumption may either be domestic consumption or industrial consumption. The waste
water coming out of industries are called industrial waste and that from residential localities
as domestic waste or municipal waste. The engineering task involves collection of waste
water, design of underground network of pipes (sewers), design of pumps and other
accessories, treatment of waste and safe disposal into land and water bodies. This is given in
Figure. 3.24

Fig.3.24 Waste water Management System


Treatment Systems
Treatment plants can be classified as simple disinfection, filter plants, or softening plants.
Plants employing simple chlorination have a high water quality source and chlorinate to
ensure that the water reaching customers contains safe bacteria levels. Generally, a filtrations
plant is used to treat surface water and a softening plant to treat groundwater.
In a filtration plant, rapid mixing, flocculation, sedimentation, filtration, and disinfection are
employed to remove color, turbidity, taste and odors, and bacteria. Additional operations may
include bar racks or coarse screens if floating debris and fish are a problems. Figure.3.24
shows a typical flow diagram of a filtration plant. The raw (untreated) surface water enters
the plant via low-lift pumps. Usually screening has taken place prior to pumping. During
mixing, chemicals called coagulants are added and rapidly dispersed through the water. The
chemical reacts with the desired impurities and forms precipitants (flocs) that are slowly
brought into contact with one another during flocculation. The objective of the flocculation is
109

to allow the flocs to collide and grow to a settable size. The particles are removed by gravity
(sedimentation). This is done to minimize the amount of solids that are applied to the filters.
For treatment works with high-quality raw water, it may be possible to omit sedimentation
and perhaps flocculation. This modification is called direct filtration.
Filtration is the final polishing (removal) of particles. During filtration the water is passes
through sand or similar media to screen out the fine particles that will not settle. Disinfection
is the addition of chemicals (usually chlorine) to kill or reduce the number of pathogenic
organisms. Disinfection of the raw water is neither economical nor efficient. The color and
turbidity consume the disinfectant thus requiring the use of the excessive amounts of
chemical.
Softening plants utilize the same unit operations as filtration plants, but use different
chemicals. Thus primary function of a softening plant is to remove hardness (calcium and
magnesium). In a softening plant (a typical flow diagram is shown in Fig. the design
considerations of the various facilities are different than those in filtrations. Also the
chemicals doses are much higher in softening, and the corresponding sludge production is
greater.
During rapid mix, chemicals are added to react with and precipitate the hardness.
Precipitation occurs in the reaction basin. The other unit operations are the same as in a
filtrations plant except for the additional re carbonation step employed in softening to adjust
the final pH.
MUNICIPAL WASTE WATER TREATMENT
The alternative for municipal waste water treatment fall in to three categories Primary
treatment Secondary treatment, advanced treatment. It is commonly assumed that each of the
degrees of treatment noted in the (Figure3.25) includes the previous steps .For example,
primary treatment is assumed to include the pretreatment process: back rack, grit chamber
and equalization process. Likewise, secondary treatment is assumed to include all the
processes of primary treatment: rack, grit chamber, and equalization basin and primary
settling tank.
The purpose of treatment is to provide protection to the waste water treatment plant (WWTP)
equipment that follows. In some older municipal plants the equalization step may not be
included.
The major goal of treatment is to remove from wastewater those wastewater those pollutants
that will either settle or float. Primary treatment will typically remove about 60% percent of
the suspended solids in raw sewage and 35 percent of the BOD5. Then soluble pollutants are
not removed at one time, this was the only treatment used by many cities now federal law
requires that municipalities provide secondary treatment. Although, primary treatment alone
is no longer acceptable, it is still frequently used as the first treatment step in a secondary
treatment system. The major goal of secondary treatment is to remove the soluble BOD5
that escapes the primary process and to provide added removal of suspended solids
.Secondary treatment is typically achieved by using biological processes. These provide the
same biological reaction that would occur in the receiving water if it had adequate capacity
to assimilate the waste water. The secondary treatment processes are designed to speed up the
natural water so that the breakdown of the degradable organic pollutants can be achieved in

110

relatively short time periods. Although secondary treatment may remove more than 85
percent of the BOD5 and suspended solids, does not remove significant amount of nitrogen,
phosphorus are heavy metals, nor it does it completely remove pathogenic bacteria and
viruses.

Fig. 3.25 Degrees of treatment


In case where secondary level of treatment is not adequate, additional treatment process are
applied to the secondary effluent to provide advanced waste water treatment (AWT). These
processes may involve chemical treatment and filtration of the waste water much like
adding a typical water treatment to the tail end of a secondary plant or they may involve
applying the secondary effluent to the land in carefully designed irrigation system where the
pollutants are removed by a soil crop system. Some of these processes can remove as much
as 99 percent of the BOD5, phosphorus, suspended solids and bacteria, and 95 percent of the
nitrogen. They can produce a sparkling clean, colourless, odourless effluent indistinguishable
in appearance form a high quality drinking water. Although these process and land treatment
systems are often applied to secondary effluent for advanced treatment, they have also been
used in place of conventional secondary treatment processes.

111

Most of the impurities removed from waste water do not simply vanish. Some organics are
broken down into harmless Co2 and water. Most of the impurities removed from waste water
as a solid, i.e. sludge. Because most of the impurities removed from the waste water are
present in the sludge, sludge handling and disposal must be carried out carefully to achieve
satisfactory pollution control.

112