Anda di halaman 1dari 3

12/22/10

Bharat Heavy Electricals Limited Bhopal


Transformer Engineering Department
Our Ref: TRE/69071/GKL
Date- 22-12-2010
Shri P.K Sharma
CMG

Sub: Submission of Customer Drawings for 340 MVA 420/16.5 kV 3 Phase Generator transformer
for M/S Abhijit Infra Ltd. (AINL) against WO 69071-Q-512-01 & 60036-Q-512-01
Dear Sir,
With reference to subject please find enclosed herewith the 3 sets of the following drawings/documents for
further submission to Customer/PEM/DCPL
Sl. No.
1
2
3
4
5
6
7
8
9
10
11
12
13

Description
OGA
OGA Part List
Foundation Plan
HV Bushing
LV Bushing
HV Neutral Bushing
Bus Duct Mounting flange details
320 Dia Twin Bi Directional Roller
Shipping Diagram
Rating & Diagram Plate
Valve Schedule Plate
Technical Data Sheet
Customer Inspection Test Schedule

Drawing No.
34600000717
34600000718
34600000719
34600000720
34600000721
34600000722
34600000724
34600000723
34600000725
34600000726
34600000727
TRE/69071/GTP
TRE/69071/CITS

Rev.No.
01
01
01
00
00
00
00
00
00
00
00
01
00

Please also note that the Sl. No. 1-3 has been revised as per customer comments dtd: 23.11.10.
Our point wise reply is as below:
Sl. No.
1
2

Customer point
Provide necessary Shut off valves for
detachable cooler units
Confirm that all valves are made of Gun Metal.

Confirm that all gasketed joints are with earth


continuity through copper strips.

BHEL Reply
Indicated as item no. 123
Please note that valves upto 50 NB
shall be of Gun metal. All valves
above 50 NB shall be of Cast steel
with Gun metal fittings. This is our
standard practice and followed for all
projects of NTPC/POWERGRID and
also the earlier supplies to JINDAL.
Please note that the Copper strips are
provided at Tank, turret joints etc.
Other joints get the earth continuity
through nut-bolts etc.

TRE BLOCK-3 EASTERN ANNEXE, BHEL, PIPLANI, BHOPAL 462021


Page 1 of 3

12/22/10

Bharat Heavy Electricals Limited Bhopal

Confirm that all drain valves shall be with


threaded adopter.

Indicate the size of Earthing Connection for


item no. 212a and 110.
Indicate Transformer Marshalling Box.
Item no. 181 (HV Terminal Connector) shall
be suitable for TWIN Moose ACSR.
Provide Pressure Relief device with trip contact.
Confirm Explosion Vent shall be double
diaphragm type.
Correct the Name of the Project.
Indicate breather.
Submit other drawings as listed.
Direction of Transformer Withdrawal will be
opposite left hand side to Cooling Bank. Change
the foundation plan accordingly.
Indicate item no. 007: Pump Support on
foundation plan.
Indicate Oil Filling Instruction Plate on OGA
Part List.

6
7
8
9
10
11
12
13

14
15

This is our standard practice and


followed for all projects of
NTPC/POWERGRID and also the
earlier supplies to JINDAL.
We have provided two nos. sampling
valves at Top & Bottom with
threaded adopter.(Item no. 25 & 25a)
Indicated in the revised OGA
drawing(Sht-03)
Indicated as item no. 34
Confirmed. Please confirm that the
conductor spacing shall be 450mm.
Confirmed
Please note that Explosion vent is
not applicable as PRV is provided.
Indicated as item no. 17
Submitted as per list above
Indicated in revised Foundation plan
drawing.
Indicated in revised Foundation plan
drawing.
Indicated in revised OGA and OGA
Part list

The Technical data sheet has been revised as per Customer comments dtd 05.08.10. Please find below the
point wise reply for your comments on GTP.
Sl.
No.
1
2
3
4
5
6

Customer point

BHEL Reply

Transformer rated out put for ONAN as well as ONAF

Not applicable with OFAF type


unit coolers.
Winding insulation level with impulse and power frequency
Indicated in Cl.5.1.
No load current referred to HV (%)
Indicated in Cl. 10.1 to 10.5
Rated voltage of tap changer
Indicated in Cl.18.3
BHEL shall specify no of cooling units required for full load Indicated in Cl.14.8
operation
For secondary resistance (5 ohms) in the CT data sheet shall It may please be noted that CT
be rechecked
secondary resistance is indicated
as per Customer Specification
Annexure E.

Other drawings are fresh submission for customer approval.


Please arrange the approval of the above drawings/documents at the earliest.

TRE BLOCK-3 EASTERN ANNEXE, BHEL, PIPLANI, BHOPAL 462021


Page 2 of 3

12/22/10

Bharat Heavy Electricals Limited Bhopal

G.LALWANI
DY.MGR (TRE)

Cc:
1. Shri.R. Shukla, DGM (TRS)

C:\USR\gkl\1WO\340_69071_Abhijit\Corr\Sub_Dwg_00_221210.doc

TRE BLOCK-3 EASTERN ANNEXE, BHEL, PIPLANI, BHOPAL 462021


Page 3 of 3

Anda mungkin juga menyukai