Anda di halaman 1dari 4

SITANSU MOHANTY

Bhartiar Nagar, 3rd street


Cell: +91 9941551844

Mettukuppam, Chennai-600097, Tamil Nadu


Email:sitansu.mohanty90@gmail.com

Job Objective

Highly motivated and goal-oriented telecom professional with extensive experience of 6+ YEARS in
Planning & Parametric Optimization 2G and 3G network.

Demonstrated ability to work independently, or in a team with excellent relationship to client staff and
other team members. Experience of effectively handling and coordinating multiple tasks. Strong ability of
making quick and accurate decisions.

Job Responsibility
Familiar vendor equipments: NSN (ULTRA & FLEXI), ERICSSON,HUAWEI
Primary Job responsibility:
1.
RF Network Optimization Data
2.
RF Network Optimization Voice
3.
EMF & TRAI Related Activities.
4.
DOT Guidelines & Compliance Of Sites.
5.
KPI Analysis & Performance Improvement
6.
Statistical Report Analysis Quality Improvement
7.
New Features Implementation
8.
Network Planning & Design: Capacity Planning/ Coverage Planning
9.
Drive Test & BSS Parameter Audit
10. Troubleshooting

Software Utilities & Tools:


DRIVE TEST TOOLS: TEMS,NEMO 4,5,GENEX PROBE
POST PROCESSING TOOLS: GENEX ASISTANT, NEMO ANALYZER ,AGILENT
MAPPING TOOLS : MAP INFO, MIPT , MCOM 4.2, NEMO EXPORT WIZARD
PLANNING TOOL: AIRCOM ASSET ENTERPRISE 7.0
MISC TOOLS:NETACT,REFLECTION, ERICSSON P6 5.23 WRAN EXPLORER,CITRIX,WINFIOL

Work Experience Details


Currently Working as NPO Engineer in NSN and Responsible for Network Planning & Optimization.
I was working for Aircel Limited as Senior Engineer and Responsible for RF Planning & Optimization.
Troubleshoot solution for 2G/3G,EMF & TRAI compliance.(From Jul2013 to Jan2014)

Preparing, Analyzing and Validation of KPI reports for 3G network.

In 3G maintaining radio network in terms of KPI -3G RRC (Setup & Access complete ratio, Drop ratio), 3G
Voice setup (Setup & Access complete ratio, Drop ratio), SHO, ISHO, etc.
In 3G Analysis of Log files (Ec/No, RSCP, Pilot Pollution etc).

Involved in 3G WCDMA HSDPA Network validation, optimization and performance monitoring by


detailed analysis of call events (Dropped call, Blocked Call , Soft handover Failure, RACH Error, PS
Access failure and Radio Bearer Setup Failure etc.) by analyzing Layer 3 messages, CPICH RSCP, CPICH
Eb/No, Ec/Io, UTRA RSSI, UE Tx Power, BLER, Power control, Cell Parameters and neighbor list.
Generating change request for making hardware & parameter changes

Radio Network optimization by monitoring RAN Reports and KPI statistics.


TRAI performance reports submission for monthly and quarterly reports.
EMF TERM cell audit & TRAI quality audit.

1 OF 3

I was Working For Videocon Mobile Services from September 2011 to June 2013 as an
Network Executive for Chennai Tamilnadu .
Multivendor experience of the following systems:

NSN (RG10, RG20)

HUAWEI

ERICSSON
Key responsibilities:

Day to day optimization works(BBH, NBH, DBH)

GPRS/EDGE implementation

EDGE capacity Planning

Parameter tuning for both voice and data service

KPI formation for both voice and data service

HW Alarm Monitoring

Conduct new Feature trial

Making standard template for other technical groups to use it.

Monitoring & maintaining the radio KPI of network, BSC and Cell level

Capacity planning & Coverage Planning sites in co-ordination with Marketing.

EMF Radiation checks with Self certification & TRAI report Submission.

In Building Solution Planning


Achievement:

Introduce dynamic channel allocation for Data Services as PCU pooling.

FACCH Call Setup to reduce SD Congestion.

NetAct Optimizer plan for Neighbor and frequency Changes.

High utilization cells 4th sector addition

Splitting-Splitter TRX configuration

ABIS allocation SIGN 0 & SIGN 2 Configuration


I was Working For Metro wireless Engineering Pvt Ltd. From September 2009 to September 2011 as an
RF planner for 3 green field projects (BHARTI AIRTEL, VIDEOCON & IDEA) .where NSN and Huawei was
the vendor. For NSN Project I was on contract for 6 months. (Tamil Nadu, Kerala & Orissa Circle)
Responsibility:

RF survey conducted for feasibility check after nominal Freeze, New sites planning

Site Creation with Mandatory Parameters & IP

Alignment of field parameters as per planned data PLO prelaunch optimization

Group of sites optimized, to achieve designed quality cum coverage as per plan

Quality cum Coverage achieved as per plan


Quarterly Drive test For TRAI
TRX addition and Cabex Sites Optimization

2 OF 3

3g single site verification and clusters optimization.


Drive test KPI analysis with drive test log file and resolve the issues like call drop, poor
quality.
Poor RSCP and ECIO analysis and recommendation to improve coverage.
Neighbor tuning both for 2G and 3G neighbor list.
Site creation (integrated packaging) & neighbor list tuning.
Neighbor auditing and planning, CRF (change request form) xml creation and dump
validating, new site creation, parameter modification as per the drive test analysis.
Drive route preparation, cluster wise analysis of RSCP, Ec/Io and HSDPA throughputs
analysis.
System module HW alarm monitoring & coordination with project team for smooth
process of SSV.
post processing to improve Ec/Io based on pilot pollution, missing neighbor and active
set analysis

I was Working For ADA Cellworks Pvt Ltd. From January 2009 to September 2009 as an RF Engineer
working on HUAWEI System for Aircel & TATA Docomo (Mahrashtra Circle ROMH)
Responsibility:
KPI Improvement (TCH blocks & drops, SD blocks & drops, HOSR, CSSR, DL/UL quality)
Daily traffic variation Check & monitoring call volumes daily and weekly offs.
Zero call cells (analyzing cells with zero traffic or no calls).
Delivering frequency & neighbor plan avoiding interference .
GPRS/EDGE implementation with data KPI improvement for high throughput avoiding TBF drops.
PCU loading and Gb link utilization
Cell Outage (planned & unplanned) & alarm monitoring

Achievement:
SCFT of 1st Phase sites with Cluster distinction all the reports submitted to customer as per given
timeline.
BTS, BSC level parametric changes with MOPs preparation as per guidelines.
PLO and CABEX sites requirement on monthly basis KPI analysis and improvement plans
implementation.

I joined NR SWITCH AND RADIO SERVICES as RF Engineer on 29th June, 2007.


Responsibility:
RF survey for new sites as per customer requirement.
Drive test and physical parameter audit, both SCFT and Cluster Optimization.
Drive test parameters check at field level Network Audit.
Achievement:
Completed 1013 sites physical audit for Airtel MP&CG on time limit 2 months handling 10 teams .
Coordinated MP NSN team as tem lead for Airtel site Audit (MPCG Circle)
Professional Training

UMTS Fundamental

NSN BSS Parameter Planning

Basic cell planning Principles

GSM Radio network tuning

: Trained by Metro telworks


: Trained by Metro telworks
: Trained by ADA Cellworks
: Trained by Metro telworks
3 OF 3

GSM Radio network features


RF Survey & Drive Test

: Trained by Videocon
: Trained by NR Switch & Radio Services

Educational Qualification

2003-2007: Bachelor of Technology (B.tech In Electronics & Telecommunication) with 72%


2002:12th from NSM City collage Cuttack, Orissa
2000: HSC From Orissa Board
Personal details
Fathers Name : Madan Mohan Mohanty
Place of Birth
: Cuttack, Orissa
Date of Birth
: 4th May 1985
Nationality
: Indian
Contact No Alt : 09776044864
Sex
: Male

4 OF 3

Anda mungkin juga menyukai