Contents

page

page
Overview
Introduction
Product features
Intended use
Safety instructions
Standards and regulations

1-3
4
4
4
5
5

B7
B8

B9
Part A
Basic system TRIO 270
B10
A1
A2
A3
A4

Working steps
TRIO Element
Element connection
BFD
TAR 85, Bar 85
Tie positons
Push-pull props

6-7
8-9
B11
10
11
12-13
14-15

B1

B2

B3

B4

B5

B6

Corners
right-angled corners
thick walls
obtuse and acute corners
T-junction
90
obtuse wall connection

16
17
18
19
20

38-39

Foundations
Foundation strap
Foundation tie clamp

40
40

Shaft formwork
Shaft element TSE

42-43

Circular structures
TRIO polygonal

44

Load-carrying structures
Operating instructions

45

Part C
Add-on systems
C1
C2
C3

Teil B
Application

Extension
Extension guidelines

TRIO 330
TRIO Aluminium
TRIO Structure

Part D
Cleaning
D1
D2

Care and cleaning


Repair

Part E
Product overview

Offset
wall offset
height offset

21
22

Infills
timber
infill LA
filler support TPP

23
23
24

Stopends
stopend panel TR 24
timber and filler support
stopend panel reinforcement

25
25
26-27

Working and concreting scaffold


concreting platform
TRG 80
Guardrails
Platform system TRIO Platform

28-30
31-32
33
34-37

46-49
50
51

52
53

54-71

Legend
Important safety
instructions

Instructions

Visual control

Practical tip

Overview
To give a clearer overview, only a part
of the necessary work platforms are
shown.
B3

A2

B7

B6

B4

B6

B2

B1

B6

A3

A1

A2

B1
A4

B5

Overview
To give a clearer overview, only a part
of the necessary work platforms are
shown.
B3

A2

B7

B6

B4

B6

B2

B1

B6

A3

A1

A2

B1
A4

B5

Dokument 1

28.04.2005

12:48 Uhr

Seite 1

Overview
A1 Element
A2 Element connection
A3 Ties
A4 Push-pull props
B1 Corners
B2 T-junction
B3 Wall offset
B4 Infills
B5 Stopend formwork
B6 Working and concreting scaffolding
B7 Extensions

Introduction
Whether for residential building or
industrial, for small or large building
sites, the TRIO wall formwork system
is adaptable and versatile. These
assembly instructions are provided to
ensure its problem-free use. They
show the basic TRIO system, with
formwork heights h = 270 and h = 330,
and its usage, with add-on systems
and safety features. At the end you
will find out something about the care
of the product.
The identification of the components
is made without the addition of TRIO.
Measurements without units are given
in cm.
The individual parts of the system
h = 270 are shown in Part F with their
item numbers. Please refer to your
PERI specialist if you have any
questions.

Correct use
These assembly instructions contain
information on the handling and correct
use of the TRIO formwork system.
Safety instructions and load instructions
must be adhered to exactly.
For other uses, or use beyond that
described, it is necessary to obtain
our specific agreement and additional
construction instructions from the
operator.
The operator must ensure that the
construction and use instructions
delivered by PERI are present and
available for the workers.
Fundamentally, only materials in good
condition may be used. Damaged
components must be changed.
For the use of our products, the most
recent safety and environmental
regulations applicable to the respective
countries must be adhered to.
The assembly instructions and the
PERI offer and implementation plans
do not replace the working and
assembly instructions from the
operator on the building site.

Product features
The TRIO 270 wall formwork system
is a heavy formwork for shuttering
walls, pillars, foundations and other
concrete components.
The basic equipment includes the
panels, corner and filler elements,
alignment couplers, compensation
waler, push-pull props, work platforms
and all the necessary small parts for
assembly. The steel parts are powder
coated in red.
Shuttering is carried out with 5 element
heights and 6 widths in a grid size of
30 cm. The elements can be used
upright or on their sides.
With TRIO it is possible to fulfil the
flatness requirements of DIN 18202
up to line 7 of table 3. See GSV table
part E.

For all applications, the relevant


additional parts and tables are
available.
TRIO L
(aluminium powder coated in yellow)
can be combined as required with
TRIO 270.
TRIO 330
For office buildings and industrial
construction.
TRIO Structure
For components with special
demands on the surface.
Tie system DW 15 and DW 20

Safety instructions
These assembly instructions are
directed at the people who work with
the TRIO panel formwork system. Not
adhering to the assembly instructions
and the safety instructions can lead to
accidents and damage.

3. Ensure stability during all building


states.

Duties of the operator:


1. The operator must ensure that the
instructions delivered by PERI and
other necessary instructions are
available to the users.
2. All persons who work with the
product must be familiar with the
content of these instructions and
the safety instructions contained
therein.
3. The operator must inform any
people who cannot read these
instructions, or can only read them
with difficulty, on the content of
these instructions.
4. The operator must ensure that the
assembly and dismantling of the
product as well as its proper use
is overseen and lead by suitable
professionals who are authorised
to give instructions.
5. The operator must put in place the
necessary conditions for the
adherence to all valid safety
regulations.

5. Working areas must be reachable


via safely accessible routes.

General safety instructions:


1. The TRIO components must be
found to be in a faultless state
before every use. Damaged
components must be replaced by
original PERI parts.
2. The TRIO must be assembled in
such a way that all load effects are
safely transferred.

4. Safely establish working locations


for assembly, alteration and
dismantling as well as for moving.

6. People working at heights of more


than 2.00 m must be secured
against falling.

14. Only remove the lifting accessories


from the positioned formwork parts
or units after they cannot change
their position unintentionally.
15. In strong winds, move formwork
elements with guide cables. Avoid
collision with other objects.
16. Store and transport components
so that they do not change

7. During unfavourable weather


conditions, entering dangerous
areas should be avoided.
8. Only strip the components when
the concrete has sufficiently set
and the person responsible has
authorised it.
9. Carry out stripping or moving with
suitable tools. Do not pull off
formwork elements with a crane!
10. Do not endanger the stability of
building, scaffold and formwork
parts during stripping.
11. Formwork parts may only be
transported with lifting equipment
and load-carrying equipment when
suitable lifting means are available.
12. The weight of the components
may not exceed the permissible
load of the lifting equipment.
13. Remove loose parts or secure so
that they do not fall.

Standards and regulations.


DIN 4420 Working and safety scaffolds
DIN 4421 Falsework
DIN 18202 Tolerances in building
DIN 18216 Formwork ties;
requirements, testing, use
DIN 18218 Pressure of fresh concrete
on vertical formwork
UVV BGV C22 Building operations
UVV VBG 9a Load-carrying gear
BGR 169 Safety regulations for
working and safety scaffolds
BGR 187 Falsework and formwork
construction
BetrSichV Operational safety
regulations
Relevant
PERI product information
TRIO posters
TRIO lifting hooks
TRIO lifting gear combi
Pallets and stacking devices
Technical data
Test report according to GSV
Formwork technology tables

Working steps
Adjustable formwork
1. assemble lying flat
2. attach push-pull props
- to first element: 2 props
- second element onwards: 1 prop
3. move with crane to place of use

Secure elements against tipping


and wind!
Only remove transport hooks when
prop is properly attached!

Closing formwork with concreting


scaffold
1. attach brackets to the horizontal
elements
2. attach decking and handrail boards
3. move with crane to place of use
4. attach ties

Only remove transport hooks when


an upper tie has been attached!

Start shuttering from external or


internal corner to filler.

External corner
60

72

Internal corner

Working steps
Concreting
from a safe working scaffold Striking,
moving from filler to corner Consider
concrete strength!

Striking, moving from filler to corner

Consider concrete strength!


1. attach lifting hooks to TRIO element.
2. remove ties
3. remove push-pullprops
4. remove element connectors
5. move element
6. clean element
7. attach push-pull props
8. detach lifting hooks

Cleaning
with PERI BIO CLEAN and PERI spray
equipment.

A1 TRIO element
Overview of elements
Width cm
90

120

72

60

30

330

240

S)

S)

S) N)

S)

S)

S)

S)

S) A)

S) A) N)

S) A)

S) A)

S)

S)

S) N)

S)

S)

A) M)

A)

A)

S)

S)

S)

90

120

270

Height cm

S)

60

A)

S)
Legend
S) elements with steel frames (red powder coating)
A) elements with aluminium frames (yellow powder coating)
N) standard elements or as multi-purpose element
M) only multi-purpose element

TE

TGE

A1 TRIO element
Element width 240 cm

Element width 120 cm

10.3

10.4
10
10.6

10.1
10.2

10.7
10.8

10.4

10.5
10.4

10
10.1
10.2
10.3
10.4
10.5
10.6
10.7
10.8

TRIO element
Tie position drawn-in
Tie position in edge profile
Element strut
connection possibilities for scaffold brackets, push-pull props and other equipment
Levering corner
Transport openings
Frame
Plywood
9

A2 Element
Connection
Alignment coupler BFD
Used for:

20.3

1. Horizontal assembly
2. Attach push-pull props
on first element:
2 push-pull props
on second element:
1 push-pull prop

20.2
20.1

20.4

20

3. transport by crane to place of use

Secure elements against toppling


over and wind forces!
Detach lifting hook only when pushpull prop is plugged!

Fig. 1

20.2

Closing formwork with concreting


scaffolding
20.1
1. Attach bracket to horizontal element.
2. Install decking and handrail boards.
3. Transport by crane to place of use.
4. Fit tie.

Detach lifting hook only when one


top tie is installed!

Fig. 2

20.5

Form from external or internal corner


for compensation.

Fig. 3

10.3
1

3
10

Fig. 4

A2 Element
Connection
Compensation Waler TAR 85
The compensation waler TAR 85 23 is
used as an element connection that
braces, aligns, and transmits forces.
Used for:
filler plates. See B4.
corners with double wall thickness
compensation WDA. See B1.
acute and obtuse corners. See B3.
wall projections. See B3.
high extensions. See B7.

23
23.1

Assembly
1. Insert the hooks 23.1 into the
connection holes 10.4 in the element.
2. Hammer wedge tight. Fig. 5.

23.2
Fig. 5

10.4

Waler 85
for stopends.
Assembly
1. Push stopend tie 25 through waler 24
and attach to the frame profile of the
elements.
2. Tighten with wingnut pivot plate 33.
Fig. 6 cross-section.

25

33

24
25

33

Fig. 6

11

A3 Tie positions
Tie system

Standard: DW 15
Approved load according to DIN 18216:
90 kN
Parts for DW 15
tie rod 30
spacing tube 31
cone 32
wingnut pivot plate 33
Fig. 7.

30

33

32

31

Fig. 7

For high formwork pressures


up to 87 kN/m2: DW 20
Approved load according to
DIN 18216: 150 kN

Parts for DW 20
tie rod 30
spacing tube 31
DK sealing cone 32
counterplate 34
wingnut 35
Fig. 9.

30

32

34, 35

31

Fig. 8

Miscellaneous
Tie rod spanner 36 for tigthening ties
from one side by one person only.
Plugs 37 to seal unused tie holes.
Fig. 9

36
37

Usage
Only use as many ties as necessary.
Close unused tie holes in the elements
with plugs.
Ensure approved tie loads are not
exceeded. See GSV tables part E.
With high formwork pressures up to
87 kN/m2, use tie system DW 20.
Keep to pouring speed.

Fig. 9

Tie holes closed by concrete can be


opened with a hammer blow due to
their conical shape. Fig. 9a.
Fig. 9a

12

A3 Tie positions
Angled ties using DW 15

Secure elements against lifting.


Angled ties can be used for vertical
and horizontal elements.

3 3

The conical tie hole makes angled ties


possible in all directions up to 3.
Fig. 10. Additional application
possibilities are thus available.
One-sided angled. Fig. 10a.
Max. 3.
Two-sided angled. Fig. 10b.
Max. 2 x 3.

Fig. 10

Height offset. Fig. 10c.


Max. 1 cm per 10 cm of wall thickness.

Fig. 10a

Fig. 10b

Fig. 10c

13

A4 Push-pull props
Push-pull props and kicker braces are
used for aligning the TRIO formwork,
for stability and for support against
wind forces.
The choice of the correct prop and
brace is made according to the
formwork height.

PERI Push-Pull-Props and Kicker Braces


Figure 1

Formwork height h [m]


Allowable prop spacing [m]
(max. width of influence)

3.0

4.0

5.0

6.0

Figure 2
7.0

9.0 10.0 11.0 12.0

8.0

3.53 2.73 2.19 1.82 1.58 1.42

Actual prop load FRS [kN]


at maximum spacing

9.7

9.7

9.8

9.8

9.8

9.6

Actual kicker load FAV [kN]


at maximum spacing

2.1

2.3

2.2

2.2

2.3

2.6

x = Distance of base plate [m]


from rear face of formwork

1.2

1.6

2.0

2.4

2.9

3.5

y = *Top connection point [m]


from top of formwork

1.0

1.2

1.5

1.8

2.0

2.0

1.93 1.67 1.49 1.35


FRS1 9.4 11.3 11.3 11.3
FRS2 9.5 8.5 9.3 10.1

x1
x2
y1
y2

2.6

2.3

2.1

1.9

4.3
2.6
1.5
4.5

4.7
2.6
1.8
5.5

5.3
2.8
1.8
6.2

5.9
3.0
1.8
6.9

*If necessary, the distance from top of formwork must be adapted to the system.
A maximum force of 11.3 kN is to be led into the building at the foot of the pushpull-prop for the given width of influence.
Wind loads:

h < 8 m = 0.5 kN/m2


8 m < h < 20 m = 0.8 kN/m2

60

0,5 kN/m2

0,5 kN/m2

y2
F RS1

F RS
FAV

F RS2

Figure 1

0,8 kN/m2

y1

Figure 2

FAV

60

x2
x1

14

60

A4 Push-pull props
Assembly

43

Brace Connector
Fig. 11.
A4 Push-pull props
Push-pull props and kickers are
attached to the element with the brace
connector.
Connection is possible to the horizontal
and vertical element struts.
Fig. 12a + 12b.

44

42
44

45

1. Place the brace connector 41 onto the


element strut 10.3 such that the hook
tie 42 grips in a connecting hole 10.4.
2. Tighten the brace connector with a
triple wingnut.
Fig. 13a horizontal cross-section
13b vertical cross-section

Fig. 11

43

41
42
10.4
10.3

Fig. 13a

Fig. 12a

43
42
10.4

41
10.3
Push-pull props and kickers
Fig. 14.
1. Secure push-pull prop or kicker 40 on
the attachment plate 44 with pin and
cotter pin. Fig. 14a.
2. Secure base plate, for example with
PERI Multi-Monti 46. Fig. 14b.

Fig. 12b

Fig. 13b

41

44
45
Fig. 14a

41
40

Ankerschraube
Multi-Monti MMS 20 x 130
Art. Nr.: 103606

Zur Befestigung von Richtsttzen,


Abspannungen bei SKYDECK
Bhnen oder auskragenden
Deckentischen ist die Multi-Monti
Schraube eine ideale Alternative zu
bisher eingesetzten
Befestigungssystemen.
Die Vorteile im berblick
mehrfach wiederverwendbar
einfache Durchsteckmontage
enorme Zeit- und Kostenersparnis
keine Sprengwirkung des Dbels
geprfte Sicherheit auch in
niederfestem, nicht ausgehrtetem Beton.

Technische Daten
Ankerlnge
Klemmstrke

[mm]

tfix

[mm] 10-15

hnom [mm]

Verankerungstiefe

[mm]

18

MDmax

[Nm]

150

SW

[mm]

30

140

[mm]

360

Randabstand

ar

[mm]

180

d [mm]

240

a
a

ar

db

ungerissenem Beton oder ungerissener Beton bei erreichter Festigkeit


w 10 N/mm2

[mm]

Fmax [kN]

41,7

empf. FQ [kN]
empf. FZ [kN]

10,4
10,4

empf. FQ [kN]
empf. FZ [kN]

16,4
16,4

46

Sicherheitsbeiwert s = 4
empfohlene Last in B25

Abstand
Mindestbauteildicke

Bruchlastmitte
in 2 Tage altem ungerissenem Beton
bei erreichter Festigkeit
w 10 N/mm2

empfohlene Last in B10

[mm]

dO

Durchgangsloch im zu
befestigenden Teil

ungerissener Beton

Sicherheitsbeiwert s = 4

21

SW 30

tfix

Fig. 14

130
115

hO

Bohrer (Hammerbohrer DIN 8035)


Max. Anzugsdrehmoment
Schlsselweite

Bohrtiefe

hnom

PERI GmbH
Postfach 12 64
89259 Weienhorn
Tel.: 0 73 09 / 9 50 - 0
Fax: 0 73 09 / 9 51 - 0
info@peri.de
www.peri.de

Fig. 14b

15

B1 Corners
Right-angled corners
60

60

60
TRM 72

TRM 72

TRM 72

Wall thicknesses from 18 cm to


40 cm can be contiuously shuttered.
Fig 15a to 15f.

18

18

per 2 WDA 5/6


20
18

25

30

18

18

2 WDA 5

1 WDA 5/6

The infill is made using compensators.


These are:
wall thickness compensator WDA 18
or infill provided by contractor 50

TRM 72

TRM 72

18
1 WDA 5/6

60

60

60
TRM 72

Wall thickness d = 30 cm is without


infill.
With wall thickness d < 30 cm, infill
on the inside.
With wall thickness d > 30 cm infill on
the outside.

per 1 WDA

18

50

2 WDA 5
35

40

X
Fig. 15a - 15f

External corner
consisting of:
TRIO element TR 60 11 and TRIO
element TR 72 12
Alignment coupler BFD 20 (5 BFD with
h = 2.70 m). Fig. 16.

11

13

12

20
Element TR 72 must always be on the
right when seen from the outside, and
must cover element TR 60 11.
Make sure alignment coupler is fitted
correctly. Fig. 16a.

20

Internal corner
consisting of:
TRIO corner TE 13 or corner TAE (alu)
alignment coupler BFD 20
(2 BFD for h = 2.70 m). Fig. 17.
For the number of alignment couplers
for other element heights, see TRIO
poster.
Fig. 16

Plan view

TR
60

72

12
TR

11

Fig.16a

16

Fig. 17

B1 Corners
Right-angled corners with large wall
thicknesses
Wall thickness 60 cm
Permissible fresh concrete pressure
60 kN/m2
60

TE
90

60

240

60

TRM 72

240

240

Element connection with:


alignment coupler BFD 20
3 BFD with h = 2.70 m and over a
length of L of 2.25 m per element joint
compensation waler TAR 85 23
Fig. 18a + 18b.

240

90

20

Fig. 18b

23

Fig. 18a

Wall thickness 80 cm
Permissible fresh concrete pressure
60 kN/m2

240
TE

80

120

240

240

80

Element connection with:


alignment coupler BFD 20
3 BFD with h = 2.70 m and over a
length of L of 3.0 m per element joint
universal waler 245 26
waler stop 27
tie rod cylinder yoke 28
Fig. 19a + 19b.

120

240

26
Fig. 19a

20
28

Fig. 19b

27

17

B1 Corners
Obtuse and acute corners

14

Angles from 75 can be shuttered with


the TRIO articulated corner TGE 14.
Fig. 20a + 20b.
14

The alignment couplers BFD are


assembled from the bottom up for
external and internal corners.

min 75
max 165

Fig. 20

For the number of alignment couplers


for other element heights, see TRIO
poster.

3 3
3 3,3

External corner
The external corner should be stabilized
with compensation waler TAR 85 23.
Fig. 21.
14

TR 60

TR

60

Fig. 21

Internal corner. Fig. 22.

Fig. 22

Infills for external


and internal corners.
internal X

external X

x
Wall thickness (cm)

Angle
25

30

35

36

40

165

9.2

8.5

7.8

7.2

7.1

6.5

150

6.2

4.9

3.5

2.2

1.9

0.9

135

3.1

1.0

1.1

3.2

3.6

5.2

120

0.5

3.4

6.2

9.1

9.7

12.0

105

4.6

8.4

5.8

1.9

1.5

1.9

75

13.8

7.3

0.8

5.7

7.0

12.2

20

18

12

B2 T-junction
90 T-junction

20
18

25

Es sind Wandstrken von 18 cm bis


60 cm stufenlos schalbar.
18

13
wall thickness of d = 30 cm is without
infill. Fig. 23a.
with wall thickness d < 30 cm, infill is
on the inside. Fig. 23b d.
with wall thickness d >30 cm, infill is
on the outside. Fig. 23e f.

1 WDA 5/6

18

13

1 WDA 5/6

18
1 WDA 5/6

15

Infills are made with compensators.


These are:
wall thickness compensation WDA 18
or infill provided by contractor 50

15

Fig. 23b

28

30

50

13
Assembly
Shutter the T-junction with TRIO corner
element TE 13.
Shutter the opposite straight wall with
a TRIO element TR 90 15 or
TR 120 16.
Fig. 23a 23h.

13

90

90

15

15

Fig. 23d

Fig. 23a

40

35

With two infills (wall thickness


compensation):
Insert one wall thickness
compensation each on the right and
left of the element.

Fig. 23c

13

13

90

90

18

15

1 WDA 5/6

Fig. 23e

15

Fig. 23f

18
1 WDA 5
50

60

13

18

18
1 WDA 5

Arrangement and number of


horizontal walers 85 24, 25 and
connection parts 55 see stopend with
timber. Fig. 35.

13

1 WDA 5

120

120

16

16

Fig. 23g

24

Fig. 23h

25
55

Fig. 23i

19

B2 T-junction
Obtuse wall connection
With large panel TR 270 x 240.
Fig. 24a.

Fig. 24a

With multi-panel TRM 72. Fig. 24b.

Fig. 24b

With wall thickness compensation


WDA 18 or timber. Fig. 24c.

Fig. 24c

With cam nut 19. Fig. 24d.


19

Fig. 24d

20

B3 Wall offset
Wall offsets using wall thickness =
30 cm as an example
51 17

23 50
Wall offset 20 cm.

20
30

Fig. 25

20

29

25 11
12
23
50
13

60

Fig. 26

25 11

23

60
TRM 72

30
TRM 72

12
23
50
13

81 - 90

Wall offset 81 90 cm
Consisting of internal and external
corner. Prepared with:
element TR 60 11
multi panel TRM 72 12
TRIO corner TE 13
compensation waler TAR 85 23
infill provided by contractor 50
additional tie point 30
Fig. 27.

23

60

TRM 72

Wall offset 21 80 cm
Consisting of internal and external
corner. Prepared with:
element TR 60 11
multi panel TRM 72 12
TRIO corner TE 13
compensation waler TAR 85 23
hook tie 25
infill provided by contractor 50
Fig. 26.

30

TRM 72

Prepared with:
compensation waler TAR 85 23
hook tie DW 15/400 29
infill provided by contractor 50
filler support 51
element TR 30 17
additional BFD 20 for 12 cm and more
wall offset.
Fig. 25.

21 - 80

60

Fig. 27

20 11

50

TRM 72

60

12

Nailed boards make the adjustment of


the offset easier.

TRM 72

13
91 - 100

Wall offset 91 100 cm


Consisting of internal and external
corner. Prepared with:
element TR 60 11
multi panel TRM 72 12
TRIO corner TE 13
compensation waler TAR 85 23
infill provided by contractor 50
Fig. 28.

60

Fig. 28

21

B3 Wall offsets
Height offset
With height offsets, the alignment
couplers BFD 20 are mounted
alternately on the frame struts of the
left and right elements depending on
the offset.
Fig. 29

20

Fig. 29

22

B4 Infill
With timber provided by contractor
10 cm

50
20

The infill is made with timber 50 cut


to size. Fig. 30.

With an infill > 2.5 cm, tie centrally in


the timber.
The alignment couplers BFD 20 are
arranged the same as with standard
elements.
The wingnut swivel plate must overlap
the frames of the adjoining elements
by at least 1 cm.

Fig. 30

TRIO Filler Plate LA from 6 to 36 cm.


52

Always place tie through the infill 52!

52

With identical infills on both sides, the


compensation waler TAR 85 23 is
attached with the hooks from above.
Fig. 31. Tie is placed in upper tie hole
a. Fig. 31a.

The lower compensation waler TAR


85 23 must be attached to the strut
with the hooks from below if a TRIO
element, e.g. multipanel TRM 72, is
present on the opposite side. Fig. 31b.
Tie is placed in the lower tie hole b.
Fig. 31a.

a
b

Fig. 31a

23
Fig. 31

Fig. 31b

23

B4 Infill
TRIO filler support TPP infill from
20 to 36 cm
consisting of:
filler support 53 (2x)
filler plate 21 mm 51
Fig. 32.
It should be fixed in such a way that
tie forces are transferred centrally
through the compensation waler TAR
85 23 to the neighbouring elements.
Fig. 33.
51

Mounting
Fig. 32a

53

Fig. 32

max. 36

Fig. 32a

23
53

51

Fig. 33

24

B5 Stopends
Stopend panel TR 24
for wall thicknesses of 24 cm.
Fig. 34.
54
The stopend panel TR 24 54 can also
be used as a wall element.
The element TR 30 can be used as a
stopend panel for wall thicknesses of
30 cm (without illustration).

Fig. 34

Stopend with timber and filler plate


for walls of all thicknesses
Use without TR 270 x 240 at wall end.
Connection parts:
waler 85 24
stopend tie 25 with wingnut pivot plate
tie bracket AH 55 with tensioning
fittings
Fig. 35.

24
25

Use with TR 270 x 240 at wall end


(without illustration).
Connection parts:
waler 85 24 (3x)
stopend tie 25 with wingnut pivot plate
The pressure of the concrete is
transferred to the TRIO elements by
the stopend ties and the walers 85.

Fig. 35

55

25

B5 Stopends
Stopend panel reinforcement
without water bar
H = 2.70 m and 1.20 m
Concrete cover c:

Consisting of:
two external parts AT 3 56 for approx.
2.5 cm concrete slabs or two external
parts AT 5 for approx. 5 cm concrete
slabs
a central part MT 57. Fig. 36.

Reinforcement

d-b
c=
2

The rubber lip 56.1 allows a continuous


reinforcement thickness of 16 mm.
Assembly
1. Position the first side of the formwork.
2. Attach the first external part AT 56 to
the formwork positioned using
alignment couplers BFD 20.
3. Fix first layer of reinforcement.
4. Position centre part MT 57.
5. Fix second layer of reinforcement.
6. Position closing formwork.
7. Insert second external part AT 56 into
the middle part MT.
8. Secure with alignment coupler
BFD 20.
Fig. 37

16* 16*

56.1
56
57

56

Fig. 36
* mm

57

20

Fig. 37

26

B5 Stopends
Stopend panel reinforcement with
water bar
H = 2.70 m and 1.20 m.
Consisting of:
two external parts AT 3 56 for approx.
2.5 cm concrete slab or two external
parts AT 5 for approx. 5 cm concrete
slab
a centre part MT 58. Fig. 38.
The rubber lip 56.1 allows a continuous
reinforcement thickness of 16 mm.
Assembly
1. Position the first side of the formwork.
2. Attach the first external part AT 56 to
the formwork positioned using
alignment couplers BFD 20.
3. Fix first layer of reinforcement.
4. Position central part MT 58.
5. Fix second layer of reinforcement.
6. Position closing formwork.
7. Insert second external part AT 56
into the centre part MT.
8. Secure with alignment coupler
BFD 20.
Fig. 39a + 39b.

16*

16*

56.1
56

58
Fig. 38
* mm

Fig. 39a

Wall thickness d [cm]

d-b

Reinforcement

MT
MT
MT
MT

270x20
270x24/25
270x30
270x35/36

Concrete cover approx. ca. 25 mm

[mm]

118
158
218
268

c=

b
H = 2,70 m
AT 270x3
AT 270x5

Stopend panel reinforcement with


expanding water bar.
Consisting of:
two external parts AT 56
middle part MTF 58
filler plates 51, provided by the
contractor
Fig. 39b.
20
56
58
51

MTF
MTF
MTF
MTF

H = 1,20 m
AT 120x3
AT 120x5
MT
MT
MT
MT

120x20
120x24/25
120x30
120x35/36

MTF
MTF
MTF
MTF
Fig. 39b

270x20
270x24/25
270x30
270x35/36

120x20
120x24/25
120x30
120x35/36

118
158
218
268

118
158
218
268
118
158
218
268

Concrete cover approx. ca. 50 mm

20 24/25 30 35/36 24/25 30 35/36 40


2
2
2
2
2
2
2
2
without water bar
with water bar
1
1
1
1
1
1
1
1
without water bar
with water bar
1
1
1
1
1
1
1
1
2

2
2

without water bar


1
1
1
1
without water bar
1
1
1
1

2
2
2
with water bar

1
1
1
1
with water bar
1
1
1
1

27

B6 Working and
Concreting Scaffold
Concreting platform 120/270
Pre-assembled concreting platform
120/270 60
Fig. 40
Permissible operating weight
1.50 kN/m2.
Scaffold group 2

61

61.1

60

Assembly
1. Raise handrail frame 61 and secure
with pins 61.1. Fig. 40a.

Fig. 40a
Fig. 40

61.1

2. Raise connection hook 62 until they


click into place. Fig. 41.
The sliding collar 62.1 must be at the
bottom. Fig. 41a.

62.1
62

3. Attach concreting platform 60 to


4-chain lifting gear. Fig. 42a + 42b.
Fig. 41a

The attachment points are marked in


yellow.
62

Fig. 41

Fig. 42b

60

Fig. 42a

Fig. 42

28

B6 Working and
Concreting Scaffold
Concreting platform 120/270
Assembly
4. Attach the concreting platform to the
upper edge of the formwork with the
connection hook. Use guide rope 62.3
from below. Fig. 43.
5. Detach 4-chain lifting gear. The safety
catch 62.2 grips under the frame profile
and secures. Fig. 44.
Visual check of the safety catch.
6. Attach side rail, e.g side rail 55.
The concreting platform must be
removed for storage of the elements.

62.3

Fig. 43

62.2

Fig. 44

29

B6 Working and
Concreting Scaffold
Concreting platform 120/270
Always place in an inclined position
before lifting by crane.
Place handrail frame in an inclined
position
1. Take out cotter pin and safety pin 61.1.
2. Angle safety rail backwards at a max.
of 15.
3. Replace safety pin and secure with
cotter pin.
4. Safety rail is now in an inclined position.
Fig. 45a 45d.

61.1
Fig. 45a

Fig. 45b

Fig. 45c

Fig. 45d

ca. 15

30

B6 Working and
Concreting Scaffold
Scaffold bracket TRG 80 and 120
A concreting scaffold is attached to
the TRIO formwork with scaffold
brackets 63. Fig. 46.
Allowed operating weight:
1.5 kN/m2. Scaffold Group 2
80
120

63
Decking and safety rails must attached
in such a way that they cannot tip or
bend.

270

Scaffolding parts provided by the


contractor must be in accordance
with the relevant safety regulations
(in Germany, DIN 4420).
Timber parts must be of at least
Sort Class S10 according to
DIN 4074 and must be identified
(BGR 169).
Cross-section of the safety planks:
3 cm x 15 cm.
Secure boards.

Fig. 46

With extended formwork units, the


scaffolding is assembled in the course
of the pre-assembly.

Allowed load width in m for


wooden plank or board scaffold
decking
Table 8, DIN 4420 Part 1
Scaffold Group

Plank or board width


(cm)

Board or plank thickness (cm)


3.0
3.5
4.0
4.5

1, 2, 3

5.0

20

1.25

1.50

1.75

2.25

2.50

24 and 28

1.25

1.75

2.25

2.50

2.75

31

B6 Working and
Concreting Scaffold
Scaffold bracket TRG 80 and 120
Assembly
1. Attach the scaffold brackets 63 in the
attachment holes of the elements. Fig.
47. Attachment is possible on the
horizontal, fig. 47a, and vertical, fig.
47b, element struts.

63

Visual check of the connection parts.


2. Lay out the decking planks from below
over the complete width of the
brackets and attach.
270

3. Insert safety rails and fasten with nails.

Fig. 47a

4. Attach side rails, e.g. FTF side rails


64. Fig. 48.

Fig. 47

Fig. 47b

64

30

0m
5m
2,1
1,3
h
t
id
rt w

h
idt

x.
ma

ma

Fig. 48

32

dw
po
up
.s

loa

B6 Working and
Concreting Scaffold
Guardrails
consisting of:
handrail post holder TRIO 65
handrail post HSGP 66
Fig. 49.

66

With a falling height > 3.0 m guardrails


on the scaffolding edge is necessary.
Assembly is carried out horizontally.
With vertical assembly, this is carried
out, for example, from a mobile
scaffold.

65

> 3,0 m

Assembly
1. Attach handrail post holder TRIO 65
in the connection holes of the
elements.
Only possible on vertical struts.
2. Secure with cotter pin.
3. Insert handrails HSGP 66.
4. Insert safety rails and secure with nails.
5. Assemble aide de levage TRP 67.
6. Lift with crane.
When raising the element, it should
be ensured that the safety rail is not
damaged by the crane sling. Fig. 50.

Fig. 49

With extended formwork units,


assemble the guardrails during the
pre-assembly.

66

Dismantling
Do not lay formwork elements onto
the handrail post holders TRIO 65.
65
Scaffolding parts provided by the
contractor must be in accordance
with the relevant safety regulations
(in Germany, DIN 4420).
Timber parts must be of at least
Sort Class S10 according to
DIN 4074 and must be identified
(BGR 169).
Cross-section of the safety planks:
3 cm x 15 cm.
Secure boards with nails.

0m
2,1 ,35 m
h1
w
idt
ad
w
o
t
l
r
x.
po
ma
up
.s
x
ma
h
idt

Fig. 50

33

B6 Working and
Concreting Scaffold
Platform system TRIO Platform
This is a platform system with
integrated access ladder 68.
Allowed operating weight:
1.5 kN/m2. Scaffold Group 2.
68
Assembled platforms remain on the
element for:
transport across the building site
folded up for transport between
building sites.
Height: 2.70 m, Fig. 51.
Move with 2 TRIO lifting hooks
1.5 tonne
Fig. 51

Extended height: 5.40 m, fig. 52. Lift


using Erection Aid TRP.
Base extension height: 3.90 m
consisting of TR 120 x 240 and
TR 270 x 240. Fig. 53.

Fig. 52

Fig. 53

34

B6 Working and
Concreting Scaffold
Assembly

10

1. Lay formwork elements 10 onto a level


surface. Fig. 54.

68

2. Attach platform 68 to the horizontal


strut with pins 68.1. Fig. 55 + 55a.

Fig. 54

68.1

Fig. 55a

Fig. 55

3. Fold out the guardrails and lock in


place. Fig. 56, 56a 56c.

68.2

Fig. 56c
Fig. 56

Fig. 56b

Fig. 56a

35

B6 Working and
Concreting Scaffold
Assembly
68.4

Starting from the top.


4. Fold out the platforms 68.3. Fig. 57.
5. Fasten TRP strut 121 68.4. For the
lower attachment, press the platform
lightly forwards. Fig. 57a + 57b.
6. Install TRP push-pull props 68.5.
Fig. 57c + 57d.

68.4
Fig. 57a

Fig. 57b

68.5
68.3

68.5

Fig. 57c

Fig. 57

Fig. 57d

7. Secure TRP push-pull props 68.5.


Fig. 58 + 58a.

68.6

Fig. 58

68.6
36

Fig. 58a

B6 Working and
Concreting Scaffold
Assembly
8. Secure TRP ladder 68.7 and the
Erection Aid TRP 68.8 with extended
units. Fig. 59.
68.7

68.8

Fig. 59

9. Unfold side rails.


10. Secure external push-pull props (RSS)
68.9 for inclined support. Fig. 60.
11. Lift with crane and secure e.g. with
PERI Multi Monti.

68.9

Fig. 60

37

B7 Extensions
Extension instructions for horizontal
pre-assembly
up to h = 5.40 m
Keep to permissible load of 1.5 t
(TRIO lifting hook) and crane
capacity!

TR 30 / 60 / 72

TR 90 / 120

TR 270 x 240

5,40

Element connection:
with one or more horizontal element
joints always use alignment coupler
BFD 20. Fig. 61a 61d.

2,70

Extension possibilities, number and


arrangement of alignment couplers
BFD, compensation walers TAR 85
and formwork ties can be found on
the TRIO poster.

20

Pre-assemble extension units


horizontally, with the formlining
downwards. Place timber or boards
underneath. Assembly surface must
be level.

TRIO Versetzhaken 1,5t


Art.-Nr. 023690

Fig. 61a

Fig. 61b

Fig. 61c

4,80

Lift with crane. Fig. 62.

2,70

Betriebsanleitung

Fig. 61d

38

Fig. 62

B7 Extensions
Extension instructions for horizontal
pre-assembly
up to h = 8.10 m

TR 90 / 120

Element connection:
With extension units h > 5.40 m, the
element joints are made with
alignment couplers BFD 20 and
compensation walers TAR 85 23.
Fig. 63a + 63b.

1,20

1,20

2,70

23

20
When using an element TR 30 as the
last extension element, the upper tie
position does not have to be used.

2,40

8,10

Pre-assemble the extension units


horizontally, with the formlining
downwards. Lay timber or boards
underneath. The assembly surface
must be level.
Extension units up to a height of
h = 8.10 m can be lifted with a crane
without additional bracing.
Fig. 64.

Fig. 63b
Fig. 63a

Fig. 64

39

B8 Foundation
formwork
Foundation strap
Foundation strap 80 is provided for
shuttering of single foundations
according to the so-called arming
vane principle. Attach fixing board 81
with nails. Fig. 65.

80

2,4

0m

max 1,0 m

x
ma

81
Fig. 65

Foundation tie clamp


In the absence of lower tie positions
in strip and single foundations, the
foundation tie clamp is used with
perforated foundation ties.
Required perforated foundation tie
length:
foundation width + 50 cm

85
SW 14

86
85.1
85.2

max. 1,20 m

Assembly
1. Place elements onto the perforated
tie 86.
2. Attach the foundation tie clamp 85 in
the lowest connection hole with pin
85.1.
3. Attach perforated tie to the tensioning
lever 85.2.
4. Tension with ratchet spanner.
Permissible tensile force: 16 kN.
Fig. 66.

85

0m

2,7

86
12
Fig. 66

40

ca. 25

41

B9 Shaft formwork
Shaft element TSE
For fast striking and moving of shaft
formwork.
30

90

Load capacity 2.0 tonnes


From TRIO element TR 30 there is the
possibility to connect TRIO elements
with shaft element TSE.
The connection to TR 24 and TRIO
corner is not possible.

2t
2t
2t
2t

Minimum shaft width 1.30 m


Assembly
1. Insert shaft element 90 between two
TRIO elements. Fig. 67.
2. Secure with pin and cotter pin 90.1.
Fig. 68.
With TRIO element TR 30 fasten in
the inner hole.
With TRIO elements TR 60, 72, 90,
120 fasten in the outer hole.
3. Move element unit to place of use
and fasten to the internal formwork
with alignment couplers BFD. Fig. 69.
4. Bring shaft element into shuttering
position with crowbar. Press crowbar
downwards. Fig. 70a + 70b.
5. Position tie rod through the shaft
element.

10

Fig. 67

90.1
TR 30
Fig. 68

42

Fig. 69

Fig. 70a + 70b

B9 Shaft formwork
Shuttering

10

Abb.71a

The opposite infill in the external


formwork is 10 cm wide.
Tie through the shaft element.
Fig. 71a.

45,5

18

Striking
Do not exceed crane capacity!
With rectangular shafts, an adjustable
crane sling is necessary due to the
varying lengths of the sides to achieve
as near as possible the same tensile
load on all four sides.

2,5

2,5

Fig. 71b

1.Dismantle tie components.


2. Attach crane sling to all four shaft
elements.
3. Pull gently and bring the shaft elements
with the crowbar into the striking
position. Fig. 72. The shuttering size
reduces by 2.5 cm on each side of the
shaft. Fig. 71b.
4. Pull up the whole internal shaft
formwork.

Fig. 72

Extensions
Place shaft elements one above the
other and connect with pins 90.2.
Fig. 73.

90.2

Fig. 73

43

B10 Circular
structures
TRIO polygonal
With suitable element widths and
infills, circular structures can be
shuttered with TRIO. See table below.
Ties are placed through the infills.

min. 4

20
2,6

In order not to detract from the


effectiveness of the alignment couplers
BFD 20, the elements may only deviate
by a max. of 2.6 from the centre point.
Fig. 74.
The width of the internal infill
50 = min. 4 cm.
The width of the external infill
50 = max. 10 cm. Fig. 75.
Do not attach alignment coupler
BFD 20 on the struts. Fig. 76.

2,6

50

2,6

2,6

Fig. 74

50
max. 10

Fig. 75

20

Minimum radii based on element widths


Element width

TR 30
TR 60
TR 72
TR 90
TR 120
TR 240
TR 270

min. radius

3.55 m
6.90 m
8.25 m
10.25 m
13.60 m
26.95 m
30.30 m

deviation
from curve

4 mm
7 mm
8 mm
11 mm
14 mm
28 mm
31 mm

Fig. 76

Plan view. Fig. 77.

Fig. 77

44

B11 Lifting
equipment
Operating instructions

When using lifting equipment, the


following operating instructions
must be taken into consideration:
TRIO lifting hooks
TRIO lifting gear combi-2
TRIO lifting gear 3
pallets and stacking devices

TRIO Versetzhaken 1,5t


Art.-Nr. 023690

TRIO Kombigehnge-2
Art.-Nr. 044760

Transportgehnge-3
Art.-Nr. 044770

Paletten und
Stapelrungen

Betriebsanleitung

Betriebsanleitung

Betriebsanleitung

Betriebsanleitung

45

C1 TRIO 330
Standard join

20

Connecting elements with alignment


coupler BFD 20. Fig. 78.
Amount: 3 pieces.

Up to concreting heights of 3.30 m,


only tie positions and are used.
330

Fig. 78

270

330

Combination h = 330 with


h = 270
Fig. 79.

Fig. 79

20
External corner
Element connection with alignment
coupler BFD 20.
Amount: 7 pieces.
Fig. 80.

Fig. 80

46

C1 TRIO 330
Obtuse and acute corners
3 3
3 3,3

External corners
Element connection with alignment
coupler BFD and compensation waler
TAR 85. Fig. 81.
Amount:

20

2 x 8 BFD 20
2 x 2 TAR 23

Fig. 81

Internal corners
Element connection with alignment
coupler BFD. Fig. 82.

23

20

Fig. 82

Amount: 2 x 5 BFD 20.

23

20

Extensions h = 330 with


h = 270
Element connection with alignment
coupler BFD and compensation waler
TAR 85. Fig. 83.
Amount h = 330: 2 x 6 BFD 20
2 x 3 TAR 23
Amount h = 270: 2 x 6 BFD 20
2 x 2 TAR 23

Fig. 83

47

C1 TRIO 330
Extension guidelines for horizontal
pre-assembly

270

with combination h = 330 + 270


Number of ties: 5 for each height
Fig. 84a.

270

600

600

240

Fig. 84a

with combination h = 270 + 330


Number of ties: 4 for each height
Fig. 84b.
Fig. 84b

Extension guidelines for horizontal


pre-assembly
up to 5.40 m
Fig. 84c.

540

330

540

330

Fig. 84c

Combination h = 330
+ 330 horizontal + 60
Fig. 84d.
Fig. 84d

48

C1 TRIO 330
Extension guidelines for horizontal
pre-assembly
up to h = 8.10 m

330

TR 90 / 120

Element connection
With extension units h > 5.40 m,
element joins are made with alignment
coupler BFD 20 and compensation
waler TAR 85 23. Fig. 85a + 85b.
23

20

660

When using an element TR 30 as the


last extension element, the uppermost
tie position does not have to be used.
Fig. 85c.

240

Pre-assemble extension units


horizontally, with the formlining
downwards. Place timber or boards
underneath. The assembly surface
must be level.

Abb.85a

3,30

8,10

1,20

Fig. 85b

Fig. 85c

49

C2 TRIO Alu
90

When using TRIO Alu elements, the


same formwork guidelines apply as
with TRIO 270 steel.

72

270

It can be combined with TRIO steel.


Concrete pressure is 60 kN/m2, line 6.
For element connection see A2.

Element widths for h = 2.70 m:


90/72/TAM 72/60/30 cm.
Fig. 86a 86e.

Fig. 86a

With extensions together with steel


elements, the Alu elements must be
on top.
When using TRIO Alu elements, the
corners can be shuttered and struck
without a crane. Fig. 87.

TAM 72

60

Fig. 86c

Fig. 86d

72

60

TAE

Fig. 87

50

Fig. 86b

30

Fig. 86e

C3 TRIO Structure
TRIO Structure has been developed
for special concrete surfaces. See also
TRIO Structure brochure.
The TRIO frame element is delivered
with backing formlining 10.9 that can
be covered with profile boards 10.8
(plank pattern). Fig. 88.
When using TRIO Structure elements,
the same formwork guidelines apply
as for TRIO 270 steel.

10.9

10.8

It can be combined 100% with


TRIO 270 and TRIO 330 steel.

Assembly of profile boards


Attachment can be made from the
front or back.

Fig. 88

11
TS 60

12
TSM 72

Corner 90. Fig. 89.


element TSM 72 12
element TS 60 11
corner TSE 13

TSE

13
Fig. 89
30

12

23

14

72

30

TSM 72

21 mm

Corner 135. Fig. 90.


articulated corner TSGE 14
element TSM 72 12
element TS 60 11
compensation waler TAR 85 23

TS 60

TS

21 mm

TS

60

TSGE

11
Fig. 90

51

D1 Care and
cleaning
What should be done?

Why?

1. Spray new formwork all over with release agent,


e.g. PERI BIO Clean before first use.

Provides fundamental protection against adhesion


and corrosion before first soiling cover completely
with release agent.

2. Spray formwork with PERI Bio Clean after striking


each time, then clean.

Helps to remove concrete remains and eases


cleaning. Use of force and scraping is unnecessary.
Formliner / paint stay intact.

3. For long storage periods, e.g. bad weather, store


formwork after cleaning and spraying.

The frame is thus protected against corrosion &


formlining against weathering.

4. Spray moving parts regularly with release agent


and/or grease as required.

Removes rust, prevents corrosion and maintains


ease of movement of parts.

5. Transport elements with suitable and secure


transport equipment and lifting gear.

Prevents damage by incorrect transport.

6. Ensure proper storage of elements and


accessories. Prevents damage of the element
frames and accessories.

Damage to the formlining caused by denting etc. is


also prevented.

7. Do not throw or drop accessories.

The parts remain functional.

8. Do not use unnecessary force during assembly


and dismantling.

The parts remain functional.

Care tips

Tips for cleaning


During cleaning, store the element securely!
It is not permitted to clean elements that are
hanging from a crane!
Remove concrete rest!
1. Spray the reverse side of the formwork with water
immediately after concreting.

Concrete not yet hardened and can be easily removed,


thus reducing cleaning effort.

2. After striking, spray the formwork all over with


PERI BIO Clean.

Mixes and removes concrete residue, makes later


mechanical cleaning easier.

3. Before mechanical cleaning, remove nails, batons,


etc. from the formlining.

Prevents unnecessary enlargement of nail holes and


damage to formlining. Also prevents damage to
cleaning tools.

4. Use a suitable tool, e.g. scraper, to clean element


mechanically.
5. Brush elements after mechanical cleaning. Remove
dust and concrete residue.
6. If necessary, spray elements again after shuttering.

52

The formlining surface is clean for next use.

D2 Repair
Small repairs can be made at the
building site, e.g. with veneer plugs
and timber pieces.
Large repairs, e.g. formlining change,
must be carried out by PERI or at a
suitable workshop.
Instructions can be found in the PERI
Cleaning and Repair Service brochure
or from PERI.
Necessary spare parts and tools can
be found in the PERI delivery
programme.

53

TRIO Steel Panels, h = 2.70m


Weight kg

Item no.

329,00

022570

Panel TR 270x240 = 6.48m2


Fitted with 18mm Finply formlining.

2400

300

600

300

600

300

300

575

300

150

600

300

24
150

300

2700

300

24

300

75
75

680

120

150

300

575

300

24

540

27

Panel TR 270x120 = 3.24m2


Panel TR 270x30 = 0.81m2
Fitted with 18mm Finply formlining.

159,00
52,90

150

540

1320

120

Detail:
The tapered tie hole allows
the tie to be angled at 6 in
any direction.

Levering corner

100

100

150

022510
022560

1200
300

300

300

120

2700

2700

24

27
Detail:
The tapered tie hole allows
the tie to be angled at 6 in
any direction.
25
Levering corner

54

Also with levering corner as


from the year 2002

25

Panel TR 270x90 = 2.43m2


Panel TR 270x60 = 1.62m2
Fitted with 18mm Finply formlining.

Weight kg

Item no.

112,00
80,30

022520
022550

900
300

600
300

2700

2700

300

Also with levering corner as


from the year 2002

Panel TR 270x72 = 1.94m2


Multi Panel TRM 270x72 = 1.94m2
For external corners, for oblique
angles, wall junctions, stopends etc..
Fitted with 18mm Finply formlining.
Complete with:
Plug 20/24 (44x)

89,20
93,80

022530
022540

24

30 30
30 30 30
25

49

720

720

300

300
300

2700

2700

300

23

600

37

575

300

150

300

Also with levering corner as


from the year 2002

Levering corner

150

300

575

600

24

25

25
150

150

55

TRIO Steel Panels, h = 1.20m


Panel TR 120x240 =2.88m2
Fitted with 18mm Finply formlining.

Weight kg

Item no.

160,00

022514

2400
300

600

600

600

300

1320

540

120

540

Panel TR 120x120 =1.44m2


Fitted with 18mm Finply formlining.

67,90

022600

1200

25
300
300

52,80

150
25

022610
900

1200

300

56

300

325

300
300

1200

25

Panel TR 120x90 =1.08m2


Fitted with 18mm Finply formlining.

150

300

300

1200

150

200

300

300

800

300

200

300

25

150

Panel TR 120x72 =0.86m2


Multi Panel TRM 120x72 =0.86m2
For external corners, for oblique
angles, wall junctions, stopends etc.
Fitted with 18mm Finply formlining.
Complete with:
Plug 20/24 (44x)

Weight kg

Item no.

43,50
51,90

022620
022630
20

25
720

49

30
30 30

720

300

150

25
150

Panel TR 120x60 =0.72m2


Fitted with 18mm Finply formlining.

39,50

333

150

23

600

37

24

867

300

1200

1200

300

37

30

300

25
150

022640

600

1200

300

24,90

022650

300

1200

Panel TR 120x30 =0.36m2


Fitted with 18mm Finply formlining.

57

TRIO Steel Panels, h = 0.60m


Panel TR 60x90 = 0.54m2
Fitted with 18mm Finply formlining.

Weight kg

Item no.

31,40

022790
900
300

300

120

300

600

300

300

TRIO TR 60x60 panel = 0.36m2


Fitted with 18mm Finply formlining.

24,20

022810

600

600

300

Panel TR 60x30 = 0.18m2


Fitted with 18mm Finply formlining.

14,60

022820

600

300

Panel TR 60x72 = 0.43m2


Fitted with 18mm Finply formlining.

26,30

022800

720

600

300

18,00

022840

300
35

300

120

300

600

35
300

Inside Corner TE 60-2 = 0.36m2


Fitted with 18mm Finply formlining.

58

Weight kg

Item no.

70,50
33,50

022580
022660

Inside Corner TE
For 90 inside corners.
Fitted with 18mm Finply formlining.
TE 270-2 = 1.62m2
TE 120-2 = 0.72m2

300

300

300

300

575

300

300

120

35

35

300

584
33

300

300

300

575

300

023200
023300

300

300

584

300

333

300
300

24

575

1200

300

300

24

300

300

33
33

300

292

300

94,80
43,60

75

120

292

2700

TGE 270 = 1.62m2


TGE 120 = 0.72m2

300

300

333

575

Articulated Corner TGE


For oblique angles from 75.
Can be used internally and externally.
To be used as a 90 inside corner
with TVR 45/45 Offset Waler.
Fitted with Steel formlining.

300

24

300

24

1200

300

865

300

300

35

300

2700

300

Detail x

24

33

30
30

30

59

Shaft Panel TSE 270 = 0,27m2


Shaft Panel TSE 120 = 0,12m2
For lifting complete internal formwork
in shafts. Height extendable.
Complete with:
Pin 20x140, galv. and
Cotter Pin 4/1 (7x bzw. 5x).

Weight kg

Item no.

124,00
69,30

105523
105524

Shuttered

100

600/720/900/1200 panel

297

297

569

632

25

600

55

1200

900

Struck

2700

1560

100

455

1200

300

300mm panel

Load-bearing point
Permissible load: 2000kg
Panel 135 Corner
for forming 135 corners.
Internal Panel

TEI 270/135
TEI 120/135

External Panel TEA 270/135


TEA 120/135

58,10
29,40

103317
103284

76,00
35,00

103337
103330
33

575
300

29
0

120

300

290

300

135

33

60

300
300

300

1200

333

135

300

575

300

240

300

300

300

33

135

300

2700

120

19

300

190

Weight kg

Item no.

Stopend Panel

Wall thickness d [cm]


AT 270x3
AT 270x5

15,90
17,40

023060
105953

b
[mm]

MT 270x20
MT 270x24/25
MT 270x30
MT 270x35/36

27,50
31,00
37,30
42,30

023061
023062
023064
023065

118
158
218
268

MTF 270x20
MTF 270x24/25
MTF 270x30
MTF 270x35/36

29,50
33,90
39,00
43,00

023074
023075
023077
023076

118
158
218
268

7,17
7,84

023067
105978

H = 2.70m

Concrete cover approx. 25mm

Concrete cover approx. 50mm

20 24/25 30 35/36 24/25 30 35/36 40


2
2
2
2
2
2
2
2
without water bar
without water bar
1
1
1
1
1
1
1
1
with water bar
with water bar
1
1
1
1
1
1
1
1

H = 1.20m
AT 120x3
AT 120x5
MT 120x20
MT 120x24/25
MT 120x30
MT 120x35/36

12,30
14,00
16,80
19,00

MTF 120x20
MTF 120x24/25
MTF 120x30
MTF 120x35/36
Without water bar MT

14,30
14,90
17,00
18,80

1
with water bar
1
1
1

118
158
218
268

2
2
2
2
without water bar
1
1
1
1
with water bar
1
1
1
1

MTF
AT

AT

MT

MTF
AT

AT

With water bar

b
c

Without water bar

without water bar


1
1
1

118
158
218
268

023081
023080
023078
023079

With water bar MTF

MT

023068
023069
023071
023072

Concrete cover c c = d b of reinforcing bar.


2

61

Weight kg

Item no.

44,00
20,60

023040
023030

Stopend Panel 24
For 240mm thick walls.
Can also be used as a wall panel.
Fitted with 18mm Finply formlining.
240

900

575

TR 270x24 = 0.65m2
TR 120x24 = 0.29m2

25

325

575

900

1200

25

900

2700

240

77

25

120

Filler Plate LA
Closes any gap from 60 to 360mm.
LA 270x36 = up to 0.97m2
LA 120x36 = up to 0.43m2

48,80
24,30

023170
023270

570

150

40

40

120

400

550

867

567

150

33

2700

40

62

333

620

24
150

150

570

1200

24

Weight kg

Item no.

Wall Thickness Compensation WDA


For variations in wall thickness at corners.
To be clamped onto panel with
BFD Alignment Coupler.
023182
023192
023995

WDA-2 120/5, steel


WDA-2 120/6, steel
WDA 120/10, alu

= 0.06m2
= 0.07m2
= 0.12m2

7,49
7,90
4,95

023282
023292
023990

50/60/100
150

16,20
17,10
10,70

2700

40

570

430

= 0.14m2
= 0.16m2
= 0.27m2

120

60

WDA-2 270/5, steel


WDA-2 270/6, steel
WDA 270/10, alu

TPP 270
TPP 120
TPP 270/27
TPP 120/27

8,08
3,61
7,86
3,35

867
150

101813
101823
101834
101839

With nailing strip.


For infilling with 21mm
(27mm) plywood filler.
Filler Support TPA

333

1200
40
570
150

430

Filler Support TPP, alu

33
567

430

150

50/60/100

max. 360

TPA 270
TPA 120

5,79
2,53

023460
023450

Coniferous timber.
For infilling with 21mm plywood filler.
Detail TPP

66

98 (92)

32

21
(27)

51

2700

60

Detail TPA

60

96

1200

21

36

50

63

TRIO Accessories
Weight kg
Alignment Coupler BFD, galv.
For all main connections.

4,05

Item no.
023500

25

Clamping length

288

Permissible Tension Force: 20kN.


Compensation Waler TAR 85
Powder-coated, red.
For infilling, transfers tie forces, aligns.
Waler 85
Powder-coated, yellow.
Without mounting hook.

12,50

023550

8,67

023551

80

180

45
30 30

850

Max compensation
width 360

Permissible Bending Moment: 4.4kNm


8,91

023560

450

450

Projection Waler TVR45/45


For connecting internal corners without
using TRIO TE Corners, particularly for
wall offsets.

40

40 30
45

64

60

51

260

64

52

58

164

60

max. 220 mm

Weight kg
Hook Tie DW15 L = 400, galv.

0,64

Item no.
023650

58

Thread DW15

400

20

Permissible Tension Force: 20kN.


0,42

023820
68

Hook Tie Head DW15, galv.

102

30
Female thread
DW15

Permissible Tension Force: 20kN.


1,20

023640

140

Stopend Tie TS, galv.


For transmitting force from stopends into
panel frame.

50
440

58

Thread DW15

Permissible Tension Force: 20kN.


7,06

023390

790

Stacking Device TRIO, galv.


For stacking and shifting 5 TRIO Panels
of any size. Allows the stack to be shifted
by crane or fork-lift truck.
4 devices are required for each stack.
Follow Instructions for Use.

2nd to 5th panel with


formlining facing up

120

146

1st panel with formlining


facing down

Lifting device to BGR 500


Permissible load: 500kg
Lifting Pin TRIO

150

0,33

023440
254

18

125

750303
25

22

0,021

33

Stacking Aid DW20


Prevents the panels from slipping.
Protects formlining against damage.

56

65

Weight kg
Lifting Gear-3 TRIO
For lifting stacks of panels.

15,60

Item no.
044770

TRANSPORTGEHNGE-3
Art.Nr: 044770
Fabr.Nr:
Baujahr: 200

Prfplaket

3500

Betriebsanleitung
beachten!

TR 330x240

10

5x
TR 270x240

S
4
m

5x

0c

<

24

8x

Follow Instructions
for Use.
Lifting Gear Combi-2 TRIO
For lifting stacks of panels and
TRIO Lifting Hooks or galvanized stacking
devices can be connected to the hooks.

26,10

044760

TRIO-Kombigehnge-2
Art.Nr: 044760
Fabr.Nr:
Baujahr: 200

Prfplaket

350
0

Betriebsanleitung
beachten!

3100

TR 330x240
5x
m

TR 270x240
5x

0c

4300
60

S
4

24

45

<

12

8x

Follow Instructions
for Use.
Lifting Hook TRIO 1.5t
Use 2 for each unit to be lifted!
Follow Instructions for Use.

7,06

023690

110

30

510

60

steel
alu

1,50 t
0,75 t

Schalung und Gerste

208

1,50 t
0,75 t

TRIO-Versetzhaken 1,5t
Art.Nr.: 023690
Fabr.Nr.:
Baujahr: 199
Tragfhigkeit: 1,5t
Gehngeneigungswinkel max.30
Betriebsanleitung beachten!

Perm. load: 1500kg,


by max. angle of
inclination of 30.

66

184

80

Universal Waler 245


For tying acute and obtuse angles of
thick walls. (eg bridge abutments).
Complete with:
Spacers (3x),
Hex. Bolt ISO 4014 M20x100-8.8, galv. (3x),
Hex. Nut ISO 7042 M20-8, galv. (3x),
and Compensation Washer 20 (6x).

Weight kg

Item no.

81,80

023920

132

140

50

80

52

Spacer adjustable
Requires 30mm spanner

20

52

2466

60
24

Waler Stop
Used in combination with Universal Waler 245.

46

39x60 = 2340

4,65

023930

44
3 x 80 = 240

80

20

80

46

36

34

130
350

2,10
0,85

022030
024240

Brace Connector TRIO, galv.


For fixing Push-Pull Props and Kickers
to the TRIO panels.
Complete with:
Pin 16x42 and Cotter Pin 4/1.

3,26

023660

Plug 20/24mm
For sealing tie holes 20 to 24mm, which
are not required.
Supplied in packs of 250 pcs.

0,003

160

41

222

104

Accessories:
Tie Rod Cylinder Yoke SW, galv. (1x)
Wedge KZ (2x)

030300
28

20

21

19

67

Weight kg
2,00

145

023630

60
75

100

90

Permissible tie force


Hole = 15kN
Hole = 30kN
023800
88

4,84

48

Foundation Strap TRIO


For connecting TRIO Panels with 60mm
wide edge section assembled in the
windmill configuration.

150

100

342

142

80

182

Foundation Tie Clamp TLS


For tying foundation formwork.
Complete with:
Captive Pin

2,29

023010

140

Perforated Foundation Tie,


25m roll
For use with TRIO
Foundation Tie Clamp.

Clam

16,90

023020

15

22

50

Permissible Tension Force: 16kN.

68

ping

trave

l 55m

65

136

170

SW 14

Requires 14mm spanner.


Permissible Tension Force with Perforated
Foundation Tie: 16kN.

60
51

61

150

21

50

25
30

Top Tie Bracket-2 AH, galv.


For anchoring independantly of the panel
grid, particularly in case of foundations
and extensions.

Item no.

Connector SB-1,2 - TRIO, DOMINO


For single face formwork with SB 1 and 2
brace frame.

Weight kg

Item no.

48,80

027680

250
240

160

650

1770

min 1270 max 1650

265

60

120

490

60

21

Load-bearing point
Perm. load of the crane lifting eye: 1000kg
with lifting chains 15 to the vertical

25

Accessories:
Pins 19x165, galv. SB-TRIO (2x)

027690

8,76

025740

21

203

25

130

125

25

117

Connector SB-A,B,C - TRIO, DOMINO


One for each tie point

0,40

25

cam nut 50
120

B 15
130

Accessory:
Pin 19x165, galv.
(One for each connection)

0,40

027690

Pin 19x165, galv.

0,40

027690

35

20

19

145

165

For 120mm thick formwork panels.

69

Concreting Platform 120x270


Preassembled 2.7m wide working and
concreting platform, which is mounted
on the panel from above with self-locking
mechanism.
Always lift with 4-chain Lifting Gear!
Crane lifting points are yellow for easy
identification.

Weight kg

Item no.

130,00

022950

1800

440

440

2680

80

995
328

1210

1164

312

163

163

120

Permissible Load: 150kg/m2


Scaffold Bracket TRG
Secured automatically when mounted
on horizontal or vertical struts.

35

120

023670
023680

1051

12,70
16,80

560

TRG 80
TRG 120

65
TRG 80

1821

895
TRG 120
35

1051

115 185

560

635

120

65

200

115 185

635

1821

1262

200

150kg/m2

Permissible Load:
Allowable Spacing: 1.35m

70

Item no.

13,10

023590

1050

Scaffold Bracket TRG 100/112


For mounting on horizontal and vertical
intermediate struts. Mounting on the top
struts allows the scaffold planking to extend
right to the front edge of the formlining.
Complete with:
Pin (1x) and Cotter Pin 4/1 (2x).

Weight kg

981

110

758

290

max 154

Permissible Load: 150kg/m2


Allowable Spacing: 1.35m
3,54

034580

2,56

101592

76

n
pa
xs
Ma .10m
2
l=

213

> 3000

Handrail Post Holder TRIO


Required from 3.0m drop, to comply with
ZH 1/603 of German Association for the
Building Trade.
Maximum width of load to be carried = 1.35m.
Permissible l for 3x15 handrail boards = 2.10m.
Complete with:
Cotter Pin 4/1 (1x)

44

216

185 115

Accessories:
Handrail Post HSGP

20

034580

65

35

1300

3,54

1050

034580

120

3,54

560

Handrail Post HSGP


Mounted on safety handrail post holder
TRIO, or TRIO scaffold bracket TRG 100/112.

43

Accessories:
Handrail Post HSGP

213

155

39

71

72

73

PERI International

1 PERI GmbH
Rudolf-Diesel-Strasse
89264 Weissenhorn
Phone 07309/950-0
Telefax 07309/951-0
info@peri.de
www.peri.de

43
22

20

19

33
35
18

45

39

53

11
11

21
6
47
17
5

31
16

13

29

30
54

49

42

4
24
34

2 France
PERI S.A.S.
Zone Industrielle Nord
34-36 rue des Frres Lumire
77109 Meaux Cedex
Tel.: ++33 /1/ 64 35 24 40
Fax: ++33 /1/ 64 35 24 50
peri.sas@peri.fr
www.peri.fr

7 USA
PERI Formwork Systems, Inc.
Suite 200
7272 Park Circle Drive
Hanover, MD 21076
Tel.: ++1 /4 10/ 7 12-72 25
Fax: ++1 /4 10/ 7 12-70 80
info@peri-usa.com
www.peri-usa.com

3 Switzerland
PERI AG
Aspstrae 17
8472 Ohringen
Tel.: ++41 /52/ 3 20 03 03
Fax: ++41 /52/ 3 35 37 61
info@peri.ch
www.peri.ch

8 Indonesia
PT Beton Perkasa Wijaksana
P.O. Box 3737
Jakarta 10210
Tel.: ++62 /21/ 5 71 26 44
Fax: ++62 /21/ 5 73 85 64
beton@cbn.net.id

9
4 Spain
PERI S.A. Sociedad Unipersonal
Ctra. Paracuellos - Fuente el Saz km. 18,9
Camino de Malatones, km. 0,5
28110 Algete / Madrid
Tel.: ++ 34 / 91 / 6 20 48 00
Fax: ++ 34 / 91 / 6 20 48 01
info@peri.es
10
www.peri.es
5 Belgium / Luxemburg
N.V. PERI S.A.
Industriepark
Nijverheidsstraat 6 PB 54
1840 Londerzeel
Tel.: ++32 /52/ 31 99 31
Fax: ++32 /52/ 30 08 30
info@peri.be
www.peri.be
6 Netherlands
PERI B.V.
v. Leeuwenhoekweg 23
Postbus 304
5480 AH-Schijndel
Tel.: ++31 /73/ 5 47 91 00
Fax: ++31 /73/ 5 49 36 51
info@peri.nl
www.peri.nl

74

Italy
PERI S.p.A.
Via G. Pascoli, 4
20060 Basiano (MI)
Tel.: ++39 /02/ 9 50 78-1>
Fax: ++39 /02/ 95 76 19 14
perispa@peri.it
www.peri.it
Japan
Hory Corporation
11-17 Fuyuki, Kohtoh-Ku
Ishima Bldg., 9F
Tokyo 135-0041
Tel.: ++81 /3/ 38 20 88 71
Fax: ++81 /3/ 56 21 70 24
frbk6541@mb.infoweb.or.jp

11 United Kingdom/Irland
PERI Ltd.
Market Harborough Road
Clifton upon Dunsmore
Rugby, CV23 0AN
Tel.: ++44 /17 88/ 86 16 00
Fax: ++44 /17 88/ 86 16 10
info@peri.ltd.uk
www.peri.ltd.uk

12 Turkey
16 Austria
PERI Ges.mbH
PERI Kalp ve skeleleri
Industriegelnde 152
San. Tic. Ltd. Sti.
Postfach 1
akmakl Ky Kars
3131 Getzersdorf
Sanbir Bl. 4.Blge 9.Cadde No: 133
Tel.: ++43 / 27 83 / 41 19
Bykekmece / Istanbul
Fax: ++43 /27 83/ 41 19-20
Tel.: ++90 /2 12/ 8 86 74 01(02)-(09)
office@peri.at
Fax: ++ 90 / 2 12 / 8 86 74 15
www.peri.at
periteknik@peri.com.tr
www.peri.com.tr
17 Czech Republic
13 Hungary
PERI spol. s r.o.
P.O. Box 3
PERI Kft.
252 42 Jesenice / Prahy
Zdor u. 4.
Tel.: ++420 /241 090 311
1181 Budapest
Fax: ++420 /241 090 315
Tel.: ++ 36 /1/ 2 960 960
info@peri.cz
Fax: ++ 36 /1/ 2 960 950
www.peri.cz
info@peri.hu
www.peri.hu
18 Denmark
14 Malaysia
PERI DANMARK A/S
forskalling og stillads
PERI-HORY MALAYSIA
Greve Main 26
Formwork SDN.BHD.
2670 Greve
Unit 19-04-7, Level 7
Tel.: ++ 45 / 43 / 45 36 27
PNB Damansara
Fax: ++ 45 / 43 / 45 36 87
19 Lorong Dungun
peri@peri.dk
Damansara Heights
www.peri.dk
50490 Kuala Lumpur
Tel.: + 60 / 3 / 20 93 68 23
19 Finland
Fax: + 60 / 3 / 20 92 58 76
PERI Suomi Ltd. Oy
info@perimalaysia.com
Periistentie 61
www.perimalaysia.com
05200 Rajamki
15 Singapore
Tel.: ++358 /9/ 27 66 06-0
Fax: ++358 /9/ 27 66 06-66
PERI-HORY ASIA
info@perisuomi.fi
Formwork Pte. Ltd.
www.perisuomi.fi
No. 1 Sims Lane # 06-10
Singapore 387355
20 Norway
Tel.: ++ 65 / 67 44 29 89
PERI NORGE AS
Fax: ++ 65 / 67 44 36 93
Industrigata 11
pha@periasia.com
3400 Lier
Tel.: ++ 47 / 32/ 24 17 00
Fax: ++ 47 / 32/ 24 17 01
info@peri.no
www.peri.no

12

21 Poland
PERI Polska Sp. z o.o.
ul. Stoeczna 62
05-860 Pochocin
Tel.: ++ 48 / 22 / 72 17 400
Fax: ++ 48 / 22 / 72 17 401
info@peri.pl.pl
www.peri.pl.pl
22 Sweden
PERIform SVERIGE AB
Montrgatan 4-6
Box 9073
30013 Halmstad
Tel.: ++ 46 / 35 / 17 46 60
Fax: ++ 46 / 35 / 17 46 78
peri@periform.se
www.periform.se
23 Korea
PERI (Korea) Ltd.
9thFl., Yuseong Bldg.
830-67 Yeoksam-dong,
Kangnam-ku,
Seoul 135-080
Tel.: ++ 82 / 2 / 5 50 22 00
Fax: ++ 82 / 2 / 5 57 53 82
info@perikorea.com
www.perikorea.com
24 Portugal
PERIcofragens Lda.
Rua Cesrio Verde, n 5 - 3 Piso
Linda-a-Pastora
2790-326 QUEIJAS
Tel.: ++3 51 /21/ 4 25 38 90
Fax: ++3 51 /21/ 4 25 39 46
geral@peri.emporsoft.pt
25 Argentina
PERI S.A.
Ruta Nacional No. 9, km 47,5
(Panamericana Ramal Escobar)
(1625) Escobar / Prov. Bs. As.
Tel.: ++ 54 / 34 88 / 42 81 00
Fax: ++ 54 / 34 88 / 42 30 21
info@peri.com.ar
www.peri.com.ar

45
37
44

51

52
23

10

38
41

40
48
50

36
28
14
15
8

26

46
27

36 United Arab Emirates


31 Slovakia
PERI (L.L.C.)
PERI spol. s r.o.
Pribylinsk 10
Brashy Building, Office No. 212
831 04 Bratislava
Shk. Zayed Road
P.O. Box 27933
Tel.: ++421 /2/ 4 92 09-1 11
Fax: ++421 /2/ 4 92 09-1 10
Dubai
info@peri.sk
Tel.: ++ 971 / 4 / 3 39 44 94
www.peri.sk
Fax: ++ 971 / 4 / 3 39 44 34
perillc@perime.com
32 Australia
PERI Australia Pty. Ltd.
37 Canada
116 Glendenning Road
PERI Formwork Systems, Inc.
Chile
PERI Chile Ltda.
Glendenning NSW 2761
45 Nixon Road
C /Jos de San Martin 104
Bolton, Ontario
Tel.: ++61 /2/ 88 05 23 00
L7E 1K1
Fax: ++61 /2/ 96 75 72 77
Parque Industrial Los Libertadores
Tel.: ++ 1 / 9 05 / 9 51 54 00
info@periaus.com.au
Colina, Santiago de Chile
Fax: ++ 1 / 9 05 / 9 51 54 54
www.periaus.com.au
Tel.: ++56 /2/ 4 44 60 00
bbaxa@peri.ca
Fax: ++56 /2/ 4 44 60 01
www.peri.ca
perich@peri.cl
33 Estonia
www.peri.cl
PERI AS
Valdme 8
38 Lebanon
PERI GmbH
Tnassilma Tehnopark
Philippines
76401 Saku vald
PERI GmbH
Lebanon Representative Office
Harjumaa
4-B Sycamore Center,
AYA Commercial Center, 7th Fl,
Tel.: + 3 72 / 6 / 77 11 00
Alabang-Zapote Road
Dora Highway
Fax: + 3 72 / 6 / 77 11 22
Corner Buencamino Street,
P.O box: 90 416-Jdeideh
peri@peri.ee
Alabang Muntinlupa
Beirut - Lebanon
www.peri.ee
Metro Manila
Tel: ++ 961 / 1 24 33 65
Fax: ++ 961 / 1 24 33 67
Tel.: ++63 /2/ 8 09 34-01 (02) (03)
Fax: ++63 /2/ 8 09 17 68
Mob: ++ 961 / 3 73 73 67
34 Greece
PERI Hellas Ltd.
afady@hotmail.com
helmut@skyinet.net
Sokratous Str.
lebanon@peri.de
5th kil. Koropi-Varis Ave.
Romania
P. O. Box 407
PERI Romnia SRL
39 Lithuania
PERI UAB
Calea Bucureti nr. 2B
194 00 Koropi
Titnago st. 19
077015 Baloteti - ILFOV
Tel.: ++30 /210/ 66 20 895-8
2053 Vilnius
Tel.: ++40 /21/ 2 66 24-19 (21)
Fax: ++30 /210/ 66 28 416
Tel.: ++ 370 / 5 / 2 31 14 54
Fax: ++40 /21/ 2 66 24 20
info@perihellas.gr
Fax: ++ 370 / 5 / 2 32 19 66
info@peri.ro
www.perihellas.gr
info@peri.lt
www.peri.ro
www.peri.lt
35 Latvia
PERI SIA
Slovenia
Goran Opali s. p.
Granita 26
40 Morocco
PERI S.A.
technologije in storitve
1057 Riga
Route de Rabat, km. 5
Obrena 137
Tel.: ++371 / 7 13 41 11
Piste de Beni Touzine
2000 Maribor
Fax: ++371 / 7 13 41 15
Tanger
Tel.: ++386 /2/ 4 21 52 40
info@peri-latvija.lv
Tel.: ++ 212 / 39 31 75 48
Fax: ++386 /2/ 4 21 52 41
www.peri-latvija.lv
Fax: ++ 212 / 39 31 75 49
perimaro@menara.ma

26 Brazil
PERI Formas e
Escoramentos Ltda.
Passagem Abar, 1.502
06300-000 Carapicuba
So Paulo
Tel.: ++55 /11/ 41 86 10 41
Fax: ++55 /11/ 41 86 10 41
info@peribrasil.com.br
www.peribrasil.com.br
27

28

29

30

32

25

41 Israel
PERI Formwork
Engineering Ltd.
16 Moshe Dayan st.
P.O. Box 10202
Kiriat Arie
Petach Tikva 49002
Tel.: ++ 972 / 3 / 9 24 93 32
Fax: ++ 972 / 3 / 9 24 93 31
info@peri-il.com
www.peri-il.com

45 Russian Federation
PERI GmbH
Krasnopresnenskaja
Naberezhnaja 12
Hotel Mezhdunarodnaja 2
Nr. 408
123610 Moskau
Tel.: ++7 / 0 95/ 2 58 23 49
Fax: ++7/ 0 95/ 2 58 23 50
moscow@peri.ru
www.peri.ru

46 South Africa
42 Bulgaria
PERI BULGARIA EOOD
PERI Wiehahn (Pty.) Ltd.
Kv. Vragdebna
P.O. Box 2668
m. Nova Machala Nr. 46
Bellville 7535
1839 Sofia, Bulgarien
Tel.: ++ 27 / 21 / 9 05 18 15
Tel.: ++3 59 /2/ 8 14 40 40-45
Fax: ++ 27 / 21 / 9 05 47 07
Fax: ++3 59 /2/ 8 14 40 50
team@wiehahn.co.za
peri.bulgaria@peri.bg
www.periwiehahn.co.za
www.peri.bg
47 Ukraine
43 Iceland
TOW PERI Ukraina
Merkr HF
23, M. Raskowoj Str.
Akralind 2
02002 Kiev
201 Kpavogi
Tel.: ++380 /44/ 5 68 53 57
Tel.: ++ 354 / 5 94 60 00
Fax: ++380 /44/ 5 68 51 45
Fax: ++ 354 / 5 94 60 01
peri@peri.com.ua
danni@merkur.is
www.peri.com.ua
www.merkur.is
48 Egypt
44 Kazakhstan
PERI GmbH
PERI Kalip ve Iskeleleri
Egypt Branch Office
Almaty Branch Office
24 A, Obour Gardens,
Furmanova Strae, 65
4th floor, apt. #1
Salah Salem Street
Bro 412 Corner Makataeva
11361 Heliopolis / Kairo
480004, Alma Ata
Tel.: ++20 /2/ 4 04 85 24/26
Tel.: ++ 7 / 32 72 / 73 00 72
Fax: ++ 20 / 2 / 4 04 57 84
Fax: ++ 7 / 32 72 / 73 91 16
peri@link.com.eg
perialmaty@peri.com.tr
www.link.com.eg
www.peri.com.tr
49 Serbia / Montenegro
PERI - Oplate d.o.o.
Jurija Gagarina 81
11070 Novi Beograd
Tel.: +3 81/ 11/ 2 15 31-48 /-49
Fax: +3 81/ 11 / 3 18 59 62
milebojanic@ptt.yu
www.peri.co.yu

50 Mexico
PERI Cimbras y Andamios, S.A.
de C.V.
Cerrada de Tejocotes, Lote 4,
Bodega A
Fracc. San Martin Obispo
C.P.54763 Cuautitln Izcalli
Estado de Mxico
Tel.: ++ 52 / 55 / 58 87 72 30
Fax: ++ 52 / 55 / 58 87 71 09
info@peri.com.mx
www.peri.com.mx
51 Azerbaijan
PERI BAKU
Baku Branch Office
Mehdi Hseyn 71/9
Baku / Aserbaidschan
Tel : + 994 12 97 64 24
Fax : + 994 12 92 45 51
peribaku@peri.com.tr
52 Turkmenistan
PERI Kalp ve skeleleri
Agabat Branch Office
Oguzhan Kesi No: 112 Kat:3
Agabat
Tel : +993 12 45 66-83/84
Fax : +993 12 45 23 50
periashgabat@peri.com.tr
53 Belarus
PERI GmbH
Gikalostr. 3
Bro 413
220000 Minsk / Belarus
Tel : +3 75 / 1 72 / 84 72 38
Fax: +3 75 / 1 72 / 84 72 38
peri@mail.belpak.by
54 Croatia
PERI Oplate i Skele d.o.o.
Dolenica 20
10 250 Zagreb/Donji Stupnik
Tel : +3 85 /1/ 6 55 36 36
Fax: +3 85 /1/ 6 55 36 37
peri1@zg.t-com.hr
www.peri.de

75

4.10 e 05/2005 3ma Art.Nr.:791723 Copyright by PERI GmbH