CONTROL DE COSTOS

INDIRECTOS

Activar / Desactivar OB...

COSTOS INDIRECTOS
Llenar Datos Generales primero:

PROYECTOS EPC

14-Partidas Opcionales 94xx

273282547.xls

06/11/201517:30:53

COSTOS
Proyecto :
Cliente :

INDIRECTOS ( Gastos Generales)

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD
CAL Y CEMENTOS SUR S.A
Fecha: 14-Mar-15

Datos Generales
Estimado del Presupuesto

2,100,000.00 US$$

Estimado HH

16,444.00 HH

Duracin Total Obra

9101
9102
9103
9104
9201
9202
9203
9204

2.00 Mes

Personal de Direccin
Personal de apoyo
Sistemas y Comunicaciones
Gastos de Oficina Principal
Equipos y vehculos de apoyo
Alojamiento y Alimentacin
Gastos Personal
Infraestructura de operacin

Pgina 4

273282547.xls

06/11/201517:30:53

COSTOS
Proyecto :
Cliente :

9205
9206
9207
9208
9500

94XX
94XX
94XX
94XX
94XX

INDIRECTOS ( Gastos Generales)

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD
CAL Y CEMENTOS SUR S.A
Fecha: 14-Mar-15

Gastos de operacin
Control de Calidad
Prevencin de Riesgos y Medio Ambiente
Topografa
Gastos Financieros
Responsabilidad Social
Ingeniera
Procura
Partida 94XX
Partida 94XX
Partida 94XX
Partida 94XX
Partida 94XX

TOTAL GASTOS GENERALES CONSTRUCCIN (US$)

Pgina 5

273282547.xls

06/11/201517:30:53

COSTOS
Proyecto :
Cliente :

INDIRECTOS ( Gastos Generales)

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD
CAL Y CEMENTOS SUR S.A
Fecha: 14-Mar-15

Datos Generales
Estimado del Presupuesto

2,100,000.00 US$$

Estimado HH

16,444.00 HH

Duracin Total Obra

2.00 Mes

9101 Personal de Direccin

0.00

9101 Descripcin

Costo Variable

Costo Fijo

Sub Totales US $

9101 PERSONAL DE STAFF

0.00

9101 Sub Total Sueldos de Empleados

0.00

0.00

0.00
0.00

Costo Variable

Costo Fijo

Sub Totales US $

9102 Personal de Apoyo

0.00

9102 Descripcin
9102 PERSONAL DE APOYO

0.00

0.00

9102 Sub Total Personal auxiliar de GG

0.00

0.00

0.00

Costo Variable

Costo Fijo

Sub Totales US $

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Costo Variable

Costo Fijo

Sub Totales US $

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Costo Variable

Costo Fijo

Sub Totales US $

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Costo Variable

Costo Fijo

Sub Totales US $

0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

Costo Variable
0.00
0.00
0.00
0.00
0.00

Costo Fijo
0.00
0.00
0.00
0.00
0.00

Sub Totales US $
0.00
0.00
0.00
0.00
0.00

9103 Sistemas y Comunicaciones

0.00

9103 Descripcin
9103
9103
9103
9103

EQUIPOS INFORMATICOS
SOFTWARE
EQUIPOS DE COMUNICACIN
Sub Total Equipos de Comunicacin y Computo

9104 Gastos de Oficina Principal

0.00

9104 Descripcin
9104
9104
9104
9104

VISITAS GERENCIALES
GASTOS DE ELABORACIN DE OFERTA
PROCESAMIENTO DE PLANILLAS
Sub Total Gastos de Oficina Principal

9201 Equipos y Vehculos de apoyo

0.00

9201 Descripcin
9201
9201
9201
9201
9201
9201
9201
9201

VEHCULOS LIGEROS
VEHCULOS DE TRANSPORTE MEDIANO Y PESADO
EQUIPOS DE MANIOBRA PARA ALMACENES
EQUIPOS PARA MANTENIMIENTO
EQUIPOS DEL TALLER MECNICO
EQUIPOS DE ILUMINACIN
EQUIPOS DE GENERACIN
Sub Total Equipos y Vehculos

9202 Alojamiento y alimentacin

0.00

9202 Descripcin
9202
9202
9202
9202
9202

CAMPAMENTOS
SERVICIOS DE CAMPAMENTOS (ELECTRICIDAD, AGUA, TELFONO)
ALIMENTACIN
HOSPEDAJE
LAVANDERIA

9202 Sub Total Alojamiento y Alimentacin

9203 Gastos Personal


9203
9203
9203
9203
9203
9203

0.00

Descripcin
GASTOS EN PERSONAL (EXMENES MDICOS, VACUNAS, ETC)
ENTRENAMIENTO DEL PERSONAL
EVENTOS Y RECREACIONES DEL PERSONAL
CAPACITACIONES
Sub Total Alojamiento y Alimentacin

9204 Infraestructura de operacin

0.00

Pgina 6

273282547.xls

06/11/201517:30:53

COSTOS
Proyecto :
Cliente :

INDIRECTOS ( Gastos Generales)

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD
CAL Y CEMENTOS SUR S.A
Fecha: 14-Mar-15

9204 Descripcin
9204
9204
9204
9204
9204
9204
9204
9204

OFICINAS DE OBRA
TALLERES
ALMACN
COMEDOR
OFICINAS DE CAMPO
ACCESORIOS DE OFICINA
SERVICIOS
MUEBLES Y ENSERES

9204 Sub Total Facilidades en Obra

Pgina 7

Costo Variable

Costo Fijo

Sub Totales US $

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

273282547.xls

06/11/201517:30:53

COSTOS
Proyecto :
Cliente :

INDIRECTOS ( Gastos Generales)

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD
CAL Y CEMENTOS SUR S.A
Fecha: 14-Mar-15

9205 Gastos de operacin

0.00

9205 Descripcin

Costo Variable

Costo Fijo

Sub Totales US $

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

Costo Variable

Costo Fijo

Sub Totales US $

9206 SC CONTROL DE CALIDAD


9206 EQUIPOS DE LABORATORIO

0.00
0.00

0.00
0.00

0.00
0.00

9206 Sub Total Facilidades en Obra

0.00

0.00

0.00

Costo Variable

Costo Fijo

Sub Totales US $

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Costo Variable

Costo Fijo

Sub Totales US $

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Costo Variable

Costo Fijo

Sub Totales US $

Garanta de fiel cumplimiento

6,825.00

6,825.00

Fianza por Fondo de Garanta

9,450.00

9,450.00

9205
9205
9205
9205
9205
9205
9205
9205
9205
9205

GASTOS DE OPERACIN
GASTOS DE REPRESENTACIN
GASTOS DEL CONTRATO
LETREROS DE OBRA
SERVICIOS (ELECTRICIDAD, AGUA, TELEFONO)
TRANSPORTE DE PERSONAL
TRANSPORTE DE MATERIALES
TRANSPORTE DE EQUIPOS
UTILES, PAPELERA Y ECONOMATO
LICENCIAS Y TRAMITES MUNICIPALES PROVISORIOS

9205 Sub Total Gastos Varios

9206 Control de Calidad

0.00

9206 Descripcin

9207 Prevencin de Riesgos y Medio Ambiente

0.00

9207 Descripcin
9207
9207
9207
9207

SEGURIDAD Y PRIMEROS AUXILIOS


EPI y SPC
VARIOS
Sub Total Facilidades en Obra

9208 Topografa

0.00

9208 Descripcin
9208
9208
9208
9208
9208

EQUIPOS DE TOPOGRAFA
REPLANTEO
TOPOGRAFA DE PRODUCCIN
SC DE TOPOGRAFIA
Sub Total Topografa

9500 Gastos Financieros

24,213.00

9500 Descripcin

Garanta de Seriedad de la Oferta


Garanta adelanto en efectivo
Garanta adelanto de materiales
Sencico
Seguros G y M

0.00

0.00

525.00

525.00

0.00

0.00

4,200.00

4,200.00

693.00

693.00

2,520.00

2,520.00

Seguro CAR

0.00

0.00

Costos de Financiamiento

0.00

0.00

0.00

0.00

ITF

Sub Total Gastos Financieros

0.00

0.00

0.00

24,213.00

24,213.00

Costo Variable

Costo Fijo

Sub Totales US $

Responsabilidad Social

0.00

Descripcin
PLAN DE RESPONSABILIDAD SOCIAL

0.00

0.00

VARIOS

0.00

0.00

0.00
Sub Total Responsabilidad Social

0.00

Pgina 8

0.00
0.00

0.00

273282547.xls

06/11/201517:30:53

COSTOS
Proyecto :
Cliente :

INDIRECTOS ( Gastos Generales)

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD
CAL Y CEMENTOS SUR S.A
Fecha: 14-Mar-15

Ingeniera

0.00

Descripcin

Costo Variable

GESTIN DE INGENIERA

Costo Fijo

0.00

Sub Totales US $
0.00
0.00

Sub Total Ingeniera

0.00

0.00

0.00

Costo Variable

Costo Fijo

Sub Totales US $

Procura

0.00

Descripcin
PERSONAL PURCHASING Y COORDINACIN

0.00

0.00

PERSONAL EXPEDITING AND LOGISTIC

0.00

0.00

PERSONAL INSPECT COORDINATOR

0.00

0.00

PERSONAL DE ASISTENCIA

0.00

0.00

GASTOS DE COURIER

0.00

0.00

PREVISIN PARA VIAJES AL EXTERIOR

0.00

Sub Total Procura

0.00

0.00

0.00

Costo Variable

Costo Fijo

Sub Totales US $

0.00

Partidas Opcionales 94xx

0.00

Descripcin
94XX Partida 94XX

0.00

0.00

94XX Partida 94XX

0.00

0.00

94XX Partida 94XX

0.00

0.00

94XX Partida 94XX

0.00

0.00

94XX Partida 94XX

0.00

Sub Total Partidas 94

TOTAL DE COSTOS INDIRECTOS (US$)

Pgina 9

0.00

0.00

0.00

Costo Variable

Costo Fijo

0.00

24,213.00

0.00

24,213.00

273282547.xls

06/11/201517:30:53

COSTOS
Proyecto :
Cliente :

INDIRECTOS

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD
CAL Y CEMENTOS SUR S.A
Fecha: 14-Mar-15

Datos Generales
Estimado del Presupuesto

2,100,000.00 US$$

Estimado HH

16,444.00 HH

Duracin Total Obra

2.00 Mes

9101 Personal de Direccin

139,183.92

9101

Descripcin

Costo Variable

9101

PERSONAL DE STAFF

139,183.92

9101

Sub Total Personal de Direccin

139,183.92

0.00

Costo Variable

Costo Fijo

9102 Personal de Apoyo


9102 Descripcin

Costo Fijo

Sub Totales US $
139,183.92
139,183.92
12,182.40
Sub Totales US $

9102

PERSONAL DE APOYO

12,182.40

9102

Sub Total Personal de Apoyo

12,182.40

0.00

12,182.40

Costo Variable

Costo Fijo

Sub Totales US $

1,300.76
100.00
310.00
1,710.76

23,200.00
0.00
240.00
23,440.00

24,500.76
100.00
550.00
25,150.76

Costo Variable

Costo Fijo

Sub Totales US $

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Costo Variable

Costo Fijo

9103 Sistemas y Comunicaciones


9103

Descripcin

9103
9103
9103
9103

EQUIPOS INFORMATICOS
SOFTWARE
EQUIPOS DE COMUNICACIN
Sub Total Sistemas y Comunicaciones

25,150.76

9104 Gastos de Oficina Principal


9104

Descripcin

9104
9104
9104
9104

VISITAS GERENCIALES
GASTOS DE ELABORACIN DE OFERTA
PROCESAMIENTO DE PLANILLAS
Sub Total Gastos de Oficina Principal

12,182.40

0.00

9201 Equipos y Vehculos de apoyo

0.00
0.00
0.00
0.00
39,742.80

9201

Descripcin

9201
9201
9201
9201
9201
9201
9201

VEHCULOS LIGEROS
VEHCULOS DE TRANSPORTE MEDIANO Y PESADO
EQUIPOS DE MANIOBRA PARA ALMACENES
EQUIPOS PARA MANTENIMIENTO
EQUIPOS DEL TALLER MECNICO
EQUIPOS DE ILUMINACIN
EQUIPOS DE GENERACIN

11,700.00
28,042.80
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

11,700.00
28,042.80
0.00
0.00
0.00
0.00
0.00

9201

Sub Total Equipos y Vehculos

39,742.80

0.00

39,742.80

Costo Variable

Costo Fijo

9202 Alojamiento y alimentacin

Sub Totales US $

20,518.00

9202

Descripcin

9202
9202
9202
9202
9202

CAMPAMENTOS
SERVICIOS DE CAMPAMENTOS (ELECTRICIDAD, AGUA, TELFONO)
ALIMENTACIN
HOSPEDAJE
LAVANDERIA

4,200.00
390.00
11,118.00
4,420.00
390.00

0.00
0.00

4,200.00
390.00
11,118.00
4,420.00
390.00

9202

Sub Total Alojamiento y Alimentacin

20,518.00

0.00

20,518.00

Costo Variable

Costo Fijo

9203 Gastos Personal

Sub Totales US $

0.00

9203

Descripcin

9203
9203
9203
9203

GASTOS EN PERSONAL (EXMENES MDICOS, VACUNAS, ETC)


ENTRENAMIENTO DEL PERSONAL
EVENTOS Y RECREACIONES DEL PERSONAL
CAPACITACIONES

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

9203

Sub Total Gastos Personal

0.00

0.00

0.00

Costo Variable

Costo Fijo

9204 Infraestructura de Operacin

Sub Totales US $

0.00

9204

Descripcin

9204
9204
9204
9204
9204
9204
9204
9204

OFICINAS DE OBRA
TALLERES
ALMACN
COMEDOR
OFICINAS DE CAMPO
ACCESORIOS DE OFICINA
SERVICIOS
MUEBLES Y ENSERES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

9204

Sub Total Infraestructura de Operacin

0.00

0.00

0.00

Pgina 10

Sub Totales US $

273282547.xls

06/11/201517:30:53

COSTOS
Proyecto :
Cliente :

INDIRECTOS

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD
CAL Y CEMENTOS SUR S.A
Fecha: 14-Mar-15

9205 Gastos de operacin


9205

Descripcin

9205
9205
9205
9205
9205
9205
9205
9205
9205
9205
9205

18,995.00
Costo Variable

Costo Fijo

Sub Totales US $

GASTOS DE OPERACIN
GASTOS DE REPRESENTACIN
GASTOS DEL CONTRATO
LETREROS DE OBRA
SERVICIOS (ELECTRICIDAD, AGUA, TELEFONO)
TRANSPORTE DE PERSONAL
TRANSPORTE DE MATERIALES
TRANSPORTE DE EQUIPOS
UTILES, PAPELERA Y ECONOMATO
LICENCIAS Y TRAMITES MUNICIPALES PROVISORIOS

5,850.00
0.00
0.00
0.00
8,270.00
4,875.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5,850.00
0.00
0.00
0.00
8,270.00
4,875.00
0.00
0.00
0.00
0.00

Sub Total Gastos de Operacin

18,995.00

0.00

18,995.00

Costo Variable

Costo Fijo

9206 Control de Calidad

0.00

9206

Descripcin

9206
9206

SC CONTROL DE CALIDAD
EQUIPOS DE LABORATORIO

0.00
0.00

0.00
0.00

0.00
0.00

9206

Sub Total Control de Calidad

0.00

0.00

0.00

Costo Variable

Costo Fijo

900.00
5,700.00
0.00
6,600.00

320.00
0.00
0.00
320.00

Costo Variable

Costo Fijo

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Costo Variable

Costo Fijo

Sub Totales US $

Garanta de fiel cumplimiento

6,825.00

6,825.00

Fianza por Fondo de Garanta

9,450.00

9,450.00

9207 Prevencin de Riesgos y Medio Ambiente


9207

Descripcin

9207
9207
9207
9207

SEGURIDAD Y PRIMEROS AUXILIOS


EPI y SPC
VARIOS
Sub Total Prevencin de Riesgos y Medio Ambiente

Sub Totales US $

6,920.00
Sub Totales US $
1,220.00
5,700.00
0.00
6,920.00

9208 Topografa
9208

Descripcin

9208
9208
9208
9208
9208

EQUIPOS DE TOPOGRAFA
REPLANTEO
TOPOGRAFA DE PRODUCCIN
SC DE TOPOGRAFIA
Sub Total Topografa

0.00

9500 Gastos Financieros

0.00
0.00
0.00
0.00
0.00
24,213.00

Descripcin

Garanta de Seriedad de la Oferta


Garanta adelanto en efectivo
Garanta adelanto de materiales
Sencico
Seguros G y M

0.00

0.00

525.00

525.00

0.00

0.00

4,200.00

4,200.00

693.00

693.00

2,520.00

2,520.00

Seguro CAR

0.00

0.00

Costos de Financiamiento

0.00

0.00

Seguro RC Parguas

0.00

0.00

ITF

9500

Sub Totales US $

Sub Total Gastos Financieros

0.00

0.00

0.00

24,213.00

24,213.00

Costo Variable

Costo Fijo

Sub Totales US $

Responsabilidad Social

5,000.00

Descripcin
PLAN DE RESPONSABILIDAD SOCIAL
VARIOS

5,000.00

5,000.00

0.00

0.00

0.00
Sub Total Responsabilidad Social

0.00

5,000.00

0.00

5,000.00

Costo Variable

Costo Fijo

Sub Totales US $

Ingeniera

0.00

Descripcin
GESTIN DE LA INGENIERA

0.00

0.00

Sub Total Ingeniera

0.00

0.00

0.00

Costo Variable

Costo Fijo

Sub Totales US $

0.00

Procura

0.00

Descripcin
PERSONAL PURCHASING Y COORDINACIN

0.00

0.00

PERSONAL EXPEDITING AND LOGISTIC

0.00

0.00

PERSONAL INSPECT COORDINATOR

0.00

0.00

PERSONAL DE ASISTENCIA

0.00

0.00

GASTOS DE COURIER

0.00

0.00

PREVISIN PARA VIAJES AL EXTERIOR

0.00

Sub Total Procura

0.00

0.00

0.00

Costo Variable

Costo Fijo

Sub Totales US $

Descripcin

Pgina 11

0.00

273282547.xls

06/11/201517:30:53

COSTOS
Proyecto :
Cliente :

INDIRECTOS

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD
CAL Y CEMENTOS SUR S.A
Fecha: 14-Mar-15

94XX

Partida 94XX

0.00

0.00

94XX

Partida 94XX

0.00

0.00

94XX

Partida 94XX

0.00

0.00

94XX

Partida 94XX

0.00

0.00

94XX

Partida 94XX

0.00

Sub Total Partidas 94

0.00

0.00

Costo Variable

Costo Fijo

243,932.88

47,973.00

TOTAL DE COSTOS INDIRECTOS EN SOLES (S/.)

0.00
0.00
291,905.88

0.14

0
0

Pgina 12

01. PERSONAL EN OBRA


COD.
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069

DESCRIPCION
DIRECCIN
Gerente de Proyecto
Gerente de Proyecto 2
Gerente de Proyecto 3

Gerente de Ingeniera
Gerente de Ingeniera 2
Gerente de Ingeniera

Gerente de Procura 1
Gerente de Procura 2
Gerente de Procura 3

Gerente de Construccin 1
Gerente de Construccin 2
Gerente de Construccin 3

Gerente de Contratos 1
Gerente de Contratos 2
Gerente de Contratos 3

Superintendente Civil
Superintendente Civil
Superintendente Civil 3

Superintendente Mecnico 1
Superintendente Mecnico 2
Superintendente Mecnico 3

Superintendente de Piping 1
Superintendente de Piping 2
Superintendente de Piping 3
Superintendente Electrico 1
Superintendente Electrico 2
Superintendente Electrico 3
Ingeniero Residente (Site Manager)
Administrador Contrato
Superintendente de Commissioning 1
Superintendente de Commissioning 2
Superintendente de Commissioning 3
Gerente Construccion
Ingeniero Campo Civil Movimiento Tierras
Ingeniero Campo Mecanico Equipo
Ingeniero Campo Mecanico Piping
Ingeniero Campo Civil Concreto
Ingeniero Equipo Mecanico
Ingeniero Campo Mecanico Est Bombeo Tk-901 Poza Alm
Ingeniero Campo Civil (Area 1 y 3)
Ingeniero Campo Civil (Area 2)
Supervisor de Campo 1
Supervisor de Campo 2
Supervisor de Campo 3
Ingeniero Campo Civil Asistente
Ingeniero Campo Mecanico Asistente
Ingeniero Suelos y Pavimentos
Ingeniero Electricista
Ingeniero Sanitario
Ingeniero Responsable Trazo
Ingeniero p/As Built

und
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes

UNITARIO MENSUAL
S/.
Empleados

9,000.00

7,000.00

COSTO HORARIO INC.


LEYES SOCIALES S/.
Otros

1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144

Ingeniero Archivador (turn over)


Ingeniero Campo Mecnico
Ingeniero Canteras y Procesamiento Materiales
Maestro General

mes
mes
mes
mes

Ingeniero Asistente Civil


Ingeniero Asistente Electricista
Ingeniero Asistente Mecanico
Ingeniero Asistente
Personal Perforacion Voladura
Relevos

mes
mes
mes
mes
mes
mes

OFICINA TECNICA
Gerente de Oficina Tnica 1
Gerente de Oficina Tnica 2
Gerente de Oficina Tnica 3
Gerente de Oficina Tnica 4
Gerente de Oficina Tnica 5
Jefe de Oficina Tcnica
Jefe Ingeniero de Topografa
Jefe de Oficina Tcnica 3
Jefe de Oficina Tcnica 4
Jefe de Oficina Tcnica 5
Asistente Oficina Tecnica
Asistente Oficina Valorizaciones
Asistente Oficina Presupuestos
Asistente Oficina
Asistente Oficina
Arquitecto
Ingeniero Civil
Responsable EIA
Responsable CIRA
Ingeniero Mecanico

Ingeniero Electrico/Instrumentacin

Ingeniero Piping

Ingeniero Costos

Ingeniero Asistente Programacion y Reportes

Controlador de documentos

Civil Designer Engineer

Electrical Designer Engineer

mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes

7,000.00

5,000.00

4,000.00

1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236

Piping PDS Designer Engineer

Instrument Designer Engineer

Piping Dratsman
Ing. Supervisor
Topografo
Relevo Topografico
Supervisor de Topografa

Tcnico Metradista
Dibujante Civil
Dibujante Mecnico
Dibujante Electricista
Autocadista
Traductores
Tcnico laboratorista
Ayudantes Topografo
Auxiliares de Oficina
Auxiliar de Laboratorio
Ayudantes de Nivelador

PLANEAMIENTO Y CONTROL
Planning and Cost Control Manager 1
Planning and Cost Control Manager 2
Planning and Cost Control Manager 3
Planning and Cost Control Manager 4
Planning and Cost Control Manager 5
Asistente Control Proyectos
Cost Control Engineer 1
Cost Control Engineer 2
Cost Control Engineer 3
Cost Control Engineer 4
Cost Control Engineer 5
Ingeniero Planeamiento
Planning Engineer Civil
Planning Engineer Electromecnico
Planning Engineer 3
Planning Engineer 4
Planning Engineer 5
Production Controler 1
Production Controler 2
Production Controler 3
Production Controler 4
Production Controler 5
Asistente Control de materiales del Cliente
Asistente de Planeamiento
Asistente de Costos

mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes

mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes

1237
1238
1239
1240
1241
1242
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326
1327
1328
1329
1400
1401
1402
1403
1404
1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438

SEGURIDAD
Gerente de HSE
Ingeniero de HSE
Jefe de Prevencin de Riesgos
Ingeniero Ambiental
Ingeniero Prevencion Riesgos/MA
Ingeniero Medio Ambiental
Supervisor de Seguridad
Asistente de seguridad/medio ambiente

Mdico
Paramedico
Enfermero
Enfermero ayudante
Relevo 06

CALIDAD
Gerente de QA-QC
Jefe de QA/QC
Ingeniero QA-QC
Ingeniero QA-QC Civil
Ingeniero QA-QC Mecnico
Ingeniero QA-QC Electricista
Inspector Primario Civil
Inspector Primario de Equipment
Inspector Primario de Piping
Inspector Primario Electrico & Instrumentacin
Inspector de QA/QC Hydrotest/Precommissioing
Inspector de QA/QC Onshore Piping
Inspector de QA/QC Piling & Platform
Inspector de QA/QC Start Up
Inspector de QA/QC Topsides
Inspectores QA-QC
Asistente QA-QC
Controlador de documentos QC
Fabric Primary Ispector
Fabric. Welding Primary Inspector
Inspector Q&C Civil
Inspector Q&C Acabados
Inspector Q&C Mecanico
Laboratorista
Ayudante Laboratorio
Supervisor Concreto
Control Documentario
Relevo 05

mes
mes
mes
mes
mes
mes
mes
mes
mes

mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes

mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes

6,000.00
5,000.00

1439
1440
1500
1501
1502
1503
1504
1505
1506
1507
1508
1509
1510
1511
1512
1513
1514
1515
1516
1517
1518
1519
1520
1521
1522
1523
1524
1525
1526
1527
1528
1529
1530
1531
1532
1533
1534
1535
1536
1537
1538
1539
1540
1600
1601
1602
1603
1604
1605
1606
1607
1608
1609
1610
1611
1612
1613
1614
1615
1616
1617
1618
1619
1620
1621
1622
1623
1624
1625
1626
1627
1628
1629
1630
1631

mes
mes
ADMINISTRACIN
Administrador
Jefe Administrador de obras
Administrador de Obra
Asistente Administrativo
Jefe De Servicios Administrativos
Auxiliar Administrativo
Contador
Contador Senior
Asistente de contabilidad
Tesorero
Jefe de finanzas
Jefe de Personal
Asistente de Oficina
Asistente de personal
Planillero
Asistente de Sistemas
Analista de Sistemas
Coordinador de Viajes
Profesor de traduccin
Secretaria Gerencia Proyectos
Secretaria
Relacionista Industrial
Relacionista Comunitario

SERVICIOS GENERALES
Jefe de servicios generales
Secretaria
Jefe de Campo
Accom. Asst. Clerk
Camp Oper. Boss
Supervisor
Coordinador de campo
Jefe de Almacen
Coordinador de transporte
Supervisor de Mantenimiento
Toolhouse Supervisor
Comunication & Nets Administraitor
Asistente de Servicios Generales
Asistente de Comunicaciones
Asistente de compras
Empleado de almacenes (5)
Electricista de mantenimiento
Chofer
Ayudante de limpieza
Asistente Almacen
Administracion de Materiales
Administrador de Obra
Apoyo Logstico
Arqueologo
Asistente De Logstica
Asistente Social
Ayudantes de Almacn 1
Ayudantes de Topografia
Cocinero
Consultor
Coordinador De Obra

mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes

4,000.00

mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes

3,000.00

3,000.00

3,000.00
2,000.00

3,000.00

2,500.00

1632
1633
1634
1635
1636
1637
1638
1639
1640
1641
1642
1643
1644
1645
1646
1647
1648
1649
1650
1651
1652
1653
1654
1655
1656
1657
1658
1659
1660
1661
1662
1663
1664
1665
1666
1667
1668
1669
1670
1671
1672
1673
1674
1675
1676
1677
1678
1679
1680
1681
1682
1683
1684
1685
1686
1687
1688
1689
1690
1691
1692
1693
1694

Sealeras
Chofer
Chofer Mediano
Chofer Pesado
Maniobrista Riger
Electricista
Encargado De Tramites
Gasfitero
Jefe de Servicios Generales
Ingeniero Mecanico
Ingeniero Mecanico Asistente
Jefe De Administracion De Obras
Responsable de Almacen 1
Responsable de Almacen 2
Jefe Campamento
Jefe De Servicios Administrativos
Jefe de Tiempo
Lavandero
Encargado de limpieza de Campamento
Asistente administrador de materiales
Operador de equipo pesado
Operador Pesado
Pasadores de Tiempo
Encargado de personal
Oficial de Asuntos Pblicos
Secretaria De Proyecto
Senior Accountant
Sealeros
Superintendente De Mantenimiento
Supervisor De Electricidad
Supervisor De Estructuras
Supervisor De Montaje
Supervisor De Obras Civiles
Supervisor De Seguridad
Supervisor De Soldadura
Supervisor De Tuberia
Supervisor General
Supervisor Instrumentista
Supervisor Mecanico
Tareador
Tareador de Equipos
Tecnico En Tuberias
Tecnico Mecanico
Tecnico Soldador
Tecnico Voladuras
Tesorero
Transport Supervisor
Vigias de trnsito
Guardin
Personal Subcontratista
Despachador

mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes

1,500.00

2,000.00
0.00

02. SISTEMAS Y COMUNICACIONES


COD.
2000
2001
2002
2003
2004

DESCRIPCION
EQUIPOS INFORMATICOS
Computadoras
Notebooks (Laptops)
Impresoras Multifuncionales
Impresora Laser A3

und

und
und
und
und

UNITARIO MENSUAL
US$

COSTO DE REPOSICIN
US$

52.23
110.00
4,090.00
19.00

2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2100
2101
2102
2103
2104
2105
2106
2107
2108
2109
2110
2111
2112
2113
2114
2115
2116
2117
2118
2200
2201
2202
2203
2204
2205
2206
2207
2208
2209
2210
2211
2212
2213
2214
2215
2216
2217
2218
2219
2220
2221
2222
2223
2224
2225
2226

Impresora Laser A4
Impresora de Inyeccin de tinta A3
Impresora de Carro Ancho
Plotter
Scaner A4
Servidor
Accesorios de red
UPS
Instalacion de computadoras, telefonos, fax, etc
Copiadoras
Copiadora A3 - A4
Copiadora de planos hasta A0
Mantenimiento de impresoras
Mantenimiento de computadoras
Camara Digital
Proyector

und
und
und
und
und
und
glb
und
glb
und
und
und
glb
glb
und
und

SOFTWARE
Licencias software(Autocad 2000)
Licencias software(MS Office)
Licencias software(Windows 98)
Licencias software(Project)
Licencias software(Contabilidad y Almacen: Sistema Oracle)
Licencias software(Equipos)
Licencias software
Licencias software(Planilla)
Licencias software(S10)
Licencias software(Primavera)

mes
mes
mes
mes
mes
mes
mes
mes
mes
mes

147.00

EQUIPOS DE COMUNICACIN
Radios Fijos
Radios Mviles
Antenas e instalacion
Nextel- telefonia
Walkie talky
Acometida telefonica
Central telefnica (3 tron - 8 anexos aprox)
Anexos telefnicos
Fax
Telefono Celular
Internet Satelital - Servicio
Consumo Telefonico

und
und
und
und
und
glb
und
und
und
und
mes
und

35.00
30.00

80.00
3,500.00
2,800.00

Sumin e Instal Red/ Internet Satelital

glb

19,439.68

und

UNITARIO MENSUAL
US$

79.00
500.00
2,000.00
1,500.00
125.00

300.00

555.00

230.00
50.00
333.33

3,500.00
60.00

1,600.00
50.00
200.00

03. EQUIPOS Y VEHICULOS DE APOYO


COD.

DESCRIPCION

COSTO DE REPOSICIN
US$

3000
3001
3002
3003
3004
3005
3006
3007
3008
3009
3010
3011
3012
3013
3014
3015
3016
3017
3018
3100
3101
3102
3103
3104
3105
3106
3107
3108
3109
3110
3111
3112
3113
3114
3115
3116
3117
3118
3119
3120
3121
3122
3123
3200
3201
3202
3203
3204
3205
3206
3207
3208
3209
3300
3301
3302
3303
3304
3305
3306
3307
3308
3309
3400
3401
3402
3403
3404
3405
3406
3407
3408
3409
3410
3500

VEHICULOS LIGEROS
Autos personal staff
Camioneta c.simple
Camioneta c.doble
Camioneta c.simple 4x4
Camioneta c.doble 4x4
Ambulancia

mes
mes
mes
mes
mes
mes

VEHICULOS DE TRANSPORTE MEDIANO Y PESADO


Camin Cama baja
Camion cisterna 2500 gal
Camion d-300
Gra 30Ton
Camin Baranda
Camion lubricador
Camion plataforma c/grua Hiab 6ton (doble traccion)
Cisterna combustible 2500 gal
Combi
Custer
Microbus 55 Pasajeros
Plataforma cama baja+ Tracto
Tractor
Trailer
Vans (15 pax)
Camioneta Lubricadora - Combustible
Camion Hiab 8tn

mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes
mes

EQUIPOS DE MANIOBRA PARA ALMACENES


Montacargas 3 Ton
Grua torre
Instalacin Gra Torre (cimentacin)
Montaje y Desmontaje Torre Grua

mes
mes
glb
glb

EQUIPOS PARA MANTENIMIENTO


Motobomba
Compresora
Equipo de Arenado
Instalacin de gra torre

mes
mes
mes
glb

EQUIPOS DEL TALLER MECNICO

EQUIPOS DE ILUMINACIN

1,950.00

22,000.00
8,750.00
8,321.40
3,300.00
5,700.00

2,500.00
8,025.00
28,510.00
15,000.00

3501
3502
3503
3504
3505
3506
3507
3508
3600
3601
3602
3603
3604
3605
3606
3607
3608
3609
3610
3611
3612

Torre de Iluminacin
Tableros Elctricos

mes
mes

EQUIPOS DE GENERACIN
Grupo Electrogeno 75 KW
Grupo Electrogeno 120 KW
Grupo Electrogeno 100 KW en s.by
Grupo Electrogeno 30 KW
Grupo Electrogeno 30 KW

mes
mes
mes
mes
mes

1,875.00
1,800.00

04. ALOJAMIENTO Y ALIMENTACION


COD.
4000
4001
4002
4003
4004
4005
4006
4007
4008
4009
4010
4011
4012
4013
4014
4015
4016
4017
4100
4101
4102
4103
4104
4105
4106
4107
4108
4109
4110
4111
4112
4113
4114
4115
4116
4117
4118
4119
4120
4121
4200
4201
4202
4203
4204
4205
4206
4207
4300

DESCRIPCION

und

CAMPAMENTOS Y VIVIENDAS
Instalaciones elctricas de los campamentos
Instalaciones de agua
Acometida elctrica
Instalacin del campamento

mes
glb
glb
m2

SERVICIOS DE CAMPAMENTOS Y VIVIENDAS


Electricidad Vivienda Personal Staff
Agua Vivienda Personal Staff
Telfono Vivienda Personal Staff
Fax Vivienda Personal Staff
Area para Almacenes yTalleres
Agua para Almacenes y Oficinas
Conformacion de rea p/Oficinas y Talleres

mes
mes
mes
mes
m2
mes
m2

Electricidad Campamento
Agua Campamento
Telfono Campamento
Fax Campamento

mes
mes
mes
mes

Serv. de limp. y mucama de camp. Direccin


Serv. de limp. y mucama de camp. Apoyo

dia
dia

ALIMENTACIN
Alimentacin Staff (Destaque)
Alimentacin Staff (Local)
Alimentacin Apoyo (Destaque)
Alimentacin Apoyo (Local)
Alimentacin Visitas

und
und
und
und
und

HOSPEDAJE

UNITARIO MENSUAL
US$

2,100.00
25,000.00

1.50
1.50

PRECIO UNITARIO
26.70
26.70
25.50
25.50
26.70

COSTO FIJO

US$

4301
4302
4303
4304
4305
4306
4400
4401
4402
4403
4404
4405
4406

Hospedaje Direccin
Hospedaje Apoyo

dia
dia

17.00
11.00

LAVANDERIA
Lavandera Staff
Lavandera Apoyo

und
und

1.50
1.50

und

UNITARIO MENSUAL
US$

05. INFRAESTRUCTURA DE OPERACIN


COD.
5000
5001
5002
5003
5004
5005
5006
5007
5008
5009
5010
5011
5012
5013
5100
5101
5102
5103
5104
5105
5106
5107
5108
5109
5110
5111
5112
5113
5114
5115
5116
5117
5118
5119
5120
5121
5122
5200
5201
5202
5203
5204
5205
5206
5207
5208
5209
5210
5211
5212
5213
5214
5215
5216
5300
5301

DESCRIPCION
OFICINAS DE OBRA
Contenedor de Oficinas 6m x 3m
Loza y techo entre contenedores
Contenedor de oficinas 20'
Muebles y enseres de oficina
Muebles y enseres de enfermera
Movilizacin e Instalacin Oficinas y Almacenes
Alquiler Activos p/areas Oficina y Almacenes
Alquiler Area p/Instalacion Campamento 4ha
Agua p/Campamento

TALLERES
Taller de Arenado
Taller de Carpintera
Taller de Estructuras y Soportes
Taller de Fabricacin Estructuras
Taller de Fabricacin Tuberas
Estructura Metalica p/Taller
Taller de Mantenimiento
Taller de Mecnica
Taller de Montaje de Equipos
Taller de Multiuso
Taller de Pintura
Taller Elctrico e Instrumentacion
Taller Radiografiado
Rehabilitacin Talleres
Tanque estacionario para combustibles
Preliminares p/Instalacion Oficinas y Almacenes

COSTO FIJO US$

mes

glb
glb
mes
mes

360,245.43
367,728.49

glb
glb

glb

ALMACN
Almacn
Cerco para almacn
Contenedor 20' almacn de campo
Contenedor 40' almacn de campo
Contenedor 40' almacn principal
Estanteras en Almacn
Frentes
Polvorin
Principal
Contenedor Almacen/Garita Control/Tanques/otros

glb

COMEDOR
Instalacion Carpa Comedor

glb

37,380.00

98,638.08

41,940.12

5302
5303
5304
5305
5306
5307
5308
5309
5400
5401
5402
5403
5404
5405
5406
5407
5408
5500
5501
5502
5503
5504
5505
5506
5507
5508
5509
5510
5511
5600
5601
5602
5603
5604
5605
5606
5607
5608
5609
5610
5611
5700
5701
5702
5703
5704
5705
5706
5707
5708
5709
5710
5711
5712
5713
5714
5715
5716
5717
5718
5719
5720
5721
5722
5723
5724
5725
5726
5727
5728
5729
5730
5731
5732
5733

Muebles y enseres de comedor y oficinas


Servicios para el comedor (Electricidad, Agua)
Empleados
Obreros

OFICINAS DE CAMPO
Contenedor 20' Oficinas de obra
Contenedor 40' Oficinas de obra
Instalacion Carpa Oficinas

glb

96,603.52

glb
glb

28,162.06

ACCESORIOS DE OFICINA (AIRE ACONDICIONADO, SURTIDOR DE AGUA, ETC)


Equipos de Aire Acondicionado Ventana
Ventiladores de Techo
Maquina de agua
Cafetera, Microondas, Refrigeradora
Mantenimiento de oficinas
Equipos de calefaccin

SERVICIOS
Instalacion de mdulos de Baos Mixtos
Tanque enterrado como pozo septico
Mantenimeinto tanque septico
SSHH (caseta tipo DISAL)
Tanque para agua
Servicios Instalaciones Sanitarias (agua)
Servicios Instalaciones Sanitarias (desague)
Recojo Residuos Solidos Peligrosos
Recojo Residuos Solidos
Instal. Y Suminist Tanques Agua/Agua Residuales/Combusti
Servicio Instalaciones Electricas
MUEBLES Y ENSERES
Escritorios
Anaqueles
Estantes
Sillas
Equipos de Aire Acondicionado Ventana
Ventiladores de Techo
Maquina de agua
Artefactos Electricos
Mantenimiento de oficinas
Archivadores
Mesa de Reuniones
Tachos de Basura
Planotecas

glb

26,697.50

mes
glb
glb
mes
mes
glb
glb

3,312.67
17,744.16

32,256.82
46,313.28

5734
5735

06. GASTOS DE OFICINA PRINCIPAL


COD.
6000
6001
6002
6003
6004
6005
6006
6007
6008
6009
6010
6011
6012
6013
6014
6015
6016
6017
6018
6019
6020
6021
6022
6023
6024
6025
6026
6027
6028
6029
6030
6031
6032
6033
6034
6035
6036
6037
6038
6039
6040
6041
6042
6043
6044
6045
6046
6047
6048
6049
6050
6051
6052
6053
6054
6055
6056
6057
6058
6059

DESCRIPCION
VISITAS GERENCIALES
Visitas gerenciales

GASTOS DE ELABORACIN DE OFERTA


Costo de Bases o estudios
Visita al Lugar de la Obra ,viajes
Personal Tecnico y/o Adimistrativo
Procesamiento
Utiles, Copias
Gastos Notariales por Legalizacion Documentos
Ingeniero Desarrollo Fase Proyecto
Costos de oferta
Costos preoperacionales
Costos Postoperacionales

PROCESAMIENTO DE PLANILLAS
Procesamiento personal de campo
Procesamiento planilla de empleados
Contabilidad Of. Principal

und

UNITARIO MENSUAL
US$

glb

500.00

COSTO DE REPOSICIN
US$

und
glb

glb
glb
glb
glb

mes
mes

6.00
5,555.60

und

UNITARIO MENSUAL
US$

07. GASTOS PERSONAL


COD.
7000
7001

DESCRIPCION
GASTOS PERSONAL
Exmenes mdicos

COSTO DE REPOSICIN
US$
0.00

7002
7003
7004
7005
7006
7007
7008
7009
7010
7011
7012
7013
7014
7015
7016
7017
7018
7019
7020
7021
7022
7023
7024
7025
7026
7027
7028
7029
7030
7031
7032
7033
7034
7035
7036
7037
7038
7039
7040
7041
7042
7043
7044
7045
7046
7047
7048
7049
7050
7051
7052
7053
7054
7055
7056
7057
7058
7059
7060
7061
7062
7063
7064
7065
7066
7067
7068
7069
7070
7071
7072
7073
7074
7075
7076

Examen Toxicologico
Examen mdico de empleados/apoyo
Examen mdico de supervisores
Examen mdico de obreros
Calificacion de soldadores (Certificacin)
Calificacion de soldadores (HH Entrenam.)
Calificacion de soldadores (Materiales)
Calificacion de soldadores (Soldadura)
Calificacion de soldadores (Herramientas)
Ensayos de Gammagrafa
Costos preoperativos - personal
Sistema Integrado de Gestin

glb

0.00

ENTRENAMIENTO DEL PERSONAL


Costos Entrenamiento Personal
Costo de Induccion al Personal Obrero

EVENTOS Y RECREACIN DEL PERSONAL


Recreacin

glb

2,500.00

CAPACITACIONES
Capacitacin al personal

glb

3,000.00

7077
7078
7079

08. GASTOS DE OPERACIN


COD.

DESCRIPCION

8000
8001
8002
8003
8004
8005
8006
8007
8008
8009
8010
8011
8012
8013
8014
8015
8016
8017
8018
8019
8020
8021
8022
8023
8024
8025
8026
8027
8028
8029
8030
8031
8032
8033
8034
8035
8036
8037
8038
8039
8040
8041
8042
8043
8044
8045
8046
8047
8048
8049
8050
8051
8052
8053
8054
8055
8056
8057
8058
8059
8060
8061
8062
8063
8064
8065
8066

GASTOS DE OPERACIN
Utiles de Oficina, Inc. tinta, papel, etc.
Viaticos
Gastos de Administracion varios (limpieza)
Consumo Telefono y Fax (GyM)
Copia de planos
Agua (1 Bidon 20 lts./ 20 pers. x 1 dia)
Mantenimiento de campamentos
Mantenimiento de Equipos de Oficina
Pruebas de Laboratorio
Videos y Fotografias de obra
Alquiler de viviendas y oficinas
Arranque Obra
Movilizacion Desmovilizacion Equipos Gruas
Movilizacion Materiales
Movilizacion Desmovilizacion Encofrados
Operacin + Movilizacion +Desmovilizacion Torres Grua PC
Movilizacion Estructuras Metalicas
Movilizacion Materiales Cerramiento
Movilizacion Desmovilizacion Equipos Construccion Civil
GASTOS DE REPRESENTACION
Gastos de representacin

und

UNITARIO MENSUAL
US$

mes

600.00

COSTO DE REPOSICIN
US$

200.00

mes

2,625.00

est
glb
glb
glb
glb
glb
glb
glb

45,300.00

mes

GASTOS DEL CONTRATO


Consultora

glb

LETREROS DE OBRA
Letreros de Obra

und

1,000.00

8067
8068
8069
8070
8071
8072
8073
8074
8075
8076
8077
8078
8079
8080
8081
8082
8083
8084
8085
8086
8087
8088
8089

SERVICIOS (ELECTRICIDAD, AGUA, TELFONO)


Electricidad
Agua
Consumo telefonico
Consumo de Fax
Consumo telefonos celulares
Consumo Internet
Comunicacin Satelital
Sistema de Radiocomunicaciones

8090

TRANSPORTE DE PERSONAL

8091
8092
8093
8094
8095
8096
8097
8098
8099
8100
8101
8102
8103
8104
8105
8106
8107
8108
8109
8110
8111
8112
8113
8114
8115
8116
8117
8118
8119
8120
8121
8122
8123
8124
8125
8126
8127
8128
8129
8130
8131
8132
8133
8134
8135
8136
8137
8138
8139
8140

Viajes Personal Staff - Rgimen 1


Viajes Personal Staff - Rgimen 2
Viajes Personal Staff - Rgimen 3
Viajes Personal Staff - Rgimen 4
Viajes Personal Staff - Rgimen 5
Viajes Personal Apoyo - Rgimen 1
Viajes Personal Apoyo - Rgimen 2
Viajes Personal Apoyo - Rgimen 3
Viajes Personal Apoyo - Rgimen 4
Viajes Personal Apoyo - Rgimen 5
Transporte Personal Staff (interno)
Transporte Personal Apoyo (interno)

TRANSPORTE DE MATERIALES

TRANSPORTE DE EQUIPOS
Movilizacin
Desmovilizacin

mes
mes
mes
mes
mes
mes
mes
mes

1,200.00
45.00
4,000.00

Costo unitario (US$)


und
und
und
und
und
und
und
und
und
und
und
und

350.00

8141
8142
8143
8144
8145
8146
8147
8148
8149
8150
8151
8152
8153
8154
8155
8156
8157
8158
8159
8160
8161
8162
8163
8164
8165
8166
8167
8168
8169
8170
8171
8172
8173
8174
8175
8176
8177
8178
8179
8180

UTILES, PAPELERA Y ECONOMATO


Copias de Planos
Segundo Original
Utiles de Oficina

LICENCIAS Y TRAMITES MUNICIPALES PROVISORIOS

09. CONTROL DE CALIDAD


COD.
9000
9001
9002
9003
9004
9005
9006
9007
9008
9009
9010
9011
9012
9013
9014
9015
9016
9017
9018
9019

DESCRIPCION

und

UNITARIO MENSUAL
US$

COSTO DE REPOSICIN
US$

SC CONTROL DE CALIDAD

EQUIPOS DE LABORATORIO
Equipo para Mecnica de suelos
Equipo prueba de Concreto
Equipo prueba de Asfalto Caliente
Laboratorio de obra
Laboratorio de concreto
Laboratorio Suelos y Concreto
Densimetro Nuclear

glb
glb
mes
mes
mes
mes
mes

4,710.00

10. PREVENCIN DE RIESGOS Y MEDIO AMBIENTE


COD.
10000
10001
10002
10003
10004

DESCRIPCION
SEGURIDAD Y PRIMEROS AUXILIOS
Extinguidores
Medicinas y equipos primeros auxiliios
Botiqun de primeros auxilios
Seguridad

und

Costo Variable US$

und
und
und
glb

300.00
150.00

80.00

10005
10006
10007
10008
10009
10010
10011
10012
10013
10014
10015
10016
10017
10018
10019
10020
10021
10022
10023
10024
10025
10026
10027
10028
10029
10030
10031
10032
10033
10034
10035
10036
10037
10038
10039
10040
10041
10042
10043
10044
10045
10046
10047
10048
10049
10050
10051
10052
10053
10054
10055
10056
10057
10058
10059

EPI y SPC
Casco tipo Jockey
Mscara a Prueba de Gases y Humos
Botas de Jebe con punta de acero
Mameluco desechable
Carteles y cintas de seguridad
Cables de acero p' lnea de vida
Tag's de bloqueo, andamios, etc.
Implementos de seguridad Ings. / Administ.
Ropa de seguridad
Filtros de Reemplazo

VARIOS
Folletos informativos
Premio seguridad
Capacitacin en seguridad y primeros auxilios
Traslado de explosivos
Pararrayos (Inc. Poste, Soportes, PAT)

mes

450.00

und

480.00

glb
und

11. TOPOGRAFA
COD.
11100
11101
11102
11103
11104
11105
11106
11107
11108
11109
11110
11200
11201
11202
11203

DESCRIPCION
EQUIPOS DE TOPOGRAFA
Estacin Total
Teodolito
Nivel
Miras, jalones, wincha

REPLANTEO

und
mes
mes
mes
mes

UNITARIO MENSUAL
US$

COSTO DE REPOSICIN
US$

11204
11205
11300
11301
11302
11303
11304
11305
11400
11401
11402
11403
11404
11405

TOPOGRAFIA DE PRODUCCION (COLOCACION DE PUNTOS, NIVELACION)

SC DE TOPOGRAFIA
Servicio de Topografia de Acompaamiento
Equipo Complementario Campo

mes
mes

28,600.50
5,220.00

und

Costo Fijo Total US$


6,825.00
9,450.00
0.00
525.00
0.00
4,200.00
693.00
2,520.00

12. GASTOS FINANCIEROS


COD.
12000
12001
12002
12003
12004
12005
12006
12007
12008
12009
12010
12011
12012
12013
12014
12015

DESCRIPCION
Garanta de fiel cumplimiento
Fianza por Fondo de Garanta
Garanta de Seriedad de la Oferta
Garanta adelanto en efectivo
Garanta adelanto de materiales
Sencico
Seguros G y M
ITF
Seguro CAR
Otros Seguros RC Patronal
Garanta Beneficios Sociales
Costos de Financiamiento
Seguro RC Parguas

0.00

13. RESPONSABILIDAD SOCIAL


COD.
13000
13001
13002
13003
13004
13005
13006
13007
13008
13009
13010
13011
13012
13100
13101
13102
13103
13104
13105
13106
13107
13108
13109
13200
13201
13202
13203
13204
13205
13206
13207
13208
13209

DESCRIPCION
Plan de Responsabilidad Social
Actividad Responsabilidad Social
Cursos Capacitacion Social

Varios

und

UNITARIO US$

und
mes

5,000.00
1,500.00

COSTO FIJO US$

GyM S.A.
PROYECTO:
INICIO:
DURACION (Mes)
HORAS/MES
NS$/U$s
FECHA

CRONOGRAMA GENERAL

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD
21/7
15-Apr-15
28/7
2
35/7
200
21/10
1.00
10/4
14-Mar-15

Actividad

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov Dic

10

11

12

13

14

15

16

17

18

Ene MESES
19

INGENIERIA

TOTAL
0

PROCURA

OBRAS CIVILES

OBRAS ELECTROMECANICAS

PRUEBAS Y PUESTA EN SERVICIO

0
0

21/7

D21/7

D
D

21/7
21/7

D21/7
D21/7

E
E

L
D

21/7
21/7

L21/7
D21/7

21/7

D21/7

21/7

L21/7

1,600 SERVICIOS GENERALES


0.00
1.0
0.0
1.0
0.0
0.0

1,608 Jefe de Almacen


1,620 Asistente Almacen
1,623 Apoyo Logstico
1,626 Asistente Social

TOTALES

9.0

0.0
2.0
0.0
0.0
0.0
0.0
0.0
0.0
1.0
0.0
0.0
0.0

0.0
400.0
0.0
0.0
0.0
0.0
0.0
0.0
200.0
0.0
0.0
0.0

0.0
0.0
2.0
0.0
0.0
0.0

0.0
400.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0

0.0
0.0
2.0
2.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.00
9,000.00
0.00
0.00
0.00
0.00
0.00
0.00
7,000.00
0.00
0.00
0.00

0.0
400.0
400.0
0.0
0.0
0.0

0.00
1,800.00
0.00
0.00
0.00
0.00
0.00
0.00
1,400.00
0.00
0.00
0.00

0.00
5,646.24
0.00
0.00
0.00
0.00
0.00
0.00
4,391.52
0.00
0.00
0.00

0.00
16,446.24
0.00
0.00
0.00
0.00
0.00
0.00
12,791.52
0.00
0.00
0.00

0.00
4,000.00
0.00
0.00
0.00

0.00
800.00
0.00
0.00
0.00

0.00
2,509.44
0.00
0.00
0.00

0.00
7,309.44
0.00
0.00
0.00

14,618.88
0.00
14,618.88
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
6,000.00
5,000.00
0.00
0.00
0.00

0.00
1,200.00
1,000.00
0.00
0.00
0.00

0.00
3,764.16
3,136.80
0.00
0.00
0.00

0.00
10,964.16
9,136.80
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

40,201.92
0.00
21,928.32
18,273.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
2.0
2.0
0.0
0.0
0.0
0.0

0.0
400.0
400.0
0.0
0.0
0.0
0.0

0.00
3,000.00
3,000.00
0.00
0.00
0.00
0.00

0.00
0.00
600.00
0.00
0.00
0.00
0.00

0.00
1,568.40
1,882.08
0.00
0.00
0.00
0.00

0.00
4,568.40
5,482.08
0.00
0.00
0.00
0.00

20,100.96
0.00
9,136.80
10,964.16
0.00
0.00
0.00
0.00

0.0
0.0
2.0
0.0
2.0
0.0
0.0

0.0
400.0
0.0
400.0
0.0
0.0

0.00
3,000.00
0.00
2,500.00
0.00
0.00

0.00
600.00
0.00
0.00
0.00
0.00

0.00
1,882.08
0.00
1,307.00
0.00
0.00

0.00
5,482.08
0.00
3,807.00
0.00
0.00

18,578.16
0.00
10,964.16
0.00
7,614.00
0.00
0.00

17.0

3,400

0.00

TOTAL

Modo
Empleado (E)
Otros (O)

Considerar
Destaque (D)

Rgimen de
trabajo

MESES

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

1,200 PLANEAMIENTO Y CONTROL


0.0
0.0
0.0
0.0
1,300 SEGURIDAD

1,400 CALIDAD

1,500 ADMINISTRACIN
1,515 Planillero
1,600
1,619
1,633
1,635

SERVICIOS GENERALES
Ayudante de limpieza
Chofer
Chofer Pesado

1,642
1,627
1,628
1,659
1,671
1,680
1,636
1,681

Ingeniero Mecanico Asistente


Ayudantes de Almacn 1
Ayudantes de Topografia
Sealeros
Tareador
Guardin
Maniobrista Riger
Personal Subcontratista

TOTALES

HORAS

1
1

Oct

Dic

Ene

Sep

Nov

Jul

Jun

Ago

Abr

May

18

19

TOTAL

1
1

1
1

DESTAQUE

BENEF.
SOCIALES

COSTO
UNITARIO

COSTO TOTAL

Meses

US $

20%

52.28%

US $

US $

Nmero de mes

PROM CONTAR

10

11

12

13

14

15

16

17

18

19

0
2
0
0
0
0
0
0
1
0
0
0

0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00

0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00

0
0
2
0
0
0

0.00
0.00
1.00
0.00
0.00
0.00

0.00
0.00
2.00
0.00
0.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0
0
2
2
0
0
0

0.00
0.00
1.00
1.00
0.00
0.00
0.00

0.00
0.00
2.00
2.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
2
2
0
0
0
0

0.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00

0.00
0.00
2.00
2.00
0.00
0.00
0.00
0.00

0
0
2
0
2
0
0

0.00
0.00
1.00
0.00
1.00
0.00
0.00

0.00
0.00
2.00
0.00
2.00
0.00
0.00

9.00

17.00

17

MESES

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.0
0.0
0.0
0.0

21/7

L21/7

2.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.0
0.0
0.0
0.0
2.0

0.0
0.0

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.0
0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.0
0.0

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,000.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,045.60
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,045.60
0.00
0.00
0.00

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
800.0
0.0
0.0
0.0
800

0.00

4,200.00

TOTAL

Meses

Das trabajados

8,091

Viajes Personal Staff - Rgimen 1

13

21

Das de
descanso
7

Staff

1.07

US$
4,875.00

A Gastos Oper.

8,092

Viajes Personal Staff - Rgimen 2

13

21

21/7

Staff

1.07

0.00

A Gastos Oper.

8,093
8,094

Viajes Personal Staff - Rgimen 3


Viajes Personal Staff - Rgimen 4

13
13

21
21

7
7

21/7
21/7

Staff
Staff

1.07
1.07

0.00
0.00

A Gastos Oper.
A Gastos Oper.

8,095

Viajes Personal Staff - Rgimen 5

13

21

21/7

Staff

1.07

0.00

A Gastos Oper.

8,096

Viajes Personal Apoyo - Rgimen 1

21

21/7

Apoyo

1.07

0.00

Rgimen de
trabajo
21/7

A Gastos Oper.

Viajes por mes

Costo unitario
US$
350.00

Total

8,097

Viajes Personal Apoyo - Rgimen 2

21

21/7

Apoyo

1.07

0.00

A Gastos Oper.

8,098
8,099

Viajes Personal Apoyo - Rgimen 3


Viajes Personal Apoyo - Rgimen 4

0
0

21
21

7
7

21/7
21/7

Apoyo
Apoyo

1.07
1.07

0.00
0.00

A Gastos Oper.
A Gastos Oper.

8,100

Viajes Personal Apoyo - Rgimen 5


Transporte personal
Transporte Personal Staff (interno)
Transporte Personal Apoyo (interno)

0
HH
3400
800

21

21/7

Apoyo

1.07
Viajes por hh
5.00
5.00

0.00
Total
0.00
0.00

A Gastos Oper.

TOTAL TRANSPORTE DE PERSONAL

17

1
1

COSTO BRUTO
UNITARIO

TRANSPORTE DE PERSONAL (va a gastos de operacin)

8,101
8,102

16

TOTAL

Staff
Apoyo

Costo unitario

4,875.00

A Gastos Oper.
A Gastos Oper.

TOTAL

PROM CONTAR

0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
12,182.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12,182.40
0.00
0.00
0.00

0
0
0

0.00
0.00
0.00

0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
4
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00

12,182.40

151,366.32

10

10

Viajes personal

15

Abr

CANT.

0.0
0.0
OFICINA TECNICA
Tcnico laboratorista
Auxiliar de Laboratorio
Autocadista

14

PROGRAMA DE PERSONAL

1,000 DIRECCIN

1,100
1,167
1,170
1,165

13

Ago

CATEGORIA

139,183.92

PERSONAL DE APOYO

CODIGO

12

Ene

D21/7

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.00
1.00
1.00
0.00
0.00
0.00
0.00

11

Dic

21/7

1,500 ADMINISTRACIN
Asistente Administrativo
Jefe de Personal
Relacionista Industrial
Relacionista Comunitario
Asistente de Sistemas

10

Nov

1,400 CALIDAD
1,404 Ingeniero QA-QC Civil
1,406 Ingeniero QA-QC Electricista
1,417 Asistente QA-QC
1,418 Controlador de documentos QC

Oct

E
E

Sep

D21/7

0.0
0.0
0.0
0.0
0.0
1.0
1.0
0.0
0.0
0.0

Ago

21/7

1,300 SEGURIDAD
1,305 Ingeniero Prevencion Riesgos/MA
1,307 Supervisor de Seguridad
1,308 Asistente de seguridad/medio ambiente
1,313 Paramedico

Jul

1,200 PLANEAMIENTO Y CONTROL


1,225 Asistente de Planeamiento
1,226 Asistente de Costos

Jun

May

0.0
1.0
0.0
0.0
0.0

Abr

1,111 Asistente Oficina Tecnica


1,136 Controlador de documentos

MESES

45,684.00
0.00
32,892.48
0.00
0.00
0.00
0.00
0.00
0.00
12,791.52
0.00
0.00
0.00

Mar

Ingeniero Residente (Site Manager)


Gerente Construccion
Ingeniero Campo Civil (Area 1 y 3)
Ingeniero Campo Civil (Area 2)
Ingeniero Asistente Civil
Ingeniero Electricista
Ingeniero Asistente Electricista
Relevos
Administrador Contrato

PROGRAMA DE PERSONAL

L
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00

Meses

Mar

US $

Feb

COSTO TOTAL

US $

Dic

COSTO
UNITARIO

52%

Ene

BENEF.
SOCIALES

20%

Oct

DESTAQUE

US $

Nov

COSTO BRUTO
UNITARIO

1,100 OFICINA TECNICA

1,504
1,512
1,523
1,524
1,516

HORAS
TOTALES

Sep

MESES

Feb

1,045
1,050
1,057
1,058
1,075
1,066
1,076
1,080
1,046

Rgimen de
trabajo

Dic

1,000 DIRECCIN

Destaque (D)

Ene

Modo
Empleado (E)
Otros (O)

Nov

PERSONAL DE DIRECCION

CANT.

Oct

CATEGORIA

Sep

CODIGO

Abr

PERSONAL DE OBRA

Ago

01

11
1

2.00

2.00

21

11

19

GyM S.A.

CRONOGRAMA GENERAL

PROYECTO:
INICIO:
DURACION (Mes)
HORAS/MES
NS$/U$s
FECHA

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD
21/7
15-Apr-15
28/7
Mes de Anlisis
2
35/7
200
21/10
1.00
10/4
14-Mar-15

Actividad
1

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

MESES

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

TOTAL

INGENIERIA

PROCURA

OBRAS CIVILES

OBRAS ELECTROMECANICAS

PRUEBAS Y PUESTA EN SERVICIO

0
0

53

54

55

56

57

Jun

52

Abr

51

Mar

50

May

49

Dic

48

Feb

47

Nov

46

Ene

45

Oct

44

Jul

43

Sep

42

Jun

41

Ago

40

Abr

39

Mar

38

May

37

Dic

36

Feb

35

Nov

34

Ene

33

Oct

32

Jul

31

Sep

30

Jun

29

Ago

28

Abr

27

Mar

26

May

25

Dic

24

Feb

23

Nov

22

Ene

21

58

59

60

TOTAL

PROM

CONTAR

Abr

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Mar

0.00

May

TOTAL

Feb

0.00

Ene

0.0

Dic

0.0

Nov

0.0

15

16

17

18

19

20

21

22

23

MESES

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

TOTAL

Meses

US $

Nmero de mes

10

11

12

13

14

MESES

HORAS

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0

0.0

0.0

0.00

0.00

1,000 DIRECCIN

1,100 OFICINA TECNICA

1,200 PLANEAMIENTO Y CONTROL

1,300 SEGURIDAD

1,400 CALIDAD

1,500 ADMINISTRACIN

1,600 SERVICIOS GENERALES

TOTALES

Jul

COSTO TOTAL

US $

Ago

COSTO
UNITARIO

52%

Jun

BENEF.
SOCIALES

0%

Abr

DESTAQUE

US $

Mar

COSTO BRUTO
UNITARIO

May

Rgimen de
trabajo

Feb

Considerar
Destaque (D)

Ene

Modo
Empleado (E)
Otros (O)

Dic

CANT.

Nov

PROGRAMA DE PERSONAL
Oct

PERSONAL DE APOYO

Oct

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Sep

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Jul

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Ago

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Jun

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Abr

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Mar

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

May

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Feb

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Ene

0.00

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Dic

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Nov

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Oct

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

Sep

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Jul

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0
0.0
0.0
0.0
0.0

Ago

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

Jun

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Abr

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

Mar

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0

May

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

Feb

0.00
0.00
0.00
0.00
0.00
0.00

Ene

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

1,600 SERVICIOS GENERALES

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL
TRANSPORTE DE PERSONAL (va a gastos de operacin)

8,091
8,092

Viajes Personal Staff - Rgimen 1


Viajes Personal Staff - Rgimen 2

0
0

Rgimen de
trabajo
0
0

Staff
Staff

0.00
0.00

US$
0.00
0.00

A Gastos Oper.
A Gastos Oper.

8,093

Viajes Personal Staff - Rgimen 3

Staff

0.00

0.00

A Gastos Oper.

8,094
8,095

Viajes Personal Staff - Rgimen 4


Viajes Personal Staff - Rgimen 5

0
0

0
0

Staff
Staff

0.00
0.00

0.00
0.00

A Gastos Oper.
A Gastos Oper.

8,096
8,097

Viajes Personal Apoyo - Rgimen 1


Viajes Personal Apoyo - Rgimen 2

0
0

0
0

Apoyo
Apoyo

0.00
0.00

0.00
0.00

A Gastos Oper.
A Gastos Oper.

8,098

Viajes Personal Apoyo - Rgimen 3

Apoyo

0.00

0.00

A Gastos Oper.

8,099
8,100

Viajes Personal Apoyo - Rgimen 4


Viajes Personal Apoyo - Rgimen 5

0
0

0
0
Rgimen de
trabajo
0
0

Apoyo
Apoyo

0.00
0.00

0.00
0.00

A Gastos Oper.
A Gastos Oper.

TOTAL TRANSPORTE DE PERSONAL

20

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1,500 ADMINISTRACIN

Transporte Personal Staff (interno)


Transporte Personal Apoyo (interno)

19

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

8,101
8,102

18

Dic

1,400 CALIDAD

Transporte personal

17

Nov

1,300 SEGURIDAD

Viajes personal

16

Oct

1,200 PLANEAMIENTO Y CONTROL

CATEGORIA

15

Sep

1,100 OFICINA TECNICA

CODIGO

14

MESES

PROGRAMA DE PERSONAL

L
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTALES

13

Oct

0.0
0.0
0.0
0.0
0.0

12

Jul

0.00
0.00
0.00
0.00
0.00

11

Sep

0.00
0.00
0.00
0.00
0.00

10

Jun

0.00
0.00
0.00
0.00
0.00

Ago

0.00
0.00
0.00
0.00
0.00

Abr

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0

Mar

0.0
0.0
0.0
0.0
0.0
0.0

May

0.0
0.0
0.0
0.0
0.0

Dic

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Feb

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Nov

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Ene

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Oct

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

US $

Jul

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Sep

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Jun

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Ago

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Abr

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

1,000 DIRECCIN

Meses

Mar

COSTO TOTAL

May

COSTO
UNITARIO
US $

Dic

BENEF.
SOCIALES
52%

Feb

DESTAQUE

HORAS TOTALES

Nov

COSTO BRUTO
UNITARIO
US $

MESES

Ene

PERSONAL DE DIRECCION

Rgimen de
trabajo

Oct

Destaque (D)

Abr

Modo
Empleado (E)
Obrero (O)

Sep

CANT.

Abr

CATEGORIA

Sep

CODIGO

Ago

PERSONAL DE OBRA

Ago

01

Meses

HH
0
0

Das trabajados

Das de
descanso

Viajes por mes

Viajes por hh
Staff
Apoyo

0.00
0.00

Costo unitario US$

Costo unitario

Total

Total
0.00
0.00

A Gastos Oper.
A Gastos Oper.
0.00

TOTAL

0.00

0.00

PROM

CONTAR

GyM S.A.

CRONOGRAMA GENERAL
Abr Ago Sep Oct Nov

17

18

Ene Feb Mar


19

20

21

Abr May Jun


22

23

24

INGENIERIA

PROCURA

OBRAS CIVILES

NS$/U$s

1.00

OBRAS ELECTROMECANICAS

FECHA

14-Mar-15

PRUEBAS Y PUESTA EN SERVICIO 0

Jun

16

Abr

15

May

Dic

14

Mar

Nov

13

Feb

Oct

12

Ene

Sep

11

Dic

Ago

10

Nov

Jul

Oct

Jun

Sep

May

Jul

Abr

Ago

Mar

Jun

Feb

Abr

Ene

May

Dic

INICIO:
15-Apr-15
DURACION (Meses) 2
HORAS/MES
200

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

2,000
2,001
2,002
2,004

EQUIPOS INFORMATICOS
Computadoras
Notebooks (Laptops)
Impresora Laser A3

und
und
und

6.0
1.0
0.0

2.0
2.0
0.0

2,010
2,011
2,012
2,013
2,015
2,019

Servidor
Accesorios de red
UPS
Instalacion de computadoras, telefonos, fax, etc
Copiadora A3 - A4
Camara Digital

und
glb
und
glb
und
und

1.0
2.0
9.0
2.0
3.0
4.0

1.0
1.0
1.0
1.0
1.0
1.0

COSTO
UNITARIO
MENSUAL
US $
52.23
110.00
19.00
0.00
79.00

100.00%
100.00%
100.00%
125.00
100.00%

2,105
2,108
2,109
2,110
2,200
2,202
2,204
2,207
2,203
2,208
2,212
2,210

Licencias software(Contabilidad y Almacen: Sistema Oracle)


Licencias software(Planilla)
Licencias software(S10)
Licencias software(Primavera)
EQUIPOS DE COMUNICACIN
Radios Mviles
Nextel- telefonia
Central telefnica (3 tron - 8 anexos aprox)
Antenas e instalacion
Anexos telefnicos
Consumo Telefonico
Telefono Celular

T O TALES

mes
mes
mes
mes
mes

und
und
und
und
und
und
und

0.0
0.0
0.0
1.0
0.0

3.0
2.0
0.0
0.0
1.0
0.0
1.0

36.0

0.0

147.00
0.00
555.00
230.00
50.00
333.33
0.00

0.0
0.0
2.0
0.0

2.0
2.0
0.0
0.0
1.0
0.0
1.0

300.00
0.00

Meses / Cantidad

US $

Nmero de mes

1,300.76
626.76
220.00
0.00

23,200.00
0.00
0.00
0.00

79.00
0.00
0.00
0.00
375.00
0.00

0.00
1,000.00
18,000.00
3,000.00
0.00
1,200.00

100.00
0.00

0.00
0.00

0.00
0.00
100.00
0.00

0.00
0.00
0.00
0.00

310.00
180.00
0.00
0.00
0.00
50.00
0.00
80.00

240.00
0.00
240.00
0.00
0.00
0.00
0.00
0.00

1,710.76

23,440.00

6
1

6
1

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

1
2
9
2
3
4

3
2

3
2

0.00

60.00
1,600.00
3,500.00
50.00
2,800.00
80.00
0.00
0.00
0.00
0.00
0.00

COSTO FIJO

US $

0.00

30.00
100.00%
100.00%
100.00%

COSTO
VARIABLE

0.00
500.00
2,000.00
1,500.00

0.00
2,100 SOFTWARE
2,101 Licencias software(Autocad 2000)

COSTO
UNITARIO
FIJO
US $

Dic

DEPRECIA
MESES CION
(%)

Ene

CANT.

Nov

Und.

PROGRAMA DE SISTEMAS Y COMUNICACIONES


Oct

CATEGORIA

COSTO TOTAL

Sep

CODIGO

COSTO UNITARIO

Abr

SISTEMAS Y COMUNICACIONES

Ago

02

Actividad

Mar

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

Feb

PROYECTO:

0.00
0.00
0.00
0.00
0.00
13

36

Abr May Jun

Jul

Abr May Jun

Jul

Abr May Jun

MESES

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

TOTAL

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago Sep Oct Nov

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Dic

0
0

0
0

Ene Feb Mar

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Ago Sep Oct Nov

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Dic

0
0

0
0

Ene Feb Mar

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Ago Sep Oct Nov

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Dic

0
0

0
0

Ene Feb Mar

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

MESES
TOTAL

0
0

PROM CONTAR

12
2
0
0
1
2
9
2
3
4
0

6.00
1.00
0.00
0.00
1.00
2.00
9.00
2.00
3.00
4.00
0.00

2.00
2.00
0.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00

0
0
0
0
2
0
0

0.00
0.00
0.00
0.00
1.00
0.00
0.00

0.00
0.00
0.00
0.00
2.00
0.00
0.00

6
4
0
0
1
0
1
0
0
0
0
0

3.00
2.00
0.00
0.00
1.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00

2.00
2.00
0.00
0.00
1.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00

GyM S.A.
PROYECTO:

CRONOGRAMA GENERAL
Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

10

11

12

13

14

15

16

17

18

19

20

21

22

23

INGENIERIA

PROCURA

OBRAS CIVILES

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

INICIO:
15-Apr-15
DURACION (Meses) 2
HORAS/MES
200
NS$/U$s

1.00

OBRAS ELECTROMECANICAS

FECHA

14-Mar-15

PRUEBAS Y PUESTA EN SERVICIO

Dic

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Ene

Mes de Anlisis

Actividad

10

11

12

13

14

15

16

17

18

19

20

21

22

23

CANT.

DEPRECIA
MESES CION
(%)

COSTO
UNITARIO
MENSUAL
US $

COSTO
UNITARIO
FIJO
US $

2,000 EQUIPOS INFORMATICOS


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2,100 SOFTWARE

2,200 EQUIPOS DE COMUNICACIN

T O TALES

0.0

COSTO
VARIABLE

COSTO FIJO

Meses / Cantidad

Oct

Und.

PROGRAMA DE SISTEMAS Y COMUNICACIONES


Nov

CATEGORIA

COSTO TOTAL

Sep

CODIGO

COSTO UNITARIO

Ago

SISTEMAS Y COMUNICACIONES

Abr

02

US $

US $

Nmero de mes

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

MESES

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

TOTAL

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

MESES
TOTAL

PROM CONTAR

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

GyM S.A.

Dic

Ene

Abr May Jun

Jul

Abr May Jun

Jul

MESES

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

TOTAL

OBRAS ELECTROMECANICAS

PRUEBAS Y PUESTA EN SERVICIO

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

CRONOGRAMA GENERAL
Abr

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

PROYECTO:

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

INICIO:
DURACION (Meses)

15-Apr-15

INGENIERIA

PROCURA

HORAS/MES

200

OBRAS CIVILES

NS$/U$s

1.00

FECHA

14-Mar-15

06
CODIGO

GASTOS DE OFICINA PRINCIPAL


CATEGORIA

COSTO UNITARIO
Und.

Cant.

Meses

Fijo
Variable

6,000 VISITAS GERENCIALES


6,001 Visitas gerenciales

glb

0.0

0.0

Variable

COSTO UNITARIO
MENSUAL
US $

COSTO TOTAL

COSTO UNITARIO
FIJO
US $

500.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

6,020 GASTOS DE ELABORACIN DE OFERTA

6,040 PROCESAMIENTO DE PLANILLAS


6,042 Procesamiento planilla de empleados
6,043 Contabilidad Of. Principal

mes
mes

0.0
0.0

0.0
0.0

Variable
Variable

6.00
5,555.60
0.00
0.00
0.00

Actividad

COSTO
VARIABLE
US $

0.00
0.00
0.00

Feb Mar

Ago Sep Oct Nov

Dic

Ene Feb Mar

PROGRAMA DE GASTOS VARIOS

COSTO FIJO
US $

0.00
0.00

0.00
0.00

0.00

0.00

0.00
0.00
0.00

Ago Sep Oct Nov

0.00
0.00
0.00

Meses
Nmero de mes

MESES
TOTAL

0.00
0.00
0.00
0.00
0.00

PROM

CONTAR

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

GyM S.A.

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

MESES

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

TOTAL

PROCURA

200

OBRAS CIVILES

NS$/U$s

1.00

OBRAS ELECTROMECANICAS

FECHA

14-Mar-15

PRUEBAS Y PUESTA EN SERVICIO

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

CRONOGRAMA GENERAL

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

PROYECTO:

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

INICIO:
DURACION (Meses)

15-Apr-15

HORAS/MES

06
CODIGO

Mes de Anlisis

GASTOS DE OFICINA PRINCIPAL


CATEGORIA

COSTO UNITARIO
Und.

Cant.

Meses

COSTO TOTAL

Fijo

COSTO UNITARIO
FIJO

COSTO
VARIABLE

COSTO FIJO

Variable

US $

US $

US $

US $
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

6,020 GASTOS DE ELABORACIN DE OFERTA

0.00

6,040 PROCESAMIENTO DE PLANILLAS

0.00

0.0

PROGRAMA DE GASTOS VARIOS

COSTO UNITARIO
MENSUAL

6,000 VISITAS GERENCIALES

T OTALE S

Actividad
INGENIERIA

Meses
Nmero de mes

MESES
TOTAL

CONTAR

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

PROM

0.00

0.00

GyM S.A.

Jul

10

11

12

13

14

15

16

17

18

19

20

INGENIERIA

PROCURA

OBRAS CIVILES

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

INICIO:
15-Apr-15
DURACION (Meses) 2
HORAS/MES
200

Abr May Jun

Feb

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

Dic

Abr Ago Sep Oct Nov

PROYECTO:

Ene

CRONOGRAMA GENERAL

10

11

12

13

14

15

16

17

18

19

20

Actividad

0.0000000

NS$/U$s

1.00

OBRAS ELECTROMECANI

FECHA

14-Mar-15

PRUEBAS Y PUESTA EN S

3,000 VEHICULOS LIGEROS


3,005 Camioneta c.doble 4x4

3,100
3,108
3,110
3,106
3,111
3,104
3,200
3,202
3,203
3,201
3,204

mes

VEHICULOS DE TRANSPORTE MEDIANO Y PESADO


Cisterna combustible 2500 gal
mes
Custer
mes
Camion lubricador
mes
Microbus 55 Pasajeros
mes
Gra 30Ton
mes
EQUIPOS DE MANIOBRA PARA ALMACENES
Grua torre
Instalacin Gra Torre (cimentacin)
Montacargas 3 Ton
Montaje y Desmontaje Torre Grua

mes
glb
mes
glb

3.0

1.0
0.0
0.0
1.0
0.0

0.0
0.0
0.0
0.0

2.0

2.0
0.0
0.0
2.0
0.0

0.0
0.0
0.0
0.0

1,950.00
0.00
0.00
0.00
8,321.40
3,300.00
8,750.00
5,700.00
22,000.00
0.00

COSTO VARIABLE

COSTO FIJO

US $

US $

US $

8,025.00
28,510.00
2,500.00
15,000.00
0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

3,500 EQUIPOS DE ILUMINACIN

TOTALES

0.0
0.0

5.0

0.0
0.0

Dic

Ene Feb

Meses
Nmero de mes

11,700.00
11,700.00

0.00
0.00

28,042.80
16,642.80
0.00
0.00
11,400.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00

39,742.80

0.00

0.00

3,400 EQUIPOS DEL TALLER MECNICO

mes
mes

Ago Sep Oct Nov

0.00
0.00
0.00

3,300 EQUIPOS PARA MANTENIMIENTO

3,600 EQUIPOS DE GENERACIN


3,601 Grupo Electrogeno 75 KW
3,602 Grupo Electrogeno 120 KW

Ene Feb Mar

PROGRAMA DE EQUIPOS Y VEHICULOS


Oct

CANT.

COSTO TOTAL

COSTO
UNITARIO FIJO

Nov

Und.

COSTO
UNITARIO
MENSUAL
US $

Sep

CATEGORIA

COSTO UNITARIO
%
MESES DEPRECIA
CION

Abr

CODIGO

EQUIPOS Y VEHICULOS

Ago

03

Dic

1,875.00
1,800.00
0.00

0.00

0.00
0.00

0.00
0.00
5

Mar

Abr May Jun

Jul

Ago

MESES

21

22

23

24

25

26

TOTAL

Mar

Abr

May

Jun

Jul

Ago

21

22

23

24

25

26

MESES
TOTAL
0

6
0
0
0

3.00
0.00
0.00
0.00

2.00
0.00
0.00
0.00

2
0
0
2
0
0

1.00
0.00
0.00
1.00
0.00
0.00

2.00
0.00
0.00
2.00
0.00
0.00

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0

0.00
0.00
0.00

0.00
0.00
0.00

0
0
0

0.00
0.00
0.00

0.00
0.00
0.00

0
0

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0

PROM CONTAR

0.00
0.00
5.00

GyM S.A.
PROYECTO:

CRONOGRAMA GENERAL

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

INICIO:
15-Apr-15
DURACION (Meses) 2
HORAS/MES
200

Mes de Anlisis

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

10

11

12

13

14

15

16

17

18

19

20

INGENIERIA

PROCURA

OBRAS CIVILES

Actividad

1
0.0000000

NS$/U$s

1.00

OBRAS ELECTROMECANI

FECHA

14-Mar-15

PRUEBAS Y PUESTA EN S

3,000 VEHICULOS LIGEROS


0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

3,100 VEHICULOS DE TRANSPORTE MEDIANO Y PESADO

3,200 EQUIPOS DE MANIOBRA PARA ALMACENES

3,300 EQUIPOS PARA MANTENIMIENTO

3,400 EQUIPOS DEL TALLER MECNICO

3,500 EQUIPOS DE ILUMINACIN

3,600 EQUIPOS DE GENERACIN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Meses
Nmero de mes

Mar

US $

Feb

COSTO FIJO

US $

Ene

COSTO VARIABLE

US $

Dic

PROGRAMA DE EQUIPOS Y VEHICULOS


Nov

CANT.

COSTO TOTAL

COSTO
UNITARIO FIJO

Oct

Und.

COSTO
UNITARIO
MENSUAL
US $

Sep

CATEGORIA

COSTO UNITARIO
%
MESES DEPRECIA
CION

Abr

CODIGO

EQUIPOS Y VEHICULOS

Ago

03

10

11

12

13

14

15

16

17

18

19

20

TOTALES

0.0

0.00

0.00

MESES

60

TOTAL

21

22

23

24

25

26

27

Jun

Jun

59

May

May

58

Abr

Abr

57

Mar

Mar

56

Feb

Feb

55

Ene

Ene

54

Dic

Dic

53

Nov

Nov

52

Oct

Oct

51

Sep

Sep

50

Ago

Ago

49

Jul

Jul

48

Jun

Jun

47

May

May

46

Abr

Abr

45

Mar

Mar

44

Feb

Feb

43

Ene

Ene

42

Dic

Dic

41

Nov

Nov

40

Oct

Oct

39

Sep

Sep

38

Ago

Ago

37

Jul

Jul

36

Jun

Jun

35

May

May

34

Abr

Abr

33

Mar

Mar

32

Feb

Feb

31

Ene

Ene

30

Dic

Dic

29

Oct

Nov

28

Nov

Oct

27

Sep

Sep

26

Ago

Ago

25

Jul

Jul

24

Jun

Jun

23

May

May

22

Abr

Abr

21

Mar

Mar

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

MESES
TOTAL

PROM CONTAR

0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

GyM S.A.

CRONOGRAMA GENERAL
Abr Ago Sep Oct Nov

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

10

11

12

13

14

15

16

17

18

19

INICIO:
15-Apr-15
DURACION (Meses2

INGENIERIA

PROCURA

HORAS/MES

200

OBRAS CIVILES

NS$/U$s

1.00

OBRAS ELECTROMECANICA 0

FECHA

14-Mar-15

PRUEBAS Y PUESTA EN SER 0

Dic

Ene

Ene

Dic

Oct

Ene Feb Mar

Nov

Oct Nov

Sep

Dic

Ago

Sep

Jul

Ago

Jun

Jul

May

Jun

Abr

Abr May

Mar

Actividad

Feb

PROYECTO:

10

11

12

13

14

15

16

17

18

19

4,000 CAMPAMENTOS Y VIVIENDAS


4,107 Conformacion de rea p/Oficinas y Talleres
4,106 Agua para Almacenes y Oficinas

m2
mes

4,100 SERVICIOS DE CAMPAMENTOS Y VIVIENDAS


4,117 Serv. de limp. y mucama de camp. Direccin dia
4,118 Serv. de limp. y mucama de camp. Apoyo
dia

0.0
1.0

6.5
0.0

0.0
2.0

2
0

Variable
Variable

25000.00
2100.00
0.00
0.00

Variable
Variable

30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

COSTO FIJO

US $

US $

US $

Meses
Nmero de mes

4,200.00
0.00
4,200.00

0.00
0.00
0.00

390.00
390.00
0.00

0.00
0.00
0.00

6
0

7
0

Dic

Fijo
Variable

Ene

Meses.

Oct

Cant.

PROGRAMA DE ALOJAMIENTO Y ALIMENTACION

COSTO
VARIABLE

Nov

Und.

COSTO TOTAL

COSTO
UNITARIO FIJO

Sep

CATEGORIA

COSTO UNITARIO
COSTO
UNITARIO
MENSUAL
US $

Ago

CODIGO

ALOJAMIENTO Y ALIMENTACION

Abr

04

0.00
0.00
0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

ALIMENTACIN
Alimentacin Staff (Destaque)
Alimentacin Staff (Local)
Alimentacin Apoyo (Destaque)
Alimentacin Apoyo (Local)

und
und
und
und

2,600.0
800.0
0.0
800.0

10.0
10.0
10.0
10.0

260.0
80.0
0.0
80.0

26.7
26.7
25.5
25.5

534.00
534.00
0.00
510.00
0.00
0.00

4,300 HOSPEDAJE
4,301 Hospedaje Direccin
4,302 Hospedaje Apoyo

dia
dia

2,600.0
0.0

10.0
10.0

260.0
0.0

17.0
11.0

340.00
0.00
0.00
0.00

4,400 LAVANDERIA
4,401 Lavandera Staff
4,402 Lavandera Apoyo

und
und

2,600.0
0.0

10.0
10.0

260.0
0.0

1.5
1.5

30.00
0.00
0.00
0.00

TOTALES

4.0

10

11

12

13

14

15

Dic

Ene

Oct

Nov

Sep

Ago

Jul

Jun

May

Abr

Meses
Nmero de mes

Mar

US $

Feb

US $
4,200
4,201
4,202
4,203
4,204

Dic

CANT.

Ene

Uno cada

Oct

HH

Nov

Und.

Sep

CATEGORIA

COSTO
VARIABLE

Ago

CODIGO

COSTO
UNITARIO
MENSUAL
US $

Abr

PROGRAMA DE ALOJAMIENTO Y ALIMENTACION


COSTO
UNITARIO

16

17

18

19

11,118.00
6,942.00
2,136.00
0.00
2,040.00

6
2
0
2

7
2
0
2

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

4,420.00
4,420.00
0.00

6
0

7
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

390.00
390.00
0.00

6
0

7
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

15,928.00

Abr May Jun

Jul

Ago

MESES

20

21

22

23

24

25

26

TOTAL

Feb

Mar

Abr

May

Jun

Jul

Ago

Feb Mar

20

21

22

23

24

25

26

Jul

0
0

Ago

0
0

Jun

0
0

May

0
0

Abr

0
0

Mar

0
0

Feb

0
0

MESES
TOTAL

20

21

22

23

24

25

26

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

CONTAR

0
2
0
0

0.00
1.00
0.00
0.00

0.00
2.00
0.00
0.00

13
0
0
0
0
0
0
0
0
0
0
0
0

6.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MESES
TOTAL

0
0
0
0

PROM

PROM

CONTAR

13
4
0
4
0
0

6.50
2.00
0.00
2.00
0.00
0.00

2.00
2.00
0.00
2.00
0.00
0.00

0
13
0
0
0

0.00
6.50
0.00
0.00
0.00

0.00
2.00
0.00
0.00
0.00

0
13
0
0
0

0.00
6.50
0.00
0.00
0.00

0.00
2.00
0.00
0.00
0.00

GyM S.A.
PROYECTO:

CRONOGRAMA GENERAL

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

INICIO:
15-Apr-15
DURACION (Meses2

Mes de Anlisis

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

10

11

12

13

14

15

16

17

18

19

20

21

INGENIERIA

PROCURA

Actividad

HORAS/MES

200

OBRAS CIVILES

NS$/U$s

1.00

OBRAS ELECTROMECANI

FECHA

14-Mar-15

PRUEBAS Y PUESTA EN S

Oct

Nov

Dic

Ene

Feb

Mar

0.00
0.00
0.00

10

11

12

13

14

15

16

17

18

19

20

21

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.00
0.00
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00

Sep

Variable
Variable

Ago

0
0

Jul

4,100 SERVICIOS DE CAMPAMENTOS Y VIVIENDAS


4,117 Serv. de limp. y mucama de camp. Ddia
0.00
4,118 Serv. de limp. y mucama de camp. dia
0.00

0.00

Jun

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.00

May

4,000 CAMPAMENTOS Y VIVIENDAS

Meses
Nmero de mes

Abr

US $

Mar

US $

Feb

COSTO FIJO

US $

Ene

Fijo
Variable

Dic

Meses.

Nov

Cant.

PROGRAMA DE ALOJAMIENTO Y ALIMENTACION

COSTO
VARIABLE

Oct

Und.

COSTO TOTAL

COSTO
UNITARIO FIJO

Sep

CATEGORIA

COSTO UNITARIO
COSTO
UNITARIO
MENSUAL
US $

Abr

CODIGO

ALOJAMIENTO Y ALIMENTACION

Ago

04

0
0
0
0
0
0
0
0
0
0
0

PROGRAMA DE ALOJAMIENTO Y ALIMENTACION

0.0
0.0

0.0
0.0

1.5
1.5

0.00
0.00
0.00
0.00

TOTALES

0.0

Mar

und
und

Feb

4,400 LAVANDERIA
4,401 Lavandera Staff
4,402 Lavandera Apoyo

Ene

0.00
0.00
0.00
0.00

Dic

17.0
11.0

Nov

0.0
0.0

Oct

0.0
0.0

Sep

dia
dia

Ago

4,300 HOSPEDAJE
4,301 Hospedaje Direccin
4,302 Hospedaje Apoyo

Jul

0.00
0.00
0.00
0.00
0.00
0.00

Jun

26.7
26.7
25.5
25.5

May

0.0
0.0
0.0
0.0

Abr

0.0
0.0
0.0
0.0

Mar

und
und
und
und

Feb

ALIMENTACIN
Alimentacin Staff (Destaque)
Alimentacin Staff (Local)
Alimentacin Apoyo (Destaque)
Alimentacin Apoyo (Local)

Ene

US $
4,200
4,201
4,202
4,203
4,204

Dic

CANT.

Nov

Uno cada

Oct

HH

Sep

Und.

COSTO
VARIABLE

Abr

CATEGORIA

COSTO
UNITARIO
MENSUAL
US $

Ago

CODIGO

COSTO
UNITARIO

10

11

12

13

14

15

16

17

18

19

20

21

0.00
0.00
0.00
0.00
0.00

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0.00
0.00
0.00

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0.00
0.00
0.00

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

US $

0.00

Meses
Nmero de mes

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

MESES

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

TOTAL

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

Jun

0
0

May

0
0

Abr

0
0

Mar

0
0

Feb

0
0

Ene

0
0

Dic

0
0

Nov

0
0

Oct

0
0

Sep

0
0

Ago

0
0

Jul

0
0

Jun

0
0

May

0
0

Abr

0
0

Mar

0
0

Feb

0
0

Ene

0
0

Dic

0
0

Nov

0
0

Oct

0
0

Sep

0
0

Ago

0
0

Jul

0
0

Jun

0
0

May

0
0

Abr

0
0

Mar

0
0

Feb

0
0

Dic

0
0

Ene

0
0

Nov

0
0

Oct

0
0

Sep

0
0

Ago

0
0

Jul

0
0

Jun

0
0

May

0
0

Abr

0
0

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

MESES
TOTAL

PROM

CONTAR

0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MESES
TOTAL

PROM

CONTAR

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

GyM S.A.

CRONOGRAMA GENERAL
Abr Ago Sep Oct Nov

OBRAS ELECTROMECANICAS

FECHA

14-Mar-15

7,000
7,001
7,012
7,002

GASTOS PERSONAL
Exmenes mdicos
Costos preoperativos - personal
Examen Toxicologico

glb

25.0
0.0
0.0

1.0
0.0
0.0

US $

US $

US $

US $

0.00
0.00

0.00
0.00

0.00
0.00

7,040 EVENTOS Y RECREACIN DEL PERSONAL


7,041 Recreacin

7,060 CAPACITACIONES
7,061 Capacitacin al personal

TOTALES

glb

glb

0.0

0.0

0.0

0.0

0.0

Fijo
0.00
0.00

2,500.00
0.00
0.00

0.00
0.00

3,000.00
0.00
0.00

Fijo

22

TOTAL

PRUEBAS Y PUESTA EN SERVICIO 0

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

10

11

12

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

Meses
Nmero de mes

13

14

15

16

17

Abr

COSTO FIJO

Variable

0.00
0.00

21

Mar

COSTO
VARIABLE

7,020 ENTRENAMIENTO DEL PERSONAL

20

Feb

COSTO UNITARIO
FIJO

0.00

19

Dic

COSTO UNITARIO
MENSUAL

0.00

18

PROGRAMA DE GASTOS VARIOS

Fijo

Fijo
Variable
Fijo

17

Ene

Meses

16

Oct

Cant.

15

Nov

Und.

COSTO TOTAL

14

Sep

CATEGORIA

COSTO UNITARIO

13

Jul

CODIGO

GASTOS DE PERSONAL

12

Ago

07

11

Jun

1.00

10

Abr

NS$/U$s

May

OBRAS CIVILES

Mar

200

MESES

Feb

HORAS/MES

Ene Feb Mar Abr

Dic

PROCURA

Dic

Ene

Ago Sep Oct Nov

Oct

INGENIERIA

Jul

Nov

15-Apr-15

Ene Feb Mar Abr May Jun

Sep

INICIO:
DURACION (Meses)

Actividad

Dic

Abr

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

Ago

PROYECTO:

18

19

20

21

22

25

25

MESES
TOTAL

PROM

CONTAR

25
0
0
0
0

25.00
0.00
0.00
0.00
0.00

1.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

25.00

GyM S.A.

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

MESES

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

TOTAL

PROCURA

200

OBRAS CIVILES

NS$/U$s

1.00

OBRAS ELECTROMECANICAS

FECHA

14-Mar-15

PRUEBAS Y PUESTA EN SERVICIO

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

CRONOGRAMA GENERAL

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

PROYECTO:

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

INICIO:
DURACION (Meses)

15-Apr-15

HORAS/MES

07
CODIGO

Mes de Anlisis

GASTOS PERSONAL
CATEGORIA

Actividad

COSTO UNITARIO
Und.

Cant.

Meses

Fijo
Variable

COSTO UNITARIO
MENSUAL
US $

COSTO TOTAL

COSTO UNITARIO
FIJO
US $

7,000 GASTOS PERSONAL

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

7,020 ENTRENAMIENTO DEL PERSONAL

0.00

7,040 EVENTOS Y RECREACIN DEL PERSONAL

7,060 CAPACITACIONES

T OTALE S

COSTO
VARIABLE
US $

0.0

INGENIERIA

PROGRAMA DE GASTOS VARIOS

COSTO FIJO
US $

Meses
Nmero de mes

MESES
TOTAL

PROM

CONTAR

0.00

0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

GyM S.A.

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

10

11

12

13

14

15

16

17

18

19

20

TOTAL

OBRAS ELECTROMECANI

PRUEBAS Y PUESTA EN SE

Dic

Ene

Feb

CRONOGRAMA GENERAL

18

19

20

PROYECTO:

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

INICIO:
DURACION (Meses)

15-Apr-15

INGENIERIA

PROCURA

HORAS/MES

200

OBRAS CIVILES

NS$/U$s

1.00

FECHA

14-Mar-15

5,000 OFICINAS DE OBRA


5,006 Movilizacin e Instalacin Oficinas y Almacenes
5,007 Alquiler Activos p/areas Oficina y Almacenes

glb
glb

0.0
0.0

0
0

100.0%

360,245.43
367,728.49
0.00
0.00
0.00
0.00
0.00

5,200 ALMACN
5,210 Contenedor Almacen/Garita Control/Tanques/otros

5,300 COMEDOR
5,301 Instalacion Carpa Comedor
5,302 Muebles y enseres de comedor y oficinas

5,400 OFICINAS DE CAMPO


5,403 Instalacion Carpa Oficinas

glb

glb

glb
glb

glb

0.0

0.0

0.0
0.0

0.0

0
0

0.00
0.00
0.00

0.00
37,380.00
0.00
0.00
0.00

98,638.08
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

41,940.12
96,603.52
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

28,162.06
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

100.0%

100.0%
100.0%

100.0%

5,500 ACCESORIOS DE OFICINA (AIRE ACONDICIONADO, SURTIDOR DE AGUA, ETC)


100.0%
100.0%
100.0%

5,600
5,601
5,610
5,607
5,606
5,611

SERVICIOS
Instalacion de mdulos de Baos Mixtos
Instal. Y Suminist Tanques Agua/Agua Residuales/Combusti
Servicios Instalaciones Sanitarias (desague)
Servicios Instalaciones Sanitarias (agua)
Servicio Instalaciones Electricas

glb
glb
glb
glb
glb

0.0
0.0
0.0
0.0
0.0

0
0
0
0
0

100.0%

26,697.50
32,256.82
17,744.16
3,312.67
46,313.28
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5,700 MUEBLES Y ENSERES

T O TALE S

0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

Jun

Jul

Ago

Sep

Oct

Nov

Meses
Nmero de mes

May

US $
0.00
0.00
0.00

Abr

COSTO FIJO

US $

10

11

12

13

14

15

16

17

0.00
0.00
0.00
0.00

5,100 TALLERES
5,116 Preliminares p/Instalacion Oficinas y Almacenes

COSTO
VARIABLE

Mar

COSTO
UNITARIO
FIJO
US $

Feb

COSTO
UNITARIO
MENSUAL
US $

Ene

%
MESES DEPRECIACI
ON

Dic

CANT.

Nov

Und.

Ene Feb

0.00

MESES

PROGRAMA DE FACILIDADES EN OBRA


Oct

CATEGORIA

COSTO TOTAL

Sep

CODIGO

COSTO UNITARIO

Ago

INFRAESTRUCTURA DE OPERACIN

Abr

05

Actividad

0.00

MESES
TOTAL

PROM CONTAR

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

GyM S.A.

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

MESES

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

TOTAL

PROCURA

200

OBRAS CIVILES

NS$/U$s

1.00

OBRAS ELECTROMECANI

FECHA

14-Mar-15

PRUEBAS Y PUESTA EN S

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

CRONOGRAMA GENERAL

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

HORAS/MES

05

Mes de Anlisis

INFRAESTRUCTURA DE OPERACIN

CODIGO

CATEGORIA

COSTO UNITARIO
Und.

CANT.

%
MESES DEPRECIACI
ON

COSTO
UNITARIO
MENSUAL
US $

COSTO TOTAL

COSTO
UNITARIO
FIJO
US $

5,000 OFICINAS DE OBRA

COSTO
VARIABLE

COSTO FIJO

US $

US $
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5,100 TALLERES

0.00

5,200 ALMACN

0.00

5,300 COMEDOR

5,400 OFICINAS DE CAMPO

5,500 ACCESORIOS DE OFICINA (AIRE ACONDICIONADO, SURTIDOR DE AGUA, ETC)

5,600 SERVICIOS

5,700 MUEBLES Y ENSERES

T O TALE S

PROGRAMA DE FACILIDADES EN OBRA

MESES
TOTAL

PROM CONTAR

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Meses
Nmero de mes

Oct

DURACION (Meses)

Actividad
INGENIERIA

Nov

15-Apr-15

Sep

INICIO:

Abr

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

Ago

PROYECTO:

0.00

0.00

0.00

GyM S.A.

Abr

Ago

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

MESES

10

11

12

13

14

15

16

17

18

19

20

21

TOTAL

OBRAS ELECTROMECANICAS

PRUEBAS Y PUESTA EN SERVICIO

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

CRONOGRAMA GENERAL

10

11

12

13

14

15

16

17

18

19

20

21

PROYECTO:

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

INICIO:
DURACION (Meses)

15-Apr-15

INGENIERIA

PROCURA

HORAS/MES

200

OBRAS CIVILES

NS$/U$s

1.00

FECHA

14-Mar-15

08

GASTOS DE OPERACIN

CODIGO
8,000
8,001
8,006
8,012

CATEGORIA
GASTOS DE OPERACIN
Utiles de Oficina, Inc. tinta, papel, etc.
Agua (1 Bidon 20 lts./ 20 pers. x 1 dia)
Arranque Obra

8,020 GASTOS DE REPRESENTACION


8,021 Gastos de representacin
8,003 Gastos de Administracion varios (limpieza)

Actividad

COSTO UNITARIO
Und.

mes
mes
est

mes

Cant.

1.0
1.0
0.0

0.0
0.0

Meses

1.0
2.0
0.0

0.0
0.0

COSTO TOTAL

Fijo

COSTO UNITARIO
MENSUAL

COSTO UNITARIO
FIJO

COSTO
VARIABLE

COSTO FIJO

US $

US $

US $

US $

Fijo
Variable

600.00
2,625.00
45,300.00
0.00
0.00

1,000.00
200.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

8,060 LETREROS DE OBRA

8,090
8,091
8,092
8,093
8,094
8,095
8,096
8,097
8,098
8,099
8,100
8,101
8,102

SERVICIOS (ELECTRICIDAD, AGUA, TELFONO)


Consumo telefonico
Consumo telefonos celulares
Consumo Internet

TRANSPORTE DE PERSONAL
Viajes Personal Staff - Rgimen 1
Viajes Personal Staff - Rgimen 2
Viajes Personal Staff - Rgimen 3
Viajes Personal Staff - Rgimen 4
Viajes Personal Staff - Rgimen 5
Viajes Personal Apoyo - Rgimen 1
Viajes Personal Apoyo - Rgimen 2
Viajes Personal Apoyo - Rgimen 3
Viajes Personal Apoyo - Rgimen 4
Viajes Personal Apoyo - Rgimen 5
Transporte Personal Staff (interno)
Transporte Personal Apoyo (interno)

5,850.00
600.00
5,250.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00

0.00

mes
mes
mes

und
und
und
und
und
und
und
und
und
und
und
und

0.0
3.0
1.0

6.5
6.5
6.5
6.5
6.5
0.0
0.0
0.0
0.0
0.0
8.5
2.0

0.0
2.0
2.0

2.0
2.0
2.0
2.0
2.0
0.0
0.0
0.0
0.0
0.0
2.0
2.0

Variable
Variable
Variable

Variable
Variable
Variable
Variable
Variable
Variable
Variable
Variable
Variable
Variable
Variable
Variable

1,200.00
45.00
4,000.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00

0.00
0.00

8,110 TRANSPORTE DE MATERIALES

8,130 TRANSPORTE DE EQUIPOS

0.00

PROM

CONTAR

1
2
0
0
0

1.00
1.00
0.00
0.00
0.00

1.00
2.00
0.00
0.00
0.00

0
0
0
0

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0
0
0
0

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0
0
6
2
0
0
0
0
0
13
13
13
13
13
0
0
0
0
0
17
4
0

0.00
3.00
1.00
0.00
0.00
0.00
0.00
0.00
6.50
6.50
6.50
6.50
6.50
0.00
0.00
0.00
0.00
0.00
8.50
2.00
0.00

0.00
2.00
2.00
0.00
0.00
0.00
0.00
0.00
2.00
2.00
2.00
2.00
2.00
0.00
0.00
0.00
0.00
0.00
2.00
2.00
0.00

0
0

0.00
0.00

0.00
0.00

0
0

0.00
0.00

0.00
0.00

0
0

0.00
0.00

0.00
0.00

0.00

0.00

0.00

8,270.00
0.00
270.00
8,000.00

0.00
0.00
0.00
0.00

3
1

3
1

4,875.00
4,875.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

6
6
6
6
6
0
0
0
0
0
8
2

7
7
7
7
7
0
0
0
0
0
9
2

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18,995.00

0.00

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00

8,170 LICENCIAS Y TRAMITES MUNICIPALES PROVISORIOS


0.0

0.00
0.00

8,150 UTILES, PAPELERA Y ECONOMATO


0.00
0.00

1
1

MESES
TOTAL

0.00
0.00
0.00
0.00

375.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

Meses
Nmero de mes

0.00
0.00

8,040 GASTOS DEL CONTRATO

8,080
8,083
8,085
8,086

PROGRAMA DE GASTOS VARIOS

Variable
Variable
Variable
Variable
Variable
Variable

Sep Oct Nov

0.00

0
46

51

49.00

GyM S.A.

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

MESES

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

TOTAL

PROCURA

200

OBRAS CIVILES

NS$/U$s

1.00

OBRAS ELECTROMECANICAS

FECHA

14-Mar-15

PRUEBAS Y PUESTA EN SERVICIO

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

CRONOGRAMA GENERAL

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

PROYECTO:

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

INICIO:
DURACION (Meses)

15-Apr-15

HORAS/MES

08
CODIGO

Mes de Anlisis

GASTOS DE OPERACIN
CATEGORIA

COSTO UNITARIO
Und.

Cant.

Meses

COSTO TOTAL

Fijo

COSTO UNITARIO
FIJO

COSTO
VARIABLE

COSTO FIJO

Variable

US $

US $

US $

US $
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

8,020 GASTOS DE REPRESENTACION

8,040 GASTOS DEL CONTRATO


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

8,060 LETREROS DE OBRA

und
und
und
und
und
und
und
und
und
und
und
und

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Variable
Variable
Variable
Variable
Variable
Variable
Variable
Variable
Variable
Variable
Variable
Variable

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

8,110 TRANSPORTE DE MATERIALES

8,130 TRANSPORTE DE EQUIPOS

8,150 UTILES, PAPELERA Y ECONOMATO


0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

8,170 LICENCIAS Y TRAMITES MUNICIPALES PROVISORIOS

T OTALE S

0.00

0.00

0.0

Meses
Nmero de mes

MESES
TOTAL

PROM

CONTAR

0.00

0.00

0.00

8,080 SERVICIOS (ELECTRICIDAD, AGUA, TELFONO)

TRANSPORTE DE PERSONAL
Viajes Personal Staff - Rgimen 1
Viajes Personal Staff - Rgimen 2
Viajes Personal Staff - Rgimen 3
Viajes Personal Staff - Rgimen 4
Viajes Personal Staff - Rgimen 5
Viajes Personal Apoyo - Rgimen 1
Viajes Personal Apoyo - Rgimen 2
Viajes Personal Apoyo - Rgimen 3
Viajes Personal Apoyo - Rgimen 4
Viajes Personal Apoyo - Rgimen 5
Transporte Personal Staff (interno)
Transporte Personal Apoyo (interno)

PROGRAMA DE GASTOS VARIOS

COSTO UNITARIO
MENSUAL

8,000 GASTOS DE OPERACIN

8,090
8,091
8,092
8,093
8,094
8,095
8,096
8,097
8,098
8,099
8,100
8,101
8,102

Actividad
INGENIERIA

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0
0
0
0

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0.00

GyM S.A.

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

TOTAL

OBRAS ELECTROMECANICAS

PRUEBAS Y PUESTA EN SERVICI

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

CRONOGRAMA GENERAL
Abr Ago Sep Oct Nov

PROYECTO:

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

Actividad

INICIO:
15-Apr-15
DURACION (Meses) 2
HORAS/MES
200

INGENIERIA

OBRAS CIVILES

NS$/U$s

1.00

FECHA

14-Mar-15

09
CODIGO

PROCURA

CONTROL DE CALIDAD
CATEGORIA

COSTO UNITARIO
Und.

Cant.

Meses

Fijo
Variable

COSTO UNITARIO
MENSUAL
US $

COSTO TOTAL

COSTO UNITARIO
FIJO
US $

9,000 SC CONTROL DE CALIDAD

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
4,710.00
0.00
0.00
0.00
0.00

0.00

9,010 EQUIPOS DE LABORATORIO


9,016 Laboratorio Suelos y Concreto

TOTALES

COSTO
VARIABLE
US $

mes

0.0

0.0

0.0

Variable
Variable

Ene Feb Mar Abr May Jun

Jul

Ago Sep Oct Nov

Dic

Ene Feb Mar Abr May Jun

Jul

Ago Sep Oct Nov

Dic

Ene Feb Mar Abr May Jun

Jul

Ago Sep Oct Nov

Dic

Ene Feb Mar Abr May Jun

MESES

PROGRAMA DE GASTOS VARIOS

COSTO FIJO
US $

Meses
Nmero de mes

MESES
TOTAL

PROM

CONTAR

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

GyM S.A.

CRONOGRAMA GENERAL

PROYECTO:

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

INICIO:
15-Apr-15
DURACION (Meses) 2
HORAS/MES
200

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

MESES

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

TOTAL

PROCURA

OBRAS CIVILES

NS$/U$s

1.00

OBRAS ELECTROME

FECHA

14-Mar-15

PRUEBAS Y PUESTA

Dic

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Ene

Mes de Anlisis

Abr
Actividad
INGENIERIA

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

Meses

Variable

COSTO UNITARIO
FIJO
US $

9,000 SC CONTROL DE CALIDAD

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

9,010 EQUIPOS DE LABORATORIO

TOTALES

COSTO
VARIABLE
US $

0.00

0.0

0.00

COSTO FIJO
US $

Meses
Nmero de mes

Oct

Cant.

COSTO UNITARIO
MENSUAL
US $

PROGRAMA DE GASTOS VARIOS


Nov

Und.

Fijo

COSTO TOTAL

Sep

CATEGORIA

COSTO UNITARIO

Abr

CODIGO

CONTROL DE CALIDAD

Ago

09

MESES
TOTAL

PROM

CONTAR

0.00
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

GyM S.A.

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

TOTAL

OBRAS ELECTROMECANICAS

PRUEBAS Y PUESTA EN SERVICI

Sep

Oct

Nov

Dic

Ene

Feb

Mar

CRONOGRAMA GENERAL
Abr Ago Sep Oct Nov

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

Actividad

INICIO:
15-Apr-15
DURACION (Meses) 2
HORAS/MES
200

INGENIERIA

OBRAS CIVILES

NS$/U$s

1.00

FECHA

14-Mar-15

10,000
10,001
10,002
10,003

10,020 EPI y SPC


10,028 Implementos de seguridad Ings. / Administ.
10,025 Carteles y cintas de seguridad

und
mes

5.0
1.0

2.0
2.0

Variable
Variable

300.00
150.00
0.00
0.00

0.00
0.00

480.00
450.00
0.00

0.00

10,040 VARIOS
0.00
0.00
0.00

TOTALES

0.0

Jul

Ago Sep Oct Nov

2
1
1

5,700.00
4,800.00
900.00

0.00
0.00
0.00

5
1

5
1

0.00

0.00

6,600.00

320.00

Dic

Ene Feb Mar Abr May Jun

Jul

Ago Sep Oct Nov Dic

Ene Feb Mar Abr May Jun

Jul

Ago Sep Oct Nov

Dic

Ene Feb Mar Abr May Jun

44

45

46

47

48

49

50

51

52

53

54

55

56

57

Jun

43

Abr

42

Mar

41

May

40

Feb

39

Dic

38

Ene

37

Oct

36

Nov

35

Sep

34

Jul

33

Ago

32

Jun

31

Abr

30

Mar

29

May

28

Feb

27

Dic

26

Ene

25

Oct

24

Nov

23

Sep

22

Jul

21

Ago

20

Abr

19

Jun

18

Mar

17

May

16

Feb

15

Dic

14

Ene

13

Oct

12

Nov

11

Sep

10

Jul

2
2
1
1

Ago

Abr

Meses
Nmero de mes

320.00
320.00
0.00
0.00

Jun

US $

900.00
0.00
600.00
300.00

May

US $
80.00

Mar

US $

Feb

US $

Fijo
Variable
Variable

Dic

Variable

Ene

COSTO FIJO

Oct

COSTO
VARIABLE

Nov

2.0
2.0
2.0

COSTO UNITARIO
FIJO

Sep

Meses

2.0
1.0
1.0

COSTO UNITARIO
MENSUAL

Jul

Cant.

und
und
und

Fijo

Ago

Und.

Ene Feb Mar Abr May Jun

MESES

PROGRAMA DE GASTOS VARIOS


Jun

CATEGORIA
SEGURIDAD Y PRIMEROS AUXILIOS
Extinguidores
Medicinas y equipos primeros auxiliios
Botiqun de primeros auxilios

COSTO TOTAL

Abr

CODIGO

COSTO UNITARIO

May

PdR y GA

Abr

10

PROCURA

Ago

PROYECTO:

58

59

60

0.00
0.00
0.00
10

10

MESES
TOTAL

PROM

CONTAR

4
2
2
0
0

2.00
1.00
1.00
0.00
0.00

2.00
2.00
2.00
0.00
0.00

0
10
2
0
0
0
0
0

5.00
1.00
0.00
0.00
0.00
0.00
0.00

2.00
2.00
0.00
0.00
0.00
0.00
0.00

10.00

GyM S.A.

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

MESES

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

TOTAL

PROCURA

200

OBRAS CIVILES

NS$/U$s

1.00

OBRAS ELECTROMECANICAS

FECHA

14-Mar-15

PRUEBAS Y PUESTA EN SERVICIO

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

CRONOGRAMA GENERAL

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

PROYECTO:

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

INICIO:
DURACION (Meses)

15-Apr-15

HORAS/MES

10

Mes de Anlisis

PdR y GA

CODIGO

COSTO UNITARIO
CATEGORIA

Und.

Cant.

Meses

COSTO TOTAL

Fijo

COSTO UNITARIO
FIJO

COSTO
VARIABLE

COSTO FIJO

Variable

US $

US $

US $

US $
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

10,020 EPI y SPC

0.00

10,040 VARIOS

0.0

PROGRAMA DE GASTOS VARIOS

COSTO UNITARIO
MENSUAL

10,000 SEGURIDAD Y PRIMEROS AUXILIOS

T OTALE S

Actividad
INGENIERIA

Meses
Nmero de mes

MESES
TOTAL

PROM

CONTAR

0.00

0.00

0.00

0.00

0.00

0.00

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

GyM S.A.

CRONOGRAMA GENERAL
Abr Ago Sep Oct Nov Dic Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic Ene Feb Mar Abr MayJun Jul AgoSep Oct Nov Dic EneFebMar AbrMayJun Jul AgoSep Oct Nov Dic EneFebMar AbrMayJun Jul AgoSep Oct Nov Dic EneFebMar AbrMayJun MESES
6

10

11

12

13

14

15 16

17

18

19

20

21

22

23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

41

42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60

OBRAS CIVILES

1.00

OBRAS ELECTROMECANICAS

14-Mar-15

PRUEBAS Y PUESTA EN SERVICIO 0

Abr

May

Jun

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Abr

May

Jun

10

11

12

18

19

20

21

22

23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

41

42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60

US $

US $
0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00

11,200 REPLANTEO

11,300 TOPOGRAFIA DE PRODUCCION (COLOCACION DE PUNTOS, NIVELACION)


0.00
0.00
11,400 SC DE TOPOGRAFIA
11,401 Servicio de Topografia de Acompaamiento
11,402 Equipo Complementario Campo

TOTALE S

mes
mes

0.0
0.0

0.0
0.0

28,600.50
5,220.00

Meses
Nmero de mes

13

14

15 16

17

Mar

COSTO FIJO

US $

Mar

Meses

Mar

Cant.

Oct

Und.

11,100 EQUIPOS DE TOPOGRAFA

TOTAL

PROGRAMA DE GASTOS VARIOS

COSTO
VARIABLE

Sep

CATEGORIA

COSTO TOTAL

COSTO UNITARIO
FIJO

Nov

CODIGO

COSTO UNITARIO
COSTO UNITARIO
%
MENSUAL
DEPRECIACIO
N
US $

Jul

TOPOGRAFA

Actividad

Ago

11

Feb

FECHA

Mar

NS$/U$s

Dic

PROCURA

200

Ene

HORAS/MES

Oct

INGENIERIA

Nov

15-Apr-15

Sep

INICIO:
DURACION (Meses)

Abr

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

Ago

PROYECTO:

MESES
TOTAL

PROM

CONTAR

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

GyM S.A.

CRONOGRAMA GENERAL

PROYECTO:

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

MESES

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

TOTAL

PROCURA

OBRAS CIVILES

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PARA 1000 TMPD

INICIO:
15-Apr-15
DURACION (Meses) 2
HORAS/MES
200
NS$/U$s

1.00

OBRAS ELECTROMECANICAS

FECHA

14-Mar-15

PRUEBAS Y PUESTA EN SERVICI

Abr

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Ago

Mes de Anlisis

Actividad
INGENIERIA

10

11

12

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

11,200 REPLANTEO

11,300 TOPOGRAFIA DE PRODUCCION (COLOCACION DE PUNTOS, NIVELACION)

11,400 SC DE TOPOGRAFIA

TOTALES

0.0

0.00

0.00

0.00

0.00

50

51

52

53

54

55

56

57

Jun

49

Abr

48

May

47

Mar

46

Feb

45

Dic

44

Ene

43

Oct

42

Nov

41

Sep

40

Jul

39

Ago

38

Jun

37

Abr

36

May

35

Mar

34

Feb

33

Dic

32

Ene

31

Oct

30

Nov

29

Sep

28

Jul

27

Ago

26

Jun

25

Abr

24

May

23

Mar

22

Feb

21

Dic

20

Ene

19

Oct

18

Nov

17

Sep

16

Jul

15

Ago

14

Jun

13

58

59

60

MESES
TOTAL

PROM

CONTAR

0.00

0.00

0.00

Meses
Nmero de mes

Abr

US $
0.00

0.00
0.00
0.00
0.00
0.00

May

US $

0.00
0.00
0.00
0.00
0.00

Mar

US $

11,100 EQUIPOS DE TOPOGRAFA

Feb

COSTO FIJO

Dic

Meses

COSTO
VARIABLE

Ene

Cant.

COSTO UNITARIO
FIJO

Oct

Und.

PROGRAMA DE GASTOS VARIOS


Nov

CATEGORIA

COSTO UNITARIO
%
MENSUAL
DEPRECIACI
ON
US $

COSTO TOTAL

Sep

CODIGO

COSTO UNITARIO

Jul

TOPOGRAFA

Ago

11

0
0
0
0
0

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

GyM S.A.

CRONOGRAMA GENERAL
Abr

Ago

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

INGENIERIA

PROCURA

HORAS/MES

200

OBRAS CIVILES

NS$/U$s

1.00

OBRAS ELECTROMECANI

FECHA

14-Mar-15

PRUEBAS Y PUESTA EN S

PROYECTO:

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PA

INICIO:
DURACION (Meses)

15-Apr-15

Ene

Feb

Mar

Abr

May

Jun

Jul

Dic

Nov

1
1
1

Oct

1
1
1

Sep

Ago

1
1

Jul

2
1
1

Jun

May

Meses
Nmero de mes

Abr

7.0

US $
6,825.00
9,450.00
0.00
525.00
0.00
4,200.00
693.00
2,520.00

Mar

2.0
2.0
0.0
2.0
0.0
2.0
2.0
2.0
0.0
2.0
0.0
0.0

COSTO TOTAL

Feb

1.0
1.0
0.0
1.0
0.0
1.0
1.0
1.0
0.0
1.0
0.0
0.0

COSTO
UNITARIO
MENSUAL
US $
3,412.50
4,725.00
0.00
262.50
0.00
2,100.00
346.50
1,260.00
0.00
0.00
0.00
0.00

Ene

MESES

Dic

TOTALES

QTY.

Nov

Garanta de fiel cumplimiento


Fianza por Fondo de Garanta
Garanta de Seriedad de la Oferta
Garanta adelanto en efectivo
Garanta adelanto de materiales
Sencico
Seguros G y M
ITF
Seguro CAR
Costos de Financiamiento
Seguro RC Parguas

Und.

PROGRAMA DE GASTOS FINANCIEROS


Oct

12,000
12,001
12,002
12,003
12,004
12,005
12,006
12,007
12,008
12,011
12,012

CATEGORIA

Sep Oct

Sep

CODIGO

COSTO

Ago

GASTOS FINANCIEROS

Abr

12

Actividad

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

0.00
0.00
24,213.00

Ago

Sep MESES
TOTAL

Sep

27

Ago

26

26

27

MESES
TOTAL PROM CONTAR
2
1.00
2.00
2
1.00
2.00
0
0.00
0.00
2
1.00
2.00
0
0.00
0.00
2
1.00
2.00
2
1.00
2.00
2
1.00
2.00
0
0.00
0.00
2
1.00
2.00
0
0.00
0.00
0
0.00
0.00
7.00

GyM S.A.

CRONOGRAMA GENERAL
Abr

Ago

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

INGENIERIA

PROCURA

HORAS/MES

200

OBRAS CIVILES

NS$/U$s

1.00

OBRAS ELECTROMECANI

FECHA

14-Mar-15

PRUEBAS Y PUESTA EN S

PROYECTO:

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATORIO PA

INICIO:
DURACION (Meses)

15-Apr-15

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Meses
Nmero de mes

Abr

0.0

US $
6,825.00
9,450.00
0.00
525.00
0.00
4,200.00
693.00
2,520.00

Mar

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

COSTO TOTAL

Feb

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

COSTO
UNITARIO
MENSUAL
US $
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Ene

MESES

Dic

TOTALES

QTY.

Nov

Garanta de fiel cumplimiento


Fianza por Fondo de Garanta
Garanta de Seriedad de la Oferta
Garanta adelanto en efectivo
Garanta adelanto de materiales
Sencico
Seguros G y M
ITF
Seguro CAR
Costos de Financiamiento

Und.

Oct

12,000
12,001
12,002
12,003
12,004
12,005
12,006
12,007
12,008
12,011

CATEGORIA

PROGRAMA DE GASTOS FINANCIEROS


Sep

CODIGO

COSTO

Ago

GASTOS FINANCIEROS

Sep Oct

Abr

12

Mes de Anlisis

Actividad

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

0.00
0.00
24,213.00

Jun MESES
60

TOTAL

Jun

59

May

May

58

Abr

Abr

57

Mar

Mar

56

Feb

Feb

55

Dic

Ene

54

Ene

Dic

53

Nov

Nov

52

Oct

Oct

51

Sep

Sep

50

Ago

Ago

49

Jul

Jul

48

Jun

Jun

47

May

May

46

Abr

Abr

45

Mar

Mar

44

Feb

Feb

43

Ene

Ene

42

Dic

Dic

41

Nov

Nov

40

Oct

Oct

39

Sep

Sep

38

Ago

Ago

37

Jul

Jul

36

Jun

Jun

35

May

May

34

Abr

Abr

33

Mar

Mar

32

Feb

Feb

31

Ene

Ene

30

Dic

Dic

29

Nov

Nov

28

Oct

Oct

27

Sep

Sep

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

MESES
TOTAL PROM CONTAR
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0
0.00
0.00
0.00

GyM S.A.
PROYECTO:

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL H

INICIO:
DURACION (Meses)

4/15/2015

HORAS/MES

200

NS$/U$s

FECHA

3/14/2015

14
CODIGO

INGENIERIA
CATEGORIA

QTY.

T O TALE S

0.0

MESES

CRONOGRAMA GENERAL
Abr

Ago

Sep

Oct

INGENIERIA

PROCURA

OBRAS CIVILES

OBRAS ELECTROMECANI

PRUEBAS Y PUESTA EN S

ELOS LINEA DE CAL HORNO RO

Oct

0.00

Meses

Sep

COSTO
UNITARIO
COSTO TOTAL
MENSUAL
US $
US $
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Ago

PROGRAMA DE INGENIERA
Abr

COSTO

Actividad

10

11

12

13

14

15

16

17

Nov

Nov

Oct

Oct

Sep

Sep

Ago

Ago

Jul

Jul

Jun

Jun

May

May

Abr

Abr

Mar

Mar

Feb

Feb

Ene

Ene

Dic

Dic

Nov

Nov

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

Dic

Dic

Nov

Nov

Oct

Oct

Sep

Sep

Ago

Ago

Jul

Jul

Jun

Jun

May

May

Abr

Abr

Mar

Mar

Feb

Feb

Ene

Ene

Dic

Dic

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

Ene

Ene

Dic

Dic

Nov

Nov

Oct

Oct

Sep

Sep

Ago

Ago

Jul

Jul

Jun

Jun

May

May

Abr

Abr

Mar

Mar

Feb

Feb

Ene

Ene

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

Feb

Feb

Ene

Ene

Dic

Dic

Nov

Nov

Oct

Oct

Sep

Sep

Ago

Ago

Jul

Jul

Jun

Jun

May

May

Abr

Abr

Mar

Mar

Feb

Feb

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

TOTAL

Jun

Jun MESES

May

May

Abr

Abr

Mar

Mar

57

58

59

60

MESES
TOTAL PROM CONTAR
0 0.00
0.00
0 0.00
0.00
0 0.00
0.00
0 0.00
0.00
0 0.00
0.00
0 0.00
0.00
0 0.00
0.00
0 0.00
0.00
0.00

GyM S.A.

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Nov

Dic

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

TOTAL

INGENIERIA

DURACION (meses): 2

PROCURA

NS$/U$s

1.00

OBRAS CIVILES

Fecha

14-Mar-15

OBRAS ELECTROMECANI 0

PRUEBAS Y PUESTA EN S 0

Abr

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

Ene

Feb

Mar

Abr

May

Jun

CRONOGRAMA GENERAL
Abr Ago Sep Oct Nov Dic

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

PROYECTO:

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO ROTATO

INICIO:

15-Apr-15

15

PROCURA

CODIGO

COSTO

CATEGORIA

Und.

COSTO
UNITARIO
HORAS
US $

Cant.

Actividad

Abr May Jun Jul Ago Sep Oct Nov Dic Ene Feb Mar Abr May Jun Jul Ago Sep Oct

Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic Ene Feb Mar Abr May Jun MESES

PROGRAMA DE PROCURA

COSTO TOTAL
Meses
Nmero de mes

US $

15,000 PERSONAL PURCHASING Y COORDINACIN

MESES
TOTAL

0.00

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15,100 PERSONAL EXPEDITING AND LOGISTIC

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

15,200 PERSONAL INSPECT COORDINATOR

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

15,300 PERSONAL DE ASISTENCIA

0.00

Jun

Jul

Ago

Sep

Oct

Nov

Jun

Jul

Ago

Sep

Oct

Nov

May

May
May

May

Abr
Abr

Abr

Mar

Abr

Mar

Feb

Mar

Feb

Dic

Ene

Dic

Ene

Feb

Sep
Sep

Mar

Ago
Ago

Feb

Jul
Jul

Dic

Jun
Jun

Ene

May
May

Dic

Ene

Oct

Nov

Oct

Nov

Abr

Mar
Mar

Abr

Feb
Feb

Mar

Ene
Ene

Feb

Dic
Dic

Mar

Nov
Nov

Feb

Oct
Oct

Dic

Sep
Sep

Ene

Ago
Ago

Dic

Jul
Jul

Ene

Jun
Jun

Nov

May
May

Nov

Abr

Oct

Sep

Oct

Sep

Ago

Ago

Jul

Jun

Jul

Jun

Abr

May

Abr

May

Abr

Nov

Mar

Oct

Feb

Mar

Feb

Dic

Ene

Sep

0.00

Abr

T O TALE S

Ago

0.00
0.00
0.00
0.00
0.00

PROM CONTAR
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

Invitados /
Licitacion

% Invitados
extranjeros

0
15,402 Costo de envo en etapa de Provisin
Envos por O/C + 3
Cantidad de O/C
envos de planos

TOTAL

PROM

CONTAR

TOTAL

PROM

CONTAR

Cantidad de Licitaciones por mes

Costo de envo en etapa de Licitacin


Cantidad de
Licitaciones

Jun

Meses
15401

Jun

15,400 GASTOS DE COURIER

Invitados
extranjeros

Envos al
exterior /
Licitacin

Proveedores
Extranjeros

Envos al
Exterior por
O/C

Costo de
Pasaje US$

Cantidad de
das por viaje

Costo Unitario
por Courier US$

Parcial
US$
0.00
Cantidad de Envos por O/C

%
Proveedores
extranjeros

0
Total Gastos de Courier

Costo Unitario
por Courier US$

Parcial
US$
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total previsin viajes al exterior

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Dic

Meses

Ene

Parcial
US$

Nov

Costo unitario
estada US$

Oct

AL Cantidad de
viajes

Sep

VIAJES

Abr

PARA

Ago

CANTIDAD DE VIAJES POR MES


PREVISIN
15,500
EXTERIOR

0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

GyM S.A.

CRONOGRAMA GENERAL
Abr Ago Sep Oct
1

10

11

12

13

14

15

16

17

18

19

20

21

22

23 24

25

26

27

TOTAL

INGENIERIA

DURACION (meses): 2

PROCURA

NS$/U$s

1.00

OBRAS CIVILES

Fecha

14-Mar-15

OBRAS ELECTROMECANI 0

PRUEBAS Y PUESTA EN S 0

Dic

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Abr May Jun Jul Ago Sep MESES

Nov

Mar

Oct

Feb

Sep

Ene

Ago

Dic

Jul

Nov

Jun

Oct

May

Sep

Abr

Ago

Mar

Jul

Feb

Jun

Ene

May

Dic

Abr

Nov

Mar

Oct

15-Apr-15

Feb

Sep

INICIO:

10

11

12

13

14

15

16

17

18

19

20

21

22

23 24

25

26

27

13

RESPONSABILIDAD SOCIAL

CODIGO

CATEGORIA

13,000 Plan de Responsabilidad Social


13,001 Actividad Responsabilidad Social
13,002 Cursos Capacitacion Social

COSTO
Und.

und
mes

Cant.

1.0
0.0

COSTO
UNITARIO
US $
5,000.00
1,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

13,100 Varios

Actividad

Ene

Ago

MOVIMIENTO MASIVO DE SUELOS LINEA DE CAL HORNO R

Dic

Abr

PROYECTO:

Nov

PROGRAMA DE PROCURA

COSTO TOTAL
US $

Meses
Nmero de mes

5,000.00
5,000.00
0.00

0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

13,200

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

T O TALE S

5,000.00

MESES
TOTAL

PROM CONTAR
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00

0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Anda mungkin juga menyukai