PACKAGE NO
: ESH 01
: CENTRAL SULAWESI
PART 2
SECTION VI.1 SCOPE OF WORK
SECTION VI.2A SPECIAL SPECIFICATIONS
OCTOBER 2009
File name and location: K:\Rame-Rame\33 - Master Bidding Documents\Part 1, 3, 2VI.1 and VI.2A\ESH-01.doc
TABLE OF CONTENTS
Section III.
Section IV.
Bidding Forms
Section V.
Eligible Countries
Works Requirements
Description
RCP Culvert Inside Diameter (Nominal 80 cm) 75-85 cm
Unit
Est Qty
Road
Est Qty
Bridge
Ln.M
3,079
2.3.9.2
Ln.M
11,753
SS.2.3.9.4b
Ln.M
2,675
3.1.1
Common Excavation
Cu.M
64,737
3.1.2
Rock Excavation
Cu.M
27,744
3.2.1
Common Embankment
Cu.M
17,137
14,730
4.2.1
Cu.M
10,823
480
4.2.2
Cu.M
18,204
448
5.1.1
Cu.M
20,773
999
5.1.2
Cu.M
3,135
875
6.3.5a
Sq.M
97,375
8,265
6.3.6a
Cu.M
5,979
557
7.1.3
Cu.M
1,871
1,870
7.3.4
Kg
204,731
260,146
7.5.2
Cu.M
994,000
7.9
Stone Masonry
Cu.M
6,282
827
SS.7.6.10e
Ln.M
4,094
7.9
Stone Masonry
Cu.M
6,282
827
GENERAL
Description
The work shall consist of the supply, assembly, installation,
maintaining and removing of Project Sign Board as shown in the
Standard Drawing and at both end project locations or as shown on
the Drawing or as directed by the Engineer.
The installation work for project sign board shall include all
necessary excavation, foundation, backfill, anchorages, fixtures,
fastenings and brackets.
SS 1.2.1.2
SS 1.2.1.3
(a)
Reference Standard
The configurations, dimensions, and color of project sign boards
shall confirm to Standard Drawings.
SS 1.2.1.4
(i)
(ii)
SS 1.2.1.5
Subminttals
Submit one galvanized steel tubular post for the road signs.
Submit one sign plate with painting already completed.
Work Scheduling
In order to provide information regarding the ongoing project
construction, the project sign boards shall be properly installed
within the first three months or as early as possible within the
Mobilization Period.
The removal of project sign boards shall be done after the Defect
Liability Period and shall be responsibility of the contractor.
SS 1.2.1.6
SS 1.2.2.
MATERIALS
SS 1.2.2.1
SS 1.2.2.2
SS 1.2.2.3
SS 1.2.2.4
SS 1.2.2.5
SS 1.2.2.6
SS 1.2.2.7
Reflective Sheeting
Shall be Scotchlite Engineering grade or High Intensity Quality
grade or other approved colorfast reflective material. The face of
each signal shall be reflectorised in accordance with DLLAJR
requirements and the face of each guide post shall be reflectorised.
SS 1.2.3.
EXECUTION
SS 1.2.3.1
SS 1.2.4.
General
This article shall be read in conjunction with Section 1.3 of the General
Specifications which is modified as follows:
SS 1.3.4
SS 1.3.5
DIVISION 7 STRUCTURES
SS 7.6 - PILING
SS.7.6.1. GENERAL
This article shall be read in conjunction with Section 7.6 of the General
Specifications which is modified as follows :
SS.7.6.12. METHOD OF MEASUREMENT
SS 7.6.12.2
Basis of Payment
Description
SS 7.6.10e
SS 7.6.17a
Unit
Measurement
ASTM / BBA / BS :
BBA 93/075-1998
BBA 00/R119-2000
BS 1052/1980
BS 443/1982
ASTM A-975-1997
ASTM D792
ASTM D2240
ASTM D412/92
ASTM D1242/92
ASTM D1499/92a
ASTM D746
SS 7.10.1.3 Submittals
Sample of Wire with Manufacturers certificate that satisfy Reference
Standards in Section SS 7.10.1.3
SS 7.10.2 MATERIALS
SS 7.10.2.1 Steel Wire
All steel wire used in the fabrication of the PVC Coated Mesh Gabion and
Soil Reinforcement Mesh also in the wiring operations during
construction shall exceed BS 1052/80, having a tensile strength of not less
than 41 kg/mm2 and not exceeding 51 kg/mm2.
Wire diameters and relevant tolerances shall be in accordance with the
following table:
Wire Diameter
Mm
2.20
2.70
3.00
3.40
Tolerance
mm
0.06
0.08
0.08
0.10
All wire used in the fabrication of the gabions and in the wiring operations
during construction shall be Heavily Galvanized and PVC Coated in
accordance with BS 443/82. The minimum mass of the zinc coating shall
be as shown in the table below:
Diameter of Wire
Mm
2.20
2.70
3.00
3.40
Weight of Coating
g/sq.m
240
260
275
275
The adhesion of the zinc coating to the wire shall be such that when the
wire is wrapped six times around a four wire diameter size mandrel it shall
not flake or crack to such an extent that any zinc can be removed by
rubbing with bare fingers.
All wire used in the fabrication of Soil Reinforcement Mesh and also in
the wiring operations during construction shall have extruded onto it, after
coating it with zinc in accordance with the foregoing specification, a
coating of Poly Vinyl Chloride, otherwise referred to as PVC or other
plastic material having superior characteristics than PVC as otherwise
approved.
The PVC coating shall be 0.50mm average thickness with a tolerance of
0.05mm, and nowhere shall be less than 0.40mm thickness. The PVC shall
be grey in color.
The PVC shall be capable of resisting deleterious effects of natural
weather exposure, immersion in salt water and not show any material
difference in its initial characteristics which are:
a. Specific Gravity of PVC
Shall be 1.30 to 1.35 in accordance with ASTM D 792-91
b. Durometre Hardness of PVC
Shall be 50 to 60 shore D, in accordance with ASTM D 2240-91 (ISO
868-1985)
c. Volatile Loss of PVC
At 105C for 24 hours - Shall not be greater than 5%
In accordance with ASTM D 2287-92 E2.
Residual Ashes shall be less than 2% according to ASTM D2124-62T.
d. Tensile Strength of PVC
Shall not be less than 210 kg/sq.cm in accordance with ASTM D 41292.
e. Elongation of PVC
Shall not be less than 200% and not greater than 280% in accordance
with ASTM D 412-92.
f. Modulus of Elastiity at 100% of Elongation of PVC
Shall not be less than 190 kg/sq.cm in accordance with ASTM D 41287.
g. Resistance to Abrasion of PVC
The loss in volume shall be less than 0.30cm3 in accordance with
ASTM D 1242-56.
10
h. Creeping Corrosion
Maximum penetration of corrosion of the wire core from a square cut end shall
not be greater than 25mm when the specimen has been immersed for 2000
hours in a 50% solution of HCL (Hydrochloric Acid 12 BE).
SS 7.10.2.2 Wire Mesh
Wire mesh shall be mechanically pre-PVC Coated Mesh to become a uniform
hexagonal woven mesh wherein the joints are formed by twisting each pair of
wires through three half-turns (commonly known as double twist), in such a
manner that unraveling is prevented. Double-twist mesh is demonstrated in the
sketch below :
PVC Wire
Diameter
8 x 10
2.7
3.7
8 x 10
3.0
4.0
Remarks
PVC Coated Mesh
Gabion and Soil
Reinforcement Mesh
PVC Coated Mesh
Gabion Only
11
Certain other wire diameters may be utilized if the contract drawings and/or Engineer allow
alternative sizes. The wire mesh dimensional layout is as per the diagram below for the
various mesh sizes:
Mesh Type
8 x 10
X ( mm )
80
Y ( mm )
110
Tolerance %
+ 10 %
The Mesh tensile strength should exceed 42 50 kN/m or above. The wire mesh dimensions
above are subject to minor differentiation within the tolerance depending on the diameter of
the wire, and if the wire is Zinc+PVC coated.
SS 7.10.2.3 Selvedges
The cut edges of all mesh used in the construction of PVC Coated Mesh Gabion,
also the bottom edges of diaphragms and the end of the soil reinforcing tail in Soil
Reinforcement Mesh shall have a tight selvedge with a wire having a diameter of
at least 3.4mm.
The side selvedge of all and any mesh panels shall be woven integrally with the
main mesh as described in the above section 2.2 with a selvedge wire of at least
3.40 mm in diameter.
SS 7.10.2.4 Diaphragms and End Panels
The rear/side panels shall have a selvedge on the top, bottom and vertical sides as
described in section SS 7.10.2.3 The diaphragms shall be selvedge and on the top
and vertical sides.
The rear and side panels of the box gabion shall be formed by a continuous panel
connected to the main panel, along the bottom of the rear panel, either by a spiral
wire through the mesh openings or mechanically placed by four connecting rings.
12
80 x 100 mm
1m or 2m
1m
3m, 4m, 5m and 6m, or as
shown on the Drawings
0.5m or 1m
every 1m
Depth (H)
Diaphragm
Picture of the PVC Coated Mesh Gabion and Soil Reinforcement Mesh below :
W
L1
PVC Coated Mesh Gabion
L1
All PVC Coated Mesh Gabion and Soil Reinforcement Mesh dimensions shall be within a
tolerance limit of 5% of the required size.
13
14
completion of each lacing operation. Each loop shall be pulled tight to prevent the
joint opening during filling.
SS 7.10.3.3 Erection
Only assembled boxes, or groups of boxes, shall be positioned in the structure.
The side, or end, from which work is to proceed, shall be secured either to the
completed work, or by rods or stakes driven into the ground at the corner. These
stakes must be secure and reach at least to the top of the gabion box.
Further gabion boxes shall be positioned in the structure as required, each being
securely laced to the preceding one along all common corners and diaphragms.
Using the lacing technique described above.
Adjacent panels in Soil Reinforcement Mesh shall be laced longitudinally to
provide a homogeneous reinforcement layer.
All lacing wire in Soil Reinforcement Mesh shall be PVC coated.
SS 7.10.3.4 Geotextile
Non-woven geotextile as specified in S.S. 3.5 shall be placed at the back of each
gabion layer in PVC Coated Mesh Gabion, not in Soil Reinforcement Mesh work.
The non-woven geotextile shall be placed at the back of each gabion layer and
extend 0.5m above the lower panel and 0.5m below the higher panel to prevent
migration of fines.
SS 7.10.3.5 Stretching
Final stretching of the gabion boxes shall be carried out using a pull-lift of at least
one tonne capacity, firmly secured to the free end of the assembled gabion boxes.
Whilst under tension, the gabion boxes shall be securely laced along all edges
(top, bottom and sides) and at diaphragm points, to all adjacent boxes.
SS 7.10.3.6 Filling
Filling shall be carried out whilst gabion boxes are under tension.
The front face and all other faces which will be exposed in the completed
structure shall be hand packed with the stones placed so as to produce a neat
face free from excessive bulges, depressions and voids.
Internal bracing wires shall be provided on the exposed faces at the rate of 4/cu.m
at 330mm centres to prevent distortion of the gabion units during filling and in the
completed structure. These bracing wires shall be wrapped around two of the
mesh wires and extend from front to back. Additional bracing wires shall be
provided on exposed ends at a rate of 4/sq.m of face.
15
Mechanical filling equipment may be used with the approval of the Engineer and
providing adequate precautions are taken to protect the PVC coating from
abrasion during filling operations.
Tension on the gabion boxes shall be released only when fully laced and
sufficiently full to prevent the mesh from slackening.
All gabions shall be overfilled by 25mm using flat stone to allow for minor
settlement and to provide a level surface for subsequent layers.
SS 7.10.3.7 Structural Embankment Material
Backfill as specified elsewhere shall be placed between each subsequent mesh
panel layer to the full extent of the mesh reinforcement at each level.
SS 7.10.3.8 Compaction
The backfill shall be compacted as specified elsewhere in these specifications for
embankment construction unless otherwise specified on the drawings.
Care shall be taken to ensure heavy compaction equipment does not come into
contact with the mesh panels or within 1.0m of the gabions.
Compaction adjacent to the gabions should be done using hand operated rollers or
plate compactors.
16
Description
Unit Measurement
SS 7.10.3a
Cubic Metres
SS 7.10.4
Square Metres
17
SS 7.23.
SS.7.23.1 DESCRIPTION
This works shall consist of furnishing and installation of drainage and pull boxes
of electricity facilities for bridges, Reinforces Concrete frames and other incidental
bridges facilities. All works shall be performed in strict accordance with the
Drawings and these Specifications and as directed by the Engineer.
SS.7.23.2 MATERIALS
(a)
Drain pipe material shall conform to the requirements of JIS K 6741 (un
plasticized Poly Vinyl Chloride pipes). Deck drain material shall conform to
the requirements of JIS G 5101 (Carbon Steel Castings), JIS G 5501 (Grey
Iron Casting), and JIS G 3101 (Rolled Steel for General Structures: SS 400).
All metal deck drain material including support brackets shall be galvanized.
(b)
Pull box material shall conform to the requirements of JIS G 3101 (Rolled
Steel for General Structures: SS 400) and shall be galvanized.
SS.7.23.3 CONSTRUCTION
(a)
Drainage Facilities:
(i)
(ii)
(a)
Drain pipe, catch basin and deck drains those are to encased in concrete
shall be installed by the Contractor as indicated on the Drawing.
Drain pipe shall be fixed as indicated on the Drawing or as directed by
the Engineer.
Pull Box
Pull box and conduit for lighting in bridge parapets shall be installed as
indicated on the drawings, or directed by the Engineer, before the concrete is
placed. After concrete hardens it shall be checked that pull box can open
freely.
18
Unit
Measurement
SS.7.23.1
Linear metre
SS.7.23.2
SS.7.23.3
SS.7.23.4
SS.7.23.5
Linear metre
Linear metre
Unit
Unit
19
GENERAL
This article shall be read in conjunction with Section 8.4 of the General
Specifications which is modified as follows :
SS 8.4.1.1
Description
The work shall consist of the supply, assembly and installation of replacement or
additional road furniture such as road signs, guide posts, kilometre posts, guard
rails, road studs, cat eyes, curbs, sidewalk, traffic light and road illumination,
coloured surfacing for road on the school safety zone (ZoSS, Zona Selamat
Sekolah) and the application of pavement markings to either new or newly overlaid
pavement surfaces, at locations shown on the Drawings or as directed by the
Engineer.
The installation work for road furniture shall include all necessary excavation,
foundation, backfill, anchorages, fixtures, fastenings and brackets.
SS 8.4.2
MATERIAL
EXECUTION
SS 8.4.3.4.
(b)
SS 8.4.4.
Description
Unit Measurement
SS 8.4.3h
SS 8.4.13
Square Metre
21
22