Anda di halaman 1dari 14

MINE OPERATION EXPANSION

PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.


TITLE

Technical Specification Cable Reeler


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24
This Manual is our property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

PAGE

N SHOUGANG

992663-5921-D-E-ET-0004
N SANDVIK

1/14
REV.

C1847-TS-30-540-00-0

REVISIONS
IT: ISSUE
TYPE
Rev.

IT

A Preliminary
B - For Approval

C - For Information
D - For Quotation
Description

FOR QUOTATION

E - For Construction
F - As Purchased

G - As Built
H - Cancelled

By

Ver.

Apr.

Aut.

Date

MNS

MNS

MNS

MNS 02.09.2014

SHOUGANG PER S.A.A.


TITLE

N SHOUGANG

Technical Specification Cable Reeler


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24
This Manual is our property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT
992663-5921-D-E-ET-0004
N SANDVIK

C1847-TS-30-540-00-0

PAGE

2/14
REV.

Content
1

OBJECTIVE OF SPECIFICATION ............................................................................................. 3

TERMS AND DEFINITION ......................................................................................................... 3

REFERENCE TO CONTRACTUAL DOCUMENTS .................................................................... 3

SITE DATA ................................................................................................................................ 4

SCOPE OF WORK ..................................................................................................................... 5

TECHNICAL SPECIFICATION................................................................................................... 5

ENCLOSURES........................................................................................................................... 8

SCOPE OF SUPPLY .................................................................................................................. 8

PAINTING .................................................................................................................................. 8

10

CODES & STANDARDS ............................................................................................................ 9

11

DESIGN & CONSTRUCTION ................................................................................................... 11

12

TESTING & INSPECTION ........................................................................................................ 12

13

PACKAGING, TRANSPORTATION & STORAGE ................................................................... 12

14

DOCUMENTATION .................................................................................................................. 13

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.


TITLE

N SHOUGANG

This Manual is our property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

Technical Specification Cable Reeler


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24

992663-5921-D-E-ET-0004
N SANDVIK

C1847-TS-30-540-00-0

PAGE

3/14
REV.

1 OBJECTIVE OF SPECIFICATION
This specification establishes the minimum requirements for design, manufacture, testing at
manufacturers work, transportation & delivery (transportation and delivery details will be
given in separate agreement) of POWER & CONTROL Cable Reel Drums.

2 TERMS AND DEFINITION


PS
PR
ITP

Stacker
Reclaimer
Inspection & Test Plan = Quality Control Plan (QCP)

3 REFERENCE TO CONTRACTUAL DOCUMENTS


The following documents are important for the requirements of this specification and part of
the attached specification package:

Title

Document Code / File Name

Specification Drawings

C1847-PS1-30-510-1-0.dwg
C1847-PR1-30-510-1-0.dwg

Client Electric Design Criteria

997601-5000-G-E-CD-001
992881-5700-G-E-CD-0001 Rev. C

Client Electric Specification

997601-5000-G-E-ET-001

Steel structure ITP

1847-QA-01_0 - ITP Steel structure


and / or
997601-5000-G-ST-ET-001 Rev.1

Paint ITP

1847-QA-04_0 - ITP Paint


and / or
997601-5000-G-ST-ET-002 Rev.1

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.


TITLE

Technical Specification Cable Reeler


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24
This Manual is our property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

PAGE

N SHOUGANG

992663-5921-D-E-ET-0004
N SANDVIK

4/14
REV.

C1847-TS-30-540-00-0

4 SITE DATA
4.1

Location
The equipment described in this specification shall be installed in a iron ore mine located in
Distrito San Juan de Marcona / Peru in South America.
The following site conditions are to be considered for selecting the equipment offered.

4.2

Site Conditions EXCERPT


Criteria

Value

Altitude

850m

Max. Air Temperature (for design)

35C

Min. Air Temperature (for design)

5C

Relative Humidity min. / max

50% / 90%

Wind Speed (operational)

90km/h
Sea Breeze, highly corrosive and high
contamination level of an industrial type
Zone 3
(According to the Peruvian Technical
Standard Structure 030)

Atmosphere
Rated Seismic:

Design should be considering tropical climate weather conditions with rapid condensations,
heavy rain, windblown to near horizontal. The air is heavily saline and corrosive dust laden.
The equipment will be in open area, exposed to the all-adverse weather condition.
Refer to Specification 992881-5000-G-E-CD-0001

4.3

4.4

ELECTRICAL DATA
Medium Voltage Supply:

4,16kV (+/- 10%)

Motor Supply Voltage:

480VAC, 3 phase, 60 Hz

Small Consumers:

480/230 VAC, 3/1 phase / 60Hz

MCC Control Voltage:

220VAC

Control Signal Voltage:

24VDC for PLC input/output signals

Protection Class:

IPW55 for motors (weather proofed)


IP65 for junction boxes, control boxes, control panels,
and field devices

APLICATION
The mine operation Expansion Project and Benefit plant shall be equipped with a new bulk
handling system (BHS) for iron ore.
The stockyard of the BHS shall be mainly composed of the following:

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.


TITLE

This Manual is our property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

Technical Specification Cable Reeler


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24
4.5

PAGE

N SHOUGANG

992663-5921-D-E-ET-0004
N SANDVIK

5/14
REV.

C1847-TS-30-540-00-0

Equipment
-

1 Stacker

1 Reclaimer

5 SCOPE OF WORK
5.1

General
The scope of work includes design, manufacture, inspection at manufacturers works,
transportation, delivery of complete cable reels and accessories required for specified duty
requirements of the above mentioned machines. Transportation requirements will be covered
in separate agreement.

5.2

Scope
Equipment

Qty

1.1

Stacker 01

C1703-PS1-30-540-0-0.dwg

Cable reels

1.2

Reclaimer 01

C1703-PR1-30-540-0-0.dwg
C1703-PR2-30-540-0-0.dwg

Cable reels

Sum

According Drawing

Equipment Type

6 TECHNICAL SPECIFICATION
Technical Data: (Power Cable Drum = 1 pcs.)
Drive description:
Used as Power Cable Drum on a moveable Stockpile Equipment (on rails) Land based
connection box at the end of the travel way
Drive data/requirements:
Standard drum type reeler AC squirrel cage drive, torque controlled via magnetic clutch
HV slip rings in fully welded stainless steel
Enclosure

IP65

Anti condensation Heater (230V) including Thermostat


Lockable doors / covers
warning labels
undrilled gland plates
Power supply

3 Phase + Earth

Rated Voltage

4.160V / 50Hz

Current

213,67A

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.


TITLE

Technical Specification Cable Reeler


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24
This Manual is our property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

PAGE

N SHOUGANG

992663-5921-D-E-ET-0004
N SANDVIK

6/14
REV.

C1847-TS-30-540-00-0

Control slip rings in fully welded stainless steel


Enclosure

IP65

Anti condensation Heater (230V) including Thermostat


Lockable doors / covers
warning labels
undrilled gland plates
Control cores included in Power supply cable
Number of copper control cores:

min. 12

required cable length on reeler

290m + 40m Spare

cable type

round

recommended dimension

Reclaimer::
3x70mm+2x35mm/2+10x2.5+18LWL
Stacker:
3x35mm+2x25mm/2+10x2.5+18LWL

Safety equipment:
Gear limit switch

2 Windings left warning


1 Winding left alarm (stop long travel)
Reeler Full - Indication

Tension control switch

Cable tension too high


Cable tension too low

complete travel way distance

600m

total cable length

Reclaimer:
Stacker:\

mounting level centre cable reeler to ground

appr. 6,25m

Travel speed max.

0 - 20 m/min

min. time of acceleration

0 to 100% speed in 2,5sec

800m
750m

Motor data/requirements:
AC-squirrel cage motor (WEG Type), suitable for VVVF control Housing cast iron totally
enclosed fan cooled (TEFC)
Rated Power

acc. requirement

Rated Voltage:

480V

Rated Frequency:

50Hz

Phases

Poles

Winding insulation

class F

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.


TITLE

N SHOUGANG

This Manual is our property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

Technical Specification Cable Reeler


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24

992663-5921-D-E-ET-0004
N SANDVIK

C1847-TS-30-540-00-0

Temperature rise

class B

Frame

acc. requirement

Duty

S1

Duty cycle (relativ)

100%

daily operation hours

24

Protection

IP55

Winding Temp. Protection

PTC

Space Heater

230V / 50Hz

Shaft

one side only

max. plus Inclination

N.A

max. minus Inclination

N.A

Relevant Standards

IEC / CE / NEMA

PAGE

7/14
REV.

Scope of Supply
Cable Drum complete with Gearbox, Motor and magnetic clutch, Gear Limit Switch, HV- and
LV- Junction Box and/or Slip Ring with heaters, Reeler pendulum cable guide including overtension and under-tension detection switches.
Reeling Cable including Cable End Termination for Power and Control - & LWL cores on all
ends.
Provide following Data:
Reclaimer:
Cable Dimension

3 x 50mm

Cable Weight

7960kg/km

Max. tension force

......Nm

Stacker:
Cable Dimension

3 x 35mm

Cable Weight

7960kg/km

Max. tension force

......Nm

For more details and/or information please refer to enclosed clients specification
In case of any discrepancies between the Client specification and the SANDVIK specification
the conditions and details as per the SANDVIK specification shall be govern
Feeding point
(*)

Centre of travel length

Centre of travel length

Final data will be furnished after receipt of technical details of cable from cable
manufacturer.

SHOUGANG PER S.A.A.


TITLE

N SHOUGANG

Technical Specification Cable Reeler


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24
This Manual is our property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT
992663-5921-D-E-ET-0004
N SANDVIK

PAGE

8/14
REV.

C1847-TS-30-540-00-0

The Power cable reeling drums shall be complete with squirrel cage torque controlled or
equivalent motor/system, suitable rated slip rings and brush / collector assembly, cable
guides for proper paying in / paying out of cables, cable laying arrangement, protection
against over tension and under tension of cable, gear cam limit switch, pendulum limit switch,
the directional limit switches etc. including cable guide & tension relieving drum to be located
at a suitable place close to feeding point, as necessary for the application.
Power cable reel shall be suitable for winding & unwinding of two parallel run of cables as
described. However both cables shall be terminated in a common slip ring enclosure.
Motor shall be suitable for operating at power supply with variation as indicated. The speed
of winding of cable shall be properly matched with machine travel speed.

7 ENCLOSURES
Annexure

Title

Docu-Code

Annexure 1

Vendor Manuals / Technical


Documentation

C1847-TS-Documentation

8 SCOPE OF SUPPLY
Quantity
Power CRD with all attachment, but without cable
Control CRD with all attachment, but without cable
Tension Relieving Drum, Cable funnel etc

:
:
:

1 no.
1 no.
1 set

9 PAINTING
Painting shall be done with powder coated epoxy based paint considering highly polluted
atmosphere laden with bauxite ore particles and strictly as per environmental requirements.
Paint shade shall be Grey shade RAL 7032.
The supplier shall indicate detailed painting procedure to be adopted and paint shade in the
respective dimensional drawing for approval.

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.


TITLE

N SHOUGANG

This Manual is our property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

Technical Specification Cable Reeler


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24

992663-5921-D-E-ET-0004
N SANDVIK

C1847-TS-30-540-00-0

PAGE

9/14
REV.

10 CODES & STANDARDS


The manufacturer shall be qualified for producing cable reels, supplied for mobile machines
in coal mines and terminals, in similar applications in term of capacity, length, width, diameter
etc. Supplier shall provide the relevant reference list for each proposed item.
All equipment covered under this specification shall comply with all currently applicable
statutes, regulations & safety codes of European Standard as nominated within this
documents or any relevant national or government standard of any member of the European
Communities or any relevant International Standard recognised by such a member state, can
be used for compliance provided that the standard offers guarantees of safety, suitability and
fitness for purpose.
Especially, the whole supply and any of its parts shall be designed, manufactured and
erected in accordance with Africans laws and the local directives in force and with any
prescription from public authorities.

10.1 General
ANSI

- American National Standards Institute

DIN

- Deutsches Institut fr Normung

ISO

- International Organization for Standardization

10.2 Mechanical Standards


ISO 2262:

Steel Shackles

ISO 2372:

Analysis of Vibration

ISO 5049/1:

Mobile Continuous Bulk Handling Equipment

BS 302:

Stranded Steel Wire Ropes

BS 3643:

ISO Metric Screw Threads

BS 4235:

Metric Keys and Keyways

BS 4500:

ISO Limits and Fits

BS 5304:

Safety of Machinery (Guarding)

BS 970:

Shafting

10.3 Structural Standards


DIN 267:

Metric Threads - Laminated Metric Thread Screws

DIN 1026:

Metric channels

BS-EN 287 Part 1;

Approval testing of welders/fusion welding

BS-EN 288 Part 3:

Specification and approval of welding procedures for metallic materials

BS 5135:

Metal arc welding of carbon and carbon manganese steels

BS 4360:

Weldable structural steel

BS 2573 Part 1:

Classification, stress calculations and design of structures

BS 3923:

Methods for ultrasonic examination of welds

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.


TITLE

N SHOUGANG

This Manual is our property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

Technical Specification Cable Reeler


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24

992663-5921-D-E-ET-0004
N SANDVIK

C1847-TS-30-540-00-0

BS 2600:

Radiographic examination of fusion welded butt joints in steel

BS 4 Part 1:

I and H sections

BS 4848 Part 2:

Hot finished hollow sections

BS 6363:

Cold formed sections

BS 29:

Forgings

BS 3100:

Steel castings

BS 1452:

Cast iron

PAGE

10/14
REV.

ISO - R657/EN10056: Angles


SABS 094:

The use of high strength friction grip bolts and nuts

SABS 135:

ISO metric bolts, screws and nuts (hexagon and square) (coarse thread
free fit series)

SABS 1431:

Weldable structural steel

SABS 136:

Isometric precision hexagon-head bolts and screws, and hexagon nuts


(coarse thread medium fit series)

SHOUGANG PER S.A.A.


TITLE

N SHOUGANG

Technical Specification Cable Reeler


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24
This Manual is our property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT
992663-5921-D-E-ET-0004
N SANDVIK

C1847-TS-30-540-00-0

PAGE

11/14
REV.

11 DESIGN & CONSTRUCTION


The equipment to be supplied shall be designed based on the information given in this
specification and additional requirements as per referenced documents. The bidder shall
carefully examine the data furnished and shall satisfy himself regarding the performance of
the equipment under specified operating conditions.

11.1 GENERAL INFORMATIONS


The cable reeler shall be designed taking into account the following main requirements:
The cable reeler shall be supplied in accordance with the official instruction by codes and
standards, herein mentioned, to come into force at the date of order. In particular the
European Community standard 89/392/CEE, Machinery Directive shall be followed and every
ISPESL and CE certificates shall be provided. Its also clarified that all the codes and
standards expressly mentioned in this TS shall be applied within the limitation or reference
values specified. Use of FEM standards, Section II is allowed only if not in conflict with the
regulation, codes and standards expressly indicated in the PTS.
The cable reeler shall be designed for service defined as heavy duty and continuous
operation and shall be installed outside.
The cable reeler shall be suitable for the specified operating conditions and it shall be
designed and manufactured for a minimum service life of (30) thirty years, same as for the
whole handling machine.
All the auxiliary components and related accessories shall be designed in order to have a
mean time between maintenance (MTBM) not less than the scheduled maintenance step
activities for the main equipment.
All the main equipment, auxiliary components and related accessories shall be pre-fabricated
as much as possible.
The cable reeler shall be designed considering all space requirements and all access for field
erection, pre-commissioning, commissioning and start-up, operation and maintenance
activities. If during any inspection activities, this requirement is not met, its suppliers
responsibility to perform all the necessary modification at its own care and cost.
Site welding activities shall be avoided or minimized.
Site painting activities shall be avoided or minimized.
Final equipment colours and shades will be communicated and are specified in the paint ITP.
All welds shall be continuous, seal type, in order to prevent the corrosion on all structural
parts where a visual checking and maintenance activities cannot be performed. Tack welds
are not permitted.

SHOUGANG PER S.A.A.


TITLE

N SHOUGANG

Technical Specification Cable Reeler


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24
This Manual is our property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT
992663-5921-D-E-ET-0004
N SANDVIK

C1847-TS-30-540-00-0

PAGE

12/14
REV.

12 PROTECTION TREATMENT

The design of protection against corrosion shall be done according to the


environment (severe marine and industrial atmosphere) and the functional
requirements (presence of coal dust). The result shall be proved by means of the
evidence on practical applications for a significant period and/or by laboratory tests.

All surfaces which are directly exposed to the external atmosphere shall be
galvanized and painted in accordance to paint specification.

The treatments against corrosion for all the other secondary structures shall be
designed and chosen by the designer(s) according to the above-mentioned
environmental conditions.

Until not revised by additional specification (paint ITP) 70m galvanized plus top
coat paint should be considered.

13 TESTING & INSPECTION


13.1 General
Tests shall be done both at manufactures shop. If applicable prior to manufacturing the
manufacturer shall provide a Quality Control Plan (QCP) or an Inspection & Test Plan (ITP)
for approval by Sandvik and if required by the client.
The ITP shall include hold and witness points for all parties involved.
Shop testing and inspection report shall be provided.

13.2 Test Scope


All Cable Reelers shall be inspected and tested in accordance with the applicable standards
and/or codes with the following clarifications:

Dimensional check before shipment

Visual control

14 PACKAGING, TRANSPORTATION & STORAGE


The Cable Reelers shall be securely stored and transported with protective seaworthy
packing.

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT

SHOUGANG PER S.A.A.


TITLE

N SHOUGANG

This Manual is our property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

Technical Specification Cable Reeler


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24

992663-5921-D-E-ET-0004
N SANDVIK

C1847-TS-30-540-00-0

PAGE

13/14
REV.

15 DOCUMENTATION
Details of the requirements for documentation are defined in a separate specification and
shall comprise:

15.1 Bidder documentation


The bidder shall present documents showing the equipment offered and prepare drawings
showing the positioning and functionality of the equipment in its working position.
1.

General arrangement and dimensional drawing of control desk including weight,


fixing details, etc.

2.

Equipment list complete with designation, rating, type and make of components

3.

Wiring diagram of control desk with termination details

4.

Equipment layout of Control Desk

5.

Catalogues of components used, including details of joysticks

6.

Painting and constructional details

15.2 Vendor Manuals


It shall consist of

Detailed description of the equipment supplied; technical data sheet etc.


Spare list
Assembly-, Commissioning-, Operation-, Maintenance and Repair instructions;
Transport and storage instructions

The supplier shall submit a typical vendor manual from similar project to SANDVIK for
review and approval by SANDVIK.

15.3 Quality
The manufacturers Data report (MDR) shall consist of:

Quality inspection and test reports, certificate as per ITP-requirements


CE-Declaration according to the EC Machine Directive
CE-Declaration in accordance with the ATEX Directives if any
Supplier shall provide a Certificate of the companys integrated Quality System

The supplier shall submit a typical MDR from similar projects to SANDVIK for review and
approval by SANDVIK.

15.4 REQUIRED Documents


GA Drawing:

14 days after signing the contract.

Final design drawing (CAD), documentation, bore holes position scheme and design
calculation with all relevant data shall be submitted no later than 14 days after signing the
contract.
Inspection and Testing Plan (refer to QA)

28 days after signing the contract.

Spare Parts Catalogue

42 days after signing the contract.

SHOUGANG PER S.A.A.


TITLE

N SHOUGANG

Technical Specification Cable Reeler


Reclaimer (5921-RC-210) PR100-1200 / 45
Stacker (5921-ST-110) PS200-1000 / 24
This Manual is our property for which we reserve all rights. It must not be reproduced or used otherwise or made available to any third party without our prior permission in writing.

MINE OPERATION EXPANSION


PROJECT AND BENEFIT PLANT
992663-5921-D-E-ET-0004
N SANDVIK

C1847-TS-30-540-00-0

PAGE

14/14
REV.

Project specific operating, maintenance, lubrication manuals (no generic documentation)


including transportation, storage and assembly instructions shall be supplied electronically
(only native files) and in paper
14 days before shipment..
Languages
German:

English:

1 electronically / 2 printed

Spanish:

1 electronically / 2 printed

If any doubt or in case any inconsistencies within this specification including its attachments
arise, please contact Sandvik Mining and Construction Materials Handling GmbH & Co KG

Anda mungkin juga menyukai