Ref
Category
Risk
Client
Design
Client
Client
Client
External
External
10
External
11
Design
12
13
14
Design
Design
Design
17
Design
22
Client
Potential Impact
Action
Owner
Next
Action
Target
Date
Designers +
Arup
Ongoing
Designers +
Arup
mid April
09
Schedule
Impact
[weeks]
Problty.
Impact
Departments monitor schedule frequently & coordinate with other ICL parties
Introduction of a dry riser to the building as part of the Details are included in the Fire Strategy.
fire strategy was advised by the fire officer/engineer.
Potential impact in layouts.
Neighbours - dust, noise and the proximity of the Science Museum; Stoppages to construction due to complaints / delay
Management issue of main contractor's site logistics.
Students - lack of barrier around site.
costs.
Acoustic issues from plant room have effects on Faculty / Skempton Client dissatisfaction
Sandy Brown engaged to carry out chiller noise
users
modelling to assess if any impact.
Movement in existing structure during construction works.
Damage to finishes.
Ongoing monitoring for general areas.
Risk
Cost Impact
Score/
(Project
Category Costs) [K]
Action Plan
ICL
Project risk
Designers /
PM / Fire
officer
Contractor,
PM
Arup /
Sandy
Brown
Ongoing
AKT
Ongoing
PM/M&E
Designer
01/10/08
No residual risk
4
Ongoing monitoring during construction works.
TB&A, Main
Contractor,
M&E
Contractor
Ongoing
TB&A
end April
09
TB&A
24
Construction Noise and vibration during to the works disrupts teaching and
research.
26
Construction Users operations disrupted by construction works - entrance areas, Disruption to College users
lifts, pedestrians, users with buildings department, traffic, parking,
deliveries, skips, etc..
27
Construction Pre-ordering of large plant and long lead items (e.g. faade, steel,
lifts, Pluswall faade system) not completed early enough
Handover Failure to meet stakeholder requirements at Handover
28
Design
Monitor execution of the works in accordance with the plans
team / PM /
agreed. Hot desks being provided for users.
Contractor /
ICL
Contractor requested to submit a procurement schedule with key
Contractors
dates for all package to allow monitoring of timely procurement by
/ PM
the PM
Handover plan to be done.
PM
29
56
29a
30
32
Construction Decants of the MED Project Technical Centre, Formula Student and Delay to the project
Racing Green and Student Fire Engine groups and between phase
moves - if these cannot be completed by the time (and within the
duration) currently assumed the construction schedule may be
effected. AV Requirements may exceed current budget allowances. The requirements may need to exceed the current
Client
Specialist
standards.
External
Screen to Refuse Skip
Fire requirement from Peter Seal to have a screen
protecting the skip for avoidance of potential fire
Changes in the Masterplan scheme/design with have
External
Masterplan
direct impacts on the Skempton design
35
Design
Existing structure
36
Design
Existing structure
38
Design
39
43
Design
Design
Maintenance Access
Building regulations approvals.
44
Design
46
Design
file:///var/www/apps/conversion/tmp/scratch_2/273830843.xls
end April
09
Jun 10
ICL / PM
23
Date
Achieved
ICL
Delays and costs associated with tracing and isolating TB&A have engaged T Clarke to carry out a survey of
existing services
the existing services to mitigate the risk of discovering
unknown services during construction and to confirm
the assumed redundant services as well as advise of
all live services. The outcome of the survey will also
enable the design team to reduce the amount of
services shut downs during the construction phase.
Ongoing managment issue for Phase 1. Phase 2 and
Durability labs survey information issued for tender.
Existing services in mezzanine plant room may impact the layout of Delay while re-design completed.
the shared teaching spaces.
Sustainability Brief - Client aspiration of 'exemplar of energy efficiency &
Failure to fulfill the brief, misallocation of funding, abortive work
sustainability' not defined and expectations may not be met
COMMENTS
Last Update:25/03/09
KEY:
Key/ Critical
Intermediate
Minor
2
1
3
2
6
2
Ongoing
Ongoing
Ongoing
Designers /
CDMC
Monitor
Arup /
Decant
Manager
Ongoing
Arup / ICL
01/08/08
Page 1 of 3
DL / Arup
MLM Bldg
Control
FSC / ICL /
Design
team
ICL FM /
Arup
25/07/08
Ongoing
Ongoing
Ongoing
01/07/08
01/09/08
Ongoing
Ongoing
Ongoing
SEQ Programme
SKEM0901
Project Risk Register
Client
Client-Brief/
User Requirements
Team
External
Design
Construction
Handover
Operations
Ref
47
48
Category
Risk
Construction BMS
Potential Impact
Problty.
Impact
College acceptance of the BMS may cause subsequent BMS design completed, costs are in excess of budget
allowances. Costs have been agreed and are within current
delay to handover and signoff
cost reporting. BMS contractor appointed and validation
engineers appointment due in June 09.
Risk
Cost Impact
Score/
(Project
Category Costs) [K]
50
Most plant has now been lifted onto the roof at June 09. May
require further minor lifts, to be coordinated with ICL. No
impact to date.
52
53
54
Construction Lifts
55
58
59
1
1
2
2
2
2
Construction Coordination of the scope of work in the Hydrology Lab, i.e. for
services feeding L1 areas above, is to be confirmed with Wallis and
the users.
Construction Issue of MEPH design information for Phase 2 and Durability Labs
has been staggered, may lead to confusion or delay in the pricing
of these elements.
Construction Damage to existing services within the building may cause delay to
the project and require remedial work.
R_72
R_73
60
61
62
63
65
R_67
R_68
R_69
R_70
R_71
file:///var/www/apps/conversion/tmp/scratch_2/273830843.xls
Action
Owner
Next
Action
Target
Date
Main
Contractor,
PM
Ongoing
June 09
Design in splicing - define logistics in ELS. DT for review. Closed for Contractor /
Phase 1, Phase 2 ongoing.
AKT
June 09
Requirement of:
- definition of crane location
- investigation of Unwin road columns
- working on weekends
Design
Team /
Contractors
Ongoing
PM / ICL
Ongoing
Schedule
Impact
[weeks]
Action Plan
Page 2 of 3
COMMENTS
49
51
Last Update:25/03/09
Key/ Critical
Intermediate
Minor
Wallis
Arup / DL /
Wallis
Monitor
Arup /
Wallis
Arup /
Wallis
Ongoing
Jun 10
Ongoing
Ongoing
end April
09
Ongoing
end April
09
Ongoing
Ongoing
Ongoing
Wallis /
Arup
10/07/09
TBA / Arup
10/07/09
Wallis / TBA
Date
Achieved
Medium/ Serious
Low/ Marginal
Probability
High/ Probable
High/ Critical
Probability Categories
Low/ Improbable
Impact
Description
Prob
Scale Value
Probable
>70%
Could happen
30-70%
Improbable
<30%
Impact Categories
Description
Guide Scenario
Scale Value
Critical
Serious
Marginal