DURABLE STRUCTURES
DS
12
IC
DURABLE STRUCTURES
LNE
C
1 - HISTORICAL EVOLUTION
ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012
DURABLE STRUCTURES
12
- 1999 - Extinction of JAE and JAE-SA and the creation of three institutes - IEP, ICOR
and ICERR;
- 2001 - Collapse of Hintze Ribeiro Bridge;
DS
- 2002 - Merger of IEP, ICOR and ICERR, into a single institute - IEP Instituto das
Estradas de Portugal;
IC
DURABLE STRUCTURES
LNE
C
- 2006 -
- 2007 -
- 2008
ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012
DURABLE STRUCTURES
- 2009 -
12
- DCM gives formation to COs technical staff about Inventory and Routine
Inspections.
- 2010 -
DS
IC
DURABLE STRUCTURES
LNE
C
- 2012 -
ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012
DURABLE STRUCTURES
12
IC
DS
2 MANAGEMENT MODEL
DURABLE STRUCTURES
SCG Information
INSPECTIONS
INSPEC
ES
LNE
C
Inventories
Invent rio
CO s
Routine
Insp . Rotina
Insp.
COs
Principal
Insp . Principais
Insp.
Historical
Hist
rico
Record
Construction
and
Maintenance
DCM
Directorate
(DCM)
Underwater
Insp . Subaqu
Insp.
ticas
Damage
Insp . deInsp.
Dano
Special
Insp . Especiais
Insp.
Information
Updating
Specific Survey
INTERVENTION
OBRA
Operations
Centros
Centre
(COs)
Operacionais
EM
GOOD
BOM
BAD
EM MAU
Trabalhos
Maintenance
de
Works
Manuten o
EC
EC 0
1
EC
EC 1
2
EC
EC 2
3
EC
EC 3
4
EC
EC 4
5
EC 5
PROJECT
PROJECTO
Direco
Projectsde
Directorate
Projectos
de
Repair
Reparao
Works
ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012
DURABLE STRUCTURES
DS
12
The Conservation Management Model allows all information on bridges to be correctly organized and
handled, making it a fundamental instrument for the management of these structures;
The set of activities that belong to the Bridge Maintenance Management System is transversal to the
different EP directorates;
The Conservation Management Model is completely integrated in EPs operations, ensuring the
reliability of results.
IC
DURABLE STRUCTURES
LNE
C
ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012
DURABLE STRUCTURES
12
DS
IC
DURABLE STRUCTURES
LNE
C
4 SUMMARY OF ACTIVITIES
ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012
DURABLE STRUCTURES
12
4 SUMMARY OF ACTIVITIES
IC
DS
DURABLE STRUCTURES
LNE
C
400
300
200
100
EP Direct Management
Interferes with EP roads
ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012
DURABLE STRUCTURES
12
1805
1750
1500
1250
984
750
DS
1000
534
500
399
150
250
0
Outras
509
159
Passagem
Inferior
Passagem
Superior
Ponte
Tnel
Viaduto
IC
DURABLE STRUCTURES
LNE
C
- Theres a predominance of bridges with a length lower than 50m (84%). In this set prevail bridges with a
length below 10m (55%).
ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012
DURABLE STRUCTURES
12
4.1.4 Distribution of EP bridges, by deck material type (in December 31, 2012)
4%
3%
Reiforced Concrete
19%
40%
Masonry
DS
Precast/Prestressed Concrete
Flexible Culverts (ARMCO)
34%
The predominance of masonry structures is related to the age of the Portuguese road network;
The predominance of concrete structures is related to the reduced length of the bridges that are part of
EPs patrimony.
IC
DURABLE STRUCTURES
LNE
C
4 SUMMARY OF ACTIVITIES
4.2 Routine Inspections
ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012
DURABLE STRUCTURES
12
5502
5000
4000
3261
3000
2596
2000
DS
2483
1575
1000
321
38
0
2006
2007
1st Cycle
2008
2009
2010
2011
2nd Cycle
2012
3rd Cycle
IC
- In each 2 years cycle, a campaign of Routine Inspections is carried out for all EP bridges.
DURABLE STRUCTURES
4.2.2 Main Inspections carried out as a result of the Routine Inspections requests
Routine Inspections
6000
Confirmed Requests
LNE
C
5502
5000
4000
3261
3000
2000
1575
907
1000
321
2483
17
208
17
2006
2007
1st Cycle
38
2008
153
295
46
2009
2010
45
136
58
2011
2nd Cycle
The request of a Main Inspections usually results from an alert situation in a Routine Inspection;
Main Inspections are only carried out when its anticipation is justified;
Following the Main Inspections, a great amount of interventions have been carried out, preventing a more
severe evolution of detected damage.
ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012
DURABLE STRUCTURES
12
4 SUMMARY OF ACTIVITIES
IC
DS
DURABLE STRUCTURES
1400
Outsourced
Contratao Externa
LNE
C
1200
1000
800
67
15
454
1097
900
904
847
0
2011
2012
116
691
600
734
36
400
387
349
200
2001
2002
2003
40
8
80
7
65
2004
2005
2006
54
2007
2008
2009
2010
Since June 2010, all Main Inspections to ordinary bridges are done by EPs technical staff;
In 2011, the first cycle of 5 years ended, with all EP bridges assessed;
The second cycle of Main Inspections will start in 2012 and will last until 2016. In this period of time, almost
5.150 bridges will be inspected;
For the planning of this second cycle a great number of new bridges will be added to EPs patrimony duo to the
incorporation of Grande Lisboa and Douro Litoral concessions.
ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012
DURABLE STRUCTURES
90
12
80
68
70
60
50
30
40
DS
40
35
40
24
20
8
10
0
2001
2002
2003
2004
2005
2006
2007
2008
1st Cycle
2009
2010
2nd
Cycle
2011
2012
1 ciclo
2 ciclo
Main Underwater Inspections are held every 4 years in approximately 150 bridges
which foundations
are
permanently under water;
These Inspections are carried out in a 2 years cycle, when and where needed;
To date, an Underwater Inspections Manual is being developed, to increase the technical knowledge about
the behavior of bridge underwater components.
IC
DURABLE STRUCTURES
3,90%
LNE
C
14,75%
14%
0,52%
0,74%
26,00%
EC0
EC1
EC2
54,09%
EC3
EC4
EC5
At the end of 2009, the percentage of bridges with EC4 and EC5 was 6%. This percentage decreased to a
value of 4,42%, in the end of 2011.
At the end of 2011, the percentage of EC3 was 14,75%. It follows that almost 80,83% of bridges are considered
in a Very Good or Good condition.
ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012
DURABLE STRUCTURES
12
4 SUMMARY OF ACTIVITIES
IC
DS
DURABLE STRUCTURES
Detected
/ cumulative
Detectadas/acumuladas
Solutionde
inresoluo
hand
Previso
LNE
C
450
404
Solved / cumulative
Resolvidos/acumulados
421
408
421
400
300
150
117
75
50
74
2002
137
73
2003
141
174
82
96
75
2001
274
216
181
200
100
299
235
250
353
340
350
87 26
2004
45
62
92
119
153
158
166
188
147
91
2005
2006
2007
2008
2009
2010
2011
2012
68
13
2013
2014
The diagram shows the number of bridges with EC4 and EC5 detected in Main Inspections.
It also shows the number of bridges with Solved situations, due to the conclusion of its intervention, or due
to the fact that they were transferred to other organization or were deactivated.
Per year the diagram shows the number of Bridges with Unsolved situations transfer from the year before.
ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012
DURABLE STRUCTURES
12
Studies
Estudos
220
200
180
160
144
143
140
112
120
100
DS
85
80
87
64
58
60
52
58
40
20
2001
41
20
20
23
2002
2003
2004
38
6 6
19
2005
65
55
23
21
21
2006
2007
2008
2009
2010
2011
2012
The study combines projects of several bridges located in the same area, with similar damages and identical
intervention priority.
To date a study on all Foot Bridges is under development. Due to their particular dimension and need of
strategic analysis, this study will allow the planning and prioritization of interventions.
IC
DURABLE STRUCTURES
Priority temporary
intervention
Interveno
prioritria
provisria
EC4eand
EC4
EC5EC5
LNE
C
180
160
159
140
149
120
100
80
89
60
23
40
20
2001
2002
2
8
2003
15
29
2004
17 21 17
2005
33
11
2006
33
20
2007
8
12
16
11
34
2008
48
29
2009
37
35
77
53
48
23
16
2010
2011
2012
2013
2014
7
1
2015
ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012
DURABLE STRUCTURES
12
550
Network
Periodic
Cons.
Peridica
Conservation
450
414,3
409,5
392,2
400
350
Maintenance
505,4
495,9
500
Network
Continuous
Cons.
Corrente
355,0
338,5
321,6
Construction
Construo of new
roads and bridges
TOTAL
Total Operacional
370,2
326,4
DS
288,3
300
262,1
256,3
236,6
250
222,8
206,9
205,4
200
176,3
149,3
150
137,5
116,2
77,6
100
50
27,4
22,0
3,0
3,8
3,5
2001
2002
2003
94,6
76,7
41,7
43,1
36,7
159,4 ( T.O. )
127,0
110,2
87,4
92,3
40,8
38,2
55,1
90,1
54,0 ( O.A. )
39,4
65,4
52,0 ( C.C. )
41,5
37,2 ( Cst. )
16,2 ( C.P. )
13,6
16,6
17,9
17,2
33,1
31,6
25,8
2004
2005
2006
2007
2008
2009
2010
2011
Since 2008 - Amounts without taxes, due to EPs new legislative framework;
Summarizing, the amounts due to bridge requalification and common conservation have been increasing, due
to EPs campaign to preserve its patrimony.
IC
DURABLE STRUCTURES
LNE
C
Network Periodic
Conservation
0,6%
0,9%
0,8%
2,7%
4,2%
Network Continuous
Maintenance
Construction of new
roads and bridges
33,9%
11,5%
5,0%
5,2%
8,5%
11,6%
ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012
DURABLE STRUCTURES
12
IC
DS
DURABLE STRUCTURES
LNE
C
ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012
DURABLE STRUCTURES
Strategic Planning:
12
DS
Highlight all the information concerning the Inventory and the Inspections;
Access and registration control of changed information;
IC
DURABLE STRUCTURES
Technical Developments:
LNE
C
ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012
DURABLE STRUCTURES
DS
12
LNE
C
IC