Anda di halaman 1dari 52

PROJECT ID: CEET/ 07/48

KIGALI INSTITUTE OF SCIENCE AND TECHNOLOGY


INSTITUT DES SCIENCES ET DE TECHNOLOGIE DE KIGALI
Avenue de l Arme, B.P. 3900 Kigali, Rwanda

FACULTY OF ENGINEERING
DEPARTMENT OF CIVIL ENGINEERING AND ENVIRONMENTAL TECHNOLOGY

A PPROJECT
ON

Comparison between concrete


blocks and bricks from Ruliba

submitted by

ZIRIMWABAGABO LEODOMIR
Under the Guidance of

Mr. KAYINAMURA FRANCIS


Submitted in partial fulfillment of the requirements for the award of

BACHELOR OF SCIENCE DEGREE IN


CIVIL ENGINEERING AND ENVIRONMENTAL TECHNOLOGY
FEBRUARY 2008

CHAPTER I : 1.0 : INTRODUCTION.


1.1: Statement of problem.
At the beginning as history tell it, people lived in a primitive way. They lived in caves
and later small communities were developed and shelters were put up. At that time,
natural building materials was easily available and have been used as the technology in
construction of buildings were developed.
Although, clay bricks and concrete blocks are improved in order to obtain safe and
esthetic locations, their price are not affordable for every one. Since, raw materials for
manufacturing building materials are cheap and rise day to day. For instance, one bag of
Portland cement (50kg) was being bought at 5,000rwf ten years ago, but now costs
13,000rwf . It means that, this increases 10% every year.
Similarly, labor cost increases for a considerable rate. In addition, cutting trees for firing
ceramic materials damages our forest which leads to environmental problems, and as a
result, the sustainable development is not ensured.

1.2 : Objectives of study.


Due to cheapness of building materials and the environmental problems due to
deforestation , this project intends to achieve the following objectives :

To facilitate the community to select required structural materials in terms of


stability, economy and esthetic;

To learn which type of structural materials can be used to improve engineering


structure at reasonable price;

To decide what kind of structure to make;

To minimize the deforestation rate due to cutting trees for firing the bricks;

To make sure the safety of the building and to give a good appearance to a
building;

To enable individual to be familiar with before hand the outlay of the work.

1.3: Justification.
The Engineering sector is in position to discover which bricks or blocks available in
plenty, which can be utilized to put up the building structure of acceptable qualities, with
low cost, thus necessitate the making comparison between concrete blocks and bricks
from Ruliba, which are current building materials mostly used in Rwanda.
It is not easy to decide which kind of structural materials to use in construction because
of different building material made by diverse organizations which appear on market.
Generally, some people prefer to use little cost structural material without consideration
of other necessary properties. In fact, diverse factors should be considered such as
economics, structural and environmental factors.
Moreover, rural and urban communities have no required knowledge about building
structure. For that matter it is important to inform them on structural blocks and bricks
commonly available on market like concrete blocks and Ruliba bricks.
One of the government policy is to protect the environment by reducing the deforestation
velocity due to use of timber in various purposes. Then, the production of ordinary bricks
was reduced.
As a solution, it is time to give the information on modern structural bricks and blocks
which complete engineering requirements. The building development requires the
construction of apparent building. For achieving this purpose it necessary to be familiar
on face bricks most used in construction of houses like Ruliba bricks compared to
concrete blocks.

1.4 : Scope of study.


This study was conducted on manufacturing place as well as site of construction where
bricks and blocks are considered as basic building materials. It includes the cost, some
properties and technical specifications necessary to achieve the project.
As the basic of this topic is Ruliba bricks and concrete blocks, that is reason why some
experiments like laboratory test was conducted as well as considerable readings in
relation to the topic was proceeded to compare the cost and the strength of both.

CHAPTER II. 2.0 : LITERATURE REVIEW.


2.1 : Varieties of bricks and blocks.
Bricks may be defined as small a cored building unit of rectangular shape that is
composed of organic non-metallic substances of mineral origin hardened by heat or
chemical action. Blocks are similar defined but have larger dimensions than that of
bricks. Blocks are larger than bricks.

2.1.1 : Clay bricks.


Clay bricks like other ceramic products are based on clay, to which various amount of
quartz and feldspar have been added. Selected proportions are mixed with water, shaped,
dried and fired to produce the structural clay products of brick, roof and structural tiles
etc.

Types of bricks.
Bricks of masonry units may be solid, hollow, or architectural terra cotta. All types can
serve a structural function, a decorative function, or a combination of both. The various
types differ in their formation and composition.

Building bricks.
Also called common or hard bricks, are made from ordinary clay and are fired in kilns.
These bricks have no particular shoring, markings, surface texture, or color. Because
building bricks are generally used as the burning courses in either solid or cavity brick
walls, the harder and more durable type are preferred.

Face bricks.
Face bricks are of better quality and has better durability and appearance than structural
brick. Because of this, face bricks are used in exposed wall faces. The most common face
brick colors are various shades of brown, red, gray, yellow, or white.

Clinker brick.
Clinker brick is over burned in the kiln. Clinker bricks are usually rough, hard, durable,
and sometimes irregular in shape.

Pressed brick.
Pressed brick is made by a dry-press, rather than by kiln firing. Pressed brick have
regular, smooth faces, sharp edges, and perfectly square corner. Normally, they are used
like face brick.

Glazed Brick.
Glazed brick has one surface coated with a white or colored ceramic glazing. The glazing
forms when mineral ingredients fuse together in glasslike coating during burning. Glazed
bricks are particularly suited for walls or partitions in hospitals, dairies, laboratories. And
other structures requiring sanitary conditions and ease of cleaning.

Fire brick.
Fire brick is made from a special type of clay. This clay is very pure and uniform and is
able to withstand the high temperatures of fireplaces, boilers, and similar constructions.
Fire bricks are generally larger than other structural bricks and are often hand-molded.

2.1.2 : Calcium silicate bricks.


Raw materials: Siliceous aggregate, a high calcium lime and water; very fine aggregate
:1.15 mm sieve.
Size: 215 x 102.5 x 65 mm
Density:1700 kg/ m3
Strength:14-27.5 N/mm2

2.2 : Bricks forming process.


2.2.1 : Manufacture process.
After raw clay has been screened and crashed, machine-made bricks are formed either by
extrusion and cutting, or by pressing. Plastic clays may be extruded as continuous column
of rectangular section (with or without perforations) which is cut into individual bricks by
wire, acting like a chisel cutter, as it emerges from the die.

2.2.2 : Firing.
Firing transforms the raw clay brick into a rigid continuous (although usually porous
ceramic by way of a complicated succession of physical and chemical changes. Water is
lost rapidly as the kiln temperature rise above 1000C.
The clay minerals decompose between 400 and 7000 c. At about 9000C crystalline silica,
alumina and spinel compounds appear and the mineral mullite 3Al2O32SiO2 forms above
about 10000C.
The minor oxide constituents include Na2O, K2O, MgO, CaO, and FeO produce relatively
low melting eutectic mixtures with principal components of SiO2 and Al2O3, so that some
melting may occur below 10000C.

2.3 : Technical specification of bricks.


2.3.1: Strength of bricks.
Bricks often have to withstand great compressive stresses. The durability of the masonry
depends upon the strength of the bricks. Common building bricks should have a
minimum strength of 35 kg/cm2 . Also, the compressive strength of any individual brick
should not fall below the average compressive strength specified for the corresponding
class of brick by more than 20% .
The average compressive strength of common burnt clay bricks is given
in table 2.1.
(N/mm2)

Compressive

Class

Average

designation

strength not

strength less

less than

than kgf/cm2

(N/mm2)

kgf/cm2
350

350

(35)

400

(40)

300

300

(30)

350

(35)

250

250

(25)

300

(30)

200

200

(20)

250

(25)

175

175

(17.5)

200

(20)

150

150

(15)

175

(17.5)

125

125

(12.5)

150

(15)

100

100

(10)

125

(12.5)

75

75

(7.5)

100

(10)

50

50

(5)

75

(7.5)

35

35

(3.5)

50

(5)

Table 2.1:Average compressive strength of common burnt clay bricks. IS :1077- 1976.

2.3.2: Test for compressive strength.


The specimen brick is immersed in water for 24 hours. The frog of the brick is filled flush
with 1:3 mortar and the brick is stored under damp jute bags for 24 hours followed by
immersion in clean water for three days. The specimen is then placed between the plates
of compression testing machine.
Load is applied axially at a uniform rate of 14N/mm2(140Kg/cm2) and the maximum load
at which the specimen fails is noted for determination of compressive strength of brick
given by:
Compressive strength = Maximum load at failure/Loaded Area of bricks (Average of
five results shall be reported).

2.3.3: Compressive strength and other mechanical properties.


The compressive strength is the only mechanical property used in brick specification. It is
the failure stress measured normal to the bed face. Bricks are tested wet, normally with
frogs filled with hardened mortar. A considerable variation is found between individual
bricks and a batch of ten is tested to obtain a mean strength.
Generally, compressive strength decreases with increasing porosity, but strength is also
influenced by clay composition and firing. The compressive strength is limited by brittle
fracture and is sensitive to individual flows in the sample under test, including those
associated with large particles, fissures formed during shaping, and shrinkage cracks. The
youngs modulus of elasticity of brick ceramic lies usually in the range 5 to 30KN/mm2.

2.3.4: Factors affecting compressive strength.


Arnold W. Hendry in structural masonry (1998) have stated the important factors in
determining the compressive strength of masonry as follow:
1. Unit characteristics: Strength; type and geometry like solid, perforated, hollow,
relative height; absorption.
2. Mortar characteristics: Strength developed by mix, water/ cement ratio, water
retentivity; relative deformation and relative thickness.
3. Masonry: Bond; direction of stressing; local stress.
Some of these factors, such as the unit characteristics, are determined in the
manufacturing process, while others, such as mortar properties, are susceptible to
variations in constituent materials, proportioning, mixing and accuracy of construction.

2.3.5: Size of bricks.


The International Standard states that the length of brick should be equal to two
times width plus one joint size of 10mm. So that, the length = 2width+1 joint. Most
commonly used bricks format are 215x102,5x65mm and 210x100x63mm with
mortar joints of 10mm the size becomes respectively 225x112,5x75mm and
220x110x73mm.

10

2.4: Concrete blocks features.


2.4.1: Concrete block technology.
Concrete block technology offers a speedier, cost effective, environmentally sound
alternative to conventional walling materials like bricks, stones, compressed earth blocks,
etc... It is based on the principle of densification of a lean concrete mix to make a regular
shaped, uniform high performance masonry unit.
Concrete block technology can be easily adapted to suit special needs of users by
modifying design parameters such as mix proportion, water/cement ratio and type of
production system. It is an effective means of utilizing wastes generated by stone
crushers, quarrying and stone processing units. The technology has high potential in areas
where raw materials are easily available.

2.4.2: Business.
The concrete block technology package is a highly profitable business for micro and
small scale building material producers and construction companies. The market for
concrete blocks is growing at a rapid rate, specially in the areas where burnt bricks are
not easily available or are of poor quality.

2.4.3: Product.
The specifications and the characteristics of a concrete block depend on the machine used
to manufacture concrete blocks. The most common size of solid concrete blocks is
300x200x150mm. The basic raw material is cement, fine aggregate and coarse aggregate.
Very little water is used. This is possible only with mechanized compaction and vibration
and gives the block high quality in spite of the lean mix, which uses very little cement.

11
Weight of a concrete blocks can be surface engineered by using pieces of stone or
ceramic waste on their face. Another common type are hollow concrete blocks. They are
made with a richer mix, but offer a number of advantages, such as lighter weight, easier
handling and facility for conducting or reinforcement through the hollows.

2.4.4: Unique features of concrete block technology :

Cost effective compared to other traditional walling systems

Maximum utilization of stones wastes and local resources

Structural performance can be engineered

Decentralized local production

Offers business opportunities

2.4.5: Production process.


Concrete blocks are usually produced using a semi-mechanized stationary type machine.
The other production systems are-manual moulds which require hand tamping, a mobile
semi-mechanized egg-laying machine and fully mechanized system which combines
compression and vibration.
High quality machines provide optimum vibration in the mix so that the ratio of cement
used can be reduced substantially without compromising on the strength of the blocks.
The machine also compacts and consolidates the mix so that the blocks are uniform in
size and attain desired physical properties.
The blocks are cured for a minimum period of 14 days, before they are ready to use. On
an average 600-800 blocks can be made in 8 hours by 1 skilled and 6-8 semi-skilled
workers.

12

2.4.6:Building with concrete blocks.


Concrete blocks can be used like any other masonry unit to build foundations, walls,
arches and corbels, etc. A typical

concrete block is equivalent to 4.5 bricks, thus

construction is faster than with other masonry units. The mortar used is also less which
results in cost saving. They are compatible with other materials like fired bricks, dressed
stone and compressed earth blocks for composite wall construction.
Acceptability of concrete blocks is very high in urban areas for all types of buildings.
They are very popular as a long lasting, low maintenance and investment for institutional
and industrial buildings. The permanence of a cement based product is making concrete
blocks a preferred choice in rural areas as well.

2.4.7: Perforated and hollow block units.


A number of

investigators have studied the effect of different types of units on

compressive strength and an extensive series of tests were undertaken by West et Al. at
the British Ceramic Research Association to examine the compressive strength of
brickwork built with a variety of wire-cut bricks having different hole patterns with
perforation ratios up to 20 per cent.
The results of these tests showed that if the brickwork strength was calculated on the
basis of a standard crushing test on the unit, the perforation pattern made little practical
difference. In these tests, the perforations were either circular holes or slots with round
ends, but in some tests reported by Monk the units had rectangular slots, and these tests
showed reduced compressive strength in prisms. It would seem probable that such slots
would introduce stress concentrations, not only in service but also in manufacture, which
would be a source of weakness.

13
Schellbach has examined the strength of various types of highly perforated units and has
found that the highest ratio of masonry strength to unit strength was obtained with a
perforation ratio of 38-43 per cent. Schellbachs study included examination of stress
concentration factors associated with different perforation patterns, and he concluded that
these remain within acceptable limits even with rectangular slots, provided that the
corners are well rounded.
Hollow block masonry may be built with the cores either unfilled or filled with concrete .
In the former case the mortar joint may cover the whole of the bed face of the block (fullbedded) or only the outer shells (face-shell-bedded). These different construction
methods result in considerable variations in structural behavior and this quite clearly
results in a more complex situation than for solid units in assessing masonry strength.
It is usual to take the strength of hollow units which are to be laid full-bedded as the
maximum test load divided by the gross area of the unit. This value is then used to
determine the masonry strength as if the unit were solid.
The stress conditions and mode of failure of shell-bedded hollow block masonry differ
considerably from those in solid block masonry. They have been investigated by Shrive
who has shown that tensile stresses are developed in the webs of the blocks, which
eventually lead to failure.
Hollow block work masonry is frequently built with the cores filled with concrete (grout).
The compressive strength of this type of masonry is found to be considerably less than
the sum of the strengths of the hollow block and concreted core tested separately, even
when the materials are of approximately the same nominal strength.
This is because there is a difference in the strains in block and fill materials at ultimate
load.
Thus Hamid and Drysdale have found the strain at ultimate strength of fill material used
in their investigations to be about 0.0024 compared with the strains at failure of the block
material of 0.0036. BY Arnold W. Handry in Structural Masonry (1998)

14

2.4.8: Benefit of using concrete blocks .


It is faster to built with concrete blocks than with bricks and the amount of mortar is
reduced to less than half. If face shell bedding is used, in which the mortar is placed
only along the edges of the blocks, the consumption of mortar is reduced by a further
50%. However, the total cement required for the blocks and mortar is far greater than that
required for the mortar in a brick wall.

2.5: Concrete blocks forming process.


2.5.1: Mix proportion of blocks.
Concrete blocks are often made of 1:3:6 concrete with a maximum aggregate size of
10mm or a cement-sand mixture with a ratio of 1:7, 1:8 or 1:9. These mixture , if
properly cured, give concrete blocks a compressive strength well above what is required
in one-storey building.
The blocks may be solid, cellular or hollow. Cellular blocks have cavities with one end
closed while in hollow the cavities pass through. Lightweight aggregate such as cracked
pumice stone is sometimes used. Blocks are made to a number of coordinating sizes, the
actual sizes being About 10mm less to allow for the thickness of the mortar.

2.5.2: Blocks manufacturing.


Blocks can be made by using a simple block- making machine operated by an engine
or by hand. They can also be made by using simple wooden moulds on a platform or
floor. The mould can be lined with neat steel plate to prevent damage during
tamping and to reduce wear on the mould. In large-scale production steel moulds are
often used.

15

The wooden mould is initially oiled overnight and need not be oiled each time it is
filled. It is sufficient to wipe it clean with a cloth. The concrete, of stiff or plastic
consistency placed in layer is compacted with a 3 kg rammer. The mould has a
steel plate cut to the shape of the Block which is put on as a lid and held dawn
as the hollow-making pieces are then loosened and the sides of the mould removed
with a swift motion. All parts of the mould should be slightly tapered so they can be
easily removed from the block.
Starting the day after the block have been made, water is sprinkled on them for two
weeks during curing. After 48 hours the blocks can be removed for stacking. But the
wetting is continued. After curing, the blocks are dried. If damp blocks are put in wall,
they will shrink and cause cracks. To assure maximum drying, the blocks are dried. If
damp blocks are stacked interspaced, exposed to the prevailing wind and in the case of
hollow blocks, with the cavities laid horizontal to form a continuous passage for the
circulating air.

2.5.3: Decorative and Ventilating blocks.


Decorative concrete or sand/cement blocks can serve several purposes:

Provide light and security without installing windows, or shutters.

Provide permanent ventilation.

Give an attractive appearance.

In addition, some are designed to keep out rain while others include mosquito-proofing.
Blocks of simple shape can be made in a wooden mould by inserting pieces of wood to
obtain the desired shape, but more complicated designs usually require a professionally
made steel mould.

16

2.6.Mortar for jointing.


Mortar is a plastic mixture of water and binding materials used to join concrete blocks,
bricks or other masonry units. It is desirable for mortar to hold moisture, be plastic
enough to stick to the trowel and the blocks or bricks and finally to develop adequate
strength without cracking.
Mortar need not be stronger than the units it joins. In fact cracks are more likely to appear
in the blocks or bricks if the mortar is excessively strong. There are several types of
mortars each suitable for particular applications and of varying costs. Most of these
mortars include sand and ingredient.
In all cases the sand should be clean, free of organic material, be well graded
(a variety of sizes) and not exceed 3mm of silt in the sedimentation test. In most cases,
particle size should not exceed 3mm as the mortar will be " hash and difficult to work
with. Lime mortar is typically mixed 1 part lime to 3 of sand. Two types of lime are
available.
Hydraulic lime hardens quickly and should be used within an hour. It is suitable for both
above and below ground applications. Non-hydraulic lime requires air to harden and can
only be used above ground. If smoothed off while standing, a pile of this type of lime
mortar can be stored for several days.
Cement mortar is stronger and more waterproof than lime mortar, but is difficult to work
with because it is not "fat or plastic and falls away from the blocks or bricks during
placement. In addition, cement mortar is more costly than other types.
Consequently it is used in only a few application such as dump-proof course or in
some limited areas where heavy loads are expected. A 1:3 mix using fine sand is
usually required to get adequate plasticity.

17
Compo mortar is made with cement, lime and sand. In some localities a 50:50
cement-lime mix is sold as mortar cement. The addition of the lime reduces the cost
and improves the workability. 1:2:9, cement-lime-sand mix is suitable for general
purposes, while a 1:1:6 is better for exposed surfaces and a 1:3:12 can be used for
interior walls or stone walls where the extra plasticity is helpful.
Mortar can also be made using pozzolana, bitumen, cutback, or soil. A 1:2:9 Lime
pozzolana-sand mortar about equals a 1:6 cement-sand mortar. Adobe and stabilized soil
blocks are often laid in a mortar of the same composition as the blocks.
Table 2.2 and 2.3 provide information on the materials required for a cubic Meter of
various mortars and the amount of mortar per square meter for several building units.
Starting with cement mortar, strength decreases with each type, although ability to
accommodate movement increases.
Table 2.2: Materials required per Cubic Meter of mortar.
Type

Cement bag

Lime kg

Sand m3

Cement mortar 1:5

6.0

1.1

Compo mortar 1:1:6

5.0

100.0

1.1

Compo mortar 1:2:9

3.3

13.5

1.1

Cement mortar 1: 8

3.7

1.1

Compo mortar 1:3:12

2.5

150.0

1.1

Lime mortar 1:3

200.0

1.1

Table 2.3: Mortar Required for Various Types of Walls.


Type of wall

Amount required per m2 wall

11.5 cm brick wall

0.25 m3

22.2cm brick wall

0.51m3

10cm sand-cement block wall

0.008m3

15cm sand-cement block wall

0.011m3

20cm sand-cement block wall

0.015m3

18

2.7 : Cost in structural materials.


2.7.1: Economy in construction.
According to B.N. Dutta in estimation and costing in civil engineering, the construction
should be done as economic as possible by organizing labor, materials, supervision etc.
All designs and working drawing should be prepared well in advance. Requirement of
materials should be worked out and materials should be organized, collected and stocked
close to the site of working well in advance so that work is not held up for want of
materials.
Materials should be stored at suitable place so that they can be mixed and supplied to the
mason and other artisans readily with least possible lead and delay.
Laborers should be well organized to use then fully and the number of different category
of labor should be controlled and their work supervised to get maximum work from them.
The whole construction shall be completed as quickly as possible so that the supervision
cost may be minimum possible.
Over head costs should be as low as possible, local materials should be used as far as
possible which will be cheap, and save cost of transport. Locally available stone, timber
etc, should be used which will reduce cost of transport. As cement and steel are costly
and are not readily available, stone slab may be use in roof slab instead of reinforced
concrete.

2.7.2: Unit cost.


For a given production figure, fixed and variable costs are added together and total
divided by the number of blocks produced giving the unit cost. This enables the price of
blocks to be set at a sensitive level. It is useful to calculate the effect of changes in cost or
in productivity on the unit cost. The costs of raw materials
identical.

and stabilizer remain

19

2.7.3: Cost estimating.


The estimated cost is prepared in order to know the probable cost of construction before
starting the project works. If the money available lower than the estimate, attempts must
be made to reduce the cost, by reducing the work or by changing the specifications.
In preparing the estimate the quantities of different items of work are calculated and from
these quantities the cost is calculated. For that matter a knowledge of drawings is
essential. The one who can understand and read a drawing can find out the dimensions in
length, breadth, height or depth etc. Calculations consist mainly of a length x breadth x
height for volumes and length x breadth or length x height for areas.
In the preparation of estimates one has to go into details of each item however big a
small it might be. Nothing should be left or missed. An estimator should picture the
object (the structure in his mind from the study of drawings and specifications).
Alternatively the estimate can be done by measuring the length, breadth and height
from the existing structure.
If estimate is exceeded it becomes difficult to the engineer to explains and account
for additional money. Inaccuracy in preparing estimate; mission of items, changes
in design improper rates etc.., are the reason for exceeding the estimate, through
increase in the rates is one of the main reason.
In forming a correct estimate, care should be taken to find out the dimensions of all
items correctly, and to avoid omissions of any kind of work or part there of. The rate
of each item should also be reasonable and workable.
The rate in estimate provide for the complete work, which consist of the cost of
materials, transport, cost of water, taxes, establishment and supervision cost
reasonable profit of contractor, etc. In preparing estimate the principle to be followed
is to make each item or dimension clear and intelligible so that they can be
understood, checked or verified by any body. A remark column may be introduced
and notes may be given where necessary.

20

2.7.4: Methods of estimating.


1. Estimate : Previous to stating the construction project it is compulsory to know its
probable cost which is worked out by estimating. An estimation is a computation of the
quantity required and payments expected to be incurred in the construction of a work.
The estimate is the probable cost of a work and is determined theoretically by
mathematical calculations based on the plans and drawings and current rates.
Approximate estimate may be prepared by various methods but accurate estimate is
prepared by detailed estimate method.
2. Actual cost : The actual cost of work is known at the completion of the work.
Account of all expenditure is maintained day to day during the execution of work in the
account section and at the actual cost should not differ much from the estimated cost
worked out at the beginning.
3. Detailed estimate : Preparation of detailed estimate consists of working out the
quantities of different items of work and then working out the cost. The estimate is
prepared in two stages :
a. Details of measurements and calculation of quantities.
The whole work is divided into different items of work as earth work, concrete, etc.. and
the items are classified and grouped under different sub-heads, and details of
measurement of each item of work are taken out and the quantities under each item are
computed in the prescribed form known as measurement form.
b. Abstract of estimated cost.
The cost under item of work is calculated from the quantities already computed at
workable rate, and the total cost is worked out in prescribed form, abstract of estimate
form. A 1.5% to 3% is also added for contingencies, to allow for petty contingent
expenditures, unforeseen expenditures, changes in design, changes in rates, etc. Which
may occur during the execution of work charge establishment.
The grand total thus obtained is estimated cost of work.

21

3. Rates. Rates of different items in the estimate are the current rates for the completion
of the items of work which include supply of materials, transport, labor, scaffolding
overheads, contractor's profit, taxes, etc.
By IVOR H. Seeley in building construction technology.

22

CHAPTER III . 3.0 : RESEARCH METHODOLOGY.


3.1 : Data collection techniques.
The first and most important information was extracted from library and Web site. All
most literature review concerning bricks and blocks Like sizes, strength, mix ratio,
manufacture, raw materials etc are recorded from engineering published materials.
The second data collection technique applied in this research is the site Visiting. The
most concerned site is "BRIQUETERIE RWANDAISE RULIBA (BRR).The objective
that visit was to Collect the data / information about the Bricks produced by that factory
like technical specifications, cost, availability and the center of market. The information
tabulated below was extracted from syllabus of Ruliba factory.
Sizes of bricks/

Mass (kg)

Pieces/m2

Blocks (mm)

cost/ piece

cost/m2

(rwf)

(rwf)

400 x 175 x 120

10.5

20

434.24

8684.8

400 x 175 x 95

6.9

25

316.24

7906

250 x 175 x 190

8.9

20

408.28

8165.6

250 x 175 x 95

4.35

36

198.24

7136.64

250 x 120 x 95

3.15

36

135.94

4893.84

260 x 125 x 68

2.6

52

80.24

4172.48

210 x 100 x 63

60

76.7

4602

210 x 50 x 63

60

47.2

2832

210 x 100 x 63

60

231.28

13876.8

Table 3.1 : Variety of Ruliba bricks and their relatives prices.

23

The third data collection technique used is experiment like laboratory test. The crushing
strength test was conducted in order to know the resistance of Ruliba bricks under applied
load. Prepared sample is placed between the compressive machine plates and the load is
applied regularly and axially to the sample. The maximum load at failure divided by the
loaded area of the brick determine the crushing strength of the brick.
The observation method are used to know attractive appearance that presented Ruliba
bricks, the uniformity of color; surface and edges. Hand manipulation may necessary to
test the roughness of materials surface.
The visit was also been conducted on field were the construction works by using concrete
blocks took place. The technical specifications like mix proportion, size and the strength
was been recorded. The interview method were applied to know the real situation on the
construction field.

Production and construction cost.


Estimation and costing of two typical walls is a benchmark of this study. Two typical
walls were considered in order to make safe comparison . One is constructed with Ruliba
blocks (210x100x63), the second with concrete blocks (400x200x150).
Calculations consist mainly of a length x breadth x height for volumes
and length x breadth or length x height for areas.

24

3.2 : Data organization for analysis.


3.2.1 : Calculation of masonry unit cost.
A) Bricks from Ruliba.
For calculation of masonry unit cost for Ruliba bricks, four items are considered: The
unit cost of bricks, transport, mortar for binding units and labor cost.

1. Cost of bricks.
The cost of Ruliba bricks are fixed according to their mass, sizes and properties. To be
familiar on their unit cost, the price of one brick must be multiplied by the number of
bricks required to make one cubic meter of masonry.
Sizes (mm)

Pieces/m3

cost/ piece

Cost/m3

(rwf)

(rwf)

400 x 175 x 120

114

434.24

49503.36

400 x 175 x 95

143

316.24

45222.32

250 x 175 x 190

114

408.28

46543.92

250 x 175 x 95

206

198.24

40837.44

250 x 120 x 95

300

135.94

40782

260 x 125 x 68

433

80.24

34743.9

210 x 100 x 63

600

76.7

46020

210 x 50 x 63

1200

47.2

56640

210 x 100 x 63

600

231.28

46256

Table 3.2: Unit cost of Ruliba bricks.

25

2. Transport cost.
The transport cost depends upon the distance of and the weight of materials. At
reasonable distance, say from Ruliba to any where in Kigali city, one tour of five tones
costs 35,000rwf of transport. In table below, the unit cost presented, is estimated
basically to that information by calculation the transport cost of one kg per km multiply
by the number of bricks contained in one cubic meter of masonry.
In other Provinces, it is very strange to use Ruliba blocks because of high carrying price.
For instance, In districts like Musanze (North); Nyanza (south); Kayonza (Eastern) and
Karongi(Western), the transport costs lie between 60,000rwf and 80,000rwf per trip. The
table bellow illustrates the estimated transportation cost for different sizes.
Sizes (mm)

Mass (kg)

Bricks

Bricks per
3

cost/kg/km

Cost/m3/km

Unit cost at

per trip

one m

(Rwf)

(Rwf)

20 km

400 x 175 x 120

10.5

476

114

3.7

421.8

8436

400 x 175 x 95

6.9

725

143

2.4

343.2

6864

250 x 175 x 190

8.9

562

114

3.1

353.4

7068

250 x 175 x 95

4.35

1149

206

1.5

309

6180

250 x 120 x 95

3.15

1587

300

1.1

330

6600

260 x 125 x 68

2.6

2500

433

0.7

303.1

6062

210 x 100 x 63

2500

600

0.7

420

8400

210 x 50 x 63

5000

1200

0.35

420

8400

210 x 100 x 63

1667

600

1.0

600

12000

Table 3.2: Unit cost of transport at 20km distance of various size of Ruliba bricks.

26

3. cost of mortar.
Ratio: 1:4
One part of cement over four parts of sand:
Volume of brick with joint = 0.220 x 0.110 x 0.073 = 0.0017666m3
Number of bricks = 1/0.001766 = 566 bricks
Volume of net brick = 0.210 x 0.100 x 0.063 = 0.001323m3
Total volume of bricks : 566 x 0.001323 = 0.749m3
Volume of mortar : 1- 0.749 = 0.251m3
Unit volume of cement : 1/5 x 0.251 = 0.0502 m3
Mass of cement : = 0.0502 x 1500 = 75.3 kg
Unit cost of cement = 12000/50 x 75.3 = 18072 rwf
Unit volume of sand : 4/5 x 0.251 = 0.2008m3
Unit cost of sand : 35000/5 x 0.2008 = 1405.6 rwf
Unit cost of mortar = Unit cost of cement + Unit cost of sand
= 18072 +1405.6
=19477.6rwf

4. Labor cost.
Sizes (mm)

Built

Number of

Labor Cost of

Labor cost of

bricks

bricks in m3.

one brick (rwf)

one m3(rwf)

per day.
400 x 175 x 120

19

114

353.68

40239

400 x 175 x 95

24

143

280

40040

250 x 175 x 190

19

114

353.68

40239

250 x 175 x 95

38

206

176.84

36429

250 x 120 x 95

56

300

120

36000

260 x 125 x 68

84

433

80

34640

210 x 100 x 63

120

600

56

33600

210 x 50 x 63

240

1200

28

33600

210 x 100 x 63

120

600

56

33600

Table 3.4 : Unit labor cost of masonry for various sizes of bricks.

27

One mason is paid 560rwf / hour


One porter is paid 280rwf/ hour
Total = 840rwf/ hour i.e. 840 x 8 =6720rwf.
One porter and one mason can built 120 bricks of 210 x 100 x 63 mm sizes per day.

B) Concrete blocks.
Three main items must be taken into account in estimation of unit cost of wall made with
concrete blocks. Then, the unit cost of wall =(Cost of blocks + labor cost +cost of
mortar). It is more economic to make blocks on place of work to avoid the transport cost
of finished units.
The cost of blocks combines both the cost of raw materials and which of former. So that,
his is paid around 40rwf per block. For that case, the transport fees of raw materials may
be considered. On market, one trip of sand bought between 35,000rwf and 40,000rwf,
while one bag of cement costs 11,0000rwf for imported Hima Portland cement and
13,000rwf for local Portland cement.
For labor cost, one mason and one porter can build about 60 blocks of 400 x 200 x 170
mm sizes per day. The day of work is equivalent of eight hours. Most employers does not
consider the security and other taxes for their employees which is wrong. Then, the labor
cost of one mason is 560rwf per hour, while the porter paid 280rwf per hour.
The cost of mortar for binding concrete blocks units is estimated like the cost of blocks.
The difference lies in their mix proportion ratio in which, that of mortar is one part of
cement to four parts of aggregate.

28

1.Unit cost of blocks.


Net volume of blocks in one cubic meter of wall.
Net volume of one block: 0.40 x 0.20 x 0.17 = 0.0136 m3.
Volume of block with 10 cm joint : 0.41 x 0.21 x 0.18 = 0.0155m3.
Number of blocks : 1/0.0155 = 64.5 blocks.
Net volume of blocks in 1m3:0.0136 x 64.5 = 0.877m3.

2.Unit cost of raw materials.


Mix proportion : 1: 14.
Unit volume of cement : 1/15 x 0.877 = 0.058 m3.
Mass of cement: 0.058 x 1500 = 87 kg.
Cost of cement: 12000/50 x 87 = 20880rwf.
Unit volume of sand: 14/15 x 0.877 = 0.818m3.
5m3 costs 35000rwf i.e. 7000rwf/m3.
Unit cost of sand: 0.818 x 7000 = 5726rwf.
Former unit cost: 40 x 64.5 = 2580rwf.
unit cost of blocks = 20,880 + 5,726 +2,580 =29,186rwf.

3.Unit cost of mortar for binding materials.


Ratio: 1:4
Unit volume of mortar : 1- 0.877 = 0.123 m3
Unit volume of cement :1/5 x 0.123 = 0.024m3
Mass of cement: 0.024 x 1500 = 36 kg
Unit cost of cement: 12000/50 x 36 = 8,640rwf
Unit volume of sand: 4/5 x 0.123 = 0.098 m3
Unit cost of sand: 35000/5 x 0.098 = 686rwf
Total unit cost of mortar: 8,640 + 686 =9,326rwf.

29

4.Labor unit cost.


One mason is paid to 560rwf / hour and one porter is paid 280rwf/ hour.
Labor cost = 840rwf/ hour i.e. 840 x 8 = 6,720rwf
As said above, one unit of volume contains 64.5 blocks sized to
400mm x 200mm x170mm.Then, the output of one mason is 60/64.5=
0.930m3 per day.
From this, the determination of unit labor cost is simple. That must be
equal to 6,720/ 0.930 x 1=7,226rwf.
The unit cost of blocks wall = 29,186 + 9,326 + 7,226 = 45,738rwf.
Table 3.5 : Unit cost comparison of Ruliba bricks wall and concrete wall.
Ruliba bricks (1m3)
Descriptions

Concrete blocks (1m3)

Unit cost(rwf.)

Descriptions

Unit cost (rwf.)

1. Bricks unit cost

45,172

Blocks unit cost

29,186

2. Trans. Unit cost

7,779

Trans. Unit cost

3.Mortar unit cost

19,477.6

Mortar unit cost

9,326

4. Labor unit cost

36,487

Labor unit cost

7,226

Total unit cost

108,915.6

Total unit cost

45,738

30

3.2.2: Data related to technical specifications.


A)Technical specification of Ruliba bricks.
Report of laboratory test for strength and density.
Purpose: This laboratory test is conducted in order to state some mechanical properties
of Ruliba bricks like compressive strength and the density . This test will help us to make
comparison of Ruliba bricks properties with that of concrete blocks.

Hypothesis.
Each structural wall must withstand against natural and artificial action like compressive
stress, capillarity, etc. That will depend on resistance of its structural materials say bricks.
The problem behind is to know the ability of these materials to support the applied loads
in order to make safe design. As the Ruliba brick is the case study, it required to know the
crushing strength of that product.

Materials and apparatus.


- Two Ruliba bricks samples;
- Balance;
- Ruler;
- Crushing- machine.

Procedure.

Preparation of samples;

Measurement of loaded area;

The brick is then weighted ;

The specimen is then compressed between the plates of testing machine.

The maximum load at failure is noted as the crushing load of the brick.

31

Results and data.


Sample 1: Length (L1) = 26 cm
Width (W1)= 12.5 cm
Height (H1)= 6.8 cm
Number of Hollow (N)= 6
Length of hollow (l1) = 7.8 cm
Width (w1) = 2.7 cm
Height (h1) = 6.8 cm
Crushing load = 240 KN
Loaded area = (L1 x W1) (l1 x w1) x N
= (26 x 12.5) (7.8 x 2.7) x 6 = 199 cm2
Crushing strength = Crushing load / loaded area of brick.
= 240/199
= 1.21 KN/cm2
Sample 2 : Length (L2) = 26 cm
Width (W2)= 12.5 cm
Height (H2)= 6.8 cm
Number of Hollow (N)= 6
Length of hollow (l2) = 7.8 cm
Width (w2) = 2.7 cm
Height (h2) = 6.8 cm
Crushing load = 440 KN
Loaded area = (L2 x W2) (l2 x w2) x N
= (26 x 12.5) (7.8 x 2.7) x 6 = 199 cm2
Crushing strength = Crushing load / loaded area of brick.
= 440/199
= 2.21 KN/cm2

32

Density:
Sample 1: Total volume of brick = 26 x 12.5 x 6.8 = 2210 cm3
Total volume of voids = 7.8 x 2.7 x 6.8 = 143.208 cm3
Total volume of solid = 2210 143.208 = 2066.792 cm3
Density = Weight (W1)/ Total volume of solid
= 2.633/2066.792 x 10-6 = 1273.95 Kg/m3
Sample 2: Total volume of brick = 26 x 12.5 x 6.8 = 2210 cm3
Total volume of voids = 7.8 x 2.7 x 6.8 = 143.208 cm3
Total volume of solid = 2210 143.208 = 2066.792 cm3
Density = Weight (W2)/ total volume of solid
= 2.643/2066.792 x 10-6
= 1278.79 Kg/m3
Average Density = (D1 + D2)/2
= (1273.95 + 1278.79)/2
= 1276.37 Kg/cm3

Conclusion and recommendation.


The result of test show that there is a great difference between the crushing strength of
sample number 1 and that of sample number 2 . The previous observations made on
samples was shown that there was small crack on sample 1, which is the reason of that
difference in strength. So that, result given by the corresponding sample must be ignored
and consider the second result as the crushing strength of Ruliba bricks.i.e.2.21 KN/cm2.
As density, the average of two solutions gives the density of 1276.37 kg/cm3.
As recommendation, it better to control carefully the samples before testing and to take
more samples during laboratory test.

33

Table 3.6: Technical specifications of Ruliba bricks.


Types

Sizes (cm)

Mass(kg)

Mass density

Average compressive

(kg/m3)

strength (kg/cm2)

Hollow block

40 x 17.5 x 12

10.5

1250

2.16

Hollow block

40 x 17.5 x 9.5

6.9

1037.6

1.79

Hollow block

25 x 17.5 x 19

8.9

1070.6

1.85

Hollow block

25 x 17.5 x 9.5

4.35

1046.6

1.81

Hollow block

25 x 12 x 9.5

3.15

1666.7

2.88

Hollow block

26 x 12.5 x 6.8

2.6

1276.37

2.21

Hollow brick

21 x 10 x 6.3

1511.7

2.62

Hollow brick

21 x 5 x 6.3

1511.7

2.62

Fire brick

21 x 10 x 6.3

2267.6

3.92

B)Technical specification of concrete blocks.


Table3.7: Technical specifications of concrete blocks.
Parameters

Description

Typical size

300 x 200 x 150

Average compressive strength at 28

50-110 kg/cm2

days.
Mix proportion

1:12-14 (1 part of cement: 12:14 part


sum graded aggregate)

Water absorption in 24 hours

Less than 10% by weight

34

3.3 : Results presentation.


3.3.1: Strength and density.
The result from laboratory test show that the crushing strength and the density of Ruliba
bricks are respectively equivalent to 2.21kg/m2 , and 1276.37 kg/m3.While
the compressive strength of concrete blocks varies from 50 to 110 kg/m2. Those
parameters recorded after 28 day of manufacture, depends on method of manufacture, the
quality and mix proportion of raw materials. Then, the compressive strength of blocks
made by block-making machine is greater than that of man- made blocks.
3.3.2: Cost.
All most costs of bricks from Ruliba are not affordable by every one in this country. But
are reasonable depending on raw materials used, modern technology used and the esthetic
aspect presented by those products.
All costs of Ruliba bricks fixed according to their Functions, sizes and mass are tabulated

250 x 175 x 190

250 x 175 x 95

250 x 120 x 95

260 x 125 x 68

210 x 100 x 63

210 x 50 x 63

210 x 100 x 63

Bricks unit cost

49,503

45,222

46,544

40,837

40,782

34,744

46,020

56,640

46,256

Trans. Unit cost

8,436

6,864

7,068

6,180

6,600

6,062

8,400

8,400

12,000

Mortar unit cost

19,478

19,478

19,478

19,478

19,478

19,478

19,478

19,478

19,478

Labor unit cost

40,239

40,040

40,239

36,429

36,000

34,640

33,600

33,600

33,600

Total unit cost

117,656

111,604

113,329

102,924

102,860

94,924

107,498

118,118

111,334

400 x175 x 120

400 x 175 x 95

Sizes (mm)

below:

Table 3.8: Total unit cost of masonry for various sizes of bricks.

35
The cost of concrete block is influenced by which of its constituents and the production
cost. For a ratio of 1:14, one bag of cement is used to produce 36 blocks with sizes 400 x
200 x 200mm.Also, for sand, one trip of five tones costs 35,000rwf. The production cost
is 40rwf per block. (man-made block.). For that, total cost of concrete block is about
500rwf.

3.3.3: Availability.
Ruliba bricks are available at Ruliba factory(B.R.R) situates at Nyabarongo bridge in
Nyarugenge District in Kigali city Province. They are obtained in abundance in different
form , function and sizes.
Concrete blocks are easily available, because they can be produced on work site. The
advantage of producing blocks on site is to avoid the transport cost, to control the quality
of raw materials, to organize the proportion mix process and to save money.
Some peoples produce blocks and sell them at 500-700rwf per block but, the mix
proportion of raw materials is critical because they want to gain more profit.

3.3.4: Materials used.


The clay and shale are the basic raw materials used in Ruliba bricks making. The use of
fuel has replaced that of wood in order to reduce the deforestation velocity.
Raw materials for producing concrete blocks are cement, sand and aggregate with ratio of
1:3:6. The maximum aggregate size is 10 mm. The quality of raw materials must be well
controlled in order to get final product of good properties.

36
3.3.5: Method of manufacture.
Bricks from Ruliba factory are made mechanically by using machine. Prepared plastic
clay are extracted as continuous column of rectangular section with or without
perforations which is cut into individual bricks by wire.
Continuously, those bricks are fired up to 900 - 11000 C .Below that temperature, all
components react and dissolves ones with others , forming monolithic material.
Blocks may be made by using machine or hand after mixing raw materials at required
ratio. The obtained product is cured during two weeks by sprinkling water up to it
maximum strength. Produced blocks can be solid ,cellular or hollow depending on mould
used.

3.3.6: sizes.
Ruliba bricks are available in various sizes. Each client buy the products according to his
appreciation . The bricks of greatest sizes are similar to those of blocks are commonly
used in construction of contour walls. Small bricks are used in construction of building
walls.
Products

Function

Sizes (cm)

Hollow block

Face wall

40 x 17.5 x 12

Hollow block

Face wall

40 x 17.5 x 9.5

Hollow block

Face wall

25 x 17.5 x 19

Hollow block

Face wall

25 x 17.5 x 9.5

Hollow block

Face wall

25 x 12 x 9.5

Hollow block

Face wall

26 x 12.5 x 6.8

Hollow brick

Face wall

21 x 10 x 6.3

Hollow brick

Face wall

21 x 5 x 6.3

Fire brick

Fire resistant

21 x 10 x 6.3

Table 3.9: Different sizes of Ruliba bricks.

37

Sizes are that the main difference between blocks and bricks. The fist one have great
sizes while the second one have small sizes. so that, common sizes of blocks are 400 x
200 x 200mm; 400 x 200 x 175mm; 400 x 200 x 150mm; 300 x 200 x 150mm etc.

3.3.7 : Center of market.


The center of market is Kigali city, because of reasonable distance from Ruliba. It is not
easy to get market in others provinces or district for reason of high transport cost. In
addition, most richest people and companies live in Kigali town.
Concrete blocks are popular because of its cheapness and resistance. In addition, it
manufacturing process not requires high technology and more instruments. Even if the
binder like cement is cheap, their cost is affordable comparatively to other structural
materials.

38

CHAPTER IV . 4.0 : DISCUSSIONS.


4.1: Cost comparison.
Let us to consider two structural wall of 10m length, 3m height, and 0.20 m thick
constructed respectively with Ruliba bricks and concrete blocks.
The abstracts of estimation and costing of those walls are presented bellow.
4.1:Abstract of estimation and costing of typical wall made in Ruliba bricks.
SN Items of work

Units

Quantities

Rate

Total cost (rwf)

m3

108,916

653,496

m2

60

4000

240,000

m2

60

2,500

150,000

Bricks work
with cement
mortar

Jointing outside
and inside

Varnishing
Total

1,043,496

Table 4.2:Abstract of estimating and costing of typical wall made in concrete blocks.
SN Items of work
1

Units

Quantities

Rates(rwf)

Total cost(rwf)

45,738

274,428

with m2

60

4,000

240,000

m2

60

2,500

150,000

Blocks work with m3


cement mortar

Plastering
cement mortar

Painting
Total

664,428

39
As seen in above tables, only three items are considered in each case. It is observed that
the total cost of wall made with concrete blocks is lower than that which is constructed in
Ruliba bricks.

4.2:Compressive strength comparison.


Brick/Block

Sizes in mm.

Compressive

Density(kg/m3)

Strength(kg/cm2)
Concrete block
Bricks

300x200x150

from 260x125x68

50-110

2250

22.1

1276.37

Ruliba
Table 4.3:Size, compressive strength, density of concrete blocks and bricks from Ruliba
factory.
General comparison of concrete blocks with Bricks from Ruliba.
Concrete blocks

Bricks from Ruliba

High Compressive strength

Low compressive strength

Less cost

High cost

Can be produced on site

Are produced on factory

Has not good appearance

Has good appearance

Are most available

Are only available on factory

Are require plastering

Not requires the plastering

Are not require jointing

It requires jointing

The manufacturing process is not The manufacturing process is


complicated

complicated.

Less variability of sizes

Most variable of sizes.

Machine and hand made products

Machine-made products

Are not burned

Are burned

Their density is high

Their density is low

40

CHAPTER V. 5.0 : CONCLUSION AND RECOMMENDATIONS.


5.1 : Conclusion.
According to results obtained and the discussion made, it is shown that the Concrete
blocks should be preferable before bricks from Ruliba because of it durability and it low
cost. But, in point of view architectural aspect, the bricks from Ruliba are dominant
because of it good looking when is used in construction of wall. That is due to their
regular corners and joint when Portland cement mortar is used in jointing.
The unit cost of wall made with Bricks is greatest due to its transport cost, method of
manufacture and it availability. The time required to built the structural wall with each of
both materials is different. In addition, it is not easy to use Ruliba bricks for people who
lives away of Kigali city and its surrounding in reason of transport price.
For that case, most people prefer to use concrete blocks in their construction project.
Also, the concrete blocks are most used in internal and external wall where the plaster is
required. As environmental sector, the problem are similar for both materials when the
engines used produce gas waste which is very dangerous to the atmosphere.
As conclusion, the results of this project show that concrete blocks are compressive
resistant, less expensive but less esthetic comparatively to Ruliba bricks. So that, it is
advantageous to use concrete blocks fist of Ruliba bricks.

5.2 : Recommendations.
After the completion of this project, the recommendations given are follow:

The concrete blocks should be adopted in construction of buildings fist to Ruliba


bricks because of they durability as well as they cheapness.

The price of Ruliba bricks should be minimized as possible in order to facilitate


the population to construct the esthetic building with low cost .

The mix proportion of Ruliba bricks should be controlled in order to improve they
qualities.

41

REFERENCES.
A. Books.
1.Arnold W. Handry (2003) Structural Masonry Addison Wesley longmen
limited , England.
2. E. Paul Degarmo, JT.Black and Ronarld A. KOHSER (1997) Materials and
processes in manufacturing, New delhi.
3. Ivor H. Seely, (1992) Building technology, customer services department,
mac millan Distribution Ltd. England.
4. Prof. BN Dutta, Estimating and costing in civil Engineering UBS
Distributors Pvt Ltd.
5. Tata Mc (2003) Civil Engineering materials, Graw- hill publishing company
Limited, New-delhi.

B. Web sites:
http://www. Google.com
http:// www.scoland.gov.uk

42

APPENDICES.
The information below, was given by one of mason of B. L HARBET RWANDA
Limited. The Structural materials used are Reinforced concrete, modern bricks and
blocks.
Statement of calculation of monthly salary for mason.
Enterprise : B.L HARBERT RWANDA Limited
Works : Construction of New American Embassy
Site: KACYIRU
Rate to pay 560rwf/hour
Pay type

FRW Rate

Hours worked

RT Basic

560

152.00

85,120

Over time 1.5

840

83

69,720

Over time 1.7

952

47

44,744

Double Time

1,120

22

24,640

Gross to pay

224,224Frw

PAYE

Per Tax table

51267.2

NSSF

3% of Gross Pay

6726.72

FARG

1% of basic

Net to pay

851.20
165,378.88Frw

Total

DECLARATION.

I, ZIRIMWABAGABO Lodomir, declare that the project entitled COMPARISON


BETWEEN CONCRETE BROCKS AND BRICKS FROM RULIBA is my own work.
It has never been presented any where in Institute or University for the same purpose.

ZIRIMWABAGABO Lodomir

ii

Dedication.
To:
My God;
My family;
All who have contributed to this work.

iii

ACKNOWLEDGEMENT.
The author is grateful to all who contributed to the successfulness of the
present study, in particular way thanks goes to Mr. KAYINAMURA Francis
who provided guidance to the present research work.
Special thanks go to KIST Staff and students for their immeasurable
technical assistance and their availability to assist in application of class
theories and practices.
I m grateful to the staff of Ruliba factory who provided me with useful data
that made this study possible. The bless of God for all who gave a helping
hand to the successful completion of the present work.

iv

ABSTRACT.

The current technology involves the construction of building with update


materials require low cost and stability. Given that, some one who
desires to construct a building, the common question to be asked for is how
to get cheap and esthetic building materials.
Raw materials for manufacturing concrete blocks are expensive. For
instance, on one bag of local Portland cement costs 13.000rwf .On the other
hand, cutting trees for firing clay bricks leads to deforestation which affects
our environment.
The bed rock of this project is to take out the confusion during the choice of
sustainable building materials, the best objective in building design, as well
as to show how it is possible to build up the buildings using materials which
may resist against natural actions.
Main assumption of this project, are the selection of structure materials,
require low cost and durability; the ability to withstand against the
expensiveness of raw material and the design for environment.
In order to make excellent comparison, different techniques were employed.
Information about topic from libraries, website field visit of Ruliba factory
BRR was tracked down. The crushing strength test was conducted in order
to check the resistance of Ruliba bricks. In addition, the cost of two typical
walls constructed in materials under comparison was estimated.

TABLE OF CONTENTS.
Certificate
Declaration..i
Dedication...ii
Acknowledgement.iii
Abstract......iv
Table of contents........................................................v
List of tables..vi
List of symbols and abbreviations .vii
Appendices
CHAPTER I .
1.0 : Introduction

... ... ... ... ... ... ..1

1.1 : Statement of problem...1


1.2 : Objectives of study

... ..............................................................1

1.3 : Justification......2
1.4 : Scope of study..3
CHAPTER II .
2.0 : Literature review......................................4
2.1: Varieties of bricks and blocks

..4

2.1.1 : Clay bricks....4


2.1.2 : Calcium silicate bricks .....6
2.2 :Bricks forming process....6
2.2.1 : Manufacture process.6
2.2.2 : Firing.6
2.3 : Technical specification of bricks.....7
2.3.1 : Strength of bricks .....7
2.3.2 : Test for compressive strength .....8
2.3.3 : Compressive strength and other mechanical properties...8
2.3.4 : Factors affecting compressive strength...................................9

vi
2.3.5 : Size of bricks ..................................9
2.4 : Concrete blocks features..........10
2.4.1 : Concrete block technology.....10
2.4.2 : Business .....10
2.4.3 : Product ...........................................10
2.4.4 : Unique features of concrete block technology...................................11
2.4.5 : Production process .11
2.4.6 : Building with concrete ...12
2.4.7 : Perforated and hollow blocks.12
2.4.8 : Benefit of using concrete blocks.14
2.5 : concrete blocks forming process14
2.5.1 : Mix proportion of blocks ...14
2.5.2 : Blocks manufacturing 14
2.5.3 : Decorative and ventilating blocks.. ... ... 15
2.6 : Mortar for jointing.........................................................16
2.7: Cost in structural materials.18
2.7.1 : Economy in construction ...18
2.7.2 : Unit cost .18
2.7.3 : Cost estimating 19
2.7.4 : Method of estimating .20
CHAPTER III .
3.0 : Research Methodology ..........22
3.1 : Data collection techniques.22
3.2 : Data organization for analysis...24
3.2.1 : Calculation of masonry unit cost24
3.2.2 : Data related to technical specifications..................................30

vii

3.3 : Results presentation...34


3.3.1 : strength and density34
3.3.2 : Cost.34
3.3.3 : Availability.....................................35
3.3.4 : Materials used.35
3.3.5 : Method of manufacture...36
3.3.6 : Sizes............................................36
3.3.7 : Center of market.....37
CHAPTER IV .
4.0 : Discussions ..38
4.1 : Cost comparison38
4.2 : Compressive strength comparison.........................................39
CHAPTER V.
5.0 : Conclusion and recommendations.............40
5.1 : Conclusion ...................................................40
5.2 : Recommendations..............40
References.41
Appendices

viii

LIST OF TABLES.
Table 2.1:Average compressive strength of common burnt clay bricks..7
Table 2.2: Materials required per Cubic Meter of mortar..17
Table 2.3: Mortar Required for Various Types of Walls...17
Table 3.1 : Varieties of BRR Bricks/ blocks and their relative prices...22
Table 3.2 : Unit cost of Ruliba bricks24
Table 3.3 : Unit cost of transport at 20km distance of various size of
Ruliba bricks...25
Table 3.4 : Unit labor cost of masonry for various sizes of bricks26
Table 3.5 : Unit cost comparison of Ruliba bricks wall and concrete wall...29
Table 3.6: Technical specifications of Ruliba bricks.33
Table 3.7 : Technical specifications of concrete blocks33
Table 3.8 : Total unit cost of masonry for various sizes of bricks.34
Table 3.9 : Different sizes of Ruliba bricks ..36
Table 4.1 : Abstract of estimation and costing of typical wall made in
Ruliba bricks...38
Table 4.2 : Abstract of estimating and costing of typical wall made in
concrete blocks38
Table 4.3 : Size, compressive strength, density of concrete blocks and .........39
bricks from Ruliba factory.

ix

List of symbols and abbreviations.

Abbreviations

Descriptions

units

KIST

Kigali Institute of Sciences and Technology

B.R.R

Briqueterie Rwandaise Ruliba

CEET

Civil Engineering and Environmental Technology

L1

Length of brick for sample number 1

cm

L2

Length of brick for sample number 2

cm

W1

Width of brick for sample number 1

cm

W2

Width of brick for sample number 2

cm

H1

Height of brick for sample number 1

cm

H2

Height of brick for sample number 2

cm

Number of hollows

l1

Length of hollows for

l2

Length of hollows for sample number 2

cm

w1

Width of hollows for sample number 1

cm

w2

Width of hollows for sample number 2

cm

h1

Height of hollows for sample number 1

Cm

h2

Height of hollows for sample number 2

Cm

D1

Density of brick for sample number 1

Kg/cm3

D2

Density of brick for sample number 2

Kg/cm3

sample number 1

cm

Anda mungkin juga menyukai