WestCommercialMultiModal
Corridor&MartinsPoint
SharedUsePathStudies
PublicWorkshop
June11,2015
TonightsAgenda
WelcomeandIntroductions
MeetingOverview
CompleteStreets101
W.CommercialPurpose&Need
W.CommercialIssues&Options
MartinsPointPurpose&Need
MartinsPointIssues&Options
NextSteps
Questions
Workshop
6/11/2015
ProjectSchedule
AprilMay:Fieldwork,siteanalysis
andStakeholdermeetings
June:PublicWorkshop#1
JuneAugust:Developmentand
RefinementofAlternatives
September:PublicWorkshop#2
SeptOctober:Recommendations
andCostEstimates
NovDecember:FinalReport
JuneDecember:UrbanInteractive
platform/website
Context:
MultimodalTransportation
ConnectionsandGaps
6/11/2015
CompleteStreets101
WhatareCompleteStreets?
SafeComfortableConvenient
6/11/2015
IncompleteStreetsareUnsafe
Morethan40% ofpedestriandeathsin2007and
2008occurredwherenocrosswalkwasavailable.
andInadequate
Nosidewalksorcrosswalksforwalkers
Uninvitingforbusriders
Unsafe forpeopleonbicycles
Inaccessibleforwheelchairusers
6/11/2015
CompleteStreets
inCommercial/IndustrialCorridors:
MaintainRoadwayCapacity
AccommodateTrucksandEmergencyVehicles
ImproveSafetyforAllUsers
ImproveAccessibilityforAllUsers
EncourageHealthierLifestyles
ReduceAirandWaterPollution
ReducePersonalTransportationCosts
ImproveQualityofLife
Provideamoregreen,attractivestreetscape
IndustrialCompleteStreets
Strategiestomaintain
truckaccessandimprove
walking& bicyclingsafety
Mountableaprons
Maintainsidewalkgrade
Hivisibilitycrosswalks
andmedianislands
11travellanesfor
bicycleaccess
3035mphspeedlimits
Mountableapronandraisedcrosswalk
Crosswalkmedianisland
6/11/2015
WestCommercialStreet
PurposeandNeedSummary
The purpose of the West Commercial Multi-Modal Corridor is to
recommend a configuration for the corridor that safely accommodates all
modes of transportation and accommodates current land uses and future
development projects. Changes proposed along the corridor will create
an enhanced gateway to Portlands waterfront.
Goals:
Balance truck access and staging with ped/bike safety and mobility
Serve divergent land uses and the widest number of roadway users
Create an attractive gateway to Portlands waterfront.
Needs:
Reduce high vehicle speeds
Create better defined areas for truck parking and staging
Extend the shared-use path network and provide on-road bike
accommodations
Enhanced pedestrian accessibility along and across the street
WestCommercialSt.KeyIssues
5.Sidewalks
&Crosswalks
4.Shareduse
PathAlignment
3.Onstreet
BikeLanes
1.Truckaccess
andstaging
2.Development
andParking
6/11/2015
1.TruckAccessandStaging
MaineDOT designforBeachStreetintersection
2.DevelopmentandParking
6/11/2015
2.DevelopmentandParking
Whatisthebestroadwaydesign
tosupportdevelopment?
Marine
Industrial
Zone
WestCommercialStreetcrosssection,westofStarMatchbuilding
Whatisthe
bestroadway
designto
support
development?
WestofStarMatch:
Currentconditions
Marine
Industrial Zone
Marine
Industrial Zone
6/11/2015
Whatisthe
bestroadway
designto
support
development?
Marine
Industrial Zone
WestofStarMatch:
Option1,Parkingon
BothSides,No
HarborSideSidewalk
Whatisthe
bestroadway
designto
support
development?
WestofStarMatch:
Option2,
Parking/sidewalkon
HarborSideOnly
Marine
Industrial Zone
Marine
Industrial Zone
Marine
Industrial Zone
6/11/2015
Whatisthe
bestroadway
designto
support
development?
EvaluationMatrix
example
3.OnStreetBicycleAccess
W.CommercialatStarMatch:<2015
W.CommercialatStarMatch:2016+
10
6/11/2015
3.OnStreetBicycleAccess
W.CommercialatStarMatch:<2015
W.CommercialatStarMatch:2016+
4.SharedusePathAlignment
MaineDOT
fundedpath
alignment
Potentialoff
roadpath
alignment
11
6/11/2015
4.SharedusePathAlignment
Potentialoff
roadpath
alignment
Useoftunnelforpotential
offroadalignmentoption
5.SidewalksandCrosswalks
Sidewalkonthe
approachtoBeckys
ExistingsidewalksandcrosswalkalongW.Commercial
12
6/11/2015
5.SidewalksandCrosswalks
KeyLocation:crosswalk
fromIMTtoHarborView
MemorialPark
Facingsouth
Facingwest
MartinsPointPath
PurposeandNeedSummary
The primary purpose of the Martins Point Path Study is to recommend
short and long-term options for improved non-motorized connections between
the Back Cove & East End paths with the Martins Pt. Bridge and points north.
Ultimately, the improved links will serve the transportation and recreation
needs of the East Deering neighborhood and of people throughout the City.
Goals:
Enhance the East Coast Greenway route through Portland to points north
Increase pedestrian and bicycle capacity for the route between Tukeys
Bridge and the Martins Point Bridge
Needs:
In short-term, enhance bicycle connectivity along the Veranda St. corridor
Improve pedestrian crossings at various intersections along the Veranda
Street corridor
Increase capacity on the Tukeys Bridge congested pathway
Increase safety by reducing vehicle speeds along Route 1
13
6/11/2015
MartinsPointKeyIssues
5.VerandaSt.
ShortTerm
1.EastCoast
Greenway
Connectivity
4.HCLsatI295
On/OffRamps
3.I295
RightofWay
2.PathCongestion
onTukeysBridge
1.EastCoastGreen
wayConnectivity
Martins
Point
Bridge
Back
Cove
Trail
Downtown
viathe
BaysideTrail
14
6/11/2015
2.PathCongestiononTukeys
Walkers,runnersandbicyclistscompeteforspaceonthe810path
Solution:MultipleOptions
Potentialnewshare
usepathalignment
Possibleconnection
belowbridge
15
6/11/2015
ConnectionBelowBridge
WestsideofTukeys bridgelookingsouth
PotentialNewPathAlignment
CurrentConditions
Existing
Path
16
6/11/2015
PotentialNewPathAlignment
Option1: Cantileveredpathoneastside
Existing
Path
PotentialNewPathAlignment
Option2: Useofbridgestructurefornewpath
Existing
Path
17
6/11/2015
PotentialNewPathAlignment
RecentlyattachedpathstructureontoI279bridgeinPittsburgh
PotentialNewPathAlignment
Option3: Separatestructurefornewpath
18
6/11/2015
PotentialNewPathAlignment
MinneapolisMN
DesMoinesIA
EugeneOR
3.I295ROWAlignment
19
6/11/2015
4:HCLsatI295On/OffRamps
Potentialofframplaneconversion
toshareusepathw/barrier
Potentialrealignment
ofofframp
Highspeedtrafficto
onramp
4a.I295OffRamp
Viewoftwolane,I295northboundofframptoRoute1
20
6/11/2015
4b.I295OnRamp
IntersectionofVerandaStreetandtheI295southboundonramp
5.VerandaStreetShortTerm
CurrentconditionsonVerandaStreetfacingnorthwest
21
6/11/2015
Istherealogical
shortterm
improvement
forbicyclists?
VerandaStreet:
CurrentConditions
Istherealogical
shortterm
improvement
forbicyclists?
VerandaStreet:
Option1 Enhanced
SharedLaneMarkings
22
6/11/2015
Istherealogical
shortterm
improvement
forbicyclists?
VerandaStreet:
Option2 CycleTrack
oneastside
NextSteps
Consolidationofcomments
Refinementofroutingand
alternativesdesigntreatments
PublicWorkshop#2topresent
draftrecommendations
PreferredAlternativeswithCost
Estimates
TrafficanalysisandInterchange
ModificationReport(ifneeded)
Draft/Finalreport
23
6/11/2015
Questions
Workshop
24
6/11/2015
WestCommercialMultiModal
Corridor&MartinsPoint
SharedUsePathStudies
PublicWorkshop
June11,2015
25