Anda di halaman 1dari 26

HANOI PEOPLES COMMITTEE

HANOI METROPOLITAN RAILWAY MANAGEMENT BOARD (MRB)


DAELIM INDUSTRIAL CO., LTD (DAELIM)

CONSTRUCTION DESIGN REPORT


PROJECT: HANOI PILOT LIGHT METRO LINE
Section Nhon - Hanoi Railway Station
PACKAGE: ELEVATED SECTION - LINE
PACKAGE NUMBER: HPLMLP/CP-01
PILE CAP OF PIERS FROM P151 TO P154 (NHUE RIVER CROSSING BRIDGE)

Location: Tu Liem District, Hanoi

PROJECT IMPLEMENTATION CONSULTANT: SYSTRA S.A


June, 2015

Project Reference: DLM-IMP-TRE-WVO-J04-18904-E-2A

CONSTRUCTION DESIGN REPORT


PROJECT: HANOI PILOT LIGHT METRO LINE
Section Nhon - Hanoi Railway Station
PACKAGE: ELEVATED SECTION - LINE
PACKAGE NUMBER: HPLMLP/CP-01
PILE CAP OF PIERS FROM P151 TO P154 (NHUE RIVER CROSSING BRIDGE)

Location: Tu Liem District, Hanoi

Hanoi,

HANOI METROPOLITAN
RAILWAY MANAGEMENT
BOARD (MRB)
Date of approval, Ha Noi, ../../ 2015

Doc No DLM-IMP-TRE-WVO- J04-18904-E-2A

CONTRACTOR
(DAELIM)

June 2015

PROJECT IMPLEMENTATION
CONSULTANT
(SYSTRA S.A.)

Page 2/26

Hanoi Pilot Light Metro Project

Construction design report of pile cap of piers from P151 to P154

Contractor Approval / Revision Record Sheet

Revision

Date

Subject of issue / Revision

Authors

1A

/01/2015

First issue

Nguyen Van Dien

2A

/06/2015

Second issue

Nguyen Van Dien

Revision
N:

2A

Name

Date

Prepared by

NGUYEN VAN DIEN

/06/2015

Checked by

KIM DO GYUN

/06/2015

Validated by

LEE YOUNG CHUL

/06/2015

Signature

Contractors specific comments:

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 3/26

Hanoi Pilot Light Metro Project

Construction design report of pile cap of piers from P151 to P154

Table of contents
1.

2.

3.

4.

5.

INTRODUCTION ........................................................................................................................................ 6
1.1

GENERAL ............................................................................................................................................ 6

1.2

PACKAGE CP01................................................................................................................................... 6

1.3

PURPOSE OF THE REPORT ............................................................................................................... 6

DESIGN CRITERIA.................................................................................................................................... 7
2.1

LEGAL BASIS ...................................................................................................................................... 7

2.2

APPLIED STANDARDS AND SPECIFICATIONS ............................................................................ 8

2.3

MATERIAL PROPERTIES .................................................................................................................. 8

2.3.1

Concrete ........................................................................................................................................ 8

2.3.2

Reinforcement Steel ...................................................................................................................... 8

TECHNICAL DESIGN ASSESSMENT .................................................................................................... 9


3.1

REVIEWED DOCUMENTS ................................................................................................................. 9

3.2

RELATED DOCUMENTS ................................................................................................................... 9

3.3

VERIFICATION METHODOLOGY.................................................................................................. 10

REVIEW RESULT .................................................................................................................................... 10


4.1

GENERAL REVIEW .......................................................................................................................... 10

4.2

SPECIFIC RECOMMENDATION ..................................................................................................... 10

4.2.1

Level of pile cap ........................................................................................................................... 10

4.2.2

Arrangement of earthing bar ....................................................................................................... 11

4.2.3

Change the rebar shape of intermediate pier .............................................................................. 13

CONSTRUCTION DESIGN REPORT OF PILE CAP FROM P151 TO P154 ..................................... 14


5.1

5.1.1

Topography ................................................................................................................................. 14

5.1.2

Geological ................................................................................................................................... 14

5.2

PILE CAP P151 AND P154 ................................................................................................................. 14

5.2.1

Design ......................................................................................................................................... 14

5.2.2

Comparison from technical design document ............................................................................. 17

5.3

6.

TOPOGRAPHY, GEOLOGY CONDITIONS .................................................................................... 14

PILE CAP P152 AND P153 ................................................................................................................. 18

5.3.1

Design ......................................................................................................................................... 18

5.3.2

Comparison from technical design document ............................................................................. 21

APENDIX.................................................................................................................................................... 22
6.1.1

Check cutting section of pier P151 and P154 ............................................................................. 22

6.1.2

Check cutting section of pier P152 and P153 ............................................................................. 24

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 4/26

Hanoi Pilot Light Metro Project

Construction design report of pile cap of piers from P151 to P154

Abbreviations
MRB
PIC
DLM

Hanoi Metropolitan Railway Management Board


Project Implementation Consultant (SYSTRA S.A.)
DAELIM INDUSTRIAL CO., LTD

Project References
Ref N

Ref ID number

PIC-TEC-TRE-WVO-L20-00194-E-2A

Technical design statement input data/


volume 1

PIC-TEC-TRE-WVO-L20-00195-E-4A

Technical design statement design/ volume


2

PIC-TEC-TDR-WVO-J00-29001-E-2A

Viaduct design criteria

PIC-TEC-TDR-WVO-J00-29002-E-2A

Viaduct - composition of design notes

PIC-TEC-TRE-WGO-L00-05015-E-2A

Dimensioning note drainage of viaduct,


bridges, ramps and trenches

PIC-TEC-TRE-ZDO-J04-18000-E-3A

Bearing capacity Nhue River

PIC-TEC-TRE-WSU-L00-39016-E-4A

Site specific geological, hydrogeological


and geotechnical report for pile foundation
in elevated section

PIC-TEC-TRE-ZDO-J04-18021-E-3A

Stability during construction

PIC-TEC-TDR-WGO-L00-39003-E-5A

Foundation design criteria

10

PIC-TEC-TRE-ZDO-J04-18003-E-2A

Design of intermiate pier

11

PIC-TEC-TRE-ZDO-J04-18004-E-2A

Design of end pier

12

PIC-TEC-TTS-WVO-L20-00037-E-2A.

Technical specifications

13

SET 3 - 18H

Technical design drawings of Nhue river


crossing bridge

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Ref description

Page 5/26

Hanoi Pilot Light Metro Project

1.

INTRODUCTION

1.1

GENERAL

Construction design report of pile cap of piers from P151 to P154

Hanoi Pilot light metro line project running on dedicated lines with a total length of main line
about 12.5 km, including:
+

Start point: The first station Nhon (Tu Liem) + final station Hanoi railway station located

on Tran Hung Dao (front Hanoi station) + elevated road: about 8.5 km + underground section:
about 4 km + Stations: 12 stations including 8 elevated stations (stations S1 to S8) and 4
underground stations (stations S9 to S12), which has 2 connection transit station.

1.2

Depot: Approximately 15 ha (in Minh Khai & Tay Tuu commune, Tu Liem district).

1435mm double rail track, rail / railway switch according to the European standard UIC 60

or equivalent.
Means of transport: rolling was selected as type size "medium" - type B (according to European
standards) with a width between 3.00 m 2.75m; the maximum number carriages of train is 5, a
length of about 100 meters with a capacity of 1.200 passengers, according to the developmental
stage of expected passengers from 2015 to after 2063.

PACKAGE CP01

Package CP01 Line Elevated Section is located in area of Nhon, Tu Liem district and area of
Cau Giay district, and ending at Kim Ma street of Ba Dinh district.

The work items of package CP01 include:


+

Alignment;

Typical viaduct;

Structure of slope (retaining wall);

Special bridges: Nhue River Bridge, Ring Road No. 3 Viaduct - Mai Dich Bridge, Ring

Road No.2 Viaduct - Cau Giay;


+

Cast-In-Place slab bridges: structures of transitions section, T-Shape, Viaduct access to

depot.

1.3

PURPOSE OF THE REPORT

The objective of this report is to review the technical design document and provide all the
necessary information supporting the construction drawing design of pile cap from P151 to P154,
Section Nhon - Hanoi Railway Station, Package No. HPLMLP/CP-01under the HANOI PILOT
LIGHT METRO LINE PROJECT. See more detail on drawing ref. no. DLM-IMP-TRE-WVO-J0418270-B-2A;

This report includes review of drawings, calculation sheets of pile cap from P151 to P154;

Recommendation for items which, have not been mentioned or insufficient in technical design
calculation sheets and drawings;

Construction design reports shall include all the necessaries calculations and studies needed for the
construction, Technical design review, and all the necessaries calculations and studies (at the discretion
of the Engineer) needed for the integration of the data provided by the other Designated Contractors.

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 6/26

Hanoi Pilot Light Metro Project

Construction design report of pile cap of piers from P151 to P154

Other necessary documents to form sufficient basis for establishment of construction design
drawings would be included in Construction design reports, such as:
+
+
+
+

Design criteria.
Detailed proposal, modifications.
Detailed case studies.
Computer modeling input, output.

Implementation description of Construction design for pile cap from P151 to P154.

Construction design reports is prepared by the Contractor and will be checked, reviewed, and
verified internally before submitted to Engineer and Employer for approval.

142000
65000

4200 1157

1229 4200

10900

2445

9x3000=27000

2000

4950 50
650
2300
300

2500

3500

2500

4500

2431

4200

9348

3200
6678

4200

4500

VERTICAL CURVE R2500


U ? NG CONG ? NG R2500

1000
1000

2000
4600

38500
9x3000=27000

3500

7997
1500

1400 1400
1800

2000

1400 1400
1800

1500

9x3000=27000

3200

4500

2000

4500

1800

9x3000=27000

2300
322

2000

7363

38500
50 4950
650

10900

Figure 2. General view of Nhue River Bridge

2. DESIGN CRITERIA
2.1

LEGAL BASIS
Construction Law No. 50/2014/QH13 dated 01/07/2014 of the National Assembly of Socialist
Republic of Vietnam 13th;

Decree No. 12/2009/ND-CP dated 12/02/2009 of Government on the management of investment


projects in construction. Decree No. 83/2009/ND-CP dated 15/10/2009 of the Government amending
and supplementing some articles of Decree No. 12/2009/ND-CP;

Decree No. 15/2013/ND-CP dated 15/04/2013 of Government on the management of construction


quality.

Circular No. 10/2013/TT-BXD dated 25/7/2013 of the Ministry of Construction about Management of
construction quality.

Decision No. 54 / QD-MB Hanoi dated 20/7/2012 on the approval of the technical design of the
Elevated section - Line (Package 1) - Hanoi Pilot Light Metro Line Project, section Nhon to Hanoi
railway station;

Contract No. 4/2014/H-TCXD date 11/04/2014 the construction of the package CP01 Line Elevated section under Hanoi Pilot Light Metro Line Project, section Nhon to Hanoi railway station.

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 7/26

Hanoi Pilot Light Metro Project

2.2

Construction design report of pile cap of piers from P151 to P154

APPLIED STANDARDS AND SPECIFICATIONS


Some primary standards are used for the design as follows:
+

Bridge Design standards 22TCN 272-05;

Earthquake resistant design Standard for construction TCXDVN 375-2006;

ASSHTO LRFD Edition 2007: America Association of State Highway and Transportation

Officials, for geotechnical design.

2.3

MATERIAL PROPERTIES

2.3.1

Concrete

Concrete grades given in the following table were adopted in the construction design stage.
Table 1. Concrete grade
Grade (fc)

E (short term)

Cylinder Strength

Modulus of Elasticity

Superstructures

45 N/mm

34 kN/mm

Pads and mortar for bearings

60 N/mm

38 KN/mm

Pier caps, Pier shaft

35 N/mm

31 kN/mm

Pile Caps

35 N/mm

31 kN/mm

Lean concre

15 N/mm

18.2 kN/mm

Piles

30 N/mm

29 kN/mm

Structural Element

Poissons ratio = 0.18.

Shear modulus of concrete, G, is calculated using the following equation: G = Ec/2(1 + )

Thermal expansion coefficient: 1.08x10-5oC-1

Creep and shrinkage coefficients are referred from Article 5.4.2.3.1 of 22TCN 272-05.

The humidity ratio in Hanoi area is taken as 80% according to 22TCN 272-05.

2.3.2

Reinforcement Steel

The specified yield strength of the steel reinforcement is fy = 420MPa (grade 60 reinforcement).

The modulus of elasticity of passive reinforcement Es is taken as 200,000 MPa (from Article
5.4.3.2 of 22TCN 272-05).

Diameters of rebar can be used are: 6mm, 8mm, 10mm, 12mm, 14mm, 16mm, 18mm, 20mm,
22mm, 25mm, 28mm, 32mm, 36mm, 40mm.

Maximum length of bars can be used is 11.70m.

Unit weight of reinforcement steel is 78.5kN/m3.

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 8/26

Hanoi Pilot Light Metro Project

Construction design report of pile cap of piers from P151 to P154

3. TECHNICAL DESIGN ASSESSMENT


3.1

REVIEWED DOCUMENTS
Technical design drawing - Nhue River Crossing Substructures P151-P154-Conc out (ref. no.
PIC-TEC-GDO-WVO-J04-18100-B-2A);

Technical design drawing - Nhue River Crossing P152-P153 Concrete out (ref. no. PIC-TECGDO-WVO-J04-18101-B-3A);

Technical design drawing - Nhue River Crossing Pile caps P151-P154 - Reinf Plan view
(ref. no. PIC-TEC-GRR-WVO-J04-18130-B-3A; PIC-TEC-GRR-WVO-J04-18131-B-3A);

Technical design drawing - Nhue River Crossing Pier - P151 - Reinf (ref. no.. PIC-TEC-GRRWVO-J04-18210-B-3A;

PIC-TEC-GRR-WVO-J04-18211-B-3A;

PIC-TEC-GRR-WVO-J04-

18212-B-3A);

Technical design drawing - Nhue River Crossing Pier - P154 - Reinf (ref. No. PIC-TEC-GRRWVO-J04-18240-B-3A;

PIC-TEC-GRR-WVO-J04-18241-B-3A;

PIC-TEC-GRR-WVO-J04-

18242-B-3A);

Technical design drawing - Nhue River Crossing Pile caps P152-P153 - Reinf Plan view
(ref. no. PIC-TEC-GRR-WVO-J04-18140-B-3A; PIC-TEC-GRR-WVO-J04-18141-B-3A);

Technical design drawing - Nhue River Crossing Pier-Pier cap P152- Reinf (ref. no. PIC-TECGRR-WVO-J04-18220-B-3A; PIC-TEC-GRR-WVO-J04-18221-B-3A; PIC-TEC-GRR-WVOJ04-18222-B-3A; PIC-TEC-GRR-WVO-J04-18223-B-3A; PIC-TEC-GRR-WVO-J04-18224-B3A);

Technical design drawing - Nhue River Crossing Pier-Pier cap P153- Reinf (ref. no. PICTEC-GRR-WVO-J04-18230-B-3A;
WVO-J04-18232-B-3A;

PIC-TEC-GRR-WVO-J04-18231-B-3A;

PIC-TEC-GRR-WVO-J04-18233-B-3A;

PIC-TEC-GRR-

PIC-TEC-GRR-WVO-J04-

18234-B-3A);

Technical design report Nhue River Crossing Pile cap calculation note (ref. no. PIC-TECTRE-ZDO-J04-18002-E-2A).

3.2

RELATED DOCUMENTS
Technical design report List of standards for CP01 technical design (ref. no. PIC-TEC-TREWOO-L20-00198-E-3A);

Technical design report Foundation design criteria (ref. no. PIC-TEC-TDR-WGO-L00-39003-E5A);

Technical design report Site specific geological, hydrogeological and geotechnical report for pile
foundation design (ref. no. PIC-TEC-TRE-WSU-L00-39016-E-4A);

Technical design drawing General notes Viaducts bar bending schedule (ref. no. PIC-TECGAD-WVO-L00-11003-B-2A).

Technical design drawing - Nhue River Crossing Piles P151-P154 - Reinf (ref. no. PIC-TECGRR-WVO-J04-18110-B-3A);

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 9/26

Hanoi Pilot Light Metro Project

Construction design report of pile cap of piers from P151 to P154

Technical design drawing - Nhue River Crossing Piles P152-P153 - Reinf (ref. no. PIC-TECGRR-WVO-J04-18113-B-3A);

3.3

VERIFICATION METHODOLOGY
For technical design calculation reports:
+

Review input data: geometric dimensions, material properties and geological data;

Reviewed the conformity of the formulas, calculation steps and calculation results with

requirements of approved Standards;

For technical design drawings:


+

Review the conformity between technical design drawings and technical design calculation

reports;
+

Review the conformity between technical design drawings and approved Standards;

Review the conformity between technical design drawings design and quantity table.

4. REVIEW RESULT
4.1

GENERAL REVIEW
General assessments for package CP01 was mentioned in following reports:
+

Report Technical design assessment report for project Alignment ref.no DLM-IMP-TRE-

WVO-J00-35200-E.
+

Report Assessment report for foundation structure ref.no DLM-IMP-TRE-WVO-J00-

00003-E
+

Report Technical design assessment report for drainage ref.no DLM-IMP-TRE-WVO-

L20-33200-E.
+

Report Assessment Report for Superstructure and Pier Structure ref.no DLM-IMP-TRE-

WVO-J00-00017-E.

In this report, DLM review designing of pile cap from P151 to P154, level of top and bottom of
pile cap, earthing system.

In Technical design calculation reports of pile cap from P151 to P154, geometric dimensions are
in accordance with drawing. Input data and formulas have complied with the requirements of List
of Standards for CP-01 technical design.

DLM accept pile cap of pier from P151 to P154, related drawings and all documents indicated in
basic of review, except items indicated in 4.2. Specific recommendation.

4.2
4.2.1

SPECIFIC RECOMMENDATION
Level of pile cap
Detail of pile cap level that proposed by DLM update from latest topography survey data

are mentioned in drawings ref. no. DLM-IMP-TRE-WVO-J04-18260-B-3B (Shop drawing of


General view of Nhue river crossing bridge) and Refer. to section 4.2.1 of construction report of
General view of Nhue river crossing bridge (Ref. No. DLM-IMP-TRE-WVO-J04-18902-E/V-3B).
Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 10/26

Hanoi Pilot Light Metro Project

4.2.2

Construction design report of pile cap of piers from P151 to P154

Arrangement of earthing bar

a) Transition pier (Using main rebars as earthing bars):


For Pier P151 and P154, the earthing bar is not shown in drawings of pile cap in technical
design. The Contractor proposes to use 04 main bars of each pile cap as earthing bar. These
rebars will be connected together by welding with connection bar D18. The earthing system of
pile cap will connect with earthing bar of bored piles and pier shaft by welded with connection
bar D18. The connection bars D18 can be adjusted locally to match with actual position of
earthing system of bored piles and pier shaft.

4600
2200

1200

4600

1900
1350

4600

1350

1200

100

50 50

100

50 50

4600

0
R5

50

50

100
50

50 50

100

50
R

50
50

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

10
0
50

50 50

50 50

0
R5

Page 11/26

Hanoi Pilot Light Metro Project

Construction design report of pile cap of piers from P151 to P154

b) Intermediate pier:

Pile cap P152 and P153 used earthing bars D18 connect to preset earthing bar in bored pile. There
are preset earthing bar of pier shaft. The earthing bars of bored pile, pile cap and pier shaft connect
by weld joint. The earthing bar of pile cap connect to copper plate by clamp. And the copper plate
connect to copper rods by copper wire.

Arrange the earthing bar in pile cap:

1265

150

50

300

10

18

10

100

50

40

80

50

115

20

28

18

40

16

45

40

87

10

280

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

10

Page 12/26

Hanoi Pilot Light Metro Project

4.2.3

Construction design report of pile cap of piers from P151 to P154

Change the rebar shape of intermediate pier

At the bottom rebar of pier shaft, there are bars B07-D32 and B08-D32 connect with rebar of pier
shaft by lapping lenth 1920mm. In this location, the bending length of bar B17-D12, B18-D12,
B19-D12 is not enough. DLM proposes changing the bending shape of these rebars as well as

2000

98

159

11x135=1485

159

98

names for bars B17b-D12, B17b*-D12, B18b-D12, B19b-D12.

103

17x135=2295

103

2500

Bending shape in technical design

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

71

72

4
R2

32 24

71

72

4
R2

72

Change the bending shape of bars B17-D12, B18-D12, B19-D12:


72

Bending shape in construction design

Page 13/26

Hanoi Pilot Light Metro Project

Construction design report of pile cap of piers from P151 to P154

5. CONSTRUCTION DESIGN REPORT OF PILE CAP FROM P151 TO P154


5.1

TOPOGRAPHY, GEOLOGY CONDITIONS

5.1.1

Topography

In the technical design stage, the topography survey was carried out, but it was a significantly
long time ago from the technical design to the construction design stage, many the terrain conditions
and relevant projects in the project corridor significantly changed. So that, in the construction design
stage, the Contractor has surveyed terrain to update the new terrian conditions and relevant projects in
the corridor of alignment. In this document, DLM has updated the latest topography survey as Ref.
No. DLM-IMP-TRE-WAO-J00-00002-E/V.
5.1.2

Geological

In the technical design stage, the Geological survey was carried out, only carried out on some
typical at some certain pier but not all typical pier of Metro line. So that, in the construction design
stage, the Contractor has surveyed to update the new geological survey data at some pier of Metro
line. In this document, DLM has updated base on the additional soil investigation report as Ref. No.
DLM-IMP-TRE-ZCO-J00-00001-E/V.

5.2

PILE CAP P151 AND P154

5.2.1

Design

Pile cap P151 and P154 are square-section pier shaft, cast-in-placed reinforcement concrete structure,
dimensions: Width x Long x Thickness = 4.6x4.6x1.5m. Typical pile cap are based on bored pile with
1.0m in diameter.

Concrete cover for pile caps is 75 mm (especially at bottom side, cover concrete is 150 mm following comments no. 3 in document no. PIC-IMP-TCM-WVO-J02-01068-E-1A issued by PIC
for designing typical pile cap the concrete cover at bottom is 150mm,);

Connection between bored pile and pile cap:


3x300=900

250

175

138

F04-D18

18

18 75

F08-D18

F08-D18

F03A-D18
75

3x300=900

F03C-D18

32 32

F02-D32

F01-D32

212

150 32 32

F02-D32

250

F01-D32

F01-D32

8x150=1200

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

150

Page 14/26

Hanoi Pilot Light Metro Project

Construction design report of pile cap of piers from P151 to P154

15cm above the top of bored pile will be embedded into pile cap;

Six layers of stirrup upper cut-off level which are arranged in steps 75mm, shall be installed after
treatment of pile head. Detail of these bars see in drawing of bored pile No. DLM-IMP-TREWVO-J04-18210-B-3A.

The length of main rebar of bored pile embedded in pile cap are listed in the following table:
Pile cap
name

P151 &
P154

Pile cap
thickness

Embedded
pile head

Main
rebar

Embedded
length

mm

mm

mm

mm

1500

150

D25

1200

The distance from the top


of pile rebar
To bottom To top of pile
of pile cap
cap
mm
mm
1350

150

Connection between pile cap and pier shaft:


250

3x300=900

237

280

300

280

300

4600
316

300

280

237

3x300=900

250

175

1500

3x300=900
230

250

1500

120

300

175

150

8x150=1200

237

266

300

280

237

8x150=1200

150

4600

Pile cap and pier shaft shall be constructed at different times and connected to each other

by construction joints. Following of the construction procedure of the contractor, construction


joints between pile cap and pier shaft is higher than the top of pile cap 100mm.
+

17 layers of stirrup of pier shaft that be installed with rebar of pile cap are arranged @

70mm (Some stirrup are modified locally on vertical direction in order to avoid conflict with
the rebars of top pile cap).
+

There is a drainage pipe passing through from pier shaft, some preset bar of pier shaft must
be cut near location of drainage pipe (bar S1C). Alternate bars will be provide with enough

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 15/26

Hanoi Pilot Light Metro Project

Construction design report of pile cap of piers from P151 to P154

development length in pier shaft (bar S1B). Detail of cutting bars and alternate bars see in
drawing DLM-IMP-GRR-WVO-J04-18283-B; DLM-IMP-GRR-WVO-J04-18323-B.
+

Main rebar and stirrup bars of pier shaft embedded in pile cap shall be installed with rebar of
pile cap. See more detail of these rebars on drawing DLM-IMP-GRR-WVO-J04-18281-B;
DLM-IMP-GRR-WVO-J04-18282-B; DLM-IMP-GRR-WVO-J04-18321-B; DLM-IMPGRR-WVO-J04-18322-B.

DLM has checked the cutting section (detail calculation refer to appendix):

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 16/26

Hanoi Pilot Light Metro Project

5.2.2

Construction design report of pile cap of piers from P151 to P154

Comparison from technical design document

In the construction design, the Contractor has incorporated some recommendations of the
Contractor and instruction of Engineer as compared with the Technical design as introduced in
detailed previously in this report.

In construction design stage, construction design drawings of pile cap has been designed following
additional items for construction method purpose:
+

Rebar at bottom of pile cap are moved up toward top of pile cap direction in order to avoid

conflict with the head of pile;


+

The length of stirrup bars are modified to conform to new position of rebars at bottom of

pile cap.
+

Rebars at top of pile cap are modified locally position on plan in order to avoid conflict

with the main longitudinal rebars of pier shaft. See more detail of modifying rebars at top of
pile cap in drawing ref. No. DLM-IMP-GRR-WVO-J04-18276-B; DLM-IMP-GRR-WVOJ04-18316-B.
+

Rebars at bottom of pile cap are modified locally position on with rebar at top of pile cap

and side of pile cap to become reinforced frame. See more detail of modifying rebars at
bottom of pile cap in drawing ref. No. DLM-IMP-GRR-WVO-J04-18275-B; DLM-IMPGRR-WVO-J04-18315-B.
+

Depend on actual bars of bored pile, rebars at bottom of pile cap are shall adjusted locally

to match with actual position of main rebars of bored piles.


+

Stirrup of pier shaft on pile cap area are modified locally on vertical direction in order to
avoid conflict with the rebars of pile cap. Detail of these bars see in drawing No. DLMIMP-GRR-WVO-J04-18277-B; DLM-IMP-GRR-WVO-J04-18317-B.

The Contractor proposes to use 04 main bars of pile cap for earthing continuity. See more
detail of earthing bar on drawing ref. No. DLM-IMP-GRR-WVO-J04-18279-B; DLM-IMPGRR-WVO-J04-18319-B.

The anchorage length of main rebars (at top and bottom of pile cap): proposes to choose

following anchorage-longitudinal reinforcement (with D32: 384mm if bend 900 and 192mm if
bend 450) on table anchorage-longitudinal reinforcement table of drawing PIC-TEC-GADWVO-L00-11003-B-2A General notes - Viaducts - Bar bending schedule and drawing
DLM-IMP-GAD-WVO-J04-18272-B Pile cap - General note.
+

The development length of stirrup rebars (at side surface of pile cap): proposes to choose

following development length of reinforcement (720mm with D18) on table tension


development length/ overlapping table of drawing PIC-TEC-GAD-WVO-L00-11003-B-2A
General notes - Viaducts - Bar bending schedule and drawing DLM-IMP-GAD-WVO-J0418272-B Pile cap - General note.
+

Quantity comparison table between technical design and construction design drawing will

be attached in construction design drawing;

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 17/26

Hanoi Pilot Light Metro Project

5.3

Construction design report of pile cap of piers from P151 to P154

PILE CAP P152 AND P153

5.3.1 Design
Pile cap P152 and P153 are rectangle-section, cast-in-placed reinforcement concrete structure,
dimensions: Width x Long x Thickness = 7.4x10.9x3.5m. Typical pile cap are based on bored pile
with 1.5m diameter.

Concrete cover for pile caps is 75 mm (especially at bottom side, cover concrete is 150 mm following comments no. 3 in comment sheet no. PIC-IMP-TCM-WVO-J02-01068-E-1A issued by
PIC for designing typical pile cap the concrete cover at bottom is 150mm);

Connection between bored pile and pile cap:


@300
F10a-D32

275
F08a-D18
120

25 75
32

F09-D25

F05a-D18
F06-D16

9x300=2700

F07-D18

3500

F04a-D18

32 32
32 32

F11-D32

150

F02-D32

230

F03-D32

200

250

75

F01-D32
@150

100

175

15cm above the top of bored pile will be embedded into pile cap;

Six layers of stirrup upper cut-off level which are arranged in steps 75mm, shall be installed after
treatment of pile head. Detail of these bars see in drawing of bored pile No. DLM-IMP-TREWVO-J04-18210-B-3A.

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 18/26

Hanoi Pilot Light Metro Project

Construction design report of pile cap of piers from P151 to P154

The

length of main rebar of bored pile embedded in pile cap are listed in the following table:
The distance from the top
Pile cap
of pile rebar
Embedded
Main
Embedded
Pile cap
thickpile head
rebar
length
name
To bottom To top of pile
ness
of pile cap
cap
mm
mm
mm
mm
mm
mm
P152 &
P153

3500

150

D32

2850

3000

500

Connection between pile cap and pier shaft:


7400
340

270 290 300 290 270

340

8x300=2400

250

17x150=2550

175

9x300=2700
175

17x150=2550

200 150 135 210 135 150 200


100 155 130 130 155 100
7400

Pile cap and pier shaft shall be constructed at different times and connected to each other

by construction joints. Following of the construction procedure of the contractor, construction


joints between pile cap and pier shaft distance 100mm from top pile cap.
+

Main longitudinal rebars of pier shaft (B01-D32, B04-D32) are put on rebars F02-D32 at

bottom of pile cap;


+

Main longitudinal rebars of pier shaft (B03-D32, B04-D32) are put on rebars F11-D32 at

bottom of pile cap;


+

3500

248
250
164

9x300=2700
248
250
164

3500

138

8x300=2400

138

250

32 layers of stirrup of pier shaft are installed with rebar of pile cap are in step @100mm.

+ At

pier P152, There is a drainage pipe passing through from pier shaft, some preset bar of

pier shaft must be cut near location of drainage pipe (bar B04b-D32 and B04b*-D32).
Alternate bars will be provide with enough development length in pier shaft (bar B04c-D32
and B04c*-D32). Detail of cutting bars and alternate bars see in drawing DLM-IMP-GRRWVO-J04-18295-B;

DLM-IMP-GRR-WVO-J04-18296-B;

DLM-IMP-GRR-WVO-J04-

18297-B.

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 19/26

Hanoi Pilot Light Metro Project


+

Construction design report of pile cap of piers from P151 to P154

Main rebar and stirrup bars of pier shaft embedded in pile cap shall be installed with rebar of
pile cap. See more detail of these rebars on drawing No. DLM-IMP-GRR-WVO-J04-18296B; DLM-IMP-GRR-WVO-J04-18309-B.

DLM has checked the cutting section (detail calculation refer to appendix):

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 20/26

Hanoi Pilot Light Metro Project

5.3.2

Construction design report of pile cap of piers from P151 to P154

Comparison from technical design document

In the construction design, the Contractor has incorporated some recommendations of the
Contractor and instruction of Engineer as compared with the Technical design as introduced in
detailed previously in this report.

In construction design stage, construction design drawings of pile cap has been designed following
additional items for construction method purpose:
+

Rebar at bottom of pile cap are moved up toward top of pile cap direction in order to avoid

conflict with the head of pile;


+

The length of stirrup bars are modified to conform to new position of rebars at bottom of

pile cap.
+

Rebars at top of pile cap are modified locally position on plan in order to avoid conflict

with the main longitudinal rebars of pier shaft. See more detail of modifying rebars at top of
pile cap in drawing ref. No. DLM-IMP-GRR-WVO-J04-18290-B; DLM-IMP-GRR-WVOJ04-18304-B.
+

Rebars at bottom of pile cap are modified locally position on plan to avoid preset bars of

pier shaft and together rebar at top of pile cap; side of pile cap to become reinforced frame.
See more detail of modifying rebars at bottom of pile cap in drawing ref. No. DLM-IMPGRR-WVO-J04-18289-B; DLM-IMP-GRR-WVO-J04-18303-B.
+

Depend on actual bars of bored pile, rebars at bottom of pile cap are shall adjusted locally

to match with actual position of main rebars of bored piles.


+

Stirrup of pier shaft on pile cap area are modified locally on vertical direction in order to

avoid conflict with the rebars of pile cap.


+

The anchorage length of main rebars (at top and bottom of pile cap): proposes to choose

following anchorage-longitudinal reinforcement (with D32: 384mm if bend 900 and 192mm if
bend 450) on table anchorage-longitudinal reinforcement table of drawing PIC-TEC-GADWVO-L00-11003-B-2A General notes - Viaducts - Bar bending schedule and drawing
DLM-IMP-GAD-WVO-J04-18272-B Pile cap - General note.
+

The devolopment length of stirrup rebars (at side surface of pile cap): proposes to choose

following development length of reinforcement (720mm with D18) on table tension


development length/ overlapping table of drawing PIC-TEC-GAD-WVO-L00-11003-B-2A
General notes - Viaducts - Bar bending schedule and drawing DLM-IMP-GAD-WVO-J0418272-B Pile cap - General note.
+

In area of bar B07-D32; B08-D32, the stirrup bars B17-D12; B18-D12; B19-D12 must be

change bending shape.


+

Quantity comparison table between technical design and construction design drawing will

be attached in construction design drawing;


Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 21/26

Hanoi Pilot Light Metro Project

Construction design report of pile cap of piers from P151 to P154

6. APENDIX
6.1.1

Check cutting section of pier P151 and P154

General Information:
====================
File Name: D \01. Nhon - Ga HN\01. Nhue Bridge Crossing\02. Substructure\01. Pile cap\PC col P151; P154\P151-P154.col
Project: Kiem toan lai than tru
Column: P151; P154
Engineer: ......
Code: ACI 318-02
Units: Metric
Run Option: Investigation
Run Axis: Y-axis

Slenderness: Not considered


Column Type: Structural

Material Properties:
====================
f'c = 35 MPa
fy = 400 MPa
Ec = 27805.6 MPa
Es = 199955 MPa
Ultimate strain = 0.003 mm/mm
Beta1 = 0.796192

No.

Section:
========
Exterior Points
X (mm) Y (mm) No. X (mm) Y (mm) No. X (mm) Y (mm)
----- ---------- ---------- ----- ---------- ---------- ----- ---------- ---------1
0
900
2
-61
898
3
-183
881
4
-301
848
5
-414
799
6
-519
735
7
-614
658
8
-698
568
9
-769
468
10
-825
359 11
-867
240 12
-892
123
13
-900
0 14
-892
-123 15
-867
-243
16
-825
-359 17
-769
-468 18
-698
-568
19
-614
-658 20
-519
-735 21
-414
-799
22
-301
-848 23
-183
-881 24
-61
-898
25
0
-900 26
61
-898 27
183
-881
28
301
-848 29
414
-799 30
519
-735
31
614
-658 32
698
-568 33
769
-468
34
825
-359 35
867
-240 36
892
-123
37
900
0 38
892
123 39
867
243
40
825
359 41
769
468 42
698
568
43
614
658 44
519
735 45
414
799
46
301
848 47
183
881 48
61
898
Gross section area, Ag = 2.53704e+006 mm^2
Ix = 5.12311e+011 mm^4
Iy = 5.12104e+011 mm^4
Xo = 5.71483e-005 mm
Yo = -9.03359e-006 mm
Reinforcement:

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 22/26

Hanoi Pilot Light Metro Project

Construction design report of pile cap of piers from P151 to P154

==============
Rebar Database: ASTM A615
Size Diam (mm) Area (mm^2) Size Diam (mm) Area (mm^2) Size Diam (mm) Area (mm^2)
---- --------- ----------- ---- --------- ----------- ---- --------- ----------# 3
10
71 # 4
13
129 # 5
16
200
# 6
19
284 # 7
22
387 # 8
25
510
# 9
29
645 # 10
32
819 # 11
36
1006
# 14
43
1452 # 18
57
2581
Confinement: Tied; #3 ties with #10 bars, #4 with larger bars.
phi(a) = 0.8, phi(b) = 0.9, phi(c) = 0.65

05/22/15 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION 11:36:35 Licensed to: Britec
P151-P154

Page 3

Pattern: Irregular
Total steel area, As = 37800 mm^2 at 1.49%
Area mm^2 X (mm) Y (mm) Area mm^2 X (mm) Y (mm) Area mm^2 X (mm) Y (mm)
--------- -------- -------- --------- -------- -------- --------- -------- -------804 -784 -220
804 -806 -111
804 -806
111
804
747 -324
804 -273 -767
804 -556 -595
804 -374 -723
804 -469 -665
804 -631 -514
804 -695 -423
804 -166 -797
804
-56 -812
804
56 -812
804
166 -797
804 556 -595
804
469 -665
804
374 -723
804
273 -767
804
631 -514
804
695 -423
804 -273
767
804 -814
0
804 -747 -324
804 -785
218
804 -747
324
804 -695 423
804 -556
595
804 -631
514
804 -469 665
804 -374
723
804
747 324
804
695
423
804 784 -220
804
802 -141
804
802
141
804 784
220
804 -166
797
804
-56
812
804
56 812
804
166 797
804
469
665
804 556
595
804
631 514
804
374
723
804 273
767
804
796 -172
804
796
172
Factored Loads and Moments with Corresponding Capacities: (see user's manual for notation)
=========================================================
Pu
Muy
fMny
No.
kN
kN-m
kN-m fMn/Mu
--- ------------ ------------ ------------ -------1
6052.0
6678.0 12850.2 1.924
*** Program completed as requested! ***
Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 23/26

Hanoi Pilot Light Metro Project

6.1.2

Construction design report of pile cap of piers from P151 to P154

Check cutting section of pier P152 and P153

General Information:
====================
File Name: D \01. Nhon - Ga HN\01. Nhue Bridge Crossing\02. Substructure\01. Pile cap\PC col P152\P152-P153.col
Project: Kiem toan lai than tru
Column: P152-p153
Engineer: ......
Code: ACI 318-02
Units: Metric
Run Option: Investigation
Run Axis: Y-axis

Slenderness: Not considered


Column Type: Structural

Material Properties:
====================
f'c = 35 MPa
fy = 400 MPa
Ec = 27805.6 MPa
Es = 199955 MPa
Ultimate strain = 0.003 mm/mm
Beta1 = 0.796192

No.

Section:
========
Exterior Points
X (mm) Y (mm) No. X (mm) Y (mm) No. X (mm) Y (mm)
----- ---------- ---------- ----- ---------- ---------- ----- ---------- ---------1
-1150
1000
2 -1221
971
3
-1250
900
4
-1250
-900
5
-1221
-971
6
-1150
-1000
7
1150 -1000
8
1221
-971
9
1250
-900
10
1250
900 11
1221
971 12
1150
1000
Gross section area, Ag = 4.98828e+006 mm^2
Ix = 1.65556e+012 mm^4
Iy = 2.58662e+012 mm^4
Xo = -2.84576e-006 mm
Yo = 0.00101119 mm

Reinforcement:
==============
Rebar Database: ASTM A615
Size Diam (mm) Area (mm^2) Size Diam (mm) Area (mm^2) Size Diam (mm) Area (mm^2)
---- --------- ----------- ---- --------- ----------- ---- --------- ----------# 3
10
71 # 4
13
129 # 5
16
200
# 6
19
284 # 7
22
387 # 8
25
510
# 9
29
645 # 10
32
819 # 11
36
1006
# 14
43
1452 # 18
57
2581
Confinement: Tied; #3 ties with #10 bars, #4 with larger bars.
phi(a) = 0.8, phi(b) = 0.9, phi(c) = 0.65
Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 24/26

Hanoi Pilot Light Metro Project

Construction design report of pile cap of piers from P151 to P154

Pattern: Irregular
Total steel area, As = 61123 mm^2 at 1.23%
Area mm^2 X (mm) Y (mm) Area mm^2 X (mm) Y (mm) Area mm^2 X (mm) Y (mm)
--------- -------- -------- --------- -------- -------- --------- -------- -------491 -473 -914
491 -608 -914
491 -743 -914
491 -878 -914
491 1013 -914
491
878 -914
491
743 -914
491
608 -914
491
473 -914
491
338 -914
491
203 -914
491
68 -914
491
-68 -914
491 -1148 902
491 -1013
882
491 -203
882
491 -357 890
491 -473
882
491 -608
882
491 -743 882
491 -893
886
491
896 888
491
743
882
491 608
882
491
473 882
491
359
890
491 203
882
491
68 882
491
-58
884
491 1148
902
491 -1013
914
491 -203 914
491 -338
914
491 -473
914
491 -608 914
491 -743
914
491 -878
914
491 1013 914
491
878
914
491
743 914
491
608
914
491 473
914

05/22/15 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION 11:10:21 Licensed to: Britec
P152-P153
491
338
491
-68
491 1132
491 -1134
491 1132
491 1164
491 -1130
491 1132
491 1132
491 1164
491 1164
491 1132
491 1164
491 1164
491 -1132
491 -1164
491 -1164
491 -1132
491 -1132

914
914
405
80
270
-270
874
608
-337
-607
-202
338
608
203
-472
-742
-337
743
338

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

491
491
491
254
491
491
491
491
491
491
491
491
491
491
491
491
491
491
491

203
914
1132 -405
1164 405
-7 -921
1164 270
1130 -875
1134 873
1132 -742
1132 -202
1164 -472
1132 743
1132 203
1164 473
-1132 -742
-1132 -337
-1164 -607
-1164 -202
-1140 632
-1139 223

491
491
491
491
491
491
491
491
491
491
491
491
491
491
491
491
491
491
491

68
1164
-1140
999
1132
-1133
1132
1132
1164
1164
1132
1164
1164
-1140
-1139
-1164
-1164
-1132
-1164

Page 3

914
-405
-89
885
-270
-873
-607
-472
-742
-337
473
743
338
-632
-222
-472
-67
473
743
Page 25/26

Hanoi Pilot Light Metro Project

491
491
491
491
491
491
491
491

Construction design report of pile cap of piers from P151 to P154

-1164
608
491 -1164 473
491 -1164
-1164
203
491 -1164
68
491 -1148
-1013 -882
491 -203 -882
491 -338
-473 -882
491 -608 -882
491 -743
-878 -882
491 1013 -882
491
878
743 -882
491
608 -882
491
473
338 -882
491
203 -882
491
68
-68 -882
491 1148 -902
491 -1013
491 -203 -914
491 -338 -914

338
-902
-882
-882
-882
-882
-882
-914

Factored Loads and Moments with Corresponding Capacities: (see user's manual for notation)
=========================================================
Pu
Muy
fMny
No.
kN
kN-m
kN-m fMn/Mu
--- ------------ ------------ ------------ -------1
17258.0
25052.0 39783.9 1.588
*** Program completed as requested! ***

Doc N DLM-IMP-TRE-WVO- J04-18904-E-2A

Page 26/26

Anda mungkin juga menyukai