Anda di halaman 1dari 51

DESIGN OF CIRCULAR WATER TANK (Rigid joint)

Nameof work:1

Tank capacity

154

K ltr

Depth of water

4.30

mtr

4300

mm

Free board

0.30

300

mm

Conrete

cbc

20
7

fy

415

154000 ltr

unit weight 25000 N/m3


m 13.3

N/mm2

Tensile stress

115

N/mm2

mm

Effective Cover

40

mm

12

mm

110

mm c/c

upto 25% height

12

mm

260

mm c/c

upto 50% height

12

mm

310

mm c/c

upto 75% height

12

mm

350

mm c/c

upto 100% height

12

mm

420

mm c/c

mm

200

mm c/c

Steel

Nominal Cover

35

Reinforcement
Vertivcal
Hoops Ring

Floor

(both direction)

179

7000
12 mm Ring
420 mm c/c

179

100%
1.08 m

12 mmBars
220 mm c/c
12 mm Ring
350 mm c/c

75%
1.08 m

4300
12 mm Ring
310 mm c/c

50%
0.65 m

12 mm Bars
110 mm c/c
12 mm Ring
260 mm c/c

1.50 m

8 mm Ring
200 mm c/c
8 mm Ring
200 mm c/c
179
75

DESIGN OF CIRCULAR WATER TANK (Rigid joint)


Nameof work:Tank capacity
Depth of water
Free board
Conrete
Steel

0
154 K ltr
4.30 m
0.30 m
M
fy
cbc

Nominal cover

20
415 N/mm2
7 N/mm2
35 mm

154000 mm
4300 mm
300
mm
Tensile stess

=
m=
Effective cover =

1 Design Constants:- For HYSD Bars

st
cbc
k=

115
7
m*c

m*c+st
j=1-k/3
1
R=1/2xc x j x k
0.5

Cocrete M =

N/mm2

m 13.3
13.3
13.3 x

0.447

0.851

154

4.00

0.447

0.851

x 0.447 =

1.332

If D is the inside diameter of tank, we have =

2 Dimention of tank:-

from which D

20

wt. of concrete = 25000 N/mm2

N/mm2
=

115 N/mm2
13.3
40 mm

Effective depth of tank =


x D2
x 4.00 =
4

7.00

Provide a diameter of

115

m
=

7.00

say

4.30 - 0.30 =
154000
x
1000
7.00

4.00 m
1000

1000

cm

179

3 Determination of bending moment and hoop tension:= 3H+5 =


3
x 4.30 +
5
H2
= 4.30
x
4.30
=
15
h
= H/3 = 4.30
DT
7.00
x 0.179
The height above base, upto which cantilever action will be there is given by
H/3 or
D
Maximum ring tension at this level, per meter height = w (H-h)
where w
2
7.00
pressure at h/3 = 9800 x ( 4.30 - 1.4333 )x
= 98326.7
N
2
Maximum prerssure at bottom =
wH
= 9800 x 4.30 = 42140
N
1
1.433
x 42140 x 1.433 x
maximum cantilever B.M. =
Mf =
2
3
Thickness of wall from empirical formula

= 17.9
/

= 1.433

mm
m

1 m which ever is heigher

9800

N/m2

= 14429 N-m/m

4 Design of setion for cantilever action:if d is the effective thickness of tank wall,
Mf
14429
x
1000
D=
=
= 104.00 mm
1000 R
x
1000
1.33
= 104 +
35 =
139 =
say
140 mm
Total thickness =d +cover
However, provide a minimum thickness equal to the greater of following;
(I) 150mm (II) 30H+ 50 =
179 mm
30
x 4.30 +
50 =
179 Hence provide T=
144 mm
Providing
35 mm cover to the center of reinforcement,
availble d =
Mf
14429
x 1000
Ast =
Area of steel for cantilever bending is given by=
=
= 1024 mm2
st . J .d
115 x 0.851 x
144
3.14xdia2
3.14 x 12 x 12
using 12 mm bars
A
=
=
= 113 mm2
4 x100
4 x 100
Spacing of hoop Bars = 1000 x
113 / 1024 =
110
say
= 110 mm
Hence Provided 12 mm bar, @
110 mm c/c upto height of
1.50 m from base
Above this height, curtail half bars and continue the other half upto top. Let us test this for devlopment length

pk_nandwana@yahoo.co.in

12
115
st
x
=
431
mm say
0.43
m
4
0.8
=
4. tbd
x
1.50 m height above the base. These vertical bars are to be
Hence half bars may be curtailed at
25 mm
provided inner face . Keep a clear cover of =
Ld

5 Design of section for hoops action;


Maximum hoops tension

area of ring, Ash =


98327
/
115 =

98327

855

at

1.43 m above the base

mm
Let us provide rings atboth faseHence of area of ring in each face=
427.5 mm2
2
3.14xdia
3.14 x 12 x 12
using 12 mm bars
A
=
=
= 113 mm2
4 x100
4 x 100
Spacing of hoop Bars = 1000 x
113 / 428 =
264
say
= 260 mm
Hence Provided 12 mm bar, @ 260 mm c/c upto height of
1.50 m from base
and above this, the spacing may be increased
1000 x 113
mm2
Actual , Ast
=
2
x
=
870
260
98327
=
ct
0.363
<
1.2 N/mm2
260 +(
13.3 1 )x
870 =
1000
x
Hoop tension at
9800 x
2.15 x
7.00 /
2.00 =
73745
N
2.15 m below top =
2

area of ring, Ash =


73745
/
641 mm
115 =
2

Let us provide rings atboth faseHence of area of ring in each face=


3.14xdia2
using 12 mm bars
A
=
=
4 x100
Spacing of hoop Bars = 1000 x
113 / 321 =
Hence Provided 12 mm bar, @ 350 mm c/c upto height of
0.3
At the top, minimum Ash
=
x 1000 x 179 =
100
Spacing of hoop Bars
=
1000 x
113 / 269 =

mm2
321
3.14 x 12 x 12
= 113
4 x 100
352
say
= 350 mm
2.15 m from base
537

421

mm2

mm2

268.5

say

420 mm c/c

0.277

6 Distribution reinforcement:Percentage area of distribution reinforcement is

0.30

0.10

179
450

100
100

0.277
x
1000 x
179 = 496.6 area of steel in each face = 248 mm2
100
However , no additional reinforcement will be provided at inner face since the vertical steel for cantilever action
will serve this purpose. Hence provided Ast=
248.3 mm2 in vertical direction at the outer face.
3.14xdia2
3.14 x
8
x 8
using 8 mm bars
A
=
=
= 50 mm2
4 x100
4 x 100
Spacing of hoop Bars = 1000 x
50 / 248 =
202
say
= 200 mm
Hence Provided these 8 mm bar, @200 mm c/c

Ash

7 Provision for haunches:It is customary to provide150 mmx150mm haunchesat the junction of wall and base.
A haunches reinforcement of 8 mm @
200 mm c/c may be provided.
8 Design of tank floor.:Since the tank floor is resting on ground throughout , provide a minimum thickness of 150 mm
0.30
Minimum Ast
mm2 in each direction
=
x
150 x 1000
=
450
100
Provide half the reinfocement near each face, Ast
=
225 mm2
2
3.14xdia
3.14 x
8
x 8
using 8 mm bars
A
=
=
= 50 mm2
4 x100
4 x 100
Spacing of hoop Bars = 1000 x
50
/ 225 =
223
say
= 200 mm
However provide 8 mm bars @ 200 mm c/c in both direction , at top and bottom of floor slab.
The floor slab will rest on
75 mm thick layer of lean concrete covered with a layer of tar felt.
9 Detail of reinforcement :-

The detail shown in drawing.

DESIGN OF CIRCULAR WATER TANK (Rigid joint)


Nameof work:- 0

179

7000
100%
12 mm Ring
420 mm c/c

1.08 m

12 mmBars
220 mm c/c

75%

12 mm Ring
350 mm c/c

179

1.08 m

50%
12 mm Ring
310 mm c/c

0.65 m

12 mm Bars
110 mm c/c
12 mm Ring
260 mm c/c

4300

1.50 m

8 mm Ring
200 mm c/c
8 mm Ring
200 mm c/c
150
75

pk_nandwana@yahoo.co.in

VALUES OF DESIGN CONSTANTS


Grade of concrete
Modular Ratio

M-15
18.67

M-20
13.33

M-25
10.98

M-30
9.33

M-35
8.11

M-40
7.18

cbc N/mm2
m cbc

8.5

10

11.5

13

(a) st =
140
N/mm2
(Fe 250)
(b) st =
190
N/mm2
(c ) st =
230
N/mm2
(Fe 415)
(d) st =
275
N/mm2
(Fe 500)

Grade of concrete
bd (N / mm2

93.33

93.33

93.33

93.33

93.33

93.33

kc

0.4

0.4

0.4

0.4

0.4

0.4

jc

0.867

0.867

0.867

0.867

0.867

0.867

Rc

0.867

1.214

1.474

1.734

1.994

2.254

Pc (%)

0.714

1.214

1.429

1.643

1.857

Grade of
concrete

kc

0.329

0.329

0.329

0.329

0.329

0.329

M 15

jc

0.89

0.89

0.89

0.89

0.89

M 20

Rc

0.89
0.732

1.025

1.244

1.464

1.684

1.903

M 25

Pc (%)

0.433

0.606

0.736

0.866

0.997

1.127

M 30

kc

0.289

0.289

0.289

0.289

0.289

0.289

M 35

jc

0.904

0.904

0.904

0.904

0.904

0.904

M 40

Rc

0.653

0.914

1.11

1.306

1.502

1.698

M 45

Pc (%)

0.314

0.44

0.534

0.628

0.722

0.816

M 50

kc

0.253

0.253

0.253

0.253

0.253

0.253

jc

0.916

0.916

0.916

0.914

0.916

0.916

Rc

0.579

0.811

0.985

1.159

1.332

1.506

Pc (%)

0.23

0.322

0.391

0.46

0.53

0.599

Permissible shear stress Table v in concrete (IS : 456-2000)


100As
bd
< 0.15
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00 and above

M-15
0.18
0.22
0.29
0.34
0.37
0.40
0.42
0.44
0.44
0.44
0.44
0.44
0.44

Permissible shear stress in concrete


M-20
M-25
M-30
0.18
0.19
0.2
0.22
0.23
0.23
0.30
0.31
0.31
0.35
0.36
0.37
0.39
0.40
0.41
0.42
0.44
0.45
0.45
0.46
0.48
0.47
0.49
0.50
0.49
0.51
0.53
0.51
0.53
0.55
0.51
0.55
0.57
0.51
0.56
0.58
0.51
0.57
0.6

tv N/mm2
M-35
0.2
0.23
0.31
0.37
0.42
0.45
0.49
0.52
0.54
0.56
0.58
0.60
0.62

Perm
M-40
0.2
0.23
0.32
0.38
0.42
0.46
0.49
0.52
0.55
0.57
0.60
0.62
0.63

Maximum shear stress c.max in concrete (IS : 456-2000)


Grade of concrete

c.max

M-15
1.6

M-20
1.8

M-25
1.9

M-30
2.2

M-35
2.3

M-40
2.5

Grade of
concrete
M
M
M
M
M
M
M
M
M

10
15
20
25
30
35
40
45
50

Shear stress tc
100As
M-20
bd
0.15
0.18
0.16
0.18
0.17
0.18
0.18
0.19
0.19
0.19
0.2
0.19
0.21
0.2
0.22
0.2
0.23
0.2
0.24
0.21
0.25
0.21
0.26
0.21
0.27
0.22
0.28
0.22
0.29
0.22
0.3
0.23
0.31
0.23
0.32
0.24
0.33
0.24
0.34
0.24
0.35
0.25
0.36
0.25
0.37
0.25
0.38
0.26
0.39
0.26
0.4
0.26
0.41
0.27
0.42
0.27
0.43
0.27
0.44
0.28
0.45
0.28
0.46
0.28
0.47
0.29
0.48
0.29
0.49
0.29
0.5
0.30
0.51
0.30
0.52
0.30
0.53
0.30
0.54
0.30
0.55
0.31
0.56
0.31
0.57
0.31
0.58
0.31
0.59
0.31

Reiforcement %
100As
M-20
bd
0.18
0.15
0.19
0.18
0.2
0.21
0.21
0.24
0.22
0.27
0.23
0.3
0.24
0.32
0.25
0.35
0.26
0.38
0.27
0.41
0.28
0.44
0.29
0.47
0.30
0.5
0.31
0.55
0.32
0.6
0.33
0.65
0.34
0.7
0.35
0.75
0.36
0.82
0.37
0.88
0.38
0.94
0.39
1.00
0.4
1.08
0.41
1.16
0.42
1.25
0.43
1.33
0.44
1.41
0.45
1.50
0.46
1.63
0.46
1.64
0.47
1.75
0.48
1.88
0.49
2.00
0.50
2.13
0.51
2.25

0.6
0.61
0.62
0.63
0.64
0.65
0.66
0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1.00
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
1.09

0.32
0.32
0.32
0.32
0.32
0.33
0.33
0.33
0.33
0.33
0.34
0.34
0.34
0.34
0.34
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.36
0.36
0.36
0.36
0.36
0.36
0.37
0.37
0.37
0.37
0.37
0.37
0.38
0.38
0.38
0.38
0.38
0.38
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.4
0.4

1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
1.38
1.39
1.40
1.41
1.42
1.43
1.44
1.45
1.46
1.47
1.48
1.49
1.50
1.51
1.52
1.53
1.54
1.55
1.56
1.57
1.58
1.59

0.4
0.4
0.4
0.4
0.4
0.4
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

1.60
1.61
1.62
1.63
1.64
1.65
1.66
1.67
1.68
1.69
1.70
1.71
1.72
1.73
1.74
1.75
1.76
1.77
1.78
1.79
1.80
1.81
1.82
1.83
1.84
1.85
1.86
1.87
1.88
1.89
1.90
1.91
1.92
1.93
1.94
1.95
1.96
1.97
1.98
1.99
2.00
2.01
2.02
2.03
2.04
2.05
2.06
2.07
2.08
2.09

0.45
0.45
0.45
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49

2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28
2.29
2.30
2.31
2.32
2.33
2.34
2.35
2.36
2.37
2.38
2.39
2.40
2.41
2.42
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.50
2.51
2.52
2.53
2.54
2.55
2.56
2.57
2.58
2.59

0.49
0.49
0.49
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

2.60
2.61
2.62
2.63
2.64
2.65
2.66
2.67
2.68
2.69
2.70
2.71
2.72
2.73
2.74
2.75
2.76
2.77
2.78
2.79
2.80
2.81
2.82
2.83
2.84
2.85
2.86
2.87
2.88
2.89
2.90
2.91
2.92
2.93
2.94
2.95
2.96
2.97
2.98
2.99
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09

0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

3.10
3.11
3.12
3.13
3.14
3.15

0.51
0.51
0.51
0.51
0.51
0.51

Permissible Bond stress Table bd in concrete (IS : 456-2000)


M-10
--

M-15
0.6

M-20
0.8

M-25
0.9

M-30
1

M-35
1.1

M-40
1.2

M-45
1.3

M-50
1.4

Development Length in tension


bd

H.Y.S.D. Bars
(N / mm2)
kd = Ld

0.6

58

0.96

60

0.8

44

1.28

45

0.9

39

1.44

40

35

1.6

36

1.1

32

1.76

33

1.2

29

1.92

30

1.3

27

2.08

28

1.4

25

2.24

26

2.0

Modification factore

bd

Plain M.S. Bars


(N / mm2)
kd = Ld

Permissible stress in concrete (IS : 456-2000)


Permission stress in compression (N/mm2) Permissible stress in bond (Average) for
plain bars in tention (N/mm2)
Bending cbc
Direct (cc)
(N/mm2)
3.0
5.0
7.0
8.5
10.0
11.5
13.0
14.5
16.0

Kg/m
300
500
700
850
1000
1150
1300
1450
1600

(N/mm2)
2.5
4.0
5.0
6.0
8.0
9.0
10.0
11.0
12.0

Kg/m
250
400
500
600
800
900
1000
1100
1200

(N/mm2)
-0.6
0.8
0.9
1.0
1.1
1.2
1.3
1.4

in kg/m
-60
80
90
100
110
120
130
140

1.4
1.2
0.8
0.4

0.0

0.4
0.8
Percentage of tension reinforcement

1.2

1.6

2.4

2.8

VALUES OF DESIGN CONSTANTS


Grade of concrete
Modular Ratio

M-15
18.67

M-20
13.33

M-25
10.98

M-30
9.33

M-35
8.11

M-40
7.18

cbc N/mm2
m cbc

8.5

10

11.5

13

(a) st =
140
N/mm2
(Fe 250)
(b) st =
190
N/mm2
(c ) st =
230
N/mm2
(Fe 415)
(d) st =
275
N/mm2
(Fe 500)

Grade of concrete
bd (N / mm2)

93.33

93.33

93.33

93.33

93.33

93.33

kc

0.4

0.4

0.4

0.4

0.4

0.4

jc

0.867

0.867

0.867

0.867

0.867

0.867

Rc

0.867

1.214

1.474

1.734

1.994

2.254

Pc (%)

0.714

1.214

1.429

1.643

1.857

Grade of
concrete

kc

0.329

0.329

0.329

0.329

0.329

0.329

M 15

jc

0.89

0.89

0.89

0.89

0.89

M 20

Rc

0.89
0.732

1.025

1.244

1.464

1.684

1.903

M 25

Pc (%)

0.433

0.606

0.736

0.866

0.997

1.127

M 30

kc

0.289

0.289

0.289

0.289

0.289

0.289

M 35

jc

0.904

0.904

0.904

0.904

0.904

0.904

M 40

Rc

0.653

0.914

1.11

1.306

1.502

1.698

M 45

Pc (%)

0.314

0.44

0.534

0.628

0.722

0.816

M 50

kc

0.253

0.253

0.253

0.253

0.253

0.253

jc

0.916

0.916

0.916

0.914

0.916

0.916

Rc

0.579

0.811

0.985

1.159

1.332

1.506

Pc (%)

0.23

0.322

0.391

0.46

0.53

0.599

Permissible shear stress Table v in concrete (IS : 456-2000)


100As
bd
< 0.15
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00 and above

M-15
0.18
0.22
0.29
0.34
0.37
0.40
0.42
0.44
0.44
0.44
0.44
0.44
0.44

Permissible shear stress in concrete


M-20
M-25
M-30
0.18
0.19
0.2
0.22
0.23
0.23
0.30
0.31
0.31
0.35
0.36
0.37
0.39
0.40
0.41
0.42
0.44
0.45
0.45
0.46
0.48
0.47
0.49
0.50
0.49
0.51
0.53
0.51
0.53
0.55
0.51
0.55
0.57
0.51
0.56
0.58
0.51
0.57
0.6

tv N/mm2
M-35
0.2
0.23
0.31
0.37
0.42
0.45
0.49
0.52
0.54
0.56
0.58
0.60
0.62

Permis
M-40
0.2
0.23
0.32
0.38
0.42
0.46
0.49
0.52
0.55
0.57
0.60
0.62
0.63

Grade of
concrete
M
M
M
M
M
M
M
M
M

10
15
20
25
30
35
40
45
50

Maximum shear stress c.max in concrete (IS : 456-2000)


Grade of concrete

c.max

Shear stress tc

M-15
1.6

M-20
1.8

Reiforcement %

M-25
1.9

M-30
2.2

M-35
2.3

Permissible d
M-40
2.5

Grade of concrete

ct.max

100As
bd
0.15
0.16
0.17
0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.3
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.5
0.51
0.52
0.53
0.54
0.55
0.56
0.57
0.58
0.59
0.6
0.61
0.62
0.63
0.64
0.65
0.66

M-20

M-20

0.18
0.18
0.18
0.19
0.19
0.19
0.2
0.2
0.2
0.21
0.21
0.21
0.22
0.22
0.22
0.23
0.23
0.24
0.24
0.24
0.25
0.25
0.25
0.26
0.26
0.26
0.27
0.27
0.27
0.28
0.28
0.28
0.29
0.29
0.29
0.30
0.30
0.30
0.30
0.30
0.31
0.31
0.31
0.31
0.31
0.32
0.32
0.32
0.32
0.32
0.33
0.33

0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.30
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.46
0.47
0.48
0.49
0.50
0.51

100As
bd
0.15
0.18
0.21
0.24
0.27
0.3
0.32
0.35
0.38
0.41
0.44
0.47
0.5
0.55
0.6
0.65
0.7
0.75
0.82
0.88
0.94
1.00
1.08
1.16
1.25
1.33
1.41
1.50
1.63
1.64
1.75
1.88
2.00
2.13
2.25

0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1.00
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
1.09
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20

0.33
0.33
0.33
0.34
0.34
0.34
0.34
0.34
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.36
0.36
0.36
0.36
0.36
0.36
0.37
0.37
0.37
0.37
0.37
0.37
0.38
0.38
0.38
0.38
0.38
0.38
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.41
0.41
0.41
0.41
0.41

1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
1.38
1.39
1.40
1.41
1.42
1.43
1.44
1.45
1.46
1.47
1.48
1.49
1.50
1.51
1.52
1.53
1.54
1.55
1.56
1.57
1.58
1.59
1.60
1.61
1.62
1.63
1.64
1.65
1.66
1.67
1.68
1.69
1.70
1.71
1.72
1.73
1.74

0.41
0.41
0.41
0.41
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46

1.75
1.76
1.77
1.78
1.79
1.80
1.81
1.82
1.83
1.84
1.85
1.86
1.87
1.88
1.89
1.90
1.91
1.92
1.93
1.94
1.95
1.96
1.97
1.98
1.99
2.00
2.01
2.02
2.03
2.04
2.05
2.06
2.07
2.08
2.09
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28

0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.51
0.51
0.51
0.51

2.29
2.30
2.31
2.32
2.33
2.34
2.35
2.36
2.37
2.38
2.39
2.40
2.41
2.42
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.50
2.51
2.52
2.53
2.54
2.55
2.56
2.57
2.58
2.59
2.60
2.61
2.62
2.63
2.64
2.65
2.66
2.67
2.68
2.69
2.70
2.71
2.72
2.73
2.74
2.75
2.76
2.77
2.78
2.79
2.80
2.81
2.82

0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

2.83
2.84
2.85
2.86
2.87
2.88
2.89
2.90
2.91
2.92
2.93
2.94
2.95
2.96
2.97
2.98
2.99
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09
3.10
3.11
3.12
3.13
3.14
3.15

0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

Permissible Bond stress Table bd in concrete (IS : 456-2000)


M-10
--

M-15
0.6

M-20
0.8

M-25
0.9

M-30
1

M-35
1.1

M-40
1.2

M-45
1.3

Development Length in tension


bd

Plain M.S. Bars


(N / mm2)
kd = Ld

H.Y.S.D. Bars
(N / mm2)
kd = Ld

bd

0.6

58

0.96

60

0.8

44

1.28

45

0.9

39

1.44

40

35

1.6

36

1.1

32

1.76

33

1.2

29

1.92

30

1.3

27

2.08

28

1.4

25

2.24

26

Permissible stress in concrete (IS : 456-2000)


Permission stress in compression (N/mm2) Permissible stress in bond (Average) for
plain bars in tention (N/mm2)
Bending cbc
Direct (cc)
(N/mm2)
3.0
5.0
7.0
8.5
10.0
11.5
13.0
14.5
16.0

Kg/m2
300
500
700
850
1000
1150
1300
1450
1600

(N/mm2)
2.5
4.0
5.0
6.0
8.0
9.0
10.0
11.0
12.0

Kg/m2
250
400
500
600
800
900
1000
1100
1200

(N/mm2)
-0.6
0.8
0.9
1.0
1.1
1.2
1.3
1.4

in kg/m2
-60
80
90
100
110
120
130
140

Permissible direct tensile stress in concrete (IS : 456-2000)


Grade of concrete

ct.max

M-10
1.2

M-15
2.0

M-20
2.8

M-25
3.2

M-30
3.6

M-35
4.0

M-40
4.4

M-50
1.4