PROJECT ORGANIZATIONAL STRUCTURE

Engr. Hospicio Pep C.


Ebarle
Project Manager

Office
Dept.

Field Dept.

Reycarte P.
Tabudlong
Dept. head

Lemar Baliber
Dept. head

Research Assistant/Support
Staff/CAD Operators

Assistant/Support St

Daniel Benson A.
Pioquinto
D'Arthagnan S.
Cagandahan
John Tyron T. Mahilum

Winpole Balibe

Randolf P. Ca

Xcyl L. Sarucam
Draggie John
Dequilna
HRE Surveying,Realty, Engineering And Consultancy
Mission Statement:
Our mission is to serve our clients with highly accurate and easy to understand surveys,
produced in an affordable and timely manner, using state of the art technology.
As a Land Surveying Firm, we seek to develop and enhance our Profession by giving
our clients the highest quality of possible services and take its responsibility to its clients
and profession seriously.
We, HRE, strive to provide services at a high level of standards. We respect our role in
the world where the changing regulations make it difficult for clients to fully do what they
want with their properties or projects.

We strive to accommodate what we feel is a very cost effective and valuable service.
That is, to provide enthusiasms, up-to-date use of technical equipment we have on a
site by site basis. Through our team of qualified field and office technicians, as well as
with our network of professional associates HRE Surveying Services, Inc. will provide
not only traditional boundary land surveying but all other location services needed to
begin the design process for architectural or engineering disciplines. We pride
ourselves in having the latest equipment information and technologies so that we may
offer the very best in service to our clients.

Vision
To offer a complete professional surveying services for clients and discussing options
for the future. We are proud of our diversity and the many projects completed to-date.
The final word about HRE is flexibility. Whether a client requires minor property line
services, boundary or full site locations, we are willing and able to work in any capacity
that is useful to our client.

GOAL
Is to provide a high standard, comprehensive quantity surveying and construction
management services.
This will be achieved by taking a forward thinking approach built on the wealth of
expertise within the organisation

Table1. Implemented Projects:


Nature and Location of
Project

Components/Activities

Client

Duration

1. AV GARCIA POWER
SYSTEMS CORP. Prop.
Ruparan River Hydro
Electric Power Generation
Facility, Brgy. Binaton and
Soong,Digos City, Davao
del Sur

a. Relocation Survey
b. Topographic Survey
c. Construction Survey

AV GARCIA
POWER
SYSTEMS
CORP.

2. BUTUAN CITY
POLYSPORTS CENTER,
Ampayon, Butuan City

a. Relocation Survey
b. Topographic Survey
c. Construction Survey

BUTUAN
CITY
POLYSPOR
TS CENTER

3. BANGKO SENTRAL NG
PILIPINAS- BUTUAN
BRANCH-Libertad, Butuan
City

a. Relocation Survey
b. Topographic Survey
c. Construction Survey

BANGKO
SENTRAL
NG
PILIPINASBUTUAN
BRANCHLibertad

4. PROPOSED EASTERN
PETROLEUM POWER
PLANT- Brgy. Agong-ong,
Buenavista, Agusan del
Norte

a. Relocation Survey
b. Topographic Survey

EASTERN
PETROLEU
M

30
Calendar
Days

5. NATIONAL GRID CORP.


OF THE PHILS.(NGCP)138 KVA BUTUAN CITYPLACER 96 KMS 269
TOWER SITES

a. Cross Section And


Profile Survey
b. Establishment of
ground controls And
Right-of-Way corridor
c. Topographic Survey

National
Grid Corp.
Of the Phils.
(NGCP)

150
Calendar
Days

30
Calendar
Days

90
Calendar
Days

150
Calendar
Days

180

6. National Grid Corp. Of the


Phils.(NGCP) 138KVA
Butuan-Placer 96
kilometers

a. Parcellary Survey

7. EASTERN PETROLEUM
300-HAS. INDUSTRIAL
ESTATE

a. Relocation Survey
b. Topographic Survey
c. Construction Survey

National
Grid Corp.
Of the Phils.
(NGCP)

EASTERN
PETROLEU
M

Calendar
Days

On-going

Methodology
A method statement outlining how Bidder will perform the key tasks described in
this RFP shall be included in the proposal. This shall contain the organizational structure
and composition of the Bidders proposed team, the rsums of the team members, the
legal entities involved, any agencies or contractors who the Bidder will utilize, and the
general location and availability of staff for the work.

Table 2. Milestone Methodology


Milestone

Activity

M-1.
Verification 1. Establishment of
the accuracy of Survey Controls.
Lidar Data with
respect to nearby
cerftified
benchmarks from
NAMRIA.

2. Locate Water
Level Gauging
Station (WLGS)

Methodology

Expected Output

a. Locating at least
four (4) certified
benchmark from
NAMRIA

a. Narrative Report

b. Creating a Control Report


Containing all
pernitent data

c. Computation And
Adjusment
Sheets

a. Staff quage
installation

a. Water Level
Measurement at
the river croos
section.

b. Control
Diagram/Map

3. Bathymetric
Survey

a. Planning
Strategic distribution of sections to be surveyed.
b. Conduct a survey according to
plan.

4. Integration of
Bathymetric survey
data and LiDAR
data

a. Integrating the
Lidar data with
Bathymetric
data

a. River Cross
sections in .dwg
and dxf indicated
with coordianates
of of a single
pionts of a cross
section including
water levels
elevation.

a. 3D Model
Compatible with
AutoCAD/Civil 3D
& Global Mapper.

Table 3. Proposed Manpower Schedule


Activity

No. of person

No. of days per


person

10

Instrument
Man, Geodetic
Engineer

3. Bathymetric
Survey

Instrument Man,
Geodetic
Engineer, Support
Staff

15

4. Integration of
Bathymetric
survey data and
LiDAR data

CAD Operator,GIS
Expert/ Geodetic
Engineer

1. Establishment of
Survey Controls.

2. Locate Water
Level Gauging
Station (WLGS)

Responsible
Person/Staff

Instrument Man,
Geodetic
Engineer, Laborer,
Encoders,