Anda di halaman 1dari 2

SAUDI ARAMCO ID/PID - 5/18/05 - REV 0 (Standards Cutoff - June 2008)

REV 3
SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Lift Station Electrical and Control Receiving, Handling,
Storage and preservation
PROJECT TITLE

SAIC-S-4006
WBS / BI / JO NUMBER

EQUIPMENT ID NUMBER(S)

EQUIPMENT DESCRIPTION

LAYOUT DRAWING NUMBER

REV. NO.

SCHEDULED INSPECTION DATE & TIME

ACTUAL INSPECTION DATE & TIME

30-Jun-08
DATE APPROVED
QR NUMBER

15-Dec-09

PLUMB

CONTRACTOR / SUBCONTRACTOR

EQPT CODE

SYSTEM ID.

PURCHASE ORDER NUMBER

PLANT NO.

EC / PMCC / MCC NO.


QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER

SAUDI ARAMCO ACTIVITY NUMBER

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

ITEM
No.

ACCEPTANCE CRITERIA

REFERENCE

Receiving

A1

Wet well liquid level sensing devices shall meet the following
requirements:
(a) The device shall be either sealed, single-pole, float sensors,
conductance-actuated electrodes, admittance probes or ultrasonic
probes.
(b) The sensing devices shall be in a stilling enclosure.

A2

The enclosure shall be of dead front construction and shall have two
doors and two compartments that are separated by a barrier. One
compartment shall house the motor starter package and the other shall
house the liquid level and alarm controls.

A3

The doors of the enclosure shall overlap to prevent them from being
opened with the pump motor disconnect devices in the "ON" position.

SAES-S-010
Para 5.3.9.4 a

A4

Motor starters shall be full voltage, nonreversing magnetic, with overload


relay protection. The heater coil rating shall be adjustable within 6% of
full load motor current.

SAES-S-010
Para 5.3.9.4 c

A5

Control transformers equipped with an integral fuse block for secondary


protection shall be provided for each starter

SAES-S-010
Para 5.3.9.4 d

A6

The pump alternator shall be a motor driven device with three separate
Single Pole Double Throw (SPDT) micro-switches that are positioned by
cams located on the shaft of the motor.

SAES-S-010
Para 5.3.9.4 e

A7

Liquid level controls shall be off/on switch devices that open and close in
response to predetermined liquid elevations and that cause the pump(s)
to start or stop.

SAES-S-010
Para 5.3.9.4 f

A8

A Double Pole Double Throw (DPDT) control circuit power switching


plug-in relay shall be provided to enable each motor disconnect device to
provide a continuous 120-volt nominal source of power to the alarm
system, to the DPDT plug-in alarm "OFF" relay, to the liquid level
controls, and to the moisture detection controls for submersible pumps

SAES-S-010
Para 5.3.9.4 g

A9

Submersible pumps shall have probes within the oil reservoir for the
purpose of detecting a leakage of the outer seal of the motor. A warning
light, a test light, and a test push button shall be provided for each motor

SAES-S-010
Para 5.3.9.4 h

Handling, Storage and Preservation

B1

Verify that approved procedures for handling, storage and preservation of


Schedule Q
Control and Electrical lists all the required inspection schedules for
Section 5, Att. IV
maintaining the quality of electrical / instrumentation components

Page 1 of 2

SAES-S-010
Para 5.3.9.2

SAES-S-010
Para 5.3.9.4 a

WORK PERMIT REQUIRED?

PASS

FAIL

N/A

RE-INSP DATE

SAUDI ARAMCO ID/PID - 5/18/05 - REV 0 (Standards Cutoff - June 2008)

REV 3
SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Lift Station Electrical and Control Receiving, Handling,
Storage and preservation

SAIC-S-4006

PROJECT TITLE

ITEM
No.

WBS / BI / JO NUMBER

ACCEPTANCE CRITERIA

REFERENCE

30-Jun-08
DATE APPROVED
QR NUMBER

15-Dec-09

PLUMB

CONTRACTOR / SUBCONTRACTOR

PASS

FAIL

N/A

RE-INSP DATE

REMARKS:

REFERENCE DOCUMENTS:
1-SAES-A-104 - Wastewater Treatment, Reuse and Disposal, May 10, 2006
2-SAES-S-010 -- Sanitary Sewers, 31 December 2002

Contractor / Third-Party
Construction Representative*

Saudi Aramco
PMT Representative

Work is Complete and Ready for Inspection:


Name, Initials and Date:

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

Name, Initials and Date:

QC Inspector

PID Representative
Performed Inspection

Work / Rework May Proceed

Name, Initials and Date:

Name, Initials and Date:

QC Supervisor

Proponent and Others


Quality Record Approved:

Name, Sign and Date:

Name, Organization,
Initials and Date:

*Person Responsible for Completion of Quality Work / Test

Y = YES

Page 2 of 2

N = NO F = FAILED

Anda mungkin juga menyukai