REV 3
SAIC NUMBER
SAIC-S-4006
WBS / BI / JO NUMBER
EQUIPMENT ID NUMBER(S)
EQUIPMENT DESCRIPTION
REV. NO.
30-Jun-08
DATE APPROVED
QR NUMBER
15-Dec-09
PLUMB
CONTRACTOR / SUBCONTRACTOR
EQPT CODE
SYSTEM ID.
PLANT NO.
MH's SPENT
TRAVEL TIME
ITEM
No.
ACCEPTANCE CRITERIA
REFERENCE
Receiving
A1
Wet well liquid level sensing devices shall meet the following
requirements:
(a) The device shall be either sealed, single-pole, float sensors,
conductance-actuated electrodes, admittance probes or ultrasonic
probes.
(b) The sensing devices shall be in a stilling enclosure.
A2
The enclosure shall be of dead front construction and shall have two
doors and two compartments that are separated by a barrier. One
compartment shall house the motor starter package and the other shall
house the liquid level and alarm controls.
A3
The doors of the enclosure shall overlap to prevent them from being
opened with the pump motor disconnect devices in the "ON" position.
SAES-S-010
Para 5.3.9.4 a
A4
SAES-S-010
Para 5.3.9.4 c
A5
SAES-S-010
Para 5.3.9.4 d
A6
The pump alternator shall be a motor driven device with three separate
Single Pole Double Throw (SPDT) micro-switches that are positioned by
cams located on the shaft of the motor.
SAES-S-010
Para 5.3.9.4 e
A7
Liquid level controls shall be off/on switch devices that open and close in
response to predetermined liquid elevations and that cause the pump(s)
to start or stop.
SAES-S-010
Para 5.3.9.4 f
A8
SAES-S-010
Para 5.3.9.4 g
A9
Submersible pumps shall have probes within the oil reservoir for the
purpose of detecting a leakage of the outer seal of the motor. A warning
light, a test light, and a test push button shall be provided for each motor
SAES-S-010
Para 5.3.9.4 h
B1
Page 1 of 2
SAES-S-010
Para 5.3.9.2
SAES-S-010
Para 5.3.9.4 a
PASS
FAIL
N/A
RE-INSP DATE
REV 3
SAIC NUMBER
SAIC-S-4006
PROJECT TITLE
ITEM
No.
WBS / BI / JO NUMBER
ACCEPTANCE CRITERIA
REFERENCE
30-Jun-08
DATE APPROVED
QR NUMBER
15-Dec-09
PLUMB
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
REMARKS:
REFERENCE DOCUMENTS:
1-SAES-A-104 - Wastewater Treatment, Reuse and Disposal, May 10, 2006
2-SAES-S-010 -- Sanitary Sewers, 31 December 2002
Contractor / Third-Party
Construction Representative*
Saudi Aramco
PMT Representative
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
QC Inspector
PID Representative
Performed Inspection
QC Supervisor
Name, Organization,
Initials and Date:
Y = YES
Page 2 of 2
N = NO F = FAILED