HERBERT M. BAUTISTA
City Mayor
Quezon City
PURPOSE
cONTENTS
Quezon City
1. What is the
Green Building
Ordinance of
2009?
This is Quezon City Ordinance No. SP1917, which was enacted and approved
by the Quezon City Government in 2009.
It requires the design, construction or
retrofitting of buildings, other structures
and movable properties to meet minimum
standards of a green infrastructure,
providing incentives thereof and for other
purposes.
2. What is a green
building?
4
GREEN BUILDING PRIMER
3. What types of
The type of buildings covered are whole
buildings are
buildings/structures classified by the National
covered by the
Building Code, as follows:
Green Building
Regulations, Part
I?
5
Quezon City
6. How can one apply The proponent goes through the following
steps:
for a Preliminary
Certificate?
1. Obtain the Green Building application
form (see Exhibit A of this primer, for
a sample) from the DBO and fill up all
details.
2. Attach to the application form,
a description of the project plan
illustrating that the operation of the
facility will function according to the
purpose expressed in the application.
3. Submit the filled-up application form
and attachments, together with the
mandatory (page 7) and elective (page
9) requirements, to the DBO, 9th Floor,
Quezon City Hall Main Building.
6
GREEN BUILDING PRIMER
7
Quezon City
8
GREEN BUILDING PRIMER
8. Are there
any optional
requirements in
the availment of
a preliminary
certificate, to
qualify the
project proponent
for a tax credit?
9
Quezon City
(Landscape)
The provision of a Plan and layout
showing landscape in open spaces, as
required by applicable laws such that
either of the following conditions is met:
landscape area covers more than 50% of
the open area or landscape area covers
20% to 50% of the open area
For documentary requirements, refer to Annex B,
item B.2.3.1 (g) of the IRR..
10
GREEN BUILDING PRIMER
11
Quezon City
12
GREEN BUILDING PRIMER
14
GREEN BUILDING PRIMER
15
Quezon City
16
17
Quezon City
18
GREEN BUILDING PRIMER
11. How is an
application for
Preliminary
Certification
processed?
19
Quezon City
20
GREEN BUILDING PRIMER
15. Can a
Preliminary
Certification
be modified or
amended, once
issued?
21
Quezon City
16. When is a Final project and after the evaluation by the Green
Certification (FC) Building Inspection Unit (GBIU) that the
project complied with the standards.
issued?
17. What
requirements
are needed to
qualify for Final
Certification?
22
GREEN BUILDING PRIMER
NOTE:
For more detailed information on the guidelines, procedures,
application forms and other relevant information of the Green
Building Regulations, please visit the Department of the
Building Official, Quezon City Government or visit the Quezon
City website: www.quezoncity.gov.ph.
23
Quezon City
EXHIBIT A
APPLICATION FORM
FOR
PRELIMINARY CERTIFICATION
FOR GREEN BUILDING
EXHIBIT B
APPLICATION FORM
FOR
PRELIMINARY CERTIFICATION
FOR GREEN BUILDING
AMENDMENT
Quezon City
ANNEX C
EXHIBIT C
APPLICATION FORM
FOR
FINAL CERTIFICATION
FOR GREEN BUILDING
RELEVANT REFERENCES
Green Building Ordinance
Ordinance No. SP-1917, series of 2009
Quezon City
28
GREEN BUILDING PRIMER
ENVIRONMENT
MANAGEMENT
DISASTER-RISK
REDUCTION
MANAGEMENT
URBAN
DEVELOPMENT
MANAGEMENT
Quezon City