PERTH, AUSTRALIA
Presented by
Serge VARAKSIN
CHAIRMAN OF T.C. Ground Improvement
Cohesive soil
Peat , clay
Granular soil
S d , fill
Sand
1 Drainage
2 Vacuum
3 Dynamic
consolidation
4 Vibroflottation
With added
materials
4D
Dynamic
i
replacement
5 Stone columns
6 CMC
7 Jet Grouting
8 Cement Mixing
=+u
Vertical drains
CONCEPT
PARAMETERS
1 Depth
2 Drainage path
3 Cohesion
4 Consolidation parameters
(oedometer, CPT)
eO, CC, CV, CR, C, t
CPT pore dissipation test
Flat drain
circular drain
5 cm , PVC
vertical drain + geotextile
Static installation of
vertical drains
Mast=
= 72 m, depth= 55 m
Mast=
= 56 m
m, depth
h= 43 m
10
If H > Hlimite
If H ,>FAILURE
Hlimite , FAILURE
11
If H > Hlimite
If H ,>FAILURE
Hlimite , FAILURE
12
If H > Hlimite
FAILURE
If H, >
Hlimite , FAILURE
13
Vacuum Depression
Vacuum Method
No limitation: High Surcharge built up in limited period
14
Vacuum Method
No limitation: High Surcharge built up in limited period
15
H
No Failure
Vacuum Method
No limitation: High Surcharge built up in limited period
16
Classical Surcharge
Vertical
Stress
Vertical
Stress
No Failure
Failure Surface
17
VACUUM (J.M.
(J M Cognon patent)
PERTH - AUSTRALIA June 2010
18
Vacuum Consolidation
CONCEPT
PARAMETERS
1
2
3
4
56
7-
8
9
10
11
Depth
Drainage path
C diti off iimpervious
Condition
i
soilil
Watertable near surface
Absence of pervious continuous layer
Cohesion
Consolidation parameters
(oedometer, CPT)
eO, CC, CV, CR, C, t,
CPT dissipation test
Theoretical depression value
Field coefficient vacuum
Reach consolidation to effective
pressure in every layer
Target approach
19
Vacuum
Surcharge
Deviato
oric
Stress
s (q)
(q)
Deviatio
on Stres
ss
p = 2/3 1
Ko = 0.5
p = 1 ; Ko = 1
Isotropic
1= 80kPa
1= 80kPa
2 = 80kPa
3 = 80kPa
2 = 40kPa
Kf (failure line)
3 = 40kPa
Active Zone
Surcharge
h < 0
Ko (h = 0)
Passive Zone
h > 0
Vacuum Consolidation
20
Vacuum installation
Vacuum installation :
21
Vacuum installation
Vacuum installation:
horizontal drains installation
high fines contents soils
Mechanical installation
22
Vacuum installation
Menard Vacuum: membrane installation
23
Vacuum installation
Menard Vacuum: pumping station
24
Before
After
Before
After
PERTH - AUSTRALIA June 2010
25
26
27
28
29
30
31
32
Temporary
p
y sheet pile
p wall in 5 month dyke
y construction in 3 y
years
Columns GCC
33
Structural areas
Fill to
t final
fi l elevation
l
ti +
calculated settlements
VACUUM
Non structural areas
VERTICAL DRAINS
Dyke
Fooding of site for
barge floatation to (+3)
NN +3,0 m
Spinkling sand
Hydraulic fill
NN +2,2 m
Horizontal
drains
dewatering
NN +3,4 m
Schlick
Mud : Cu 0,5 KN/m
GCC
Columns
Klei/Torf
Soft clay and peat
sandSand
34
Subsoil characteristics
35
37
38
39
40
41
05/12/03
21/09/03
08/07/03
24/04/03
08/02/03
25/11/02
11/09/02
28/06/02
Date
0,00
Start of Vacuum
29.11.2002
Average meas
sured settlements
-0,50
Further filling
31.01.2003
-1,00
End of V.D.
22.08.2002
Further filling
07.04.2003
-1,50
-2,00
-2,50
-3,00
A verage settlement
-3,50
Lo west settlement
M aximum settlement
-4,00
5,00
4,50
3,50
3,00
2,50
2,00
1,50
1,00
0,50
21/0
09/03
08/0
07/03
24/0
04/03
08/0
02/03
25/1
11/02
11/0
09/02
0,00
28/0
06/02
4,00
42
43
HAMBURG A380
Reclaimed area:
170 ha
Closing Dyke:
1,2
1
2 M m Sand
60,000 G.C.C.
1,200 m
New Quay:
Sand:
11 M m
Vertical drains:
30 000 000 m
30,000,000
Vacuum Consolidation: 90,000 m
44
Thank You