Existing Utility Diversion
This section describes the utilities and service systems
that could be affected by proposed construction of Mass Transit

Project, in order to minimize potential impacts on these systems


and recommends measures to mitigate significant adverse
impacts during construction.

8.1

Likely Impact of the Pink Line Mass Transit

Project to existing Utility


Construction works on Khae Rai-Min Buri roads may

require the diversion of major utility supplies as listed in Table

8.1-1 which could lead to substantial disruption. Best practice


construction methods will be used to ensure that no damage
occurs.

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-2
Chapter 8 Existing Utility Diversion

Table 8.1-1 Summary of Impacted Utility Systems Course by


Pink Line Project (Khai Rai-Min Buri)
Quantit
Utility Type
Water
supplyMainline
Electrical
Lighting Pole

Owner
MWW
A
BMA

Size
300 mm.
Lighting Pole with
double arm lamp

Unit

1,920

m.

1,725

Ea

Location
Sidewalk at station
location
Road Median
sidewalk at the

Drainage
Culvert

BMA

1,000 - 1,200 mm.

5,840

m.

station and the


period are evade
the line

Electrical Pole with


Power Supply

MEA

power cable and

430

Ea

3,600

m.

7,840

m.

13,940

m.

sidewalk

equipment
TelephoneAerial cable

TOT

TelephoneUnderground

CAT

cable
Telecommuni

CAT

9,12,16 - D4"
OFC 24C, 36C,
48C, 96C
Copper Cable 100-

cation Optic

0.65 AP(8)

fiber

Copper Cable 50,

Sidewalk at station
location
Sidewalk at station
location
Sidewalk at station
location

100, 200-0.65
JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-3
Chapter 8 Existing Utility Diversion

AP(8)

8.2

Procedure for Utility Diversion

8.2.1

General
In order to minimize utility service and environmental

disruption and traffic congestion, guidelines procedure for utility


diversion as shown on Figure 8.2-1 is recommended to follow.

This procedure includes utility data collection within the project


vicinity that proposed project could affect, site survey to identify
precise existing utility locations and development of
comprehensive plan for utility diversion.

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-4
Chapter 8 Existing Utility Diversion

Gathering Updated Data


Mass
Mass Transit
Transit Project
Project assigns
assigns utility
utility co-coordinator
co-coordinator then
then inform
inform to
to all
all relevant
relevant parties
parties concern.
concern.
The
The Contractor
Contractor assigns
assigns utility
utility co-coordinator
co-coordinator who
who responsible
responsible for
for providing
providing project
project with
with joined-up
joined-up
management
management of
of utility
utility issues.
issues.

Updated Topographic Survey/Mapping

Construction Program/Activities

Planned Utility Protects in the same area

Proposed Utility Diversion


Location of Existing Utility
Proposed Utility Diversion Location
Join Utility projects in the same area

Co-ordination Meeting

Accurate Location of all related utility and service systems


Arrangement of Cross Section for all Utility and Mass Transit Structures
Final estimates from each utility owners with asset affect by the Project
Cost sharing among utility owner and the mass transit project
Final estimates for required utility and service of Mass Transit Project

Shop Drawings For Utility


Diversion

Figure 8.2-1 Procedure for Utility Diversion


JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-5
Chapter 8 Existing Utility Diversion

8.2.2 Co-ordination for utility diversion during construction


Gathering comprehensive data of existing utility and

service systems within the proposed Pink Line Project vicinity


are conducted for information to develop preliminary design
only. Utility and service systems within project area are

dynamic changes to suit community development. Prior to

starting construction activity, updated utility and service systems


information will needed from relevant parties. Co-ordination
with utility owners is essential activity for both effective
planning and site construction works.
8.2.3 Preparation of Shop Drawings for Utility Diversion
The intelligent and foresighted management of statutory
utilities diversion and interface is one part of critical activities

during construction period. Recommended procedure for utility


diversion as shown on Figure 8.2-1 could help Mass Transit
Project effectively deal with technical issues and complex

utilities legislation throughout the project program. In order to


reduce constructional risk and ensure that project is executed

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-6
Chapter 8 Existing Utility Diversion

efficiently, shop drawing for utility diversion is needed to be


prepared and show necessary details as follow:

Existing public and project right of way.

Location of existing utility and services systems within


project vicinity.

Location of utility and services systems that needed to


be diverted either temporary or permanent diversion.

Mass Transit Alignment.

Location of joined utility and service systems that need


to be built in the same areas (if any).

8.3 Utility Diversion Programming


A well managed utility and service systems diversion
program will deliver low risk and time and cost certainty.

Developing a specific program of utility diversion that suit


project master program, is critical for project success due to
protecting project against costly delay.

Utility specific construction programs could be arranged

and prepared as follow:

1. Separated utility specific construction program for

special utility and service systems that could be done

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-7
Chapter 8 Existing Utility Diversion

without significant interrelationship to project master


program.

2. Comprehensive construction program that include


utility diversion as one of key activity that

significantly effect to a project master program.

The Pink Line Mass Transit Project needs to adopt both


aforementioned utility diversion program. A proposed

construction program including utility diversion task is


recommended for Pink Line Mass Transit Project (Khae RaiMin Buri).
8.4

Highways and Utility Relocation.


Relocation of the utility on highways due to construction

activities, the project will include the construction of new roads

to be used for the maintenance and improvement of the existing


road. The project with route overlay on the roads, mainly in the

area of responsibility of the Highways Agency. Consultants have


put together a project plan for the agency responsible for the

implementation according to the Department of Highway Survey


JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-8
Chapter 8 Existing Utility Diversion

and Design. The issue of traffic intersection is the intersection of


the following.

- Construction of a bridge across the Khae Lai junction


- Construction of a bridge across the Sanambinnam
junction- Construction of a bridge across the
Nappharatta

8.4.1 Existing condition


Consultant survey and inspection of the responsibilities

of the Department of Highways and other agencies are


following the highway.

Highway 302 (Rattanathi bat Road) in the island.


Main channel and three traffic lanes and three lanes

per direction parallel with the 12-lane highway within


80 meters wide.

Highway 306 (Tiwanon Rd) is a small island in the


middle six lanes 3 lanes per direction. Highway

within 30 feet wide, as shown in Figure 8.4-1 Area


of approximately 3.20 m wide island is currently

used as a waiting area and turn the car back into the
JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-9
Chapter 8 Existing Utility Diversion

majority. The pavement width of 3.45 meters, the


floor space utilities such as electricity, water supply
pipes and the drainage system.

Figure 8.4-1 shows the intersection of Tiwanon Rd.


Highway 304 (Jangwattana RD.) The Pak kret- Vibha
wadee RD. For a small island eight lanes 4 lanes per
direction. Highway within 40 feet wide, as shown in
Figure 8.4-2 island area of 4.60 meters wide around
the turn and the turn out for the most part. The
pavement width of 3.45 meters, the floor space

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-10
Chapter 8 Existing Utility Diversion

utilities such as electricity, water supply pipes and


the drainage system

Figure 8.4-2 shows the intersection of Jangwattana Road.


Highway 304 (Jangwattana RD.) from vibhava dee
RD. to Lak si Circle. - Four dividers. As a concrete

island in the middle eight lanes 4 lanes per direction.


Within the broad highway. 32 m, as shown in Figure
8.4.3 with 0.60 meter wide area around the sidewalk

for about 2.20 to 3.20 meters wide, for space utilities


such as electricity, water supply pipes.

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-11
Chapter 8 Existing Utility Diversion

Figure 8.4-3 shows the intersection of Jangwattana Road.


Highway 304 (Ram Indra RD.) from Lak Si Circle to
Min Buri. As a concrete island in the middle eight

lanes 4 lanes per direction. Highway within 40 feet

wide, as shown in Figure 8.4-4 island area of 4.60


meters wide around the turn and the turn out for the
most part. The pavement width of 20.4 meters, the

floor space utilities such as electricity, water supply


pipes and the drainage system.

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-12
Chapter 8 Existing Utility Diversion

Figure 8.4-4 shows the intersection of Ram Intra RD.


There are also two routes in the responsibility of
Bangkok Metropolitan administration.

Si ha Buranu Kij Rdfrom Min buri - Klong Saen


Saeb. For a small island eight lanes 4 lanes per
direction. Within 30 meters wide.

Ram Kham Hang Rd from Su win tawong -

Srinakarin. For a small island eight lanes 4 lanes per


direction. Within 30 meters wide.

8.4.2

Improving the road.

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-13
Chapter 8 Existing Utility Diversion

To improve the road along the project route, consultant


examined the street and was designed in part the responsibility
of the Highways Agency and other agencies are following the
highway.

Highway 302 (Rattanathi Bat Road) in the island.


Main channel and three traffic lanes and three lanes

per direction parallel with the 12-lane highway within


80 meters wide.

Highway 306 (Tiwanon Rd) a typical cross-section of


the project. The area is in the middle of building
foundations and pillars of the gland. The 3.20 m
wide island that is considered sufficient for the

construction. While construction may have to adjust


the width of the traffic on the main highway down.

Space for construction. Area on the night before the


completion of construction of the gland. The impact
of construction activities around the island include

dismantling the concrete road surface in turning on

the Max Brewer. The electrical illuminated the trees


and relocation. Dismantling cars and rock out. The

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-14
Chapter 8 Existing Utility Diversion

construction of new units, stone work, landscape and


water. As shown in Figure 8.4-5

Figure 8.4-5 shows a typical cross-section on Tiwanon Rd.


In addition, the construction area. With a 30 m wide
zone of the location - the station. The need to increase. Size is
3.45 m wide footpath up the stairs - down. Stations are 4.50
meters wide impact on the public sidewalk to the relocation

must be updated. The horizontal line across the electricity and


communication lines along the poles. The water supply pipe.
The update is designed to be a refuge from the pier to the

existing sewer line. And make adjustments to cover the pond in


JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-15
Chapter 8 Existing Utility Diversion

the road surface. And the road surface in order to get a parking
space - a passenger. In particular, people with disabilities, at
least two meters wide and 7 meters long, as shown in the
Figure 8.4-6
Impact of road maintenance and construction of the

project. Necessary to modify and relocate utilities. Particular


station. Include the following.

- Updated electrical system. The underground electrical


wiring. The lane next to the sidewalk. And other
communication systems. The line runs along the
vertical poles.

- Water supply pipe.

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-16
Chapter 8 Existing Utility Diversion

Figure 8.4-6 shows a cross-section on Tiwanon Rd


Highway 304 (Jang Wattana Rd.) The Pak kretVibha wadee RD. The general section of the project.

The area is in the middle of building foundations and


pillars of the gland. The 4.60 m wide island that is
considered sufficient for the construction. While

construction may have to adjust the width of the


traffic on the main highway down. Space for

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-17
Chapter 8 Existing Utility Diversion

construction. Area on the night before the completion


of construction of the gland. The impact of

construction activities around the island include


dismantling the concrete road surface in turning on

the Max Brewer. The electrical illuminated the trees


and relocation. Dismantling cars and rock out. The

construction of new units, stone work, landscape and


water. As shown in Figure 8.4-7

Figure 8.4-7 shows a typical cross-section on Jang Wattana


Road.
JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-18
Chapter 8 Existing Utility Diversion

In addition, the construction area. Although the width of


40 meters, but the position of the - to the station. The need to
increase. Size is 3.45 m wide footpath up the stairs - down.

Stations are 4.50 meters wide impact on the public sidewalk to


the relocation must be updated. The horizontal line across the

electricity and communication lines along the poles. The water

supply pipe. The update is designed to be a refuge from the pier


to the existing sewer line. And make adjustments to cover the

pond in the road surface. And the road surface in order to get a
parking space - a passenger. In particular, people with

disabilities, at least two meters wide and 7 meters long, as


shown in the Figure 8.4-7 As well as All Rights Reserved.
Impact of road maintenance and construction of the

project. Necessary to modify and relocate utilities. Particular


station. Include the following.

- Updated electrical system. The underground electrical

wiring. The lane next to the sidewalk. And other

communication systems. The line runs along the vertical


poles.

- Water supply pipe.

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-19
Chapter 8 Existing Utility Diversion

Highway 304 (Jang Wttana Rd.) from vibhava dee


RD. to Lak si Circle.. The general section of the
project. The area is in the middle of building

foundations and pillars of the gland. The island is

only 1.60 m wide enough for construction. Especially


in the construction of the piles have to be 8-10

meters of area to operate machinery. The third lane


will be lost by the channel. May be required to

bypass the traffic. The duration and volume of the


mold during the process.
In general, the cross-sectional area of the sidewalk to the

north. While construction may have to adjust the width of the

traffic on the main highway down. Space for construction. Area

on the night before the completion of construction of the gland.


The impact of construction activities and work includes
demolition of sidewalk pavement surface paving slabs.

Dismantling cars and rock out. The construction of new rock


units. As shown in Figure 8.4-8

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-20
Chapter 8 Existing Utility Diversion

Figure 8.4-8 shows a typical cross-section on the Jangwattana


Road.

If you need to run out of center line. On the center line

of the road. Traffic problems during construction above. While


construction may have to adjust the width of the traffic on the

main highway down. Affected by construction activities will be


dismantled around the island and concrete road surface in the

two channels. The construction of concrete barriers around the


antenna module and new concrete road surface construction. As
shown in Figure 8.4-9

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-21
Chapter 8 Existing Utility Diversion

Figure 8.4-9 shows the front of the excentric centered on the


Jangwattana Road.
In addition, the construction area. Position of the way up

- to the station. The need to increase. Only from 2.20 to 3.20

meters wide, with sidewalks and the stairs up - down. Stations


are 4.50 meters wide impact on the public sidewalk to the
relocation must be updated. The horizontal line across the

electricity and communication lines along the poles. The water


supply pipe. The update is designed to be a refuge from the pier
to the existing sewer line. And make adjustments to cover the

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-22
Chapter 8 Existing Utility Diversion

pond in the road surface. And the road surface in order to get a
parking space - a passenger.
Impact of road maintenance and construction of the

project. Necessary to modify and relocate utilities. Particular


station. Include the following.
- Updated electrical system. The underground electrical
wiring. The lane next to the sidewalk. And other
communication systems. The line runs along the
vertical poles.

Water supply piping system.


Highway 304 (Ram Indra Rd.) at the four main

compass - isolated Buri. The general section of the


project. The area is in the middle of building

foundations and pillars of the gland. The 4.60 m


wide island that is considered sufficient for the

construction. While construction may have to adjust


the width of the traffic on the main highway down.

Space for construction. Area on the night before the


JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-23
Chapter 8 Existing Utility Diversion

completion of construction of the gland. The impact


of construction activities around the island include

dismantling the concrete road surface in turning on


the Max Brewer. The electrical illuminated the trees
and relocation. Dismantling cars and rock out. The

construction of new units, stone work, landscape and


water. As shown in Figure 8.4-10

Figure 8.4-10 shows a typical cross-section on the Ram Indra


Road.

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-24
Chapter 8 Existing Utility Diversion

In addition, the construction area. Although the width of


40 meters, but the position of the - to the station. The need to
increase. Size is 4.20 m wide footpath up the stairs - down.

Stations are 4.50 meters wide impact on the public sidewalk to


the relocation must be updated. The horizontal line across the

electricity and communication lines along the poles. The water

supply pipe. The update is designed to be a refuge from the pier


to the existing sewer line. And make adjustments to cover the

pond in the road surface. And the road surface in order to get a
parking space - a passenger. Especially people with disabilities.
Impact of road maintenance and construction of the

project. Necessary to modify and relocate utilities. Particular


station. Include the following.

- Updated electrical system. The underground electrical


wiring. The lane next to the sidewalk. And other
communication systems. The line runs along the
vertical poles.

- Water supply pipe.


8.4.3 Utilities affected by the project.

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-25
Chapter 8 Existing Utility Diversion

The construction of a mass transit rail projects in urban


areas with large utilities along the route have been affected and
necessitated the relocation. The construction project.

Infrastructure and services can be made simultaneously by the


impact on the public in the surrounding area to a minimum.

Counsel survey and monitoring system can Madhavan is the

responsibility of the consumer organizations. In the area below


the highway.

Table 8.4-1The utility relocation on Rattana Thibat road


(Department of Highway)

Item

Departme

Size

Amount

Unit

Location

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-26
Chapter 8 Existing Utility Diversion

nt
Water pipe
line

Electric

MWA.

300

PVCmm.

300

meter

Sidewalk

DOH

147

unit

Median

DOH

1200 mm.

300

meter

Median

voltage

MEA

unit

Sidewalk

TV cables-

TOT

300

meter

Sidewalk

meter

Sidewalk

meter

Sidewalk

pole.

Manhole
High
pole

Fiber optic

communicat

CAT

ion line
Copper
communicat
ion line

CAT

9,12,16 D4"

OFC 48C.

150

OFC 12 C.

300

OFC 8C.

150

Copper

Cable 100P

150

Table 8.4-2 The utility relocation on Tiwanon road


(Department of Highway)
Item
Water pipe

Departme
nt
MWA.

Size
300 AC

Amount
1,050

Unit
meter

Location
Sidewalk

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-27
Chapter 8 Existing Utility Diversion

Item

Departme

Size

nt

Amount

Unit

Location

mm.
line

300 PVC
mm.

Electric

150

DOH

145

unit

Median

DOH

1200 mm.

1,200

meter

Median

voltage

MEA

34

unit

Sidewalk

TV cables-

TOT

1200

meter

Sidewalk

meter

Sidewalk

pole.

Manhole
High
pole

Fiber optic
communic
ation line

CAT

9,12,16 D4"

OFC 96C

450

OFC 48C

1,200

OFC 24C

150

OFC 12C

450

OFC 8C

1,050

OFC SM
96C
OFC SM
96C

Copper

CAT

600
450

OFC 96C

300

Copper

300

meter

meter

Sidewalk
(underground)

Sidewalk

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-28
Chapter 8 Existing Utility Diversion

Departme

Item

nt

Size

Amount

Unit

Location

Cable 300P
Copper

Cable 200P

communic

Copper

ation line

Cable 100P
Copper

Cable 30P

150
150
600

Table 8.4-3 The utility relocation on Jangwattana road


(Department of Highway). Pak Kret Vibhavadee
Item
Water pipe
line

Departme
nt
MWA.

Size
150 PVC
mm.
300 AC
mm.
300 PVC
mm.
150 ST
mm.
1,000 PVC

Amount
64

Unit

Location

meter

Sidewalk

735
364
101
1,225

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-29
Chapter 8 Existing Utility Diversion

Item

Departme
nt

Size

Amount

Unit

Location

mm.
Electric

DOH

188

unit

Median

DOH

1200 mm.

2100

meter

Median

voltage

MEA

82

unit

Sidewalk

TV cables-

TOT

2,450

meter

Sidewalk

pole.

Manhole
High
pole

Fiber optic
communic

CAT

ation line

9,12,16 D4"

OFC 96C

750

OFC 48C

600

OFC 24C

150

OFC 12C

300

OFC 8C

1,500

meter

Sidewalk

OFC SM
96C
OFC SM
96C

Copper
communic

CAT

OFC 96C

600

OFC 48C

300

Copper

600

meter

meter

Sidewalk

(underground)
Sidewalk

Cable 200P

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-30
Chapter 8 Existing Utility Diversion

Item

Departme
nt

Size
Copper
Cable 100P

ation line

Copper
Cable 30P

Amount

Unit

Location

300
150

Table 8.4-4 The utility relocation on Jangwattana road


(Department of Highway). Vibhavadee to Lak si Circle
Item
Water pipe
line
Electric
pole.
Manhole
High

voltage

Departme
nt
MWA.

Size
300 PVC
mm.

Amount

Unit

Location

600

meter

Sidewalk

DOH

unit

Median

DOH

1200 mm.

100

meter

Median

MEA

37

unit

Sidewalk

1,295

meter

Sidewalk

meter

Sidewalk

meter

Sidewalk

pole
TV cables-

TOT

Fiber optic

CAT

communica
tion line

9,12,16 D4"
OFC 48C

600

OFC 8C

600

OFC 96C

150

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-31
Chapter 8 Existing Utility Diversion

OFC SM
96C
Copper
communica
tion line

CAT

Copper

Cable 50P

150

300

(underground)

meter

Sidewalk

Table 8.4-5 The utility relocation on Ram Indra road


(Department of Highway).
Item
Water pipe
line

Departme
nt
MWA

Size
300 AC
mm.
300 PVC
mm.
400 AC
mm.
700 ST
mm.
800 ST
mm.
1,000 ST
mm.
1,200 ST

Amount
225

Unit

Location

Meter

Sidewalk and
Median

3,000
375
475
250
5,275
6,375

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-32
Chapter 8 Existing Utility Diversion

Item

Departme
nt

Size

Amount

Unit

Location

mm.
Electric

DOH

405

Unit

Median

Manhole

DOH

800 mm.

930

Meter

Median

Manhole

DOH

1200 mm.

3600

Meter

Median

MEA

120

Unit

Sidewalk

4,200

Meter

Sidewalk

Meter

Sidewalk

Meter

Sidewalk

pole.

High

voltage
pole
TV cables-

TOT

Fiber optic
communica
tion line

Copper

communica
tion line

CAT

9,12,16 D4"
OFC 48C

1,350

OFC 24C

1,650

OFC 12C

1,800

OFC 8C

3,750

OFC 8C
SM 96C

CAT

2,250

OFC 24C

150

OFC 8C

300

Copper

Cable 200P
Copper

150

(underground)

Meter

Sidewalk

1,500

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-33
Chapter 8 Existing Utility Diversion

Departme

Item

Size

nt

Amount

Unit

Location

Cable 100P
Copper

Cable 50P

750

Table 8.4-6 The utility relocation on Si Ha Bura NU Kij road


(Bangkok Metropolitan Administration)

Item
Water pipe
line

Electric
pole.

Manhole
High

voltage

Department

Size

Amount

Unit

Location

300
MWA

PVC

300

meter

Sidewalk

MWA.

29

unit

Median

300

meter

Median

unit

Median

300

meter

Median

150

meter

Sidewalk

DOH

DOH

mm.

1200
mm.
-

pole
TV cables-

MEA

Fiber optic

CAT

communica

9,12,16
- D4"
OFC
48C

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Final Preliminary Design Review Report


8-34
Chapter 8 Existing Utility Diversion

OFC SM

tion line
Copper

communica
tion line

96C

CAT

Copper
Cable

Sidewalk
150

meter (underground

150

meter

Sidewalk

150P

JMS/TLT/RE5501/P1988/RE088 The feasibility study review, preliminary design plan

modification,
and preparation of tender documents for Pink Line Project. Khae Rai - Min
Buri.

Anda mungkin juga menyukai