Anda di halaman 1dari 4

TAUHEED KHAN

Date of Birth : 01 08 1969


Passport No. : E 7780554 valid upto 15.02.2014
Present Address :
NL-5 /3, Flat No.-11,Near Shivaji Chowk,
Sector -3 , Nerul , Navi Mumbai,
Cell No.-9820798314
E mail : tkhan_aec@yahoo.co.in
Permanent Address :
S/o Mr Shareef Khan,
Tulsi Nagar , Kasia , Ward No.7, Kasia
Kushinagar- Dist.,Uttar Pradesh, India
Pin -274402, Tel: 05564-272533
Language Known : English, Urdu & Hindi
Martial Status : Married and having a school going baby
Qualification : I. B E Civil - I class in 1991 from Karnataka University
Computer skill: MS Project -2000 & M S office-2000
Training : (I) For Construction Safety Conducted By National Safety Council of India, (II) For Construction Safety
Conducted By Supreme Petrochem Ltd, Nagothane
Career Summary : Around 13 Years vast experience in Execution, Planning & Monitoring,
Co-ordination, Quality Control / Estimation & Billing for Civil & Structural work in various Industrial Projects i.e. Finolex
Pipes Ltd., Supreme Petrochem Ltd, H & R Johnson (I) Ltd, TISC SEB, V V F Ltd.
Worked under various consultants i.e. M/s Uhde India Ltd, M/S M.N Dastoor (P) Ltd ,M/s Bhagawati Designs Pvt Ltd., M/s
International Airport Authority of India
Employment/Site Details: I am associated with M/s Ray Constructions, IIT Post, Powai, Mumbai-76,
since May 1992, at present working at its V V F Ltd, Project site. Earlier to M/s Ray
Constructions I worked with M/s M J Constructions during Aug91 to March92.
Brief Experience details are as follows
I .Since Feb03 to till date
At Fatty Alcohol Plant for M/s VVF Ltd, MIDC Taloja, Navi Mumbai,
Post Held : Project Engineer
Job Responsibility : Over all responsible for Planning, scheduling, monitoring and billing, rate analysis ,reconciliation of
materials for the whole project of Civil & Structural work of Process Building, Main Sub Station Building, Raw/Fire Water
Tank, Tank Farm area, Admin/Utility Building and Associated units of Saponification Plant i.e CSL-DCA Finishing
line,TPCP/MCC Bldg, Tank farm area
II. July02 to Jan03
At Haul Road SEB Project for M/s TISCO (W B Division), Ghatotand, Jharkhand
Job Responsibility : Over all responsible for Planning, scheduling, monitoring , execution and billing for Embankment & Sub
grade preparation, 200 mm thick Layer Granular Sub Base, Water Bound Macadam in two Layer , Wet mix macadam
,Bitumen Macadam in two layer 75 mm thick , Open Graded Premix Carpet, Seal Coat [all as per specification of MOST]
III. May98 to June02 :
At Supreme Petrochem Ltd, Nagothane,Raigad-Dist. II Phase :
Job Responsibility: Over all responsible for Planning, scheduling, monitoring , execution and billing , Co-ordination with
Client & consultant, Preparation of Bills, Quality Control, Reconciliation of materials for Civil & Structural work for the
following
1. New Ware House
2. HIPS III Line Process Unit and associated Utilities

3. Specialty Polystyrene Plant, its Utilities and office Building


4. Club House: Cafeteria, Gymnasium, swimming Pool, Badminton Court,
5. Flyover, WBM Roads, Carpeting of Roads, Site Grading work etc
IV. Sept97 to April98
[A] At Supreme Petrochem Ltd :
Job Responsibility: Over all in charge for Supervision, Estimation & Billing, Quality Control for civil works of
Compressor house extension & Other Miscellaneous civil works
[B] At M/S Johnson India Ltd, Pen Raigad-Dist.
Job Responsibility: Supervision, Estimation & Billing, Quality Control for Murrum Filling in Marine Clay /Slush [2 lacs cum],
compound wall supported over under ream piles.
V. Sept94 to Aug97 ;
At Supreme Petrochem Ltd, Nagothane,Raigad Dist. I Phase:
Job Responsibility: Supervision, Preparation bills, Quality Control/Reconciliation of materials, for Civil & Structural work for
various jobs ,i.e Site Grading, WBM Roads and carpeting , HIPS I Line Utilities i.e. 220 KVA Switchyard, Main Sub Station,
Raw Water Tank, Cooling Tower, Pipe Racks etc, Effluent Treatment Plant, Administration bldg, Main gate bldg .
VI. Sept92 to Aug94
At Finolex Pipes Ltd, Pawas, Ratnagiri Dist :
Job Responsibility: Supervision of utilities i.e. Supervision of Main Sub Stations, LPG Tank, Fire Station Site Grading, WBM
Roads, Preparation of bills for WBM roads only,
Reconciliation of materials for Civil & Structural Work for Utilities of I Phase plant
VII. May92 to Aug92
At International Airport ,Sahar Mumbai
Job Responsibility: Supervision of above job, Scrutiny & Certification of Sub-contractor bills for Renovation of B3 taxi Track
i.e.Removal of existing Pavement, Laying PCC, BM, AC, DAC work,
VIII. Aug 91 to March92 ; Worked With M/s M J Constructions ;
Job Responsibility : Supervision & Preparation of Bar Bending Schedule for Civil works of Punit Tower, Belapur ,Navi
Mumbai

Tauheed Khan
This is a candidate registered on
Gulfoilandgas.com. To contact this candidate
you need to purchase a subscription. Go to

Recruitment Products >>

Education: 5
Experience: 20 years

Are you Hiring?


Reach the right
candidates to fill
your technical
positions with
Gulfoilandgas Jobs

Relocation: Yes - Internationally

Our Career Center has70,000+ resumes


Industry Experience

for employers to search


10 years Civil Engineer
200-Engineering

5 years Quality Assurance Manager

400-Project Management
Consultants News

5 years Project Manager

Design/construction/Engineering Graphics News


Engineering News
Engineering Services News

Career Objective

Production Engineering News


Project & Resource Management News

to implement the project in time with view of


cost time quality factors in a beneficial manner
to stakeholders as well as organization

Training & Education News


Hydrostatic Testing News
Inspection News
Laboratory Services News
Non Destructive Testing News

Professional Experience

Testing News
Testing & Inspection Services News

Please consider my qualifications, as


summarized below and on the
attached resume for a subjected post with your
film. I believe that
the experience I have gained over the past
twenty years with various
organizations in the world in different types of
engineering works.
I also subcontracted my services out to sub
contractors, which allowed
me to perform project management. I also
gained considerable knowledge
and experience in the following areas.
Successfully managed multiples projects
concurrently and
completed some of projects on time and within
budget
Gained considerable knowledge of building
practices and
codes, estimation, planning etc
Supervised a number of different types of civil,
electro
mechanical, HVAC, Pipelines, land fill (includes
dredging) ,heavy
structural works etc
My qualifications also includes
A Bachelor of Technology in civil discipline
A Master of engineering in civil water
management

1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |
14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35
|

Proficiency in quality management , P5


Project Management ,
Microsoft Business suite ( Excel, word, outlook,
access) & safety
procedure
In addition, I have enjoyed a reputation for
being a very hard
working, intelligent, and industrious individual.
My motivation is to
completely utilize my accumulated experience
and knowledge to the
fullest extent possible, becoming a valuable
asset for the right
company.

Eductation

Sree Venkateswara University of India 04/84


04/88 B.Tech- Civil engineering (Full time)
Marathwada University of India 04/91 08/93
Masters in Civil eng.-WM (Full time

Certification
Certificate course: PMP, QMS , Construction
quality management(USACE) ,Primavera ver
5.0

Anda mungkin juga menyukai