Anda di halaman 1dari 75

Terms and Definitions

Of
Steel Making &Rolling
Operation Management
Eng. H. Saad

Terms and Definition

Eng. H. Saad

Terms and Definition

Iron Ore and Iron Making

Eng. H. Saad

Terms and Definition

Iron Map By country


Eng. H. Saad

Terms and Definition

Eng. H. Saad

Terms and Definition

Eng. H. Saad

Terms and Definition

Eng. H. Saad

Terms and Definition

Eng. H. Saad

Terms and Definition

Iron ores [1] are rocks and minerals from which metallic iron can be economically extracted. The
ores are usually rich in iron oxides and vary in color from dark grey, bright yellow, deep purple, to
rusty red.
The iron itself is usually found in the form of magnetite (Fe3O4, 72.4% Fe), hematite (Fe2O3,
69.9% Fe), goethite (FeO(OH), 62.9% Fe), limonite (FeO(OH).n(H2O)) or siderite (FeCO3, 48.2% Fe).
Ores carrying very high quantities of hematite or magnetite (greater than ~60% iron) are known
as "natural ore" or "direct shipping ore", meaning they can be fed directly into iron-making blast
furnaces. Iron ore is the raw material used to make pig iron, which is one of the main raw
materials to make steel. 98% of the mined iron ore is used to make steel

Eng. H. Saad

Terms and Definition

Eng. H. Saad

Terms and Definition

10

Eng. H. Saad

Terms and Definition

11

Coal Map

Eng. H. Saad

Terms and Definition

12

Eng. H. Saad

Terms and Definition

13

Eng. H. Saad

Terms and Definition

14

Steel Making

Eng. H. Saad

Terms and Definition

15

Eng. H. Saad

Terms and Definition

16

Eng. H. Saad

Terms and Definition

17

Eng. H. Saad

Terms and Definition

18

Eng. H. Saad

Terms and Definition

19

Eng. H. Saad

Terms and Definition

20

Eng. H. Saad

Terms and Definition

21

Eng. H. Saad

Terms and Definition

22

Eng. H. Saad

Terms and Definition

23

Eng. H. Saad

Terms and Definition

24

Steel Map By country


Eng. H. Saad

Terms and Definition

25

Eng. H. Saad

Terms and Definition

26

Eng. H. Saad

Terms and Definition

27

Eng. H. Saad

Terms and Definition

28

Or coil

Eng. H. Saad

Terms and Definition

29

Eng. H. Saad

Terms and Definition

30

Energy

Eng. H. Saad

Terms and Definition

31

Eng. H. Saad

Terms and Definition

32

Eng. H. Saad

Terms and Definition

33

Eng. H. Saad

Terms and Definition

34

Eng. H. Saad

Terms and Definition

35

Eng. H. Saad

Terms and Definition

36

Eng. H. Saad

Terms and Definition

37

Eng. H. Saad

Terms and Definition

38

Eng. H. Saad

Terms and Definition

39

Eng. H. Saad

Terms and Definition

40

Developments

Eng. H. Saad

Terms and Definition

41

Environment

Eng. H. Saad

Terms and Definition

42

Eng. H. Saad

Terms and Definition

43

Eng. H. Saad

Terms and Definition

44

Eng. H. Saad

Terms and Definition

45

Eng. H. Saad

Terms and Definition

46

Eng. H. Saad

Terms and Definition

47

Eng. H. Saad

Terms and Definition

48

Eng. H. Saad

Terms and Definition

49

Eng. H. Saad

Terms and Definition

50

In the management literature 5 M's of rule called as;


1. Men
2. Machine
3. Material
4. Maintenance
5. Method
and nowadays Management is placed on the literature as the 6th M of
management.

Eng. H. Saad

Terms and Definition

51

Eng. H. Saad

Terms and Definition

52

Eng. H. Saad

Terms and Definition

53

Eng. H. Saad

Terms and Definition

54

Overall Equipment Effectiveness


(OEE)
Can be expressed simply:
OEE = Yield x Throughput x Availability
The Maximun Theoretical

Eng. H. Saad

Terms and Definition

55

Developments

Eng. H. Saad

Terms and Definition

56

Eng. H. Saad

Terms and Definition

57

Eng. H. Saad

Terms and Definition

58

Eng. H. Saad

Terms and Definition

59

Eng. H. Saad

Terms and Definition

60

Eng. H. Saad

Terms and Definition

61

Eng. H. Saad

Terms and Definition

62

RPM Rule

Eng. H. Saad

Terms and Definition

63

Eng. H. Saad

Terms and Definition

64

EAF slag

Re - Use

Eng. H. Saad

Terms and Definition

65

Production Cost

Re - Duce

Eng. H. Saad

Terms and Definition

66

Eng. H. Saad

Terms and Definition

67

1- Outsourcing

Eng. H. Saad

Terms and Definition

68

B.E.P.

Eng. H. Saad

(4 Rs ; Outsourcing)
----------------------------4 Ps 6 Ms

Terms and Definition

69

Eng. H. Saad

Terms and Definition

70

Eng. H. Saad

Terms and Definition

71

Eng. H. Saad

Terms and Definition

72

Eng. H. Saad

Terms and Definition

73

Eng. H. Saad

Terms and Definition

74

1.

For all of our projects the running Process efficiency regularly evaluated.

2.

Our Products range regularly should be updated according to the marketing needs concerning the most
3 important properties chemical, physical, and mechanical specs

3.

The 5 M rule and its elements Man, Machine, Method, Material and Maintenance regular measurement
and improvement, using the KPI,s

4.

The 4R rule and its elements Reduce, Reuse, Recovery and Recycle should be one of our main applied
researches, in all of our production sectors.

5.

Improve the OEE , TEEP and OOE, factors for all of our production process.

6.

The 7S which concern the work place organization for efficiency and effectiveness

7.

a.

SORT

b.

SYSTEMATIZE

c.

SHINE

d.

STANDARDISE

e.

SELF DISCIPLINE

f.

SAFETY

g.

SAVE

RCA , root cause analysis and solving the production troubles

4-Wire Coil & Down Stream Projects :- Wire mesh


- Cut and Bend
- PC Strands
- Nail & Fasteners
- Cold Drawing
- Hot Rolling.
- ,..

Eng. H. Saad

Terms and Definition

75

Anda mungkin juga menyukai