_________________________________________
YES
NO
Owne
Contractor
r
Date:_________________________
If you have any questions regarding your PV system, please call the City of Folsom Building Division
at (916) 351-3555. Thank you.
PPV Packet 11-05-13
PV Equip. Manufacturers Specifications: Provide cut sheets on all components including but not limited to those
shown below; including make, model, listing, size, weight, etc. Highlight project specific information on the cut sheets
____ Inverter:
_______ Model number
_______ Integrated disconnect - Per 2013 CEC 690.15
Mounting System for Panel Installation: Highlight project specific information on the cut sheets
________ Indicate the style, diameter, length of embedment of bolts into framing members and
location of attachments
________ Indicate number of bolts per panel
________ Provide mounting details and certified engineering for listed mounting installation
Photovoltaic Modules:
________ Open-circuit voltage (Voc) from listed cut sheet Maximum system voltage from listed cut sheet
________ Short-circuit current (Isc) from listed cut sheet Maximum fuse rating from listed cut sheet
________ Maximum power- panel wattage from listed cut sheet
Electrical Schematic:
________ System inter-tie with utility company or stand alone
________ Indicate the system KW rating
________ Indicate if the system has battery backup
________ Single line drawing of electrical installation which includes:
Array
Inverter location
Size and number of electrical service meters Per 2013 CEC 690.64 (705.12)
_____
_____
_______
Proper Signage and Labeling: Signage required per City of Folsom handout (see attached)
Indicate system type below and show location of each required sign on one line diagram (see attached examples):
_______
PV Checklist
Revised 11-06-13
Page 2 of 8
______________ Structural calculations to justify the installation of PV railing or racking systems are adequate to
resist wind up-lift minimum 85 mph (based on 3 seconds gust formula) and exposure C).
______________ Show existing slope of roof, type of roof materials, and existing rafter/engineered truss size.
______________ Show number of arrays layout
______________ Show weight of arrays (in pounds per square)
______________ Ensure that lag screws have adequate pullout strength and sheer capacity as installed.
______________ PV layout shall include access pathway for Fire Department
a. _______ Residential Buildings with hip roof layouts: Modules should be located in a manner that provides
one (1) three-foot (3) wide clear access pathway from the eave to the ridge on each roof slope where
modules are located. The access pathway should be located at a structurally strong location on the
building (such as a bearing wall).
b. _______ Residential Buildings with a single ridge: Modules should be located in a manner that provides
two (2) three-foot (3) wide access pathways from the eave to the ridge on each roof slope where
modules are located.
c. _______ Hips and Valleys: Modules should be located no closer than one and one half (1.5) feet to a hip
or a valley if modules are to be placed on both sides of a hip or valley. If the modules are to be located
on only one side of a hip or valley that is of equal length then the modules may be placed directly
adjacent to the hip or valley.
_______
______________ Review time should be no greater than 5 days (depending on backlog, staffing, and completeness
of submitted plans)
2013 CEC 690.17 - Switch or Circuit Breaker. The disconnecting means for ungrounded conductors shall consist
of a manually operable switch(es) or circuit breaker(s) complying with all of the following requirements:
1. __________ Located where readily accessible
2. __________ Externally operable without exposing the operator to contact with live parts
3. __________ Plainly indicating whether in the open or closed position
4. __________ Having an interrupting rating sufficient for the nominal circuit voltage and the current that is
available at the line terminals of the equipment.
2013 CEC 250.122 - Size of Equipment Grounding Conductors. Copper, aluminum, or copper-clad aluminum
equipment grounding conductors of the wire type shall not be smaller than shown in Table 250.122 but shall not
be required to be larger than the circuit conductors supplying the equipment.
2013 CEC 690.14 (5) - Grouping. The photovoltaic system disconnecting means shall be grouped with other
disconnecting means for the system to comply with 690.14(C)(4). A Photovoltaic disconnecting means shall not
be required at the photovoltaic module or array location.
2013 CEC 690.64 (705.12) - Load Side. A photovoltaic power source shall be permitted to be connected to the
load side of the service disconnecting means of the other source(s) at any distribution equipment on the
premises, provided that (exception) the sum of the ampere ratings of the overcurrent devices shall not exceed
120% of the rating of the busbar or conductor.
This installation shall comply with the Solar Photovoltaic Installation Guideline developed by the Office of the
State Fire Marshal.
PV Checklist
Revised 11-06-13
Page 4 of 8
PV Checklist
Revised 11-06-13
Page 5 of 8
CITY OF FOLSOM
EXAMPLE 3
PV Checklist
Revised 11-06-13
Page 6 of 8
CITY OF FOLSOM
EXAMPLE 4
PV Checklist
Revised 11-06-13
Page 7 of 8
CITY OF FOLSOM
EXAMPLE 5
PV Checklist
Revised 11-06-13
Page 8 of 8