Anda di halaman 1dari 7

PIPELINE PROFILE AND WATER LEVELS

125
Pipeline Top Level Profile
Level in reservoir

120

115

110

Level (m)

Reservoir TWL:104.85 m
RL

Pipe Top Level : 105.35m


RL

105

100

Reservoir LWL : ?

Pandan Canal :
Normal Operating Condition Level :99.56 to 100.057 m
RL
Average Operating Condition Level :100.07 m RL
Maximum Operating Condition Level : 100.57 to
101.25 m RL

95

90

Reservoir Pumping
Stop Level : 104.65 m
RL
Submerged
discharge level :
102.60 m RL
Discharge Pipe Level in
Reservoir -Top Level :102.3 m
RL)

85

80
0

1000

2000

3000
Distance (ft)

4000

5000

6000

HydProfile data

Chainage
(ft)

Levels
Pip Celtreline
Pip top level
level
(ft)
(ft)
98.56
98.56
108.63
107.255
108.63
107.255
108.63
107.255
109.05
107.300
109.05
107.300
109.01
107.260
110.10
108.350
110.86
109.110
111.47
109.720
112.18
110.430
112.60
110.850
112.76
111.010
113.11
111.360
113.13
111.380
113.48
111.730
113.80
112.050
114.16
112.410
114.48
112.730
114.88
113.130
115.28
113.530
115.65
113.900
115.94
114.190
116.35
114.600
116.67
114.920
116.98
115.230
117.28
115.530
117.54
115.790
117.53
115.780

-20
-20
0
22
25
95.75
231.84
306.76
344.57
369.64
394.71
494.99
645.41
921.27
946.35
1222.23
1443.94
1643
1841.32
2092.02
2342.72
2579.26
2780.29
3007.03
3207.51
3412.53
3613.03
3761.83
3767.92

0
20
40
62
65
135.75
271.84
346.76
384.57
409.64
434.71
534.99
685.41
961.27
986.35
1262.23
1483.94
1683
1881.32
2132.02
2382.72
2619.26
2820.29
3047.03
3247.51
3452.53
3653.03
3801.83
3807.92

99.561
102.631
102.631
102.631
102.759
102.759
102.747
103.079
103.311
103.497
103.713
103.841
103.890
103.997
104.003
104.110
104.207
104.317
104.415
104.537
104.659
104.771
104.860
104.985
105.082
105.177
105.268
105.348
105.345

3778.92

3818.92

116.87

115.120

105.143

4371.92

4411.92

104.85

106.98

101.479

Page 2

Water level at pump sump (LWL)


33'' NB Pipe centerline level

42'' NB Pipe centerline level

24'' NB Pipe centerline level


Discharge pipe centreline level in
reservoir

Arrangement of 3 branches of 24"


NB pipline submreging in reservoir

HydProfile data
4371.92

4411.92
4411.92

104.85
100

115.91

101.479

Page 3

TWL in reservoir

HydProfile data (2)

Chainage
(ft)

Pip Top Level

-20
-20
0
22
25
95.75
231.84
306.76
344.57
369.64
394.71
494.99
645.41
921.27
946.35
1222.23
1443.94
1643
1841.32
2092.02
2342.72
2579.26
2780.29
3007.03
3207.51
3412.53
3613.03
3761.83
3767.92

0
20
40
62
65
135.75
271.84
346.76
384.57
409.64
434.71
534.99
685.41
961.27
986.35
1262.23
1483.94
1683
1881.32
2132.02
2382.72
2619.26
2820.29
3047.03
3247.51
3452.53
3653.03
3801.83
3807.92

(ft)RL
98.56
108.63
108.63
108.63
109.05
109.05
109.01
110.10
110.86
111.47
112.18
112.60
112.76
113.11
113.13
113.48
113.80
114.16
114.48
114.88
115.28
115.65
115.94
116.35
116.67
116.98
117.28
117.54
117.53

(m)RL
99.561
102.631
102.631
102.631
102.759
102.759
102.747
103.079
103.311
103.497
103.713
103.841
103.890
103.997
104.003
104.110
104.207
104.317
104.415
104.537
104.659
104.771
104.860
104.985
105.082
105.177
105.268
105.348
105.345

3778.92

3818.92

116.87

105.143

4371.92
4371.92

4411.92
4411.92
4411.92

104.85
104.85

101.479
101.479

07/29/2015

(ft)

Page 4

Chainage
0
65
3801.83
4411.92
Point-A
Point-B

Point-C

Point-D

LWL
104.59
103.9
102.7
102.3

HydProfile data (2)

HWL
107.4
105.95
104.95
104.65

07/29/2015

Page 5

-2.81
-2.05
-2.25
-2.35

FIGURE-4

PIPELINE PROFILE AND WATER LEVELS


125

PipeLine Top level Profile


Level in reservoir
Reservoir LWL
Reservoir HWL

120

115
Pipe Top Level : 105.35m
RL

Level (m)

110

Reservoir TWL:104.85m
RL

105

Reservoir Pumping Stop


Level : 104.65m RL

100

Pandan Canal :
Normal Operating Condition Level :99.56 to 100.057
m RL
Average Operating Condition Level :100.07 m RL
Maximum Operating Condition Level : 100.57 to
101.25 m RL

95

Discharge Pipe Level in Reservoir -Top


Level :102.3m RL)

90

85

80
0

1000

2000

3000
Distance (ft)

4000

5000

6000

FIGURE 3.5

HYDRAULIC GRADIENTS FOR SOLO PUMP OPERATION

PIPELINE PROFILE AND WATER LEVELS


125
PipeLine Top level Profile
Level in reservoir
Reservoir Discharge Pipe Level

120

Reservoir Pump Stop Level

115
Pipe Top Level : 105.35m
RL

Level (m)

110

Reservoir TWL:104.85m
RL

105

Reservoir Pumping Stop


Level : 104.65m RL

100

Discharge Pipe Level in Reservoir -Top


Level :102.3m RL)

Pandan Canal :
Normal Operating Condition Level :99.56 to 100.057 m
RL
Average Operating Condition Level :100.07 m RL
Maximum Operating Condition Level : 100.57 to 101.25
m RL

95

90

85

80
0

1000

2000

3000
Distance (ft)

4000

5000

6000

FIGURE 3.7

Anda mungkin juga menyukai