xls
Project:
15 days demo
ShortCol
Subject:
Date:
Project #
30-Jul-15
Checker:
COLUMN C1
Copyright 2007
YP
Engineer:
SAMPLE PROJECT
Page:
Date:
Last modified: 06-May-10
c =
Ec =
Es =
5 ksi
60 ksi
-0.003
145 lb/ft
4,074 ksi
29,000 ksi
Design Code:
Resistance Factors
Confinement:
b =
0.9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Area
As
in
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Width =
24
72
48 in
8
AC = 1809.56 in
IC = 260576 in
YbC =
24 in
Reinforcing
Bar No.
0.75
Spiral
Section Properties:
Diameter =
Reinforcing bars:
Bar Area =
No.bars =
(As) =
As/Ac =
Edge dist. =
c =
1
16
16
0.88%
3
AT =
1907.4 in
IT = 282159.9 in
YbT =
24.00 in
in
( < 100 )
in
5000
4000
21.00
19.40
14.85
8.04
0.00
-8.04
-14.85
-19.40
-21.00
-19.40
-14.85
-8.04
0.00
8.04
14.85
19.40
Click here
to
to
recalculat
interactio
interactio
diagram
diagram
5,471
in
Coordinates, in
Y
Pn, kip
24.00
32.04
38.85
43.40
45.00
43.40
38.85
32.04
24.00
15.96
9.15
4.60
3.00
4.60
9.15
15.96
3000
2
2000
1000
Mn, kip-ft
0
-4000
-3000
-2000
-1000
-1000
1000
2000
3000
4000
-864
-2000
Positive moment corresponds to tension in bottom fibers of the section
Positive axial force is compressive force
Factored Loads
Description
Pu
kip
1
225
2
225
3
4
5
Mu
kip-ft
1400
-1400
Capacity
Mn
kip-ft
#VALUE!
#VALUE!
Demand/
Capacity
Ratio
#VALUE!
#VALUE!
Project:
15 days demo
ShortCol
Engineer:
SAMPLE PROJECT
Subject:
Project #
Checker:
COLUMN C1
Copyright 2007
YP
30-Jul-15
Date:
Page:
Date:
CONTROL OF CRACKING
Service Load Analysis (cracked section - triangular concrete stress)
Material Properties
Concrete f'c =
5 ksi
fy =
60 ksi
fcf = 0.2285f'c =
Ec =
0.511 ksi
Es =
29000 ksi
4074 ksi
0
n = Es/Ect =
Creep factor, Ct =
Long term concrete Ect = Ec/(1+Ct) =
Steel
7.12
4074 ksi
Reinforcing Details
Bar diameter, db =
Bar spacing, s =
Concrete cover to bar in tension, clr =
1 in
8 in
2.5 in
Service Loads:
P=
M=
200 kip
800 kip-ft
14.3 in
29.1 ksi
-1.90
11
15.9
32.1
MPa
mm
mm
mm
Analysis Completed
( 11 bars)
1.095
0.75
Corresponds to crack limit width =
0.013
Calculated crack width, wk =
0.011
Smax = 700e/(sfs) - 2(clr+db/2) =
10.5
Check maximum bar spacing S Smax
(0.28 mm)
(5.7.3.4-1)
8 in 10.5 in
OK
file:///var/www/apps/conversion/tmp/scratch_7/277980449.xls
(10-4)
8in 15.6in
OK
8.2
Project:
15 days demo
ShortCol
Subject:
Project #
30-Jul-15
Date:
Checker:
COLUMN C1
Copyright 2007
YP
Engineer:
SAMPLE PROJECT
Page:
Date:
case =
29.1 34.4
OK
6.8 11
OK
(8.6.1)
0.001102
2 = ksAct(h-c)/(3EsAst(ds-c)) = 0.0002166
m = 1-2 = 0.000885
wk = 3acrm/[1+2(acr-clr)/(h-c)] =
0.011 in
(0.27 mm)
0.27mm > 0.3mm
OK
k1 =
0.8
k2 =
0.5
k3 =
3.4
k4 =
0.425
kt =
Load duration coefficient
Neutral axis from compression edge, x =
Tensile steel from compression edge, d =
Total section height, H =
h = H-yst+db/2+c =
hc,ef = min[2.5(h-d), (h-x)/3] =
=
Ac,eff (hc,ef) =
Ast =
p,eff = Ast/Ac,eff =
Ecm =
33952 MPa
Es =
200000 MPa
0.4 (0.6 for short term and 0.4 for long term loading)
362.4 mm
bar diameter, db =
25.4 mm
816.3 mm
Clear cover, c =
63.5 mm
1219.2 mm
1219.2 mm
285.6 mm
2.021 rad
208199 mm
7097 mm
0.0341
203.2 mm 5(clr+db/2) =
381 mm
342.6 mm
1113.9 mm
file:///var/www/apps/conversion/tmp/scratch_7/277980449.xls
(7.11)
min of =
342.6 mm
(7.14)
Project:
15 days demo
BoltGroup
Subject:
Date:
Page:
Date:
Pn
Mny
kip
-864
-812
-613
-399
-172
58
287
538
775
1025
1288
1506
1702
1894
2083
2279
2472
2696
2944
3179
3416
3648
3875
4098
4316
4521
4727
4926
5118
5303
5471
5471
kip-ft
0
-101
-451
-813
-1165
-1505
-1818
-2122
-2391
-2648
-2875
-2997
-3055
-3087
-3110
-3101
-3073
-3037
-3015
-2973
-2913
-2835
-2739
-2625
-2494
-2350
-2187
-2009
-1819
-1619
-1419
0
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.876
0.845
0.818
0.795
0.776
0.758
0.750
0.750
0.750
0.750
0.750
0.750
0.750
0.750
0.750
0.750
0.750
0.750
0.750
0.750
0.750
N/A
from
bottom
in
1E-010
1.63262
3.26524
4.89786
6.53048
8.1631
9.79572
11.4283
13.061
14.6936
16.3262
17.9588
19.5914
21.2241
22.8567
24.4893
26.1219
27.7545
29.3872
31.0198
32.6524
34.285
35.9176
37.5503
39.1829
40.8155
42.4481
44.0807
45.7134
47.346
48.9786
Cracke
d
momen
t
inertia
Icr
in^4
6E+006
34485
45842
55127
62379
68008
72640
76759
80728
84823
88987
93940
99582
106050
113463
121005
130587
141380
153441
166802
179649
195593
212760
231034
247437
267249
287249
303207
319119
332863
282160
Pn
Mnz
kip
-864
-816
-645
-435
-232
-10
198
432
656
883
1128
1373
1517
1659
1787
1911
2039
2159
2315
2517
2709
2903
3093
3279
3462
3641
3816
3981
4147
4308
4463
4463
kip-ft
file:///var/www/apps/conversion/tmp/scratch_7/277980449.xls
Project #
30-Jul-15
Checker:
COLUMN C1
Copyright 2007
YP
Engineer:
SAMPLE PROJECT
0
-92
-396
-752
-1075
-1405
-1702
-1995
-2258
-2509
-2739
-2944
-2939
-2915
-2875
-2833
-2768
-2694
-2633
-2617
-2586
-2541
-2482
-2410
-2323
-2223
-2110
-1989
-1852
-1705
-1548
0
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.845
0.798
0.758
0.723
0.692
0.665
0.650
0.650
0.650
0.650
0.650
0.650
0.650
0.650
0.650
0.650
0.650
0.650
0.650
0.650
N/A from
bottom
in
1E-010
1.532812
3.065623
4.598435
6.131247
7.664059
9.19687
10.72968
12.26249
13.79531
15.32812
16.86093
18.39374
19.92655
21.45936
22.99218
24.52499
26.0578
27.59061
29.12342
30.65623
32.18905
33.72186
35.25467
36.78748
38.32029
39.85311
41.38592
42.91873
44.45154
45.98435
Cracke
d
momen
t
inertia
Icr
in^4
6E+006
33754
44516
53727
60783
66418
71023
75033
78787
82540
86498
90542
95370
100839
107058
114124
121202
130188
140240
151405
163713
175356
189951
205648
222369
239986
255515
274244
292960
307458
321783
Project:
15 days demo
BoltGroup
Subject:
Date:
Page:
Date:
Pn
Mny
kip
-864
-812
-613
-399
-172
58
287
538
775
1025
1288
1506
1702
1894
2083
2279
2472
2696
2944
3179
3416
3648
3875
4098
4316
4521
4727
4926
5118
5303
5471
5471
kip-ft
0
101
451
813
1165
1505
1818
2122
2391
2648
2875
2997
3055
3087
3110
3101
3073
3037
3015
2973
2913
2835
2739
2625
2494
2350
2187
2009
1819
1619
1419
0
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.876
0.845
0.818
0.795
0.776
0.758
0.750
0.750
0.750
0.750
0.750
0.750
0.750
0.750
0.750
0.750
0.750
0.750
0.750
0.750
0.750
N/A
from
bottom
in
1E-010
1.63262
3.26524
4.89786
6.53048
8.1631
9.79572
11.4283
13.061
14.6936
16.3262
17.9588
19.5914
21.2241
22.8567
24.4893
26.1219
27.7545
29.3872
31.0198
32.6524
34.285
35.9176
37.5503
39.1829
40.8155
42.4481
44.0807
45.7134
47.346
48.9786
Cracke
d
momen
t
inertia
Icr
in^4
6E+006
34485
45842
55127
62379
68008
72640
76759
80728
84823
88987
93940
99582
106050
113463
121005
130587
141380
153441
166802
179649
195593
212760
231034
247437
267249
287249
303207
319119
332863
282160
Pn
Mnz
kip
-864
-816
-645
-435
-232
-10
198
432
656
883
1128
1373
1517
1659
1787
1911
2039
2159
2315
2517
2709
2903
3093
3279
3462
3641
3816
3981
4147
4308
4463
4463
kip-ft
file:///var/www/apps/conversion/tmp/scratch_7/277980449.xls
Project #
30-Jul-15
Checker:
COLUMN C1
Copyright 2007
YP
Engineer:
SAMPLE PROJECT
0
92
396
752
1075
1405
1702
1995
2258
2509
2739
2944
2939
2915
2875
2833
2768
2694
2633
2617
2586
2541
2482
2410
2323
2223
2110
1989
1852
1705
1548
0
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.845
0.798
0.758
0.723
0.692
0.665
0.650
0.650
0.650
0.650
0.650
0.650
0.650
0.650
0.650
0.650
0.650
0.650
0.650
0.650
N/A from
bottom
in
1E-010
1.532812
3.065623
4.598435
6.131247
7.664059
9.19687
10.72968
12.26249
13.79531
15.32812
16.86093
18.39374
19.92655
21.45936
22.99218
24.52499
26.0578
27.59061
29.12342
30.65623
32.18905
33.72186
35.25467
36.78748
38.32029
39.85311
41.38592
42.91873
44.45154
45.98435
Cracke
d
momen
t
inertia
Icr
in^4
6E+006
33754
44516
53727
60783
66418
71023
75033
78787
82540
86498
90542
95370
100839
107058
114124
121202
130188
140240
151405
163713
175356
189951
205648
222369
239986
255515
274244
292960
307458
321783
15 days demo
ShortCol
Project:
Engineer:
SAMPLE PROJECT
Subject:
Date:
Checker:
COLUMN C1
Copyright 2007
Date:
Applied Loads
Load Description
P
kip
My
kip-ft
Uniaxial Capacities
Mz
kip-ft
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Nrd = [0.85f'c(Ac-As)+fyAs] = 6436.964 kip
file:///var/www/apps/conversion/tmp/scratch_7/277980449.xls
Mny
kip-ft
Mnz
kip-ft
Demand
Capacity
Ratio
(My/Mny)a+
(Mz/Mnz)a
Project:
15 days demo
Subject:
ShortCol
Engineer:
SAMPLE PROJECT
Date:
Checker:
COLUMN C1
Copyright 2007
Date:
25 kip
(-864 4463)
Mny neg =
#VALUE! kip-ft
Mny pos =
#VALUE! kip-ft
Sign convention
Mnz neg =
#VALUE! kip-ft
Mnz pos =
#VALUE! kip-ft
P/Nrd =
0.004
a=
2.000
12
10
Mny
4
0
0
10
15
file:///var/www/apps/conversion/tmp/scratch_7/277980449.xls
20
25
30
Project:
15 days demo
Subject:
ShortCol
Engineer:
SAMPLE PROJECT
Date:
Checker:
COLUMN C1
Copyright 2007
Date:
30 deg (090)
5000
4500
4000
3500
3000
2500
2000
Mn, kip-ft
1500
1000
500
0
0
0.1
0.2
0.3
0.4
0.5
file:///var/www/apps/conversion/tmp/scratch_7/277980449.xls
0.6
0.7
0.8
0.9
YP
Project #
30-Jul-15
Page:
Biaxial
Interact'n
coeff.
file:///var/www/apps/conversion/tmp/scratch_7/277980449.xls
YP
Project #
30-Jul-15
Page:
(-864 4463)
file:///var/www/apps/conversion/tmp/scratch_7/277980449.xls
YP
Project #
30-Jul-15
Page:
file:///var/www/apps/conversion/tmp/scratch_7/277980449.xls
Project:
15 days demo
BoltGroup
Engineer:
SAMPLE PROJECT
Subject:
Checker:
COLUMN C1
Copyright 2007
YP
Project #
30-Jul-15
Date:
Page:
Date:
5 ksi
fy =
60 ksi
Ultimate strain c =
0.003
1 =
Ec = 4069.6 ksi
Es = 29000 ksi
n = Es/Ec =
7.1
0.80
b
Design Code:
AASHTO LRFD-static
b =
Resistance Factors:
0.9
Confinement:
Spiral
c =
0.75
0.750
Section Properties:
Shape: Circular
Diameter , h =
48 in
Concrete Ag = 1809.56 in
24
Steel As =
16 in
Area, in
C.G. from compression edge, in Moment Inertia, in^4
Ac
nAs
Ac+nAs
Yc
Ys
Y
Ic
nIs
I
1809.56
0
1809.557
24
0
24
260576
0
260576
Gross Concrete
24
24
24 260576 21583.67 282160
Transformed 1809.56 97.8851 1907.443
24 1.24735 260605 72257.15 332863
Cracked transformed 1804.69 97.8851 1902.577 0.0133
Loads:
P =
M =
0 kip
1619 kip-ft
Bending direction:
P=
(calculated)
kip
(Compression)
(Tension)
0 kip
-7070.1
24 in
Sum of Moments = 0
(As(fs-fc)(Ys-Yc)) =
0.85f'cAc(Yc-Ycc) =
M=
386 kip-ft
1772.8 kip-ft
2158.5 kip-ft
Recalculate!
file:///var/www/apps/conversion/tmp/scratch_7/277980449.xls
Acc = 1531.62 in
Yc-Ycc = 3.26809 in
= 2.18732 rad
file:///var/www/apps/conversion/tmp/scratch_7/277980449.xls
0
0.800
Nu =
0
Mu = 1726.817
Pure flexure, o
0.800
oMuo = 1313.618
Muo
N=0
Mud
N=0
Nub
Nu =
Mu =
Ast =
Asc =
d=
d' =
ku =
0
2159
0
16
0.0
15.7
0
1642
6776
3080
618.2
103.2
0
175934
6776
3080
618.2
110.1
7427
2781
5544
4312
747.7
148.4
###
0.331
0.400
0.600
kud =
0.0
204.9
247.3
448.6
a = kud* =
0.0
0
-561
156.9
3139
-609
197.8
4082
-769
343.6
1562
-1399
-6509
-2529
-7070.073 0.000109
-3313
0
-7590
0
Ts =
Cs =
Cc = -0.85f'cAc =
Sum(P)=
Nout
-960