PROJECTMANAGEMENT

PROFESSIONAL
FIRSTEDITION

Abstract
ProjectmanagementprofessionalhandbookisakeyforpassingPMPexamandbuilding
conceptualbasisforprojectmanagement.

JavedAkhtar,CE,PE,PMP
Javed.engr@gmail.com

PROJECTMANAGEMENTPROFESSIONAL

INTRODUCTION
Project:
Atemporaryendeavorwithabeginningandanendwhichcreatesa,

Uniqueproduct,
Animprovementofexistingproduct,(SixSigmaProject)
Service,
Result.

NOTE:Progressiveelaborationisthecharacteristicsoftheproject.

ProjectManagement:
Itisbothscienceandartofapplyingprojectmanagementskills,knowledge,andtoolsandtechniques
inasystematicwaytomeettheprojectobjectivesandrequirements.
Thecorefunctionoftheprojectmanagementistomeetthebelowobjectives,

Skill
Scope
Time
Cost
Quality
CustomerSatisfaction

Knowledge

Tools&
Techniques

Project
Management

Itinvolvesfiveprocessgroups(05)whichincludesfortyseven(47)projectmanagementprocessand
balancingthecompetingprojectconstraints(Scope,Quality,Schedule,Budget,Resources,andRisks)
forpotentialchanges.

SuccessfulProject:
Aprojectistobesaidsuccessfulwhenitmeetstheobjectives.

Intime,
Withincostbaseline,
Withoutorminimalunexpectedchangerequestsandvariationorders,
Withinqualityspecifications,
Ultimately,buyerissatisfiedwiththeproduct,service,and/orresult.

ProjectCompletion:
SellerPerspective:Aprojectisannounced/declaredasCOMPLETED,when

Productisformallyandfinallyacceptedbythecustomer.
Procurementissuccessfullyclosed.
LessonslearnedaresubmittedtothemanagementorPMO.

Buyerperspective:Aprojectisannounced/declaredasCOMPLETED,when

Productisformallyaccepted.
Procurementissuccessfullyclosed.

JavedAkhtar,CE,PE,PMP

P a g e |1

PROJECTMANAGEMENTPROFESSIONAL

ProjectStakeholders:
Anyone who can positively or negatively impact the project and can be impacted by the project.
Stakeholderscanbe,
1.
2.
3.
4.
5.
6.

Sponsor(s),
FunctionalManager(s),
ProjectManager,
ProjectTeam,
Customer/Client/Owner/User/Buyer(s)
PMO,

Treatingstakeholdersasassistantteammembersmeansyoukeeptheminformabouttheprojectand
updates.

Operation:
Itisanongoingendeavorwithnoends.Itgeneratesrepetitiveproduct,serviceorresult.Operation
doesnotend,butattheterminationofproductitmayflowinotherdirectionwithanewproductor
modificationtotheprevious.
NOTE:Pointofviewisveryimportanttoconsiderwhenidentifyinganoperationalprocessoraproject.
Tothecustomer,theworkeffortmaybeaproject,howevertotheperformingorganizationthework
effortmaybepurelyoperationalandsomethingtheydoallthetime.

OperationalStakeholders:
Operational stakeholders should be engaged and their needs identified as part of the stakeholder
register and their influence (positive or negative) should be addressed as a part of the risk
managementplan.

Program:
Aprogramisagroupofprojectsandoperationswithsimilarobjectivesorgoals.Alsocanhavelower
levelprogramsunderahighlevelprogram.
Thepurposeinmanagingagroupofsimilarprojects:

Deriveeconomiestoabiggerscale.
Theresourceutilizationimprovedbytheconceptoflearningcurve.
Improvedskills,knowledge,lessonlearnedonsimilarprojects,therisksdecreasedtoacertain
degree.
Controlovertheprojectsincreases.
Organizationsbuildtheirprofileandexpertiseindeliveringspecificprojectsthatarethepart
ofaprogram,hencecapturingthebusinessandsettingmarketplacefortheirbusiness.

ProgramManagement:
Program management controls the programs and project and their interdependencies in order to
realizespecifiedbenefits.Actionsrelatedtotheseinterdependenciesmayinclude,

Resolving resource constraints and/or conflicts that affect multiple projects within the
program,
Aligning organizational/strategic direction that affects project and program goals and
objectives,

JavedAkhtar,CE,PE,PMP

P a g e |2

PROJECTMANAGEMENTPROFESSIONAL

Resolvingissuesandchangemanagementwithinasharedgovernancestructure.

Program management subdivide the large projects into smaller, more manageable pieces or
componentscalledsubprojects.Thisapproachofprojectdecompositionisadoptedtoensurethatthe
projectsuccess,benefitsandobjectivesareachievable.

Portfolio:
Aportfolioisagroupofprograms,projectsandoperationswhicharenotrelatedtoeachother.A
portfoliorepresentstheorganizationalentireinvestment.
Mostofthecases,portfoliosarebeinglaunchedbythegovernmentatlargescale.

PortfolioManagement:
Portfolio management aligns with organizational strategic goals by selecting the right program or
projectanddeterminestheprioritiesamongtheprogramsand/orprojects.

Relationship/Communications between Projects, Program and Portfolio


Managers:
BottomUpCommunication:
1. PerformanceReports,
2. ChangeRequestswithanimpactonothersprojects.

TopDownCommunication:
1.
2.
3.
4.
5.

Strategies&Policies,
ProgressiveElaboration,
Governance,
DispositiononChangeRequests,
ImpactsofChangeRequesttootherprojects.

OrganizationalProjectManagement:
Itistheframeworkforkeepinganorganizationasawholefocusedontheoverallstrategy.Itprovides
direction for how portfolios, programs, and projects, and other organizational work should be
prioritized,managed,executed,andmeasuredtobestachievethestrategicgoals.
OrganizationalProjectManagementprovidesstrategicframeworktouseandguideportfolio,
program,andprojectmanagementtodeliverorganizationalstrategy.
PortfolioManagementselectsandprioritizeprogramsandprojectsthatwillbestachievethe
organizationsstrategicgoals.
Program Management coordinates with the management of different projects to achieve
specificthatsupportstheorganizationalstrategicgoals.
ProjectManagementmanageseffortstodevelopspecificscope,whichsupportstheportfolio
orprogrammanagementobjectivesandultimatelyorganizationalstrategicgoals.
ProjectsarebeingalignedtoanddrivenbytheOrganizationalStrategyandbeingprioritizedbasedon
that.Ifanyprojectisnotalignedwithorganizationalstrategy,theprojectwillbelowprioritizedand
evencanbeterminatedmidway.

JavedAkhtar,CE,PE,PMP

P a g e |3

PROJECTMANAGEMENTPROFESSIONAL

OrganizationalProjectManagementMaturityModel:(OPM3)
OPM3standsforOrganizationalProjectManagementMaturityModel.Thismodelisdesignedby
PMItohelporganizationstodeterminetheirlevelofmaturityinprojectmanagement.

ProjectManagementOffice(PMO):
PMO is not a single entity. PMO role within an organization can be broadly divided into three
categories.

SupportivePMO:
SupportivePMOprovides

Templates,practices,policies,methodologies,andlessonlearnedfromotherprojects.
Ittypicallyexercisesalowlevelofcontroloverprojects.

ControllingPMO:
BesidesprovidingTemplates,practices,policies,methodologies,andlessonlearned,

Itprovidestraininginprojectmanagementandprojectmanagementsoftware(PMIS),
Assistswithprojectmanagementtools,
Ensurecompliancetotheorganizationalpractices,
Ittypicallyhasamoderatelevelofcontroloverprojects.

DirectivePMO:
ThisPMOdirectlycontrolstheprojectswithahighdegree.Alsoauditstheprojectsfortheirsuccess.
AllofthefollowingarethecharacteristicsofdirectivePMObutnotlimitedto,
1. Responsible for creating and distributing project management methodologies,
processesandprocedures(OPA).
2. Monitor compliance with the organizational project management methodologies,
processesandprocedures.
3. Responsibleforcompilinglessonlearnedfortheorganization,andprovidingtothe
projects.
4. Determinesprioritiesamongtheprojects.
5. Manageinterdependenciesbetweentheprojects.
6. Provideguidancetotheprojects.
7. Canhelpprovidingtheresources(projectmanagers).
8. PMOisthepartofChangeControlBoard(CCB).
9. Canrecommendprojecttermination.
NOTE: PMO role may vary from an advisory to full authority over projects. It is a liaison between
portfolios,programs,projects,andcorporatemeasurementsystem.
Sr.

Description

TypeofPMO

Compileslessonlearnedfortheorganization.

ALLPMO

Recommend common terminology, practices, templates, forms, and SupportivePMO


reportingandotherprocedurestobeusedontheprojectsthroughout

JavedAkhtar,CE,PE,PMP

P a g e |4

PROJECTMANAGEMENTPROFESSIONAL

theperformingorganization.Itpromotesconsistencyandstreamlinethe
efforts.
3

Providessupport,trainingsandguidance,requiresalltheprojectwithin ControllingPMO
the organization to use designated project management software but
doesnotexertcontrolovertheprojects.

Manageallprojectsthroughouttheorganization.

DirectivePMO

Providesprojectmanagers.

DirectivePMO

Terminatesprojectmanagerorproject.

DirectivePMO

Hashighestlevelofcontroloverprojects.

DirectivePMO

Manageinterdependenciesbetweentheprojects.

DirectivePMO

PMOisthepartofChangeControlBoard(CCB).

DirectivePMO

10

PerformsPMOaudit.

DirectivePMO

11

Monitor compliance with the organizational project management Controlling+


methodologies,processesandprocedures.
Directive

12

Creates and distributes the project management methodologies, Controlling+


processes,andprocedures.
Directive

13

Prioritizeprojectstoalignwithstrategicgoals.

Controlling+
Directive

14

Coordinatesallprojectswithintheorganization.

Controlling+
Directive

ProjectMonitoringUnit:PMU
PMUisthedepartmentorcompanytomonitortheprojectworksandprogress.Itcanbe,

Athirdpartyhiredbythebuyerforprojectmonitoringandreportingpurpose.
Adepartmentwithinthesellerorganizationmonitoringtheprojectandreportingtothehigh
managementandCEO.

ProjectObjectives:
BuyersObjectives:
Businessneed,marketplaceetc.

SellersObjectives:
1.
2.
3.
4.
5.

JavedAkhtar,CE,PE,PMP

Scope,
Time,

Cost,
Quality,
CustomerSatisfaction,

P a g e |5

PROJECTMANAGEMENTPROFESSIONAL

ManagementbyObjectives:MBO
MBOisaphilosophyofprojectmanagementwithfollowingthreesteps,
1. Establishunambiguousandrealisticobjectives,
2. Periodicallyevaluatewhetherobjectivesarebeingmet,
3. Implementcorrectiveaction.
Forprojectmanagers,MBOmeansiftheprojectisnotinlinewiththeobjectivesordoesnotsupport
thecorporateobjectives,itislikelytoloseresources,assistanceandattention.MBOiseffectiveonly
whenmanagementsupportsit.

ProjectBasedOrganization:PBO
PBOcarrytemporarysystemformanagingprojects.Thetemporarysetupbeingestablishedbasedon
theprojectrequirementandsuccess/workisbeingmeasuredbythefinalresultratherthanbyposition
orpolitics.
PBOistypicallyProjectizedorganization.Sometimes,largePBOshavefunctionalsupportareas.

ProjectConstraints:
Projectconstraintsarelimitingfactorsthatdefineprojectboundaries.Therecanbeahundredsof
constraintsonaproject.Belowisthelistofthekeyprojectconstraints

1.
2.
3.
4.
5.
6.
7.

Scope,
Time/Schedule,
Cost/Budget,
Quality,
Resources,
Risk,
CustomerSatisfaction.

Definingprojectconstraintsandplanningthemprofessionallywill,
Ensureprojectsuccess,
Ensurecustomersatisfaction

Sometimes, project constraints may severely impact the project optimization. All constraints have
certainimpactoncustomersatisfactionwhichitselfisaconstraintontheprojects.

TheTripleConstraints:

JavedAkhtar,CE,PE,PMP

Scopeisbaselinetomeasuretimeandcost.
Scopeincreasemeansincreaseintimeandcost.ProjectscopeisdefinedinProject
ScopeStatementandcontrolledthroughWBS.Anychangeinprojectscopemustbe
subjecttoChangeRequest(CR).CostchangesaresubjecttoVariationOrderandtime
changesarerecordedthroughExtensionofTime(EOT).

Changestothetripleconstraintmustbeapprovedbythesponsor.

P a g e |6

PROJECTMANAGEMENTPROFESSIONAL

ProjectRoles:
1.ProjectManagerPowers:
1.
2.
3.
4.
5.

Formal/Legitimate:Itispowerofpositiondefendingwithlogicsandjustification.
Rewarding:Itispowerofposition.
Penalizing/Coercive:Itispowerofposition.
Expert:ItisthepowerofPMhimself.
Referent:ItisthepowerofPMhimselfbutcomesthroughanotherperson.Ifanother
person/employee likes you and wants to be like you, definitely he will obey your
instructionsandwillbeaffectionatetoyouandprojectaswell.

2.ProjectCoordinator:
1.
2.
3.
4.
5.

Reportingtoexecutiveorfunctionalmanager.
Ensuringtaskcompletion.
Cantmakebudgetorprojectdecisions.
Havesomeauthoritytoreassignresources.
Foundinweakmatrixorfunctionalorganization.

3.ProjectExpeditor:
Itistheweakestofthethreeprojectmanagementroles.Itisanassistantstaffwhohaslittleorno
formalpower.
1.
2.
3.
4.
5.

Reportingtoexecutiveorfunctionalmanager.
Ensuringtaskcompletion.
Canttakedecisions.
Foundinfunctionalorganization.
Theirrolemaybeparttime.

4.SeniorManagement:
Anyonemoreseniorthanaprojectmanagercomesunderseniormanagement.

5.FunctionalManager:
Functionalmanagersarethedepartmentmanagersandhavetheirownresourceswhichcanbeloaned
totheprojects.Financemanager,procurementmanager,design&technicalmanageretc.

6.Stakeholders:
WheneverPMBOKsaysStakeholdersthatsmeansKeyStakeholdersandthoseareseniortothe
projectmanager.

7.Sponsor:
The person or a company who invests on the project. Sponsor may be internal or external to the
company.Itmaybeacustomer,companyorathirdparty.Sponsorleadstheprojectthroughinitiating

JavedAkhtar,CE,PE,PMP

P a g e |7

PROJECTMANAGEMENTPROFESSIONAL

processesuntilformallyauthorized,andplayasignificantroleindevelopinginitialscopeandcharter.
Forissuesbeyondprojectmanagercontrol,thesponsorservesasanescalationpath.Sponsormust
beinvolvedin,

Authorizingscopechanges,
Go/NoGodecisionswhenrisksareparticularlyhigh,

JavedAkhtar,CE,PE,PMP

P a g e |8

PROJECTMANAGEMENTPROFESSIONAL

ORGANIZATIONALINFLUENCESANDPROJECTLIFECYCLE
ORGANIZATIONALIMPMACTONPROJECTS
1. OrganizationalCulture:
Organizational culture affects the project management, progress, and success. It is enterprise
environmentalfactorandincludes,

Motivationandrewardsystems,
RiskTolerance,
Leadership,hierarchy,andrelationships,
Codeofconduct,workethic,andworkhoursetc.

2. OrganizationalCommunication:
Projectmanagementishighlydependentonaneffectivecommunicationstyle,especiallyintheface
oftheprojectmanagementprofession.Itisanenterpriseenvironmentalfactor.

3. OrganizationalStructure:
Organizationalstructureisanenterpriseenvironmentalfactor,whichmayaffecttheprojectbythe
availabilityofresourcesandprojectmanagerauthority.Thesearemostimportantfactorsinorderto
evaluatetheorganizationalstructure.
Differenttypesoforganizationstructureswillhaveapositiveornegativeeffectontheeffectiveness
ofprojectmanagementinyourorganization.Belowtableishelpfultocategorizethestructureofan
organization.

Tracetheorganizationstructureusingprojectcharacteristics.

JavedAkhtar,CE,PE,PMP

P a g e |9

PROJECTMANAGEMENTPROFESSIONAL

FunctionalOrganization:
Itisaverycommonorganizationalstructurewhereteammembersworkforadepartment.

Advantages:
1.
2.
3.
4.
5.

Coordinationattoplevelbetweenthedepartmentmanagers.
Highcompanyexpertisebyfunction.
Highdegreeofprofessionalspecialization.
Clearlydefinedcareerpathintheareasofworkspecialization.
Teammembersreporttoonlyonesupervisor.

Disadvantages:
1.
2.
3.
4.

Littleornoauthorityoftheprojectmanager.
Employeesemphasisontheirfunctionalspecialty.
Hence,givinglowprioritytotheprojects.
Resourcesareoftennotdedicatedtotheprojectandarerentedfromthefunctional
managers.
5. Projectmanagerandadminstaffrolesareparttime.

ProjectizedOrganization:
ProjectizedorProjectBasedOrganization(PBO).

Advantages:
1. ProjectManagerhascompleteauthority.
2. Resourcesarefullydedicatedtotheproject.Disagreement/contentionforresources
doesnotexist.
3. Communicationiseasiestandeffective.
4. Strongloyaltytotheteamandtheprojectaswell.
5. Projectmanagerandadminstaffrolesarefulltime.

Disadvantages:
1. NoHomeDepartmentfortheprojectteam.Aftertheprojectisover,teamwillmove
toanotherprojectorbacktohomes.
2. Lowemployeesexpertiseandlowprofessionalgrowth.
3. Duplicationoffacilitiesandjobfunctions.
4. Mayresultinlessefficientuseofresources.
5. Teammemberswillnotfocustocompletetheprojectjobsastheywillbelookingfor
anotheropportunity.

MatrixOrganization:
Matrixorganizationsreflectablendoffunctionalandprojectizedcharacteristics.Matrixorganization
can be classified as weak, balanced, or strong matrix depending on relative level of power and
influencebetweenfunctionalandprojectmanagerandtheresourcesavailability.

WeakMatrixOrganization:
Advantages:
1. SameasFunctionalOrganizationwithfollowingdisadvantages.

JavedAkhtar,CE,PE,PMP

P a g e |10

PROJECTMANAGEMENTPROFESSIONAL

Disadvantages:
2.
3.
4.
5.

Projectmanagerhasverylittleornopower.
Lowprioritytotheprojectsforfunctionalmanagersandteammembers.
Resourcesarepartiallydedicatedtotheproject.
Projectmanagerandadminstaffrolesarenotfulltime.

BalanceMatrixOrganization:
Advantages:
1. SameasFunctionalOrganizationwithfollowingdisadvantages.

Disadvantages:
1.
2.
3.
4.

Moderateprioritytotheprojects.
Resourcesarepartiallydedicatedtotheproject.
Projectmanagerandadminstaffrolesarefulltime.
Powerissharedbetweenprojectmanagerandfunctionalmanager.

StrongMatrixOrganization:
Advantages:
1. PMO exists in strong matrix organization as project managers are reporting to
centralizedprojectmanagementbodywhichcanserveasPMOaswell.

Disadvantages:
1. ResourcedonotreporttoprojectmanagerandlessloyaltoPM.
2. Resourcescauseaconflictbetweenprojectmanagerandfunctionalmanager.
NOTE:Abovetwofactorsdistinguishbetweenstrongmatrixandprojectizedorganizations.

OverallAdvantages&DisadvantagesofMatrixOrganization:

Matrix(balancedorstrong)organizationispreferredwhenprojectislarge&multi
disciplinary.

Matrixorganization
Advantages

Disadvantages

Highlyvisibleprojectobjectives.

Extraadministrationisrequired.

Improvedprojectmanagercontrolover
resourcesfromweektostrongmatrix.

Morethanonebossforprojectteam.

Moresupportfromfunctionalareas.

Resourceallocation/managementiscomplex.

Bettercoordination.

Multipleinputstoteammembers.

Improvedhorizontalandvertical
disseminationofinformationfromweekto
strongmatrix.

Complexcommunications.

Teammembersmaintainahome.

Nohome.

Teammembersgainexpertiseinthefieldof
theirprofession.

Higherpotentialofresourceconflicts.

JavedAkhtar,CE,PE,PMP

P a g e |11

PROJECTMANAGEMENTPROFESSIONAL

Projectmanagementstaffisworkingfulltime Requiresadditionalpoliciesandprocedures
fortheproject.
foremployees.
Administrationstaffisworkingfulltimefor
theproject.

Differentpriorities and/orobjectivesmay
exist.

Skilledresources,highexpertise.

Requiresmoreeffortsformonitoringand
controllingtheprojects.

CompositeOrganization:
An organization that uses a combination of organizational structures is called a composite
organization.Manyorganizationalstructuresincludecertainlevelssuchas,

StrategicLevel,
MiddleManagementLevel,
OperationalLevel.

Projectmanagermayinteractwiththeselevelsdependinguponfactorssuchas,

Strategicimportancetotheproject,
Capacityofkeystakeholderstoexertinfluenceontheproject,
Degreeofprojectmanagementmaturity,
Projectmanagementsystem,and
Organizationalcommunications.

Theaforesaidfactorsdefinetheprojectcharacteristicssuchas,

Projectmanagersauthoritylevel,
Resourceavailabilityandmanagement,
Entitycontrollingtheprojectbudget,
Projectmanagersrole,and
Projectteamcomposition.

Thesecharacteristicshelptodeterminethetypeoforganizationalstructure.

ProjectManagerPowerW.R.T.OrganizationalStructure:

ProductLifeCycle:
1.
2.
3.
4.
5.

JavedAkhtar,CE,PE,PMP

Productlifecyclegenerallyconsistsofsequentialandnonoverlappingphases.
Phasetophaserelationshipisdefinedbytheoperationandcontroldivision.
Aprojectlifecycleoccursinoneormorephasesofaproductlifecycle.
Startswithconceptofanewproductandendsatproductwithdrawal.
Productlifecyclemaybethesimilarforaproductindifferentindustries.

P a g e |12

PROJECTMANAGEMENTPROFESSIONAL

ProjectLifeCycle:
1. Projectlifecycleistodeterminetheprojectphasesandtheirrelationship(sequential,
overlapping,oriterative).
2. Projectlifecycle(projectphases)aredeterminedduringinitiatingprocessgroupwhile
performinghighlevelplanning.
3. Projectlifecycledescribeswhatyouneedtodotocompletethework/project.
4. Projectlifecycleconsistsofdifferentphasessuchas,
5. Construction: Feasibility,Planning,Design,Execution,Turnover.
6. Information Technology: High level design, detailed design, Coding, Testing,
Installation,Conversion,andturnovertooperations.

ProgressiveElaboration:(Iteration)
Theprocessofcontinuallyrefiningscopeandprojectestimatesisknownasprogressiveelaboration.
It is ongoing definition of the project which means that the information on the project will
progressive be elaborated with the passage of time on the project. It involves continuous
improvement.
1.
2.
3.
4.

Rollingwaveplanning(6.1_DefineActivities)
Prototype(5.1_CollectRequirements)
Iterativerelationship(phasetophase)
Developingprojectmanagementplan

PhasetophaseRelationships:
Project manager is responsible to determine an appropriate phasetophase relationship for the
project.Followingarethephasetophaserelationships,

SequentialRelationship:
Previousphasewillbecompletedbeforestartofnextphase.

OverlappingRelationship:
Projectphasescanbeoverlapped.

ParallelRelationship:
Twoormoreprojectphasesarerunningparallel

PredictiveLifeCycle:
Predictivelifecyclesareonesinwhichprojectscope,andtimeandcostrequiredtodeliverthatscope,
aredeterminedasearlyintheprojectlifecycleaspracticallypossible.
Itis also known asplan driven orwaterfallapproach indeliveringthe project scope.Thebelow
graphicsrepresentsatypicalwaterfallimplementationofprojectphases.

JavedAkhtar,CE,PE,PMP

P a g e |13

PROJECTMANAGEMENTPROFESSIONAL

Workforeachphaseisdifferentinprecedingorsubsequentphase,therefore,theskillsetsrequired
fortheprojectteammayvaryfromphasetophase.

IterativeandIncrementalRelationship:
Due to undefined and uncertain environments, the phases of the project are being repeated
intentionally.Therepetitivephasessuccessivelyaddincrementalfunctionalitytotheproduct.Each
phase can be termed as iteration. The iterations may be performed in sequential or overlapping
fashion.Aniterationisanexampleofprogressiveelaboration.

AdaptiveLifeCycles:
These are called as change driven or agile. Adoptive methods or agile project management
approachesaregenerallypreferredtoaddresshigh

Levelofchanges,
Projectrisks,and/or
Uncertainties.

Thislifecycleisalsoiterativeandincrementalbuttheiterationsareplannedtoperformforashort
durationofusually2to4weeks.

ProductBacklog:Theprojectscopeisdecomposedtosmallelementsknownasproductbacklog.The
productbacklogsarefurtherprioritizebycollaborationofcustomerandtheperformingorganization.
The customer, product owner is ultimately responsible for what gets developed and in which
sequence.
PotentiallyShippableproductIncrement:Theprojectteamdevelopsanddeliveranincrementofthe
producttotheproductionstandardswhichisknownaspotentiallyshippableproductincrement.Itis
submittedtocustomerforreviewandacceptance.Incompleteordefectivefeaturesarenotaccepted
forsignoffataniterationendreview.
SCRUM:Itistheoneofthemosteffectivemethodscurrentlyusedinagileprojectmanagementspace.
Ascrumrepresentsagroupofpeopleworkingclosely(headtohead)andpushingagainsteachother
toachievethetarget.
SPRINT: A short attempt or iteration is known as sprint. The product features assigned to a short
attemptoriterationareknownassprintbacklog.

JavedAkhtar,CE,PE,PMP

P a g e |14

PROJECTMANAGEMENTPROFESSIONAL

CharacteristicsofProjectLifeCycle:
Withtheprogressiveelaborationandpassageoftimeontheproject,

CostofChanges

StakeholdersInfluence:
Higheratinitialphaseoftheprojectandgraduallydecreaseswiththepassageoftime.

JavedAkhtar,CE,PE,PMP

P a g e |15

PROJECTMANAGEMENTPROFESSIONAL

Resource/Staffing:
Loweratinitialphases(initiatingandplanning),Thengraduallyincreasesandhighestduringexecution,
monitoringandcontrolling,Lowersdownfromthepeaktotheminimumduringtheprojectclosing
phase.

ProjectCost:
Sameasprojectresources.Projectcostincreaseswiththeincreaseinprojectresources.

RiskImpact&probability:
Sameasstakeholdersinfluence.Higheratinitialphaseoftheprojectandgraduallydecreaseswith
thepassageoftime.

CostofChangeRequests:
ThisfactorisoppositetoStakeholdersInfluenceandRiskImpact.Costofchangesislowatthestart
oftheprojectandbecomeshighwiththepassageoftime.

EnterpriseEnvironmentalFactor:(EEF)
TherearetwotypesofEEF,Internal&Externalandtheireffectcanbepositiveornegative.Following
canbetheInternalEEFactors,

InternalEEF:
1. OrganizationalCulture.
2. OrganizationalStructureandgovernance.
3. Company/Industry/OrganizationalStandards.
Standardsaresetofrulesorprincipleswhichshouldbeadoptedduringtheprojectphases.
Thesearenecessarytofollowbutnotobligatory.Notfollowingthesestandardsmaycausere
workorextracostandcanaffectthemarketplaceconditionsbutitwillnotletyourbusiness
tostoporcauseyoutoputinprison.
4. ExistingHumanResources:
Itincludestheexistingresourcesandtheircalendarswiththeinformationofresourcetype,
category,skill,discipline,workethicsetc.
5. OrganizationalInfrastructure:
Organizational Existing Facilities and capital equipment such as insurance policies,
transportationetc.
6. ProjectManagementInformationSystem:(PMIS)
Thesearetheautomatedtoolssuchasschedulingtools,
ProjectManagementSoftware,
InformationCollectionandDistributionSystem,
ChangeControlSystem,
ConfigurationManagementSystem,
ContractChangeControlSystem,
RecordsManagementSystem,
WorkAuthorizationSystem(WAS).
7. Company/ProductMarketplaceCondition:
8. OrganizationsEstablishedCommunicationChannels:
9. PersonalAdministration:

JavedAkhtar,CE,PE,PMP

P a g e |16

PROJECTMANAGEMENTPROFESSIONAL

Staffing,retentionguidelines,employeeperformancereviewsandrewards,trainingrecords,
timetrackingandovertimepoliciesetc.
10. EmployeesWorkEthics:

WorkAuthorizationSystem(WAS):
Workauthorizationsystemisparticularlydesignedto

Assignprojectworkstotheteam,
Ensurethatworkisapprovedbeforeitbegins,and
Ensurethattheworkisdoneattherighttimeandincorrectsequence.

WBSisaneffectivetooltoassigntheworkandtomonitor&controltheprojectscope.Workpackage
dictionaryisanexampleofWAS.Organizationsmayhavedifferentapproachestoassigntheworkto
theprojectteam.

ExternalEEF:
11. GovernmentRegulations:
12. PoliticalClimate:
13. CommercialDatabases:
CommercialdatabasemayincludetheResourceProductivityRatesandUnitCostRates
etc.
14. StakeholdersRiskTolerance(Canbeinternalorexternalbasedonstakeholdertype)

Standards:
1. Anapprovedanddocumentedguidelinesbyarecognizedbody.
2. Compliancewiththestandardsisnotmandatory.
3. Noncompliance to the standards may cause marketplace to become lower and
reducedchancesoffuturebusiness.

Regulations:
1. Anofficialguidelinesprovidebyagovernment.
2. Compliancewiththestandardsismandatory.
3. Noncompliancetoregulationsmaycauselitigation,closedbusinessandsometimeto
Jail.

OrganizationalProcessAssets:(OPA)
OPAarethetemplates,plans,processes,procedure,policies,methodologies,andknowledgebases
specific to and used by the performing organization. OPA are the input to most of the planning
processes.OPAprovidesguidelinesandcriteriafortailoringeithertheorganizationsprocessesorPMI
processestothespecificneedoftheproject.OPAsarebroadlydividedintotwomajorcategories.
1. ProcessesandProcedures,
2. CorporateKnowledgeBase.

ProcessesandProcedures:
ProcessesandProceduresarefurthercategorizedtothreesubcategoriesasbelow,
1. InitiatingandplanningPNP.
2. Executing,MonitoringandControllingPNP.
3. ClosingPNP.

JavedAkhtar,CE,PE,PMP

P a g e |17

PROJECTMANAGEMENTPROFESSIONAL

InitiatingandPlanning:

Specific organization standards such as HR, HSE, Ethics, Project management, and quality
policiesandprocedures.
Templates used/adopted by the organization for project initiating and planning processes.
Thesetemplatesmayincludeavarietyofformsandformatsaslistedbelowbutnotlimited
to,

Executing,MonitoringandControlling:

Scope,time,cost,andqualitycontrolprocedures.
Changecontrolproceduresincludingstepsbywhichthemedications/changeswillbe
initiated,approved,performedandvalidated.
Financialcontrolprocedures(costcontrolaccountsandpolicies,fundingcontrolplans,
paymentmethods(cash,checks,LCetc.)andpaymentterms.
Issueanddefectmanagementproducersdefiningissueanddefectidentification,issueand
defectcontrol,resolutionandactionlists.
Organizationalcommunicationrequirements,technology,methodsetc.
Proceduresforprioritizing,approvingandissuingworkauthorizations.
Riskcontrolproceduresandtemplates.
Procurementcontrolproceduresandtemplates.
Listofthetemplatesusedformonitoringandcontrolmayincludebutnotlimitedto

Closing:

Projectclosingguidelinesandrequirements(e.g.,lessonedlearned,financialaudits,project
evaluationbyPMO,productvalidation,acceptancecriteria,listofrequiredprojectarchives
etc.)

CorporateKnowledgeBase:
Corporateknowledgebasereferstothedatabasesandsystemforstoringandretrievingtheproject
recordsandinformation.Someorganizationsduetotheirimmatureprojectmanagement,havetheir
databasesintheformoflogs.
Itmayinclude,

ConfigurationManagementSystem:
Thissystemordatabasecontaintheversionsandbaselinesofallorganizationalstandards,
procedures,policies,methodologiesandprojectdocuments.

FinancialDatabase:
Itcontainslaborhours,incurredcosts,budgets,costoverruns,fundingrequirements(cashinout
graphs)etc.

HistoricalInformationandLessonLearnedDatabase:
Itcontainsprojectrecords,documents,projectclosureinformationanddocumentation,project
selectionsandprojectperformanceinformationandinformationfromriskmanagementactivities.

JavedAkhtar,CE,PE,PMP

P a g e |18

PROJECTMANAGEMENTPROFESSIONAL

LessonLearned:PostMortem
Lesson learned are the historical records containing (variances, causes of variances, selected
correctiveactions,documentedpreventiveactions,andreasonsforselectedcorrectiveaction)which
arehelpful,

o
o
o

Asaninputtotheprojectforeffectiveplanningbyavoidingmistakesandadoptinggood
practicesdonebyothers.
Asanoutputoftheprojecttobeusedashistoricalrecordsforfutureprojects.
Toidentifythepersonswhoareaccountableformistakes.

NOTE:Aprojectmanagerwilluselessonlearnedforpoints1&2whileacompanywillusethemfor
point#3.
Lessonlearnedshouldbedocumentedwhenexecuting,monitoringandcontrolling,andclosingthe
projectorphaseandarchivedwhileclosingtheprojectorphase.Ifyoudocumentlessonlearnedwhile
closingtheprojectorphase,thosewillbeuselessforyourproject.

IssueandDefectManagementDatabase:
Itcontainsissuesanddefectslogswithinformationofstatus,control,resolutionandactionlists.

ProcessMeasurementDatabase:
ItcontainstheprocessesmeasurementdataandQAaudits,resultsofauditsand
corrective/preventiveactionlists.

ProjectLibrary:
Itcontainsfilesfrompreviousprojects(scope,cost,schedule,performancemeasurementbaselines,
projectcalendars,projectschedulenetworkdiagrams,riskregisters,plannedriskresponse,defined
riskimpacts,ingeneralitincludesallprojectfilesashardcopyandsoftcopyformat).

ProjectGovernance:
Projectgovernanceisaframeworkformakingprojectdecisions,definingrolesandresponsibilities,
andaccountabilitiesforprojectsuccessanddeterminestheeffectivenessoftheprojectmanager.
PMOmayplaysomedecisiveroleintheprojectgovernance,andtheprojectgovernanceframework
mayincludeanyorallofthefollowingelements:

Deliverableacceptancecriteria,
Escalationprocessforresolvingissuesduringtheproject,
Relationshipbetweenprojectteam,organizationgroups,andexternalstakeholders,
Projectorganizationchart,
Processesforprojectcommunications,
Decisionmakingprocessesfortheproject,
Aligningprojectgovernanceandorganizationalstrategy,
Projectlifecycleapproach,
Processforphasereview,
Processforreviewandapprovaloftheprojectchanges(Budget,scope,quality,schedule),
Processforaligninginternalstakeholderswithprojectprocessrequirements.

JavedAkhtar,CE,PE,PMP

P a g e |19

PROJECTMANAGEMENTPROFESSIONAL

PhaseEndReview:
Atthecompletionofeachphase,amanagementreviewofdecisiongateisexecutedtodetermine
whethertheprojectcancontinue,needsfurtheradjustments,orshouldbecancelled.
Thusaphaseendreviewcanachievetwogoalsfortheproject:

Authorizationtoclosethecurrentprojectphase.
Authorizationtoinitiatethesubsequentprojectphase.

Implementingtheprojectphasestructureinaprojectcandeliverthefollowingbenefits:

Breakingdowntheworkintophasesenablesmoreaccuratebudgetandtimelineestimates.
Ihelpspreventscopecreep.

JavedAkhtar,CE,PE,PMP

P a g e |20

PROJECTMANAGEMENTPROFESSIONAL

PROJECTMANAGEMENTPROCESS&PROCESSGROUPS
Process:
Aprocessisasetofinterrelatedactionsandactivitiesperformedtocreateaperspecifiedproduct,
service,andresult.
Inorderforaprojecttobesuccessful,theprojectteamshould,

Selectappropriateprocessesrequiredtomeettheprojectobjectives,
Useadefinedapproachtomeetrequirements,
Establishandmaintainappropriatecommunicationandengagementwithstakeholders,
Balancethecompetingconstraintsofscope,time,cost,quality,resources,andrisktoproduce
thespecificproduct,serviceorresult.

Theprojectprocessesaregenerallyfallintotwomajorcategories.

ProjectManagementProcess:
Aprojectmanagementprocessisacombinationofinputs,tools&techniques,andoutputs(ITTO).
OPAandEEFshouldbetakenintoaccountforeveryprocess,eventheyarenotexplicitlylistedasan
inputinthePMIprocessspecification.
APMprocessensuretheeffectiveflowoftheprojectthroughoutitslifecycle.

Input:
Everyprocessrequiressomeinformationtoapplycertaintoolsandtechniquetogetvaluable
output.Thisinformationisintheformofdocumentandservesasinputtotheprocess.

Tool&technique:
Tools and techniques are the methods and/or actions that are used to evaluate, manipulate, and
transform inputs to outputs. Tools can be software, calculation sheets, formulas etc. Tools and
techniquesarealsousedtosolvetheproblemsincasetheinputisaproblem.

Output:
Everyprocessgeneratesatleastoneoutput.Outputistheendofyourefforts.Itcanbeadocument,
product,service,oraresult.
Outputfromoneprocessisusedasaninputtoanother.

ProductorientedProcess:
Theseprocessesdemonstratetechnicalityoftheproduct.Inotherwords,theseprocessescarriedout
tomeettechnicalrequirementsandspecificationoftheproduct.Forexample,variousconstruction
toolsandtechniquesneedtobeconsideredwhendeterminingtheoverallcomplexityofthehouseto
bebuilt.

ProcessGrouping:
Projectmanagementprocessesaregroupedintotwocategories.

ProcessGroups
KnowledgeAreas

JavedAkhtar,CE,PE,PMP

P a g e |21

PROJECTMANAGEMENTPROFESSIONAL

KnowledgeArea:
Aknowledgearearepresentstheareaofspecializationandgroupedsimilarprocesseswithcomplete
setofconcepts,terms,andactivitiesthatmakeupaprofessionalfield.Therearetenknowledgeareas
coveringtheprofessionalprojectmanagementandarelistedbelow,
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

ProjectIntegrationManagement,
ProjectScopeManagement,
ProjectTimeManagement,
ProjectCostManagement,
ProjectQualityManagement,
ProjectHumanResourceManagement,
ProjectCommunicationsManagement,
ProjectRiskManagement,
ProjectProcurementManagement,and
ProjectStakeholdersManagement.

ProcessGroups:
Morethanoneprocesseswithsimilarrelatedactivitiesmakeaprocessgroup.Thisisverticalgrouping
of the processes in processes in table 3.1. There are five process groups involved in project
managementandarelistedbelow,
1.
2.
3.
4.
5.

InitiatingProcessGroup,
PlanningProcessGroup,
ExecutingProcessGroup,
MonitoringandControllingProcessGroup,and
ClosingProcessGroup.

InitiatingProcessGroup:
Thesesetofprocessesisperformedtodefineanewprojectornewphaseofanexistingproject.The
projectinitiatingprocessesmaybeperformedatprogramoportfolioleveloutsidetheprojectslevel
ofcontrol.Thestepsinvolvedinprojectinitiatingare,butnotlimitedto

Assignaprojectmanager,(itispreassignment)
Documentbusinesscaseandprojectselectioncriteria,
Determineinitialprojectscope(projectstatementofworkforRFQ/RFP/Bids/Tenders)
Dividelargeprojectintophases,
Definemeasurableprojectobjectivesandrelatedsuccesscriteria
Definehighlevelprojectassumptions,constraints,andrisks,
Describeproduct/deliverableaspracticalascanbe.
Determineprojecttimeframe(ROM+ExpertJudgment),
Estimateprojectcost(ROM+ExpertJudgment),
Defineprojectacceptanceandsuccesscriteria,
Authorizeprojectmanager(obtainformalapprovalofprojectcharter)
Identify stakeholders involved, their requirements, powers, influences, and interests are
importanttoknowatearlystageoftheprojectwhichhelpsbettertoplan,execute,monitor
andcontrol,andclosetheproject.
Alignprojectpurposeswithstakeholdersexpectations.

JavedAkhtar,CE,PE,PMP

P a g e |22

PROJECTMANAGEMENTPROFESSIONAL

CommonTNT:

ExpertJudgment,
FacilitationTechniques,and
StakeholdersAnalysis

CommonOutputs:

ProjectCharter,and
StakeholdersRegister.

Initiatingprocessandprojectlifecycle:

Staffinglevelandresourcesarelow,
ProjectCostsarelow,
Costofchangesislow,
Chanceofsuccessislow,
Riskstotheprojectsuccessarehigh,
Stakeholdersinfluenceishigh.

PlanningProcessGroup:
Startingfrombusinesscase,projectcharter,andstakeholdersregister,itistimetodevelopaplanhow
to execute, monitor and control, and close the project in order to achieve its objective. A project
management plan consists of different subsidiary management plans, documents and baselines.
Planningprocessesgrouphelpstodevelopprojectmanagementplan.

CommonOutputs:

Projectdocuments,
ManagementPlans,and
PerformanceBaselines.

ExecutingProcessGroup:
Executingprocessesgroupincludestheprocessesto

Executetheworkpackages,
Collectanddistributeworkperformanceinformation,
Performqualityassurance,
Managestakeholdersexpectations.

CommonOutputs:
Thegeneraloutputsoftheprocessesare,

Thedeliverables(product,service,orresult),
Workperformanceinformation,
Changerequests,
Conductprocurementoutputs,

Monitoring&ControllingProcessGroup:
Monitoringandcontrollingprocessesgroupincludestheprocessesto

Performinspections.

JavedAkhtar,CE,PE,PMP

P a g e |23

PROJECTMANAGEMENTPROFESSIONAL

Measureworkperformance,
Performintegratedchangecontrol,
Carryoutvarianceanalysis(EVM),
Performforecasts,
Identifyandanalyzetrends,
Projectperformanceappraisals.

CommonTNT:

Inspections,
PerformanceReviews,
VarianceAnalysis,
TrendAnalysis,
Forecasting.

CommonOutputs:
Thegeneraloutputsoftheprocessesare,

Lessonlearned,
Performancereports,
Changerequests,
Validatedchanges,(QC)
Validateddeliverables,(QC)
Completedchecklists,(QC)
Validatedcorrective/preventiveactions,(QC)
PMP,OPA,riskregister,andprojectdocumentsupdates.

Note:Therecanbesomanychangerequeststhatarepouringinduringexecutionandmonitoringand
controllingstage.Insuchcases,itisrequiredtoreplantheprojectmanagementplan.Therootcause
of unexpected changes can be improperly defined project scope. The find out the root cause, PM
shouldreviewthefollowingsindescendingorder,

ProjectScopeStatement,
ProjectCharter,and
BusinessCase.

ClosingProcessGroup:
Closingprocessesgroupisthelastgroupofprocessesinaphaseorproject.Itincludes,

Closethephaseorproject,
Closeprocurement.

CommonTNT:

Audits,
ExpertJudgment,
AnalyticalTechniques

CommonOutputs:
Thegeneraloutputsoftheprocessesare,

JavedAkhtar,CE,PE,PMP

P a g e |24

PROJECTMANAGEMENTPROFESSIONAL

Accepteddeliverable(productverification),
Lessonlearned,
Customerfeedback,
Projectarchives.

Closingprocessandprojectlifecycle:

Staffinglevelandresourcesarelow,
ProjectCostsarelow,
Costofchangesishigh,
Chanceofsuccessishigh,
Riskstoprojectsuccessarelow,
Stakeholdersinfluenceislow.

JavedAkhtar,CE,PE,PMP

P a g e |25

PROJECTMANAGEMENTPROFESSIONAL

ProcessChart:

JavedAkhtar,CE,PE,PMP

P a g e |26

PROJECTMANAGEMENTPROFESSIONAL

ProcessGroupsInteraction:

WorkPerformanceData:

DeliverableStatus,Physicalpercentcomplete,
Executedquantities,
Actualstartandfinishdates,
Actualduration,

JavedAkhtar,CE,PE,PMP

P a g e |27

PROJECTMANAGEMENTPROFESSIONAL

Actualcosts,
Numberofdefects,
Numberofchangerequests,and
Executedchangerequests.

WorkPerformanceInformation:
Theworkperformancedatacollectedfromprojectexecutionisbeinganalyzedwithvariousanalysis
andcomparisontools.Theoutputoftheanalysisiscalledworkperformanceinformation.

WorkPerformanceReport:
Workperformanceinformationiscompiledintoprojectdocuments(presetformats)knownasproject
performance reports and distributed to the project team and stakeholders through project
communicationsmatrix.
ProjectExecution

WorkPerformanceData

ProjectControl

WorkPerformanceInformation

Updated/Revised
ProjectManagement
Plan

OverallProject
Control

WorkPerformanceReports

Project
Change
Control

ApprovedChange
Request

Project
Management
Plan

ProjectTeamMembers

ProjectStakeholders

Project
Communications

Reports

WorkPerformanceData,Information,andReportsFlowChart
Projectexecutiongeneratestheworkperformancedata.
Workperformancedataisbeinganalyzedthroughcontrolprocessestogetthework
performanceinformation.
WorkperformanceinformationintheformofareportissubmittedtoProjectChange
Control,teammembers,andprojectstakeholders.
Projectchangecontrolapprovetherequiredchanges.
Projectmanagementplanismodified/revisedfortheapprovedchanges.
Themodifiedprojectmanagementplanisdistributedtoprojectteamforexecution.

JavedAkhtar,CE,PE,PMP

P a g e |28

PROJECTMANAGEMENTPROFESSIONAL

JavedAkhtar,CE,PE,PMP

P a g e |29

PROJECTMANAGEMENTPROFESSIONAL

4.PROJECTINTEGRATIONMANAGEMENT:
Projectintegrationmanagementincludestheprocessesandactivitiestocombine,unify,andmanage
interdependenciesamongtheprojectmanagementknowledgeareas.
Please refer to the attached table for processes, inputs, tools & techniques, and outputs those
constitutetotheprojectintegrationmanagement.
KeyoutputsofProjectIntegrationManagementprocessesare,
Initiating

Planning

Executing

Monitoring&
Controlling

Closing

Project
ProjectCharter Management
Plan

Deliverables,
WorkPerformance
Data,
ChangeRequests

ChangeRequests,
CRStatusUpdates

Accepted
Product

Updatesto
PMPlan
ProjectDocuments

OPAUpdates

4.1:DevelopProjectCharter:

Itistheprocessofdevelopingaformaldocumentthatauthorizestheexistenceoftheprojectand
providesprojectmanagerthepowertoapplyorganizationalresourcesforprojectactivates.Project
worksstartaftersighingofftheprojectcharter.
Itissimilartocontractualdocument(contract)insenseofobligations,bondage,andauthorization.

Contract:Legalbondagebetweensellerandbuyer.
Charter:Internalbondage/contractbetweensponsorandtheprojectteam.

JavedAkhtar,CE,PE,PMP

P a g e |30

PROJECTMANAGEMENTPROFESSIONAL

4.1.1.Inputs:
1.ProjectStatementofWork(SOW):
Statement of work (SOW) is narrative (practical as possible as can be) description of
product/deliverable.SOWisthepartofbiddocument(RFP,RFI,RequestforBid,oraspartofcontract).
Itisusuallycreatedbythecustomer/sponsor.SOWincludes,

BusinessNeed,
ProductScopeDescription,
OrganizationStrategicPlan(OSP).

Forinternalprojects,thedetailsofSOWcanbedevelopedinWBS&WBSdictionary(Iprefertocreate
aninternalprojectrequirementsdocumentcontainingtheSOW).
Forexternalprojects,theSOWiscalledprocurementstatementofwork.Itisalegaldocumentand
mustbereviewedbycontractsadministrativeprofessional

2.BusinessCase:
Business Case is the document which includes business need and project selection to initiate the
project.Businesscaseisdevelopedbasedontheproject(business)needandselection.

JavedAkhtar,CE,PE,PMP

P a g e |31

PROJECTMANAGEMENTPROFESSIONAL

2.1.BusinessNeed:
Belowarethefactorscausingtoinitiateaproject,
1.
2.
3.
4.
5.
6.
7.

MarketDemand
CustomerRequest
OrganizationalNeed
TechnologicalAdvance
LegalRequirement
SocialNeed
EnvironmentalRequirements

2.2.ProjectSelection:
Projectselectionisthepartofbusinesscase.Therearetwobroadmethodsforprojectselection:

MathematicalApproach:
Theseareconstrainedoptimizationmethods.

LinearProgramming
IntegerProgramming
DynamicProgramming
MultiObjectivePlanning

ComparativeApproach:
Thesearethemethodstomeasuretheprojectbenefits.

MurderBoard
PeerReview
ScoringModels
EconomicModels

EconomicModeling:
Belowaretheeconomicmodelsandbasedoncomparativeanalysis.
Mostcommonprojectselectioncriterionareasfollow,
1. BenefitCostRatioBCR,(Sellerandbuyer)
2. PlaybackPeriod,(Buyer)
3. PresentValuePV,IfBCRandpaybackperiodisgiven,theselectioncanbemadeonPresent
ValueConcept.

PresentValue(PV):
SelectprojectwithhighestPV.Presentvaluemeansthevalueoftodaycomparedwiththefuturevalue
(FV).PValwayslessthanFVduetothedenominatorwhichismorethan1inallthecases.
PV=FV(1+r)n
Where,r=Interestrate,n=No.oftimeperiod

NetPresentValue(NPV):
SelectprojectwithhighestNPV.Theequationis
NPV=PVIPVC
Where,PVI=PresentValueofIncome,PVC=PresentValueofCost.TheprojectwithgreatestNPVis
typicallyselected.Again,usethesameformulatocalculatepresentvalueeitherforcostorincome.
Interestratewillbethesameforbothcostandincome.

JavedAkhtar,CE,PE,PMP

P a g e |32

PROJECTMANAGEMENTPROFESSIONAL

InternalRateofReturn(IRR):
ProjectwithhigherIRRpercentageshouldbeselected.
NOTE:InterestrateisappliedtotheloanswhileIRRisappliedtotheinvestment.

PaybackPeriod:
Projectwithlowestpaybackperiodshouldbeselected.Itisthetimetorecoverthecostoftheproject.
PaybackPeriod=NetInvestmentPeriodicCashInflow

CostBenefitAnalysis:
Benefitisthesameasrevenueandthesearenottheprofit.Forexamperspective,therecanbeeither
CBRorBC.
CBR>1.0meanscostismoreandbenefitisless.LOSS
CBR=1.0meanscostandbenefitareequal.LOSS
CBR<1.0meanscostislessandbenefitismore.PROFIT
AndviceversafortheBenefitCostRatio.Ifitismorethan1.0,projectwillbebeneficial.Iflessthan
1.0orequalmeansLOSS.

EconomicValueAdded(EVA):
Itisconcernedwithwhethertheprojectreturnstothecompanymorevaluethantheinitiativecost.
ItisdifferentfromEarnedValueAnalysis(EVA).

OpportunityCost:
Itrepresentstheopportunitygivenupbyselectingoneprojectoveranother.Itisthevalueofthe
projectnotselected.

SunkCost:
Itis the actualcostexpended for the project. Sunk costs should notbe consideredwhen deciding
whethertocontinuewiththetroubledproject.

LawofDimensioningReturns:
Itstatesthataftercertainpoint,addingmoreresourceswillnotproduceaproportionalincreasein
theproductivity.

WorkingCapital:
Itistheamountthatcanbeinvestedforcertainproject(s).
WorkingCapital=InvestmentAvailable+CurrentInvestmentLiabilities

Depreciation:
Itisthelossofvaluewiththepassageoftime.Therearetwotypesofdepreciations.

StraightLineDepreciation:
Itisperiodicdepreciationandisconstantoverthelifecycleforcertainno.ofperiods.Sameamount
ofdepreciationforeveryperiodoftime.

AcceleratedDepreciation:
a. DoubleDecliningBalance
b. Sumoftheyearsdigits
AccelerateddepreciationisdepreciatesfasterthantheStraightLineDepreciation.

JavedAkhtar,CE,PE,PMP

P a g e |33

PROJECTMANAGEMENTPROFESSIONAL

ReturnonInvestment(ROI):
Higherisbetter.
ROI=NetincomebeforetaxTotalInvestment;

Netincomebeforetax=BenefitCost
ROI=NetincomeaftertaxTotalInvestment;

Netincomeaftertax=BenefitCostTax

ReturnonInvestedCapital(ROIC):
Higherisbetter.
ROIC=NetIncomeaftertaxTotalcapitalinvestedintheproject

ReturnonSales(ROS):
Higherisbetter.ROS=NEBTorNEAT/TotalSales

ReturnonAssets(ROA):
Higherisbetter.ROA=NEBTorNEAT/TotalAssets

3.Agreements:
An agreement can take the form of acontract, service level agreement (SLA), letterofagreement
(LOA), letter of intent (LOI), or memorandum of understanding (MOU). Contract is required if the
customerisexternaltotheorganization.

4.EnterpriseEnvironmentalFactors:
Companycultureandstructure,
Governmentalregulationsandindustrialstandards,
Marketplaceconditions.
Beforedevelopingprojectcharter,itismostimportanttounderstandabovementionedEEF.

5.OrganizationalProcessAssets:

TemplatesofProjectCharter,
Projectchartersfrompreviousprojects,
Organizationalstandardprocesses,proceduresandpolicies,
Historicalinformationandlessonlearned.

4.1.2.Tools&Techniques:
4.1.2.1.ExpertJudgment:
Expertjudgmentisatoolusedextensivelyandbroadlyinprojectmanagementprocessesthroughout
PMBOKtoassesstheinputdataandinformation.

SubjectMatterExperts,
KeyStakeholders,
ProjectManagementOffice(PMO),
ProfessionalsandTechnicalAssociates,
Consultants,
IndustrialGroups,
Otherunitswithintheorganization,

4.1.2.2.FacilitationTechniques:
Thesearethetechniquesexplainedin5.2CollectRequirementprocess.

JavedAkhtar,CE,PE,PMP

P a g e |34

PROJECTMANAGEMENTPROFESSIONAL

4.1.3.Outputs:
4.1.3.1.ProjectCharter:
Benefitsofprojectchartercanbe,

Itformallyrecognizetheprojectexistence.
Itformallyauthorizeprojectmanagertoutilizeresourcesandbudget.
Canbeusedtolinktheprojecttotheorganizationalstrategicplan.

Theprojectchartermayinclude,butnotlimitedto;

ProjectTitle,
BusinessCase/PurposeandJustificationoftheProject,
MeasurableProjectObjectivesandRelatedSuccessCriteria,
ResourcePreassigned,
HighLevelProduct/DeliverablesDescription,
KeyStakeholders,
StakeholdersHighlevelRequirementsasknown,
HighLevelProjectRisks&Constraints,
SummaryMilestonesSchedule,
SummaryBudget,(ROM)
ProjectApprovalRequirements,Itexplainswhowillensuretheprojectsuccess?Whowill
measureprojectsuccess?Andwhowillsignofftheproject?
AuthorizedProjectManager,
ProjectOwner/Sponsorsignoff.
Inadditiontoabove,aprojectchartermayincludeSMART(Specific,Measurable,Agreed,realistic,
Timebound)organizationalstrategicgoalswhichwillbehelpfultoaligntheprojecttoOSP.

NOTES:
1. In order to develop project charter, it is important to assign a project manager who will
performhighlevelprojectplanning&estimateswhicharethepartofprojectcharter.
2. Beforemovingtoplanningprocessgroup,itisimportant,
TounderstandOrganizationalStrategicPlan&Culture,
Toensurethattheprojectselectedfulfilsorganizationalstrategicplan,
Toensurethattheproductscopeisasfinalaspractical.

4.2:DevelopProjectManagementPlan:
Itistheprocessofintegratingandconsolidatingallsubsidiarymanagementplansandbaselinesintoa
comprehensiveprojectmanagementplan.Allsubsidiarymanagementplansarebeingassembledinto
one document in order to attain its formal signoff from key stakeholders and approval from the
customer.
Theprojectmanagementplandefineshowyoullexecute,monitorandcontrol,andclosetheproject.
Projectmanagementplanisnotetchedinstone,itisaprogressiveelaborationwheretheproject
teamlearnsmoreabouttheprojectwiththepassageoftimeonproject.

JavedAkhtar,CE,PE,PMP

P a g e |35

PROJECTMANAGEMENTPROFESSIONAL

Keyoutputistheprjectmanagementplan.

JavedAkhtar,CE,PE,PMP

P a g e |36

PROJECTMANAGEMENTPROFESSIONAL

4.2.3.Outputs:
4.2.3.1.ProjectManagementPlan:

ProjectManagementPlan(PMP)isnotasingledocument.
PMPisbeingcreatedbytheprojectmanagerwithinputfromkeystakeholders.

JavedAkhtar,CE,PE,PMP

P a g e |37

PROJECTMANAGEMENTPROFESSIONAL

ItisateambuyinefforttodevelopPMP.

Projectmanagementplanincludessubsidiaryplanswhichcanbe,
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

RequirementsManagementPlan,
ScopeManagementPlan,
ConfigurationManagementPlan,
ChangeManagementPlan,
ScheduleManagementPlan,
CostManagementPlan,
QualityManagementPlan,
ProcessImprovementPlan
HumanResourcePlan,
CommunicationsManagementPlan,
RiskManagementPlan,
StakeholdersManagementPlan.

Baseline:
Abaselineisanapprovedversionofworkproductthatcanbechangedonlythroughformalchange
controlproceduresandisusedasbasisofcomparison.
Thebelowarethetypicalprojectbaselines,
1. ScopeBaseline(ProjectScopeStatement+WBS+WBSDictionary),
2. ScheduleBaseline,
3. CostBaseline.
The performance measurement baseline (PMB) is an approved ScopeScheduleCost Plan for the
projectwork.

NOTES:

Itisnotnecessarytohavealltheplanesstatedaboveinvolvedinyourproject.Theproject
managershouldcarefullyaddresseachprocessanditsinput,tools&techniques,andoutputs
anddeterminewhichareapplicabletotheprojecttheyareworking.Thiseffortisknownas
TAILORING.
Anotherapproachcanbeadoptedinpreparationofprojectmanagementplan.ThePMOmay
combine the subsidiarymanagement plans basedontheprocessgroupstoformaproject
management manual. The project management manual can be helpful for the project
managerstodefineandcreatetheprojectmanagementplan.
ProjectManagementplanitselfisabaselinedocumentwhichrequiresformalapproval,to
bechangedforapprovedchanges,andisusedtomeasuretheprojectperformance.

ProjectDocuments:
Thereareanumberofprojectdocumentsthatareusedtohelpmanagetheproject.These
documentsarenotthepartoftheprojectmanagementplanbutarefrequentlycreated,used,and
updatedthroughouttheproject.Belowaremoreorlessgeneralprojectdocuments.
ProcurementSOW
Agreements
ProjectCharter

JavedAkhtar,CE,PE,PMP

FundingRequirements
ChangeRequests
ChangeLog

WatchList
LessonLearned
RFI&Log

P a g e |38

PROJECTMANAGEMENTPROFESSIONAL

StakeholdersRegister
Requirement
Documentation
Requirement
TraceabilityMatrix
ProjectScopeStatement
ActivityList
ActivityAttributes
MilestoneList
ScheduleNetwork
Diagram
ActivityResource
Requirement
ResourceBreakdown
Structure
ProjectCalendars
ActivityDuration
Estimate
BasisofEstimates
ScheduleData
ProjectSchedule
ActivityCostEstimate
BudgetEstimate

Forecasts (Schedule&
Cost)
QualityMetrics
QualityChecklists
QualityControl
Measurements
ProjectStaff
Assignments
Responsibility
AssignmentMatrix
(RAM)
ResourceCalendars
IssueLog
CommunicationMatrix
Teamperformance
Assessment
ProcurementDocuments
SellerProposals
RiskRegister
WorkPerformanceData
WorkPerformance
Information
WorkPerformance
Reports
RiskBreakdown
Structure

MIR&Log
NCR&Log
SSN&Log
RFS&Log
DWGSubmittalLog
DocumentSubmittalLog

MaterialSubmittalLog
Supplier/Manufacturer
SubmittalLog
SubcontractorSubmittal
Log
TechnicalQueriesLog
ConcessionRequestsLog
BookofQuantities
DailyProgressReports
WeeklyProgressReports
MonthlyProgressReports
ProjectOBS
SourceSelectionCriteria

4.3:Direct&ManageProjectWork:

Keyoutputsare,

Deliverables,
ChangeRequests,and
WorkPerformanceData.

JavedAkhtar,CE,PE,PMP

P a g e |39

PROJECTMANAGEMENTPROFESSIONAL

4.3.3Outputs:
4.3.3.1Deliverables:
DeliverableistheoutputofDirect&ManageProjectExecutionProcess(4.3)whichwillbesubjectto
8.3_PerformQCforitsvalidationandthenitissubjecttoprocess5.5_ValidateScopefordeliverable
acceptance.

4.3.3.2WorkPerformanceData:
WorkPerformanceInformationistheoutputof4.3_Direct&ManageProjectExecution.Itincludes,
DeliverableStatus,
ScheduleProgress,
CostIncurred.
Inthelistofprojectdocuments,startingfromRFIloguptodailyprogressreportaretheresultsof
executingprojectworks.

4.3.3.3ChangeRequest:
Change Requests is the output of 4.3_Direct & Manage Project Execution. It includes following
documentation,

PreventiveAction:
PreventiveactionisaPROACTIVEapproachtoavoidthedefecttohappenincaseyouare
prematureandexperiencedsuchcasesbefore.Chronically,preventiveactionfollowsthe
correctiveactioninordertoavoidthedefecttohappenagaininfuture.
CorrectiveAction:

JavedAkhtar,CE,PE,PMP

P a g e |40

PROJECTMANAGEMENTPROFESSIONAL

Correctiveactionisanapproachtorectifytheproductfaultwithoutapproachingtothe
reworkstage.Toapplyacorrectiveaction,youmusthavequalitymetricssetinadvance
toidentifytherootcauseanditsjustification.
DefectRepair:
Theprocessorprojectcomponenteithertoberepairedorreplacedbasedontheresult
plottedoverthecontrolcharts.
Defectrepaironlycanhavetwooptions,
1. Rework:
Theoutputdoesmeettotheproductspecificationsandneedtobebroughtback
intocompliance.Reworkisalwaysmoreexpensivethanthepreventiveaction.
2. Scrap:
Itrepresentstotallossofworkandinvestmentandisexpensivethananyofthe
abovescenarios(corrective,preventive,rework).
Updates:
Changestoprojectdocuments,planes,andbaselinesasaresultofCRapproval.
Changemayhappeninfollowingprojectobjectives,
Scope,
Schedule,
Cost,
Quality,
ProjectPoliciesandProcedures,
ChangeRequest(CR)maybeofmanykindsdependinguponthewayyouaregoingtodealwith,

Internal&External,
Direct&Indirect,
Optional&Mandatory.

4.4:Monitor&ControlProjectWork:

NOTE:PMImissedanimportantinputthatisdeliverableswhicharetobesubjectto8.3_Perform
QualityControltovalidatethedeliverables.
Keyoutputsare,

ValidatedDeliverables,

JavedAkhtar,CE,PE,PMP

P a g e |41

PROJECTMANAGEMENTPROFESSIONAL

WorkPerformanceReports(Generatedthrough4.3processanddistributedthrough10.2
process),and
ChangeRequest.

4.4.2:Tools&Techniques:
4.4.2.2.Analyticaltechniques:

RegressionAnalysis,

JavedAkhtar,CE,PE,PMP

P a g e |42

PROJECTMANAGEMENTPROFESSIONAL

GroupingMethods,
CausalAnalysis,
RootCauseAnalysis,
ForecastMethods,
FailureMode&EffectAnalysis(FMEA),
FaultTreeAnalysis(FTA),
ReserveAnalysis,
VarianceAnalysis,
EarnedValueManagement,
TrendAnalysis.

4.5:PerformIntegratedChangeControl:

KeyTools&Techniquesis

ChangeControlTools

Andkeyoutputis

ApprovedChangeRequests.
ChangeLog.

JavedAkhtar,CE,PE,PMP

P a g e |43

PROJECTMANAGEMENTPROFESSIONAL

JavedAkhtar,CE,PE,PMP

P a g e |44

PROJECTMANAGEMENTPROFESSIONAL

4.5.2Tools&techniques:
4.5.2.1.ChangeControlBoard(CCB):
ChangeControlBoardisaformallycharteredgroupresponsibleforreviewing,evaluating,approving,
delaying or rejecting changes to the project and recording and communication the decisions. The
followingmustbethepartofCCB,

ProjectManager,
Sponsor,
PMO.

NOTE:AllchangesmustbeapprovedbyCCBandonlyapprovedchangesmustbeincorporated.

4.5.2.2.ChangeControlTools:
Changecontroltoolsaretheautomatedandcomputeraidedsoftware.ExamplescanbeChange
controlsystemandconfigurationcontrolsystems.Forsmallorganization,thechangecontroltools
canbeintheformofexceloraccessdocument.

ChangeControlSystem:
Change Control System is a tool to track approved and disapproved changes to the project
deliverables, planes, baselines, and documentations. It can be a part of Project Management
InformationSystem(PMIS).

ConfigurationControlSystem:
ConfigurationmanagementSystemisthepartofPMISwhich

DocumentsthetechnicalandfunctionalcharacteristicsoftheProduct.
Recordsandreportseachchangetothosecharacteristics.

ChangeControlVSConfigurationControl:
ChangeControl
Itfocusesonchangestotheprojectcharacteristics.
Itmaintainslatestversionsofprojectdeliverables,
documents,plan,andbaselines.
Itensuresthateveryoneisworkingwiththelatest
andsameversionofdocuments,planes,and
baselines.

ConfigurationControl
Itfocusesonchangestotheproductcharacteristics,
Itmaintainslatestversionsofproducts,their
technicalandfunctionalcharacteristics.
Itensuresthateveryoneisworkingwiththelatest
versionofproductwithitstechnicalandfunctional
characteristics.

ProcessofMakingaChange:
Bysequence/descendingorder.
1.
2.
3.
4.

Preventtherootcauseofchanges,(Proactiveapproach)
Identifychange,
Evaluatethechangeimpact,
CreateaChangeRequest(CR),
Theprojectmanagerisresponsibletoperformtheaboveactionsinthecontextofchange
request.Ifthechangeisbeingidentifiedbytheteammember,beforeapproachingtothe
projectmanagertheteammembermustperformtheaboveactions.
5.
PerformIntegratedChangeControl(ICC),
5.1 Assessthechange,

JavedAkhtar,CE,PE,PMP

P a g e |45

PROJECTMANAGEMENTPROFESSIONAL

5.2

Lookforoptions,
The project manager is responsible (either by himself or with the help of team
member)toperformtheaboveactionsbeforeapproachingtoCCBforCRapproval.
5.3 CRApproved/Rejection,
5.4 UpdatetheCRstatusinChangeControlSystem,
6.
ProjectManagementPlanand/orBaselinesUpdates,
7.
Implement,trackandupdatetheapprovedchange,
8.
Communicatethechange&itsstatustostakeholders.

4.5.3Outputs:
4.5.3.2ChangeLog:
Changelogisthepartofprojectdocumentsandisusedtorecordthechangesoccurredinproject.
Thechangelogcontainschange,changeapproval,implementation,andvalidationstatus,andtheir
impactonprojectintermsofcost,time,andrisk.
Note:Allchangesshouldbeloggedwitherapprovedorrejected.

4.6:CloseProjectorPhase:

TheKeyinputsare,

ProjectManagementPlan,
AcceptedDeliverables,

Andkeyoutputsare,

ProductTransition/Handover,
OPAupdates,

JavedAkhtar,CE,PE,PMP

P a g e |46

PROJECTMANAGEMENTPROFESSIONAL

ProjectCloseoutDocumentation:
Alsoknownasprojectarchivesandbecomepartoforganizationalprocessassets.

ProjectFiles:
AllfilesrelatedtotheprojectincludingRFI,MIR,NCN,SSN,AccidentReports,TestReports,SiteStaff
DailyReports,RiskRegister,andalllogsassociatedtoprojectactivities.

Project/PhaseClosureDocuments:
1.
2.
3.
4.

ProjectCompletionCertificate,
ProjectAcceptanceCertificate,
ProjectHandoverCertificate,
ProjectTerminationandTransferDocument.

LessonLearned:
Lessonlearnedarearchivedduringphaseorprojectclosure.

ProjectorPhaseClosureActivities:
1.
2.
3.
4.
5.
6.
7.
8.

Performproducttransition(acceptance,handover),
Completeprojectandcontractperformance(successorfailure)report,
Obtainformalacceptanceofprojectfromcustomeraswellasfromsponsor,
Performlessonlearned,
Createprojectarchives,
Reportperformanceappraisals,
Releaseresource,and
Celebrate!

JavedAkhtar,CE,PE,PMP

P a g e |47

PROJECTMANAGEMENTPROFESSIONAL

Belowactivitiesarepartofcloseprocurementprocesswhicharetobeperformedinconjunction
withthecloseprojectorphaseprocess.
1. Conductprocurementaudits,
2. Createprocurementfiles/record

NOTES:
1. Itisbettertoassignprojectmanagerbeforeauthorizingprojectcharter.Itwillhelptoperform
highlevelplanningtoestablishprojectcharter.
2. Projectfeasibilityreportistobepreparedbeforeprojectcharterisassigned.Projectselection,
businesscase,andprojectscopeofworkarethepartsoftheprojectfeasibilityreport.
3. Phaseendreviewmustbeperformedforperformanceevaluation.
4. Contractclosuremustbeperformedbeforeadministrativeclosureofphaseorproject.

JavedAkhtar,CE,PE,PMP

P a g e |48

PROJECTMANAGEMENTPROFESSIONAL

5.SCOPEMANAGEMENT:
ProductScope:
The technical and functional features of the product. Product scope is determined based on
stakeholders(Customer,Client,and/orSponsor)requirements.

ProjectScope:
Theworkrequiredtodeliveraproduct,serviceorresultwithspecifiedfeaturesandfunctions.Usually
itevolvesaroundscope,time,cost,andquality.
NOTES:
1. ScopeManagementinvolvesmanagingbothprojectscopeaswellasproductscope.
2. Change Management Plan deals with the changes to Project Scope while Configuration
ManagementPlandealswiththechangestoProductScope.

ScopeCreep:
Scopecreepreferstouncontrolledchangestotheprojectwhichareintentionallyorforcefully
imposedtotheproject.Therearetwosubsetsofscopecreep.

ClassicScopeCreep:
Scopechangeoradditionimposedtotheprojectbythecustomerorsponsorwithoutallowing
additionaltimeandcosttoimplementthechangeoraddition.

GoldPlating:
Theelementsorscope(unapproved)addedtotheprojectbytheperformingteam.Therecanbe
manyreasonsbehindgoldplating.

Offeringadditionalfeaturesoftheproducttothecustomertomakethecustomerhappy.
Addingadditionalfeaturestotheproductforenhancedperformance.

Inanycase,goldplatingisprohibitedact.Sinceitisanunapprovedscopechangeoraddition,itmay
costthemoneyandtimethatwasnotincludedinthecostandtheschedulebaselines.

Requirements:
Arequirementisaconditionorcapabilitythatmustbepossessedbytheproduct,service,orresult
tosatisfyorfulfilcontractorotherformallyimposedspecifications.

JavedAkhtar,CE,PE,PMP

P a g e |49

PROJECTMANAGEMENTPROFESSIONAL

5.1PlanScopeManagement:

Thekeyinputsare,

ProjectManagementPlan,
ProjectCharter,

Andkeyoutputsare,

ScopeManagementPlan,
RequirementsManagementPlan.

JavedAkhtar,CE,PE,PMP

P a g e |50

PROJECTMANAGEMENTPROFESSIONAL

5.1.3Outputs:
5.1.3.1ScopeManagementPlan:
Thescopemanagementplanisacomponentofprojectmanagementplanthatdocumentshowthe
projectscopewillbedefined,executed,validated,andcontrolled.Scopemanagementplanisaffiliated
withorganizationalstrategicplan(OSP).Thedevelopmentofscopemanagementplanstartsfromthe
informationcontainedintheprojectcharter.
Scopemanagementplanincludesprocessesto,

DevelopProjectScopeStatement,
EstablishWBSandWBSDictionary,
Approveandmaintainscopebaseline,
Obtaindeliverableformalacceptance,
Controlscopechanges,(changemanagementplanandchangecontrolsystem)

ChangeManagementPlan:
Change Management Plan describes how changes to project objectives (Time, Cost, Quality, and
Scope)willbemanagedandcontrolled.ItdealswiththeProjectCharacteristicsandmayinclude,

ChangeControlProcedure
Approvallevelsforauthorizingchanges
ChangeControlBoard
Planoutlininghowchangeswillbemanagedandcontrolled.
Organizationaltoolsusedtotrackandcontrolchanges

5.1.3.2RequirementsManagementPlan:
Therequirementmanagementplanisacomponentofprojectmanagementplanthatdocumentshow
requirementswillbecollected,analyzed,documented,andmanaged.Inadditiontotherequirements,
theprojectmanagermustchooseanappropriateandeffectivephasetophaserelationshiptomeet
the project and productrequirements and document that approach inrequirements management
plan.
Requirementmanagementplanincludes,

Howrequirementswillbeplanned,tracked,andreported.
Howconfigurationmanagementactivitieswillbeperformed.
Howtherequirementswillbeprioritized.
HowtherequirementsarebeingreflectedinRTMandhowrequirementsattributeswillbe
capturedfromRTM.

ConfigurationManagementPlan:
Configuration Management Plan includes how the latest version of technical and functional
specificationsoftheproductwillbemaintainedanddistributedtothestakeholdersandensuresthat
everyoneisawareofthelatestchanges.Whendealingwithsoftwareproducts,avarietyofproduct
versionsarereleasedinthemarketplaceduetoimprovement.Theconfigurationmanagementmust
documentthesechangessothatthecustomerreceivesthecorrectversionoftheproduct.
ConfigurationManagement&controlsystemdealswiththeProductCharacteristics.

JavedAkhtar,CE,PE,PMP

P a g e |51

PROJECTMANAGEMENTPROFESSIONAL

NOTES:

Change management is associated with scope management plan and configuration


managementiswithrequirementsmanagementplan.
I prefer to keep barrier between project scope (under change management) and product
scope (under configuration management) to record, track, maintain, and report the latest
versionsforprojectandproductscoperespectively.

5.2CollectRequirements:

5.2.2:Tools&Techniques:
1.Interviews:
Interviewingstakeholders/subjectmatterexpertsoneononebutmayinvolvemultipleinterviews.

JavedAkhtar,CE,PE,PMP

P a g e |52

PROJECTMANAGEMENTPROFESSIONAL

2.FocusGroups:
Focus groups bring together prequalified stakeholders and subject matter experts. A trained
moderatorguidesthegroupthroughinteractivediscussion.Itismoreconversationalandeffective
thanaoneononeinterviewandbrainstorming.

3.FacilitatedWorkshops:
Crossfunctional stakeholders (Designer/Suppliers + End Users/Customer) are brought together to
defineproductrequirements.Examplesare,

JADJointApplicationDevelopment,usedinsoftwaredevelopment.
QFDQualityFunctionDeployment,usedinmanufacturingandalsoknownasVOCVoice
ofCustomer.

Advantagesoffacilitatedworkshops,

Buildtrust,
Promoterelationships,
Improvecommunication

4.GroupCreativityTechniques:
Thesearedata/information/requirementgatheringtechniques.Thesearedividedintotwotypes,

ADatagatheringtechniques:
4.1Brainstorming:
Brainstormingisnotanindividualeffort.Itisgroupcreativitytechnique.Oneparticipantwillgenerate
anideawhichmayleadtogenerateideasbyotherparticipant,whichleadstoyetanotherandsoon.
4.2NominalGrouping:
Ideasgeneratedbybrainstormingarefurtherrankduringthesamemeetingorinaseparatemeeting
forrequirementsgroupingandprioritization.
4.3TheDelphiTechnique:
Withthistechnique,aRFI(requestforinformation)issenttoconcernedstakeholdersanonymously,
their response are further compiled and results are sent back to the stakeholders for their final
approval/review.Thisisverygoodtechniqueespeciallywhen

Therearechancesthatthestakeholderscanopposeeachother.
Iftheinformationistobekeptsecured.
ItisessentialtoofficiallydocumenttherequirementinRFI.

BDataAnalysisTechnique:
4.4MindMapping:
It is data analysis technique. Ideas generated through brainstorming are plotted as tree. Colors,
picturesandnotationscanbeusedtomakethediagrammorereadable.
Mindmappingishelpfulin

Detailedstudyofrequirementsordata,
Problemsolving,

JavedAkhtar,CE,PE,PMP

P a g e |53

PROJECTMANAGEMENTPROFESSIONAL

Decisionmaking.

4.5AffinityDiagram:
Also known as KJ (Kawakita Jiro) method. This is requirements grouping technique. Similar
requirementsaregatheredintogroupsandeachgroupisgivenwithaname.Thisgroupingmakesit
easiertoseeadditionalareasofscope(orrisks)thathavenotbeenidentified.

JavedAkhtar,CE,PE,PMP

P a g e |54

PROJECTMANAGEMENTPROFESSIONAL

Note:MindMappingandAffinityDiagramhelptoverifythescopewithprojectcharter.

4.6MulticriteriaDecisionAnalysis:
Thistechniqueisusedtogroup,sort,andprioritizethedecisionsusingdecisionmatrix.Thedecisions
madeareanalyzedfordifferentcriteriasuchasrisklevel,uncertainty,andvaluation.

5.GroupDecisionMakingTechniques:
It is used to generate, assess, classify and prioritize the product requirements. Decision making is
carriedoutwithdifferenttechniques,

A. AnalyticHierarchyProcess(AHP):
Thisprocessisusefulwhen

Requirementsareextremelycomplex,or
Difficultdecisionsneedtobemade.

B. Voting:(UMPD)
Unanimity:
Everyoneagreesonspecificrequirements.
Majority:
Morethan50%agreesonspecificrequirements
Plurality:
If50%isnotachieved,thelargestblockinthegroupdecides.
Dictatorship:
Oneindividualmakesthedecisionforthegroup.Itcanhavenegativeimpactsontheproject.

6.QuestionnairesandSurveys:
Thesearewrittensetsofpredesignedquestions.Thistechniqueisusedforlargegroups.

7.Observations:
ItisalsoknownasJobShadowing.Itisdoneexternally(externalobserver)whileuserisperforming
hisjob.Itcanalsobedonebyaparticipantobserverwhoactuallyperformaprocesstoexperience
howitisdonetouncoverhiddenrequirements.ThisisakeytoolforQFDtocaptureVOCinfacilitated
workshops.

8.Prototypes:
ItisanexampleofProgressiveElaboration.Theseareexperimentalmodelswhichcanbesubjectto
revisionstograduallycollectthestakeholdersrequirements.

9.ContextDiagrams:
AsusedinPMBOKfordataflowdiagramsshowinginputsandtheelementsprovidingtheinputsas
wellasoutputsandtheelementsreceivingtheoutputs.

10.DocumentAnalysis:
Analyzing project documentations (business plans, agreements, RFP, RFQ, processes, policies,
procedures,issuelogs,codes,guidelinesetc.)canrevealthenewrequirements,risks,andinformation.

JavedAkhtar,CE,PE,PMP

P a g e |55

PROJECTMANAGEMENTPROFESSIONAL

5.2.3:Outputs:
RequirementDocumentation:
Requirementdocumentationincludesfollowinginformation,
1. BusinessRequirements:
a. Businessandprojectobjectivesfortraceability,
b. Businessrules,
c. Guidingprinciples,
2. StakeholdersRequirements:
a. Impactstootherorganizationalareasorgroups,
b. Impactstootherentitiesinsideoroutsidetheorganization,
c. Stakeholderscommunicationsandreportingrequirements.
3. SolutionRequirements:
a. Functionalandnonfunctional(physicalandtechnical)productrequirements,
b. Technologyandstandardcompliancerequirements,
c. Supportandtrainingrequirements,
d. Qualityrequirements,
e. Reportingrequirements,etc.
Solutionrequirementscanbedocumentedtextuallyorinmodelsorboth.
4. ProjectRequirements:
a. Performance,safety,complianceetc.
b. Productacceptancecriteria.
5. TransitionRequirements:
6. Requirementassumptions,dependencies,andconstraints.

RequirementTraceabilityMatrix:
Itshouldbedividedintotwopartsasbelow,

A.RequirementAttributes:
Requirementattributematrixcontains,

Requirements,
Owner,
Source,
Priority,
Stability,
ComplexityLevel,
Version,
Status(Completed/Approved/Added/Deleted/Deferred/Cancelled)
AcceptanceCriteria.

B.RequirementTraceability:
Ithelpstolinktherequirementstotheprojectobjectivesorproductfeaturesandtotrace&balance
thestakeholdersrequirements.Helpfultotracemissedand/orextrarequirements.

ResolvingCompetingRequirements:
Requirement must be prioritized and balanced. One technique to balance the competing
requirementsistoselect/accepttherequirementswhichbestcomply(inorder)withthebelow,

JavedAkhtar,CE,PE,PMP

P a g e |56

PROJECTMANAGEMENTPROFESSIONAL

BusinessCase,
ProjectCharter,
ProjectScopeStatement,
ProjectConstraint,

RequirementsNotes:

Ifitisnotrelatedtothereasontheprojectisinitiated.
Ifyes(above)butnotfallwithintheprojectcharter.
Changes to the project charter should be brought into sponsors attention for
approval.
Requirements delaying/affecting the project constraint (schedule or cost or
scope)shouldnotbeaccepted.
Requirementsenhancingtheprojectconstraintshouldbeaccepted.

5.3DefineScope:

JavedAkhtar,CE,PE,PMP

P a g e |57

PROJECTMANAGEMENTPROFESSIONAL

5.3.2:Tools&Techniques:
5.3.2.2.ProductAnalysis:
Itincludesthefollowingtechniquestouseinordertobreakdownhighlevelrequirementsintotangible
deliverables,

ProductBreakdown/Decomposition,
RequirementsAnalysis,
System/ProcessAnalysis,
ValueAnalysis,
System/ProcessEngineering,
ValueEngineering.

5.3.2.3.AlternativeIdentification:
Define/identify/generatedifferentapproachesinordertoselectappropriateonebyBrainstorming.

5.3.2.4.FacilitatedWorkshops:
Explainedinprocess5.2_CollectRequirements.

5.3.3:Outputs:
5.3.3.1.ProjectScopeStatement:

ProjectScopeStatementincludes,indetails,theprojectdeliverablesandworkrequiredto
createthosedeliverables.
Inenablesprojectteamtoperformmoredetailedplanning.
Guidestheprojectteamsworkduringexecution.
Providesbaselineforevaluatingthechangeswhetheradditionalworkiswithinoroutsidethe
projectboundaries.

DetailedProjectScopeStatementincludes,
1.
2.
3.
4.
5.
6.
7.

ProductScopeDescription,
ProductAcceptanceCriteria,
ProjectDeliverables,
ProjectExclusions,
ProjectAssumptions,
ProjectSpecifications,
ProjectConstraints.

JavedAkhtar,CE,PE,PMP

P a g e |58

PROJECTMANAGEMENTPROFESSIONAL

5.4CreateWBS:

Keyinputisprojectscopestatementandkeyoutisscopebaseline.
ScopeBaseline:ProjectScopeStatement+WBS+WBSDictionary

JavedAkhtar,CE,PE,PMP

P a g e |59

PROJECTMANAGEMENTPROFESSIONAL

5.4.2:Tools&Techniques:
5.4.2.1.Decomposition:
Itisthetechniquetosubdividetheworkrequiredforeachdeliverableintofundamentalcomponents.
Correctnessofdecompositioncanbedeterminedbythecomponentsbyverifyingeitherthoseare
sufficientforcompletionofcorrespondinghigherleveldeliverables.
Itisateambuyinprocess.

5.4.3:Outputs:
5.4.3.1.WBS:WorkBreakdownStructure
Detailedworkrequiredtodeliverprojectdeliverablesisdecomposedintomanageabledeliverables.
WBSisacompletehierarchyofallthescopeoftheproject.
ToplevelofWBSiscalledSummaryLevel.
LowestlevelisknownasWorkPackageLevel.
SecondlowestlevelisknownasControlAccountLevel.
WBSiscreatedwiththehelpofteam(creatingWBSisteambuyinprocess).
WBS is used to track and verify the project scope. It helps prevent changes, prevent work
slippagethroughcracks.
Itfocusestheteammembersonwhatneedstobedonewithanincreasedquality.
WithWBS,projectiseasytomanage.
AgenericWBScanbeatemplateinOPA.

JavedAkhtar,CE,PE,PMP

P a g e |60

PROJECTMANAGEMENTPROFESSIONAL

Helpspeopletogettheirmindaroundtheproject.
Preventsscopecreepandgoldplating.
DoesNOTshowdependenciesamongtheworkpackages.WBSdictionaryhelpstoovercome
thissituation.
WBScanbepreparedinthefollowingforms,
OrganizationChart/Graphical,
Outline(List),
FishboneDiagram

WorkPackages:
ItisthelowestlevelofWBSandcontainsactivitiesandmilestone,atwhichthecost,resourcesand
schedulecanbeestimatedeasily.AlsoknownasLevelofDeliverables(deliverablefocused).

ControlAccounts:
Thelevelnexttoworkpackageinascendingorderismostlyconsideredascontrolaccount.Acontrol
accountcanhavemorethanoneworkpackagesorcanhaveonlyone butaworkpackagecanbe
associatedwithonlyonecontrolaccount.
Controlaccountsareusedforearnedvalueforperformancemeasurement.

5.4.3.2.WBSDictionary:
Itissimilartoprojectcharter.Itisausefuldocumentswhich,
Preventsscopecreepandgoldplating,
ItisusedaspartofWorkAuthorizationSystem.
Itisusedtocontrolthework.
Itcontainsinterdependenciesbetweenworkpackages.
Itincludesallinformationoftheworkpackages,
1. WorkPackageDescription,
2. AcceptanceCriteria,
3. Assumptions,
4. Technicalreference(drawingno.etc.)
5. AgreementInformation(Optional)
6. Risks,
7. Resourceassigned,
8. Duration,
9. ScheduleMilestones,
10. Cost,
11. ContractInformation,
12. Completiondate,
13. Quantifieddeliverables.
14. PredecessorandSuccessorworkpackages.

AnexampleofWBSdictionaryisshownonthefollowingpage.

JavedAkhtar,CE,PE,PMP

P a g e |61

PROJECTMANAGEMENTPROFESSIONAL

5.4.3.3.ScopeBaseline:
Scopebaselineconsistsofthreedocuments,
ProjectScopeStatement,
WBS,
WBSDictionary.

JavedAkhtar,CE,PE,PMP

P a g e |62

PROJECTMANAGEMENTPROFESSIONAL

5.5ValidateScope:
Itistheprocessofformalizingtheacceptanceofthecompletedprojectdeliverables.

Thekeyinputisverifieddeliverableandkeyoutputsareaccepteddeliverables,changerequestsand
workperformanceinformation.Keytools&techniquesisInspection(RFI).

5.5.3:Outputs:

AcceptedDeliverables
ChangeRequest,

JavedAkhtar,CE,PE,PMP

P a g e |63

PROJECTMANAGEMENTPROFESSIONAL

ProjectDocumentsUpdates,

NOTE:ValidateScopeisthelastprocessbeforemovingtonextphaseoftheproject.Inthisprocess,
deliverablesaresubjecttoverificationandacceptancewhichyieldsACCEPTEDDELIEVRABLE.

5.6ControlScope:

5.6.2:Tools&Techniques:
VarianceAnalysis:
Comparison/VarianceanalysisofScopeBaselinevs.WorkperformanceInformation
Note:Importantaspectsofprojectscopecontrolare,
Determinethecauseanddegreeofvariancew.r.t.baseline.
JavedAkhtar,CE,PE,PMP

P a g e |64

PROJECTMANAGEMENTPROFESSIONAL

Decidetherequiredcorrectiveandpreventiveactions.

5.6.3:Outputs:
1.WorkPerformanceMeasurement:
It can include planned vs. actual (technical and/or physical) performance. This information is
documentedandcommunicatedtostakeholders.

2.ChangeRequests:
Refertoprocesses4.3and4.5inthebookfordetails.

3.OPAUpdates:

Causeofvariance,
Correctiveactionchosenandthereason,
Lessonlearned.

4.PMPUpdates:

ScopeBaseline,
CostBaseline,
ScheduleBaseline

5.ProjectDocumentsUpdates:

RequirementDocumentation,
RequirementTraceabilityMatrix.

JavedAkhtar,CE,PE,PMP

P a g e |65

PROJECTMANAGEMENTPROFESSIONAL

6.TIMEMANAGEMENT:
6.1PlanScheduleManagement:
It is the process of developing the scheduling tools, procedures, templates, formats, policies, and
methodologiesforplanning,developing,executing,andcontrollingtheprojectschedule.

JavedAkhtar,CE,PE,PMP

P a g e |66

PROJECTMANAGEMENTPROFESSIONAL

6.2DefineActivities:

JavedAkhtar,CE,PE,PMP

P a g e |67

PROJECTMANAGEMENTPROFESSIONAL

6.2.2:Tools&Techniques:
RollingWavePlanning:
Itisaprocessofprogressiveelaboration.Neartermprojectactivitiesareplannedindetailsandfuture
workisplannedathigherlevelofWBS.ItismostlyusedindevelopmentofITsystemandlessoften
usedforconstructionprojects.Itisperformedforthe,

Complexprojectswithlessdetails/informationareavailableatthebeginning,
Projectswhichareuniqueinnatureanddonothaveanyhistoricalinformationorprevious
example.

5.4.2.1.Decomposition:
Itisthetechniquetosubdividetheworkrequiredforeachdeliverableintofundamentalcomponents.
Correctnessofdecompositioncanbedeterminedbythecomponentsbyverifyingeitherthoseare
sufficientforcompletionofcorrespondinghigherleveldeliverables.

Itisateambuyinprocess.
Decomposesworkpackagesintosmallercomponents,
o Whichareeasytomanage,
o Thatgiveareasonableresourceestimate,
o Thatgiveareasonabledurationestimate,
o Thatgiveareasonablecostestimate,

TheWorkpackagesaretobecomposedtofollowtheheuristics,

4/40Forsmallprojects,
8/80Forlargeprojects,

The 8/80 rule is used as a reminder to project managers to limit the size of WBS work packages.
Following these guidelines will prevent micro management or the creation of work packages that
becometoolargetomanage.
Workpackagesshouldbe:

Nosmallerthan8hours,
Nolargerthan80hours,and
Between1and10daysinduration
Thisrulesuggeststhattaskdurationsbetween8hoursand80hoursaregenerallysizedaboutright.
Tasksshorterthanonedaymightbetoogranularortasklongerthan2weeksmightbetoolongto
manageproperly.

6.2.3:Outputs:
1.ActivityList:
Itincludestheactivitydescriptionandidentifier.Togenerateactivitylisttherequiredinputsaredesign
drawings,billofquantities,andscopebaseline.

ActivityTypes:
It is important to understand the activity types to plan the project activities. Task and resource
dependentactivitiesarediscreteeffortsandLOEisapportionedeffort.

JavedAkhtar,CE,PE,PMP

P a g e |68

PROJECTMANAGEMENTPROFESSIONAL

TaskDependent:
Activities are scheduled using the activity's calendar rather than the calendars of the assigned
resources. Choose task dependent when you want to control the duration of the activity yourself (that
is, no resources are assigned), or when one or more resources assigned to the same activity can work
according to the same calendar. The activity is scheduled according to the activitys calendar, not the
resource calendars. For example, you might have an activity to cure concrete; you know how long the
task takes and the addition of resources wont complete the task any earlier. You would designate this
activity as task dependent.

ResourceDependent:
Activitiesarescheduledusingthecalendarsoftheassignedresources.Thistypeisusedwhenseveral
resourcesareassignedtotheactivity,buttheymightworkseparately.Chooseresourcedependent
when you want to schedule each resource according to his/her own time schedule, or resource
calendar,nottheactivitycalendar.Theassignedresourceavailabilitydeterminesthestartandfinish
datesoftheactivity.Typically,youusethistypewhenmultipleresourcesassignedtothesameactivity
canworkindependently,orwhenavailabilitycanaffecttheactivitysduration.Forexample,anactivity
thatrequiresanInspectormightbedelayedifthatresourceisassignedtomultipleprojectsorison
vacation.
Resourcedependentactivitywillfollowtheresourcecalendarsandthedurationwillbechangedupon
resourcelevelling.

WBSSummary:
Activitiesthatareusedtorollupdate,duration,andpercentcompletevaluesforagroupofactivities
thatshareacommonWBScodelevel.ChooseWBSSummarytoindicatethattheactivityisasummary
levelWBSactivity.AWBSSummaryactivityrepresentsagroupofactivitiesthatshareacommonWBS
level.ThesummarylevelWBSactivityenablesrollupsofdatesfortheactivitygroup.Thedurationof
aWBSSummaryactivityextendsfromthestartoftheearliestactivityinagrouptothefinishofthe
latestactivity.WBScodescontrolwhichactivitiesarepartofaWBSSummaryactivity;P6incorporates
anyactivitiesthatshareacomponentoftheWBSSummaryactivity'sWBScodeintotheWBSSummary
activity.Forexample,allactivitieswhoseWBScodesbeginwithA(A.1,A.1.1,A.1.2,etc.)canbepart
ofoneWBSSummaryactivitywhoseWBScodeisA.Atalowerlevel,allactivitieswhoseWBScodes
startwithA.1(A.1.1,A.1.2,etc.)canbepartofaWBSSummaryactivitywhoseWBScodeisA.1.

LevelofEffort:
Activities have a duration that is determined by its dependent activities and are typically
administration type. Choose level of effort to indicate that the activitys duration depends on its
predecessorand/orsuccessoractivities.Alevelofeffortactivityisusuallyonethatisongoing,suchas
clericalwork,changemanagement,orprojectmanagementtasks.Forexample,sitecleanupcouldbe
considered alevel ofeffortactivity; it occursrepeatedly and is dependent on the completion of a
phase.

DiscreteEffort:
Discrete effort is a term used to describe the work that can be measured and traced to the
componentsintheworkpackages.Itistheactualworktocreatetheprojectdeliverables.Discrete
effortreferstotheparticularworkeffortthatcanbeidentifiedandtracedashavingadirecttietothe
finalcompletionoftheprojectrelatedworkbreakdownstructurecomponentsandthedeliverables.
Itisnecessarythatalltheeffortshaveaspecificmeasurableendproductorendresult.

JavedAkhtar,CE,PE,PMP

P a g e |69

PROJECTMANAGEMENTPROFESSIONAL

ApportionedEffort:
AnotherkindofactivitythatmustbeaccommodatedisApportionedEffort,sometimescalledfactored
effort. Many inspection activities are dealt with on an apportioned basis. For example, a
manufacturingworkpackagerequiresinspectionpriortoitscompletion.Ratherthancreateaseparate
work package, the budget for the inspection activity can be included in the manufacturing work
packageasapercentageoftheoverallbudgetandthatamountcanbeearnedautomaticallyasthe
workpackageisaccomplished.Ifdesired,aseparateworkpackagecanbeestablishedwithitsbudget
apercentageofthebudgetforthetasktowhichitisapportioned.Astheprimarytaskisaccomplished,
thevalueoftheapportionedefforttaskisearnedconcurrently.

2.ActivityAttributes:
Activityattributesareupdatedanddetailedversionofactivitylist.Theseareactivitycharacteristics,
1.
2.
3.
4.

ActivityID,
ActivityCodes,(Location,discipline,workpackage,projectphase,steps,etc.)
ActivityDescription,
ActivityType,(Startmilestone,finishmilestone,taskdependent,resourcedependent,
WBSsummary,levelofeffort(LOE),discreteeffort(DE),apportionedeffort(AE)).
5. LogicalRelations,Predecessor,Successor,Leadsandlags,
6. Imposeddates,
7. Responsibleperson,etc.

3.MilestoneList:
Amilestoneisasignificant/keyeventintheproject.Itisdifferentthantheactivityinthecontextof
duration.Activitieshavedurationmorethanzero(0)hours/dayswhilemilestoneshavezeroduration
Milestonecanbe

Mandatory/Contractual (required by contract, customer, consultant) or optional/Control


(requiredbyprojectmanager).
Startorfinishmilestone.

Milestonescanbeusedforaproject,

TorepresenttheprojectprogresstohighmanagementCEO(MilestoneChart).
Tocontroltheprojectprogress(Controlmilestones).

Itisadvisabletohavecontractualaswellascontrolmilestoneintheprojecttimescheduleforeffective
schedulecontrol.

JavedAkhtar,CE,PE,PMP

P a g e |70

PROJECTMANAGEMENTPROFESSIONAL

6.3SequenceActivities:

6.3.2:Tools&Techniques:
1.MethodstoDrawNetworkDiagrams:

PrecedenceDiagrammingMethod(PDM),
ArrowDiagrammingMethod(ADM),
GraphicalEvaluation&ReviewTechnique(GERT).

JavedAkhtar,CE,PE,PMP

P a g e |71

PROJECTMANAGEMENTPROFESSIONAL

PrecedenceDiagrammingMethod:(PDM)
ThismethodisusedforCriticalPathMethod(CPM)todrawnetworkdiagram.Anetworkdiagramcan
beoftwotypes,
1. AONActivityOnNode(AlsocalledPDM)
2. AOAActivityOnArrow(AlsocalledADM)

LogicalorPrecedenceRelations:
1. StarttoStart,
2. StarttoFinish,
3. FinishtoStart,
4. FinishtoFinish.
AONActivityonNode:
Nodesrepresentactivities,
Arrowsrepresentlogical/precedencerelations.PDMcanhaveallfourlogicalrelations.
Afterestimatingactivityduration,durationsareshownabove/belowthearrows.
Nodummyactivities.
Widelyusednowadays.

AOAActivityonArrow:
Arrowsrepresentactivities,
Nodesrepresentsstartandfinish,
Lengthofarrowrepresentsactivityduration,
Onlybearsfinishtostartrelationship.
Itcanhavedummyactivities.
Rarelyusednowadays.

JavedAkhtar,CE,PE,PMP

P a g e |72

PROJECTMANAGEMENTPROFESSIONAL

GraphicalEvaluation&ReviewTechnique:

Itisamodificationtonetworkdiagrammingmethod.
Itiscomputersimulationtechnique.
Itallowsconditionalbranchingandloopsbetweenactivities.
ExampleofGERTisatypicalprocesschart.
TheconditionalbranchingorloopsarebasedonYesNoorTrueFalsecriteria.
Usedforprocessevaluationanddecisionmaking.

2.DependencyDetermination:(NatureofLogicalRelation)
Dependenciesareoffourtypes,
1.
2.
3.
4.

MandatoryDependencies,
DiscretionaryDependencies,
ExternalDependencies,and
InternalDependencies.

MandatoryDependencies:
AlsoknownashardlogicE.g.,Regulations,ContractualConstraints,etc.

JavedAkhtar,CE,PE,PMP

P a g e |73

PROJECTMANAGEMENTPROFESSIONAL

DiscretionaryDependencies:
Alsoknownaspreferred,preferentialorsoftlogic.Thesearedefinebytheprojectmanagementteam
andmayhavecertainleadsandlags.Softlogicsmustbedocumentedasthesecanlimitthescheduling
options.Whenfasttrackingtechniqueisusedtocompresstheschedule,softlogicsarereviewedand
modifiedorremoved.

ExternalDependencies:
When the dependency is external to project. For example, your contract is to provide installation
servicesforWaterTreatmentPlanandyourclienthascontractwithanothersuppliertosupplythe
plant material. The dependency of equipment installation will be externally dependent to the
equipmentdelivery.Butifyouhavesupplyandinstallationcontract,thenthenatureofdependency
willnotbeexternal.
ExternaldependenciesshouldberecordedinRiskRegisterandshouldbetrackedcarefully.

InternalMandatoryDependencies:
ThesearethemandatorydependencieswhichrepresentthephysicalLimitationsunderprojectteam
controlsuchas,

RoofslabcantbecastedwithoutcastingRCCcolumns.Thecontroloverthedependencyis
undertheprojectteam.
Testingcantbeperformedunlessplantisinstalled.

3.Applyleadsandlags:
Leads and lags are being determined by the project management team based on the dependency
determination.Leadsandlagsareappliedtothelogicalrelationshiptofulfildecenciesrequirements.

LEAD:

Itistheaccelerationofsuccessoractivity.
Overlappingofactivities.
ItbearsVEmathematicalsign.
Dont introduce too many leads in the initial plan. It will helpful later on for schedule
compression(crashing).

LAG:

Itisthedelayofsuccessoractivity.
Freetimebetweentwoactivities.
Itbears+VEmathematicalsign.

NOTE:
1. Inprojectmanagementsoftware(primavera),onlytermLAGisused.Ifitis+VEmeanslagand
ifitisVEmeanslead.
2. Forschedulecompression(fasttracking),leadsareintroducedandlagsareoptimized.

JavedAkhtar,CE,PE,PMP

P a g e |74

PROJECTMANAGEMENTPROFESSIONAL

4.ScheduleNetworkTemplates:
Purposeofusingschedulenetworktemplates(fromOPA)istoexpeditethepreparationofschedule
networkdiagram.Atemplatemaycontainapertorsegmentfrompreviousproject.Thissegmentis
knownassubnetworkorfragmentednetworkschedule.

6.3.3:Outputs:
1.ProjectScheduleNetworkDiagram:PSND
ProjectScheduleNetworkDiagramissimilartoaflowchartinappearance.ScheduleNetworkDiagram
ishelpfulasit,

Justifiesyourtimeestimateforproject.
Showsworkflows.
Helpseffectiveplanning,execution,monitoringandcontrol.
Showslogicalrelations(interdependencies)betweentheactivities.
Showsprojectprogresswhenusinginprojectcontrollingprocess.
Identifiesopportunitiestocompressthescheduleinplanningandthroughoutthelifeof
theprojectaswell.

NOTES:
1. Projectschedulenetworkdiagramdoesnotchangeduetochangeinthestartorenddate.
Changingstart,finish,anddurationswillchangethelengthofcriticalpathortheproject.
2. PSNDchangesduetochangeinthelogicalrelations.
3. Atthisstageofplanning,ScheduleNetworkDiagramdoesnotshowactivityduration.After
conducting 6.5_Estimate Activity Durations Process, activity durations are introduced to
projectschedulenetworkdiagram.
Pleaserefertotheprojectschedulenetworkdiagramonthefollowingpage.

2.ProjectDocumentsUpdate:
1. ActivityList,
2. MilestoneList,
3. ActivityAttributes(forlogicalrelations,leads,andlags),and
JavedAkhtar,CE,PE,PMP

P a g e |75

PROJECTMANAGEMENTPROFESSIONAL

4. RiskRegister(forexternaldependencies).

6.4EstimateActivityResources:
Itistheprocessofestimatingresourcesrequiredtoperformtheactivities.Thisprocessinvolvesthe
followingactions,

AnalyzeWBSandactivitylist,
Estimatetheresourcesrequiredtodeveloptheproduct.
Ifrequired,decomposetheactivitiesfurtherforaccurateresourceestimation.
List the estimated resource under their respective category with the units and estimated
quantity.
Reviewtheresourceestimationforskillsandtypesofresourcesrequiredtoimplementthe
project.
GenerateResourceBreakdownStructure(RBS).
Determine/confirmresourceavailabilityfortheproject.

Therearefourtypeofresources,

1. LaborResources(HumanResource/Manpower),
DirectLabor:Themanpowerperformingtheactivitieswhicharetobesubject
toinspectionandacceptanceandaregoingtobepaid.Usuallyforemanand
thelowerstaffisconsideredasdirectlabor.
IndirectLabor:Projectmanagementteamisconsideredasindirectlabor.The
manpowerperformingthemobilizationactivitiesarealsofallunderindirect
laborifthemobilizationisnotthepartofcontractBOQ.
2. Nonlaborresources(Equipment/Machines),
Directequipment:Theequipmentthatwillbeusedtoperformtheactivities.
IndirectEquipment:Theequipmentthatwillbeusedtoperformsomework
requiredtocarryoutforstatementofprojectactivities.Suchasequipment
requiredformobilization,generators,concretevibrators,lighttowersetc.
3. Metricalresources
DirectMaterials:Thematerialsrequiredtodeveloptheproductwhichwillbe
subject for validation, inspection, and acceptance and being paid for them
e.g.,reinforcedconcrete,blocksetc.
Indirect Materials: The materials used to support the execution activities
suchasformwork,shutteringetc.
4. Money/Expense
Thepurposeofdividingtheresourcesintodirectandindirectcategoriestoestimatethedirectand
indirectcosts.

JavedAkhtar,CE,PE,PMP

P a g e |76

PROJECTMANAGEMENTPROFESSIONAL

6.4.1:Inputs:
6.4.1.4.ResourceCalendars:
Resourcecalendarsarethetimescaledresourcerequirements.
Resourcecalendarsaretobecreatedduringprocesses9.2_AcquireProjectTeamprovidingHuman
Resource Calendars and 12.2_Conduct Procurement provides Material and NonLabor Resource
Calendars. To generate resource calendars, the inputs required are 6.4_Activity Resource

JavedAkhtar,CE,PE,PMP

P a g e |77

PROJECTMANAGEMENTPROFESSIONAL

Requirement and 6.5_Activity Duration Estimates in order to generate time scaled resource
requirements(resourcecalendars).

6.4.2:Tools&Techniques:
NOTE:
Itispreferredtocombine/compare/averagetheresultsofthreetoolsandtechniquesusedto
estimatetheresourcerequirements.
1. ExpertJudgment(AnalyzeitbyPERT),
2. PublishedEstimatingData,and
3. BottomUpEstimate(Ownestimates)

6.4.2.2.AlternativeAnalysis:
Alternativeanalysisincludesanalyzing,

Differentskilllevels,
Differenttypesandsizesofmachine,
Differenttoolsandapproaches(handversusautomatedtools),
MakeorBuydecisionregardingtheresourcesbasedoncost(activitycostestimates)
andriskanalysis(riskregister).

6.4.2.3.PublishedEstimatingData:
Publisheddataforproductionrates&unitcostsofresources.Itisanenterpriseenvironmentalfactor.
Ifyouusethecompanyestablishedunitrates,thedatawillfallunderorganizationalprocessassets.

6.4.2.4.BottomUpEstimate:
When an activity cant be estimated with a reasonable degree of confidence, the work within the
activityisfurtherdecomposedintomoredetails(ActivitySteps),resourceneededareestimatedand
thenaggregatedforeachresources.

Itismoreaccurateandbasedondetailedanalysisoftheproject.
Itisteambuyineffort.
Providesabasisformonitoringandcontrollingperformancemeasurements.
Ittakestimefordecompositionoftheprojectandisexpensive.
Providesatendencytotheteamtopadtheirestimatesexceptwhentheyunderstand
theuseofreserves.
It requires that project should be well defined and understood before estimating
begins.

6.4.2.5.ProjectManagementSoftware:
Project Management Software can help to create Resource Breakdown Structure (RBS), Resource
RatesandCalendars,andtolevel/optimizeresourceutilization.

6.4.3:Outputs:
6.4.3.1.ActivityResourceRequirements:
6.4_EstimateActivityResourcesprovides,

JavedAkhtar,CE,PE,PMP

P a g e |78

PROJECTMANAGEMENTPROFESSIONAL

Resourcequantity&availability,
Resourcetype(Labor,Nonlabor,Material),
ResourceCategory(w.r.t.skill,experienceorgradelevel)

Theactivityresourcerequirementsarethenaggregatedtoestimatedresourcerequirementsforeach
workpackageforthepurposeofrecordingresourcerequirementsinWBSdictionary.
NOTE: Basis of resource estimation and assumptions associated with the estimates should be
documented.

6.4.3.2.ResourceBreakdownStructure:
RBSisagraphicalrepresentationofresourcerequirementswithaninformationofresourcetypeand
its category. It is useful for organizing and reporting project schedule with resource utilization
information.ResourcesaregroupedbytheirtypeinRBS.

6.4.3.3.ProjectDocumentsUpdate:

ActivityList,
ActivityAttributes,
ResourceCalendars(9.2&12.2)
RiskRegister,fortherisksassociatedwithresources(skills,availability,etc)

6.5EstimateActivityDurations:

Keutoolsandtechniquesare,

ParametricEstimate,
ThreePointEstimate(PERT),and
ReserveAnalysis,

JavedAkhtar,CE,PE,PMP

P a g e |79

PROJECTMANAGEMENTPROFESSIONAL

6.5.2:Tools&Techniques:
6.5.2.2.AnalogousEstimate:

Comparingtheprojectwithprevioussimilarproject.
ItestablishesanideaoftheprojectBudgetEstimate.(refertocostmanagement)
Itistopdownestimationusedforcomparisonandroughestimate.
Itislesscostly,lessaccurateandproduceroughorderofmagnitude(ROM).
Itcanbeappliedtototalprojectorapartoftheproject.
Itcanbeusedinconjunctionwithotherestimationtechnique.

6.5.2.3.ParametricEstimate:

Itisbasedonhistorical/publisheddata.
Theunitratefromhistoricaldataismultipliedbythequantityofworkrequired.E.g.,duration
forplastering1sq.marea(frompublishedunitrates)willbemultipliedbythetotalquantity
(area)ofplasteringwillgiveyouthedurationrequiredforplasteringactivity.
Parametric estimate generate a parametric model that can be used for estimations in the
tendering,planningandestimationdepartmentsservingasOPA.

JavedAkhtar,CE,PE,PMP

P a g e |80

PROJECTMANAGEMENTPROFESSIONAL

Therearetwowaystocreateparametricrelationship,

1.1 RegressionAnalysis/ScatterDiagram,
Data isplotted inthe formofa scatterdiagrambetweentwovariablesandanalyzedtodevelopa
mathematicalrelationshipbetweenthevariables.

1.2 LearningCurveEffect,
Learning Curve effect should be considered while developing a relationship (linear) between two
variables.Ifaroom(unitdimensions)willtake2daystopaintit,10similarroomsmaytakelessthen
(02x10=)20daysduetolearningeffect.

1.3 Heuristics:
Heuristicsmeansaruleofthumb.Heuristicscanbeusedtodevelopparametricmodels.AHeuristics
canbedevelopedforlearningcurveeffect.ExampleofHeuristicsis80/20principlewhichisapplied
toquality,suggestthat80%ofqualityproblemsarecausedby20%ofpotentialsourcesofproblems.

NOTE:Heuristicscanbeusedtodevelopparametricmodelsandtheresultofparametricestimatecan
becomeheuristics.

6.5.2.4.ThreePointEstimate:
Therearetwomethodsusedforthreepointestimates.

1. PERT:
ItistheProgramEvaluationandReviewTechniquealsoknownasBeatDistribution.
Itisweightedmean/averageofthreevalues,optimistic,mostlikely,andpessimistic.Themost
likelyvalueisthemostaccuratevalueandisbeinggivenaheaviestweightbymultiplyingwith
4.TheaccuracyofPERTestimationcanbeupto95%basedonthedatasource.PERTcanbe
derivedfrompublishedestimatingdataorexpertjudgment.
2. TriangularDistribution:
Itisrarelyusedinestimations.

Mean
StandardDeviation,
()
Variance

PERT

TRIANGLARDISTRIBUTION

tO +4*tML +tP
6
tP tO
6
2

tO +4*tML +tp
3
tP tO
3
2

Where,

toOptimisticValue,(Bestcaseorhappyscenario)
tMLMostLikelyValue,
tPPessimisticValue.(Worstcaseorscenario)

ProjectDurationEstimate=SumofPERTdurationsforallactivitiesoncriticalpath.
ProjectVariance=Sumofallactivityvariances
ProjectStandardDeviation=SQRT(ProjectVariance)

JavedAkhtar,CE,PE,PMP

P a g e |81

PROJECTMANAGEMENTPROFESSIONAL

Projectstandarddeviationprovidestheuncertaintyinprojectcompletionandtheconfidencelevelof
yourestimate.
NOTE:HighervalueofProjectStandardDeviationdecreasestheconfidencelevelinaccuracyofyour
durationestimate.

6.5.2.5.ReserveAnalysis:
Durationestimatesmayincludecontingencyreservesknownas timereservesorbufferstoaccount
forscheduleuncertainty.Timereservescanbeestimatedbyquantitativeanalysisofschedulerisks.
Progressiveelaborationontheprojectreducestheuseandamountoftimeandcostreserves.

6.5.2.1.OnePointEstimate:
Itisbasedonexpertjudgmentandhasnegativeeffectsontheproject.

Easyforteammemberstopadtheestimates,
Resourcestrytopleasethebossinsteadofmeetingtheneedsoftheproject,
Estimatesarehighlyunreliableandcontributetohiddenrisks,and
Schedulesareatbest,unrealisticandatworst,unattainable.

6.5.3:Outputs:
1.ActivityDurationEstimates:
Theprocessof6.5_ActivityDurationEstimateprovidesactivitydurationswithpossibleranges(range
ofestimate)anddoesnotincludetheleadsand/orlags.
RangeofEstimate(ROE)=MEANStandardDeviation
ActivityDurationEstimateincludes,

JavedAkhtar,CE,PE,PMP

ActivityDuration,
StandardDeviation,DeviationRange

P a g e |82

PROJECTMANAGEMENTPROFESSIONAL

Forscheduleflexibility,standarddeviationsindurationestimatemustbetakenintoaccount.Itmay
helpful,lateron,forschedulecompression.

+Standarddeviationcanbeconsideredaslagoraddedtotheactivitymeanduration,and
Standarddeviationcanbeconsideredaslead.

2.ProjectDocumentsUpdate:

ActivityList,
Assumptions made for activity duration estimates such as skill, experience, availability of
resources.
RiskRegister,consideringtherisksassociatedwiththetypeofestimationperformed.

6.6DevelopSchedule:
Developscheduleistheprocessofanalyzingprojectschedulenetworkdiagramandaddingthe
belowinformationtoprojectschedulenetworkdiagramusingschedulingtooltocreatetheproject
schedulemodel.

ActivityDurations,
ResourceBreakdownStructure,
ActivityResourceRequirements(assignestimatedresourcestotheactivities),

Thekeyoutputsoftheprocessare,

ScheduleBaseline,
ProjectSchedule,
SchedulingData,and
ProjectCalendars.

JavedAkhtar,CE,PE,PMP

P a g e |83

PROJECTMANAGEMENTPROFESSIONAL

JavedAkhtar,CE,PE,PMP

P a g e |84

PROJECTMANAGEMENTPROFESSIONAL

6.6.2:Tools&Techniques:
1.ScheduleNetworkAnalysis:
Ititselfisnotatoolbutitisincludesvarioustoolssuchasalltoolslistedbelowfrom2to8.

2.CriticalPathMethod(CPM):
CriticalPath:ItistimeconstraintlongestpathintheProjectScheduleNetworkDiagramwithZERO
float(slack)whichdeterminestheshortesttimetocompletetheproject.

Provides&proveshowlongtheprojectwilltake.
Helpstofocusontheprojectmanagementefforts.
Helpstoprioritizetheissues&problems.

Float/Slack:
Floatisthedelayorlazytimebetweentheactivities.

LEGEND:
ES=EarliestStartTime,
EF=EarliestFinishTime,
LS=LatestStartTime,
LF=LatestFinishTime,
Float=LSES=LFEF

Forward Pass is performed on early start and early finish dates for floats computation and to
determinethepathofzerofloat(CP).
ForwardPass,EF=ES+DUR1
BackwardPassisperformedonlatestartandlatefinishdatestoreconfirmthefloatcomputationand
toanalyzeVEfloats.
BackwardPass,LS=LFDUR+1
Therearetwokindsoffloats,

1. ActivityFloat:(PrimaryFloat)
Activityfloatisfurtherclassifiedintotwotypes,

a. FreeFloat:
Theamountoftimeanactivitycanbedelayedwithdelayingtheearlystartdateofitssuccessor(s).

b. TotalFloat:
Theamountoftimeanactivitycanbedelayedwithoutdelayingamilestonedateorprojectenddate.

2. ProjectFloat:
The amount of time a project can be delayed without delaying the externally imposed project
completiondaterequiredbythecustomer.
NOTE: Float can be negative and it shows delay. Negative float results in schedule compression
(crashingorfasttracking).

CriticalPathAnalysis:
Itisrequiredtoanalyzethecriticalpathforbelow,

JavedAkhtar,CE,PE,PMP

P a g e |85

PROJECTMANAGEMENTPROFESSIONAL

a. NearCriticalPath:
It is necessary to identify the path(s) which is/are close to the critical path in duration because
sometimeeithertoshortenthecriticalpathorduetodelaysintheproject,nearcriticalpathbecomes
critical.

b. NumbersofCriticalPath:
Therecanbemorethanonecriticalpathswhichshouldbeidentified.Thenumbersofcriticalpaths
increasetheriskontheprojectsandshouldbedocumented.

3.CriticalChainMethod(CCM):
CriticalChain:
Resourceconstrained critical path is known as critical chain. It includes the effects of resource
allocation,resourceoptimization,resourcelevelling,andactivitydurationuncertaintyoncriticalpath.

DurationBuffers:
Additionalnonworkscheduleactivities.

FeedingBuffers:
Duetolimitationsinresources,additionaldurationbuffersknownasfeedingbuffersareaddedtothe
activitydurations.Hencechangingthecriticalpathtocriticalchain.

ProjectBuffer:
AbufferaddedtotheprojectdurationisknownasProjectBuffer.

JavedAkhtar,CE,PE,PMP

P a g e |86

PROJECTMANAGEMENTPROFESSIONAL

4.ResourceOptimization:
ResourceLevelling:
ResourceHistogramorResourceUsageProfileshowsoverandunder allocationofresourcewhich
mustbeoptimized.Thetechnique/toolusedtooptimizeresourceutilizationisknownasResource
LevellinganditisacomponentofProjectManagementSoftware.
Performing resource levelling will change the activities durations if the activities are resource
dependent.Changeinactivitydurationswillchangethecriticalpath.Henceitisadvisabletoanalyze
thecriticalpathafterresourcelevelling.

ResourceSmoothing:
Resourcesmoothingincludesresourcelevellingforactivitieswithfreeand/ortotalfloats.Hencenot
effectingthecriticalpath.Resourcesmoothingwillnotoptimizealltheresources.

JavedAkhtar,CE,PE,PMP

P a g e |87

PROJECTMANAGEMENTPROFESSIONAL

5.ModelingTechniques:
WhatIfScenarioAnalysis:
Thisisatechniquetoanalyzetheprojectschedulenetworkdiagramconsideringdifferentoptions&
conditions.Thesescenarioscanbe,

Bestcase/Happyscenarios,
Worstcasescenarios.

InPrimavera,creatingdifferentscenariosinthereflectionsandmergingthereflectionstothesource
file (project schedule model) helps to analyze the effects of different scenarios on the project
schedule.

Simulation:
ThisisprobabilityanalysistechniqueandmostcommonexampleisMonteCarlosAnalysiswhichis
usedtodeterminethepossibleprojectdurationanduncertainty.

6.ApplyingLeads&Lags:
Applyingleadsandlagsisatoolthatisusedtomodify,change,and/oranalyzeschedulenetwork
diagram.Thistoolisalreadyexplainedin6.3_SequenceActivitiesbutitseffectiveuseisin6.6_Develop
ProjectScheduleandlateroninFastTrackingduring6.7_ControlSchedule..

7.ScheduleCompression:
Schedulecompressionoptionsareappliedduringthe6.6_DevelopProjectScheduleprocessandlater
onduring6.7_ControlSchedule.
NOTE:

Schedulecompressionisperformedonthecriticalpathusingbackwardpass(LS=LFDUR+1).
PMshouldinvestigateschedulecompressionoptions(fasttrackingandcrashing).

Therearetwowaystocompresstheschedule.

1. Crashing:
Thistechniqueinvolvesadditionalresourcestodecreaseactivityduration.Itreplacestimewithcost
asitisCostTimeTradingoff.Impactsare,

IncreasedResources,
IncreasedCost(tomanageadditionalresources),
IncreasedRisks(forresourcemanagement).

2. FastTracking:
Itisalsoknownasleadscan.Itinvolvesintroducingleadsanddecreasingorremovinglagsfromthe
projectscheduletoreducetheprojectduration.Itmayresultin,

Rework,
Increased/additionalriskinvolvedinsubsequentactivities.

NOTE:Itisnecessarytoidentifyallpossibleoptionsforcrashingandfasttracking.Ifintheexam,itis
givenachoicebetweencrashingorfasttracking,selectthechoiceorcombinationofchoiceswithleast
negativeimpactontheproject.

JavedAkhtar,CE,PE,PMP

P a g e |88

PROJECTMANAGEMENTPROFESSIONAL

8.SchedulingTools:
ThistoolisthepartofProjectManagementSoftware.

6.6.3:Outputs:
1.ScheduleBaseline:
The project schedule approved by customer, sponsor, key stakeholders, and functional managers
serves as schedule baseline that will be used for 6.7_Control Schedule for comparison and
performancemeasurement.Schedulebaselineincorporatesonlyapprovedchanges.

2.ProjectSchedule:
Ithasthreeparts,

1. MilestoneChart:
Itcontainstheschedulemilestones(startandfinish)andisusedtoreporttotheseniormanagement.

2. BarChart:
BarchartsalsoknownasGanttchartshowssummaryactivities(hammockactivities)withfinishand
start dates without showing logical relations. It is also used for progress presentation to project
managementteam.

3. ProjectScheduleNetworkDiagram:
Project schedule can be presented in the form of AON diagram format or TimeScaled Schedule
NetworkDiagramshowingactivitytableandGanttchartwithlogicalrelations.

3.ScheduleData:
It contains the following data and requires documentation of all identified assumptions and
constraints.

ProjectScheduleNetworkDiagram,
ScheduleActivities,
ScheduleMilestones,
ActivityAttributes,
Resourcerequirements/ResourceHistogram,
Scheduling options (resourcelevelled, best case, worst case, with or without
imposeddates)

4.ProjectDocumentsUpdate:
Duetoresourceleveling,thefollowingdocumentsmaybeupdated,

JavedAkhtar,CE,PE,PMP

ActivityResourceRequirements,
ResourceCalendars,
ActivityAttributes,
ActivityDurationEstimates,
RiskRegister(Resourcerisks)

P a g e |89

PROJECTMANAGEMENTPROFESSIONAL

JavedAkhtar,CE,PE,PMP

P a g e |90

PROJECTMANAGEMENTPROFESSIONAL

6.7ControlSchedule:

6.7.2:Tools&Techniques:
1.SchedulePerformanceAnalysis/Review:
PerformanceanalysisiddonebydeterminingSchedulePerformanceIndex(SPI).

JavedAkhtar,CE,PE,PMP

P a g e |91

PROJECTMANAGEMENTPROFESSIONAL

SchedulePerformanceIndex=EarnedValue/PlannedValue;
SPI=EVPV
Results:
i)SPI=1.0
AsScheduled.

ii)SPI<1.0
BehindtheSchedule.

iii)SPI>1.0
AheadofSchedule.

2.VarianceAnalysis:
1.ScheduleVariance:
Schedulevarianceisdeterminedasbelow,
ScheduleVariance=EarnedValuePlannedValue
SV=EVPV
Results:

i)SV=0

AsSchedule.

ii)SV<0(Value)
BehindtheSchedule.

iii)SPI>0(+Value)
AheadofSchedule.

2.TotalFloatVariance:
TotalFloatVariance=CurrentTotalFloatPlannedTotalFloat
Result:TotalFloatVarianceisanindicatorofprojectdelay.IfTFVisanegative(VE)value,means
projectisbehindthescheduleandifthistrendcontinuesinthefuture,itwillleadtototalfloatvalue
tobecomeVEindicatingdelayinprojectcompletion.Hencerequiringtoapplyschedulecompression
techniquestoovercomethenegativetotalfloat.
ALLBELOWAREEXPLAINEDUNDERPROCESS6.6_DEVELOPPROJECTSCHEDULE.

ProjectManagementSoftware:
SchedulingTool:
WhatIfScenarios:
ResourceLevelling:
ApplyingLeads&Lags:
ScheduleCompressionTechniques:

3.ResourceOptimizationTechniques:
Resourcesarebeingoptimizedfortheirusage(underandoverallocation).Thesetechniquesare
alreadyexplainedinarticle6.6.2underresoiurcelevellingandresourcesmooting.

6.7.3:Outputs:
1.WorkPerformanceMeasurements:
Workperformancemeasurements(SPI,SV,andTFV)shouldberecorded/documented.

2.ChangeRequests:
Referto4.5_IntegratedChangeControlProcess.

3.ProjectManagementPlanUpdates:

ScheduleBaseline:Shouldbeupdatedforapprovedchangerequests.
ScheduleManagementPlan:Forbadorpoorscheduleperformance,schedulemanagement
planmaybeupdatedtoreflectthechangeinthewaythescheduleismanaged.
CostBaseline:Costbaselinemaybeupdatedbasedonoutputfrom7.3_ControlCostProcess.

JavedAkhtar,CE,PE,PMP

P a g e |92

PROJECTMANAGEMENTPROFESSIONAL

4.ProjectDocumentsUpdates:

ScheduleData,Projectschedulenetworkdiagrammaybeupdatedbasedonchangerequests.
UpdatedProjectSchedule,ProjectSchedulewhichisupdatedforthereportedprogressreport
(workperformanceinformation).
RiskRegister,

5.OPAUpdate:
RequiredtoupdatedOPAfor,

Causeofvariance,
Correctiveand/orPreventiveActions,andreasonsfortheseactions.
LessonlearnedonScheduleControl.

JavedAkhtar,CE,PE,PMP

P a g e |93

PROJECTMANAGEMENTPROFESSIONAL

7.COSTMANAGEMENT:
LifeCycleCosting:
Itistheconceptoflookingatthecostofthewholelifeoftheproduct(setupcost,operationcost,
maintenancecost,terminationcost),notonlytheprojectcost.

ValueAnalysis:
AlsoknownasValueEngineering.Itsfocusistofindoutthelesscostlywaytodothesamework.The
selectedwayshouldnotaffecttheprojectobjectives.

CostRisk:
Itisageneralriskrelatedtothecostduetoinflation.Forexample,inafixedpricecontract,sellerhas
thecostrisknotthebuyer.

AccuracyofEstimate:(RangeofEstimate)

1.RoughOrderofMagnitude(ROM):
Theestimatemadeduringinitiatingphaseoftheproject.ThetypicalrangeofROMis 25%to+75%
w.r.t.actualprojectcostbutitcanbevarieddependingonhowmuchisknownabouttheprojectwhen
theestimateiscreated.

2.BudgetEstimate:
Theestimatemadeduringplanningphaseoftheprojectanditsdeviationfromtheactualcanbe10%
to+25%.

3.DefinitiveEstimate:
Itismorerefinedestimatemade/revisedasprojectprogresses(asaresultofprogressiveelaboration).
AccordingtoPMIitsdeviationfromactualprojectcostcanbe5%to+10%.

ProjectCostManagement:
Threeportionsofprojectcosts,

1.Direct&IndirectCosts,
DirectCost:
Costs directly incurred to execute the project works, team travel, team wages, and recognition,
materialandequipmentcosts.Inotherwords,directcostisthecostof

DirectLabor,
DirectMaterials,and
DirectEquipment.

JavedAkhtar,CE,PE,PMP

P a g e |94

PROJECTMANAGEMENTPROFESSIONAL

IndirectCosts:
It cant be directly traced to a specific project. Taxes, Fringe benefits, and Janitorial services.
Preferably,itcanbeincludedatactivitylevelbutalsocanbeaddedtohigherlevel.Examplesare,

IndirectLaborCosts,
IndirectMaterialsCost,
IndirectEquipmentCost,
ManagementCost,
SupervisionCost,and
CorporateExpenses,FringeBenefits,Overheadetc.

ContingenciesReserves:
Contingencyreservesaccountsforbothdirectand/orindirectcosts.Itisthecostreservedforthe
knownprojectrisksandtheirresponses.

ManagementReserves:
Aprojectmanagerisresponsibletoestimateandconsumethecontingenciesreservebutnotauthorize
to consume management cost. PM needs approval of high management for disposition of change
requestfrommanagementreserves.

2.FixedandVariableCosts:
FixedCosts:
Coststhatareconstantthroughouttheprojectsuchasequipmentleases.Fixedcostsarecoststhat
are independent of output. These remain constant throughout the relevant range and are usually
consideredsunkfortherelevantrange(notrelevanttooutputdecisions).Fixedcostsofteninclude
rent,buildings,machinery,etc.

VariableCosts:
Coststhatarechangedwiththeamountofworkbeingperformed.Variablecostsarecoststhatvary
withoutput.Generallyvariablecostsincreaseataconstantraterelativetolaborandcapital.Variable
costsmayincludewages,utilities,materialsusedinproduction,etc.

7.1PlanCostManagement:
Itistheprocessofestablishingpolicies,proceduresanddocumentationforplanning,managing,
expendingandcontrollingtheprojectcosts.Itprovidesguidancehowtheprojectcostwillbe
managedthroughouttheproject.

JavedAkhtar,CE,PE,PMP

P a g e |95

PROJECTMANAGEMENTPROFESSIONAL

Keyinputsare,

ScopeBaseline,
ScheduleBaseline,and
RiskRegister.

7.1.3Outputs:
CostManagementPlan:
Costmanagementplanmayestablishthefollowings,
1. LevelofAccuracyandprecisionincostestimation,

JavedAkhtar,CE,PE,PMP

P a g e |96

PROJECTMANAGEMENTPROFESSIONAL

2.
3.
4.
5.

UnitsofMeasure,
ControlAccounts,
ControlThresholds,
RulesforEVM,(RefertoEarnedValueofWBSinPrimavera)
5.1.1. Activity%complete,
5.1.2. WBSMilestone%complete,
5.1.3. 0/100(Start/End)
5.1.4. 50/50(Start/End)
5.1.5. Custom%complete,thecustomvaluesshowsto%completionoftheactivityatstart
tilltotheend,atenditwillbe100%.
5.1.6. EstimatetoComplete(ETC),
5.1.7. EstimateAtCompletion,(EAC)
6. ReportingFormants,
7. CostManagementProcessesDescription.
8. Proceduresforprojectcostrecording,

7.2EstimateCosts:

Costestimateisgenerallyexpressedinunitsofcurrencybutinsomecases,itisexpressed
inManHours.
Itisquantitativeassessmentofthelikelycosts(direct+indirect)forresourcesrequiredto
completetheactivities.

JavedAkhtar,CE,PE,PMP

P a g e |97

PROJECTMANAGEMENTPROFESSIONAL

7.2.1:Inputs:
1. Scope Baseline, 5.3 (Requirements with contractual and legal implications such as Health,
Safety,Security,generalinsurance,licenses&permits)
2. ProjectSchedule,6.5(Activities,Durations,Resources)
3. HumanResourcePlan,9.1(ProjectStaffingAttributes,RewardPoliciesetc.)
4. RiskRegister,11.1(ToestimateRiskMitigationCost/ReserveAnalysis)
5. QualityManagementPlan,8.1(ToestimateCOQ)
6. EEF,
7. OPA.

7.2.2:Tools&Techniques:
1. ReserveAnalysis:
CostestimatesmayincludecontingencyreservesknownasCostReservesorbufferstoaccountfor
costuncertainty.Costreservescanbeestimatedbyquantitativeanalysisofriskscost.
Progressiveelaborationontheprojectreducestheuseandamountoftimeandcostreserves.

2. CostofQuality:
Referto7.1_PlanQualityProcess

3. VendorBidAnalysis:
Projectcostcanbeestablishedbycomparingthebidvaluesfromqualifiedvendors.

JavedAkhtar,CE,PE,PMP

P a g e |98

PROJECTMANAGEMENTPROFESSIONAL

7.2.3:Outputs:
1. ActivityCostEstimates:
2. BasisofEstimates:
Mustdocumentthefollowing,
Estimationmethods,
Assumptionsmadeforestimation,
Costconstraints,
Rangeofpossibledeviation
Confidencelevelofestimate
3. ProjectDocumentUpdate:
RiskRegister

7.3DetermineBudget:
7.3.1:Inputs:
1. ActivityCostEstimate,7.1
2. BasisofEstimates,7.1
3. ScopeBaseline,5.3
3.1.
ProjectScopeStatement(FundingConstraints)
3.2.
WBS(WorkBreakdownStructure)
3.3.
WBSDictionary
4. ProjectSchedule,6.5
5. ResourceCalendars,9.2+12.2
6. Contracts,12.2(contractvalues)
7. OPA

JavedAkhtar,CE,PE,PMP

P a g e |99

PROJECTMANAGEMENTPROFESSIONAL

7.3.2:Tools&Techniques:
1.CostAggregation:
Activitiescostsarerolleduptoworkpackagelevel,costaccountlevelandsoon.

2.ReserveAnalysis:
BudgetReservesAnalysiscanestablishtheboth,

ContingenciesReserves:
These are cost allowance for unplanned but potentially required changes that can result from
identifiedrisks.

ManagementReserves:
These are budget reserves for unplanned changes to the project scope and cost result from
unidentifiedrisks.ManagementReservesarenotthepartofProjectCostBaselineandnotincluded
asapartofEVM.

JavedAkhtar,CE,PE,PMP

P a g e |100

PROJECTMANAGEMENTPROFESSIONAL

4.HistoricalRelationships:
Anyhistoricalrelationshipsthatresultinanalogousorparametricestimatecanbeusedtodevelop
mathematicalmodelstopredicttototalprojectcosts.
ParametricEstimate:UnitCost/M2xTotalCoveredArea

5.FundingLimitReconciliation:FLR
In some cases, due to funding limitations (from sponsor, company management) may require to
rescheduletheprojectworktoleveloutthefundinglimitations.Itcan,

Delaytheproject,
Project delay can be overcomewith available additional funding at anyperiod oftime
usingschedulecompressiontechniques.

7.3.3:Outputs:
1.CostPerformanceBaseline:
ItisanauthorizedtimephasedBACusedtomonitorandcontrolcostperformanceontheproject.It
is also known as Cost SCurve. It also includes cost thresholds/allowances over the estimated
expenditures.

JavedAkhtar,CE,PE,PMP

P a g e |101

PROJECTMANAGEMENTPROFESSIONAL

2.ProjectFundingRequirements:(CashOutflow)
Theseareperiodicfundingrequirements,mostlyexpressedinmonthlybasis.

JavedAkhtar,CE,PE,PMP

P a g e |102

PROJECTMANAGEMENTPROFESSIONAL

3.ProjectDocumentUpdates:
DuetoFLR,followingmeberevisedand/orupdated,

RiskRegister,
CostEstimate,
ProjectSchedule,

7.4ControlCost:
Itistheprocessofupdatingandmonitoringtheprojectcostsandmanagingchangestothecost
baseline.

7.4.1:Inputs:
1. CostManagementPlan,7.1
2. CostPerformanceBaseline,7.3

JavedAkhtar,CE,PE,PMP

P a g e |103

PROJECTMANAGEMENTPROFESSIONAL

3. Fundingrequirements,7.3
4. WorkPerformanceInformation,4.3
5. OPA

7.4.2:Tools&Techniques:
1.EarnedValueManagement:(EVM)

PlannedValue(PV):
Itistheauthorizedbudgetassignedtotheworkschedule(inclusiveofcontingencyreserves).Also
knownasbudgetedcostofworkschedule(BCWS).
JavedAkhtar,CE,PE,PMP

P a g e |104

PROJECTMANAGEMENTPROFESSIONAL

EarnedValue(EV):
Itistheauthorizedbudgetfortheworkperformed(inclusiveofcontingencyreserves).Alsoknown
asbudgetedcostofworkperformed(BCWP).
EV=PV*%Complete.
ActualCost(AC):
Itisthecostincurredfortheworkperformed.Alsoknownasactualcostofworkperformed(ACWP).
BudgetAtCompletion(BAC):
Budgetedcostoftheprojectatcompletion.Itisinclusiveofcontingencyreserves.

1.ScheduleVariance:SV
SV=EVPV

2.CostVariance:CV
CV=EVAC

3.SchedulePerformanceIndex:SPI
SPI=EVPV

4.CostPerformanceIndex:CPI
CPI=EVAC

TherulesforEVMmustbedefineanddocumented.
0/100Rule:0%atstarttillcompletion,becomes100%atcompletion.
50/50Rule:50%atstarttillcompletion,becomes100%atcompletion.
20/80Rule:20%atstarttillcompletion,becomes100%atcompletion.
0/100Rule:0%atstarttillcompletion,becomes100%atcompletion.
Custom%Complete:
JavedAkhtar,CE,PE,PMP

P a g e |105

PROJECTMANAGEMENTPROFESSIONAL

Activity%Complete:
WBSMilestone%Complete:

2.Forecasting:

1.EstimateatCompletion=EAC
a)EAC=AC+ETC

(IRequiresnewestimate)

ThisisEACwithactualtodateplusbottomupestimatetocomplete(ETC)forremainingwork.
b)EAC=AC+(BACEV)

(IISameBAC)

ThisisEACwithactualtodateplustheremainingbudgetatcompletion.Itshowsthatforremaining
work, must to consume the reaming budget and there is no additional budget to execute the
remainingwork.
c)EAC=BACCPIC

(IIIProgresscontinueswithsamerate)

ThisisEACifprojectwillprogressatthesamerate(CPI).
d)EAC=AC+[(BACEV)(CPICXSPIC)]

(IVWeightedBAC)

ThisisEACwithactualtodateplusweightedremainingBACbyperformance,

2.EstimateToComplete=ETC
a)ETC=EACAC
b)ETC=BottomupReestimation

3.ToCompleteCostPerformanceIndex=TCPI
TCPI(BAC)=(BACEV)(BACAC)
TCPI(EAC)=(BACEV)(EACAC)

4.VarianceatCompletion=VAC
VAC=BACEAC
NOTE:CPI iscumulativecostperformanceindexandSPICisthecumulativescheduleperformance
index.

CPIC=EVCACC
C

JavedAkhtar,CE,PE,PMP

P a g e |106

PROJECTMANAGEMENTPROFESSIONAL

SPIC=EVCPVC

5.TrendAnalysis:
Itistheanalysisofperformancetrendoverthepasttonoteimprovementordeterioration.

PossibleScenarios:
1. SPI>1.0&CPI>1.0:
2. SPI=1.0&CPI=1.0:

AheadSchedule&UnderBudget
Onschedule&OnBudget

Bothaheadoftarget.
Bothontarget.

Theabovescenariosaremostfavorableones.Therestofthecasesrequirescorrectiveactionbased
ontheprojectpriority(timeorcost).
3.
4.
5.
6.
7.

SPI>1.0&CPI=1.0:
SPI>1.0&CPI<1.0:
SPI<1.0&CPI=1.0:
SPI<1.0&CPI>1.0:
SPI<1.0&CPI<1.0:

AheadSchedule&OnBudget
AheadSchedule&OverBudget
BehindSchedule&OnBudget
BehindSchedule&UnderBudget
BehindSchedule&OverBudget

JavedAkhtar,CE,PE,PMP

P a g e |107

PROJECTMANAGEMENTPROFESSIONAL

JavedAkhtar,CE,PE,PMP

P a g e |108

PROJECTMANAGEMENTPROFESSIONAL

8.QUALITYMANAGEMENT:
ImportantDefinitions:
Quality:
Thedegreetowhichproduct/deliverablefulfillsrequirements.ItismeasuredintermsofSIGMA.

Grade:
Acategoryorrankusedtodistinguishitemsthathavethesamefunctionaluse.Usually,itismeasured
intermsofnumberofstarslikethreestar,fivestar,sevenstaretc.

Probability:
This term refers to likelihood that something will occur. Chances of occurrence of any event.
Probabilityisusuallyexpressedasadecimalorafractiononascaleofzerotoone.

NormalDistributionChart:
Itismostcommonchartintheshapeofabellcurveusedtomeasurevariationsfromthemean.

StandardDeviation():
=(PO)6
Itisthemeasureofthedeviationfromthemean.Youmayusethistermtosetyourcontrolpointsor
thresholds.

QualityManagementPlan:
Itincludescreatingandfollowingpoliciesandprocedurestoensurethattheprojectmeetsthedefined
needs.Itensuresprojectcompletionwithnodeviationfromprojectrequirements.

InternationalQualityStandards:
I.UNConventiononContractsforInternationalSalesofGoods(CISG).
II. International Organization for Standardization (ISO 9000) refers to quality of organizational
processes&procedures.
III.OccupationalSafety&HealthAdministration(OSHA)referstosafetystandards.

QualityTheorists:
JosephJuran:Developed80/20principlewhichisaruleofthumb,Heurist.
W.EdwardsDeming:Hedeveloped14pointstoTotalQualityManagementandadvocatedthatplan
docheckactcycleasthebasisforqualityimprovement.
PhilipCrosby:Hepopulatedcostofpoorqualityandadvocatedpreventionoverinspectionand
zerodefects.Hebelievedthatqualityisconformancetorequirements.

TotalQualityManagement:
Thisphilosophyencouragescompaniesandtheiremployeestofocusonfindingwaystocontinuously
improvethequalityoftheirproductandtheirbusinesspracticesateveryleveloftheorganization.
Thebasicconceptisthatanyonewillcontributethequalityimprovementprocess.

MarginalAnalysis:
Itisthetoolusedtoweightheprosandconsofthespecificprocess.Itisalsousedtoevaluatecurrent
businesssituationsandobstaclestogoalattainment.

JavedAkhtar,CE,PE,PMP

P a g e |109

PROJECTMANAGEMENTPROFESSIONAL

Itreferstolookingforapointwherethebenefitsorrevenuetobereceivedfromimprovingquality
equalstheincrementalcosttoachievethatquality.
Sometimesaddedattentiontoqualitydoesnotproduceaddedvaluewithsameincrement.PMmust
belookingforthatpointandwhenthepointisreached,hemuststoptryingtoimprovequality.

JustInTime(JIT):
Companies working with JIT approach must have very high level of quality in their practices and
processes.JITcanbeariskfortheprojectifperformingprocessisnotsubjecttothequality.
JITleadstoZEROinhouseinventory.Since,itisJIT,therecanbeariskofinventoryarrivinglateand/or
missinginventoryandmustberecordedinriskregister.

MutualExclusivity:
Whentwoeventsorresultscantoccurinasingletrial,thosearecalledmutualexclusive.Eventhough,
youtryandrepeatyoureffortorprocessmanytimesbutbothresultscantoccuronetime.Onetrial
willyieldoneresultandanothertrialwillyieldtheotherresultorthesameresult.
Condition:Onetrialoneresult.

StatisticalIndependent:
Iftheresultsofoneeventoractivityhavenobearingontheresultsofothereventoractivity,thetwo
eventsoractivitiesareknownasstatisticallyindependent.

ImpactsofPoorQuality:

Increasedcost
Lowmorale
Lowcustomersatisfaction
Increasedrisk
Rework
Scheduledelays

ImpactsofHighQuality:

Increasedproductivity,
Increasedcostperformance,(decreasedcosts)
Decreasedrisksandreworks,and
Increasedstakeholderssatisfaction.

JavedAkhtar,CE,PE,PMP

P a g e |110

PROJECTMANAGEMENTPROFESSIONAL

8.1PlanQualityManagement:
It is the process of identifying the quality requirements and standards for the project and its
deliverables.Itdocumentshowprojectwilldemonstratecompliancetothosequalityrequirements
andstandards.

Keyinputsare,

ScopeBaseline,(forprojectspecificationsandproductdescription)
ScheduleBaseline,
CostBaseline,
RiskRegister,

JavedAkhtar,CE,PE,PMP

P a g e |111

PROJECTMANAGEMENTPROFESSIONAL

OrganizationalQualityManagementPlan,
Templates,

Keyoutputsare,

QualityManagementPlan,
ProcessImprovementPlan,
QualityMetrics,and
QualityChecklists.

8.1.2Tools&Techniques:
1.CostBenefitAnalysis:
PMmustweighthebenefitsversescostofqualitytodeterminetheappropriatequalitylevelinorder
tomeetprojectrequirements.

2.CostofQuality:
Costofqualitycanbedividedintotwobroadcategories.
1. CostofConformance,and
2. CostofNonConformance.

JavedAkhtar,CE,PE,PMP

P a g e |112

PROJECTMANAGEMENTPROFESSIONAL

2.1.CostofConformance:
Itisthecostspenttoavoidthefailures.

2.1.1PreventionCost:
Itisthelowestcostspentoneffortstobuildaqualityproduct.Itincludesthecostof,

Qualityplanning,
Trainingsonqualityassuranceandqualitycontrol.
Costofqualitymanagementstaff.

2.1.2AppraisalCost:
Itisthecostofqualityassessmentandincludesthecostsforthefollowings,

DestructiveandNonDestructiveTesting,
QualityInspectionsandAudits,
DestructiveTestingLoss.

2.2CostofNonConformance:
Itisthehighestcostspentbecauseoffailures.

2.2.1InternalfailureCosts:
Failurereportedbyprojectteamitself(QC).Canbereworkanddisposalofscrap.
2.2.2ExternalFailureCosts:
Failurereportedbycustomer.Itcancauserework,disposalofscrap,liabilities,warrantywork,lost
businessandreputation.

JavedAkhtar,CE,PE,PMP

P a g e |113

PROJECTMANAGEMENTPROFESSIONAL

3.7QCbasicTools:
3.1CauseandEffectDiagram:(RootCauseAnalysis)
ItisalsoknownasIshikawaorFishboneDiagram.Thisdiagramisusefultotracktherootcauseof
defectingraphicformat.BelowfishbonediagramillustratesadefectLowSalesontherightand
potential/highlevelcausesandsubcauses/contributorycausesontheleftinordertofindoutthe
rootcause.
Causeandeffectdiagramscanbeused,

Tolookatthecausesofaproblem.
Toorganizethoughtsandtogeneratediscussions.
Toexplorethefactorsthatwillresultindesiredfutureoutcome.

Thehighlevelcausesaredividedinto5Ms.
1.
2.
3.
4.
5.

Methods(processes),
Materials,
Machinery(Equipment),
Manpower(People),and
MotherNature(Environment).

In general, the cause and effect analysis revolves around the project resources, processes and
enterpriseenvironmentalfactors.AnotherMcanbeaddedformoneyifnecessary.

FiveWhysMethod
Fivewhysisasimplemethodforroutecauseanalysis.Askingwhyatleastfivetimesandlookingfor
justifiable reason will either get you to the route cause or to a point where you need further
informationtounderstandthecause.Itisillustratedindiagramonthefollowingpage.

JavedAkhtar,CE,PE,PMP

P a g e |114

PROJECTMANAGEMENTPROFESSIONAL

3.2.Flowcharts:
Also known as process charts. Flowcharts help to identify process flow, logic and method for
performingaspecificactivityorgroupofactivities.Itmayproveusefulinunderstandingthecostof
qualityinaprocess.Atraditionalexampleofflowchartisshownbelow.
Flowchartsareusefultoidentify

Failingprocesssteps,and
Processimprovementoptionsandopertunities.

ASIPOCdiagramisaformofflowchart.
SIPOC:Supplier,Input,Process,Output,Customer

JavedAkhtar,CE,PE,PMP

P a g e |115

PROJECTMANAGEMENTPROFESSIONAL

3.3.ParetoChart/Diagram:

ItisdevelopedbyItalianeconomistWilfredoPareto.
Itisspecializedhistogramandprioritizationtoolforissues,defects,problems,risksetc.
Itissimilartohistogrambutitsortsthedataindescendingordertoprioritizethedefectsand
tofocusonthecorrectiveactions.
ParetochartreferstoParetoLawof80/20whichstatedthat80%ofItalianwealthwasheld
by20%ofpopulation.Dr.JosephJurantookParetosideaandappliedtogeneralbusiness
processtoseeifthisruleisapplicabletothebusinessenvironment.Hestated80/20ruleas,
20%ofbusinessproduces80%ofthewasteandrework.
80%ofthedefectsareproducedbythe20%ofthepotentialcauses.
20%ofyourcustomersproduce80%ofyourrevenues.
80%ofyourcustomercomplaintscomefrom20%ofyourcustomers.
Solvetheproblemwithhigherfrequencyorrateofeffectfirstwhichisthemostcritical.
ParetoChartseparatesthecriticalfewfromthenoncriticalmany.
ItisakeytoolinKaizen.

JavedAkhtar,CE,PE,PMP

P a g e |116

PROJECTMANAGEMENTPROFESSIONAL

3.4.CheckSheets:
Checksheethasavarietyofusewhichcanincludebutnotlimitedto,

Collectingdataaboutpotentialqualityissues,
Capturingrequiredsignoffontheprojectdocuments,
Stepstakenforadefectanalysis,
Collectingatallyofallrequiredstepsfortestingaproduct.

Anexampleappearsbelow,

3.5.Histogram:
Ahistogram(BarChart)displaysdataintheshapeofbarsorcolumns.Histogramshelptofindoutover
andunderallocationorusages.AtypicalexampleisResourceprofile/Histogram.

JavedAkhtar,CE,PE,PMP

P a g e |117

PROJECTMANAGEMENTPROFESSIONAL

3.6.ControlCharts:
Controlchartsareusedto,

Determineprocessstabilityandidentifypredictableperformance.
Identifyupperandlowercontrollimits(controlthresholds)establishedbythePM.
Identifyupperandlowerspecificationlimitsestablishedbythecustomer.
Assesstheaccuracyofdata.
Assesstheprecisionofdata

3.6.1.Mean:
Meanistheaverageormeanofallthedata.
3.6.2.SpecificationLimits:
Thesearethecontractrequirementswithmin.(lower)andmax.(Upper)valuesallowed.Theseare
customersacceptablequalitylimits.

JavedAkhtar,CE,PE,PMP

P a g e |118

PROJECTMANAGEMENTPROFESSIONAL

3.6.3.ControlLimits:
Controllimits(upperandlower)aredefinedbytheprojectmanagerandappropriatestakeholderto
reflectthepointsatwhichcorrectiveactionwillbetakentopreventexceedingspecificationlimits.
Controllimitsareachievedbyaddingtolerance/thresholdstotheapprovedbaselines.
Forrepetitiveprocesses,controllimitsare3.

3.6.4OutofControl:
Aprocessisconsideredoutofcontrolledwhen

Adatapointexceedsacontrollimit.
Seven consecutive points are above or below the mean, the process is considered out of
control.

3.6.5.RuleofSix:
Ifsixdatapointsareeithersideofthemeanevenwithincontrollimitsmayindicateandoutof
controlsituation.
3.6.6.RuleofSeven:(Heuristic/ThumbRule)
Ifsevenconsecutivepointsareinthesametrendwithbelowandabovethemeanasinfig.86,this
meansthesituationisoutofcontrolandanimmediatecorrectiveactionisrequiredbeforeitcrosses
thecontrollimit.
3.6.7.AssignableCause/SpecialCauseVariation:
Ifruleofsevenisapplicabletoanyprocess,PMmustinvestigateforthecauseofvariationinorderto
findoutassignablecauseanddocumentthecorrectiveandpreventiveactions.

3.7.ScatterDiagram:
Scatteredchartsareusedintrendandregressionanalysis.ScattereddataisplottedinXYgraphand
thentriedtointerrelatetheresultsbymappingthemwithaline.
Thecloserthepointsaretoadiagonalline,themorecloselytheyarerelated.

3.8.RunCharts:
Runchartsaresimilartocontrolchartsbutwithoutlimits.Theyshow,

Trendsinprocessoverthetime.

JavedAkhtar,CE,PE,PMP

P a g e |119

PROJECTMANAGEMENTPROFESSIONAL

Variationsintheprocessovertime.
DeclinesorImprovementsintheprocessovertime.

Trendanalysisisperformedusingrunchartsandinvolvesmathematicaltechniquestoforecastfuture
outcomesbasedonhistoricaltrends.
Trendanalysis(positive,negative,orneutral)isoftenusedtomonitor,

TechnicalPerformance,
CostPerformance,
Scheduleperformance,

4.BenchMarking:
Makeanyotherproject(internalorexternal)asbenchmarktogetideasforimprovementoncurrent
projectandtosetbasisorbenchmarktomeasurequalityperformance.ThistechniqueusesOPAor
EEF.

5.DesignofExperiment(DOE):

This technique uses experimentation to statistically determine what variables will improve
quality.
DOE should be used during plan quality to determine the number and type of tests to be
performed(statisticalsamplingplan)andtheirimpactonthecostofquality.
Itisverytimeconsumingapproachandrequiredspecialtraining.

6.StatisticalTestSampling:
Ifyouwillinspectallproductsonebyone,itwill

Taketoolong,
Costtoomuch
Beingtodestructive

Thistechniqueisusedtodocumentthesamplesizeandfrequencyofmeasurements/testsduringthe
8.1PlanQualityprocessandactualsamplingisdoneduring8.3PerformQualityControl.

7.AdditionalQualityPlanningTools:
7.1LossFunction:
Thistoolisusedtofinanciallymeasurethecustomerdissatisfactionwiththeproductsperformance.

7.2MatrixDiagrams:
Matrixdiagramsareestablishedtoimprovetheprocessandproductivitywithintheacceptablequality
limits(controlorspecificationlimits).ExampleisHouseofQualityHOQwhichisutilizedinQuality
FunctiondeploymentQFD.

7.3KanoModel:
Thismodelisusedtoseparatetheproductfeaturesintobelowthreegroupsforfurtheranalysisand
improvements.

Whatsatisfiescustomer,
Whatdelightscustomer,
Whatdissatisfiescustomer.

JavedAkhtar,CE,PE,PMP

P a g e |120

PROJECTMANAGEMENTPROFESSIONAL

7.4MarginalAnalysis:
Thistoolisusedtoweighthebenefitsorrevenuesfromimprovingqualityversesthecosttoachieve
thequality.

7.5ForceFieldAnalysis:FFA
Itisthetoolusedtoweightheprosandconsofthespecificprocess.Itisalsousedtoevaluatecurrent
businesssituationsandobstaclestogoalattainment.

8.ProprietaryQualityManagementModels:
8.1.SixSigma:
3or6sigmarepresentsthelevelofqualitythatacompanyhastodecideortrytoachieve.3islower
controllimitand6isuppercontrollimit.

o
o
o
o
o

+isontherightsideofmeanandisontheleftsideofmean.
1 = 01*Standard Deviation. If control limits are 1, 68.27% of results will fall
betweenupperandlowercontrollimits.
2 = 02*Standard Deviation. If control limits are 2, 95.45% of results will fall
betweenupperandlowercontrollimits.
3 = 03*Standard Deviation. If control limits are 3, 99.73% of results will fall
betweenupperandlowercontrollimits.
6=06*StandardDeviation.Ifcontrollimitsare6,99.9999998%ofresultswillfall
betweenupperandlowercontrollimits.

The%agesrepresenttheconfidencefactorandlevelofqualitycontrol.QClevelincreaseswiththe
increaseofstandarddeviation.6isthehighestqualitystandard.

14PointsofQualityManagement:
W.Edwardsdevelopedthe14pointsofqualitymanagement.Hedefinedtwotypesofvariationsas,

SpecialCauseVariation:Itisthevariationwhenprocesscrossesthecontrollimits.
CommonCauseVariation:Itistherandomnessintheprocess.

JavedAkhtar,CE,PE,PMP

P a g e |121

PROJECTMANAGEMENTPROFESSIONAL

14Kaizen:
Itistheconceptofconsistentandincrementalprocessorqualityimprovement.

8.1.3Outputs:
1.QualityManagementPlan:
Itdescribeshowthequalitypolicywillbeimplementedandincludesfollowingthreeprocesses.

PlanQuality
QualityAssurance
QualityControl

2.QualityMetrics:
QualitymetricsincludeproductattributesthatwillbevalidatedbyQAandmeasuredbyQC.Quality
metric is an operational definition and is used inQA andQCprocesses but itis developed inPlan
Qualityprocess.Examplesarecontrollimitsetc.

3.ProcessImprovementPlan:
ProcessImprovementPlanhelpsto,

Savetimebyincreasingefficiencyandpreventingproblems.
Savemoneyaswell.
Gaincustomersatisfaction.

4.QualityChecklists:
Checklistsareusedto,

Verifytheprocesssteps,
Ensureconsistencyinfrequencyinperformedtasks.

8.2PerformQualityAssurance:

JavedAkhtar,CE,PE,PMP

P a g e |122

PROJECTMANAGEMENTPROFESSIONAL

8.2.2Tools&Techniques:
1.QualityManagementandControlTools:
AffinityDiagrams:
Alreadydefinedin5.2_CollectRequirementsProcess.

ProcessDecisionProgramCharts:(PDPC)
Itisausefulmethodforcontingencyplanningbecauseitaidsteaminanticipatingintermediatesteps
thatcouldderailachievementofthegoal.

InterrelationshipDigraphs:
Itisanadoptionfrominterrelationshipdiagram.Itprovidesaprocessforcreativeproblemsolvingin
moderately complex scenarios that possess intertwined logical relationships for up to 50 relevant
items.

TreeDiagrams:
Alsoknownassystematicdiagrams.ExamplesareWBS,RBS,andOBS.

PrioritizationMatrices:
Identify the key issues and the suitable alternatives to be prioritized as a set of decision for
implementation.

ActivityNetworkDiagram:
Alreadyexplainedin6.3_SequenceActivities.

JavedAkhtar,CE,PE,PMP

P a g e |123

PROJECTMANAGEMENTPROFESSIONAL

MatrixDiagrams:
Thistoolisusedtoperformdataanalysis.

2.QualityAudits:
Tocheckthecompliancewiththequalitypolicies,standards,processesandprocedures.Qualityaudits
can confirm the implementation of approved change requests including corrective actions, defect
repairsandpreventiveactions.
QualityauditshelptoimprovethequalityandresultsinreducedCostofQuality.QualityAuditisatool
of QA process and verifies either the quality process is being followed. Also, to verify the quality
reports.

3.ProcessAnalysis:
Most of the time, processes are repeated throughout the project phases. If you will analyze the
processfirsttimeandnotedownthelessonlearned,itwillhelptoimprovethequalityoftheprocess
whenitwilloccurnext.

JavedAkhtar,CE,PE,PMP

P a g e |124

PROJECTMANAGEMENTPROFESSIONAL

8.3PerformQualityControl:

8.3.2Tools&Techniques:
1.
2.

ProcessFlowcharts:
ProcessControlCharts:

JavedAkhtar,CE,PE,PMP

P a g e |125

PROJECTMANAGEMENTPROFESSIONAL

8.3.3Outputs:
1.QualityControlMeasurements:
ThedocumentedresultsofQCprocess.

2.ValidatedChanges:
Any changed or repaired item is inspected and either accepted or rejected. Accepted items are
referredtovalidateddeliverablesandrejecteditemsmayrequirerework.

QualityManagementActionList:

Identifyatwhatlevelyoushouldcontrolthequality(workpackagelevel,activitylevelor
moredetailedlevel).
Identifyanyqualitystandardsandprocessesthatareapplicabletotheproject.
Determinethequalitystandardsandprocessestouse, when,andonwhatpartofthe
project.
Setstandardstoreachdesiredlevelofperformanceforactivitiesandtheproject.
Setmatrixtomeasurequalityfromthecustomersandorganizationalperspective.
Decide what you will do to make sure the processes are followed and standards are
met.YourQualityControlSystem.
Determine how you will improve the processes on the project.Your Process
ImprovementPlan.
Testthevalidityofassumptionsbeforetheyresultsindefects/problems.
Makesureyourteammembersunderstandwhatqualityisfortheirwork.
Inspecttheworkasitisbeingdone,notafter.
Measureperformanceagainststandards.
Collect problems, error and complaints. Review them and see what can be done to
preventthemfromreoccurringontheproject.
Holdmeetings,issuereports,takemeasurementsandperformcalculations.
PerformQA.
PerformQC.
Reassessthequalitystandards.
Evaluatetheeffectivenessofqualitycontrolsystem.
Managequalitywiththesameeffortastime,costorscope.
Requestchanges,includepreventiveandcorrectiveactionsanddefectrepair.
Includequalityissuesinthelessonslearned.(QualityIssueLog)
Feedlessonlearnedbackintotheproject.

JavedAkhtar,CE,PE,PMP

P a g e |126

PROJECTMANAGEMENTPROFESSIONAL

9.HUMANRESOURCEMANAGEMENT:
HighleveloutputsrequiredforHumanResourceManagement,bytheprocessgroup,arelisted
below.

Initiating

Planning

HumanResourcePlan

Executing
ProjectStaffAssignments
ResourceCalendars
Teamperformance
Assessment
ChangeRequest,
DocumentsUpdates

Monitoring&
Controlling

Closing

9.1.DevelopHumanResourcePlan:

Keyinputsare,
JavedAkhtar,CE,PE,PMP

P a g e |127

PROJECTMANAGEMENTPROFESSIONAL

ActivityResourceRequirements,
ResourceBreakdownStructure,
ResourceHistogram,
EnterpriseEnvironmentalFactor,(Existingresource,Administrationpolicies,Organizational
cultureandstructure)
OrganizationalProcessAssets,

9.1.2Tools&Techniques:
1.OrganizationalCharts&PositionDescription(Roles):

I.HierarchicalTypeCharts:
Thesechartsshowpositionandrelationshipsinagraph,topdownformat.Itcanhavetwopartsas
OrganizationalBreakdownStructure(OBS)andResourceBreakdownStructure(RBS).OBSisbasically
human resource chart. RBS contains resource category other than human resources is helpful in
trackingprojectcostsandcanbealignedwithorganizationalaccountingsystem.

II.MatrixBasedCharts:
AResponsibilityAssignmentMatrix(RAM)isusedtoillustrateconnectionbetweenworkpackagesor
activitiesandprojectteammember.ExampleofRAMisRACI(Responsible,Accountable,Consult,and
Inform) chart. RACI chart is particular important when the team consists of internal and external
memberstoensurecleardivisionofrolesandresponsibilities.
TheproposedRACIwithscoringcardfortenderrequirementsishereinbelow,
S
N

Document
Score

Document

Responsible

Accountable

Consult

Inform

(Personnel)

(Section/
Personnel)

(Section/
Personnel)

(Section)

Due
Date

Actual
Date

Anticipated
Risk

JavedAkhtar,CE,PE,PMP

P a g e |128

PROJECTMANAGEMENTPROFESSIONAL

III.TextOrientedFormats:
It is sort of Job Description (JD) which consists of Role (civil, electrical engineer), Competencies,
Qualification,Responsibilitiesandauthorities.Thetrickofthetradeinthisformisthatitincludesa
sentenceNOTLIMITEDTOand/orTASKSGIVENBYIMMEDIATEMANGER.

IV.OtherSectionsofPMP:
Someresponsibilitiesarelistedandexplainedinothersectionsofprojectmanagementplansuchas
RISKOWNER,QA/QCENGINEER/MANAGERetc.

NOTES:

RolesandResponsibilitiesaredefinedwhiledevelopinghumanresourceplanandassigned
whenprojectteamisacquired(9.2).
Project Organizational Chart is prepared while developing human resource plan and
populatedafteracquiringprojectteamduringprocess9.2.
ResponsibilityAssignmentMatrix(RACI)ispreparedforeachprocesstobecarriedoutduring
initiating,planning,executing,monitoring&controlling,andclosingtheproject.

2.Networking:
Meetings,Socialism,Formalgathering,Lunch,Dinneretc.

3.OrganizationalTheories&Rewards:
Arbitration:
Inarbitrationaneutralpartyhearsandresolvesadispute.

Perquisites(Perks):
Someemployeesreceivespecialrewardssuchasassignedparkingspaces,cornerofficesandexecutive
dinningetc.

FringeBenefits:
Thesearestandardbenefitsgiventoallemployeessuchaseducationallowance,insurance,annual
bonus,paidannualvacations,airticketsetc.

MotivationTheories:
Itisrewardingtheemployeesinsuchawaytomotivatetheirinterestandconcernstotheproject.
Herearesomemotivationtheories,

MaslowsHierarchyofNeeds:
Also known asThe Theoryof Human Motivation.Itstatesthat people will notbemotivatedand
ascendtonextlevelunlessthelevelsbelowarefulfilled.Forexampurposeyouneedtoremember
theseneedsinascendingorder.Thetopmostistheselfactualization.

JavedAkhtar,CE,PE,PMP

P a g e |129

PROJECTMANAGEMENTPROFESSIONAL

HerzbergsTheory:
Herzberg studied the factors causing satisfaction and dissatisfaction in a work environment.
Herzbergs theory deals with hygiene factors and motivating agents. This theory is known as
motivationhygienetheory.

HygieneFactors:Poorhygienefactors(workingenvironmentalfactors)maydestroymotivationbut
improving them under most circumstances will not improve motivation. Hygiene factors are not
sufficienttomotivatepeople.

Workingconditions,
Salary,
Personallife,
Relationshipsatwork,
Security,and
Status.

MotivatingAgents:Motivatingagentsare,

Responsibility
SelfActualization
ProfessionalGrowth
Recognition

So, the most important motivation factor is recognition (Best employee awards, bonus, favorable
incrementsinbenefitsetc.)whichisdonebyrewardingtheemployeesandlettingthemgrow.Giving
raisesisnotmosteffectivemotivator.
JavedAkhtar,CE,PE,PMP

P a g e |130

PROJECTMANAGEMENTPROFESSIONAL

ExpectancyTheory:
Employeeswhobelievetheireffortwillleadtoeffectiveperformanceandwhoexpecttoberewarded
fortheiraccomplishmentswillremainproductiveasrewardsmeettheirexpectationsandviceversa.
Vroomstatedthata person to bemotivated,themotivation andperformance must be linked.He
createdthreevariablestoaccountforthislink.Thesevariablesare,

Expectancy:ThisvariableistheemployeesbelievethatifIworkhardthebosswillrewardtheextra
efforts.Thiswillbeaffectedbysuchthings,

Havingtherightresourceavailable(time,money,rawmaterials),
Havingtherightskilltodothejob,
Havingthenecessarysupporttogetthejobdone.

Theabovefactorsaccountsforthehardwork.Ifabovefactorsarelackingfor,thehardworkwillnot
producethevaluableoutput.Henceshouldnotberewarded.

Instrumentality:Thisvariablesomehowisdifferentfromexpectancy.Thisistheemployeesbelieve
thatIfIdoagoodjobandperformwell,thereisrewardorrecognitionIcanreceive.

Valence:Thisistheimportancethatanindividualplacesupontheexpectedoutcome.ForexampleIf
Imainlymotivatedbythemoney,Imightnotcareaboutthecomptime.

DavidMcClellandsTheoryofNeeds:
ItisalsoknownasAcquiredNeedsTheoryandAchievementTheory.Thistheorystatesthatpeople
aremostmotivatedbyoneofthethreeneedslistedinthefollowingtable.Apersonfallingintoone
categorywillbemanageddifferentlythanaPeronfallingintoanothercategory.

LeadershipTheories:
McGregorsTheoryofXandY:
Itismanagementtheory.Therearetwogroupsofprojectteam.XandY.

TheoryX:Managerswhobelievethatemployeesneedtobewatchedeveryminute.Theybelievethat
employeesareincapable,avoidresponsibilityandavoidworkwheneverpossible.
TheoryXisapplicabletoHandWorkers.

JavedAkhtar,CE,PE,PMP

P a g e |131

PROJECTMANAGEMENTPROFESSIONAL

TheoryY:Managerswhobelievethatemployeesarewillingtoworkwithoutsupervisionandwantto
achieve.Theybelievethatemployeescandirecttheirownefforts.
TheoryYisapplicabletoMindWorkers.

TheoryZ:
TheoryZfocusedonincreasingemployeeloyaltytothecompanybyprovidingajobforlifewitha
strongfocusonthewellbeingoftheemployee,bothonandoffthejob.
TheoryZmanagementtendstopromotestableemployment,highproductivity,andhighemployee
moraleandsatisfaction.

SituationalLeadershipModel:
ThisisalsocalledtheSituationalContinuum.Thistheorystatesthatthemanagershouldapplyhis
leadershipskillstomanagetheinexperiencedemployees.Astheteammembersgrowinskills,the
projectmanagermovesfromdirecting/coachingapproach(tellingtheemployeeexactwhattodo)to
adelegatingapproach(theemployeeknowsthejobs,doesthejobs,needsverylittleguidance,and
willengagethemanagerwhenneeded).

9.1.3Outputs:
1.HumanResourcePlan:
Itdefineshowprojecthumanresourcesshouldbedefined,staffed,managed,controlledandreleased.
Itshouldinclude,

RolesandResponsibilities:
Itmustincludethefollowing,

Role:
Labeldescribingthepositionofahumanresourceintheproject.
Authority:

JavedAkhtar,CE,PE,PMP

P a g e |132

PROJECTMANAGEMENTPROFESSIONAL

Authority of human resource to the performing activity such as selection of method of


completion,qualityacceptanceandvariationsassociatedwiththeactivity.
Responsibility:
Workorportionoftheprojectwhichtobeperformedbythehumanresource.
Competency:
Skill and capacity required to complete that job described in the responsibility. Lake of
competency of human resource can lead towards proactive responses such as trainings,
hiring,schedulechangesorscopechanges.

ProjectOrganizationCharts:
Graphicaldisplayofprojectorganization.ItshouldincludeOrganizationalBreakdownStructure(OBS).
RBSisthepartofTimeManagementandisanoutputof6.3EstmateActivityResources

StaffManagementPlan:
Itisthepartofhumanresourceplanandmayinclude,

StaffAcquisition:
Staffacquisitioncanbeofmanytypes,eitherarrangethestallinternallyorbyoutsourcingdepending
upontheimpactonthecostsassociatedwitheachlevelofexpertiseneededfortheproject.

ResourceCalendars:
Itdescribesresourcetimeframes.ResourceHistogramgivesthespecificresourcemanhoursrequired
toperformtheactivity.Italsoindicatesoverandunderallocationoftheresourcewithlazydurations
aswell.Characteristicsofahistogramare,
1)
2)
3)
4)

Weeklyormonthlymanhours,
Overand/orunderallocation,
Resourcelimits,
Resourcelevelling

JavedAkhtar,CE,PE,PMP

P a g e |133

PROJECTMANAGEMENTPROFESSIONAL

ResourceHistogram:

StaffReleasingPlan:
Itincludes,
1. Method and timing of releasing team members benefits both the project and team
members.
1. Releasingteammemberstoanotherproject.
2. Cuttingoffthecostsofresourcefromtheproject.
Morale is improved when a smooth transition to upcoming projects are already planned. Staff
releasingplanalsohelpsmitigatehumanresourcerisksthatmayoccurduringand/orattheendof
theproject.

TrainingNeeds:
Whentheteammemberisnotexpectedtohaverequiredcompetencyleveltoachievethetarget.

Recognition&Reward:
Clearcriteriaforrewardsandaplannedsystemfortheiruse helpspromoteandreinforcedesired
behaviors, cause motivation. Recognition and rewards are the part of 9.3 Develop Project Team
process.

Compliance:
Compliancetothecontract,HRpolices,governmentregulationsetc.

JavedAkhtar,CE,PE,PMP

P a g e |134

PROJECTMANAGEMENTPROFESSIONAL

Safety:
Policies & procedures that protect team member from safety hazards can be included in the staff
managementplanaswellastheriskregister.

9.2.AcquireProjectTeam:

JavedAkhtar,CE,PE,PMP

P a g e |135

PROJECTMANAGEMENTPROFESSIONAL

9.2.2Tools&Techniques:
Failuretoacquirethenecessaryhumanresourcemayaffecttheprojectschedule,budgets,customer
satisfaction, quality and risks. It could decrease the probability of success and ultimately result in
projectcancellation.

1.Preassignment:
Itisselectioninadvance.Someofpreassignmentcanbefoundinprojectcharter.

2.Negotiation:
NegotiatingwithFunctionalManager(isthemainlyresponsibleforprovidingtheresources),Project
Managerforanotherproject,ManPowerSuppliers/Recruiter,Contractors,HRManagerEtc.

3.Acquisition:
Whenperformingorganizationlackstheinhousestaffneededtocompleteaproject,therequired
servicemaybeacquiredfromoutsidesource(rentalmanpower,recruiter,subcontractingetc.)

4.VirtualTeams:
Teamsthatdonotmeetfacetofacearecalledvirtualteams.

5.MultiCriteriaDecisionAnalysis:
Multicriteriadecisionanalysistoolisusedtodevelopthecriteriawhichareusedtorateorscorethe
potentialteammembers.Someexamplesoftheselectioncriteriawhichcanbeusedtoratethe
teammembersare,butnotlimitedto:

Availability,
Cost,
Experience,
Ability,
Knowledge,
Skills,
Attitude,and
InternationalFactors:
Consideringteammemberlocation(colocated,virtualteammember),timezone,and
communicationcapabilities.

HaloEffect:HaloEffectissomethingtobeawareofwhendealingwithteammembers.Youcanrate
theteammembershighorlowtoALLfactorsduetotheimpressionofahighorlowrankingonSOME
factors,whichmayleadtothebadimpactontheproject.

9.3.DevelopProjectTeam:
Improvingteamcompetencies,skills,mutualinteractionsandoverallteamenvironmenttoenhance
projectperformance.Teamworkisthecriticalfactorforprojectsuccessandprojectmanagershould
createanenvironmentthatfacilitatesteamwork.Impactsofteamdevelopment,

JavedAkhtar,CE,PE,PMP

P a g e |136

PROJECTMANAGEMENTPROFESSIONAL

LoweringtheCost,
ReducingSchedule,
ImprovingQuality,
RaisingMorale,
LoweringConflict,

9.3.2Tools&Techniques:
1.InterpersonalSkills:
Thesearealsoknownassoftskills.Thesearethebehavioralcompetenciesoftheteammembersthat
include abilities and proficiencies such as communication skills, conflict resolution, negotiation,
influence,teambuilding,andgroupfacilitation.Thesesoftskillsarevaluableassetswhendeveloping

JavedAkhtar,CE,PE,PMP

P a g e |137

PROJECTMANAGEMENTPROFESSIONAL

the project team. For example, the project team member can use emotional intelligence by
identifying,assessing,andcontrollingtheteammembersconcernsandfollowupontheirissues.

2.Training:
Teammembersoftenrequiretrainingsessionsinordertodeveloptherequiredskillsandknowledge
inordertoachievetheprojecttargets.Therecanbeavarietyoftrainingsforteammembers
workingontheproject,butnotlimitedto:

ProjectManagementTrainings,
HSETrainingsandToolBoxTalks,
QA/QCTrainings,and
TrainingsonAnimatedTools,etc.

3.TeamBuildingActivities:
Therearefivestagesofteambuildingprocess.ThesestagesarefirstproposedbyBruceTuckmanin
1965andcalledasTheTuckmanModelafterhisname.

Forming:Teammeetsandlearnsabouttheproject,theirrolesandresponsibilities.
Storming:Beginningtoaddresstheprojectworkwithtechnicalandmanagementapproach.
Norming:Teammembersstartworktogetherandadopthabitsandbehaviorthatsupport
theteam,

Performing:Teammembersstartperformingthefunctionsaswellorganizedunit.
Adjourning:Teammemberscompletetheworkandmovetootherproject.
Teambuildingactivitiescanbe,

Takingclassestogether,
MilestoneParties,
Holidayand/orbirthdaycelebration,
Trips
TeamBuyinforWBS
Involvingeveryoneinsomewayinplanningtheproject.

4.GroundRules:
Clearexpectationsandguidelinesregardingtheacceptablebehavioroftheteammembers.Ground
rulescanbe,

Honestytotheprojectandworkassigned.
Thewayateammembershouldresolvetheconflictwithanotherteammember.
Whentonotifytheimmediatesupervisororprojectmanagerifhavingdifficultywiththework.
Meetingethics,howandwhentospeak,meetingtimein&timeoutrestrictions.
Coordinationmethodsandapprovedchangesinteammemberscalendar.

5.CoLocation:
ItisoppositetoVirtualTeaming.Examplesaremeetingrooms,workstations,warroometc.Impacts
ofcolocation,

Improvescommunication

JavedAkhtar,CE,PE,PMP

P a g e |138

PROJECTMANAGEMENTPROFESSIONAL

Decreasetheimpactofconflicts
Improveteammemberidentity

WarRoom:AcolocatedplacewithWBS,NetworkDiagram,Baselinesetc.postedonthewalls.
6.Recognition&Reward:
Describedearlierinprocess9.1DevelopHRPlanunderOrganizationalTheories.

9.3.3Outputs:
1.TeamPerformanceAssessments:
Teamperformanceassessmentmeanstoevaluateandenhancetheeffectivenessoftheteamasa
whole,andtomeasuretheeffectofimprovementinindividualskillsontheteamperformance.

9.4.ManageProjectTeam:
Itistheprocessoftrackingteammembersperformance,providingfeedback,resolvingissues,and
managingchangestooptimizeprojectperformance.

Thekeytoolsandtechniquesare,

ProjectPerformanceAppraisal,and
ConflictManagement,
InterpersonalSkills.

JavedAkhtar,CE,PE,PMP

P a g e |139

PROJECTMANAGEMENTPROFESSIONAL

9.4.2Tools&Techniques:
1.ObservationandConversation:
Observingtheteammemberattitudewhenperformingthegiventaskorassignment.

2.ProjectPerformanceAppraisals:
Project performance appraisals/assessments should periodically be performed using OPAs to
evaluate employees skills & performance and issues which were remained unresolved and
suggestionstoimprovetheskillsandperformance.

3.ConflictManagement:
Conflictisinevitabletotheprojectenvironment.

ConflictSources:Rememberthesewiththeorder,
1.
2.
3.
4.
5.

Schedule,
ProjectPriorities,
Resources,
TechnicalOpinions,
AdministrativeProceduresandOverheads,

JavedAkhtar,CE,PE,PMP

P a g e |140

PROJECTMANAGEMENTPROFESSIONAL

6. Cost,
7. PersonalityDifferences,

MinimizingtheConflict:Followingfactorsmayminimizetheoccurrenceofaconflict.
1.
2.
3.
4.

GroundRules,
GroupNorms,
EffectiveCommunicationPlanning
RolesandResponsibilities

ConflictResolutionTechniques:

Thebesttechniquesisconfronting/problemsolving/collaborating.
Theworsttechniqueisforcing/directing.
Compromising,smoothingandwithdrawalcanleadtoloselosesituation.

Confronting/ProblemSolving/Collaborating:
Solving the problem personally. It is BEST conflict resolution technique. Sometimes, it requires to
incorporatemultipleviewpointsandinsightsfromdifferentperspectiveandthengoforconsensus
andthencommitment.
Compromising/Reconcile:
Findingsolutionthatwillbringsomedegreeofsatisfactiontobothparties.
Withdrawal/Avoiding:
Retreatingorpostponingtheconflictresolutionandlettingitsolvedbytheteammembers.Itisnot
theBESTchoiceforconflictresolution.
Accommodating/Smoothing:
Gofororemphasisagreementbetweentheparties,ratherthandisagreements.
Forcing/Directing:
Pushingoneviewpointattheexpenseofanother.

4.IssueLog:
Loggingoftheissuesandtheirresolutionsthatcanblocktheteamfromachievingthegoals.

5.InterpersonalSkillsofPM:
Interpersonalskillsofaprojectmanagercanbe,

LeadershipSkills,
TeamBuildingSkills,
MotivationSkills,
CommunicationSkills,
InfluencingSkills,
DecisionMaking,
NegationSkills,
PoliticalandCulturalAwareness.

A.LeadershipSkills&Styles:
Directing,

JavedAkhtar,CE,PE,PMP

P a g e |141

PROJECTMANAGEMENTPROFESSIONAL

Facilitating,
Coaching,
Supporting,
Autocratic:Everybodydowhatmanagerswantsthemtodo.
Consultative:Manageractsasteamservantandobtainsopinionsfromemployees.
ConsultativeAutocratic:InputfromteammembersbutdecisionmakingbyPM.
Census:Teamsinputbutdecisionmakingbasedongroupagreement.
Delegating:Givesufficientauthoritytoprojectteamtocompletethework.
Driver:Drivestheteamtowin.
Influencing:Teamwork,teambuilding,teamdecisionmaking.
Analytical:Managersowntechnicalknowledgeandability.
Bureaucratic:Followingtheproceduresexactly.
Charismatic:Energizingandencouragingemployeestoperformwell.
Democratic:Energizingandencouragingtheteambyparticipatinginthedecisionmaking.
LaissezFaire:Allowtodo.Thisstyleisapplicabletohighlyskilledteam.

B.Powers:
Formal/Legitimate:
Itispowerofposition.
Rewarding:
Itispowerofposition.
Penalizing/Coercive:
Itispowerofposition.
Expert:
ItisthepowerofPMhimself.
Referent:
ItisthepowerofPMhimselfbutcomesthroughanotherperson.Ifanotherperson/employee
likes you and wants to be like you, definitely he will obey your instructions and will be
affectionatetoyouandprojectaswell.

JavedAkhtar,CE,PE,PMP

P a g e |142

PROJECTMANAGEMENTPROFESSIONAL

10.COMMUNICATIONMANAGEMENT:
10.1PlanCommunicationsManagement:
Project Communications Management identifies the processes required to assure the collection,
generation,distribution,storage,retrieval,andtimelydisbursementoftheprojectinformationtoall
projectstakeholdersandprojectteammembers.

Whoneedsinformation,
Whatinformationisneeded,
Wheretodelivertheinformation,
Whentodeliver,and
Whatisthefrequencyofdelivery,
Whatistheformatofinformationtobestored,and
Howtodeliver(distributionmethods)theinformation.

ThekeyinputisStakeholdersRegisterandkeyoutputisCommunicationsManagementPlan.
CommunicationsManagementPlan:
ItisthekeyoutputofPlanCommunicationsManagementprocessandisasubsidiaryplanofthe
projectmanagementplan.Itdescribeshowprojectcommunicationswillbeplanned,executed,
monitoredandcontrolled.Theplancontainsthefollowinginformation,

Project/stakeholderscommunicationsrequirements,
Informationtobecommunicatedincludinglanguage,format,contents,andlevelofdetails,
Timeframeandfrequencyofinformationdistribution,
CommunicationMatrix,
Flowchartsforcommunicationsflow,
Communicationsconstraints,
Escalationprocessandpath,etc.

JavedAkhtar,CE,PE,PMP

P a g e |143

PROJECTMANAGEMENTPROFESSIONAL

10.2.2:ToolsandTechniques:
1.CommunicationRequirementAnalysis:
The project manager should consider the numbers of potential communications channels. The
numbersofcommunicationchannelsaretheindicationoftheprojectcommunicationscomplexityand
arecalculatedasbelow,
n(n1)/2;
Wheren=noofstakeholders

2.CommunicationTechnology:
Communicationtechnologiescanbeselectedbasedonthefollowingfactors,

Urgencyoftheneedofinformation:
Availabilityoftechnology:
Easeofuse:
Projectenvironment:
Sensitivityandconfidentialityoftheinformation:

3.CommunicationModels:
Abasicmodelisshownasbelow,

JavedAkhtar,CE,PE,PMP

P a g e |144

PROJECTMANAGEMENTPROFESSIONAL

Encode:Totranslateideasintoalanguagethatisunderstoodbyothers.
Message/FeedbackMessage:Outputofencoding.
Medium:Themethodusedtoconveythemessage.
Noise:Anythingthatinterfereswiththetransmissionandunderstandingofthemessage.
Decode:Totranslatethemessagebackintomeaningfulthoughtsorideas.

4.CommunicationMethods:
Communicationmethodscanbeclassifiedas,

InteractiveCommunication:
Itismultidirectionalexchangeofinformation.Itismostefficientcommunicationmethod.

PushCommunication:
Itensuresthatinformationisdistributedbutdoesnotcertifiesitactuallyreachedornot.SMS,
emails,letters,memos,reports,faxes,pressrelease,andvoicemailsetc.

PullCommunication:
Itisusedforverylargevolumeofinformation,orforaverylargestakeholders/recipients.It
requirestherecipientstoaccesstheinformationattheirowndiscretion.Intranetsites,shared
servers,shareddatabasesetc.

5.CommunicationTypes:
FormalWritten(FW)
Complexproblems,
projectmanagement
plan,projectcharter,
memos,longdistance

JavedAkhtar,CE,PE,PMP

FormalVerbal(FV)
Presentations,
Speeches,mass
communications.

InformalWritten(IW)
Email,handwritten
notes,textmessages,
instantmessaging.

InformalVerbal(IV)
Meetings,
Conversations,
MilestoneParties,
discussions.

P a g e |145

PROJECTMANAGEMENTPROFESSIONAL

communication,
contracts,legalnotices.

Almost55%ofcommunicationsarenonverbal(bodylanguage).
Almost38%ofthemessagetransmittedcomesthroughvocalinflection(paralingual).
Only7%ofthemessageconsistsofactualwordsthatyoucanuse.
Projectmanagerspent90%ofhistimeandeffortsoncommunication.
Projectmanagercantcontrolallcommunicationsbutheshouldtrytocontrol.

10.2ManageCommunications:
Itistheprocessofcreating,collecting,distributingandstoring,retrieving,andultimatedispositionof
theprojectcommunicationsaccordingtothecommunicationsmanagementplan.

10.2.1:Inputs:

1.
2.
3.
4.

CommunicationManagementPlan,10.1
PerformanceReports,4.4
OPA,and
EEF.

JavedAkhtar,CE,PE,PMP

P a g e |146

PROJECTMANAGEMENTPROFESSIONAL

10.2.2:Tools&Techniques:
1.
2.
3.
4.
5.

CommunicationMethods,
InformationDistributionTools,
HardCopyDocumentation,
ElectronicCommunications,Emails,Faxes,
InformationManagementSystems.

10.2.3:Outputs:
1.OPAUpdates:

StakeholderNotifications,(ResolvedIssues,ApprovedChanges,etc.)
ProjectReports,(IssueLogs,ChangeLogs,PerformanceReportsetc.)
ProjectPresentations,
Project Records, (Correspondences, Memos, MOM, and other documents describing the
project)
StakeholdersFeedbacks,regardingthePerformanceRepots.
LessonLearned.

JavedAkhtar,CE,PE,PMP

P a g e |147

PROJECTMANAGEMENTPROFESSIONAL

2.ProjectCommunications:
Projectcommunicationsareregisteredincommunicationsmatrix.

10.3ControlCommunications:
It is the process of monitoring and controlling project communications in order to ensure that
informationrequirementsoftheprojectstakeholdersaremet.Italsoinvolvesperformancereporting.

Thekeyoutputsareworkperformanceinformationandchangerequests.

JavedAkhtar,CE,PE,PMP

P a g e |148

PROJECTMANAGEMENTPROFESSIONAL

10.3.3:Outputs:
1.PerformanceReports:
Basedonprojectprogressinputs(WorkPerformanceInformationanddata)andworkperformance
measurements(fromthemonitoringandcontrollingprocesses),performancereportsareprepared
andcommunicatedtoconcernedstakeholders.Performancereportsmayinclude,

Trendsfromthepastreports,
ResultsofVarianceAnalysis,
ResultsofPerformanceAnalysis,
Forecasts,
WorkCompletedduringthereportingperiod,
Worktobecompletedduringthenextreportingperiod,(LookAhead),
CurrentStatusofRisksandIssues,
Correctiveorpreventiveactions,(Additional)

2.OPAUpdates:

Lessonlearned,
Reportingtemplates,

3.ChangeRequests:

JavedAkhtar,CE,PE,PMP

P a g e |149

PROJECTMANAGEMENTPROFESSIONAL

11.RISKMANAGEMENT:
RISK:

Anyeventwhichmayaffecttheprojectobjectives/baselines(scope,schedule,cost,quality).
RiskcanbearVEimpacts(threats)or+VEimpacts(opportunities).
Riskscanbeatactivitylevel,workpackagelevel,orprojectlevel.
Riskcanbeknown(contingencyreserves)andunknown(managementreserves).
RiskiscombinationofProbabilityandImpact.
R=PxI

Uncertainty/Probability:
Itisthelackofknowledgeaboutaneventforitsoccurrence.

RiskFactors:
Followingarethefactors,

Probability,chanceofoccurrenceoftherisk,rangeis0to1.
Impact,ofriskonprojectobjectives,itismeasuredinrespectiveunitsofobjective.For
time,itismeasureintimeunit,forcostitismeasuredincostunit.

Timing,whenwilloccur.
Frequency,howmanytimesitwilloccur.

RiskTypes:
Twotypes,
1.
2.

BusinessRisks:Bothgainorloss.
PureRisk:Onlyloss(fire,theft,injuries).

RiskCategories:
Therearetwomaintypes,

1. KnownRisks:
Thesecanbeofthreekinds.

External:Regulatory;environmental;government;marketshiftsetc.
Internal: time, cost, scope changes; inexperience; poor planning; people; staffing;

materials;equipment.
Technical:Changeintechnology.

2. UnknownRisks:
Onlyasmallportionofrisks(somesaysabout10%)isactuallyunforeseeable.

JavedAkhtar,CE,PE,PMP

P a g e |150

PROJECTMANAGEMENTPROFESSIONAL

RiskAttitudes:
Organizationsandindividualscanacceptrisksdependingupontheirattitudetowardstherisks.The
following factors are helpful in risk analysis and creating risk response and fall under enterprise
environmentalfactors.

RiskAppetite:
It is the degree of uncertainty that an entity is willing to take on in anticipation of a reward. Risk
appetiteisrelatedtotheuncertaintyleveloftheriskandhelpsincreatingriskresponse.

RiskTolerance:
Itisthedegree,amountorvolumeoftheriskthatanorganizationorindividualcanwithstand.Itis
relatedtotheimpactoftheriskandhelpsincreatingriskresponse.

RiskThresholds:
Riskthresholdsarethecontrollimits.Belowthatriskthreshold,theorganizationwillaccepttherisk.
Abovethatthreshold,theorganizationwillnottoleratetherisks.

RiskAverse:
SomeonewhodoesnotwanttotakeriskisknownasRiskAverse.

RiskManagementKeyOutputs:
Thekeyoutputsoftheriskmanagementknowledgeareaare,

RiskManagementPlan,
RiskRegister,
RiskRelatedContractDecisions.

RiskManagementOverview:
Risk identification, management, and response strategies impact every area of the project
managementlifecycleandthetenkeyknowledgeareasdefinedbythePMI.Itincludes,

Identify,quantify,evaluate,andmanagerisks,
Knownrisksversesunknownrisks,
Monitoridentifiedrisksfortriggersorachangeinuncertainty,impact,andseverity,
Monitorfornewrisks,
Riskscanhavepositiveornegativeimpacts.

RiskManagementPlan:
Itdescribeshowriskmanagementwillbestructuredandperformedontheproject.Itincludes,

MethodologyofRiskManagement,
Howriskmanagementwillbeperformed.
RiskManagementOrganizationChart,
Whowilldoriskmanagement.
RolesandResponsibilitiesofriskmanagementteam,
Whattodoinriskmanagement.
ResponsibilityAssignmentMatrix(RACIChart),

JavedAkhtar,CE,PE,PMP

P a g e |151

PROJECTMANAGEMENTPROFESSIONAL

Assigningresponsibilitiesinatabularchart.
Riskbudgeting/ContingencyReserves:Assigningresourcesandestimatingtheircosts,
Whatcostwillbespentforriskmanagementincludingcontingencyreserves?
Timing:
Schedulecontingencyreservesandestablishingriskmanagementactivities,
RiskBreakdownStructure:
RBS,riskcategorization.
RevisedStakeholdersTolerance:
ReportingFormats:
Tracking:
Howtheriskactivitieswillbetrackedanddocumentedinlessonlearned.
Audits:
Auditstobecarriedoutforriskprocessesandmanagementeffectiveness.
Definitionsofriskprobabilityandimpact:

JavedAkhtar,CE,PE,PMP

P a g e |152

PROJECTMANAGEMENTPROFESSIONAL

ProbabilityandImpactMatrix:

RiskRegister:
Riskregisterisanimportantandkeydocumentofprojectriskmanagement.Itincludesallthe
summarydetailsabouttheprojectrisksandtheoutputsofriskmanagementprocesses.
NOTE:Riskregistermustbeupdatedafterconductinga(any)projectmanagementprocessinsteadof
concentratingontheoutputsrecognizedbyPMBOK.
PleaserefertothegeneralformofRiskRegisterintheprojectmanagementtemplates.

JavedAkhtar,CE,PE,PMP

P a g e |153

PROJECTMANAGEMENTPROFESSIONAL

11.1PlanRiskManagement:
Thevery effective tool in risk management isdocuments/plans reviewsand analysis.Planningrisk
managementshouldstartearlierintheprojectwhenitisbeinginitiatedandshouldbecompleted
earlyduringprojectplanning.

11.1.1Inputs:
1.ProjectManagementPlan:

CostManagementPlan:
ItprovidesRiskBudget,ContingencyReserves,andManagementReserves.
ScheduleManagementPlan:

JavedAkhtar,CE,PE,PMP

P a g e |154

PROJECTMANAGEMENTPROFESSIONAL

ScheduleReserves
CommunicationManagementPlan:
Communicationrequiredforriskmanagement.

2.ProjectCharter:
Highlevelrisksassociatedwiththeproject.

3.ProjectScopeStatement:
Projectassumptions.

4.StakeholdersRegister:
5.OrganizationalProcessAssets:

Riskcategories,
Commondefinitionsofconceptsandterms,
Riskstatementformats,
Standardtemplates,
Rolesandresponsibilities,
Authoritylevelsfordecisionmaking,and
Lessonlearned.

11.1.2Tools&Techniques:
1. Meetings:
2. ExpertJudgment:

3.AnalyticalTechniques:

StakeholderRiskProfileAnalysis:
Togradeandqualifytheprojectstakeholdersriskappetiteandtolerance.
RiskScoringSheets:

11.1.3Outputs:
1.RiskManagementPlan:
Riskmanagementplanisalreadyexplainedabove.

JavedAkhtar,CE,PE,PMP

P a g e |155

PROJECTMANAGEMENTPROFESSIONAL

11.2IdentifyRisks:

Thekeyoutputistheriskregister.

JavedAkhtar,CE,PE,PMP

P a g e |156

PROJECTMANAGEMENTPROFESSIONAL

11.2.1Inputs:
1.RiskManagementPlan:
ItprovidesRBS,Roles&ResponsibilitiesofRiskManagementTeam.

JavedAkhtar,CE,PE,PMP

P a g e |157

PROJECTMANAGEMENTPROFESSIONAL

2.CostManagementPlan:
Projectspecificapproachofcostmanagementplanmaygeneratetherisktotheproject.

3.ScheduleManagementPlan:
Projectspecificapproachofschedulemanagementplanmaygeneratetherisktotheproject.

4.QualityManagementPlan:
Projectspecificapproachofqualitymanagementplanmaygeneratetherisktotheproject.

5.CommunicationManagementPlan:
Projectspecificapproachofcommunicationmanagementplanmaygeneratetherisktotheproject.

6.HRManagementPlan:
ProjectspecificapproachofHRmanagementplanmaygeneratetherisktotheproject.

7.ScopeBaseline:
WBS is critical input to identify and track the risks at Summary Level, Account Level and/or Work
PackageLevel.Projectscopestatementprovidesprojectassumptionstoevaluatetheuncertaintyin
projectassumptionsaspotentialcausesofprojectrisk.

8.StakeholderRegister:
Tointerviewthestakeholdersinordertoidentifytherisks.

9.ProjectDocuments:
Earned Value Reports, Work Performance Reports, Network Diagram, Baselines, Assumptions Log,
ProjectCharter,QualityChecklists,IssueLog

10.ProcurementDocuments:
Rentalsresources+contracts

11.ActivityCostEstimates:
Toidentifytherisksrelatedtocostestimation.

12.ActivityDurationEstimates:
Toidentifytherisksrelatedtodurationestimation.

13.EEF:

Publishedinformation,
Academicstudies,
Publishedchecklists,
Benchmarking,
Industrialstudies,
Riskattitudes,

14.OPA:

Lessonlearned,

JavedAkhtar,CE,PE,PMP

P a g e |158

PROJECTMANAGEMENTPROFESSIONAL

Riskstatementformats,
Templates,
Projectfiles,historicalinformation,
Organizationalandprojectprocesscontrols.

11.2.2Tools&Techniques:
1.InformationGatheringTechniques:
BrainStorming,DelphiTechnique,Interviews,Surveys&Questioners,meetings,rootcauseanalysis.

Brainstorming:
Therearefourfundamentalstepsofbrainstormingtechnique.

FocusonQuantity:
TheconceptbehindthisstepisQuantitybreedsquality.Theideaassumesthatthegreater
thenumbersofideagenerated,thehigherthechanceofproducinganeffectiveoutcomeor
solution.
WithholdCriticism:
While ideas are being generated, there are chances of ideas criticism. The team should
postponethecriticismandfocusonextendingoraddingnewideas.
WelcomeUnusualIdeas:
Togetalongandgoodlistofideas,information,ordata,unusualideasmustbewelcomed.
Thenewwayofthinkingmayprovidebettersolution.
CombineandImproveIdeas:
Goodsideasmaybecombinedinteractivelytoformasingleimprovedideaorinformation.

TheDelphiTechnique:
Thisisagoodinformationgatheringtechniquewhichishelpfulwhen,

Therearechancesofopposition,
Haloeffect,
Bandwagoneffect.

TheinformationcollectedthroughRFIorinterviewiskeptanonymousandtheparticipantisallowed
toexpresshisideasfreely.

RootCauseAnalysis:
Root cause analysis is reactive method of problem detection and solution. The analysis has been
performedafteraneventhasoccurred.Thisallowsanalysttoidentifythetriggersorindicatorsforthe
problemsto beoccurred. Inotherwords, itallows toforecastthepossibilityof abevent beforeit
mightoccur.Hence,becomesaproactivemethod.
RCAisnotasinglemethodology.Itcanbedividedintofivebroadcategories.
1.
2.
3.
4.
5.

SafetybasedRCA
ProductionbasedRCA
ProcessbasedRCA
FailurebasedRCA
SystembasedRCA.

JavedAkhtar,CE,PE,PMP

P a g e |159

PROJECTMANAGEMENTPROFESSIONAL

SeveralRCAtechniqueshadbeendevelopedwhichincludebutnotlimitedtothefollowings,

IshikawaorFishboneDiagram,
ParetoChart,
FailureModeandEffectAnalysis,FMEA
KepnerTregoe,
Bayesianinference(conditionalprobability).

ExpertInterviewing:
Itistheprocessofinterviewingsubjectmatterexpertstoobtaincriticalinformationfortheproject.

SWOTAnalysis:
Thistechniqueisusedtoanalyzehowtheorganizationalstrengthsandweaknessesplayagainstthe
opportunitiesandthreats.Thepossiblescenarioscanbe,
1. StrengthsOpportunities:
Howorganizationalstrengthshelptheorganizationtocapitalizeonopportunities.
2. StrengthsThreats:
Itidentifieshoworganizationalstrengthshelpustodealwiththecompetitorsorthreatening
situations.
3. WeaknessesOpportunities:
How necessary improvements can be made to enable the organization to capitalize on
opportunities.
4. WeaknessesThreats:
It identifies howorganizationalweaknesses leaveus vulnerabletoexternal competitors or
threats.

2.ChecklistsAnalysis:
RiskChecklistscanbedevelopedbasedonhistoricalinformationandknowledge.

3.ProjectAssumptionAnalysis:
4.DiagrammingTechniques:
Fishbone,SystemorProcessFlowCharts,InfluenceDiagrams,

5.DocumentationReview:
6.ProjectDocumentationReviews:
7.ExpertJudgment:

11.2.3Outputs:
1.RiskRegister:
Entriesofrisksidentifiedtoriskregister.Riskregisterwillcontaininformationfromotherprocesses
ofRiskManagementaswell.

JavedAkhtar,CE,PE,PMP

P a g e |160

PROJECTMANAGEMENTPROFESSIONAL

11.3PerformQualitativeRiskAnalysis:
Itissubjectiveevaluationofriskinqualitativetermseventhoughnumbersareusedfortherating.The
benefitofthisprocessisthatitenablesprojectmanagertoreducethelevelofuncertaintyandto
focusonhighpriorityrisks.

11.3.2:Tools&Techniques:
1.RiskProbability&ImpactAssessment:

ProbabilityAssessment:
Toinvestigatethelikelihoodthateachspecificriskwilloccur.Probabilityrangeis0to1
(0.1to0.9).Probabilitylevel(VeryLow,Low,Medium,High,andVeryHigh)isassessed
duringmeetingorinterviews.
ImpactAssessment:

JavedAkhtar,CE,PE,PMP

P a g e |161

PROJECTMANAGEMENTPROFESSIONAL

Toinvestigatethepotentialeffectonaprojectobjectives(schedule,cost,scope,quality).
These effects can be positive/opportunity or negative/threats. Impact level (Very Low,
Low,Medium,High,andVeryHigh)isassessedduringthemeetingorinterviews.
TheinitialassessmentofprobabilityandimpactisbasedonqualitativetermssuchasVeryLow,Low,
Medium,High,andVeryhigh.Laterduringthequantitativeriskanalysis,thesequalitativeassessments
areconvertedintodigitsandnumbers.
BasedonQualitativeand/orQuantitativeRiskAnalysis,Risksarebeingcategorizedintotwolists.

Hit/TopList:
Riskswithmedium,highandveryhighprobabilityand/orimpact.

WatchList:
Riskswithlowandverylowprobabilityand/orimpact.

2.RiskProbability&ImpactMatrix:
RiskProbabilityandImpactMatrixisusedtoclassifytherisksbasedonquantitativeriskanalysis.

R=PxI,

As,

Where,

P=Probability
P=0.1forVL,
P=0.3forL,
P=0.5forM,
P=0.7forH,
P=0.9forVH.
And

I=Impact,andwillbequantitativelyassessedas,

ImpactAssessment:
1. Weights are assigned based on the priority of the project objective during the planning
process.

Risk

Weights
M
L
H

R1
R2
R3

Prob.

Scope
2
L
H
M

ImpactonProjectObjectives
Time
Cost
1
3
M
H
VH
VL
VL
M

Quality
2
VH
M
L

2. Settingbasicvaluesforqualitativetermsfromfig.115asbelow,

VeryLow,VL
0.05

Low,L
0.1

Medium,M
0.2

High,H
0.4

VeryHigh,VH
0.8

JavedAkhtar,CE,PE,PMP

P a g e |162

PROJECTMANAGEMENTPROFESSIONAL

3. Let us use these basic values to set ProjectBased Values for impact assessment. Impacts
calculationsforvariousriskswillbeasfollowed,
Impact=WeightxBasicvalue
TotalImpactonproject=S+T+C+Q

Impact

Scope

R1
R2
R3

Time

2x0.1=0.2
2x0.4=0.8
2x0.2=0.4

1x0.2=0.2
1x0.8=0.8
1x0.05=0.05

Cost

Quality

Total

3x0.4=1.2
2x0.8=1.6
3x0.05=0.15 2x0.2=0.4
3x0.2=0.6
2x0.1=0.2

3.2
2.15
1.25

4. Projectbasedimpactrangescanbedefinedtoclassifytheimpactasfollows,
Sumofthepriorityweights=S+T+C+Q=2+1+3+2=8
Max.Range

=VeryHighImpactxSumofthePriorityWeights

=0.8x8.0=6.40
Min.Range

=VeryLowImpactxSumofthePriorityWeights=

=0.05x08=0.20
Nowsettingthevaluesofqualitativetermsfortheprojectasbelow,

VeryLow,VL
<1

Low,L
12

Medium,M
23

High,H
35

VeryHigh,VH
56.8

Basedonabovescale,wecancalculatetheimpactvaluesfortherisksasbelow,

Risk
Impacts
1
2
3

Impact
Value
3.2
2.15
1.25

Category
H
M
L

Basic
Value
0.8
0.2
0.1

Prob.
Category
M
L
H

Prob.
Value
0.5
0.3
0.7

R=PxI
0.4
0.06
0.07

THISCALCULATIONHASBEENPERFORMEDTOCONSIDERTHECUMMULATIVERISKIMPACT
ONTHEPROJECTOBJECTIVES.
5. Wehaveassessedtheriskimpactsandtheirnumericvaluesasshowninabovetable.Thefinal
riskvaluewillbeconvertedtothequalitativetermsusingtheProbabilityandImpactMatrix
asbelow,
XProbability,YImpact&ValuesforThreatsandopportunitiesXxYi.e.R=PxI

JavedAkhtar,CE,PE,PMP

P a g e |163

PROJECTMANAGEMENTPROFESSIONAL

Impact

RiskLevelsinabovefigureare,

o
o
o

LowRisk:MediumGrey,LowestValues,0.05
MediumRisk:LightGrey,>0.050.14
HighRisk:DarkGrey,HighValues,>0.14

Hencetheresultsofqualitativeriskassessmentare,
1. R1=
2. R2=
3. R3=

0.4
0.06
0.07

=HighRisk,
=MediumRisk,
=MediumRisk.

3.RiskDataQualityAssessment:
Toassessthereliability,quality,accuracyandintegrityofriskdataandtodeterminethedegreeto
whichtheriskisunderstood.
Usinglowqualityriskdatamayleadtoaqualitativeriskassessmentoflittleusetotheproject.

4.RiskCategorization:
Riskcanbecategorizedbasedon,

RiskBreakdownStructure(RBS),
ProjectPhases,and/or
ProjectArea(WBS)

5.RiskUrgencyAssessment:
Determinationofriskprioritization/ranking/ratingisnecessarytoplantheRiskResponse.Nearterm
responsesmaybeconsideredmoreurgenttoaddress.

11.3.3:Output:
1.RiskRegisterUpdate:
Riskregisterisupdatedfor,

Ranking/rating/priority,

JavedAkhtar,CE,PE,PMP

P a g e |164

PROJECTMANAGEMENTPROFESSIONAL

RiskGrouping/Categories,
Neartermriskresponse,
TrendsinQualitativeRiskAnalysis
Watchlist.

11.4:PerformQuantitativeRiskAnalysis:
QuantitativeRiskAnalysisisalsoknownasRiskAssessment.Itisnumericalevaluationofriskinthe
respectiveunitsofprojectiveobjectives.Itisbeingperformedfortherisksprioritizedinthequalitative
riskanalysisprocess.

JavedAkhtar,CE,PE,PMP

P a g e |165

PROJECTMANAGEMENTPROFESSIONAL

11.4.2:Tools&Techniques:
1.Information/DataGatheringtechniques:
1.Interviews:
Conduct interviews of stakeholders and collect data based on their experience which refers to as
historicaldata.AnalyzethedatawithThreePoint(PERT)estimate.

2.ProbabilityDistribution:
Continuous probability distributions are used to represent uncertainty in data/values. Probability
distributionscanbe,

BetaDistribution,
TriangularDistribution,
Uniform/LinearDistribution,itisusedonlywhenmostlikelyvaluesarenotobvious.
NormalDistribution,
LognormalDistribution.

3.TheDelphiTechnique:
4.ExpertJudgment:
5.HistoricalRecords:

2.QuantitativeRiskAnalysis&ModelingTechniques:
1.SensitivityAnalysis:
Thisanalysishelpstodeterminewhichriskshavethemostimpactontheproject.Onetypicalexample
ofsuchanalysisisTARNADODiagram,plottingtheimpactsintornadoshapeasshownbelow,

InTornadoDiagram,Impactisalongthehorizontalaxisandparametersareinverticalaxis.

2.ExpectedMonetaryValue(EMV)Analysis:
EMVisbettermeasuretodetermineanoverallriskranking.
JavedAkhtar,CE,PE,PMP

P a g e |166

PROJECTMANAGEMENTPROFESSIONAL

EMV=PxI
TheEMVoftheopportunitiesisgenerallyexpressedaspositivevalueswhereasthoseofthreatsare
expressedasnegativevalues.
Expectedmonetaryvalueanalysisiscommonlybeingperformedusingdecisiontreeanalysisasshown
inbelowexample.

3.ModelingandSimulation(MonteCarlos)Technique:

Itiscomputerbasedanalysisasitisintricate.
Evaluatesoverallprojectrisk.
Determinesprobabilityofcompletingtheprojectonanyspecificday.
Determinesprobabilityofanactivitybeingonthecriticalpath.
Takesintoaccountpathconvergence.
Translateuncertaintiesintoimpactstothetotalproject.
Canbeusedtoassesscostandscheduleimpacts.
Resultsinprobabilitydistribution.

PrimaveraRiskAnalysisincludessimulationtechniqueforquantitativeriskassessment.

JavedAkhtar,CE,PE,PMP

P a g e |167

PROJECTMANAGEMENTPROFESSIONAL

4.DecisionTrees:

Ittakesintoaccountfutureeventsinmakingadecisiontoday.
ItcalculatesEMVinmorecomplexsituations.
ItinvolvesMutualExclusivity:

5.FailureModeandEffectAnalysis(FMEA):
Thistechniqueutilizesthreeparametersinordertoassesstheprojectrisks.

Severity:
Severitylevelofriskrepresentsanumericvaluerangingfrom1to10.1representsnoeffect
whereas10representsahighhazard.
Probability:
1to10where1representsaprobabilitylessthan0.0007%and10representsaprobability
of20%andgreater.
Detectability:
1to10where1representsariskwhichishighlydetectableand10representsariskthatis
completelyundetectable.

RiskPriorityNumber(RPN)=SeverityxProbabilityxDetectability

11.4.3:Output:
1.RiskRegisterUpdate:
Riskregisterisupdatedfor,

JavedAkhtar,CE,PE,PMP

P a g e |168

PROJECTMANAGEMENTPROFESSIONAL

QuantitativeRiskRanking/rating/priority,
Amountoftimeandcostcontingencies,
Possible,realisticandachievableprojectcompletiondatewithconfidencelevel,
Quantitativeprobabilityresultsofmeetingprojectobjectives,
TrendsinQuantitativeRiskAnalysis,

11.5.2:PlanRiskResponse:
Thekeybenefitofthisprocessisthatitaddressestherisksbytheirprioritiesandinsertsactivities,
resources,costs,anddurationstotheprojectmanagementplan.

11.5.2:Tools&Techniques:
1.ThreatResponse:
Accept:
Donothingandacceptthethreatasitis.Itisleastdesirableoptionincasesofthreats.

JavedAkhtar,CE,PE,PMP

P a g e |169

PROJECTMANAGEMENTPROFESSIONAL

Avoid:
Removethethreatbyremovingthesource/causeoftherisk.E.g.,removetheworkpackage.
Itissecondleastoption.

Mitigate:
Reduce/minimizetheprobabilityand/orimpactofthethreat.

Transfer:
Deflect,Allocate:Makeanotherpartyresponsibleforthethreatsby,purchasinginsurance,
performancebonds,warrantee,guarantee,orbyoutsourcingthework.

2.OpportunityResponse:
Accept:
Donothingandaccepttheopportunityasitis.Alsoaleastoptionforopportunities.

Exploit:
Itisthereverseofavoid.Addorchangetheworktomakesurethattheopportunityoccurs.

Enhance:
Itisthereverseofmitigate.Increasetheprobabilityand/orimpactoftheopportunity.

Share:
Allocateownershipoftheopportunitytoathirdparty(partnership,team,orjointventure)
thatisbestabletoachievetheopportunity.

Acceptisthecommonstrategyb/wthreatandopportunityresponse.Theriskacceptancemay
besubjecttobelowriskresponseapproaches.

RiskResponseApproaches:
ActiveRiskResponse:
ActiveRiskResponsemayinvolvecreationofcontingencyplan,allocationoftimeandcostreserves
forriskacceptance.

PassiveRiskResponse:
PassiveRiskResponseleavesactionstobedeterminedasneeded.

Note:Adecisiontoaccepttheriskmustbecommunicatedtostakeholders.

3.ContingentResponseStrategy:
Some responses are designed for use only if certain events occur. This strategy contains certain
predefinedconditionstomakeariskresponse.

11.5.3:Output:
1.ProjectContingencyPlan:
The key output of this process is the contingency plan for each risk which has been evaluated
quantitatively.Eachriskmayhavetwotypesofcontingencyplans.
ContingentResponse(PlanA):

JavedAkhtar,CE,PE,PMP

P a g e |170

PROJECTMANAGEMENTPROFESSIONAL

Acontingentresponseforariskwhichhavebeendevelopedtocopupwiththerisk.
FallbackPlan(PlanB):
Fallbackplansareimplementedwhenacontingentresponseisnoteffective.

2.Contingency&ManagementReserves:
ContingencyReserves:
Costsfortheriskresponsesofknownunknownsarethecontingencyreserves.Contingencyreserves
arethepartofthecostbaseline.

ManagementReserves:
Management reserves handle unknown unknowns and are calculated based on overall project
uncertainty.Managementreservesarethepartofprojectbudgetbutarenotconsideredinthecost
baseline.

3.RiskRegisterUpdates:
Atthisstageriskregistermusthavefollowinginformation,

Identifiedrisks_11.2
Riskownersandidentifiedresponsibilities_11.5
Riskranking_11.4
RiskGrouping_11.3
Agreedriskresponsestrategies_11.5
Actionsrequiredtoimplementthechosenresponsestrategy_11.5
Budgetandscheduleactivitiesrequiredtoimplementthechosenresponsestrategy_11.4

4.RiskrelatedContractDecisions:
Asaresultofriskresponsessuchasmitigation,transfer,enhancingandsharing,decisionsshouldbe
madeduringtheplanresponseprocesswhichwillbeaninputto12.1PlanProcurement.

5.ProjectManagementPlanUpdates:

ScheduleManagementPlan,
CostManagementPlan,
QualityManagementPlan,
ProcurementManagementPlan,
HRManagementPlan,
ScheduleBaseline,
WorkBreakdownStructure,
CostPerformanceBaseline.

6.ProjectDocumentsUpdates:

AssumptionLog,
TechnicalDocumentation,and
ChangeRequests.

JavedAkhtar,CE,PE,PMP

P a g e |171

PROJECTMANAGEMENTPROFESSIONAL

11.6:ControlRisks:

11.6.2:Tools&Techniques:
1.RiskAssessment:
Monitor & control risk process sometimes identifies new risks, reassessment of current risks and
closingofthatareoutdated.

2.RiskAudits:
Riskauditsexamineanddocumenttheeffectivenessofriskresponseindealingwithidentifiedrisks
andtheirrootcauses.

JavedAkhtar,CE,PE,PMP

P a g e |172

PROJECTMANAGEMENTPROFESSIONAL

3.Variance&TrendAnalysis:
Variance&trendanalysisareperformedtocomparetheactualversesplannedriskresponsesand
impacts.Basedontheanalysis,projectcompletiondate,EACandscheduletargetsareforecasted.

4.TechnicalPerformanceMeasure:
Itisrelatedtothefunctionalityofthedeliverables.Knowingno.ofdelivereddefects,deviationssuch
asmoreorlessfunctionalitythanplannedatamilestonecanhelptoforecastthedegreeofsuccessin
achievingtheprojectobjectives.

5.ReserveAnalysis:
Remainingreservesanalysiseithertheyaresufficientforremakingrisks.

6.RiskStatusMeetings:

11.6.3:Output:
1.
2.
3.
4.
5.
6.

RiskRegisterupdates:
OPAupdates:
ChangeRequests:
PMPUpdates:(RiskManagementPlanUpdate)
ProjectDocumentsUpdates:(Assumptionlog,TechnicalDocumentation)
Residualandsecondaryrisks.

6.ResidualRisks:
Residualrisksaretheidentifiedriskswhichremainafterariskresponsestrategywasimplemented.
Residualriskscanbeidentifiedintheplanningprocessinwhichcasetheyaresubjecttocontingency
andfallbackplanning.
Forexample,ifyouknowthatanemployeeworkingontheprojectwillleaveaftercompletinghis
contractdurationbeforetheprojectisover,youmayplanacrosstrainingofalowerlevelresourcein
ordertopreparehimforreplacement.Thoughyouwillreplacetheresourceonceheshallleavebut
stillthereisariskoflowperformanceofthereplacement.Insuchcases,youmayneedtoprepare
contingencyandfallbackplanforthelowperformanceresidualrisk.

7.SecondaryRisks:
Secondaryriskistheriskthatresultsinfromimplementingariskresponsestrategy.Secondaryrisks
canmeidentifiedintheplanningprocessorthatmayoccurasaresultofdiscovery.

JavedAkhtar,CE,PE,PMP

P a g e |173