Detailed Estimate for 2.0 x 2.0m Box Cell Culvert.

Total = 42 Nos.
Sl.
No

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Unit

12.20

3.80

1.130

52.39

Cum

4
4
1
1

3.818
1.4
7.4
7.4

2.228
2.01
1.50
1.85

1.95
1.95
2.45
2.95

66.35
21.95
27.20
40.39

2.7

4.7

0.75

19.04

3.00

7.4

1.05

23.31

1.50

7.4

1.05

11.66

2
-2
-2

3.80
1.600
1.930

1.12
Sqm
Sqm

0.82
1.95
1.95

42

Nos.

6.98
-6.24
-7.53
255.5
10731.00

Below box

12.20

3.80

0.30

13.91

Wing wall low end

4
4

3.818
1.4

2.228
2.01

0.30
0.30

42

Nos.

10.21
3.38
27.5
1155.00

Below box
Box toe portion
B=SQRT(0.82*0.82*2)=1.16

12.20

3.80

Below wing wall


Wing wall low end
Below curtain wall up stream
Below curtain wall down stream
Boulder appron curtain wall to box:
B=( 7.4 + 2 ) / 2 = 4.7
Below approach slab

4
4
1
1

3.818
1.40
7.40
7.40

2
2

2.70
12.00

4.70
3.50

42

Nos.

12.00

3.60

0.38

16.42

3.60

0.71

0.82

4.19
20.61
865.62

Items

Rate

Amount
in Rs.

Cum
Cum

33.04

354552.00

Cum
Cum

416.72

481312.00

Cum
Cum

4411.08

6519488.00

Cum
Cum

5653.89

4894120.00

1 Earth work in excavation of foundation of structures as

per drawing and technical specification, including setting


out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of sides
and bottom and backfilling with

Box : L= 12 + 0.1x2 = 12.2, B= 2 +


0.3x2 + 0.5x2 + 0.1x2 = 3.8, D=
0.3+0.38+0.15+0..3 = 1.13
Wing wall :
Wing wall low end
Curtain wall up stream
Curtain wall down stream
Boulder appron curtain wall to box:
B=( 7.4 + 2 ) / 2 = 4.7
D=0.3+0.3+0.15=0.75
Boulder appron after curtain wall at D/S
D=0.3+0.75=1.05
Boulder appron after curtain wall at U/S
D=0.3+0.75=1.05
Box Toe portion : 0.3 + 0.82 = 1.12
D=1.2-0.38=0.82
Deduction for Wing Wall Portion (U/S)
Deduction for Wing Wall Portion (D/S)
Quantity for
2 Sand Filling in Foundation Trenches as per
Drawing & Technical Specification
Wing wall :

Quantity for
3 M15 Grade Plain/Reinforced Cement Concrete in
Open Foundation complete as per Drawing and
Technical Specifications.

Quantity for

3.80

0.15

6.95

1.16

0.15

1.32

2.228
2.01
1.50
1.85

0.15
0.15
0.15
0.15

5.1
1.69
1.67
2.05

0.15
0.15

3.81
12.6
35.19
1477.98

4 RCC M 25 in in Open Foundation complete


as per Drawing and Technical Specifications.

Bottom slab
Toe portion : ( 0.3 + 1.12 ) / 2 = 0.71
- 0.38 = 0.82

1.2

Quantity for

42

Nos.

12.00

5 RCC M 25 in sub-structure complete as per


drawing and Technical Specifications

Walls upto construction joint; 2.0 - 0.7 =


1.3

0.30

1.30

2x2 Box cell culvert

9.36
Page 1

Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Haunch Bottom inside

12.00

0.15

0.075

42

Nos.

2
2

12.00
12.00

0.30
0.15

0.70
0.075

5.04
0.27

2
1
2

12.00
12.00
9.60

0.30
2.60
0.53

0.45
0.35
0.30

3.24
10.92

42

Nos.

Quantity for

Quantity

Unit

Rate

Amount
in Rs.

0.27
9.63
404.46

Cum
Cum

5990.09

2422752.00

Cum
Cum

6491.08

6131344.00

6 RCC M 25 in super-structure as per drawing


and Technical Specification

Walls above construction joint


Haunch top inside
Haunch for approach slab ; ( 0.3 + 0.6 ) /
2 = 0.45
Top slab
Kerb: ( 2.6 + 3.5x2 ) =9.6
B=(0.55/0.5)/2=0.53
Quantity for

3.02
22.49
944.58

7 PCC M20 in sub structure in wing wall


4.1

Wing wall
Wing wall as per drawing no- SD-113
(Sheet-6 of 6)

47.10

Curtain wall
Curtain wall as per drawing no- SD-111
(Sheet-4 of 4)

24.90
Total

Quantity for
8

42

72.00

3024

Nos.

Cum

5324.22

16100441.00

3.458
145.236

MT

53754.35

7807067.00

0.471
0.471
19.782

MT

53074.03

1049910.00

25.2
1058.4

Cum
Cum

8286.42

8770347.00

19.20
19.20
806.4

RM
RM

3288.56

2651895.00

9.12
9.12
383.04

Sqm
Sqm

45.94

17597.00

16.51
16.51
693.42

Sqm
Sqm

33.05

22918.00

Providing and laying HYSD bar reinforcement


in Super structure
Reiforcement as per drawing no- SD-108
(Sheet- 2 of 6)

3.458

Total
Quantity for

42

Nos.

9 Providing and laying HYSD bar reinforcement


in Substructure

47.10 cum

0.1 % for Temparature bar


Quantity for
10 RCC M 30 in approach slab incl.

42

Nos.

12.00

42

Nos.

9.600

42

Nos.

9.600

42

Nos.

9.600

42

Nos.

reinforcement

Approach slab

Quantity for

3.50

0.30

25.2

11 Providing and constructing crash barrier incl.


Reinforcement

Road side
Quantity for
12 Providing and applying synthetic enamel paint
to kerb with alternate strips

Kerb
Quantity for

0.475

13 Providing and applying cement paint to


parapet and railing

Parapet
Quantity for

0.86

2x2 Box cell culvert

Page 2

Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

2
4

12.00
3.818

0.60
0.60

2.00
1.675

42

Nos.

Quantity

Unit

Rate

Amount
in Rs.

28.8
15.35
44.15
1854.3

Cum
Cum

1198.21

2221841.00

No
No

155.12

234541.00

14 Providing and laying of Filter media with

granular materials/stone crushed aggregates


satisfying the requirements laid down in
clause 2504.2.2. of MoRTH specifications to a
thickness of not less than 600 mm with
smaller size towards the soil and bigger size
towards the wall and provided over the entire
surface behind abutment, wing wall and
return wall to the full height compacted to a
firm condition complete as per drawing and
Technical Specification.

Box wall
Wing wall
Quantity for
15 Providing weep holes in Brick masonry/Plain/

Reinforced concrete abutment, wing wall/


return wall with 100 mm dia AC pipe,
extending through the full width of the
structure with slope of 1V :20H towards
drawing foce. Complete as per drawing and
Technical

Abutment wall : 2 x 12 = 24

24

24

Wing wall : 4 x {(2+1)/2x3.818} x0.5= 12

12
42

Nos.

12
36
1512

2.00

42

Nos.

2
84

Nos
Nos

10.90

42

Nos.

8.18
8.18
343.56

Cum
Cum

9548.93

3280630.00

Approach slab end


2
Wing wall and abutment joint
4
For inside hunch (Triangular Portion)
4
Haunch for approach slab ; ( 0.3 + 0.6 ) / 2 = 0.454

12.00
0.30
0.15

7.20
2.82
0.05
0.54
10.02
420.84

Sqm
Sqm

292.10

122927.00

7.20
7.20
302.40

Sqm
Sqm

14.14

4276.00

Quantity for
16 Providing and laying Drainage Spouts complete as per
drawing and Technical specification

Quantity for

8171.02

686366.00

17 Providing and laying Cement concrete

wearing coat M-30 grade including


reinforcement complete as per drawing and
Technical Specifications

Over slab
Quantity for

10.00

0.075

18 Providing & fixing 20 mm thick compressible

fibre board in expansion joint complete as per


drawing & Technical Specification.

Quantity for

0.30
2.350
0.075
0.300

0.45

42

Nos.

12.00

42

Nos.

4.00

7.43

sqm

0.15

4.46

2.7

4.7

0.15

3.81
8.27

19 Providing & fixing Tar paper


Below approach slab
Quantity for
20 Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
Technical specification

0.30

Wing wall & return wall


3.82/(sq. root 2), so A = 2.70
Return wall =1.40, so L = 2.70+1.40 =4.1m
4 x[ (4.1+1.4)/2]x 2.7

Boulder appron curtain wall to box:


B=( 7.4 + 2 ) / 2 = 4.7
D=0.3+0.3+0.15=0.75

2x2 Box cell culvert

Cum
Page 3

Sl.
No

Items

Quantity for
21 Providing and laying Pitching on slopes laid over
prepared filter media including boulder apron laid
dry in front of toe of embankment complete as per
drawing and Technical specifications

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

42

Nos.

4.00

7.43

sqm

0.30

8.91

2.7

4.7

0.3

7.61

Rate

Amount
in Rs.

Quantity

Unit

347.13

Cum

587.70

204008.00

Cum
Cum

1052.97

730593.00

Cum

3801.25

527492.00

9.99
419.58

Cum
Cum

4119.14

1728309.00

19.20
19.20
806.40

Cum
Cum

491.42

396281.00

Total

67361007.00

Wing wall & return wall


3.82/(sq. root 2), so A = 2.70
Return wall =1.40, so L = 2.70+1.40 =4.1m
4 x[ (4.1+1.4)/2]x 2.7

Boulder appron curtain wall to box:


B=( 7.4 + 2 ) / 2 = 4.7
D=0.3+0.3+0.15=0.75

Quantity for
22

42

Nos.

16.52
693.84

20%

693.84

138.77

3.00

7.40

0.30

6.66

1.50

7.40

0.30

3.33

42

Nos.

12.00

42

Nos.

Plain cement concrete (1:3:6) nominal mix in


grouting appron and revertments with crushed
stone aggregates 40mm nominal size
mechanically mixed, placed in foundation and
compacted by vibration including curing for 14
days complete in all respects as per
Taking 20% volume of stone pitching vide
item No.20 =

23 Providing and laying Flooring complete as per


drawing and Technical specifications laid over
cement concert bedding.
Boulder appron after curtain wall at D/S
Boulder appron after curtain wall at U/S

Quantity for
24 Back filling with granular materials behind
abutment, wing wall and return wall complete
as per 710.1.4 of IRC:78 and 2200 of
specificaion for Road and bridge works of
Ministry of Road Transport and Highways (4th
revision) etc.complete.

0.40

2.00

Assistant Engineer
N.H, U.G. Section, M. Rampur

2x2 Box cell culvert

Executive Engineer
N.H Division, Kesinga.

Page 4

Detailed Estimate for 2 x 2.0 x 2.0m Box Cell Culvert.


Total = 2 Nos.
Sl.
No

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Unit

12.20

6.10

1.130

84.09

Cum

4
4
1
1

3.818
1.4
9.7
9.7

2.228
2.01
1.50
1.85

1.95
1.95
2.45
2.95

66.35
21.95
35.65
52.94

2.7

0.75

28.35

3.00

9.7

1.05

30.56

1.50

9.7

1.05

15.28

2
-2
-2

6.10
1.600
1.930

1.12
Sqm
Sqm

0.82
1.95
1.95

Nos.

11.2
-6.24
-7.53
332.6
665.20

Below box

12.20

6.10

0.30

22.33

Wing wall low end

4
4

3.818
1.4

2.228
2.01

0.30
0.30

Nos.

10.21
3.38
35.92
71.84

Below box
Box toe portion
B=SQRT(0.82*0.82*2)=1.16

12.20

6.10

Below wing wall


Wing wall low end
Below curtain wall up stream
Below curtain wall down stream
Boulder appron curtain wall to box:
B=( 7.4 + 2 ) / 2 = 4.7
Below approach slab

4
4
1
1

3.818
1.40
9.70
9.70

2
2

2.70
12.00

7.00
3.50

Nos.

12.00

5.90

0.38

26.9

5.90

0.71

0.82

Nos.

6.87
33.77
67.54

Items

Rate

Amount
in Rs.

Cum
Cum

33.04

21978.00

Cum
Cum

416.72

29937.00

Cum
Cum

4411.08

381206.00

Cum
Cum

5653.89

381864.00

1 Earth work in excavation of foundation of structures as

per drawing and technical specification, including setting


out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of sides
and bottom and backfilling with

Box : L= 12 + 0.1x2 = 12.2, B= 2 +


0.3x2 + 0.5x2 + 0.1x2 = 3.8, D=
0.3+0.38+0.15+0..3 = 1.13
Wing wall :
Wing wall low end
Curtain wall up stream
Curtain wall down stream
Boulder appron curtain wall to box:
B=( 9.7 + 4.3 ) / 2 =
7.00 D=0.3+0.3+0.15=0.75
Boulder appron after curtain wall at D/S
D=0.3+0.75=1.05
Boulder appron after curtain wall at U/S
D=0.3+0.75=1.05
Box Toe portion : 0.3 + 0.82 = 1.12
D=1.2-0.38=0.82
Deduction for Wing Wall Portion (U/S)
Deduction for Wing Wall Portion (D/S)
Quantity for
2 Sand Filling in Foundation Trenches as per
Drawing & Technical Specification
Wing wall :

Quantity for
3 M15 Grade Plain/Reinforced Cement Concrete in
Open Foundation complete as per Drawing and
Technical Specifications.

Quantity for

6.10

0.15

11.16

1.16

0.15

2.12

2.228
2.01
1.50
1.85

0.15
0.15
0.15
0.15

5.1
1.69
2.18
2.69

0.15
0.15

5.67
12.6
43.21
86.42

4 RCC M 25 in in Open Foundation complete


as per Drawing and Technical Specifications.

Bottom slab
Toe portion : ( 0.3 + 1.12 ) / 2 = 0.71
- 0.38 = 0.82

1.2

Quantity for
5 RCC M 25 in sub-structure complete as per
drawing and Technical Specifications

2x2x2 Box cell culvert

Page 5

Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Walls upto construction joint; 2.0 - 0.7 =


1.3
Haunch Bottom inside

3
4

12.00
12.00

0.30
0.15

1.30
0.075

Nos.

2
4

12.00
12.00

0.30
0.15

0.70
0.075

5.04
0.54

2
1
2

12.00
12.00
11.90

0.30
4.90
0.53

0.45
0.35
0.30

3.24
20.58

Nos.

Quantity for

Quantity

Unit

Rate

Amount
in Rs.

14.04
0.54
14.58
29.16

Cum
Cum

5990.09

174671.00

Cum
Cum

6491.08

430359.00

6 RCC M 25 in super-structure as per drawing


and Technical Specification

Walls above construction joint


Haunch top inside
Haunch for approach slab ; ( 0.3 + 0.6 ) /
2 = 0.45
Top slab
Kerb: ( 2.6 + 3.5x2 ) =9.6
B=(0.55/0.5)/2=0.53
Quantity for

3.75
33.15
66.3

7 PCC M20 in sub structure in wing wall


4.1

Wing wall
Wing wall as per drawing no- SD-113
(Sheet-6 of 6)

47.10

Curtain wall
Curtain wall as per drawing no- SD-111
(Sheet-4 of 4)

24.90
Total

Quantity for
8

72.00

144

Nos.

Cum

5324.22

766688.00

9.78

MT

53754.35

525718.00

0.471
0.471
0.942

MT

53074.03

49996.00

25.2
50.4

Cum
Cum

8286.42

417636.00

23.80
23.80
47.6

RM
RM

3288.56

156535.00

11.31
11.31
22.62

Sqm
Sqm

45.94

1039.00

Providing and laying HYSD bar reinforcement


in Super structure
Foundation @ 0.06 MT/Cum

33.77 cum

2.026

Sub-Structure @ 0.06 MT/Cum

14.58 cum

0.875

Super-Structure @ 0.06 MT/Cum

33.15 cum

1.989
Total

Quantity for

4.890

Nos.

9 Providing and laying HYSD bar reinforcement


in Substructure

47.10 cum

0.1 % for Temparature bar


Quantity for
10 RCC M 30 in approach slab incl.

Nos.

12.00

Nos.

11.900

Nos.

11.900

Nos.

11.900

reinforcement

Approach slab

Quantity for

3.50

0.30

25.2

11 Providing and constructing vertical post and


precast railing incl. Reinforcement

Road side
Quantity for
12 Providing and applying synthetic enamel paint
to kerb with alternate strips

Kerb
Quantity for

0.475

13 Providing and applying cement paint to


parapet and railing

Parapet

2x2x2 Box cell culvert

0.86

20.47
Page 6

Sl.
No

Items

Quantity for

Nos.

Length
in mtr

Nos.

2
4

12.00
3.818

Nos.

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

20.47
40.94

Sqm
Sqm

33.05

1353.00

28.8
15.35
44.15
88.3

Cum
Cum

1198.21

105802.00

No
No

155.12

11169.00

14 Providing and laying of Filter media with

granular materials/stone crushed aggregates


satisfying the requirements laid down in
clause 2504.2.2. of MoRTH specifications to a
thickness of not less than 600 mm with
smaller size towards the soil and bigger size
towards the wall and provided over the entire
surface behind abutment, wing wall and
return wall to the full height compacted to a
firm condition complete as per drawing and
Technical Specification.

Box wall
Wing wall
Quantity for

0.60
0.60

2.00
1.675

15 Providing weep holes in Brick masonry/Plain/

Reinforced concrete abutment, wing wall/


return wall with 100 mm dia AC pipe,
extending through the full width of the
structure with slope of 1V :20H towards
drawing foce. Complete as per drawing and
Technical

Abutment wall : 2 x 12 = 24

24

24

Wing wall : 4 x {(2+1)/2x3.818} x0.5= 12

12
2

Nos.

12
36
72

2.00

Nos.

2
4

Nos
Nos

10.90

Nos.

9.73
9.73
19.46

Cum
Cum

9548.93

185822.00

Approach slab end


2
Wing wall and abutment joint
4
For inside hunch (Triangular Portion)
4
Haunch for approach slab ; ( 0.3 + 0.6 ) / 2 = 0.454

12.00
0.30
0.15

7.20
2.82
0.05
0.54
10.02
20.04

Sqm
Sqm

292.10

5854.00

7.20
7.20
14.40

Sqm
Sqm

14.14

204.00

Quantity for
16 Providing and laying Drainage Spouts complete as per
drawing and Technical specification

Quantity for

8171.02

32684.00

17 Providing and laying Cement concrete

wearing coat M-30 grade including


reinforcement complete as per drawing and
Technical Specifications

Over slab
Quantity for

11.90

0.075

18 Providing & fixing 20 mm thick compressible

fibre board in expansion joint complete as per


drawing & Technical Specification.

Quantity for

Nos.

12.00

Nos.

4.00

7.43

0.30
2.350
0.075
0.300

0.45

19 Providing & fixing Tar paper


Below approach slab
Quantity for
20 Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
Technical specification

0.30

Wing wall & return wall


3.82/(sq. root 2), so A = 2.70
Return wall =1.40, so L = 2.70+1.40 =4.1m
4 x[ (4.1+1.4)/2]x 2.7

sqm

2x2x2 Box cell culvert

0.15

4.46

Page 7

Sl.
No

Items

Boulder appron curtain wall to box:


B=( 9.7 + 4.3 ) / 2 =
7.00 D=0.3+0.3+0.15=0.75
Quantity for
21 Providing and laying Pitching on slopes laid over
prepared filter media including boulder apron laid
dry in front of toe of embankment complete as per
drawing and Technical specifications

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

2.7

0.15

Rate

Amount
in Rs.

Quantity

Unit

5.67
10.13
20.25

Cum
Cum

587.70

11901.00

1052.97

42645.00

Nos.

4.00

7.43

sqm

0.30

8.91

2.7

0.3

11.34

Nos.

20.25
40.5

Cum
Cum

20%

40.50

8.10

Cum

3801.25

30790.00

3.00

9.70

0.30

8.73

1.50

9.70

0.30

4.37
13.10
26.2

Cum
Cum

4119.14

107921.00

19.20
19.20
38.40

Cum
Cum

491.42

18871.00

Total

3892643.00

Wing wall & return wall


3.82/(sq. root 2), so A = 2.70
Return wall =1.40, so L = 2.70+1.40 =4.1m
4 x[ (4.1+1.4)/2]x 2.7

Boulder appron curtain wall to box:


B=( 9.7 + 4.3 ) / 2 =
7.00 D=0.3+0.3+0.15=0.75

Quantity for
22

Plain cement concrete (1:3:6) nominal mix in


grouting appron and revertments with crushed
stone aggregates 40mm nominal size
mechanically mixed, placed in foundation and
compacted by vibration including curing for 14
days complete in all respects as per
Taking 20% volume of stone pitching vide
item No.20 =

23 Providing and laying Flooring complete as per


drawing and Technical specifications laid over
cement concert bedding.
Boulder appron after curtain wall at D/S
Boulder appron after curtain wall at U/S

Quantity for

Nos.

12.00

Nos.

24 Back filling with granular materials behind


abutment, wing wall and return wall complete
as per 710.1.4 of IRC:78 and 2200 of
specificaion for Road and bridge works of
Ministry of Road Transport and Highways (4th
revision) etc.complete.
0.40

2.00

Assistant Engineer
N.H, U.G. Section, M. Rampur

2x2x2 Box cell culvert

Executive Engineer
N.H Division, Kesinga.

Page 8

Detailed Estimate for 4.0 x 2.0m Box Cell Culvert.


Total = 1 Nos.
Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

12.20

7.70

1.130

106.15

Cum

4
4
1
1

3.818
1.4
7.4
7.4

2.228
2.01
1.50
1.85

1.95
1.95
2.45
2.95

66.35
21.95
27.20
40.39

2.7

4.7

0.75

19.04

3.00

7.4

1.05

23.31

1.50

7.4

1.05

11.66

2
-2
-2

7.70
1.600
1.930

1.12
Sqm
Sqm

0.82
1.95
1.95

14.14
-6.24
-7.53
316.42
316.42

Cum
Cum

33.04

10455.00

Cum
Cum

416.72

17406.00

Cum
Cum

4411.08

192720.00

Cum
Cum

5653.89

395377.00

1 Earth work in excavation of foundation of structures as

per drawing and technical specification, including setting


out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of sides
and bottom and backfilling with

Box : L= 12 + 0.1x2 = 12.2, B= 2 +


0.3x2 + 0.5x2 + 0.1x2 = 3.8, D=
0.3+0.38+0.15+0..3 = 1.13
Wing wall :
Wing wall low end
Curtain wall up stream
Curtain wall down stream
Boulder appron curtain wall to box:
B=( 7.4 + 2 ) / 2 = 4.7
D=0.3+0.3+0.15=0.75
Boulder appron after curtain wall at D/S
D=0.3+0.75=1.05
Boulder appron after curtain wall at U/S
D=0.3+0.75=1.05
Box Toe portion : 0.3 + 0.82 = 1.12
D=1.2-0.38=0.82
Deduction for Wing Wall Portion (U/S)
Deduction for Wing Wall Portion (D/S)
Quantity for
2 Sand Filling in Foundation Trenches as per
Drawing & Technical Specification

Nos.

Below box

12.20

7.70

0.30

28.18

Wing wall low end

4
4

3.818
1.4

2.228
2.01

0.30
0.30

Nos.

10.21
3.38
41.77
41.77

Below box
Box toe portion
B=SQRT(0.82*0.82*2)=1.16

12.20

7.70

Below wing wall


Wing wall low end
Below curtain wall up stream
Below curtain wall down stream
Boulder appron curtain wall to box:
B=( 7.4 + 2 ) / 2 = 4.7
Below approach slab

4
4
1
1

3.818
1.40
7.40
7.40

2
2

2.70
12.00

4.70
3.50

Nos.

12.00

7.50

0.68

61.2

7.50

0.71

0.82

Nos.

8.73
69.93
69.93

Wing wall :

Quantity for
3 M15 Grade Plain/Reinforced Cement Concrete in
Open Foundation complete as per Drawing and
Technical Specifications.

Quantity for

7.70

0.15

14.09

1.16

0.15

2.68

2.228
2.01
1.50
1.85

0.15
0.15
0.15
0.15

5.1
1.69
1.67
2.05

0.15
0.15

3.81
12.6
43.69
43.69

4 RCC M 25 in in Open Foundation complete


as per Drawing and Technical Specifications.

Bottom slab
Toe portion : ( 0.3 + 1.12 ) / 2 = 0.71
- 0.38 = 0.82

1.2

Quantity for
5 RCC M 25 in sub-structure complete as per
drawing and Technical Specifications

4x2 Box cell culvert

Page 9

Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Walls upto construction joint; 2.0 - 0.7 =


1.3
Haunch Bottom inside

2
2

12.00
12.00

0.30
0.15

1.30
0.075

Nos.

2
2

12.00
12.00

0.30
0.15

0.70
0.075

5.04
0.27

2
1
2

12.00
12.00
13.40

0.30
5.10
0.53

0.45
0.58
0.30

3.24
35.5

Nos.

Quantity for

Quantity

Unit

Rate

Amount
in Rs.

9.36
0.27
9.63
9.63

Cum
Cum

5990.09

57685.00

Cum
Cum

6491.08

313324.00

6 RCC M 25 in super-structure as per drawing


and Technical Specification

Walls above construction joint


Haunch top inside
Haunch for approach slab ; ( 0.3 + 0.6 ) /
2 = 0.45
Top slab
Kerb: ( 2.6 + 3.5x2 ) =9.6
B=(0.55/0.5)/2=0.53
Quantity for

4.22
48.27
48.27

7 PCC M20 in sub structure in wing wall


4.1

Wing wall
Wing wall as per drawing no- SD-113
(Sheet-6 of 6)

47.10

Curtain wall
Curtain wall as per drawing no- SD-111
(Sheet-4 of 4)

24.90
Total

Quantity for
8

72.00

72

Nos.

Cum

5324.22

383344.00

6.392
6.3915

MT

53754.35

343571.00

0.471
0.471
0.471

MT

53074.03

24998.00

25.2
25.2

Cum
Cum

8286.42

208818.00

26.80
26.80
26.8

RM
RM

3288.56

88133.00

12.73
12.73
12.73

Sqm
Sqm

45.94

585.00

23.05
23.05

Sqm

Providing and laying HYSD bar reinforcement


in Super structure
Foundation @ 0.05 MT/Cum
Sub-Structure @ 0.05 MT/Cum
Super-Structure @ 0.05 MT/Cum

69.93 cum

3.497

9.63 cum

0.482

48.27 cum

2.414
Total

Quantity for

Nos.

9 Providing and laying HYSD bar reinforcement


in Substructure

47.10 cum

0.1 % for Temparature bar


Quantity for
10 RCC M 30 in approach slab incl.

Nos.

12.00

Nos.

13.400

Nos.

13.400

Nos.

13.400

reinforcement

Approach slab

Quantity for

3.50

0.30

25.2

11 Providing and constructing vertical post and


precast railing incl. Reinforcement

Road side
Quantity for
12 Providing and applying synthetic enamel paint
to kerb with alternate strips

Kerb
Quantity for

0.475

13 Providing and applying cement paint to


parapet and railing

Parapet

4x2 Box cell culvert

0.86

Page 10

Sl.
No

Items

Quantity for
14 Providing and laying of Filter media with

Nos.

Length
in mtr

Nos.

2
4

12.00
3.818

Nos.

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

23.05

Sqm

33.05

762.00

28.8
15.35
44.15
44.15

Cum
Cum

1198.21

52901.00

No
No

155.12

5584.00

granular materials/stone crushed aggregates


satisfying the requirements laid down in
clause 2504.2.2. of MoRTH specifications to a
thickness of not less than 600 mm with
smaller size towards the soil and bigger size
towards the wall and provided over the entire
surface behind abutment, wing wall and
return wall to the full height compacted to a
firm condition complete as per drawing and
Technical Specification.

Box wall
Wing wall
Quantity for

0.60
0.60

2.00
1.675

15 Providing weep holes in Brick masonry/Plain/

Reinforced concrete abutment, wing wall/


return wall with 100 mm dia AC pipe,
extending through the full width of the
structure with slope of 1V :20H towards
drawing foce. Complete as per drawing and
Technical

Abutment wall : 2 x 12 = 24

24

24

Wing wall : 4 x {(2+1)/2x3.818} x0.5= 12

12
1

Nos.

12
36
36

2.00

Nos.

2
2

Nos
Nos

10.90

Nos.

8.18
8.18
8.18

Cum
Cum

9548.93

78110.00

Approach slab end


2
Wing wall and abutment joint
4
For inside hunch (Triangular Portion)
4
Haunch for approach slab ; ( 0.3 + 0.6 ) / 2 = 0.454

12.00
0.30
0.15

7.20
2.82
0.05
0.54
10.02
10.02

Sqm
Sqm

292.10

2927.00

7.20
7.20
7.20

Sqm
Sqm

14.14

102.00

Quantity for
16 Providing and laying Drainage Spouts complete as per
drawing and Technical specification

Quantity for

8171.02

16342.00

17 Providing and laying Cement concrete

wearing coat M-30 grade including


reinforcement complete as per drawing and
Technical Specifications

Over slab
Quantity for

10.00

0.075

18 Providing & fixing 20 mm thick compressible

fibre board in expansion joint complete as per


drawing & Technical Specification.

Quantity for

0.30
2.350
0.075
0.300

0.45

Nos.

12.00

Nos.

4.00

7.43

sqm

0.15

4.46

2.7

4.7

0.15

3.81

19 Providing & fixing Tar paper


Below approach slab
Quantity for
20 Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
Technical specification

0.30

Wing wall & return wall


3.82/(sq. root 2), so A = 2.70
Return wall =1.40, so L = 2.70+1.40 =4.1m
4 x[ (4.1+1.4)/2]x 2.7

Boulder appron curtain wall to box:


B=( 7.4 + 2 ) / 2 = 4.7
D=0.3+0.3+0.15=0.75

4x2 Box cell culvert

Page 11

Sl.
No

Items

Quantity for
21 Providing and laying Pitching on slopes laid over
prepared filter media including boulder apron laid
dry in front of toe of embankment complete as per
drawing and Technical specifications

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Nos.

4.00

7.43

sqm

0.30

8.91

2.7

4.7

0.3

7.61

Rate

Amount
in Rs.

Quantity

Unit

8.27
8.265

Cum
Cum

587.70

4857.00

Cum
Cum

1052.97

17395.00

Cum

3801.25

12559.00

9.99
9.99

Cum
Cum

4119.14

41150.00

19.20
19.20
19.20

Cum
Cum

491.42

9435.00

Total

2278540.00

Wing wall & return wall


3.82/(sq. root 2), so A = 2.70
Return wall =1.40, so L = 2.70+1.40 =4.1m
4 x[ (4.1+1.4)/2]x 2.7

Boulder appron curtain wall to box:


B=( 7.4 + 2 ) / 2 = 4.7
D=0.3+0.3+0.15=0.75

Quantity for
22

Nos.

16.52
16.52

20%

16.52

3.30

3.00

7.40

0.30

6.66

1.50

7.40

0.30

3.33

Nos.

12.00

Nos.

Plain cement concrete (1:3:6) nominal mix in


grouting appron and revertments with crushed
stone aggregates 40mm nominal size
mechanically mixed, placed in foundation and
compacted by vibration including curing for 14
days complete in all respects as per
Taking 20% volume of stone pitching vide
item No.20 =

23 Providing and laying Flooring complete as per


drawing and Technical specifications laid over
cement concert bedding.
Boulder appron after curtain wall at D/S
Boulder appron after curtain wall at U/S

Quantity for
24 Back filling with granular materials behind
abutment, wing wall and return wall complete
as per 710.1.4 of IRC:78 and 2200 of
specificaion for Road and bridge works of
Ministry of Road Transport and Highways (4th
revision) etc.complete.

0.40

Assistant Engineer
N.H, U.G. Section, M. Rampur

4x2 Box cell culvert

2.00

Executive Engineer
N.H Division, Kesinga.

Page 12

Detailed Estimate for 3.0 x 2.0m Box Cell Culvert.


At CD No- 182/3 & 192/1.
Total = 12 Nos.
Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

12.20

5.84

1.130

80.51

Cum

4
4
1
1

3.818
1.4
7.4
7.4

2.228
2.01
1.50
1.85

1.95
1.95
2.45
2.95

66.35
21.95
27.20
40.39

2.7

4.7

0.75

19.04

3.00

7.4

1.05

23.31

1.50

7.4

1.05

11.66

2
-2
-2

5.84
1.600
1.930

1.12
Sqm
Sqm

0.82
1.95
1.95

10.73
-6.24
-7.53
287.37
3448.44

Cum
Cum

33.04

113936.00

Cum
Cum

416.72

174822.00

1 Earth work in excavation of foundation of structures as

per drawing and technical specification, including setting


out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of sides
and bottom and backfilling with

Box : L= 12 + 0.1x2 = 12.2, B= 2 +


0.3x2 + 0.5x2 + 0.1x2 = 3.8, D=
0.3+0.38+0.15+0..3 = 1.13
Wing wall :
Wing wall low end
Curtain wall up stream
Curtain wall down stream
Boulder appron curtain wall to box:
B=( 7.4 + 2 ) / 2 = 4.7
D=0.3+0.3+0.15=0.75
Boulder appron after curtain wall at D/S
D=0.3+0.75=1.05
Boulder appron after curtain wall at U/S
D=0.3+0.75=1.05
Box Toe portion : 0.3 + 0.82 = 1.12
D=1.2-0.38=0.82
Deduction for Wing Wall Portion (U/S)
Deduction for Wing Wall Portion (D/S)
Quantity for
2 Sand Filling in Foundation Trenches as per
Drawing & Technical Specification

12

Nos.

Below box

12.20

5.84

0.30

21.37

Wing wall low end

4
4

3.818
1.4

2.228
2.01

0.30
0.30

12

Nos.

10.21
3.38
34.96
419.52

Below box
Box toe portion
B=SQRT(0.82*0.82*2)=1.16

12.20

5.84

Below wing wall


Wing wall low end
Below curtain wall up stream
Below curtain wall down stream
Boulder appron curtain wall to box:
B=( 7.4 + 2 ) / 2 = 4.7
Below approach slab

4
4
1
1

3.818
1.40
7.40
7.40

2
2

2.70
12.00

4.70
3.50

12

Nos.

1
2

12.00
5.64

Wing wall :

Quantity for
3 M15 Grade Plain/Reinforced Cement Concrete in
Open Foundation complete as per Drawing and
Technical Specifications.

Quantity for

5.84

0.15

10.69

1.16

0.15

2.03

2.228
2.01
1.50
1.85

0.15
0.15
0.15
0.15

5.1
1.69
1.67
2.05

0.15
0.15

3.81
12.6
39.64
475.68

Cum
Cum

4411.08

2098263.00

28.43
6.07
34.5
414

Cum
Cum

5653.89

2340710.00

4 RCC M 25 in in Open Foundation complete


as per Drawing and Technical Specifications.

Bottom slab
Key
Quantity for

12

Nos.

12.00

5.64
0.69

0.42
0.78

5 RCC M 25 in sub-structure complete as per


drawing and Technical Specifications

Walls upto construction joint; 2.0 - 0.7 =


1.3

0.42

3x2 Box cell culvert

1.30

13.1
Page 13

Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Haunch Bottom inside

12.00

0.15

0.075

12

Nos.

2
2

12.00
12.00

0.30
0.15

0.70
0.075

5.04
0.27

2
1
2

12.00
12.00
10.84

0.30
3.84
0.53

0.45
0.42
0.30

3.24
19.35
3.41
31.31
375.72

Quantity for

Quantity

Unit

Rate

Amount
in Rs.

0.27
13.37
160.44

Cum
Cum

5990.09

961050.00

Cum
Cum

6491.08

2438829.00

6 RCC M 25 in super-structure as per drawing


and Technical Specification

Walls above construction joint


Haunch top inside
Haunch for approach slab ; ( 0.3 + 0.6 ) /
2 = 0.45
Top slab
Kerb:
Quantity for

12

Nos.

7 PCC M20 in sub structure in wing wall


Wing wall

4.1

Wing wall as per drawing no- SD-113


(Sheet-6 of 6)

47.10

Curtain wall
Curtain wall as per drawing no- SD-111
(Sheet-4 of 4)

24.90
Total

Quantity for
8

12

72.00

864

Nos.

Cum

5324.22

4600126.00

4.751
57.010

MT

53754.35

3064514.00

0.471
0.471
5.652

MT

53074.03

299974.00

25.2
302.4

Cum
Cum

8286.42

2505813.00

21.68
21.68
260.16

RM
RM

3288.56

855552.00

10.3
10.3
123.6

Sqm
Sqm

45.94

5678.00

18.64
18.64
223.68

Sqm
Sqm

33.05

7393.00

Providing and laying HYSD bar reinforcement


in Super structure
Foundation @ 0.06 MT/Cum

34.50 cum

2.070

Sub-Structure @ 0.06 MT/Cum

13.37 cum

0.802

Super-Structure @ 0.06 MT/Cum

31.31 cum

1.879
Total

Quantity for

12

Nos.

9 Providing and laying HYSD bar reinforcement


in Substructure

47.10 cum

0.1 % for Temparature bar


Quantity for

12

Nos.

12.00

10 RCC M 30 in approach slab incl.


reinforcement

Approach slab

Quantity for

12

Nos.

10.840

3.50

0.30

25.2

11 Providing and constructing vertical post and


precast railing incl. Reinforcement

Road side
Quantity for

12

Nos.

10.840

12

Nos.

10.840

12

Nos.

12 Providing and applying synthetic enamel paint


to kerb with alternate strips
Kerb
Quantity for

0.475

13 Providing and applying cement paint to


parapet and railing

Parapet
Quantity for

3x2 Box cell culvert

0.86

Page 14

Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

2
4

12.00
3.818

0.60
0.60

2.00
1.675

12

Nos.

Quantity

Unit

Rate

Amount
in Rs.

28.8
15.35
44.15
529.8

Cum
Cum

1198.21

634812.00

No
No

155.12

67012.00

14 Providing and laying of Filter media with

granular materials/stone crushed aggregates


satisfying the requirements laid down in
clause 2504.2.2. of MoRTH specifications to a
thickness of not less than 600 mm with
smaller size towards the soil and bigger size
towards the wall and provided over the entire
surface behind abutment, wing wall and
return wall to the full height compacted to a
firm condition complete as per drawing and
Technical Specification.

Box wall
Wing wall
Quantity for
15 Providing weep holes in Brick masonry/Plain/

Reinforced concrete abutment, wing wall/


return wall with 100 mm dia AC pipe,
extending through the full width of the
structure with slope of 1V :20H towards
drawing foce. Complete as per drawing and
Technical

Abutment wall : 2 x 12 = 24

24

24

Wing wall : 4 x {(2+1)/2x3.818} x0.5= 12

12
12

Nos.

12
36
432

2.00

12

Nos.

2
24

Nos
Nos

10.90

12

Nos.

8.86
8.86
106.32

Cum
Cum

9548.93

1015242.00

Approach slab end


2
Wing wall and abutment joint
4
For inside hunch (Triangular Portion)
4
Haunch for approach slab ; ( 0.3 + 0.6 ) / 2 = 0.454

12.00
0.30
0.15

7.20
2.82
0.05
0.54
10.02
120.24

Sqm
Sqm

292.10

35122.00

7.20
7.20
86.40

Sqm
Sqm

14.14

1222.00

Quantity for
16 Providing and laying Drainage Spouts complete as per
drawing and Technical specification

Quantity for

8171.02

196104.00

17 Providing and laying Cement concrete

wearing coat M-30 grade including


reinforcement complete as per drawing and
Technical Specifications

Over slab
Quantity for

10.84

0.075

18 Providing & fixing 20 mm thick compressible

fibre board in expansion joint complete as per


drawing & Technical Specification.

Quantity for

0.30
2.350
0.075
0.300

0.45

12

Nos.

12.00

12

Nos.

4.00

7.43

sqm

0.15

4.46

2.7

4.7

0.15

3.81
8.27

19 Providing & fixing Tar paper


Below approach slab
Quantity for
20 Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
Technical specification

0.30

Wing wall & return wall


3.82/(sq. root 2), so A = 2.70
Return wall =1.40, so L = 2.70+1.40 =4.1m
4 x[ (4.1+1.4)/2]x 2.7

Boulder appron curtain wall to box:


B=( 7.4 + 2 ) / 2 = 4.7
D=0.3+0.3+0.15=0.75

3x2 Box cell culvert

Cum
Page 15

Sl.
No

Items

Quantity for
21 Providing and laying Pitching on slopes laid over
prepared filter media including boulder apron laid
dry in front of toe of embankment complete as per
drawing and Technical specifications

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

12

Nos.

4.00

7.43

sqm

0.30

8.91

2.7

4.7

0.3

7.61

Rate

Amount
in Rs.

Quantity

Unit

99.18

Cum

587.70

58288.00

Cum
Cum

1052.97

208741.00

Cum

3801.25

150712.00

9.99
119.88

Cum
Cum

4119.14

493803.00

19.20
19.20
230.40

Cum
Cum

491.42

113223.00

Total

22440941.00

Wing wall & return wall


3.82/(sq. root 2), so A = 2.70
Return wall =1.40, so L = 2.70+1.40 =4.1m
4 x[ (4.1+1.4)/2]x 2.7

Boulder appron curtain wall to box:


B=( 7.4 + 2 ) / 2 = 4.7
D=0.3+0.3+0.15=0.75

Quantity for
22

12

Nos.

16.52
198.24

20%

198.24

39.65

3.00

7.40

0.30

6.66

1.50

7.40

0.30

3.33

12

Nos.

12.00

12

Nos.

Plain cement concrete (1:3:6) nominal mix in


grouting appron and revertments with crushed
stone aggregates 40mm nominal size
mechanically mixed, placed in foundation and
compacted by vibration including curing for 14
days complete in all respects as per
Taking 20% volume of stone pitching vide
item No.20 =

23 Providing and laying Flooring complete as per


drawing and Technical specifications laid over
cement concert bedding.
Boulder appron after curtain wall at D/S
Boulder appron after curtain wall at U/S

Quantity for
24 Back filling with granular materials behind
abutment, wing wall and return wall complete
as per 710.1.4 of IRC:78 and 2200 of
specificaion for Road and bridge works of
Ministry of Road Transport and Highways (4th
revision) etc.complete.

0.40

Assistant Engineer
N.H, U.G. Section, M. Rampur

3x2 Box cell culvert

2.00

Executive Engineer
N.H Division, Kesinga.

Page 16

Detailed Estimate for 3.0 x 3.0m Box Cell Culvert.


Total = 9 Nos
Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

12.20

5.84

1.170

83.36

Cum

4
4

6.844
1.4

2.641
2.01

1.95
1.95

140.99
21.95

1
1

12.68
12.68

1.50
1.85

2.45
2.95

46.60
69.2

4.84

7.84

0.75

56.92

3.00

12.68

1.05

39.94

1.50

12.68

1.05

19.97

2
-2
-2

5.84
1.870
2.300

1.08
Sqm
Sqm

0.78
1.95
1.95

9.84
-7.29
-8.97
472.51
4252.59

Cum
Cum

33.04

140506.00

Cum
Cum

416.72

174172.00

Cum
Cum

4411.08

2203731.00

1 Earth work in excavation of foundation of structures as


per drawing and technical specification, including setting
out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of sides
and bottom and backfilling with

Box : L= 12 + 0.1x2 = 12.2, B= 3+


0.42x2 + 0.9x2 + 0.1x2 = 5.84, D=
0.3+0.42+0.15+0..3 = 1.17
Wing wall :
Wing wall low end
L=SQRT(4.84*4.84*2)=6.844
Curtain wall up stream
L=(4.84+4.84+3)=12.68
Curtain wall down stream
Boulder appron curtain wall to box:
B=( 12.68 + 3 ) / 2 = 7.84
D=0.3+0.3+0.15=0.75
Boulder appron after curtain wall at D/S
D=0.3+0.75=1.05 B=(4.84*2+3)=12.68
Boulder appron after curtain wall at U/S
D=0.3+0.75=1.05 B=(4.84*2+3)=12.69
Box Toe portion : 0.3 + 0.78 = 1.08
D=1.2-0.42=0.78
Deduction for Wing Wall Portion (U/S)
Deduction for Wing Wall Portion (D/S)
Quantity for
2 Sand Filling in Foundation Trenches as per Drawing
& Technical Specification

Nos.

Below box

12.20

5.84

0.30

21.37

Wing wall low end

4
4

6.844
1.4

2.641
2.01

0.30
0.30

Nos.

21.69
3.38
46.44
417.96

12.20

Wing wall :

Quantity for
3 M15 Grade Plain/Reinforced Cement Concrete in
Open Foundation complete as per Drawing and
Technical Specifications.
Below box
Box toe portion B=SQRT(0.78*0.78*2)=1.10

Below wing wall


Wing wall low end
Below curtain wall up stream
Below curtain wall down stream
Boulder appron curtain wall to box:
B=( 12.68 + 3 ) / 2 = 7.84
Below approach slab
Quantity for

5.84

0.15

10.69

5.84

1.10

0.15

1.93

4
4
1
1

6.844
1.40
12.68
12.68

2.641
2.01
1.50
1.85

0.15
0.15
0.15
0.15

10.85
1.69
2.85
3.52

2
2

4.84
12.00

7.84
3.50

0.15
0.15

11.38
12.6
55.51
499.59

Nos.

12.00

5.64

0.42

28.43

5.64

0.69

0.78

6.07
34.5

4 RCC M 25 in in Open Foundation complete


as per Drawing and Technical Specifications.

Bottom slab
Toe portion : ( 0.3 + 1.08 ) / 2 = 0.69
- 0.42 = 0.78

1.2

3x3 Box Cell Culvert

Cum
Page 17

Sl.
No

Items

Quantity for

Nos.

Length
in mtr

Nos.

2
2

12.00
12.00

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

310.5

Cum

5653.89

1755533.00

23.18
0.27
23.45
211.05

Cum
Cum

5990.09

1264208.00

Cum
Cum

6491.08

1947129.00

Cum

5324.22

6828312.00

5.66
50.922

MT

53754.35

2737279.00

0.78
0.78
7.02

MT

53074.03

372580.00

25.2
25.2
226.8

Cum
Cum

8286.42

1879360.00

21.68
21.68
195.12

RM
RM

3288.56

641664.00

10.3
10.3
92.7

Sqm
Sqm

45.94

4259.00

5 RCC M 25 in sub-structure complete as per


drawing and Technical Specifications

Walls upto construction joint; 3.0 - 0.7 =


2.3
Haunch Bottom inside
Quantity for

0.42
0.15

2.30
0.075

Nos.

2
2

12.00
12.00

0.42
0.15

0.70
0.075

7.06
0.27

2
1
2

12.00
12.00
10.84

0.30
3.84
0.53

0.45
0.42
0.30

3.24
19.35

6 RCC M 25 in super-structure as per drawing


and Technical Specification
Walls above construction joint
Haunch top inside
Haunch for approach slab ; ( 0.3 + 0.6 ) /
2 = 0.45
Top slab
Kerb: ( 3.84 + 3.5x2 ) =10.84
B=(0.55/0.5)/2=0.53
Quantity for

Nos.

3.41
33.33
299.97

7 PCC M20 in sub structure in wing wall


Wing wall
Wing wall as per drawing no- SD-113 (Sheet4 of 6)

99.80

Curtain wall
Curtain wall as per drawing no- SD-111
(Sheet-4 of 4)

42.70
Total

Quantity for
8

142.50

1282.5

Nos.

Providing and laying HYSD bar reinforcement


in Superstructure
Reiforcement as per drawing no- SD-108
(Sheet- 2 of 6)

5.658

Total
Quantity for

Nos.

9 Providing and laying HYSD bar reinforcement


in Substructure

99.80 cum

0.1 % for Temparature bar


Quantity for

Nos.

12.00

Nos.

10.840

Nos.

10.840

10 RCC M 30 in approach slab incl.


reinforcement

Approach slab
Quantity for

3.50

0.30

11 Providing and constructing vertical post and


precast railing incl. Reinforcement

Road side
Quantity for
12 Providing and applying synthetic enamel paint
to kerb with alternate strips

Kerb
Quantity for

Nos.

10.840

0.475

13 Providing and applying cement paint to


parapet and railing
Parapet

3x3 Box Cell Culvert

0.86

18.64
Page 18

Sl.
No

Items

Nos.

Quantity for

Length
in mtr

Nos.

2
4

12.00
6.844

Nos.

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

18.64
167.76

Sqm
Sqm

33.05

5544.00

43.2
36.3
79.5
715.5

Cum
Cum

1198.21

857319.00

No
No

155.12

72596.00

14 Providing and laying of Filter media with


granular materials/stone crushed aggregates
satisfying the requirements laid down in
clause 2504.2.2. of MoRTH specifications to a
thickness of not less than 600 mm with
smaller size towards the soil and bigger size
towards the wall and provided over the entire
surface behind abutment, wing wall and return
wall to the full height compacted to a firm
condition complete as per drawing and
Technical Specification.
Box wall
Wing wall D=((3.79-1.5)+1)/2=1.65
Quantity for

0.60
0.60

3.00
2.21

15 Providing weep holes in Brick masonry/Plain/

Reinforced concrete abutment, wing wall/


return wall with 100 mm dia AC pipe,
extending through the full width of the
structure with slope of 1V :20H towards
drawing foce. Complete as per drawing and
Technical Specifications

Abutment wall : 2 x 12 = 24

24

24

Wing wall : 4 x {(3+1)/2x6.844} x0.5= 12

28
9

Nos.

28
52
468

2.00

Nos.

2
18

Nos
Nos

10.90

Nos.

8.86
8.86
79.74

Cum
Cum

9548.93

761432.00

Approach slab end


2
Wing wall and abutment joint
4
For inside hunch (Triangular Portion)
4
Haunch for approach slab ; ( 0.3 + 0.6 ) / 2 = 0.454

12.00
0.42
0.15

7.20
5.75
0.05
0.54
13.54
121.86

Sqm
Sqm

292.10

35595.00

7.20
7.20
64.80

Sqm
Sqm

14.14

916.00

Quantity for
16 Providing and laying Drainage Spouts complete as per
drawing and Technical specification

Quantity for
17 Providing and laying Cement concrete
wearing
coat
M-30
grade
including
reinforcement complete as per drawing and
Technical Specifications

Over slab
Quantity for

10.84

0.075

8171.02

147078.00

18 Providing & fixing 20 mm thick compressible

fibre board in expansion joint complete as per


drawing & Technical Specification.

Quantity for
19 Providing & fixing Tar paper
Below approach slab
Quantity for
20 Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
Technical specification

Nos.

12.00

Nos.

4.00

18.49

0.30
3.420
0.075
0.300

0.45

0.30

Wing wall & return wall


6.84/(sq. root 2), so A = 4.84
Return wall =1.40, so L = 4.84+1.40 = 6.24m
4 x[ (6.24+1.4)/2]x 4.84

sqm

3x3 Box Cell Culvert

0.15

11.09

Page 19

Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Boulder appron curtain wall to box:


B=( 12.68 + 3 ) / 2 = 7.84
D=0.3+0.3+0.15=0.75

4.84

7.84

0.15

Nos.

4.00

18.49

sqm

0.30

22.19

4.84

7.84

0.30

Nos.

22.77
44.96
404.609

20%

404.61

80.92

3.00

12.68

0.30

11.41

1.50

12.68

0.30

Nos.

12.00

Quantity for
21 Providing and laying Pitching on slopes laid over
prepared filter media including boulder apron laid
dry in front of toe of embankment complete as per
drawing and Technical specifications

Rate

Amount
in Rs.

587.70

118868.00

Cum
Cum

1052.97

426041.00

Cum

3801.25

307604.00

5.71
17.12
154.08

Cum
Cum

4119.14

634677.00

24.00
24.00
216.00

Cum
Cum

372.53

80466.00

Total

23396869.00

Quantity

Unit

11.38
22.47
Cum
202.2595 Cum

Wing wall & return wall


6.84/(sq. root 2), so A = 4.84
Return wall =1.40, so L = 4.84+1.40 = 6.24m
4 x[ (6.24+1.4)/2]x 4.84

Boulder appron curtain wall to box:


B=( 12.68 + 3 ) / 2 = 7.84
D=0.3+0.3+0.15=0.75
Quantity for
22

Plain cement concrete (1:3:6) nominal mix in


grouting appron and revertments with crushed
stone aggregates 40mm nominal size
mechanically mixed, placed in foundation and
compacted by vibration including curing for 14
days complete in all respects as per
Taking 20% volume of stone pitching vide item
No.20 =

23 Providing and laying Flooring complete as per


drawing and Technical specifications laid over
cement concert bedding.
Boulder appron after curtain wall at D/S
Boulder appron after curtain wall at U/S

Quantity for
24 Back filling with granular materials behind
abutment, wing wall and return wall complete
as per 710.1.4 of IRC:78 and 2200
of
specificaion for Road and bridge works of
Ministry of Road Transport and Highways (4th
revision) etc.complete.

0.40

Nos.

Assistant Engineer
N.H, U.G. Section, M. Rampur

3x3 Box Cell Culvert

2.50

Executive Engineer
N.H Division, Kesinga.

Page 20

Detailed Estimate for Re-construction of 3.0 x 4.0m Box Cell Culvert.


Sl.
Items
No
1 Earth work in excavation of foundation of
structures as per drawing and technical
specification,
including
setting
out,
construction of shoring and bracing, removal
of stumps and other deleterious matter,
dressing of sides and bottom and backfilling
with

Box : L= 12 + 0.15x2 = 12.30, B=


4 + 0.550x2 + 1.20x2 + 0.1x2 = 7.70,
D= 0.3+0.550+0.15+0.3 = 1.3
Wing wall :
( 7.035 + 2.05 ) / 2 =4.54
Wing wall low end
Curtain wall up stream
Curtain wall down stream
Boulder appron curtain wall to box:
( 23.32
+ 5 ) / 2 = 14.16
Boulder appron after curtain wall at
D/S
Boulder appron after curtain wall at
U/S
Box Toe portion : 0.3 + 0.52 = 0.82

Quantity for
2

Wing wall low end

Quantity for

Quantity

Unit

Cum

12.20

5.84

1.30

92.62

9.84

4.54

2.45

438.09

4
1
1

1.40
23.32
23.32

2.05
1.50
1.85

2.45
2.45
2.95

28.13
85.70
127.27

14.16

5.84

0.75

124.04

3.00

23.32

1.05

73.46

1.50

23.32

1.05

36.73

9.60

0.82

0.52

8.19
1014.22

Cum

3042.66

Cum

Nos.

12.20

5.84

0.30

21.37

12.95

4.54

0.30

70.60

1.40

2.05

0.30

3.44
95.42

Cum

286.26

Cum

Nos.

Rate

Amount
in Rs.

33.04

100530.00

416.72

119290.00

Below box

12.20

5.84

0.15

10.69

Below wing wall

12.95

4.54

0.15

35.30

Wing wall low end

1.40

2.05

0.15

1.72

4411.08

1220235.00

M15 Grade Plain/Reinforced Cement


Concrete in Open Foundation complete
as per Drawing and Technical
Specifications.

PCC M15 under Curtain wall as per


drawing no- SD-111 (Sheet-4 of 4)

9.00

Floor apron as per drawing no- SD111 (Sheet-4 of 4)

22.90

Below approach slab

Quantity for
4

Height
in mtr

Sand Filling in Foundation Trenches as


per Drawing & Technical Specification

Below box
Wing wall :
( 7.035 + 2.05 ) / 2 = 4.54

Nos.

Total = 3 Nos.
Length
Breadth
in mtr
in mtr

12.00

3.50

Nos.

0.15

12.60
92.21

Cum

276.63

Cum

RCC M 25 in in Open Foundation


complete as per Drawing and
Technical Specifications.
Page 21

Box cell culvert 3x4

Sl.
No

Items
Bottom slab
Toe portion :
0.3 + 0.82 ) / 2 = 0.56,
- 0.68 = 0.52

Length
in mtr
12.00

Breadth
in mtr
5.84

Height
in mtr
0.68

5.84

0.56

0.52

Nos.
(
1.2

Quantity

Unit

Rate

Amount
in Rs.

Cum

5653.89

865989.00

Cum

5990.09

787637.00

6491.08

1025617.00

47.65
3.40
51.06

Quantity for
5

RCC M 25 in sub-structure complete


as per drawing and Technical
Specifications
Walls upto construction joint;
4.0 - 0.7 = 3.30
Haunch Bottom inside

Nos.

153.17

12.00

0.55

3.30

43.56

12.00

0.15

0.08

0.27
43.83

Quantity for
6

Nos.

Walls above construction joint

12.00

0.55

0.70

9.24

Haunch top inside

12.00

0.15

0.08

0.27

12.00

0.30

0.45

3.24

Top slab

12.00

5.10

0.58

35.50

Kerb: ( 6.4 + 3.5x2 ) = 13.40

13.40

0.55

0.30

4.42

RCC M 25 in super-structure as per


drawing and Technical Specification

Haunch for approach slab ;


( 0.3 + 0.6 ) / 2 = 0.45

Quantity for
7

131.49

Nos.

Quantity for

158.00

Cum

191.99

60.30

Nos.

252.29

Cum

756.87

Cum

5324.22

4029742.00

MT

53754.35

1189747.00

MT

53074.03

239967.00

Providing and laying HYSD bar


reinforcement in Superstructure
Foundation @ 0.05 MT/Cum

51.06

cum

2.553

Sub-Structure @ 0.05 MT/Cum

43.83

cum

2.192

Super-Structure @ 0.05 MT/Cum

52.67

cum

2.633
Total

Quantity for
9

Cum

Plain/Reinforced cement concrete M20 in open foundation and substructure as per drawing and
technical specifications and as per
clause No.1500,1700,2100 and 2100
of specificaion for Road and bridge
works of Ministry of Road Transport
and Highways (4th r
Wing wall
Wing wall as per drawing no- SD113 (Sheet-6 of 6)
Curtain wall
Curtain wall as per drawing no- SD111 (Sheet-4 of 4)

52.67

7.378

Nos.

22.133

192

cum

1.51

Providing and laying HYSD bar


reinforcement in Substructure
0.1 % for Temparature bar

Total
Quantity for

Nos.

1.51
4.52

Page 22

Box cell culvert 3x4

Sl.
Items
No
10 RCC M 30 in approach slab incl.
reinforcement
Approach slab

Quantity for

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

12.00

3.50

0.30

25.20

Unit

25.20

Cum
Cum

Nos.

75.60

13.40

26.80

Rate

Amount
in Rs.

8286.42

626453.00

3288.56

264400.00

45.94

1754.00

33.05

2285.00

1198.21

542266.00

155.12

50724.00

11 Providing and constructing vertical


post and precast railing incl.
Reinforcement
Road side

Quantity for

Nos.

13.40

26.80

RM

80.40

RM

12 Providing and applying synthetic


enamel paint to kerb with alternate
strips
Kerb

Quantity for

Nos.

13.40

0.48

12.73
12.73

Sqm

38.19

Sqm

13 Providing and applying cement paint


to parapet and railing
Parapet

Quantity for

0.86

23.05
23.05

Sqm

69.14

Sqm

Nos.

Box wall

12.00

0.60

4.00

57.60

Wing wall

12.95

0.60

3.00

93.25

14 Providing and laying of Filter media


with granular materials/stone crushed
aggregates
satisfying
the
requirements laid down in clause
2504.2.2. of MoRTH specifications to
a thickness of not less than 600 mm
with smaller size towards the soil and
bigger si

Quantity for

Nos.

150.85

Cum

452.56

Cum

15 Providing weep holes in Brick


masonry/Plain/ Reinforced concrete
abutment, wing wall/ return wall with
100 mm dia AC pipe, extending
through the full width of the structure
with slope of 1V :20H towards
drawing foce. Complete as per
drawing and Technical
Abutment wall : 2 x 12 x2.5 = 60
Wing wall :
4x
{ 1/2x(4+1)x9.841} x0.5 = 49

Quantity for
16 Providing and laying Drainage Spouts
complete as per drawing and Technical
specification

Quantity for

60

60.00

49

49.00
109.00

No
No

Nos.

327.00

2.00

Nos.

Page 23

Nos

12

Nos

8108.90

97307.00

Box cell culvert 3x4

Sl.
Items
No
17 Providing
and
laying
Cement
concrete wearing coat M-30 grade
including reinforcement complete as
per
drawing
and
Technical
Specifications
Over slab & approach slab

Quantity for

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

10.90

13.40

0.075

10.95

Unit

10.95

Cum

32.86

Cum

Nos.

Approach slab end

12.00

0.30

7.20

Wing wall and abutment joint

2.02

4.78

38.60

-do-

0.55

0.85

1.87

Rate

Amount
in Rs.

9548.93

313811.00

292.10

41775.00

14.14

305.00

587.70

223511.00

1052.97

400459.00

18 Providing & fixing 20 mm thick


compressible
fibre
board
in
expansion joint complete as per
drawing & Technical Specification.

Quantity for

Nos.

12.00

47.67

Sqm

143.02

Sqm

19 Providing & fixing Tar paper


Below approach slab

Quantity for

0.30

7.20
7.20

Sqm

21.60

Sqm

Nos.

4.00

40.79

sqm

0.30

48.95

14.16

9.16

0.30

77.82

20 Providing and laying Filter material

underneath pitching in slopes complete as


per drawing and Technical specification

Wing wall & return wall


9.841/(sq root 2), so A = 6.96
Return wall =1.40, so L = 6.96+1.40 =
8.36m
4 x[ (8.36+1.4)/2]x 8.36
Boulder appron curtain wall to box:
( 23.32
+ 5 ) / 2 = 14.16

Quantity for

126.77

Cum

380.31

Cum

Nos.

4.00

40.79

sqm

0.30

48.95

14.16

9.16

0.30

77.82

21 Providing and laying Pitching on slopes

laid over prepared filter media including


boulder apron laid dry in front of toe of
embankment complete as per drawing
and Technical specifications

Wing wall & return wall


9.841/(sq root 2), so A = 6.96
Return wall =1.40, so L = 6.96+1.40 =
8.36m
4 x[ (8.36+1.4)/2]x 8.36
Boulder appron curtain wall to box:
( 23.32
+ 5 ) / 2 = 14.16

Quantity for

Nos.

Page 24

126.77

Cum

380.31

Cum

Box cell culvert 3x4

Sl.
No
22

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

20%

380.31

76.06

Cum

3801.25

289134.00

3.00

23.32

0.75

52.47

1.50

23.32

0.75

26.24

4119.14

972591.00

372.53

48280.00

Plain
cement
concrete
(1:3:6)
nominal mix in grouting appron and
revertments with crushed stone
aggregates 40mm nominal size
mechanically mixed, placed in
foundation and compacted by
vibration including curing for 14 days
complete in all respects as per
Taking 20% volume of stone pitching
vide item No.20 =

23 Providing and laying Flooring complete as

per drawing and Technical specifications


laid over cement concert bedding.
Boulder appron after curtain wall at
D/S
Boulder appron after curtain wall at
U/S

Quantity for

Nos.

12.00

78.71

Cum

236.12

Cum

24
Back filling with granular materials
behind abutment, wing wall and
return wall complete as per 710.1.4
of IRC:78 and 2200 of specificaion
for Road and bridge works of Ministry
of Road Transport and Highways (4th
revision) etc.complete.

0.40

4.50

Nos.

43.20
43.20

Cum

129.60

Cum
Total

Assistant Engineer
N.H, U.G. Section, M. Rampur

Page 25

13453809.00

Executive Engineer
N.H Division, Kesinga.

Box cell culvert 3x4

Detailed Estimate for 4.0 x 3.0m Box Cell Culvert.


Total = 2 Nos
Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

12.20

7.70

1.170

109.91

Cum

4
4

6.844
1.4

2.641
2.01

1.95
1.95

140.99
21.95

1
1

12.68
12.68

1.50
1.85

2.45
2.95

46.60
69.2

4.84

7.84

0.75

56.92

3.00

12.68

1.05

39.94

1.50

12.68

1.05

19.97

2
-2
-2

7.70
1.870
2.300

1.08
Sqm
Sqm

0.78
1.95
1.95

12.97
-7.29
-8.97
502.19
1004.38

Cum
Cum

33.04

33185.00

Cum
Cum

416.72

44381.00

Cum
Cum

4411.08

525095.00

1 Earth work in excavation of foundation of structures as

per drawing and technical specification, including setting


out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of sides
and bottom and backfilling with

Box : L= 12 + 0.1x2 = 12.2, B= 3+


0.42x2 + 0.9x2 + 0.1x2 = 5.84, D=
0.3+0.42+0.15+0..3 = 1.17
Wing wall :
Wing wall low end
L=SQRT(4.84*4.84*2)=6.844
Curtain wall up stream
L=(4.84+4.84+3)=12.68
Curtain wall down stream
Boulder appron curtain wall to box:
B=( 12.68 + 3 ) / 2 = 7.84
D=0.3+0.3+0.15=0.75
Boulder appron after curtain wall at D/S
D=0.3+0.75=1.05 B=(4.84*2+3)=12.68
Boulder appron after curtain wall at U/S
D=0.3+0.75=1.05 B=(4.84*2+3)=12.69
Box Toe portion : 0.3 + 0.78 = 1.08
D=1.2-0.42=0.78
Deduction for Wing Wall Portion (U/S)
Deduction for Wing Wall Portion (D/S)
Quantity for
2 Sand Filling in Foundation Trenches as per Drawing
& Technical Specification

Nos.

Below box

12.20

7.70

0.30

28.18

Wing wall low end

4
4

6.844
1.4

2.641
2.01

0.30
0.30

Nos.

21.69
3.38
53.25
106.5

12.20

Wing wall :

Quantity for
3 M15 Grade Plain/Reinforced Cement Concrete in
Open Foundation complete as per Drawing and
Technical Specifications.
Below box
Box toe portion B=SQRT(0.78*0.78*2)=1.10

Below wing wall


Wing wall low end
Below curtain wall up stream
Below curtain wall down stream
Boulder appron curtain wall to box:
B=( 12.68 + 3 ) / 2 = 7.84
Below approach slab
Quantity for

7.70

0.15

14.09

7.70

1.10

0.15

2.54

4
4
1
1

6.844
1.40
12.68
12.68

2.641
2.01
1.50
1.85

0.15
0.15
0.15
0.15

10.85
1.69
2.85
3.52

2
2

4.84
12.00

7.84
3.50

0.15
0.15

11.38
12.6
59.52
119.04

Nos.

12.00

7.50

0.68

61.2

7.50

0.69

0.78

8.07
69.27

4 RCC M 25 in in Open Foundation complete


as per Drawing and Technical Specifications.

Bottom slab
Toe portion : ( 0.3 + 1.08 ) / 2 = 0.69
- 0.42 = 0.78

1.2

4x3 Box Cell Culvert

Cum
Page 26

Sl.
No

Items

Quantity for

Nos.

Length
in mtr

Nos.

2
2

12.00
12.00

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

138.54

Cum

5653.89

783290.00

30.36
0.27
30.63
61.26

Cum
Cum

5990.09

366953.00

Cum
Cum

6491.08

681174.00

Cum

5324.22

1517403.00

7.62
15.237

MT

53754.35

819055.00

0.78
0.78
1.56

MT

53074.03

82795.00

25.2
25.2
50.4

Cum
Cum

8286.42

417636.00

26.80
26.80
53.6

RM
RM

3288.56

176267.00

12.73
12.73
25.46

Sqm
Sqm

45.94

1170.00

5 RCC M 25 in sub-structure complete as per


drawing and Technical Specifications

Walls upto construction joint; 3.0 - 0.7 =


2.3
Haunch Bottom inside
Quantity for

0.55
0.15

2.30
0.075

Nos.

2
2

12.00
12.00

0.55
0.15

0.70
0.075

9.24
0.27

2
1
2

12.00
12.00
13.40

0.30
5.10
0.53

0.45
0.58
0.30

3.24
35.5

6 RCC M 25 in super-structure as per drawing


and Technical Specification
Walls above construction joint
Haunch top inside
Haunch for approach slab ; ( 0.3 + 0.6 ) /
2 = 0.45
Top slab
Kerb: ( 3.84 + 3.5x2 ) =10.84
B=(0.55/0.5)/2=0.53
Quantity for

Nos.

4.22
52.47
104.94

7 PCC M20 in sub structure in wing wall


Wing wall
Wing wall as per drawing no- SD-113 (Sheet4 of 6)

99.80

Curtain wall
Curtain wall as per drawing no- SD-111
(Sheet-4 of 4)

42.70
Total

Quantity for
8

142.50

285

Nos.

Providing and laying HYSD bar reinforcement


in Superstructure
Foundation @ 0.05 MT/Cum

69.27 cum

3.464

Sub-Structure @ 0.05 MT/Cum

30.63 cum

1.532

Super-Structure @ 0.05 MT/Cum

52.47 cum

2.624

Total
Quantity for

Nos.

9 Providing and laying HYSD bar reinforcement


in Substructure

99.80 cum

0.1 % for Temparature bar


Quantity for

Nos.

12.00

10 RCC M 30 in approach slab incl.


reinforcement

Approach slab
Quantity for

Nos.

13.400

Nos.

13.400

Nos.

3.50

0.30

11 Providing and constructing vertical post and


precast railing incl. Reinforcement
Road side
Quantity for
12 Providing and applying synthetic enamel paint
to kerb with alternate strips

Kerb
Quantity for

0.475

4x3 Box Cell Culvert

Page 27

Sl.
No

Items

Nos.

Length
in mtr

13.400

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

23.05
23.05
46.1

Sqm
Sqm

33.05

1524.00

43.2
36.3
79.5
159

Cum
Cum

1198.21

190515.00

No
No

155.12

16132.00

13 Providing and applying cement paint to


parapet and railing

Parapet
Quantity for

Nos.

2
4

12.00
6.844

Nos.

0.86

14 Providing and laying of Filter media with


granular materials/stone crushed aggregates
satisfying the requirements laid down in
clause 2504.2.2. of MoRTH specifications to a
thickness of not less than 600 mm with
smaller size towards the soil and bigger size
towards the wall and provided over the entire
surface behind abutment, wing wall and return
wall to the full height compacted to a firm
condition complete as per drawing and
Technical Specification.
Box wall
Wing wall D=((3.79-1.5)+1)/2=1.65
Quantity for

0.60
0.60

3.00
2.21

15 Providing weep holes in Brick masonry/Plain/

Reinforced concrete abutment, wing wall/


return wall with 100 mm dia AC pipe,
extending through the full width of the
structure with slope of 1V :20H towards
drawing foce. Complete as per drawing and
Technical Specifications

Abutment wall : 2 x 12 = 24

24

24

Wing wall : 4 x {(3+1)/2x6.844} x0.5= 12

28
2

Nos.

28
52
104

2.00

Nos.

2
4

Nos
Nos

10.90

Nos.

10.95
10.95
21.9

Cum
Cum

9548.93

209122.00

Approach slab end


2
Wing wall and abutment joint
4
For inside hunch (Triangular Portion)
4
Haunch for approach slab ; ( 0.3 + 0.6 ) / 2 = 0.454

12.00
0.42
0.15

7.20
5.75
0.05
0.54
13.54
27.08

Sqm
Sqm

292.10

7910.00

7.20
7.20
14.40

Sqm
Sqm

14.14

204.00

Quantity for
16 Providing and laying Drainage Spouts complete as per
drawing and Technical specification

Quantity for
17 Providing and laying Cement concrete
wearing
coat
M-30
grade
including
reinforcement complete as per drawing and
Technical Specifications

Over slab
Quantity for

13.40

0.075

8171.02

32684.00

18 Providing & fixing 20 mm thick compressible

fibre board in expansion joint complete as per


drawing & Technical Specification.

Quantity for
19 Providing & fixing Tar paper
Below approach slab
Quantity for
20 Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
Technical specification

Nos.

12.00

Nos.

0.30
3.420
0.075
0.300

0.30

0.45

Wing wall & return wall

4x3 Box Cell Culvert

Page 28

Sl.
No

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

4 x[ (6.24+1.4)/2]x 4.84

4.00

18.49

sqm

0.15

11.09

Boulder appron curtain wall to box:


B=( 12.68 + 3 ) / 2 = 7.84
D=0.3+0.3+0.15=0.75

4.84

7.84

0.15

Nos.

4.00

18.49

sqm

0.30

4.84

7.84

0.30

Nos.

20%

89.91

3.00

12.68

0.30

11.41

1.50

12.68

0.30

Nos.

12.00

Nos.

Items

Rate

Amount
in Rs.

587.70

26415.00

1052.97

94676.00

Cum

3801.25

68356.00

5.71
17.12
34.24

Cum
Cum

4119.14

141039.00

24.00
24.00
48.00

Cum
Cum

372.53

17881.00

Total

6254862.00

Unit

6.84/(sq. root 2), so A = 4.84


Return wall =1.40, so L = 4.84+1.40 = 6.24m

Quantity for
21 Providing and laying Pitching on slopes laid over
prepared filter media including boulder apron laid
dry in front of toe of embankment complete as per
drawing and Technical specifications

11.38
22.47
Cum
44.94656 Cum

Wing wall & return wall


6.84/(sq. root 2), so A = 4.84
Return wall =1.40, so L = 4.84+1.40 = 6.24m
4 x[ (6.24+1.4)/2]x 4.84

Boulder appron curtain wall to box:


B=( 12.68 + 3 ) / 2 = 7.84
D=0.3+0.3+0.15=0.75
Quantity for
22

22.19

22.77
44.96
Cum
89.91312 Cum

Plain cement concrete (1:3:6) nominal mix in


grouting appron and revertments with crushed
stone aggregates 40mm nominal size
mechanically mixed, placed in foundation and
compacted by vibration including curing for 14
days complete in all respects as per
Taking 20% volume of stone pitching vide item
No.20 =

17.98

23 Providing and laying Flooring complete as per


drawing and Technical specifications laid over
cement concert bedding.
Boulder appron after curtain wall at D/S
Boulder appron after curtain wall at U/S

Quantity for
24 Back filling with granular materials behind
abutment, wing wall and return wall complete
as per 710.1.4 of IRC:78 and 2200
of
specificaion for Road and bridge works of
Ministry of Road Transport and Highways (4th
revision) etc.complete.

0.40

Assistant Engineer
N.H, U.G. Section, M. Rampur

4x3 Box Cell Culvert

2.50

Executive Engineer
N.H Division, Kesinga.

Page 29

Detailed Estimate for Re-construction of 4.0 x 4.0m Box Cell Culvert.


Sl.
Items
No
1 Earth work in excavation of foundation of
structures as per drawing and technical
specification,
including
setting
out,
construction of shoring and bracing, removal
of stumps and other deleterious matter,
dressing of sides and bottom and backfilling
with

Box : L= 12 + 0.15x2 = 12.30, B=


4 + 0.550x2 + 1.20x2 + 0.1x2 = 7.70,
D= 0.3+0.550+0.15+0.3 = 1.3
Wing wall :
( 7.035 + 2.05 ) / 2 =4.54
Wing wall low end
Curtain wall up stream
Curtain wall down stream
Boulder appron curtain wall to box:
( 23.32
+ 5 ) / 2 = 14.16
Boulder appron after curtain wall at
D/S
Boulder appron after curtain wall at
U/S
Box Toe portion : 0.3 + 0.52 = 0.82

Quantity for
2

Height
in mtr

Quantity

Unit

Cum

12.20

7.70

1.30

122.12

9.84

4.54

2.45

438.09

4
1
1

1.40
23.32
23.32

2.05
1.50
1.85

2.45
2.45
2.95

28.13
85.70
127.27

14.16

7.70

0.75

163.55

3.00

23.32

1.05

73.46

1.50

23.32

1.05

36.73

9.60

0.82

0.52

8.19
1083.23

Cum

1083.23

Cum

Nos.

12.20

7.70

0.30

28.18

12.95

4.54

0.30

70.60

1.40

2.05

0.30

3.44

Rate

Amount
in Rs.

33.04

35790.00

416.72

42600.00

4411.08

425928.00

Sand Filling in Foundation Trenches as


per Drawing & Technical Specification

Below box
Wing wall :
( 7.035 + 2.05 ) / 2 = 4.54
Wing wall low end

Quantity for
3

Nos.

Total = 1 Nos.
Length
Breadth
in mtr
in mtr

102.23

Cum

102.23

Cum

Nos.

Below box

12.20

7.70

0.15

14.09

Below wing wall

12.95

4.54

0.15

35.30

Wing wall low end

1.40

2.05

0.15

1.72

M15 Grade Plain/Reinforced Cement


Concrete in Open Foundation complete
as per Drawing and Technical
Specifications.

PCC M15 under Curtain wall as per


drawing no- SD-111 (Sheet-4 of 4)

9.00

Floor apron as per drawing no- SD111 (Sheet-4 of 4)

22.90

Below approach slab

Quantity for

12.90

3.50

Nos.

Page 30

0.15

13.55
96.56

Cum

96.56

Cum

Box cell culvert 4x4

Sl.
Items
No
4 RCC M 25 in in Open Foundation
complete as per Drawing and
Technical Specifications.
Bottom slab
Toe portion :
(
0.3 + 0.82 ) / 2 = 0.56,
1.2
- 0.68 = 0.52

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

12.00

7.50

0.68

61.20

7.50

0.56

0.52

4.37

Unit

Rate

Amount
in Rs.

Cum

5653.89

370714.00

Cum

5990.09

262546.00

6491.08

341872.00

65.57
Quantity for
5

RCC M 25 in sub-structure complete


as per drawing and Technical
Specifications
Walls upto construction joint;
4.0 - 0.7 = 3.30
Haunch Bottom inside

Nos.

65.57

12.00

0.55

3.30

43.56

12.00

0.15

0.08

0.27
43.83

Quantity for
6

Nos.

Walls above construction joint

12.00

0.55

0.70

9.24

Haunch top inside

12.00

0.15

0.08

0.27

12.00

0.30

0.45

3.24

Top slab

12.00

5.10

0.58

35.50

Kerb: ( 6.4 + 3.5x2 ) = 13.40

13.40

0.55

0.30

4.42

RCC M 25 in super-structure as per


drawing and Technical Specification

Haunch for approach slab ;


( 0.3 + 0.6 ) / 2 = 0.45

Quantity for
7

43.83

Nos.

Quantity for

52.67

Cum

191.99

60.30

Nos.

Providing and laying HYSD bar


reinforcement in Superstructure
Reiforcement as per drawing noSD-108 (Sheet- 5 of 6)

Quantity for

252.29

Cum

252.29

Cum

5324.22

1343247.00

MT

53754.35

492067.00

9.154

Total

Cum

Plain/Reinforced cement concrete M20 in open foundation and substructure as per drawing and
technical specifications and as per
clause No.1500,1700,2100 and 2100
of specificaion for Road and bridge
works of Ministry of Road Transport
and Highways (4th r
Wing wall
Wing wall as per drawing no- SD113 (Sheet-6 of 6)
Curtain wall
Curtain wall as per drawing no- SD111 (Sheet-4 of 4)

52.67

9.15

Nos.

9.15

192

cum

1.51

Providing and laying HYSD bar


reinforcement in Substructure
0.1 % for Temparature bar

Page 31

Box cell culvert 4x4

Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Total
Quantity for

Nos.

12.00

Quantity

Unit

Rate

Amount
in Rs.

MT

53074.03

79989.00

8286.42

208818.00

3288.56

88133.00

45.94

585.00

33.05

762.00

1198.21

180755.00

155.12

16908.00

1.51
1.51

10 RCC M 30 in approach slab incl.


reinforcement
Approach slab

Quantity for

3.50

0.30

25.20
25.20

Cum
Cum

Nos.

25.20

13.40

26.80

11 Providing and constructing vertical


post and precast railing incl.
Reinforcement
Road side

Quantity for

Nos.

13.40

26.80

RM

26.80

RM

12 Providing and applying synthetic


enamel paint to kerb with alternate
strips
Kerb

Quantity for

Nos.

13.40

0.48

12.73
12.73

Sqm

12.73

Sqm

13 Providing and applying cement paint


to parapet and railing
Parapet

Quantity for

0.86

23.05
23.05

Sqm

23.05

Sqm

Nos.

Box wall

12.00

0.60

4.00

57.60

Wing wall

12.95

0.60

3.00

93.25

14 Providing and laying of Filter media


with granular materials/stone crushed
aggregates
satisfying
the
requirements laid down in clause
2504.2.2. of MoRTH specifications to
a thickness of not less than 600 mm
with smaller size towards the soil and
bigger si

Quantity for

Nos.

150.85

Cum

150.85

Cum

15 Providing weep holes in Brick


masonry/Plain/ Reinforced concrete
abutment, wing wall/ return wall with
100 mm dia AC pipe, extending
through the full width of the structure
with slope of 1V :20H towards
drawing foce. Complete as per
drawing and Technical
Abutment wall : 2 x 12 x2.5 = 60
Wing wall :
4x
{ 1/2x(4+1)x9.841} x0.5 = 49

Quantity for

60

60.00

49

49.00

Nos.

109.00

No

109.00

No

16 Providing and laying Drainage Spouts


complete as per drawing and Technical
specification
Page 32

Box cell culvert 4x4

Sl.
No

Items

Quantity for

Nos.

Length
in mtr

2.00

Nos.

10.90

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

4
4

Nos

Nos

8108.90

32436.00

and
laying
Cement
17 Providing
concrete wearing coat M-30 grade
including reinforcement complete as
per
drawing
and
Technical
Specifications
Over slab & approach slab

Quantity for

5.10

0.075

4.17
4.17

Cum

4.17

Cum

Nos.

Approach slab end

12.00

0.30

7.20

Wing wall and abutment joint

2.02

4.78

38.60

-do-

0.55

0.85

1.87

9548.93

39812.00

292.10

13925.00

14.14

102.00

587.70

74504.00

18 Providing & fixing 20 mm thick


compressible
fibre
board
in
expansion joint complete as per
drawing & Technical Specification.

Quantity for

Nos.

12.00

47.67

Sqm

47.67

Sqm

19 Providing & fixing Tar paper


Below approach slab

Quantity for

0.30

7.20
7.20

Sqm

7.20

Sqm

Nos.

4.00

40.79

sqm

0.30

48.95

14.16

9.16

0.30

77.82

20 Providing and laying Filter material

underneath pitching in slopes complete as


per drawing and Technical specification

Wing wall & return wall


9.841/(sq root 2), so A = 6.96
Return wall =1.40, so L = 6.96+1.40 =
8.36m
4 x[ (8.36+1.4)/2]x 8.36
Boulder appron curtain wall to box:
( 23.32
+ 5 ) / 2 = 14.16

Quantity for

Nos.

126.77

Cum

126.77

Cum

21 Providing and laying Pitching on slopes

laid over prepared filter media including


boulder apron laid dry in front of toe of
embankment complete as per drawing
and Technical specifications

Wing wall & return wall


9.841/(sq root 2), so A = 6.96
Return wall =1.40, so L = 6.96+1.40 =
8.36m

Page 33

Box cell culvert 4x4

Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

4 x[ (8.36+1.4)/2]x 8.36
Boulder appron curtain wall to box:
( 23.32
+ 5 ) / 2 = 14.16

4.00

40.79

sqm

0.30

48.95

14.16

9.16

0.30

77.82

Quantity for
22

Unit

126.77

Cum

Rate

Amount
in Rs.

Nos.

126.77

Cum

1052.97

133486.00

20%

126.77

25.35

Cum

3801.25

96378.00

3.00

23.32

0.75

52.47

1.50

23.32

0.75

26.24

4119.14

324197.00

372.53

16093.00

Plain
cement
concrete
(1:3:6)
nominal mix in grouting appron and
revertments with crushed stone
aggregates 40mm nominal size
mechanically mixed, placed in
foundation and compacted by
vibration including curing for 14 days
complete in all respects as per
Taking 20% volume of stone pitching
vide item No.20 =

23 Providing and laying Flooring complete as

per drawing and Technical specifications


laid over cement concert bedding.

Boulder appron after curtain wall at


D/S
Boulder appron after curtain wall at
U/S

Quantity for

Nos.

12.00

78.71

Cum

78.71

Cum

24
Back filling with granular materials
behind abutment, wing wall and
return wall complete as per 710.1.4
of IRC:78 and 2200 of specificaion
for Road and bridge works of Ministry
of Road Transport and Highways (4th
revision) etc.complete.

0.40

4.50

Nos.

43.20
43.20

Cum

43.20

Cum
Total

Assistant Engineer
N.H, U.G. Section, M. Rampur

Page 34

4621647.00

Executive Engineer
N.H Division, Kesinga.

Box cell culvert 4x4

Detailed Estimate for Re-construction of 4.0 x 5.0m Box Cell Culvert.


Sl.
Items
No
1 Earth work in excavation of foundation of
structures as per drawing and technical
specification,
including
setting
out,
construction of shoring and bracing, removal
of stumps and other deleterious matter,
dressing of sides and bottom and backfilling
with

Box : L= 12 + 0.15x2 = 12.30, B=


5 + 0.70x2 + 1.50x2 + 0.1x2 = 9.60,
D= 0.3+0.68+0.15+0.3 = 1.43
Wing wall :
( 7.035 + 2.05 ) / 2 =4.54
Wing wall low end
Curtain wall up stream
Curtain wall down stream
Boulder appron curtain wall to box:
( 23.32
+ 5 ) / 2 = 14.16
Boulder appron after curtain wall at
D/S
Boulder appron after curtain wall at
U/S
Box Toe portion : 0.3 + 0.52 = 0.82

Quantity for
2

Height
in mtr

Quantity

Unit

Cum

12.20

7.70

1.43

134.33

12.95

4.54

2.45

576.58

4
1
1

1.40
23.32
23.32

2.05
1.50
1.85

2.45
2.45
2.95

28.13
85.70
127.27

14.16

9.16

0.75

194.56

3.00

23.32

1.05

73.46

1.50

23.32

1.05

36.73

9.60

0.82

0.52

8.19
1264.94

Cum

1264.94

Cum

Nos.

12.20

7.70

0.30

28.18

12.95

4.54

0.30

70.60

1.40

2.05

0.30

3.44

Rate

Amount
in Rs.

33.04

41794.00

416.72

42600.00

4411.08

504247.00

Sand Filling in Foundation Trenches as


per Drawing & Technical Specification

Below box
Wing wall :
( 7.035 + 2.05 ) / 2 = 4.54
Wing wall low end

Quantity for
3

Nos.

Total = 1 Nos.
Length
Breadth
in mtr
in mtr

102.23

Cum

102.23

Cum

Nos.

Below box

12.20

7.70

0.15

14.09

Below wing wall

12.95

4.54

0.15

35.30

Wing wall low end

1.40

2.05

0.15

1.72

M15 Grade Plain/Reinforced Cement


Concrete in Open Foundation complete
as per Drawing and Technical
Specifications.

PCC M15 under Curtain wall as per


drawing no- SD-111 (Sheet-4 of 4)

11.70

Floor apron as per drawing no- SD111 (Sheet-4 of 4)

38.90

Below approach slab

Quantity for

12.00

3.50

Nos.
Page 35

0.15

12.60
114.31

Cum

114.31

Cum

Box cell culvert 4x5

Sl.
Items
No
4 RCC M 25 in in Open Foundation
complete as per Drawing and
Technical Specifications.
Bottom slab
Toe portion :
(
0.3 + 0.82 ) / 2 = 0.56,
1.2
- 0.68 = 0.52

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

12.00

7.50

0.68

61.20

9.40

0.56

0.52

5.47

Unit

Rate

Amount
in Rs.

Cum

5653.89

376971.00

Cum

5990.09

434341.00

6491.08

358230.00

66.67
Quantity for
5

RCC M 25 in sub-structure complete


as per drawing and Technical
Specifications
Walls upto construction joint;
5.0 - 0.7 = 4.30
Haunch Bottom inside

Nos.

66.67

12.00

0.70

4.30

72.24

12.00

0.15

0.08

0.27
72.51

Quantity for
6

Nos.

Walls above construction joint

12.00

0.70

0.70

11.76

Haunch top inside

12.00

0.15

0.08

0.27

12.00

0.30

0.45

3.24

Top slab

12.00

5.10

0.58

35.50

Kerb: ( 6.4 + 3.5x2 ) = 13.40

13.40

0.55

0.30

4.42

RCC M 25 in super-structure as per


drawing and Technical Specification

Haunch for approach slab ;


( 0.3 + 0.6 ) / 2 = 0.45

Quantity for
7

72.51

Nos.

Quantity for

55.19

Cum

446.95

78.50

Nos.

525.45

Cum

525.45

Cum

5324.22

2797611.00

MT

53754.35

522419.00

Providing and laying HYSD bar


reinforcement in Superstructure
Foundation @ 0.05 MT/Cum

66.67

cum

3.334

Sub-Structure @ 0.05 MT/Cum

72.51

cum

3.626

Super-Structure @ 0.05 MT/Cum

55.19

cum

2.759
Total

Quantity for
9

Cum

Plain/Reinforced cement concrete M20 in open foundation and substructure as per drawing and
technical specifications and as per
clause No.1500,1700,2100 and 2100
of specificaion for Road and bridge
works of Ministry of Road Transport
and Highways (4th revision)etc
complete.
Wing wall
Wing wall as per drawing no- SD113 (Sheet-6 of 6)
Curtain wall
Curtain wall as per drawing no- SD111 (Sheet-4 of 4)

55.19

Nos.

9.72
9.72

Providing and laying HYSD bar


reinforcement in Substructure
Page 36

Box cell culvert 4x5

Sl.
No

Items

Nos.

Length
in mtr

0.1 % for Temparature bar

447

cum

Breadth
in mtr

Height
in mtr

Nos.

12.00

Unit

Rate

Amount
in Rs.

MT

53074.03

186213.00

8286.42

208818.00

3288.56

88133.00

45.94

585.00

33.05

762.00

1198.21

198009.00

155.12

21407.00

3.51
Total

Quantity for

Quantity

3.51
3.51

10 RCC M 30 in approach slab incl.


reinforcement
Approach slab

Quantity for

3.50

0.30

25.20
25.20

Cum
Cum

Nos.

25.20

13.40

26.80

11 Providing and constructing vertical


post and precast railing incl.
Reinforcement
Road side

Quantity for

Nos.

13.40

26.80

RM

26.80

RM

12 Providing and applying synthetic


enamel paint to kerb with alternate
strips
Kerb

Quantity for

Nos.

13.40

0.48

12.73
12.73

Sqm

12.73

Sqm

13 Providing and applying cement paint


to parapet and railing
Parapet

Quantity for

0.86

23.05
23.05

Sqm

23.05

Sqm

Nos.

Box wall

12.00

0.60

5.00

72.00

Wing wall

12.95

0.60

3.00

93.25

14 Providing and laying of Filter media


with granular materials/stone crushed
aggregates
satisfying
the
requirements laid down in clause
2504.2.2. of MoRTH specifications to
a thickness of not less than 600 mm
with smaller size towards the soil and
bigger si

Quantity for

Nos.

165.25

Cum

165.25

Cum

15 Providing weep holes in Brick


masonry/Plain/ Reinforced concrete
abutment, wing wall/ return wall with
100 mm dia AC pipe, extending
through the full width of the structure
with slope of 1V :20H towards
drawing foce. Complete as per
drawing and Technical
Abutment wall : 2 x 12 x2.5 = 60
Wing wall :
4x
{ 1/2x(5+1)x12.95} x0.5 = 78

Quantity for

60

60.00

78

78.00

Nos.

Page 37

138.00

No

138.00

No

Box cell culvert 4x5

Sl.
Items
No
16 Providing and laying Drainage Spouts
complete as per drawing and Technical
specification

Quantity for

Nos.

Length
in mtr

2.00

Nos.

10.90

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

4
4

Nos

Nos

8108.90

32436.00

17 Providing
and
laying
Cement
concrete wearing coat M-30 grade
including reinforcement complete as
per
drawing
and
Technical
Specifications
Over slab & approach slab

Quantity for

13.50

0.075

11.04
11.04

Cum

11.04

Cum

Nos.

Approach slab end

12.00

0.30

7.20

Wing wall and abutment joint

2.02

4.78

38.60

-do-

0.55

0.85

1.87

9548.93

105384.00

292.10

13925.00

14.14

102.00

587.70

46887.00

18 Providing & fixing 20 mm thick


compressible
fibre
board
in
expansion joint complete as per
drawing & Technical Specification.

Quantity for

Nos.

12.00

47.67

Sqm

47.67

Sqm

19 Providing & fixing Tar paper


Below approach slab

Quantity for

0.30

7.20
7.20

Sqm

7.20

Sqm

Nos.

4.00

68.12

sqm

0.15

40.87

14.16

9.16

0.15

38.91

20 Providing and laying Filter material

underneath pitching in slopes complete as


per drawing and Technical specification

Wing wall & return wall


12.95/(sq root 2), so A = 9.157
Return wall =1.40, so L = 9.157+1.40 =
10.55m
4 x[ (10.55+1.4)/2]x 11.40
Boulder appron curtain wall to box:
( 23.32
+ 5 ) / 2 = 14.16

Quantity for

Nos.

79.78

Cum

79.78

Cum

21 Providing and laying Pitching on slopes

laid over prepared filter media including


boulder apron laid dry in front of toe of
embankment complete as per drawing
and Technical specifications

Wing wall & return wall


12.95/(sq root 2), so A = 9.157

Page 38

Box cell culvert 4x5

Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

4.00

68.12

sqm

0.30

81.74

14.16

9.16

0.30

77.82

Unit

Rate

Amount
in Rs.

Return wall =1.40, so L = 9.157+1.40 =


10.55m
4 x[ (10.55+1.4)/2]x 11.40
Boulder appron curtain wall to box:
( 23.32
+ 5 ) / 2 = 14.16

Quantity for
22

159.56

Cum

Nos.

159.56

Cum

1052.97

168013.00

20%

159.56

31.91

Cum

3801.25

121307.00

3.00

23.32

0.75

52.47

1.50

23.32

0.75

26.24

4119.14

324197.00

Plain
cement
concrete
(1:3:6)
nominal mix in grouting appron and
revertments with crushed stone
aggregates 40mm nominal size
mechanically mixed, placed in
foundation and compacted by
vibration including curing for 14 days
complete in all respects as per
Taking 20% volume of stone pitching
vide item No.20 =

23 Providing and laying Flooring complete as

per drawing and Technical specifications


laid over cement concert bedding.

Boulder appron after curtain wall at


D/S
Boulder appron after curtain wall at
U/S

Quantity for

Nos.

12.00

78.71

Cum

78.71

Cum

24
Back filling with granular materials
behind abutment, wing wall and
return wall complete as per 710.1.4
of IRC:78 and 2200 of specificaion
for Road and bridge works of Ministry
of Road Transport and Highways (4th
revision) etc.complete.

0.40

Nos.

5.00

48.00
48.00

Cum

48.00

Cum

372.53

Total

Assistant Engineer
N.H, U.G. Section, M. Rampur

Page 39

17881.00
6612272.00

Executive Engineer
N.H Division, Kesinga.

Box cell culvert 4x5

Detailed Estimate for 5.0 x 3.0m Box Cell Culvert.


Total = 3 Nos
Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

12.20

9.60

1.170

137.03

Cum

4
4

6.844
1.4

2.641
2.01

1.95
1.95

140.99
21.95

1
1

12.68
12.68

1.50
1.85

2.45
2.95

46.60
69.2

4.84

7.84

0.75

56.92

3.00

12.68

1.05

39.94

1.50

12.68

1.05

19.97

2
-2
-2

9.60
1.870
2.300

1.08
Sqm
Sqm

0.78
1.95
1.95

16.17
-7.29
-8.97
532.51
1597.53

Cum
Cum

33.04

52782.00

Cum
Cum

416.72

75272.00

Cum
Cum

4411.08

842031.00

1 Earth work in excavation of foundation of structures as

per drawing and technical specification, including setting


out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of sides
and bottom and backfilling with

Box : L= 12 + 0.1x2 = 12.2, B= 3+


0.42x2 + 0.9x2 + 0.1x2 = 5.84, D=
0.3+0.42+0.15+0..3 = 1.17
Wing wall :
Wing wall low end
L=SQRT(4.84*4.84*2)=6.844
Curtain wall up stream
L=(4.84+4.84+3)=12.68
Curtain wall down stream
Boulder appron curtain wall to box:
B=( 12.68 + 3 ) / 2 = 7.84
D=0.3+0.3+0.15=0.75
Boulder appron after curtain wall at D/S
D=0.3+0.75=1.05 B=(4.84*2+3)=12.68
Boulder appron after curtain wall at U/S
D=0.3+0.75=1.05 B=(4.84*2+3)=12.69
Box Toe portion : 0.3 + 0.78 = 1.08
D=1.2-0.42=0.78
Deduction for Wing Wall Portion (U/S)
Deduction for Wing Wall Portion (D/S)
Quantity for
2 Sand Filling in Foundation Trenches as per Drawing
& Technical Specification

Nos.

Below box

12.20

9.60

0.30

35.14

Wing wall low end

4
4

6.844
1.4

2.641
2.01

0.30
0.30

Nos.

21.69
3.38
60.21
180.63

12.20

Wing wall :

Quantity for
3 M15 Grade Plain/Reinforced Cement Concrete in
Open Foundation complete as per Drawing and
Technical Specifications.
Below box
Box toe portion B=SQRT(0.78*0.78*2)=1.10

Below wing wall


Wing wall low end
Below curtain wall up stream
Below curtain wall down stream
Boulder appron curtain wall to box:
B=( 12.68 + 3 ) / 2 = 7.84
Below approach slab
Quantity for

9.60

0.15

17.57

9.60

1.10

0.15

3.17

4
4
1
1

6.844
1.40
12.68
12.68

2.641
2.01
1.50
1.85

0.15
0.15
0.15
0.15

10.85
1.69
2.85
3.52

2
2

4.84
12.00

7.84
3.50

0.15
0.15

11.38
12.6
63.63
190.89

Nos.

12.00

9.40

0.68

76.7

9.40

0.69

0.78

10.12
86.82

4 RCC M 25 in in Open Foundation complete


as per Drawing and Technical Specifications.

Bottom slab
Toe portion : ( 0.3 + 1.08 ) / 2 = 0.69
- 0.42 = 0.78

1.2

5x3 Box Cell Culvert

Cum
Page 40

Sl.
No

Items

Quantity for

Nos.

Length
in mtr

Nos.

2
2

12.00
12.00

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

260.46

Cum

5653.89

1472612.00

38.64
0.27
38.91
116.73

Cum
Cum

5990.09

699223.00

Cum
Cum

6491.08

1246872.00

Cum

5324.22

2276104.00

9.488
28.464

MT

53754.35

1530064.00

0.78
0.78
2.34

MT

53074.03

124193.00

25.2
25.2
75.6

Cum
Cum

8286.42

626453.00

26.80
26.80
80.4

RM
RM

3288.56

264400.00

12.73
12.73
38.19

Sqm
Sqm

45.94

1754.00

5 RCC M 25 in sub-structure complete as per


drawing and Technical Specifications

Walls upto construction joint; 3.0 - 0.7 =


2.3
Haunch Bottom inside
Quantity for

0.70
0.15

2.30
0.075

Nos.

2
2

12.00
12.00

0.70
0.15

0.70
0.075

11.76
0.27

2
1
2

12.00
12.00
13.40

0.30
6.40
0.53

0.45
0.58
0.30

3.24
44.54

6 RCC M 25 in super-structure as per drawing


and Technical Specification
Walls above construction joint
Haunch top inside
Haunch for approach slab ; ( 0.3 + 0.6 ) /
2 = 0.45
Top slab
Kerb: ( 3.84 + 3.5x2 ) =10.84
B=(0.55/0.5)/2=0.53
Quantity for

Nos.

4.22
64.03
192.09

7 PCC M20 in sub structure in wing wall


Wing wall
Wing wall as per drawing no- SD-113 (Sheet4 of 6)

99.80

Curtain wall
Curtain wall as per drawing no- SD-111
(Sheet-4 of 4)

42.70
Total

Quantity for
8

142.50

427.5

Nos.

Providing and laying HYSD bar reinforcement


in Superstructure
Foundation @ 0.05 MT/Cum

86.82 cum

4.341

Sub-Structure @ 0.05 MT/Cum

38.91 cum

1.946

Super-Structure @ 0.05 MT/Cum

64.03 cum

3.202

Total
Quantity for

Nos.

9 Providing and laying HYSD bar reinforcement


in Substructure

99.80 cum

0.1 % for Temparature bar


Quantity for

Nos.

12.00

10 RCC M 30 in approach slab incl.


reinforcement

Approach slab
Quantity for

Nos.

13.400

Nos.

13.400

Nos.

3.50

0.30

11 Providing and constructing vertical post and


precast railing incl. Reinforcement
Road side
Quantity for
12 Providing and applying synthetic enamel paint
to kerb with alternate strips

Kerb
Quantity for

0.475

5x3 Box Cell Culvert

Page 41

Sl.
No

Items

Nos.

Length
in mtr

13.400

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

23.05
23.05
69.15

Sqm
Sqm

33.05

2285.00

43.2
36.3
79.5
238.5

Cum
Cum

1198.21

285773.00

No
No

155.12

24199.00

13 Providing and applying cement paint to


parapet and railing

Parapet
Quantity for

Nos.

2
4

12.00
6.844

Nos.

0.86

14 Providing and laying of Filter media with


granular materials/stone crushed aggregates
satisfying the requirements laid down in
clause 2504.2.2. of MoRTH specifications to a
thickness of not less than 600 mm with
smaller size towards the soil and bigger size
towards the wall and provided over the entire
surface behind abutment, wing wall and return
wall to the full height compacted to a firm
condition complete as per drawing and
Technical Specification.
Box wall
Wing wall D=((3.79-1.5)+1)/2=1.65
Quantity for

0.60
0.60

3.00
2.21

15 Providing weep holes in Brick masonry/Plain/

Reinforced concrete abutment, wing wall/


return wall with 100 mm dia AC pipe,
extending through the full width of the
structure with slope of 1V :20H towards
drawing foce. Complete as per drawing and
Technical Specifications

Abutment wall : 2 x 12 = 24

24

24

Wing wall : 4 x {(3+1)/2x6.844} x0.5= 12

28
3

Nos.

28
52
156

2.00

Nos.

2
6

Nos
Nos

10.90

Nos.

8.86
8.86
26.58

Cum
Cum

9548.93

253811.00

Approach slab end


2
Wing wall and abutment joint
4
For inside hunch (Triangular Portion)
4
Haunch for approach slab ; ( 0.3 + 0.6 ) / 2 = 0.454

12.00
0.42
0.15

7.20
5.75
0.05
0.54
13.54
40.62

Sqm
Sqm

292.10

11865.00

7.20
7.20
21.60

Sqm
Sqm

14.14

305.00

Quantity for
16 Providing and laying Drainage Spouts complete as per
drawing and Technical specification

Quantity for
17 Providing and laying Cement concrete
wearing
coat
M-30
grade
including
reinforcement complete as per drawing and
Technical Specifications

Over slab
Quantity for

10.84

0.075

8171.02

49026.00

18 Providing & fixing 20 mm thick compressible

fibre board in expansion joint complete as per


drawing & Technical Specification.

Quantity for
19 Providing & fixing Tar paper
Below approach slab
Quantity for
20 Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
Technical specification

Nos.

12.00

Nos.

0.30
3.420
0.075
0.300

0.30

0.45

Wing wall & return wall

5x3 Box Cell Culvert

Page 42

Sl.
No

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

4 x[ (6.24+1.4)/2]x 4.84

4.00

18.49

sqm

0.15

11.09

Boulder appron curtain wall to box:


B=( 12.68 + 3 ) / 2 = 7.84
D=0.3+0.3+0.15=0.75

4.84

7.84

0.15

Nos.

4.00

18.49

sqm

0.30

4.84

7.84

0.30

Nos.

20%

134.87

3.00

12.68

0.30

11.41

1.50

12.68

0.30

Nos.

12.00

Nos.

Items

Rate

Amount
in Rs.

587.70

39623.00

1052.97

142014.00

Cum

3801.25

102535.00

5.71
17.12
51.36

Cum
Cum

4119.14

211559.00

24.00
24.00
72.00

Cum
Cum

372.53

26822.00

Total

10361577.00

Unit

6.84/(sq. root 2), so A = 4.84


Return wall =1.40, so L = 4.84+1.40 = 6.24m

Quantity for
21 Providing and laying Pitching on slopes laid over
prepared filter media including boulder apron laid
dry in front of toe of embankment complete as per
drawing and Technical specifications

11.38
22.47
Cum
67.41984 Cum

Wing wall & return wall


6.84/(sq. root 2), so A = 4.84
Return wall =1.40, so L = 4.84+1.40 = 6.24m
4 x[ (6.24+1.4)/2]x 4.84

Boulder appron curtain wall to box:


B=( 12.68 + 3 ) / 2 = 7.84
D=0.3+0.3+0.15=0.75
Quantity for
22

22.19

22.77
44.96
Cum
134.8697 Cum

Plain cement concrete (1:3:6) nominal mix in


grouting appron and revertments with crushed
stone aggregates 40mm nominal size
mechanically mixed, placed in foundation and
compacted by vibration including curing for 14
days complete in all respects as per
Taking 20% volume of stone pitching vide item
No.20 =

26.97

23 Providing and laying Flooring complete as per


drawing and Technical specifications laid over
cement concert bedding.
Boulder appron after curtain wall at D/S
Boulder appron after curtain wall at U/S

Quantity for
24 Back filling with granular materials behind
abutment, wing wall and return wall complete
as per 710.1.4 of IRC:78 and 2200
of
specificaion for Road and bridge works of
Ministry of Road Transport and Highways (4th
revision) etc.complete.

0.40

2.50

Assistant Engineer
N.H, U.G. Section, M. Rampur

Executive Engineer
N.H Division, Kesinga.

5x3 Box Cell Culvert

Page 43

Detailed Estimate for 5.0 x 2.0m Box Cell Culvert.


Total = 2 Nos.
Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

12.20

9.60

1.130

132.35

Cum

4
4
1
1

3.818
1.4
7.4
7.4

2.228
2.01
1.50
1.85

1.95
1.95
2.45
2.95

66.35
21.95
27.20
40.39

2.7

4.7

0.75

19.04

3.00

7.4

1.05

23.31

1.50

7.4

1.05

11.66

2
-2
-2

9.60
1.600
1.930

1.12
Sqm
Sqm

0.82
1.95
1.95

17.63
-6.24
-7.53
346.11
692.22

Cum
Cum

33.04

22871.00

Cum
Cum

416.72

40614.00

Cum
Cum

4411.08

421964.00

Cum
Cum

5653.89

991127.00

1 Earth work in excavation of foundation of structures as

per drawing and technical specification, including setting


out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of sides
and bottom and backfilling with

Box : L= 12 + 0.1x2 = 12.2, B= 2 +


0.3x2 + 0.5x2 + 0.1x2 = 3.8, D=
0.3+0.38+0.15+0..3 = 1.13
Wing wall :
Wing wall low end
Curtain wall up stream
Curtain wall down stream
Boulder appron curtain wall to box:
B=( 7.4 + 2 ) / 2 = 4.7
D=0.3+0.3+0.15=0.75
Boulder appron after curtain wall at D/S
D=0.3+0.75=1.05
Boulder appron after curtain wall at U/S
D=0.3+0.75=1.05
Box Toe portion : 0.3 + 0.82 = 1.12
D=1.2-0.38=0.82
Deduction for Wing Wall Portion (U/S)
Deduction for Wing Wall Portion (D/S)
Quantity for
2 Sand Filling in Foundation Trenches as per
Drawing & Technical Specification

Nos.

Below box

12.20

9.60

0.30

35.14

Wing wall low end

4
4

3.818
1.4

2.228
2.01

0.30
0.30

Nos.

10.21
3.38
48.73
97.46

Below box
Box toe portion
B=SQRT(0.82*0.82*2)=1.16

12.20

9.60

Below wing wall


Wing wall low end
Below curtain wall up stream
Below curtain wall down stream
Boulder appron curtain wall to box:
B=( 7.4 + 2 ) / 2 = 4.7
Below approach slab

4
4
1
1

3.818
1.40
7.40
7.40

2
2

2.70
12.00

4.70
3.50

Nos.

12.00

9.40

0.68

76.7

9.40

0.71

0.82

Nos.

10.95
87.65
175.3

Wing wall :

Quantity for
3 M15 Grade Plain/Reinforced Cement Concrete in
Open Foundation complete as per Drawing and
Technical Specifications.

Quantity for

9.60

0.15

17.57

1.16

0.15

3.34

2.228
2.01
1.50
1.85

0.15
0.15
0.15
0.15

5.1
1.69
1.67
2.05

0.15
0.15

3.81
12.6
47.83
95.66

4 RCC M 25 in in Open Foundation complete


as per Drawing and Technical Specifications.

Bottom slab
Toe portion : ( 0.3 + 1.12 ) / 2 = 0.71
- 0.38 = 0.82

1.2

Quantity for
5 RCC M 25 in sub-structure complete as per
drawing and Technical Specifications

5x2 Box cell culvert

Page 44

Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Walls upto construction joint; 2.0 - 0.7 =


1.3
Haunch Bottom inside

2
2

12.00
12.00

0.70
0.15

1.30
0.075

Nos.

2
2

12.00
12.00

0.70
0.15

0.70
0.075

11.76
0.27

2
1
2

12.00
12.00
13.40

0.30
6.40
0.53

0.45
0.58
0.30

3.24
44.54

Nos.

Quantity for

Quantity

Unit

Rate

Amount
in Rs.

21.84
0.27
22.11
44.22

Cum
Cum

5990.09

264882.00

Cum
Cum

6491.08

831248.00

6 RCC M 25 in super-structure as per drawing


and Technical Specification

Walls above construction joint


Haunch top inside
Haunch for approach slab ; ( 0.3 + 0.6 ) /
2 = 0.45
Top slab
Kerb: ( 2.6 + 3.5x2 ) =9.6
B=(0.55/0.5)/2=0.53
Quantity for

4.22
64.03
128.06

7 PCC M20 in sub structure in wing wall


4.1

Wing wall
Wing wall as per drawing no- SD-113
(Sheet-6 of 6)

47.10

Curtain wall
Curtain wall as per drawing no- SD-111
(Sheet-4 of 4)

24.90
Total

Quantity for
8

72.00

144

Nos.

Cum

5324.22

766688.00

8.690
17.379

MT

53754.35

934197.00

0.471
0.471
0.942

MT

53074.03

49996.00

25.2
50.4

Cum
Cum

8286.42

417636.00

26.80
26.80
53.6

RM
RM

3288.56

176267.00

12.73
12.73
25.46

Sqm
Sqm

45.94

1170.00

Providing and laying HYSD bar reinforcement


in Super structure
Foundation @ 0.05 MT/Cum

87.65 cum

4.383

Sub-Structure @ 0.05 MT/Cum

22.11 cum

1.106

Super-Structure @ 0.05 MT/Cum

64.03 cum

3.202

Total
Quantity for

Nos.

9 Providing and laying HYSD bar reinforcement


in Substructure

47.10 cum

0.1 % for Temparature bar


Quantity for
10 RCC M 30 in approach slab incl.

Nos.

12.00

Nos.

13.400

Nos.

13.400

Nos.

13.400

reinforcement

Approach slab

Quantity for

3.50

0.30

25.2

11 Providing and constructing vertical post and


precast railing incl. Reinforcement

Road side
Quantity for
12 Providing and applying synthetic enamel paint
to kerb with alternate strips

Kerb
Quantity for

0.475

13 Providing and applying cement paint to


parapet and railing

Parapet

5x2 Box cell culvert

0.86

23.05
Page 45

Sl.
No

Items

Quantity for

Nos.

Length
in mtr

Nos.

2
4

12.00
3.818

Nos.

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

23.05
46.1

Sqm
Sqm

33.05

1524.00

28.8
15.35
44.15
88.3

Cum
Cum

1198.21

105802.00

No
No

155.12

11169.00

14 Providing and laying of Filter media with

granular materials/stone crushed aggregates


satisfying the requirements laid down in
clause 2504.2.2. of MoRTH specifications to a
thickness of not less than 600 mm with
smaller size towards the soil and bigger size
towards the wall and provided over the entire
surface behind abutment, wing wall and
return wall to the full height compacted to a
firm condition complete as per drawing and
Technical Specification.

Box wall
Wing wall
Quantity for

0.60
0.60

2.00
1.675

15 Providing weep holes in Brick masonry/Plain/

Reinforced concrete abutment, wing wall/


return wall with 100 mm dia AC pipe,
extending through the full width of the
structure with slope of 1V :20H towards
drawing foce. Complete as per drawing and
Technical

Abutment wall : 2 x 12 = 24

24

24

Wing wall : 4 x {(2+1)/2x3.818} x0.5= 12

12
2

Nos.

12
36
72

2.00

Nos.

2
4

Nos
Nos

10.90

Nos.

11.04
11.04
22.08

Cum
Cum

9548.93

210840.00

Approach slab end


2
Wing wall and abutment joint
4
For inside hunch (Triangular Portion)
4
Haunch for approach slab ; ( 0.3 + 0.6 ) / 2 = 0.454

12.00
0.30
0.15

7.20
2.82
0.05
0.54
10.02
20.04

Sqm
Sqm

292.10

5854.00

7.20
7.20
14.40

Sqm
Sqm

14.14

204.00

Quantity for
16 Providing and laying Drainage Spouts complete as per
drawing and Technical specification

Quantity for

8171.02

32684.00

17 Providing and laying Cement concrete

wearing coat M-30 grade including


reinforcement complete as per drawing and
Technical Specifications

Over slab
Quantity for

13.50

0.075

18 Providing & fixing 20 mm thick compressible

fibre board in expansion joint complete as per


drawing & Technical Specification.

Quantity for

Nos.

12.00

Nos.

4.00

7.43

0.30
2.350
0.075
0.300

0.45

19 Providing & fixing Tar paper


Below approach slab
Quantity for
20 Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
Technical specification

0.30

Wing wall & return wall


3.82/(sq. root 2), so A = 2.70
Return wall =1.40, so L = 2.70+1.40 =4.1m
4 x[ (4.1+1.4)/2]x 2.7

sqm

5x2 Box cell culvert

0.15

4.46

Page 46

Sl.
No

Items

Boulder appron curtain wall to box:


B=( 7.4 + 2 ) / 2 = 4.7
D=0.3+0.3+0.15=0.75
Quantity for
21 Providing and laying Pitching on slopes laid over
prepared filter media including boulder apron laid
dry in front of toe of embankment complete as per
drawing and Technical specifications

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

2.7

4.7

0.15

Rate

Amount
in Rs.

Quantity

Unit

3.81
8.27
16.53

Cum
Cum

587.70

9715.00

1052.97

34790.00

Nos.

4.00

7.43

sqm

0.30

8.91

2.7

4.7

0.3

7.61

Nos.

16.52
33.04

Cum
Cum

20%

33.04

6.61

Cum

3801.25

25119.00

3.00

7.40

0.30

6.66

1.50

7.40

0.30

3.33
9.99
19.98

Cum
Cum

4119.14

82300.00

19.20
19.20
38.40

Cum
Cum

372.53

14305.00

Total

5452966.00

Wing wall & return wall


3.82/(sq. root 2), so A = 2.70
Return wall =1.40, so L = 2.70+1.40 =4.1m
4 x[ (4.1+1.4)/2]x 2.7

Boulder appron curtain wall to box:


B=( 7.4 + 2 ) / 2 = 4.7
D=0.3+0.3+0.15=0.75

Quantity for
22

Plain cement concrete (1:3:6) nominal mix in


grouting appron and revertments with crushed
stone aggregates 40mm nominal size
mechanically mixed, placed in foundation and
compacted by vibration including curing for 14
days complete in all respects as per
Taking 20% volume of stone pitching vide
item No.20 =

23 Providing and laying Flooring complete as per


drawing and Technical specifications laid over
cement concert bedding.
Boulder appron after curtain wall at D/S
Boulder appron after curtain wall at U/S

Quantity for

Nos.

12.00

Nos.

24 Back filling with granular materials behind


abutment, wing wall and return wall complete
as per 710.1.4 of IRC:78 and 2200 of
specificaion for Road and bridge works of
Ministry of Road Transport and Highways (4th
revision) etc.complete.
0.40

Assistant Engineer
N.H, U.G. Section, M. Rampur

5x2 Box cell culvert

2.00

Executive Engineer
N.H Division, Kesinga.

Page 47

Detailed Estimate for Re-construction of 5.0 x 5.0m Box Cell Culvert.


Sl.
Items
No
1 Earth work in excavation of foundation of
structures as per drawing and technical
specification,
including
setting
out,
construction of shoring and bracing, removal
of stumps and other deleterious matter,
dressing of sides and bottom and backfilling
with

Box : L= 12 + 0.15x2 = 12.30, B=


5 + 0.70x2 + 1.50x2 + 0.1x2 = 9.60,
D= 0.3+0.68+0.15+0.3 = 1.43
Wing wall :
( 7.035 + 2.05 ) / 2 =4.54
Wing wall low end
Curtain wall up stream
Curtain wall down stream
Boulder appron curtain wall to box:
( 23.32
+ 5 ) / 2 = 14.16
Boulder appron after curtain wall at
D/S
Boulder appron after curtain wall at
U/S
Box Toe portion : 0.3 + 0.52 = 0.82

Quantity for
2

At CD No- 185/1, 186/1, 187/1 & 191/3.


Total = 4 Nos.
Length
Breadth
Height
Nos.
Quantity
in mtr
in mtr
in mtr

12.90

9.60

1.43

177.09

12.95

4.54

2.45

576.58

4
1
1

1.40
23.32
23.32

2.05
1.50
1.85

2.45
2.45
2.95

28.13
85.70
127.27

14.16

9.16

0.75

194.56

3.00

23.32

1.05

73.46

1.50

23.32

1.05

36.73

9.60

0.82

0.52

8.19

Unit

Cum

5230.79

Cum

Nos.

12.90

9.60

0.30

37.15

12.95

4.54

0.30

70.60

1.40

2.05

0.30

3.44

Amount
in Rs.

33.04

172825.00

416.72

185353.00

Cum

1307.70
4

Rate

Sand Filling in Foundation Trenches as


per Drawing & Technical Specification

Below box
Wing wall :
( 7.035 + 2.05 ) / 2 = 4.54
Wing wall low end

Quantity for

Nos.

Page 48

111.20

Cum

444.79

Cum

Box cell culvert 5x5

Sl.
Items
No
3 M15 Grade Plain/Reinforced Cement

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Below box

12.90

9.60

0.15

18.58

Below wing wall

12.95

4.54

0.15

35.30

Wing wall low end

1.40

2.05

0.15

1.72

Unit

Rate

Amount
in Rs.

Concrete in Open Foundation complete


as per Drawing and Technical
Specifications.

PCC M15 under Curtain wall as per


drawing no- SD-111 (Sheet-4 of 4)

11.70

Floor apron as per drawing no- SD111 (Sheet-4 of 4)

38.90

Below approach slab

12.90

3.50

0.15

13.55
119.74

Cum

478.97

Cum

4411.08

2112796.00

Cum

5653.89

1988617.00

Cum

5990.09

1867668.00

6491.08

1784321.00

Quantity for

Nos.

RCC M 25 in in Open Foundation


complete as per Drawing and
Technical Specifications.
Bottom slab
Toe portion :
(
0.3 + 0.82 ) / 2 = 0.56,
1.2
- 0.68 = 0.52

12.90

9.40

0.68

82.46

9.40

0.56

0.52

5.47
87.93

Quantity for
5

RCC M 25 in sub-structure complete


as per drawing and Technical
Specifications
Walls upto construction joint;
5.0 - 0.7 = 4.30
Haunch Bottom inside

Nos.

351.73

12.90

0.70

4.30

77.66

12.90

0.15

0.08

0.29
77.95

Quantity for
6

Nos.

311.79

Walls above construction joint

12.90

0.70

0.70

12.64

Haunch top inside

12.90

0.15

0.08

0.29

12.90

0.30

0.45

3.48

Top slab

12.90

6.40

0.58

47.88

Kerb: ( 6.4 + 3.5x2 ) = 13.40

13.40

0.55

0.30

4.42

RCC M 25 in super-structure as per


drawing and Technical Specification

Haunch for approach slab ;


( 0.3 + 0.6 ) / 2 = 0.45

Quantity for

Nos.

Page 49

68.72

Cum

274.89

Cum

Box cell culvert 5x5

Sl.
Items
No
7 Plain/Reinforced cement concrete M20 in open foundation and substructure as per drawing and
technical specifications and as per
clause No.1500,1700,2100 and 2100
of specificaion for Road and bridge
works of Ministry of Road Transport
and Highways (4th revision)etc
complete.

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Wing wall
Wing wall as per drawing no- SD113 (Sheet-6 of 6)
Curtain wall
Curtain wall as per drawing no- SD111 (Sheet-4 of 4)

Quantity for
8

Rate

Amount
in Rs.

78.50

Nos.

525.45

Cum

2101.80

Cum

5324.22

11190446.00

MT

53754.35

3083134.00

MT

53074.03

744853.00

8286.42

897916.00

3288.56

352534.00

45.94

2339.00

14.339
Total

Unit

446.95

Providing and laying HYSD bar


reinforcement in Superstructure
Reiforcement as per drawing noSD-108 (Sheet- 5 of 6)

Quantity for

Quantity

14.34

Nos.

57.36

447

cum

3.51

Providing and laying HYSD bar


reinforcement in Substructure
0.1 % for Temparature bar

Total
Quantity for

Nos.

12.90

3.51
14.03

10 RCC M 30 in approach slab incl.


reinforcement
Approach slab

Quantity for

3.50

0.30

27.09
27.09

Cum
Cum

Nos.

108.36

13.40

26.80

11 Providing and constructing vertical


post and precast railing incl.
Reinforcement
Road side

Quantity for

Nos.

13.40

26.80

RM

107.20

RM

12 Providing and applying synthetic


enamel paint to kerb with alternate
strips
Kerb

Quantity for

0.48

Nos.

Page 50

12.73
12.73

Sqm

50.92

Sqm

Box cell culvert 5x5

Sl.
Items
No
13 Providing and applying cement paint
to parapet and railing
Parapet

Quantity for

Nos.

Length
in mtr

13.40

Breadth
in mtr

Height
in mtr

Quantity

0.86

23.05

Unit

23.05

Sqm

92.19

Sqm

Nos.

Box wall

12.90

0.60

5.00

77.40

Wing wall

12.95

0.60

3.00

93.25

Rate

Amount
in Rs.

33.05

3047.00

1198.21

817919.00

155.12

85626.00

14 Providing and laying of Filter media


with granular materials/stone crushed
aggregates
satisfying
the
requirements laid down in clause
2504.2.2. of MoRTH specifications to
a thickness of not less than 600 mm
with smaller size towards the soil and
bigger si

Quantity for

Nos.

170.65

Cum

682.62

Cum

15 Providing weep holes in Brick


masonry/Plain/ Reinforced concrete
abutment, wing wall/ return wall with
100 mm dia AC pipe, extending
through the full width of the structure
with slope of 1V :20H towards
drawing foce. Complete as per
drawing and Technical
Abutment wall : 2 x 12 x2.5 = 60
Wing wall :
4x
{ 1/2x(5+1)x12.95} x0.5 = 78

Quantity for
16 Providing and laying Drainage Spouts
complete as per drawing and Technical
specification

Quantity for

60

60.00

78

78.00
138.00

No
No

Nos.

552.00

2.00

Nos.

11.80

Nos

16

Nos

8108.90

129742.00

17 Providing
and
laying
Cement
concrete wearing coat M-30 grade
including reinforcement complete as
per
drawing
and
Technical
Specifications
Over slab & approach slab

Quantity for

13.50

Nos.

Page 51

0.075

11.95
11.95

Cum

47.79

Cum

9548.93

456343.00

Box cell culvert 5x5

Sl.
Items
No
18 Providing & fixing 20 mm thick
compressible
fibre
board
in
expansion joint complete as per
drawing & Technical Specification.

Nos.

Length
in mtr

Breadth
in mtr

Approach slab end

12.90

0.30

7.74

Wing wall and abutment joint

2.02

4.78

38.60

-do-

0.55

0.85

1.87

Quantity for

Nos.

12.90

Height
in mtr

Quantity

Unit

48.21

Sqm

192.85

Sqm

Rate

Amount
in Rs.

292.10

56331.00

14.14

438.00

587.70

187548.00

1052.97

672053.00

19 Providing & fixing Tar paper


Below approach slab

Quantity for

0.30

7.74
7.74

Sqm

30.96

Sqm

Nos.

4.00

68.12

sqm

0.15

40.87

14.16

9.16

0.15

38.91

20 Providing and

laying Filter material


underneath pitching in slopes complete as
per drawing and Technical specification

Wing wall & return wall


12.95/(sq root 2), so A = 9.157
Return wall =1.40, so L = 9.157+1.40 =
10.55m
4 x[ (10.55+1.4)/2]x 11.40
Boulder appron curtain wall to box:
( 23.32
+ 5 ) / 2 = 14.16

Quantity for

79.78

Cum

319.12

Cum

Nos.

4.00

68.12

sqm

0.30

81.74

14.16

9.16

0.30

77.82

21 Providing and laying Pitching on slopes

laid over prepared filter media including


boulder apron laid dry in front of toe of
embankment complete as per drawing
and Technical specifications

Wing wall & return wall


12.95/(sq root 2), so A = 9.157
Return wall =1.40, so L = 9.157+1.40 =
10.55m
4 x[ (10.55+1.4)/2]x 11.40
Boulder appron curtain wall to box:
( 23.32
+ 5 ) / 2 = 14.16

Quantity for

Nos.

Page 52

159.56

Cum

638.25

Cum

Box cell culvert 5x5

Sl.
No
22

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

20%

638.25

127.65

Cum

3801.25

485226.00

3.00

23.32

0.75

52.47

1.50

23.32

0.75

26.24

4119.14

1296788.00

372.53

76890.00

Plain
cement
concrete
(1:3:6)
nominal mix in grouting appron and
revertments with crushed stone
aggregates 40mm nominal size
mechanically mixed, placed in
foundation and compacted by
vibration including curing for 14 days
complete in all respects as per
Taking 20% volume of stone pitching
vide item No.20 =

23 Providing and laying Flooring complete as

per drawing and Technical specifications


laid over cement concert bedding.

Boulder appron after curtain wall at


D/S
Boulder appron after curtain wall at
U/S

Quantity for

Nos.

12.90

78.71

Cum

314.82

Cum

24
Back filling with granular materials
behind abutment, wing wall and
return wall complete as per 710.1.4
of IRC:78 and 2200 of specificaion
for Road and bridge works of Ministry
of Road Transport and Highways (4th
revision) etc.complete.

0.40

Nos.

5.00

51.60
51.60

Cum

206.40

Cum
Total

Junior Engineer
N.H Section, Kesinga.

Assistant Engineer
N.H Sub division,Kesinga

Page 53

28650753.00

Executive Engineer
N.H Division, Kesinga.

Box cell culvert 5x5

Detailed Estimate for 6.0 x 3.0m Box Cell Culvert.


Total = 2 Nos
Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

12.20

11.50

1.170

164.15

Cum

4
4

6.844
1.4

2.641
2.01

1.95
1.95

140.99
21.95

1
1

12.68
12.68

1.50
1.85

2.45
2.95

46.60
69.2

4.84

7.84

0.75

56.92

3.00

12.68

1.05

39.94

1.50

12.68

1.05

19.97

2
-2
-2

11.50
1.870
2.300

1.08
Sqm
Sqm

0.78
1.95
1.95

19.38
-7.29
-8.97
562.84
1125.68

Cum
Cum

33.04

37192.00

Cum
Cum

416.72

55974.00

Cum
Cum

4411.08

597613.00

1 Earth work in excavation of foundation of structures as

per drawing and technical specification, including setting


out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of sides
and bottom and backfilling with

Box : L= 12 + 0.1x2 = 12.2, B= 3+


0.42x2 + 0.9x2 + 0.1x2 = 5.84, D=
0.3+0.42+0.15+0..3 = 1.17
Wing wall :
Wing wall low end
L=SQRT(4.84*4.84*2)=6.844
Curtain wall up stream
L=(4.84+4.84+3)=12.68
Curtain wall down stream
Boulder appron curtain wall to box:
B=( 12.68 + 3 ) / 2 = 7.84
D=0.3+0.3+0.15=0.75
Boulder appron after curtain wall at D/S
D=0.3+0.75=1.05 B=(4.84*2+3)=12.68
Boulder appron after curtain wall at U/S
D=0.3+0.75=1.05 B=(4.84*2+3)=12.69
Box Toe portion : 0.3 + 0.78 = 1.08
D=1.2-0.42=0.78
Deduction for Wing Wall Portion (U/S)
Deduction for Wing Wall Portion (D/S)
Quantity for
2 Sand Filling in Foundation Trenches as per Drawing
& Technical Specification

Nos.

Below box

12.20

11.50

0.30

42.09

Wing wall low end

4
4

6.844
1.4

2.641
2.01

0.30
0.30

Nos.

21.69
3.38
67.16
134.32

12.20

Wing wall :

Quantity for
3 M15 Grade Plain/Reinforced Cement Concrete in
Open Foundation complete as per Drawing and
Technical Specifications.
Below box
Box toe portion B=SQRT(0.78*0.78*2)=1.10

Below wing wall


Wing wall low end
Below curtain wall up stream
Below curtain wall down stream
Boulder appron curtain wall to box:
B=( 12.68 + 3 ) / 2 = 7.84
Below approach slab
Quantity for

11.50

0.15

21.05

11.50

1.10

0.15

3.8

4
4
1
1

6.844
1.40
12.68
12.68

2.641
2.01
1.50
1.85

0.15
0.15
0.15
0.15

10.85
1.69
2.85
3.52

2
2

4.84
12.00

7.84
3.50

0.15
0.15

11.38
12.6
67.74
135.48

Nos.

12.00

11.30

0.8

108.48

11.30

0.69

0.78

12.16
120.64

4 RCC M 25 in in Open Foundation complete


as per Drawing and Technical Specifications.

Bottom slab
Toe portion : ( 0.3 + 1.08 ) / 2 = 0.69
- 0.42 = 0.78

1.2

6x3 Box Cell Culvert

Cum
Page 54

Sl.
No

Items

Quantity for

Nos.

Length
in mtr

Nos.

2
2

12.00
12.00

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

241.28

Cum

5653.89

1364171.00

46.92
0.27
47.19
94.38

Cum
Cum

5990.09

565345.00

Cum
Cum

6491.08

1130746.00

Cum

5324.22

1517403.00

12.75
25.493

MT

53754.35

1370360.00

0.78
0.78
1.56

MT

53074.03

82795.00

25.2
25.2
50.4

Cum
Cum

8286.42

417636.00

29.40
29.40
58.8

RM
RM

3288.56

193367.00

13.97
13.97
27.94

Sqm
Sqm

45.94

1284.00

5 RCC M 25 in sub-structure complete as per


drawing and Technical Specifications

Walls upto construction joint; 3.0 - 0.7 =


2.3
Haunch Bottom inside
Quantity for

0.85
0.15

2.30
0.075

Nos.

2
2

12.00
12.00

0.85
0.15

0.70
0.075

14.28
0.27

2
1
2

12.00
12.00
14.70

0.30
7.70
0.53

0.45
0.7
0.30

3.24
64.68

6 RCC M 25 in super-structure as per drawing


and Technical Specification
Walls above construction joint
Haunch top inside
Haunch for approach slab ; ( 0.3 + 0.6 ) /
2 = 0.45
Top slab
Kerb: ( 3.84 + 3.5x2 ) =10.84
B=(0.55/0.5)/2=0.53
Quantity for

Nos.

4.63
87.1
174.2

7 PCC M20 in sub structure in wing wall


Wing wall
Wing wall as per drawing no- SD-113 (Sheet4 of 6)

99.80

Curtain wall
Curtain wall as per drawing no- SD-111
(Sheet-4 of 4)

42.70
Total

Quantity for
8

142.50

285

Nos.

Providing and laying HYSD bar reinforcement


in Superstructure

120.64 cum

6.032

Sub-Structure @ 0.05 MT/Cum

47.19 cum

2.360

Super-Structure @ 0.05 MT/Cum

87.10 cum

4.355

Foundation @ 0.05 MT/Cum

Total
Quantity for

Nos.

9 Providing and laying HYSD bar reinforcement


in Substructure

99.80 cum

0.1 % for Temparature bar


Quantity for

Nos.

12.00

10 RCC M 30 in approach slab incl.


reinforcement

Approach slab
Quantity for

Nos.

14.700

Nos.

14.700

Nos.

3.50

0.30

11 Providing and constructing vertical post and


precast railing incl. Reinforcement
Road side
Quantity for
12 Providing and applying synthetic enamel paint
to kerb with alternate strips

Kerb
Quantity for

0.475

6x3 Box Cell Culvert

Page 55

Sl.
No

Items

Nos.

Length
in mtr

14.700

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

25.28
25.28
50.56

Sqm
Sqm

33.05

1671.00

43.2
36.3
79.5
159

Cum
Cum

1198.21

190515.00

No
No

155.12

16132.00

13 Providing and applying cement paint to


parapet and railing

Parapet
Quantity for

Nos.

2
4

12.00
6.844

Nos.

0.86

14 Providing and laying of Filter media with


granular materials/stone crushed aggregates
satisfying the requirements laid down in
clause 2504.2.2. of MoRTH specifications to a
thickness of not less than 600 mm with
smaller size towards the soil and bigger size
towards the wall and provided over the entire
surface behind abutment, wing wall and return
wall to the full height compacted to a firm
condition complete as per drawing and
Technical Specification.
Box wall
Wing wall D=((3.79-1.5)+1)/2=1.65
Quantity for

0.60
0.60

3.00
2.21

15 Providing weep holes in Brick masonry/Plain/

Reinforced concrete abutment, wing wall/


return wall with 100 mm dia AC pipe,
extending through the full width of the
structure with slope of 1V :20H towards
drawing foce. Complete as per drawing and
Technical Specifications

Abutment wall : 2 x 12 = 24

24

24

Wing wall : 4 x {(3+1)/2x6.844} x0.5= 12

28
2

Nos.

28
52
104

2.00

Nos.

2
4

Nos
Nos

10.90

Nos.

8.86
8.86
17.72

Cum
Cum

9548.93

169207.00

Approach slab end


2
Wing wall and abutment joint
4
For inside hunch (Triangular Portion)
4
Haunch for approach slab ; ( 0.3 + 0.6 ) / 2 = 0.45 4

12.00
0.42
0.15

7.20
5.75
0.05
0.54
13.54
27.08

Sqm
Sqm

292.10

7910.00

7.20
7.20
14.40

Sqm
Sqm

14.14

204.00

Quantity for
16 Providing and laying Drainage Spouts complete as per
drawing and Technical specification

Quantity for
17 Providing and laying Cement concrete
wearing
coat
M-30
grade
including
reinforcement complete as per drawing and
Technical Specifications

Over slab
Quantity for

10.84

0.075

8171.02

32684.00

18 Providing & fixing 20 mm thick compressible

fibre board in expansion joint complete as per


drawing & Technical Specification.

Quantity for
19 Providing & fixing Tar paper
Below approach slab
Quantity for
20 Providing and laying Filter material underneath
pitching in slopes complete as per drawing and
Technical specification

Nos.

12.00

Nos.

0.30
3.420
0.075
0.300

0.30

0.45

Wing wall & return wall

6x3 Box Cell Culvert

Page 56

Sl.
No

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

4 x[ (6.24+1.4)/2]x 4.84

4.00

18.49

sqm

0.15

11.09

Boulder appron curtain wall to box:


B=( 12.68 + 3 ) / 2 = 7.84
D=0.3+0.3+0.15=0.75

4.84

7.84

0.15

Nos.

4.00

18.49

sqm

0.30

4.84

7.84

0.30

Nos.

20%

89.91

3.00

12.68

0.30

11.41

1.50

12.68

0.30

Nos.

12.00

Nos.

Items

Rate

Amount
in Rs.

587.70

26415.00

1052.97

94676.00

Cum

3801.25

68356.00

5.71
17.12
34.24

Cum
Cum

4119.14

141039.00

24.00
24.00
48.00

Cum
Cum

372.53

17881.00

Total

8100576.00

Unit

6.84/(sq. root 2), so A = 4.84


Return wall =1.40, so L = 4.84+1.40 = 6.24m

Quantity for
21 Providing and laying Pitching on slopes laid over
prepared filter media including boulder apron laid
dry in front of toe of embankment complete as per
drawing and Technical specifications

11.38
22.47
Cum
44.94656 Cum

Wing wall & return wall


6.84/(sq. root 2), so A = 4.84
Return wall =1.40, so L = 4.84+1.40 = 6.24m
4 x[ (6.24+1.4)/2]x 4.84

Boulder appron curtain wall to box:


B=( 12.68 + 3 ) / 2 = 7.84
D=0.3+0.3+0.15=0.75
Quantity for
22

22.19

22.77
44.96
Cum
89.91312 Cum

Plain cement concrete (1:3:6) nominal mix in


grouting appron and revertments with crushed
stone aggregates 40mm nominal size
mechanically mixed, placed in foundation and
compacted by vibration including curing for 14
days complete in all respects as per
Taking 20% volume of stone pitching vide item
No.20 =

17.98

23 Providing and laying Flooring complete as per


drawing and Technical specifications laid over
cement concert bedding.
Boulder appron after curtain wall at D/S
Boulder appron after curtain wall at U/S

Quantity for
24 Back filling with granular materials behind
abutment, wing wall and return wall complete
as per 710.1.4 of IRC:78 and 2200
of
specificaion for Road and bridge works of
Ministry of Road Transport and Highways (4th
revision) etc.complete.

0.40

2.50

Assistant Engineer
N.H, U.G. Section, M. Rampur

6x3 Box Cell Culvert

Executive Engineer
N.H Division, Kesinga.

Page 57

SUMMARY OF BOX CULVERTS


Sl.
No

Description

Nos.

Amount
in Rs.

2.0 m x 2.0 m single cell Box culvert

41

67361007.00

2 x 2.0 m x 2.0 m double cell Box culvert

3892643.00

4.0 m x 2.0 m single cell Box culvert

2278540.00

3.0 m x 2.0 m single cell Box culvert

12

22440941.00

3.0 m x 3.0 m single cell Box culvert

23396869.00

3.0 m x 4.0 m single cell Box culvert

13453809.00

4.0 m x 3.0 m single cell Box culvert

6254862.00

4.0 m x 4.0 m single cell Box culvert

4621647.00

4.0 m x 5.0 m single cell Box culvert

6612272.00

10

5.0 m x 3.0 m single cell Box culvert

10361577.00

11

5.0 m x 2.0 m single cell Box culvert

5452966.00

12

6.0 m x 3.0 m single cell Box culvert

8100576.00

Grand Total

79

174227709.00

Executive Engineer
N.H Division, Kesinga.

Assistant Engineer
N.H, U.G. Section, M. Rampur

summary

Page 58

TS
Remarks

utive Engineer
vision, Kesinga.

summary

Page 59

Detailed Estimate for Re-construction of 6.0 x 6.0m Box Cell Culvert.

Sl. No

Items

Earth work in excavation of foundation of


structures as per drawing and technical
specification, including setting out,
construction of shoring and bracing,
removal of stumps and other deleterious
matter, dressing of sides and bottom and
backfilling with approved material.
Box : L= 12 + 0.15x2 =12.3, B=
6 + 0.85x2 + 1.80x2 + 0.1x2 =
11.5, D= 0.3+0.80+0.15+0.3 =
1.55

1.00

12.30

11.50

1.55

219.25

Wing wall :
( 9.986 + 2.05 ) / 2 = 6.02

4.00

16.12

6.02

2.45

951.02

Wing wall low end

4.00

1.40

2.05

2.45

28.13

Curtain wall up stream

1.00

28.80

1.50

2.45

105.84

Curtain wall down stream


Boulder appron curtain wall to
box:
( 28.80 + 6 ) / 2 = 17.40
Boulder appron after curtain wall
at D/S
Boulder appron after curtain wall
at U/S
Box Toe portion : 0.3 + 0.40 =
0.70

1.00

28.80

1.85

2.95

157.18

2.00

17.40

11.40

0.75

297.54

1.00

3.00

28.80

1.05

90.72

1.00

1.50

28.80

1.05

45.36

2.00

11.50

0.70

0.40

6.44

Quantity for
2

At CD No- 185/2, 187/2,188/1 & 188/2.


Total = 4 Nos.
Length
Breadth
Height
Nos.
Quantity
in mtr
in mtr
in mtr

Unit

Cum

7605.86

Cum

Nos.

1.00

12.30

11.50

0.30

42.44

4.00

16.12

6.02

0.30

116.45

4.00

1.40

2.05

0.30

3.44

Amount
in Rs.

33.04

251298.00

416.72

270584.00

Cum

1901.47

4.00

Rate

Sand Filling in Foundation Trenches


as per Drawing & Technical
Specification
Below box
Wing wall :
( 9.986 + 2.05 ) / 2 = 6.02
Wing wall low end

Quantity for

4.00

Nos.

Page 60

162.33

Cum

649.32

Cum

Box cell culvert 6x6

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Below box

1.00

12.30

11.50

0.15

21.22

Below wing wall

4.00

16.12

6.02

0.15

58.23

Wing wall low end

4.00

1.40

2.05

0.15

1.72

Sl. No

Items

M15 Grade Plain/Reinforced Cement


Concrete in Open Foundation
complete as per Drawing and
Technical Specifications.

PCC M15 under Curtain wall as


per drawing no- SD-111 (Sheet-4
of 4)

14.50

Floor apron as per drawing noSD-111 (Sheet-4 of 4)

59.60

Below approach slab

2.00

12.00

Quantity for

4.00

Nos.

1.00

12.00

11.30

0.80

108.48

2.00

11.30

0.50

0.40

4.52

Toe portion :
( 0.3 + 0.70 ) / 2 = 0.50,
1.2 - 0.80 = 0.40

Quantity for
RCC M 25 in sub-structure
complete as per drawing and
Technical Specifications
Walls upto construction joint;
6.0 - 0.7 = 5.30
Haunch Bottom inside

Quantity for
6

0.15

Rate

Amount
in Rs.

Cum
Cum

4411.08

2961863.00

5653.89

2555558.00

5990.09

2597063.00

6491.08

2267230.00

12.60
167.86
671.46

RCC M 25 in in Open Foundation


complete as per Drawing and
Technical Specifications.
Bottom slab

3.50

Unit

113.00

Cum

452.00

Cum

4.00

Nos.

2.00

12.00

0.85

5.30

108.12

2.00

12.00

0.15

0.08

0.27
108.39

Cum

433.56

Cum

4.00

Nos.

Walls above construction joint

2.00

12.00

0.85

0.70

14.28

Haunch top inside

2.00

12.00

0.15

0.08

0.27

2.00

12.00

0.30

0.45

3.24

Top slab

1.00

12.00

7.70

0.70

64.68

Kerb: ( 7.7 + 3.5x2 ) = 14.70

2.00

14.70

0.55

0.30

4.85

RCC M 25 in super-structure as
per
drawing
and
Technical
Specification

Haunch for approach slab ;


( 0.3 + 0.6 ) / 2 = 0.45

Quantity for

4.00

Nos.

Page 61

87.32

Cum

349.28

Cum

Box cell culvert 6x6

Sl. No
7

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Rate

Amount
in Rs.

Cum

5324.22

17097987.00

MT

53754.35

3891815.00

MT

53074.03

1176466.00

Cum
Cum

8286.42

835271.00

RM
RM

3288.56

386735.00

Sqm
Sqm

45.94

2566.00

Sqm
Sqm

33.05

3343.00

705.94

96.90
Total

Quantity for

4.00

802.84

Nos.

3211.36

Providing and laying HYSD bar


reinforcement in Superstructure
Reiforcement as per drawing noSD-108 (Sheet- 5 of 6)

Quantity for
9

Unit

Plain/Reinforced cement concrete


M-20 in open foundation and substructure as per drawing and
technical specifications and as per
clause No.1500,1700,2100 and
2100 of specificaion for Road and
bridge works of Ministry of Road
Transport and Highways (4th
revision)etc complete.
Wing wall
Wing wall as per drawing no- SD113 (Sheet-6 of 6)
Curtain wall
Curtain wall as per drawing noSD-111 (Sheet-4 of 4)

Quantity

18.10

4.00

Nos.

72.40

705.94

cum

5.54

Providing and laying HYSD bar


reinforcement in Substructure
0.1 % for Temparature bar

5.54
Quantity for
10

11

12

13

4.00

Nos.

22.17

Approach slab

2.00

12.00

Quantity for
Providing and constructing vertical
post and precast railing incl.
Reinforcement
Road side

4.00

Nos.

25.20
100.80

2.00

14.70

29.40

Quantity for
Providing and applying synthetic
enamel paint to kerb with alternate
strips
Kerb

4.00

Nos.

29.40
117.60

2.00

14.70

Quantity for

4.00

Nos.

2.00

14.70

4.00

Nos.

RCC M 30 in approach slab incl.


reinforcement

Providing and applying cement


paint to parapet and railing
Parapet

Quantity for

3.50

0.30

0.48

25.20

13.97
13.97
55.86

0.86

25.28
25.28
101.14

Page 62

Box cell culvert 6x6

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Box wall

2.00

12.00

0.60

6.00

86.40

Wing wall

4.00

16.12

0.60

3.50

135.41

Sl. No

Items

14

Providing and laying of Filter


media
with
granular
materials/stone
crushed
aggregates
satisfying
the
requirements laid down in clause
2504.2.2. of MoRTH specifications
to a thickness of not less than 600
mm with smaller size towards the
soil and bigger size towards the
wall and provided over the entire
surface behind abutment, wing
wall and return wall to the full
height compacted to a firm
condition complete as per drawing
and Technical Specification.

Quantity for
15

17

Amount
in Rs.

221.81

Cum

887.23

Cum

1198.21

1063090.00

No
No

155.12

114789.00

8108.90

129742.00

72.00

72.00

113.00

113.00

4.00

Nos.

185.00
740.00

2.00

Quantity for
Providing and laying Cement
concrete wearing coat M-30 grade
including reinforcement complete
as per drawing and Technical
Specifications

Nos.

4
16

Over slab

1.00

11.80

Quantity for
Providing and laying Drainage Spouts
complete as per drawing and Technical
specification

Quantity for
18

Nos.

Rate

Providing weep holes in Brick


masonry/Plain/
Reinforced
concrete abutment, wing wall/
return wall with 100 mm dia AC
pipe, extending through the full
width of the structure with slope of
1V :20H towards drawing foce.
Complete as per drawing and
Technical Specifications
Abutment wall : 2 x 12x3 = 72
Wing wall : 4 x { 1/2x(6+1)x16.1}
x0.5 = 113

16

4.00

Unit

4.00

Nos.

Approach slab end


Wing wall and abutment joint
-do-

2.00
4.00
4.00

12.00
2.44
0.55

Quantity for

4.00

Nos.

7.70

0.08

Nos
Nos

6.81
6.81

Sqm

27.26

Sqm

9548.93

260285.00

7.20
57.78
1.87
66.85
267.40

Sqm
Sqm

292.10

78107.00

Providing & fixing 20 mm thick


compressible fibre board in
expansion joint complete as per
drawing & Technical Specification.
0.30
5.92
0.85

Page 63

Box cell culvert 6x6

Sl. No

Items

Nos.

Length
in mtr

Breadth
in mtr

Page 64

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

Box cell culvert 6x6

Sl. No
19

Items
Providing & fixing Tar paper
Below approach slab
Quantity for

20

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

2.00

12.00

0.30

7.20
7.20
28.80

4.00

Nos.

Sqm
Sqm

14.14

407.00

4.00

80.94

sqm

0.30

97.13

2.00

13.84

10.84

0.30

90.02

4.00

Nos.

Cum
Cum

587.70

439937.00

4.00

80.94

sqm

0.30

97.13

2.00

13.84

10.84

0.30

90.02

4.00

Nos.

187.14
748.57

Cum
Cum

1052.97

788225.00

20%

748.57

149.71

Cum

3801.25

569103.00

1.00

3.00

28.80

0.75

64.80

1.00

1.50

28.80

0.75

32.40

4.00

Nos.

Cum
Cum

4119.14

1601522.00

Providing and laying Filter material


underneath pitching in slopes
complete as per drawing and
Technical specification
Wing wall & return wall
16.12/(sq. root 2), so A = 11.40
Return wall =1.40, so L = 11.40+1.40
= 12.80m
4 x[ (12.8+1.4)/2]x 11.40
Boulder appron curtain wall to
box:
L=( 24.680 + 3) / 2 = 13.84
B=(6.42-1)*2=10.84
Quantity for

21

187.14
748.57

Providing and laying Pitching on


slopes laid over prepared filter media
including boulder apron laid dry in
front of toe of embankment complete
as per drawing and Technical
specifications

Wing wall & return wall


16.12/(sq. root 2), so A = 11.40
Return wall =1.40, so L = 11.40+1.40
= 12.80m
4 x[ (12.8+1.4)/2]x 11.40
Boulder appron curtain wall to
box:
L=( 24.680 + 3) / 2 = 13.84
B=(6.42-1)*2=10.84
Quantity for
22

Plain cement concrete (1:3:6)


nominal mix in grouting appron
and revertments with crushed
stone aggregates 40mm nominal
size mechanically mixed, placed in
foundation and compacted by
vibration including curing for 14
days complete in all respects as
per
Taking 20% volume of stone
pitching vide item No.20 =

23

Providing and laying Flooring


complete as per drawing and
Technical specifications laid over
cement concert bedding.
Boulder appron after curtain wall
at D/S
Boulder appron after curtain wall
at U/S

Quantity for

97.20
388.80
Page 65

Box cell culvert 6x6

Sl. No

Items

Nos.

Length
in mtr

Breadth
in mtr

Page 66

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

Box cell culvert 6x6

Sl. No

Items

24

Back filling with granular materials


behind abutment, wing wall and
return wall complete as per
710.1.4 of IRC:78 and 2200 of
specificaion for Road and bridge
works of Ministry of Road
Transport and Highways (4th
revision) etc.complete.

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

12.00

0.40

6.00

Nos.

Quantity

Unit

Rate

Amount
in Rs.

57.60
57.60
230.40

Cum
Cum

372.53

85831.00

TOTAL AMOUNT

Junior Engineer
N.H Section, Kesinga

Assistant Engineer
N.H Sub division, Kesinga

Page 67

39428817.00

Executive Engineer
N.H Division, Kesinga.

Box cell culvert 6x6

Detailed Estimate for Re-construction of 7.0 x 5.0m Box Cell Culvert.

Sl. No

Items

Earth work in excavation of foundation of


structures as per drawing and technical
specification, including setting out,
construction of shoring and bracing,
removal of stumps and other deleterious
matter, dressing of sides and bottom and
backfilling with

Quantity

Unit

Cum

Box : L= 12 + 0.15x2 =12.3, B=


7 + 0.850x2 + 0.800x2 + 0.1x2 =
10.5, D= 0.3+0.850+0.15+0.3 =
1.6

1.00

12.30

10.50

1.60

206.64

Wing wall :
( 9.986 + 2.05 ) / 2 = 6.02

4.00

13.433

6.02

2.45

792.49

Wing wall low end

4.00

1.40

2.05

2.45

28.13

Curtain wall up stream

1.00

28.80

1.50

2.45

105.84

Curtain wall down stream


Boulder appron curtain wall to
box:
( 28.80 + 6 ) / 2 = 17.40
Boulder appron after curtain wall
at D/S
Boulder appron after curtain wall
at U/S
Box Toe portion : 0.3 + 0.40 =
0.70

1.00

28.80

1.85

2.95

157.18

2.00

17.40

11.40

0.75

297.54

1.00

3.00

28.80

1.05

90.72

1.00

1.50

28.80

1.05

45.36

2.00

11.50

0.70

0.40

6.44

Quantity for
2

Nos.

At CD No- 183/5.
Total = 1No.
Length
Breadth
Height
in mtr
in mtr
in mtr

1730.34

Cum

1730.34

Cum

1.00

Nos.

1.00

12.30

10.50

0.30

38.75

4.00

13.43

6.02

0.30

97.04

4.00

1.40

2.05

0.30

3.44

Rate

Amount
in Rs.

33.04

57170.00

416.72

58020.00

Sand Filling in Foundation Trenches


as per Drawing & Technical
Specification
Below box
Wing wall :
( 9.986 + 2.05 ) / 2 = 6.02
Wing wall low end

Quantity for

1.00

Nos.

Page 68

139.23

Cum

139.23

Cum

Box cell culvert 7x5

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Below box

1.00

12.30

10.50

0.15

19.37

Below wing wall

4.00

13.43

6.02

0.15

48.52

Wing wall low end

4.00

1.40

2.05

0.15

1.72

Sl. No

Items

M15 Grade Plain/Reinforced Cement


Concrete in Open Foundation
complete as per Drawing and
Technical Specifications.

PCC M15 under Curtain wall as


per drawing no- SD-111 (Sheet-4
of 4)

13.10

Floor apron as per drawing noSD-111 (Sheet-4 of 4)

47.10

Below approach slab

2.00

12.00

Quantity for

1.00

Nos.

1.00

12.00

10.30

0.95

117.42

2.00

11.50

0.50

0.40

4.60

Toe portion :
( 0.3 + 0.70 ) / 2 = 0.50,
1.2 - 0.80 = 0.40

Quantity for
RCC M 25 in sub-structure
complete as per drawing and
Technical Specifications
Walls upto construction joint;
7.0 - 0.7 = 6.30
Haunch Bottom inside

Quantity for
6

0.15

Rate

Amount
in Rs.

Cum
Cum

4411.08

628202.00

5653.89

689888.00

5990.09

771464.00

6491.08

687697.00

12.60
142.41
142.41

RCC M 25 in in Open Foundation


complete as per Drawing and
Technical Specifications.
Bottom slab

3.50

Unit

122.02

Cum

122.02

Cum

1.00

Nos.

2.00

12.00

0.85

6.30

128.52

2.00

12.00

0.15

0.08

0.27
128.79

Cum

128.79

Cum

1.00

Nos.

Walls above construction joint

2.00

12.00

0.85

0.70

14.28

Haunch top inside

2.00

12.00

0.15

0.08

0.27

2.00

12.00

0.30

0.45

3.24

Top slab

1.00

12.00

8.90

0.78

83.30

Kerb: ( 7.7 + 3.5x2 ) = 14.70

2.00

14.70

0.55

0.30

4.85

RCC M 25 in super-structure as
per
drawing
and
Technical
Specification

Haunch for approach slab ;


( 0.3 + 0.6 ) / 2 = 0.45

Quantity for

1.00

Nos.

Page 69

105.95

Cum

105.95

Cum

Box cell culvert 7x5

Sl. No
7

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Rate

Amount
in Rs.

Cum

5324.22

3033261.00

MT

53754.35

946453.00

MT

53074.03

200904.00

Cum
Cum

8286.42

208818.00

RM
RM

3288.56

96684.00

Sqm
Sqm

45.94

642.00

Sqm
Sqm

33.05

836.00

482.21

87.50
Total

Quantity for

1.00

569.71

Nos.

569.71

Providing and laying HYSD bar


reinforcement in Superstructure
Reiforcement as per drawing noSD-108 (Sheet- 5 of 6)

Quantity for
9

Unit

Plain/Reinforced cement concrete


M-20 in open foundation and substructure as per drawing and
technical specifications and as per
clause No.1500,1700,2100 and
2100 of specificaion for Road and
bridge works of Ministry of Road
Transport and Highways (4th r
Wing wall
Wing wall as per drawing no- SD113 (Sheet-6 of 6)
Curtain wall
Curtain wall as per drawing noSD-111 (Sheet-4 of 4)

Quantity

17.61

1.00

Nos.

17.61

482.21

cum

3.79

Providing and laying HYSD bar


reinforcement in Substructure
0.1 % for Temparature bar

3.79
Quantity for
10

11

12

13

1.00

Nos.

3.79

Approach slab

2.00

12.00

Quantity for
Providing and constructing vertical
post and precast railing incl.
Reinforcement
Road side

1.00

Nos.

25.20
25.20

2.00

14.70

29.40

Quantity for
Providing and applying synthetic
enamel paint to kerb with alternate
strips
Kerb

1.00

Nos.

29.40
29.40

2.00

14.70

Quantity for

1.00

Nos.

2.00

14.70

1.00

Nos.

RCC M 30 in approach slab incl.


reinforcement

Providing and applying cement


paint to parapet and railing
Parapet

Quantity for

3.50

0.30

0.48

25.20

13.97
13.97
13.97

0.86

25.28
25.28
25.28

Page 70

Box cell culvert 7x5

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Box wall

2.00

12.00

0.60

5.00

72.00

Wing wall

4.00

13.43

0.60

3.50

112.84

Sl. No

Items

14

Providing and laying of Filter


media
with
granular
materials/stone
crushed
aggregates
satisfying
the
requirements laid down in clause
2504.2.2. of MoRTH specifications
to a thickness of not less than 600
mm with smaller size towards the
soil and bigger si

Quantity for
15

16

17

19

Nos.

Rate

Amount
in Rs.

184.84

Cum

184.84

Cum

1198.21

221474.00

No
No

155.12

23733.00

8108.90

32436.00

Providing weep holes in Brick


masonry/Plain/
Reinforced
concrete abutment, wing wall/
return wall with 100 mm dia AC
pipe, extending through the full
width of the structure with slope of
1V :20H towards drawing foce.
Complete as per drawing and
Technical
Abutment wall : 2 x 12x3 = 72
Wing wall : 4 x
{ 1/2x(5+1)x13.433} x0.5 = 80.598

72.00

72.00

81.00

81.00

Quantity for
Providing and laying Drainage Spouts
complete as per drawing and Technical
specification

1.00

Nos.

153.00
153.00

2.00

Quantity for
Providing and laying Cement
concrete wearing coat M-30 grade
including reinforcement complete
as per drawing and Technical
Specifications

Nos.

4
4

Over slab

1.00

11.80

Quantity for
18

1.00

Unit

1.00

Nos.

Approach slab end


Wing wall and abutment joint
-do-

2.00
4.00
4.00

12.00
2.44
0.55

Quantity for

1.00

Nos.

2.00

12.00

1.00

Nos.

8.70

0.08

Nos
Nos

7.70
7.70

Sqm

7.70

Sqm

9548.93

73522.00

7.20
57.78
1.87
66.85
66.85

Sqm
Sqm

292.10

19527.00

7.20
7.20
7.20

Sqm
Sqm

14.14

102.00

Providing & fixing 20 mm thick


compressible fibre board in
expansion joint complete as per
drawing & Technical Specification.

Providing & fixing Tar paper


Below approach slab
Quantity for

0.30
5.92
0.85

0.30

Page 71

Box cell culvert 7x5

Sl. No

Items

20

Providing and laying Filter material


underneath pitching in slopes
complete as per drawing and
Technical specification

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

4.00

58.43

sqm

0.15

35.06

2.00

13.84

10.84

0.15

45.01

1.00

Nos.

Cum
Cum

587.70

47053.00

4.00

58.43

sqm

0.30

70.11

2.00

13.84

10.84

0.30

90.02

1.00

Nos.

160.13
160.13

Cum
Cum

1052.97

168607.00

20%

160.13

32.03

Cum

3801.25

121735.00

1.00

3.00

28.80

0.75

64.80

1.00

1.50

28.80

0.75

32.40

1.00

Nos.

Cum
Cum

4119.14

400380.00

Wing wall & return wall


13.433/(sq. root 2), so A = 9.5
Return wall =1.40, so L = 9.5+1.40 =
10.90m
4 x[ (10.90+1.4)/2]x 9.5
Boulder appron curtain wall to
box:
L=( 24.680 + 3) / 2 = 13.84
B=(6.42-1)*2=10.84
Quantity for
21

80.06
80.06

Providing and laying Pitching on


slopes laid over prepared filter media
including boulder apron laid dry in
front of toe of embankment complete
as per drawing and Technical
specifications

Wing wall & return wall


13.433/(sq. root 2), so A = 9.5
Return wall =1.40, so L = 9.5+1.40 =
10.90m
4 x[ (10.90+1.4)/2]x 9.5
Boulder appron curtain wall to
box:
L=( 24.680 + 3) / 2 = 13.84
B=(6.42-1)*2=10.84
Quantity for
22

Plain cement concrete (1:3:6)


nominal mix in grouting appron
and revertments with crushed
stone aggregates 40mm nominal
size mechanically mixed, placed in
foundation and compacted by
vibration including curing for 14
days complete in all respects as
per
Taking 20% volume of stone
pitching vide item No.19 =

23

Providing and laying Flooring


complete as per drawing and
Technical specifications laid over
cement concert bedding.
Boulder appron after curtain wall
at D/S
Boulder appron after curtain wall
at U/S

Quantity for

97.20
97.20

Page 72

Box cell culvert 7x5

Sl. No

Items

24

Back filling with granular materials


behind abutment, wing wall and
return wall complete as per
710.1.4 of IRC:78 and 2200 of
specificaion for Road and bridge
works of Ministry of Road
Transport and Highways (4th
revision) etc.complete.

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

12.00

0.40

6.50

Nos.

Quantity

Unit

Rate

Amount
in Rs.

62.40
62.40
62.40

Cum
Cum

372.53

23246.00

TOTAL AMOUNT

Junior Engineer
N.H Section, Kesinga

Assistant Engineer
N.H Sub division, Kesinga

Page 73

8511854.00

Executive Engineer
N.H Division, Kesinga.

Box cell culvert 7x5

Detailed Estimate for Re-construction of 7.0 x 7.0m Box Cell Culvert.

Sl. No

Items

Earth work in excavation of foundation of


structures as per drawing and technical
specification, including setting out,
construction of shoring and bracing,
removal of stumps and other deleterious
matter, dressing of sides and bottom and
backfilling with
Box : L= 12 + 0.15x2 =12.3, B=
7 + 0.95x2 + 1.30x2 + 0.1x2 =
11.7, D= 0.3+0.950+0.15+0.3 =
1.7

1.00

12.30

11.70

1.70

244.65

Wing wall :
( 9.986 + 2.05 ) / 2 = 6.02

4.00

19.17

6.02

2.45

1131.19

Wing wall low end

4.00

1.40

2.05

2.45

28.13

Curtain wall up stream

1.00

28.80

1.50

2.45

105.84

Curtain wall down stream


Boulder appron curtain wall to
box:
( 28.80 + 6 ) / 2 = 17.40
Boulder appron after curtain wall
at D/S
Boulder appron after curtain wall
at U/S
Box Toe portion : 0.3 + 0.40 =
0.70

1.00

28.80

1.85

2.95

157.18

2.00

17.40

11.40

0.75

297.54

1.00

3.00

28.80

1.05

90.72

1.00

1.50

28.80

1.05

45.36

2.00

11.50

0.70

0.40

6.44

Quantity for
2

At CD No- 185/2,187/2,188/1 & 188/2.


Total = 4 Nos.
Length
Breadth
Height
Nos.
Quantity
in mtr
in mtr
in mtr

Unit

Cum

8428.15

Cum

Nos.

1.00

12.30

11.70

0.30

43.17

4.00

19.17

6.02

0.30

138.51

4.00

1.40

2.05

0.30

3.44

Amount
in Rs.

33.04

278466.00

416.72

308589.00

Cum

2107.04

4.00

Rate

Sand Filling in Foundation Trenches


as per Drawing & Technical
Specification
Below box
Wing wall :
( 9.986 + 2.05 ) / 2 = 6.02
Wing wall low end

Quantity for

4.00

Nos.

Page 74

185.13

Cum

740.52

Cum

Box cell culvert 7x7

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Below box

1.00

12.30

11.70

0.15

21.59

Below wing wall

4.00

19.17

6.02

0.15

69.26

Wing wall low end

4.00

1.40

2.05

0.15

1.72

Sl. No

Items

M15 Grade Plain/Reinforced Cement


Concrete in Open Foundation
complete as per Drawing and
Technical Specifications.

PCC M15 under Curtain wall as


per drawing no- SD-111 (Sheet-4
of 4)

17.50

Floor apron as per drawing noSD-111 (Sheet-4 of 4)

87.20

Below approach slab

2.00

12.00

Quantity for

4.00

Nos.

1.00

12.00

11.50

0.95

131.10

2.00

11.50

0.50

0.40

4.60

Toe portion :
( 0.3 + 0.70 ) / 2 = 0.50,
1.2 - 0.80 = 0.40

Quantity for
RCC M 25 in sub-structure
complete as per drawing and
Technical Specifications
Walls upto construction joint;
7.0 - 0.7 = 6.30
Haunch Bottom inside

Quantity for
6

0.15

Rate

Amount
in Rs.

Cum
Cum

4411.08

3702925.00

5653.89

3068931.00

5990.09

3448135.00

6491.08

2794410.00

12.60
209.86
839.46

RCC M 25 in in Open Foundation


complete as per Drawing and
Technical Specifications.
Bottom slab

3.50

Unit

135.70

Cum

542.80

Cum

4.00

Nos.

2.00

12.00

0.95

6.30

143.64

2.00

12.00

0.15

0.08

0.27
143.91

Cum

575.64

Cum

4.00

Nos.

Walls above construction joint

2.00

12.00

0.95

0.70

15.96

Haunch top inside

2.00

12.00

0.15

0.08

0.27

2.00

12.00

0.30

0.45

3.24

Top slab

1.00

12.00

8.90

0.78

83.30

Kerb: ( 7.7 + 3.5x2 ) = 14.70

2.00

14.70

0.55

0.30

4.85

RCC M 25 in super-structure as
per
drawing
and
Technical
Specification

Haunch for approach slab ;


( 0.3 + 0.6 ) / 2 = 0.45

Quantity for

4.00

Nos.

Page 75

107.63

Cum

430.50

Cum

Box cell culvert 7x7

Sl. No
7

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Rate

Amount
in Rs.

Cum

5324.22

24274397.00

MT

53754.35

4756185.00

MT

53074.03

1704371.00

Cum
Cum

8286.42

835271.00

RM
RM

3288.56

386735.00

Sqm
Sqm

45.94

2566.00

Sqm
Sqm

33.05

3343.00

1022.71

117.10
Total

Quantity for

4.00

1139.81

Nos.

4559.24

Providing and laying HYSD bar


reinforcement in Superstructure
Reiforcement as per drawing noSD-108 (Sheet- 5 of 6)

Quantity for
9

Unit

Plain/Reinforced cement concrete


M-20 in open foundation and substructure as per drawing and
technical specifications and as per
clause No.1500,1700,2100 and
2100 of specificaion for Road and
bridge works of Ministry of Road
Transport and Highways (4th r
Wing wall
Wing wall as per drawing no- SD113 (Sheet-6 of 6)
Curtain wall
Curtain wall as per drawing noSD-111 (Sheet-4 of 4)

Quantity

22.12

4.00

Nos.

88.48

1022.71

cum

8.03

Providing and laying HYSD bar


reinforcement in Substructure
0.1 % for Temparature bar

8.03
Quantity for
10

11

12

13

4.00

Nos.

32.11

Approach slab

2.00

12.00

Quantity for
Providing and constructing vertical
post and precast railing incl.
Reinforcement
Road side

4.00

Nos.

25.20
100.80

2.00

14.70

29.40

Quantity for
Providing and applying synthetic
enamel paint to kerb with alternate
strips
Kerb

4.00

Nos.

29.40
117.60

2.00

14.70

Quantity for

4.00

Nos.

2.00

14.70

4.00

Nos.

RCC M 30 in approach slab incl.


reinforcement

Providing and applying cement


paint to parapet and railing
Parapet

Quantity for

3.50

0.30

0.48

25.20

13.97
13.97
55.86

0.86

25.28
25.28
101.14

Page 76

Box cell culvert 7x7

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Box wall

2.00

12.00

0.60

7.00

100.80

Wing wall

4.00

19.17

0.60

3.50

161.06

Sl. No

Items

14

Providing and laying of Filter


media
with
granular
materials/stone
crushed
aggregates
satisfying
the
requirements laid down in clause
2504.2.2. of MoRTH specifications
to a thickness of not less than 600
mm with smaller size towards the
soil and bigger si

Quantity for
15

18

Amount
in Rs.

261.86

Cum

1047.45

Cum

1198.21

1255061.00

No
No

155.12

196692.00

72.00

72.00

245.00

245.00

Quantity for
Providing and laying Cement
concrete wearing coat M-30 grade
including reinforcement complete
as per drawing and Technical
Specifications

4.00

Nos.

Over slab

1.00

11.80

Quantity for
17

Nos.

Rate

Providing weep holes in Brick


masonry/Plain/
Reinforced
concrete abutment, wing wall/
return wall with 100 mm dia AC
pipe, extending through the full
width of the structure with slope of
1V :20H towards drawing foce.
Complete as per drawing and
Technical
Abutment wall : 2 x 12x3 = 72
Wing wall : 4 x { 1/2x(7+1)x19.17}
x0.8 = 245

16

4.00

Unit

4.00

Nos.

Approach slab end


Wing wall and abutment joint
-do-

2.00
4.00
4.00

12.00
2.44
0.55

Quantity for

4.00

Nos.

2.00

12.00

4.00

Nos.

317.00
1268.00

8.90

0.08

7.88
7.88

Sqm

31.51

Sqm

9548.93

300849.00

7.20
57.78
1.87
66.85
267.40

Sqm
Sqm

292.10

78107.00

7.20
7.20
28.80

Sqm
Sqm

14.14

407.00

Providing & fixing 20 mm thick


compressible fibre board in
expansion joint complete as per
drawing & Technical Specification.

Providing & fixing Tar paper


Below approach slab
Quantity for

0.30
5.92
0.85

0.30

Page 77

Box cell culvert 7x7

Sl. No

Items

19

Providing and laying Pitching on


slopes laid over prepared filter media
including boulder apron laid dry in
front of toe of embankment complete
as per drawing and Technical
specifications

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Unit

Rate

Amount
in Rs.

4.00

110.77

sqm

0.30

132.92

2.00

13.84

10.84

0.30

90.02

4.00

Nos.

222.94
891.76

Cum
Cum

1052.97

938994.00

20%

891.76

178.35

Cum

3801.25

677959.00

1.00

3.00

28.80

0.75

64.80

1.00

1.50

28.80

0.75

32.40

4.00

Nos.

97.20
388.80

Cum
Cum

4119.14

1601522.00

12.00
Nos.

62.40
62.40
249.60

Cum
Cum

372.53

92983.00

Nos.

4.00
4.00
16.00

No
No

#REF!

#REF!

Wing wall & return wall


19.17/(sq. root 2), so A = 13.55
Return wall =1.40, so L = 13.55+1.40
= 14.95m
4 x[ (14.95+1.4)/2]x 13.55
Boulder appron curtain wall to
box:
L=( 24.680 + 3) / 2 = 13.84
B=(6.42-1)*2=10.84
Quantity for
20

Plain cement concrete (1:3:6)


nominal mix in grouting appron
and revertments with crushed
stone aggregates 40mm nominal
size mechanically mixed, placed in
foundation and compacted by
vibration including curing for 14
days complete in all respects as
per
Taking 20% volume of stone
pitching vide item No.19 =

21

Providing and laying Flooring


complete as per drawing and
Technical specifications laid over
cement concert bedding.
Boulder appron after curtain wall
at D/S
Boulder appron after curtain wall
at U/S

Quantity for
22

23

Back filling with granular materials


behind abutment, wing wall and
return wall complete as per
710.1.4 of IRC:78 and 2200 of
specificaion for Road and bridge
works of Ministry of Road
Transport and Highways (4th
revision) etc.complete.

Sinthetic enamel Paint for culvert


No.
Both side

4.00

Quantity for

4.00

0.40

6.50

TOTAL AMOUNT

Page 78

#REF!

Box cell culvert 7x7

Sl. No

Items

Junior Engineer
N.H Section, Kesinga

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Assistant Engineer
N.H Sub division, Kesinga

Page 79

Unit

Rate

Amount
in Rs.

Executive Engineer
N.H Division, Kesinga.

Box cell culvert 7x7

Detailed Estimate for Re-construction of 3 x 3.0 x 3.0m Box Cell Culvert.


At CD No-101/5 & 144/1.
Total = 2Nos
1 Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,

construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and
backfilling with approved material.

Total of bed level to founding level


Sand= 300 + PCC M15 = 150+Raft=500 =950mm

1
x 12.30
x
Key of base slab
2
x
1/2
x(
Wing Walls
4
x
1/2
x(
Return Walls
4
x
1/2
x(
Curtain walls(U/S)
1
x
24.6
x
Curtain walls(D/S)
1
x
24.6
x
Floor appron (U/S & D/S)
2
x
1/2
x(
Flexible appron (U/S)
1
x
24.6
x
Flexible appron (D/S)
1
x
24.6
x

11.54

0.95

134.84

Cum

1.10

0.40

)x

11.54

0.70

12.12

Cum

2.20

5.436

)x

6.929

1.65

174.6

Cum

1.794

1.044

)x

2.01

1.65

18.82

Cum

1.50

2.15

79.33

Cum

1.85

2.65

120.59

Cum

22.597

10.94

90.55

Cum

2.35

0.75

43.35

Cum

5.175

0.75

)x

Rs.

6.00

Total for
#REF!
(P-211)

0.45

=
=

Total
2
Nos
/ Cum

95.47 Cum
769.67 Cum
1539.34
Rs.

#REF!

2 Providing and filing sand in foundation of RCC culverts as per clause No.304 of specificaion for Road and bridge works of
Ministry of Road Transport and Highways (4th revision) etc. complete in all respects.

Raft
1
x
Wing wall
4
x

12.3

1/2
Return wall
4
x
1/2
Sides of base slab
2
x 11.54

11.54

0.3

x(

2.20

5.436

)x

6.929

x(

1.794

1.044

)x

2.01

0.50

0.10

42.58

Cum

0.3

31.75

Cum

0.3

3.42

Cum

1.15
78.9

Cum
Cum

282.72
361.62
723.24

Cum

Total
Total volume of earth work vided item No.1
Deduct
Sand filling vide item No.2 above
Volume of Wing & Return Wall
=
174.6 +
18.82 =
PCC M-15(Item No.3)
Curtain walls (U/S & D/S)
vide item No.4
RCC M-25 vide item No.5
Net

=
=

769.67
78.90

Cum
Cum

(-)
(-)

193.42
70.27

Cum
Cum

(-)
(-)
=

66.00
78.36
282.72

Cum
Cum
Cum
Total
2
Nos
/ Cum

Rs.

Total for
#REF!
(P-213)

Page 80

#REF!

Box cell culvert 3x3x3

3 Plain/Reinforced cement concrete M-15 in foundation complete as per drawing and technical specifications and as per
clause No.1500,1700 and 2100 of specificaion for Road and bridge works of Ministry of Road Transport and Highways (4th
revision) etc. complete in all respects.
Below raft

11.54 x
0.15
1x
12.30 x
Wing walls
2.20 +
5.436
4x
1/2 x(
Return wall
1.794 +
1.044
4x
1/2 x(
Curtain walls :-As per SDIII(Sheet 4 of 4) Page-43
Floor appron:-As per SDIII (Sheet 4 of 4) Page-43

21.29

Cum

)x

6.929

0.15

15.87

Cum

)x

2.01

0.15

=
=
=
=

Cum
Cum
Cum
Cum
Cum

Rs.

Total for
#REF!
(P-214)

1.71
9.8
21.6
70.27
140.54

Total
Nos
/ Cum

#REF!

4 Plain/Reinforced cement concrete M-20 in open foundation and sub-structure as per drawing and technical specifications
and as per clause No.1500,1700,2100 and 2100 of specificaion for Road and bridge works of Ministry of Road Transport
and Highways (4th revision)etc complete.

Wing walls and return walls


AS per SD/113(Sheet 6 of 6) Page-37
i)
Curtain walls (U/S & D/S)
AS per SD/113(Sheet 4 of 4) Page-37
ii)

Rs.

Total for
#REF!
(P-218)

Total
2
Nos
/ Cum

105.53

=
=

66.00
171.53
343.06

Cum
Cum
Cum
Cum
Cum
#REF!

5 Plain/Reinforced cement concrete M-25 in open foundation complete as per drawing and technical specifications and as per
clause No.1500,1700 and 2100 of specificaion for Road and bridge works of Ministry of Road Transport and Highways (4th
revision) etc.complete.

Base Raft
1
x
Key
2
x

12.00

11.34

0.50

11.34

1/2

x(

1.00

Rs.

0.30
Total for
#REF!
(P-215)

)x

0.70
Total
2
Nos
/ Cum

68.04

Cum

=
=

10.32
78.36
156.72

Cum
Cum
Cum
#REF!

6 Plain/Reinforced cement concrete M-25 in sub-structure complete as per drawing and technical specifications and as per

clause No.1500,1700 and 2200 of specificaion for Road and bridge works of Ministry of Road Transport and Highways (4th
revision) etc.complete in all respspects.

End Shaft
2
x
Middle Shaft
2
x
Hunch
3
x
Branches
2
x
2
x

12

0.47

33.84

Cum

12

0.4

28.80

Cum

12

1/2

0.15

1.62

Cum

12
12

x
x

0.3
1/2

x
x

0.3
0.3

0.3

2.16
1.08
67.50
135

Cum
Cum
Cum
Cum

Rs.

Total for
#REF!
(P-216)

0.15

Nos
/ Cum

#REF!

7 Providing and placing Reinforced/ prestressedcement concrete M-25 in super -structure as per drawing and technical

specification and as per clause No.1500,1600 and 1700 of specificaion for Road and bridge works of Ministry of Road
Transport and Highways (4th revision) etc.complete in all respects.

Deck Slab
1
x

12.00

10.74

1/2

x(

0.60

Rs.

Total for
#REF!
(P-217)

Page 81

0.45
Total
2
Nos
/ Cum

)=

67.66
67.66
135.32

Cum
Cum
Cum
#REF!

Box cell culvert 3x3x3

8 PCC M-15 grade leveling course below approach slab complete as per drawing and technical specification and as per
clause No.2700 of specificaion for Road and bridge works of Ministry of Road Transport and Highways (4th revision)
etc.complete in all respects.

Below Approach Slab


3.30
x
0.15
2
x 12.00
x
Floor Appron as per SD/III(Sheet 4 of 4) P-37

=
=

Rs.

Total for
#REF!
(P-214)

Total
Nos
/ Cum

11.88
43.20
55.08
110.16

Cum
Cum
Cum
#REF!

9 Reinforced cement concrete M-30 grade in approach slab including reinforcement and form work complete as per drawing
and technical specificationand as per clause No.1500,1600,1700, and 2704 of specificaion for Road and bridge works of
Ministry of Road Transport and Highways (4th revision) etc.complete.

12.00

3.50

0.30

Rs.

Total for
#REF!
(P-221)

Total
2
Nos
/ Cum

25.2
25.2
50.4

Cum
Cum
#REF!

10 Providing and laying tar paper bearing below deck/Approach slab including cost,conveyance and taxes of all materials etc.

complete as per clause No.2003.3 of specificaion for Road and bridge works of Ministry of Road Transport and Highways
(4th revision) etc.complete in all respects.

2.00

12.00

0.30

Rs.

Total for
#REF!
(P-229)

=
=

Total
2
Nos
/ Sqm

7.20
7.20
14.4

Sqm
Sqm
Cum
#REF!

11 Providing and fixing 20mm thick compressible fibre board in expansion joints complete as per drawing and technical
spedifications and as per clause No.2605 of specificaion for Road and bridge works of Ministry of Road Transport and
Highways (4th revision) etc.complete .

2.00

12.00

0.30

Rs.

Total for
#REF!
(P-229)

=
=

Total
2
Nos
/ Sqm

7.20
7.20
14.4

Sqm
Sqm
Cum
#REF!

12
Back filling with granular materials behind abutment, wing wall and return wall complete as per 710.1.4 of IRC:78 and 2200
of specificaion for Road and bridge works of Ministry of Road Transport and Highways (4th revision) etc.complete.

Back of Abutment
2
x 12.00

0.4

2.45

Rs.

Total for
570.22
(P-234)

=
=

Total
2
Nos
/ Cum

23.52
23.52
47.04

Cum
Cum
Cum
26823.00

13 Providing weep holes as per clause No.1000,2706,2708 and 2709 of specificaion for Road and bridge works of Ministry of
Road Transport and Highways (4th revision) etc.

Abutments
2
x
Wing Walls
4
x
Return Walls
4
x

35

70

Nos

27

108

Nos

16
194
388

Nos
Nos
Cum

Rs.

Total for
#REF!
(P-227)

Total
2
Nos
/ No

#REF!

14
Providing RCC railing of M-30 grade in-situ with 20mm nominal size aggregate, true to the line and grade, tolorence of
vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 200mm, leaving
adequate space between vertical post of exapnsion, complte as per clause No.2703,1500,1600 and 1700 of specificaion for
Road and bridge works of Ministry of Road Transport and Highways (4th revision) etc.complete .

10.74

+(

3.50

Rs.

Total for
#REF!
(P-223)

Page 82

Total
2
Nos
/ mtr

35.48
35.48
70.96

Mtr
Mtr
Cum
#REF!

Box cell culvert 3x3x3

15 Providing and laying flexible appron 750mm thick comprising of loose stone boulders weighing not less than 40 Kg beyond

curtain wall as per clause No.2507.2 of specificaion for Road and bridge works of Ministry of Road Transport and Highways
(4th revision) etc. complete.

As per SD/III (Sheet 4 of 4) P-37


750 mm thick Appron

Rs.

Total for
#REF!
(P-232)

Total
2
Nos
/ Cum

132.30
132.30
264.6

Cum
Cum
Cum
#REF!

16 Providing and laying pitching on slopes laid over the prepared filter media including boulder appron
laid dry in front of toe of embankment complete as per clause No.2504 of specificaion for Road and
bridge works of Ministry of Road Transport and Highways (4th revision) etc.
4
x
1/2
x(
15.00
+
5.00
)x
7.35
x
0.3
=
88.20 Cum
Total =
88.20 Cum
Total for
2
Nos
176.4 Cum
@
Rs.
#REF!
/ Cum
(P-231)
17

#REF!

Plain cement concrete (1:3:6) nominal mix in grouting appron and revertments with crushed stone
aggregates 40mm nominal size mechanically mixed, placed in foundation and compacted by
vibration including curing for 14 days complete in all respects as per clause No.2504 of specificaion
for Road and bridge works of Ministry of Road Transport and Highways (4th revision) etc .
Taking 20% volume of stone pitching vide
88.20
x
20%
17.64
Cum
item No.18 =
Total
17.64
Cum
Total for
2
Nos
35.28 Cum
@
Rs.
#REF!
/ Cum
(P-247)

#REF!

18 Providing and laying of filter media with granular materials /stone crushed aggregates in RCC slab
culverts satisfying the requirement laid down in clause No.2504.2.2 of MoRT &H specification to a
thickness of not less than 600mm.
Abutments
2
x 12.00
Wing walls
4
x 3.669
Return walls
4
x 0.944

0.60

3.00

43.20

0.60

1.825

16.07

0.60

0.80

=
=

1.81
61.08
122.16

Rs.

Total for
#REF!
(P-226)

Total
2
Nos
/ Cum

Cum
Cum
#REF!

19 Providing and laying HYSD bars confirming to grade I.S. 1786-1985(reinforcement as per drawing
and as per Section No.100, 1600, of specificaion for Road and bridge works of MoSRT &H (4th
revision).
Super structure
As per SD/112 (sheet 2 of 2) Page:39 =

16.027 MT

Rs.

Total for
#REF!
(P-220)

Page 83

Total
Nos
/ MT

16.03
32.054

MT
Cum
#REF!

Box cell culvert 3x3x3

20 Providing and laying HYSD bars confirming to grade I.S. 1786-1985(reinforcement as per drawing
and as per Section No.100, 1600, of specificaion for Road and bridge works of MoSRT &H (4th
revision).
Foundation & sub-structure (Skin reinforcement)
Wing wall vide item No- 4 (i)
0.1 % for Temparature bar of
Conc quantity vide item no4(i)

105.53

Rs.

Total
2
Nos
/ MT

Rs.

Total:
2
Nos
/ Cum

Total for
#REF!
(P-220)
21 Providing and laying reinforced cement concrete of grade M-30 (Design mix) in wearing coat
including cost of reinforcement.
@

Deck slab including approach slab of both ends


11.8
x
0.075
1
x
17.74
x

=
Total for
#REF!
(P-229)

1.0553 MT
1.0553 MT
2.1106 Cum
#REF!

15.70
15.70
31.4

Cum
Cum
Cum
#REF!

Total

Junior Engineer
N.H Section,Junagarh

Junior Engineer
N.H Section,Bh.patna

Assistant Engineer
N.H Sub division, Bh.patna

Page 84

#REF!

Executive Engineer
N.H Division,Kesinga.

Box cell culvert 3x3x3

Detailed Estimate for Re-construction of 3.0 x 6.0m Box Cell Culvert.

Sl.
No

At CD No- 123/1,123/4,124/1 & 124/4.


Total = 4Nos
Length
Breadth
Height
Nos.
in mtr
in mtr
in mtr

Items

Quantity

Unit

Rate

Amount
in Rs.

Earth work in excavation of foundation of structures


as per drawing and technical specification, including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter,
dressing of sides and bottom and backfilling with
approved material.

Box : L=12 + 0.15x2 = 12.30, B=3+


0.85x2 + 1.80x2 + 0.1x2 = 8.5, D=
0.3+0.42+0.15+0.3 = 1.17

12.30

8.50

1.17

122.32

16.12

6.02

2.45

950.7

1.40

2.05

2.45

28.13

24.68

1.50

2.45

90.7

24.68

1.85

2.95

134.69

13.84

10.84

0.75

225.04

3.00

24.68

1.05

77.74

1.50

24.68

1.05

38.87

8.50

1.08

0.78

14.32

-2

1.600

Sqm

2.45

-7.84

-2

1.930

Sqm

2.45

-9.46

Nos.

Below box

12.30

8.50

0.30

31.37

Wing wall low end

4
4

16.12
1.40

6.02
2.05

0.30
0.30

Nos.

116.41
3.44
151.22
604.88

12.30

8.50

0.15

15.68

8.30

0.57

0.15

1.42

4
4
1
1

16.12
1.40
24.68
24.68

6.02
2.05
1.50
1.85

0.15
0.15
0.15
0.15

58.21
1.72
5.55
6.85

2
2

13.84
12.00

10.84
3.50

0.15
0.15

45.01
12.6

Wing wall :
B=( 9.986 +Wing
2.050
) / low
2 = end
6.02
wall
Curtain wall Up Stream
D=(6.42-1)*2*2+6=28.8
Curtain wall Down Stream
D=(6.421)*2*2+6=28.8
Boulder appron curtain wall to box:
L=( 24.680
+ 3) / 2 = 13.84
Boulder appronB=(6.42-1)*2=10.84
after curtain wall at
D/S D=0.3+0.75=1.05
Boulder appron after curtain wall at
U/S D=0.3+0.75=1.06
Box Toe portion : 0.3 + 0.78 = 1.08
D=1.2-0.42=0.78
Deduction for Wing Wall Portion (U/S)
Deduction for Wing Wall Portion (D/S)

Quantity for
2

(P-211)
#REF!

#REF!

(P-213)
#REF!

#REF!

Sand Filling in Foundation Trenches as per


Drawing & Technical Specification
Wing wall :

Quantity for
3

1665.21
6660.84 Cum

Cum

M15 Grade Plain/Reinforced Cement Concrete


in Open Foundation complete as per Drawing
and Technical Specifications.
Below box
Box toe portion
B=SQRT(0.4*0.4*2)=0.57
Below Wing wall
Wing wall low end
Below curtain wall up stream
Below curtain wall down stream
Boulder appron curtain wall to box:
L=( 24.680
+ 3) / 2 = 13.84
B=(6.42-1)*2=10.84
Below approach slab

147.04
3x6 Box Cell Culvert

(P-214)
Page 85

Sl.
No

Items

Quantity for

Nos.

Length
in mtr

Nos.

Breadth
in mtr

3x6 Box Cell Culvert

Height
in mtr

Quantity

Unit

588.16

Cum

Rate

#REF!

Amount
in Rs.

#REF!

Page 86

Sl.
No

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

12.00

8.30

0.42

41.83

8.30

0.54

0.78

6.99

Nos.

2
2

12.00
12.00

Nos.

2
2

12.00
12.00

0.85
0.15

0.70
0.075

14.28
0.27

2
1
2

12.00
12.00
11.70

0.30
7.70
0.53

0.45
0.70
0.30

3.24
64.68

Nos.

16.12

5.82

0.50

187.57

16.12

3.68

0.476

112.95

4
4
4
4

16.12
16.12
16.12
16.12

1.273
0.50
0.55
0.60

2.12
0.22
0.05
0.30

174.02
7.09
1.77
11.61

Wing wall at low end


-do-: ( 1.35+1.00)/2 = 1.175
-do-: (1.00+0.5)/2 = 0.75
-do-do-do-

4
4
4
4
4
4

1.40
1.40
1.40
1.40
1.40
1.40

1.85
1.175
0.750
0.500
0.550
0.600

0.50
0.30
1.05
0.50
0.05
0.3

5.18
1.97
4.41
1.4
0.15
1.01

Up Stream curtain wall


-do-do-

1
1
1

24.68
24.68
24.68

1.30
0.45
0.20

0.80
0.75
0.45

25.67
8.33
2.22

Items

Quantity for

Haunch Bottom inside

Quantity for

48.82
195.28

Cum

(P-215)
#REF!

#REF!

0.85
0.15

5.30
0.075

Cum

(P-216)
#REF!

#REF!

Cum

(P-217)
#REF!

#REF!

108.12
0.27
108.39
433.56

RCC M 25 in super-structure as per


drawing and Technical Specification

Walls above construction joint


Haunch top inside
Haunch for approach slab ;
Top slab
Kerb: ( 3+0.85x2 + 3.5x2 ) = 11.70
B=(0.55+0.5)/2=0.53

Quantity for
7

Amount
in Rs.

RCC M 25 in sub-structure complete as per


drawing and Technical Specifications

Walls upto construction joint;

Rate

RCC M 25 in in Open Foundation


complete as per Drawing and Technical
Specifications.

Bottom slab
Toe portion :
( 0.3 + 0.78 ) / 2 =
0.50,
1.2 - 0.42 = 0.78

Unit

3.69
86.16
344.64

Plain/Reinforced cement concrete M-20 in


open foundation and sub-structure as per
drawing and technical specifications and as
per clause No.1500,1700,2100 and 2100 of
specificaion for Road and bridge works of
Ministry of Road Transport and Highways
(4th revision)etc complete.

Wing wall : ( 9.786 + 1.85 ) / 2 = 5.82


-do-: [{(9.286+3.094)/2} +
(1.35+1.00)/2] / 2 = 3.68,
H = ( 0.652+0.30)/2 =0.476
-do-: [{(3.094+0.5)/2} + (1.00+0.5)/2] /
2 = 1.273
-do- slope wise H =
-do- slope wise
-do- slope wise

3x6 Box Cell Culvert

Page 87

Sl.
No

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

Down Stream curtain wall


-do-do-do-

1
1
1
1

24.68
24.68
24.68
24.68

1.65
0.75
0.45
0.20

0.55
0.75
0.75
0.45

22.4
13.88
8.33
2.22

Nos.

Quantity for
8

592.18
2368.72 Cum

Quantity for

Quantity for

Quantity for

Quantity for

MT

(P-219)
#REF!

#REF!

108.4 cum
592.2 cum

6.81
4.65
11.46
45.84

Nos.

MT

(P-220)
#REF!

#REF!

86.16 cum

5.41
5.41
21.64

MT

(P-220)
#REF!

#REF!

Cum

(P-221)
#REF!

#REF!

RM

(P-223)
#REF!

#REF!

Sqm

(P-233)
#REF!

#REF!

Sqm

(P-226)
#REF!

#REF!

Nos.

12.00

Nos.

25.2
100.8

11.70

23.40

Nos.

23.40
93.6

11.70

Nos.

11.700

3.50

0.30

25.2

Providing and applying synthetic enamel


paint to kerb with alternate strips

Kerb

Quantity for
14

3.07
12.28

Providing and constructing vertical post and


precast railing incl. Reinforcement

Road side

13

#REF!

RCC M 30 in approach slab incl.


reinforcement

Approach slab

12

(P-218)
#REF!

Providing and laying HYSD bar


reinforcement in Superstructure

0.8 % for Super-structure quantity

11

Amount
in Rs.

Providing and laying HYSD bar


reinforcement in Substructure

0.8 % for Sub-structure quantity


0.1 % for Temparature bar

10

Rate

Providing and laying HYSD bar


reinforcement in Foundation

0.8 % for Foundation quantity


48.8 cum
Quantity for
4
Nos.
9

Unit

0.475

11.12
11.12
44.48

Providing and applying cement paint to


parapet and railing

Parapet

Quantity for

Nos.

3x6 Box Cell Culvert

0.86

20.12
20.12
80.48

Page 88

Sl.
No

15

Items

Quantity for

2
4

12.00
16.12

0.60
0.60

6.00
3.85

Rate

Amount
in Rs.

Quantity

Unit

86.4
148.95
235.35
941.4

Cum

(P-226)
#REF!

Nos.

#REF!

72

72

Wing wall : 4 x { 1/2x(6+1)x16.1} x0.5 =


113

113

113
185
740

No

(P-227)
#REF!

#REF!

6.29
6.29
25.16

Sqm

(P-229)
#REF!

#REF!

0.54
30.03
120.12

Sqm

(P-229)
#REF!

#REF!

7.20
7.20
28.80

Sqm

(P-229)
#REF!

#REF!

Nos.

10.90

Nos.

2
4
4

12.00
0.85
0.15

Providing and laying Cement concrete


wearing coat M-30 grade including
reinforcement complete as per drawing and
Technical Specifications

Quantity for

7.70

0.075

Providing & fixing 20 mm thick


compressible fibre board in expansion joint
complete as per drawing & Technical
Specification.

Approach slab end


Wing wall and abutment joint
For inside hunch (Triangular Portion)
Haunch for approach slab ;

Quantity for
19

Height
in mtr

Abutment wall : 2 x 12 x3 = 72

Over slab

18

Breadth
in mtr

Providing weep holes in Brick


masonry/Plain/ Reinforced concrete
abutment, wing wall/ return wall with 100
mm dia AC pipe, extending through the full
width of the structure with slope of 1V :20H
towards drawing foce. Complete as per
drawing and Technical Specifications

Quantity for

17

Length
in mtr

Providing and laying of Filter media with


granular materials/stone crushed
aggregates satisfying the requirements laid
down in clause 2504.2.2. of MoRTH
specifications to a thickness of not less
than 600 mm with smaller size towards the
soil and bigger size towards the wall and
provided over the entire surface behind
abutment, wing wall and return wall to the
full height compacted to a firm condition
complete as per drawing and Technical
Specification.

Box wall
Wing wall

16

Nos.

0.30
6.700
0.075
0.30

Nos.

12.00

Nos.

7.20
22.78
0.05
0.45

Providing & fixing Tar paper

Below approach slab


Quantity for

0.30

3x6 Box Cell Culvert

Page 89

Sl.
No

20

Items

Nos.

Length
in mtr

Breadth
in mtr

Height
in mtr

Quantity

4.00

80.94

sqm

0.30

97.13

13.84

10.84

0.30

90.02

Nos.

Unit

Rate

Amount
in Rs.

Providing and laying Pitching on slopes laid over


prepared filter media including boulder apron
laid dry in front of toe of embankment complete
as per drawing and Technical specifications

Wing wall & return wall


16.12/(sq. root 2), so A = 11.40
Return wall =1.40, so L = 11.40+1.40 = 12.80m
4 x[ (12.8+1.4)/2]x 11.40

Boulder appron curtain wall to box:


L=( 24.680
+ 3) / 2 = 13.84
B=(6.42-1)*2=10.84
Quantity for

187.15
748.592 Cum

(P-231)
#REF!

#REF!

21
Plain cement concrete (1:3:6) nominal mix
in grouting appron and revertments with
crushed stone aggregates 40mm nominal
size mechanically mixed, placed in
foundation and compacted by vibration
including curing for 14 days complete in all
respects
as per clause No.2504 of
specificaion for Road and bridge works of
Ministry of Road Transport and Highways
(4th revision) etc .
Taking 20% volume of stone pitching vide
item No.20 =

22

Quantity for

24

20%

748.59

149.72

3.00

24.68

0.30

22.21

1.50

24.68

0.30

11.11

Nos.

12.00

Cum

#REF!

#REF!

Providing and laying Flooring complete as per


drawing and Technical specifications laid over
cement concert bedding.
Boulder appron after curtain wall at
D/S
Boulder appron after curtain wall at
U/S

23

(P-247)

33.32
133.28

Cum

Nos.

52.80
52.80
211.20

Cum
Cum

Nos.

4
4
16

No

(P-232)
#REF!

#REF!

Back filling with granular materials behind


abutment, wing wall and return wall
complete as per 710.1.4 of IRC:78 and
2200 of specificaion for Road and bridge
works of Ministry of Road Transport and
Highways (4th revision) etc.complete.
0.40

5.50

(P-234)
326.18

68889.00

Sinthetic enamel Paint for culvert No.

Both side

4
Quantity for

(P-232)
#REF!

#REF!

#REF!
Junior Engineer
N.H Section, Junagarh.

Junior Engineer
N.H Section, Bh.Patna.

Assistant Engineer
N.H Sub division, Bh.Patna.
3x6 Box Cell Culvert

Executive Engineer
N.H Division, Kesinga.