BTS Site Specific Documentation

1144 CABS
LTE Flexi Multi Radio BTS

Site General Information

RF Final Site Configuration

Antenna System Installation Report

Antenna System Commissioning Report

BTS Installation Report

Transmission Installation Report

BTS Commissioning & Integration Report

Power System Installation Report

Site Inventory

10

Certificates

11

Appendix

LTE Flexi Multi Radio BTS


SITE SPECIFIC DOCUMENTATION

1144 CABS

Document Revision History


Version
1-0

Number/Version
1-0

Author
Taworn Pan-on

Date Approved
4 September 2014

Version History
First Issue

Copyright Nokia Networks


Company Confidential
Paper Copy Uncontrolled

Page
2(22)

1. SITE GENERAL INFORMATION

1.1

Site Details Summary Document

CABS

Site Name
Site ID

1144

Address

Harare, Zimbabwe

Coordinates

1.2

S -17.83028

E 31.05083

Site Access Information

Site Access

REQUIRED

Special Access
Measures
Other Comments

2G Flexi MultiRadio BTS SSD

ROOFTOP SITE

3(22)

2. RF FINAL SITE CONFIGURATION

Insert the document RF Final Site Configuration from the radio network plan
following this section.

2G Flexi MultiRadio BTS SSD

4(22)

3. ANTENNA SYSTEM INSTALLATION REPORT


3.1

Antenna System Configuration


Antenna Type Code

SECTOR 1

SECTOR 2

SECTOR 3

DBXLH-8585B-VTM

DBXLH-8585B-VTM

DBXLH-8585B-VTM

Number of Antennas

0
0
4
4

Set Direction
Mechanical Tilt
Electrical Tilt 900
Electrical Tilt 1800

54

Mounting Height
Sector 1

m. AGL

120
0
4
4
54 m. AGL

240
0
4
4
54 m. AGL

Sector 1

Ant. B

-45

+45

+45

240

Sector 3

-45

+45

-45

Ant. A

Ant. A
120

+45

Sector 2

240

Sector 3

+45

-45

120

Sector 2

Ant. B

Ant. A
+45

2G Flexi MultiRadio BTS SSD

+45

-45

-45

Ant. A

Ant. A

Antenna
Support
Structure

+45

-45

-45

Ant. B

Ant. A
+45

-45

5(22)

3.2

Antenna Feeder Cable Configuration


Sector 1

Item/Description

Sector 3

+45O
Cable 2

-45O
Cable 3

+45O
Cable 4

-45O
Cable 5

+45O
Cable 6

n/a

n/a

n/a

n/a

n/a

n/a

Cable Label
Feeder Cable Type:

1.

Sector 2

-45O
Cable 1

(e.g. 1/2", 7/8, 1-5/8")

2.

Installed Feeder Cable length:

n/a

n/a

n/a

n/a

n/a

n/a

3.

Number of Earth kits installed:

n/a

n/a

n/a

n/a

n/a

n/a

4.

Number of EMPs installed:

n/a

n/a

n/a

n/a

n/a

n/a

Internal Jumper Cable Lengths

5.

a.)*

BTS Feeder Cable

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

External Jumper Cable Lengths

6.

a.)* Feeder Cable Antenna


b.)*

RF Mod Antenna

3m

n/a

n/a

n/a

n/a

n/a

c.)* RF Mod Feeder Cable

n/a

n/a

n/a

n/a

n/a

n/a

d.)* 2G SYS Mod RF Mod.

Fiber 75m.

Fiber 75m.

Fiber 75m.

Fiber 75m.

Fiber 75m.

Fiber 75m.

e.)* LTE SYS Mod RF Mod.

n/a.

n/a

n/a

n/a

n/a

n/a

* Complete row relevant to antenna configuration:

2G Flexi MultiRadio BTS SSD

6(22)

3.3

Antenna System Installation Checklist


Description
Antennas mounted according to Standard Procedures and Site Specific Documents
Antenna height checked according to Final Site Configuration
Antenna forward direction set and checked according to Final Site Configuration
Mechanical tilting angle set and checked according to Final Site Configuration
Electrical tilting angle set and checked according to Final Site Configuration
Antenna mounting clamps & tilting kits checked, all screws tightened
Feeder cables installed according to Site Specific Documents
Feeder cables grounded at top of support structure close to the antenna
Feeder cables grounded at bottom of tower/mast
Feeder cables grounded at additional points (d > 80m) where applicable
Feeder cables grounded at the entry point to BTS
Feeder cables secured in position with cable hangers and clamps
Feeder cables labelled correctly (at each end)
External jumper cable connectors checked and tightened at both ends
All external connectors checked for correct sealing
All jumper cable connectors checked and tightened at both ends
All jumper cables labelled correctly at both ends

Checke
d

N/A

N/A
N/A

Notes on Antenna System Installation

2G Flexi MultiRadio BTS SSD

7(22)

4. ANTENNA SYSTEM COMMISSIONING REPORT


4.1

Antenna System VSWR Measurement Results


SECTOR 1

SECTOR 2

SECTOR 3

Cable Label:
Sweeptests Measurement Results:
VSWR for complete Antenna
System (NSN/Netone):

n/a

n/a

n/a

n/a

n/a

n/a

RL for complete Antenna


System (NSN/Netone):

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

Checklist of Printed Sweeptests Results:


n/a

Full Antenna Subsystem:

Copies of Antenna Test Result files are printed after this section.
Note: Feeder less solution no feeder installed on site.
4.2

Antenna Measurement Equipment


Model:

Serial Number:

Manufacturer:

Last Calibration Date:

N.B. Instrument calibration interval shall not exceed 12 month

2G Flexi MultiRadio BTS SSD

8(22)

4.3

Finishing Checklist
Description
All cables restored to normal position for BTS operation
All cable connectors properly tightened
All external connectors sealed and waterproof
Black Plastic Cable Ties placed on all external sealed cable connections (to secure the
PVC tape)
Antenna system configuration table completed in Section 3.1 above
Feeder inventory list completed in Section 3.2 above
Paper copy of the antenna line test results included following each section
All VSWR measurement results are within the defined test limits.

Checke
d

Notes on Antenna System Commissioning

2G Flexi MultiRadio BTS SSD

9(22)

5. BTS INSTALLATION REPORT


5.1

BTS Configuration
Installed LTE Flexi BTS Configuration:
1+1+1

Other: __________________

Installed 2G Flexi Multi Radio BTS Configuration:


4+4+4+4+4+4

Other: __________________

2+2+2
Feeder Site / Feeder less Site Configuration:
Feeder
Feeder less
Installed LTE Flexi BTS Hardware Module/s:
FSMF SYSTEM MODULE
FXEB 1800 RF MODULE
Installed 2G Flexi Multi Radio Hardware Module/s:
ESMC SYSTEM MODULE
FXEB 1800 RF MODULE
FXDB 900 RF MODULE
FIQB TRANSMISSION SUBMODULE
FPFC POWER DISTRIBUTION MODULE
FPMA POWER MODULE
FPAA AC/DC SUBMODULE
FPBB BATTERY
Other: __________________
RF sharing on FXEB

2G Flexi MultiRadio BTS SSD

10(22)

BTS Equipment Installation Type and Location:


BTS EQUIPMENT ()

BTS EQUIPT
INSTALLATION
TYPE ()

BTS EQUIPT
INSTALLATION
LOCATION ()

REMARKS

Shelter

LTE SYSTEM
MODULE

Stack type

Outdoor

Wall Mounted

Tower

Pole Mounted

Rooftop

N/A

Shelter

2G SYSTEM
MODULE

Stack type

Outdoor

Wall Mounted

Tower

Pole Mounted

Rooftop

N/A

Shelter

RF MODULE 1

Stack type

Outdoor

(Sector 1/2/3)

Wall Mounted

Tower

Pole Mounted

Rooftop

N/A

Shelter

RF MODULE 2

Stack type

Outdoor

(Sector 4/5/6)

Wall Mounted

Tower

Pole Mounted

Rooftop

N/A

Shelter

RF MODULE 3

Stack type

Outdoor

(LTE)

Wall Mounted

Tower

Pole Mounted

Rooftop

1800 Module (FXEB)

Shelter

POWER MODULE 1
(FPFC)

Stack type

Outdoor

Wall Mounted

Tower

Pole Mounted

Rooftop

FPFC feed 3 x RF
modules

Shelter

POWER MODULE 2

Stack type

Outdoor

Wall Mounted

Tower

Pole Mounted

Rooftop

N/A

Shelter

POWER MODULE 3

2G Flexi MultiRadio BTS SSD

Stack type

Outdoor

Wall Mounted

Tower

Pole Mounted

Rooftop

N/A

11(22)

5.2

BTS Installation Checklist


Description

Checked

Delivery is complete and undamaged

Minimum clearances are met

Adapter mechanics are installed (for wall and pole installation)

N/A

Plinth is installed according to the instructions

Plinth is grounded

Transmission sub-module is installed according to the instructions

Power supply cable is connected

Modules are installed according to the instructions

Modules are grounded to the plinth

Module back covers are installed

Cable entries are installed

Antenna cables are connected according to the configuration

Internal power cables are connected

Transmission cables are connected

Optical fibre cables are cleaned and connected

External alarm cable is connected


Cables between the modules on the same plinth are routed via internal
cable entries
BTS External cables or cables between the modules on different plinths
are routed via external cable entries
Cables are tied properly

N/A

Cable connector seals are firmly in place

Unused connectors are covered with IP seals

BTS is switched on and all units are ready for commissioning

Module front covers are installed

Site is clean and installation completed

Notes on BTS Installation

2G Flexi MultiRadio BTS SSD

12(22)

6. TRANSMISSION INSTALLATION
6.1

Transmission Configuration
SUBMODULE
INSTALLED ()

INTERFACE USED ()
E1 Interface 1

LTE

E1 Interface 2
E1 Interface 3
E1 Interface 4
Gb Ethernet EIF 1
Fast Ethernet EIF 2
Fast Ethernet EIF 3
E1 Interface 1
E1 Interface 2
E1 Interface 3

FIQB (2G)

E1 Interface 4
Gb Ethernet EIF 1
Fast Ethernet EIF 2
Fast Ethernet EIF 3

6.2

Transmission Installation Checklist

Description

Checked

Transmission Sub module installed properly

Transmission cables installed as per specifications

Transmission DDF installed as per specifications

Transmission cables connected to specified transmission DDF

Notes on Transmission Installation

2G Flexi MultiRadio BTS SSD

13(22)

7. BTS COMMISSIONING AND INTEGRATION REPORT


7.1

Site Commissioning Parameters


ITEM

VALUE

BTS Name

CABS

BTS ID

911281

BTS IP Address

10.26.17.20

MME Name
MME ID
MME IP

7.2

NTP IP

10.26.8.84

Netmask

255.255.255.248

Frequency

1800 (1/1/1)

Tx Power

20W

BTS SW Release Version

LN4.0_ENB_1202_902_09

BTS Commissioning Report

Insert printed copy of BTS Commissioning Report following this section.

2G Flexi MultiRadio BTS SSD

14(22)

7.3

BTS Integration
Test Handset Details
MODEL

SERIAL NUMBER

PHONE NUMBER

SIM NUMBER

Voice Call (MOC Call) Success


CELL

OK

NA

INITIALS / DATE

CELL 1

13 April 2015

CELL 2

13 April 2015

CELL 3

13 April 2015

COMMENTS

Voice Call (MTC Call) Success


CELL

OK

NA

INITIALS / DATE

CELL 1

13 April 2015

CELL 2

13 April 2015

CELL 3

13 April 2015

COMMENTS

PS Call Success
CELL

OK

NA

INITIALS / DATE

CELL 1

13 April 2015

CELL 2

13 April 2015

CELL 3

13 April 2015

2G Flexi MultiRadio BTS SSD

COMMENTS

15(22)

8. POWER SYSTEM INSTALLATION REPORT


8.1

BTS Power Supply Configuration


Tap to Existing:

LTE System Module Circuit Breaker:


2G System Module Circuit Breaker:
Input Voltage to System Module:
RF Module Circuit Breaker:
Input Voltage to RF Module:

60A
54.24
60A
54.24

Not Applicable
Rectifier Equipment Implementation
Power System 1 / Serial No.
Power System 2 / Serial No.
Power System 3 / Serial No.
PC Serial No.
Rectifier Module type
Rectifier Serial No.

ELTEK
Rectifier 1:
Rectifier 2:
Rectifier 3:
Rectifier 4:

Other: ____________________
Rectifier 1:
Rectifier 2:
Rectifier 3:
Rectifier 4:

Battery Back-up Info

Battery Manufacturer:
No of Battery Banks:

Battery Breakers (100A/bank):

Battery Unit Serial


Numbers:
BANK1
Bat1 ______________
Bat2 ______________
Bat3 ______________
Bat4 ______________
Battery Open Circuit
Voltages:
Bank 1 _________V
Block 1 _________V
Block 2 _________V
Block 3 _________V
Block 4 _________V

BANK1
Bat1 ______________
Bat2 ______________
Bat3 ______________
Bat4 ______________
Bank 2 _________V
Block 1 _________V
Block 2 _________V
Block 3 _________V
Block 4 _________V

BANK1
Bat1 ______________
Bat2 ______________
Bat3 ______________
Bat4 ______________

BANK1
Bat1 ______________
Bat2 ______________
Bat3 ______________

Bank 3 _______V

Bank 4 _________V
Block 1 _________V
Block 2 _________V
Block 3 _________V
Block 4 _________V

Block 1 _______V
Block 2 _______V
Block 3_ ______V
Block 4 _______V

Bat4 ______________

NOTE: Battery Open CCT shall be carried out in warehouse prior delivery of batteries to site. Battery Open
Circuit Voltage below 12.30VDC should not be installed and are to be replaced!

2G Flexi MultiRadio BTS SSD

16(22)

9. SITE INVENTORY
9.1

NSN Supplied Equipment

Description

Product Code

Serial Number

Quantity

LTE/2G BTS Antenna 1

DBXLH-8585B-VTM

14CN103020908

LTE/2G BTS Antenna 2

DBXLH-8585B-VTM

14CN103036284

LTE/2G BTS Antenna 3

DBXLH-8585B-VTM

14CN103036288

LTE System Module - FSMF

472181A

EA143363611

472501A

L6144101011

2G System Module - ESMC


RF Module 1 FXDB
RF Module 2 FXDB
RF Module 3 FXDB
RF Module 1 FXEB
RF Module 2 FXEB
RF Module 3 FXEB
Transmission FIQB
Power Module 1
Power Module 2
Power Module 3
AC/DC Sub module 1
AC/DC Sub module 2
AC/DC Sub module 3
Battery 1
Battery 2
Battery 3
Battery 4
Battery 5
Battery 6
Battery 7
Battery 8
Battery 9

2G Flexi MultiRadio BTS SSD

17(22)

9.2

Changes to Site Inventory


New unit
Name / Version

2G Flexi MultiRadio BTS SSD

Serial Number

Old unit
Name / Version

Serial Number

NOKIA Fault
Report Number

18(22)

10. CERTIFICATES
10.1

GSM Flexi MultiradioBTS SITE PUNCH LIST

10.2

Insert printed copy of signed GSM Flexi MultiradioBTS Site Punch List following
this section.

FAT CERTIFICATE

Insert printed copy of signed FAT Certificate following this section.

COMPLETED BY:
NAME:_______________________________ SIGNED:_______________________ DATE: ___/___/___
(NSN Representative)

Site Name:
Site ID:

Nokia Siemens Networks

19 (22)

GSM FLEXI MULTIRADIO BTS SITE PUNCH LIST


NETONE NOKIA SIEMENS NETWORKS
SITE DATA
Item

Data

Site ID

1144

Site Name

CABS

Installed by / Date

15 November 2014

Commissioned by / Date

15 November 2014

Integrated by / Date

13 April 2015

PUNCH LIST

Select the correct check number and point to check in Flexi MultiRadio BTS Implementation
Check List. Type the description of point to check and your comments for failure description.
When completed, type what was done.
Check
no.

Defect/Failure Description

Owner

Raised by /date

Completed by /
date

PUNCH LIST APPROVED BY:

NETONE REPRESENTATIVE:_____________________________________DATE: ____ / ____ / ________


(
)
NSN REPRESENTATIVE:_______________________________________DATE: ____ / ____ / ________
(
)
Site Name:
Site ID:

Nokia Siemens Networks

20 (22)

FINAL ACCEPTANCE TESTING (FAT)


NETONE NOKIA SIEMENS NETWORKS
Site Provisional Acceptance certificate for telecom implementation works

INDENT NUMBER:

SITE ADDRESS:

SITE ID:

1144

SITE NAME:

CABS

STAGE

COMPLETE (Initials/Signature)

GSM FLEXI MULTIRADIO BTS Site Installation


GSM FLEXI MULTIRADIO BTS Site Commissioning
GSM FLEXI MULTIRADIO BTS Site Integration
GSM BTS Site Folder and Attached Documents
Nokia Networks hereby states that the whole of supplies detailed above have been inspected, implemented,
tested and unless otherwise stated conform to the specified requirements in the contract or order identified
above.

NETONE REPRESENTATIVE:_________________________________________DATE: ____ / ____ / ________


(
)
NSN REPRESENTATIVE:___________________________________________DATE: ____ / ____ / ________
(
)

Site Name:
Site ID:

Nokia Siemens Networks

21 (22)

11. APPENDIX
11.1

BTS Installation Document

Site Name:
Site ID:

Insert printed copy of BTS Installation Document following this section.