1144 CABS
LTE Flexi Multi Radio BTS
Site Inventory
10
Certificates
11
Appendix
1144 CABS
Number/Version
1-0
Author
Taworn Pan-on
Date Approved
4 September 2014
Version History
First Issue
Page
2(22)
1.1
CABS
Site Name
Site ID
1144
Address
Harare, Zimbabwe
Coordinates
1.2
S -17.83028
E 31.05083
Site Access
REQUIRED
Special Access
Measures
Other Comments
ROOFTOP SITE
3(22)
Insert the document RF Final Site Configuration from the radio network plan
following this section.
4(22)
SECTOR 1
SECTOR 2
SECTOR 3
DBXLH-8585B-VTM
DBXLH-8585B-VTM
DBXLH-8585B-VTM
Number of Antennas
0
0
4
4
Set Direction
Mechanical Tilt
Electrical Tilt 900
Electrical Tilt 1800
54
Mounting Height
Sector 1
m. AGL
120
0
4
4
54 m. AGL
240
0
4
4
54 m. AGL
Sector 1
Ant. B
-45
+45
+45
240
Sector 3
-45
+45
-45
Ant. A
Ant. A
120
+45
Sector 2
240
Sector 3
+45
-45
120
Sector 2
Ant. B
Ant. A
+45
+45
-45
-45
Ant. A
Ant. A
Antenna
Support
Structure
+45
-45
-45
Ant. B
Ant. A
+45
-45
5(22)
3.2
Item/Description
Sector 3
+45O
Cable 2
-45O
Cable 3
+45O
Cable 4
-45O
Cable 5
+45O
Cable 6
n/a
n/a
n/a
n/a
n/a
n/a
Cable Label
Feeder Cable Type:
1.
Sector 2
-45O
Cable 1
2.
n/a
n/a
n/a
n/a
n/a
n/a
3.
n/a
n/a
n/a
n/a
n/a
n/a
4.
n/a
n/a
n/a
n/a
n/a
n/a
5.
a.)*
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
6.
RF Mod Antenna
3m
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Fiber 75m.
Fiber 75m.
Fiber 75m.
Fiber 75m.
Fiber 75m.
Fiber 75m.
n/a.
n/a
n/a
n/a
n/a
n/a
6(22)
3.3
Checke
d
N/A
N/A
N/A
7(22)
SECTOR 2
SECTOR 3
Cable Label:
Sweeptests Measurement Results:
VSWR for complete Antenna
System (NSN/Netone):
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Copies of Antenna Test Result files are printed after this section.
Note: Feeder less solution no feeder installed on site.
4.2
Serial Number:
Manufacturer:
8(22)
4.3
Finishing Checklist
Description
All cables restored to normal position for BTS operation
All cable connectors properly tightened
All external connectors sealed and waterproof
Black Plastic Cable Ties placed on all external sealed cable connections (to secure the
PVC tape)
Antenna system configuration table completed in Section 3.1 above
Feeder inventory list completed in Section 3.2 above
Paper copy of the antenna line test results included following each section
All VSWR measurement results are within the defined test limits.
Checke
d
9(22)
BTS Configuration
Installed LTE Flexi BTS Configuration:
1+1+1
Other: __________________
Other: __________________
2+2+2
Feeder Site / Feeder less Site Configuration:
Feeder
Feeder less
Installed LTE Flexi BTS Hardware Module/s:
FSMF SYSTEM MODULE
FXEB 1800 RF MODULE
Installed 2G Flexi Multi Radio Hardware Module/s:
ESMC SYSTEM MODULE
FXEB 1800 RF MODULE
FXDB 900 RF MODULE
FIQB TRANSMISSION SUBMODULE
FPFC POWER DISTRIBUTION MODULE
FPMA POWER MODULE
FPAA AC/DC SUBMODULE
FPBB BATTERY
Other: __________________
RF sharing on FXEB
10(22)
BTS EQUIPT
INSTALLATION
TYPE ()
BTS EQUIPT
INSTALLATION
LOCATION ()
REMARKS
Shelter
LTE SYSTEM
MODULE
Stack type
Outdoor
Wall Mounted
Tower
Pole Mounted
Rooftop
N/A
Shelter
2G SYSTEM
MODULE
Stack type
Outdoor
Wall Mounted
Tower
Pole Mounted
Rooftop
N/A
Shelter
RF MODULE 1
Stack type
Outdoor
(Sector 1/2/3)
Wall Mounted
Tower
Pole Mounted
Rooftop
N/A
Shelter
RF MODULE 2
Stack type
Outdoor
(Sector 4/5/6)
Wall Mounted
Tower
Pole Mounted
Rooftop
N/A
Shelter
RF MODULE 3
Stack type
Outdoor
(LTE)
Wall Mounted
Tower
Pole Mounted
Rooftop
Shelter
POWER MODULE 1
(FPFC)
Stack type
Outdoor
Wall Mounted
Tower
Pole Mounted
Rooftop
FPFC feed 3 x RF
modules
Shelter
POWER MODULE 2
Stack type
Outdoor
Wall Mounted
Tower
Pole Mounted
Rooftop
N/A
Shelter
POWER MODULE 3
Stack type
Outdoor
Wall Mounted
Tower
Pole Mounted
Rooftop
N/A
11(22)
5.2
Checked
N/A
Plinth is grounded
N/A
12(22)
6. TRANSMISSION INSTALLATION
6.1
Transmission Configuration
SUBMODULE
INSTALLED ()
INTERFACE USED ()
E1 Interface 1
LTE
E1 Interface 2
E1 Interface 3
E1 Interface 4
Gb Ethernet EIF 1
Fast Ethernet EIF 2
Fast Ethernet EIF 3
E1 Interface 1
E1 Interface 2
E1 Interface 3
FIQB (2G)
E1 Interface 4
Gb Ethernet EIF 1
Fast Ethernet EIF 2
Fast Ethernet EIF 3
6.2
Description
Checked
13(22)
VALUE
BTS Name
CABS
BTS ID
911281
BTS IP Address
10.26.17.20
MME Name
MME ID
MME IP
7.2
NTP IP
10.26.8.84
Netmask
255.255.255.248
Frequency
1800 (1/1/1)
Tx Power
20W
LN4.0_ENB_1202_902_09
14(22)
7.3
BTS Integration
Test Handset Details
MODEL
SERIAL NUMBER
PHONE NUMBER
SIM NUMBER
OK
NA
INITIALS / DATE
CELL 1
13 April 2015
CELL 2
13 April 2015
CELL 3
13 April 2015
COMMENTS
OK
NA
INITIALS / DATE
CELL 1
13 April 2015
CELL 2
13 April 2015
CELL 3
13 April 2015
COMMENTS
PS Call Success
CELL
OK
NA
INITIALS / DATE
CELL 1
13 April 2015
CELL 2
13 April 2015
CELL 3
13 April 2015
COMMENTS
15(22)
60A
54.24
60A
54.24
Not Applicable
Rectifier Equipment Implementation
Power System 1 / Serial No.
Power System 2 / Serial No.
Power System 3 / Serial No.
PC Serial No.
Rectifier Module type
Rectifier Serial No.
ELTEK
Rectifier 1:
Rectifier 2:
Rectifier 3:
Rectifier 4:
Other: ____________________
Rectifier 1:
Rectifier 2:
Rectifier 3:
Rectifier 4:
Battery Manufacturer:
No of Battery Banks:
BANK1
Bat1 ______________
Bat2 ______________
Bat3 ______________
Bat4 ______________
Bank 2 _________V
Block 1 _________V
Block 2 _________V
Block 3 _________V
Block 4 _________V
BANK1
Bat1 ______________
Bat2 ______________
Bat3 ______________
Bat4 ______________
BANK1
Bat1 ______________
Bat2 ______________
Bat3 ______________
Bank 3 _______V
Bank 4 _________V
Block 1 _________V
Block 2 _________V
Block 3 _________V
Block 4 _________V
Block 1 _______V
Block 2 _______V
Block 3_ ______V
Block 4 _______V
Bat4 ______________
NOTE: Battery Open CCT shall be carried out in warehouse prior delivery of batteries to site. Battery Open
Circuit Voltage below 12.30VDC should not be installed and are to be replaced!
16(22)
9. SITE INVENTORY
9.1
Description
Product Code
Serial Number
Quantity
DBXLH-8585B-VTM
14CN103020908
DBXLH-8585B-VTM
14CN103036284
DBXLH-8585B-VTM
14CN103036288
472181A
EA143363611
472501A
L6144101011
17(22)
9.2
Serial Number
Old unit
Name / Version
Serial Number
NOKIA Fault
Report Number
18(22)
10. CERTIFICATES
10.1
10.2
Insert printed copy of signed GSM Flexi MultiradioBTS Site Punch List following
this section.
FAT CERTIFICATE
COMPLETED BY:
NAME:_______________________________ SIGNED:_______________________ DATE: ___/___/___
(NSN Representative)
Site Name:
Site ID:
19 (22)
Data
Site ID
1144
Site Name
CABS
Installed by / Date
15 November 2014
Commissioned by / Date
15 November 2014
Integrated by / Date
13 April 2015
PUNCH LIST
Select the correct check number and point to check in Flexi MultiRadio BTS Implementation
Check List. Type the description of point to check and your comments for failure description.
When completed, type what was done.
Check
no.
Defect/Failure Description
Owner
Raised by /date
Completed by /
date
20 (22)
INDENT NUMBER:
SITE ADDRESS:
SITE ID:
1144
SITE NAME:
CABS
STAGE
COMPLETE (Initials/Signature)
Site Name:
Site ID:
21 (22)
11. APPENDIX
11.1
Site Name:
Site ID:
22 (22)