NFPA-110 Chapter 8: Routine and Operational Testing Checklist
Page 1 Equipment Description
Project Company / Owner Address: Contact: Phone:
Chapter 8.1.1 General
The routine maintenance and operation testing program shall be based on all of the following: Manufacturer's recommendations, Instruction Manuals, Minimum Requirements of NFPA-110 Chapter 8, and AHJ 8.2.1. Are there two sets of instruction manuals for all the major components of the EPSS
NO YES
8.2.2. Are there two sets of manuals on all Level 1
equipment? One at equipment and one stored elsewhere?
NO YES
8.2.3. Are special tools required for routine maintenance
available onsite and available for use when needed?
NO YES
8.2.4. Are manufacturer's recommended spare
parts inventoried in a secure location on site?
NO YES
8.3.1.-2. Has the EPSS been maintained to ensure to a
reasonable degree that the system is reliable?
NO YES
8.3.3. Has a written schedule for routine maintenance
and operational testing of the EPSS been established?
NO YES
8.3.4. Is a permanent record of the EPSS inspections,
tests, exercising, operation, and repairs available?
NO YES
8.3.5. Has a written schedule for routine maintenance
and operational testing of the transfer switch evident?
NO YES
8.3.6. Has a written schedule for routine maintenance
and operational testing of the paralleling gear evident?
NO YES
8.3.7.* Is a permanent record of weekly inspections and
maintenance of the storage batteries available?
NO YES
8.3.8. Is a permanent record of annual inspections