Unit Profile :
For over a quarter of century, the best in corporate & business
world have looked to Surfacoats as the Paint Company of choice.
Among the top paint companies in South India , Surfacoats
continue to add true aesthetic value to the world of concrete &
steel providing spectacular array of brilliant , vivid and Eco friendly paints that amaze the eyes & mind equally.
Unit III plant was set up in year 2001 and expanded continuously
in capacity since year 2004.The unit has got ISO 9001 Certification
and contributes very significantly in growth and turnover of the
organisation.
Unit
2005-06
2006-07
2007-08
Annual Production
MT
2224.1
3602.6
3949.4
KWH
127300
179000
219200
Rs.
KWH / MT
1140000
57.2
1114200
49.7
1212800
55.5
Rs/Ton
512.567
309.2766
307.08462
Graphical
Representation
of
Energy consumption & cost :
specific power consumption
57.2
60
55.5
49.7
50
Specific 40
Power
30
consumption 20
10
0
2005-06
2006-07
2007-08
year
512.566881
500
400
specific
energy cost 300
per ton
200
309.2766335
307.0846204
Series7
100
0
2005-06
2006-07
year
2007-08
Specific
Works Manager
(Unit Head )
Engg.Manager
(Head Energy
Management
cell)
Prodn.
Stores
Q.C.
finance
Energy Policy :
1 ) Surfacoats is committed to continuously improve energy
efficiency by optimum utilisation of resources, monitoring &
benchmarking energy consumption and elimination of waste.
2 ) Continuously explore and implement non-conventional methods
and best prevailing practices to conserve energy.
3 ) We strive to build overall awareness among employees for
energy conservation and Eco-friendly methods
Sr.
Project
Background of
Technical &
Observations Made
No. Description
the project
Financial analysis
Impact Of
Implementation
It is feasible to
install star delta
converter which will
attrior runs on During low load
change the mode
Star Delta
high load
period,attritor
between delta and Installed star delta
Converter for
1
initially after
continue to run on
star depending on converter
attritor of 50 hp
charging & after delta leading to high load.Investment of successfully.
rating
on low load.
power consumption Rs.17000 is
required with
payback period of 7
months
When new
machines of
about 100 hp
rating are
Maximum
added in
demand
2
system,there
controller for
was expected
power system.
rise of
maximum
demand by at
least 75 KVA
Annual
Saving achieved
( Rs.)
33671
162000
17008
Lighting
Redistribution
Without
compromising the
product quality,after
step-by-step
modification in
stirrer speed by
changing pulleys
has been
made.Pulley with
the optimum
required speed has
been installed .
A single point
control of more
Separate switches
High wattage lamps
than one lamp
Investment of
are provided for all
( 250 w ) are to be
was resulting in
Rs.2300 is required the 4 high wattage
provided with
switching on
with payback period lamps with
individual switches for
lamps which
of 12 months
necessary changes
on off control.
are not required
in wiring.
at that time.
If fuel injection
pump is not
Fuel consumption of
having optimum diesel generator set
Recalibration of setting,it results has increased
Fuel Injection into en -efficient considerably per
6
Pump of diesel burning of fuel unit.It is decided to re
generator
I.e.higher
calibrate the same
consumption
after repairing /
with more
replacing nozzles
pollution.
Investment of
Rs.12000 is
required with
payback period of
18 months
Grinding time of
an attrior is
Exact quantity &
depending on
type of grinding
type & quantity
media suitable to
of grinding
Major part of energy
our requirement is
Feasible & essential
media added consumption in
charged after
Calibration of
to carry out step by
apart from other factory is in attritor as
calibration.Batch
attritors for
step study to
factors.If
they have to run more
Cycle Time has
7 optimum
achieve optimum
optimum type & hours.If it is
reduced by 1 hour
grinding in less
grinding in
quantity is
controlled,there will
per batch.The entire
time
attrior.Needs no
decided by
be major impact on
energy requirement
investment.
scientific
energy consumption.
after expansion of
meathods,there
the factory has
will be reduction
been provided by
in grinding
this innovation.
hours.
T O T A L
29931
2280
8400
346560
599850
Sr.No.
Project Description
Investment
required
( Rs.)
Projected
benefits per
annum ( Rs.)
13000
17100
68000
125993
15000
86746
229839
T O T A L