1 of 4
https://websmp230.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/sno/ui/...
SAP Note
Language English
Header Data
Released On
28.11.2011 09:16:23
Release Status
Released for Customer
Component
CO-OM-CEL-E Postings
Other Components CO Controlling
CO-OM-CCA Cost Center Accounting
CO-OM-CEL Cost Element Accounting
CO-OM-OPA-A Master Data
CO-PA Profitability Analysis
CO-PC Product Cost Controlling
Priority
Category
Symptom
This SAP Note describes the CO account assignment logic as of Release 3.0.
Between Release 2.2 and 3.0, the account assignment logic for actual postings changed. More
account assignments are possible in Release 3.0 than in Release 2.2.
Other Terms
CO interface, FB01, VF01
Solution
Account assignment logic as of Release 3.0:
1. Orders, cost centers, projects, cost objects, networks, special make-to-order
manufacturer sales orders and profitability segments are valid account assignment objects of
7/3/2015 1:34 PM
2 of 4
https://websmp230.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/sno/ui/...
Controlling. As of Release 4.5A, activity types (in connection with cost centers) can be
assigned to an account; as of Release 4.6A, business processes are permitted as account
assignment objects. Profit centers, from the point of view of CO, are objects, which, in
addition to the account assignment objects mentioned (and which may be derived from them)
can be assigned to an account.
2. Every posting row in which the account is created as cost element or revenue element must
contain a true account assignment object. You are not permitted to, for example, assign a
statistical project only to account.
3. It is possible to have any number of statistical account assignment objects in addition
to the true account assignment object. Costs can be, for example, assigned to a statistical
order and a statistical project in addition to a cost center.
4. Two or more true account assignment objects are not permitted in one posting row. The
single exception is the cost centers that are entered together with another true CO account
assignment object. In this case, this CO account assignment object is actually posted to and
the cost center is updated statistically.
5. It is possible to enter every account assignment object once only in a posting row. Two
orders, for example, cannot be assigned in one posting row.
6. Actual postings for revenues can never be made to cost centers. If the cost element is of
the type revenue, a cost center is considered as a statistical account assignment object for
this reason. In addition to the cost center, a true account assignment object that can carry
revenues is required, for example, a profitability segment. The system can automatically
derive an object like this when the relevant setting is made.
7/3/2015 1:34 PM
3 of 4
https://websmp230.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/sno/ui/...
Validity
Software Component From Rel.
SAP_APPL
300
40A
45A
46A
46C
470
500
600
602
603
604
605
606
References
This document refers to:
SAP Notes
707285 Posting to reconciliation object not allowed
551506 FAQ note Overhead Cost Controlling
397799 INFORMATION: CO-OM-OPA (Order & Project Accounting)
397239 INFO:CO-OM Interface/actual postings/commitment/down payment
370250 Program trace for the CO interface
367813 KI235 for goods movements: What should be done?
131676 CO a/c assgmnt logic in IS-U billing doc. invoicing
106968 FAQ: Account Assignment Logic
105024 Automatic account assignment (OKB9) does not work
83702 INFO: Acct assignmt logic sales order proc. - REM
70159 Interc.: No a/c-based CO-PA docs. upon goods issue
7/3/2015 1:34 PM
4 of 4
https://websmp230.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/sno/ui/...
7/3/2015 1:34 PM