23.09.03
0
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Fecha:
Pagina
1 of 18
Doc. No.
Pertenece a :
T-HbI - 01
Sulzer Chemtech AG
Technology
Contenido.
Introduccin ..................................................................................................... 2
4.1
4.2
5.1
5.2
6.1
Preparacin ........................................................................................................8
6.2
7.1
7.2
7.3
Soldadura .........................................................................................................14
7.4
7.5
7.6
10
11
12
23.09.03
0
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Fecha:
Pagina
2 of 18
Doc. No.
Pertenece a :
T-HbI - 01
Sulzer Chemtech AG
Technology
1 Introduccin
Recomendamos que un supervisor de Sulzer est presente durante la instalacin y
ensamble del empaque estructurado e internos Sulzer, as como durante el chequeo
subsecuente de las reparaciones a la columna.
El supervisor de Sulzer deber estar siempre presente, as Sulzer puede garantizar su
calidad. Asimismo, Sulzer se reserva el derecho para rechazar cualquier reclamacion con
respecto a la garanta si la instalacin no hubiera sido supervisada por sus propios
especialistas.
Sulzer no se hace responsable de los costos causados por instalacin no calificada.
Usted debe trabajar con los dibujos especficos de internos y platos que correspondan a la
orden. Pregunte al supervisor si surge alguna duda !
El alto grado de eficiencia en las columnas de Sulzer se puede alcanzar slo cuando todas
sus partes estn correctamente instaladas y se cumple con las siguientes especificaciones:
2 INSTRUCCIONES GENERALES DE SEGURIDAD.
" Es responsabilidad de todo el personal mientras est trabajando cuidar de su seguridad y
actuar de manera racional a fin de no poner en riesgo la salud y seguridad de otras personas
que puedan ser afectadas por sus actos u omisiones....
Importante: Debido al peligro de lesiones, no se deben
manejar empaques sin llevar puesta ropa protectora ni los
guantes para evitar cortadas!
23.09.03
0
Atencin:
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Fecha:
Pagina
3 of 18
Doc. No.
Pertenece a :
T-HbI - 01
Sulzer Chemtech AG
Technology
Todo el personal debe mantener su puesto de trabajo limpio y en orden para asegurar su
bienestar laboral en todo momento.
Toda el rea en donde la soldadura es realizada debe ser cerrada en la medida de lo
posible, y mantenerse tan lejos como sea posible si es que esto no tienen algn efecto
adverso en el proceso que esta siendo usado.
Transporte y almacenamiento
Acero inoxidable:
23.09.03
0
Rev.No.
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Fecha:
Pagina
4 of 18
Doc. No.
Pertenece a :
T-HbI - 01
Sulzer Chemtech AG
Technology
Grafito:
Plsticos:
Las cajas de embalaje que contienen los empaques estructurados llevarn instrucciones
adecuadas concernientes al transporte, ejemplo "este lado hacia arriba o "proteger de
la humedad".
Las tarimas para transportar empaques e internos no pueden ser apiladas.
Los dimetros de las columnas deben ser medidos y los resultados comparados con la
tolerancia mxima dada a continuacin:
Tipo de empaque
BX, CY, Mellapak 500
Mellapak < 500
Transporte horizontal
>10'000
En caso que el dimetro interno est fuera (encima o debajo) de los lmites de tolerancia
mencionados, se llevar a cabo una revisin por Sulzer Chemtech a fin de determinar si se
requiere remplazar o ajustar los empaques e internos de la torre.
4.1 Tolerancia vertical (V) del recipiente
Para la correcta operacin del empaque, debe mantenerse la verticalidad de la columna
dentro de los limites de la desviacin mxima permitida. La V de verticalidad esta en funcin
de la altura de la columna. La diferencia horizontal x entre la tapa superior de la columna y
el la base o tapa inferior es verificada.
V =
x[mm]
100[%]
altura _ columna[mm]
Tipo de columna
Columnas bridadas
Columnas soldadas
Tapa superior de la
columna y base
0.3 %
0.3 %
por seccin
0.1 %
4.2
23.09.03
0
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Fecha:
Pagina
Doc. No.
Pertenece a :
5 of 18
T-HbI - 01
Columnas bridadas:
Esmerilar completamente los cordones de soldadura para:
- dimetros internos < 800 mm y empaques BX / CY
Se permite un mximo de 2 mm de cordn de soldadura.
- dimetros internos > 800 mm y BX u otros empaques
Instalacin de la columna.
posicin
Sulzer Chemtech AG
Technology
23.09.03
0
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Fecha:
Pagina
6 of 18
5.2
Doc. No.
Pertenece a :
T-HbI - 01
Sulzer Chemtech AG
Technology
23.09.03
0
Rev.No.
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Fecha:
Pagina
7 of 18
Doc. No.
Pertenece a :
T-HbI - 01
Sulzer Chemtech AG
Technology
Responsabilidades del cliente: Entregar la columna libre de gas, limpia y aislada, con
accesibilidad, seguridad y el desperdicio dispuesto.
Las Boquillas y registros a reutilizarse deben ser checados en campo, para asegurar su
correcta elevacin y orientacin.
Despus de remover los platos y anillos soportes existentes, la redondez de la torre debe ser
verificada. Si es necesario deben considerarse recomendaciones de acciones correctivas.
La fase final de remocin de los internos viejos y la instalacin de los componentes nuevos
Sulzer ser supervisada por personal de Sulzer.
6.1 Preparacin
Una buena preparacin reduce el tiempo de instalacin. Las siguientes recomendaciones
deben considerarse:
Conocimiento de los procedimientos generales.
Acceso a la columna. (sin gases).
Ventilacin (ventiladores de aire o sistema de respiracin personal).
Iluminacin interna de las columnas (bajo voltaje y contra explosin).
Accesibilidad, andamios, gras, escalera de cuerda, conjunto de cuerda, etc.
Medios de transporte y rutas a seguir.
Pre-ensamble parcial (a fin de ahorrar tiempo durante el paro).
Comunicacin por telfono o radio.
Reglas de seguridad.
Correcto almacenaje de las herramientas.
el tipo de plato
el tipo de tornillera ( clips, tornillos, construccin soldada, etc.)
el ao de construccin y el material
corrosin y residuos de productos
revisin para detectar presencia de cinta de asbestos
23.09.03
0
Rev.No.
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Fecha:
Pagina
8 of 18
Doc. No.
Pertenece a :
T-HbI - 01
Sulzer Chemtech AG
Technology
Atencin:
Todos los anillos, soportes, conexiones de tuberas con proyecciones internas, tendrn que
ser removidos del rea donde ser instalado el empaque estructurado.
Cualquier proyeccin inevitable que todava permanezca despus de remover los anillos,
etc., no debe exceder:
Las anillos soporte debern ser removidos mediante soplete, equipo de oxicorte o plasma.
Siempre que sea posible, los anillos existentes debern ser utilizados, y de ser necesario,
completar los mismos para poder instalar nuevos anillos canales y vigas de soporte.
23.09.03
0
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Fecha:
Pagina
Doc. No.
Pertenece a :
9 of 18
T-HbI - 01
Sulzer Chemtech AG
Technology
Boquilla de soplete de
larga curva
Pared de la columna
23.09.03
0
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Fecha:
Pagina
10 of 18
Doc. No.
Pertenece a :
T-HbI - 01
Sulzer Chemtech AG
Technology
23.09.03
0
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Fecha:
Pagina
11 of 18
Doc. No.
Pertenece a :
T-HbI - 01
Sulzer Chemtech AG
Technology
Cabezal de boquilla
enfriado con aire
Anillo soporte
Pared de la columna
23.09.03
0
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Fecha:
Pagina
12 of 18
Doc. No.
Pertenece a :
T-HbI - 01
Sulzer Chemtech AG
Technology
7.3 Soldadura
Toda Soldadura debe ser realizada por soldadores calificados de acuerdo al cdigo de
recipientes a presin ASME, seccin IX, posicin 3G y 4F.
Deben estar disponibles las especificaciones para el procedimiento de soldadura (WPS) y
procedimiento de registros de calificacin (PQR) para los materiales involucrados.
Las reas de soldadura deben estar claramente especificadas con un smbolo presentado en
los dibujos.
23.09.03
0
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Pagina
Fecha:
13 of 18
Doc. No.
Pertenece a :
T-HbI - 01
Sulzer Chemtech AG
Technology
Recubrimiento
Soldadura
de sello
~ 10
Soldadura
de soporte
Placa de
respaldo
Recubrimiento
~ 10
Soldadura
De sello
Soldadura
de anillo
Anillo
Soporte
23.09.03
Rev.No.
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Fecha:
Pagina
14 of 18
Doc. No.
Pertenece a :
Sulzer Chemtech AG
Technology
T-HbI - 01
2mm
max. 4mm
4mm
Fig. 5
Fig. 6
23.09.03
0
Rev.No.
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Fecha:
Pagina
15 of 18
Doc. No.
Pertenece a :
T-HbI - 01
Sulzer Chemtech AG
Technology
23.09.03
0
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Fecha:
Pagina
16 of 18
Doc. No.
Pertenece a :
T-HbI - 01
Sulzer Chemtech AG
Technology
b)
Si la contaminacin se origina de a) los filtros, estos deben ser instalados desde la fase de
arranque.
Si la contaminacin es por b) se requerir filtracin continua.
Se deben instalar siempre 2 filtros juntos en paralelo (uno en operacin y el otro de repuesto)
con un sistema de reemplazo fcil.
El tamao de los orificios de la malla debe ser un dcimo del dimetro del orificio del
distribuidor de lquido. Las dimensiones del filtro dependen de la cantidad de flujo, el grado
de la contaminacin y la capacidad de bombeo (para los casos en que la alimentacin a la
torre pasa a travs de una bomba).
Las partculas finas y gruesas que lleguen al distribuidor se depositaran en los brazos
canales del mismo, en donde la velocidad del flujo es baja, lo que irremediablemente tapara
los canales de distribucin. Esta situacin har necesaria la instalacin de un filtro, dentro o
fuera de la columna.
Cuando los residuos de aceite en empaques, internos y partes de la columna, deban ser
removidos antes de que la columna comience a operar y el producto, de la torre, es
demasiado valioso o no sirve como agente desengrasante.
El desengrasado de los internos se har despus de armados en la columna.
Un solvente como la acetona o el percloro es vertido dentro de la columna.
Hay que asegurarse de que todas las tuberas internas y externas sean lavadas y que todo
el equipo y tanques de almacenamiento conectados a la torre estn perfectamente limpios.
Despus la columna debe ser operada por alrededor de 8 hrs. en reflujo total y con suficiente
carga de gas.
Esto significa que la columna, empaques e internos han sido lavados con solvente y que las
grasas y aceites se encuentran en el fondo o en el evaporador o rehervidor (si el solvente fue
recirculado, los contaminantes simplemente se habrn diluido!!).
S se usan mezclas acuosas en la torre, o si los empaques e internos deben estar libres de
grasa por cualquier motivo, es importante pedir los empaques e internos desengrasados a
Sulzer.
23.09.03
Rev.No.
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Fecha:
Pagina
17 of 18
Doc. No.
Pertenece a :
T-HbI - 01
Sulzer Chemtech AG
Technology
En estos casos, queda establecido que la columna, tuberas, equipos conectados y tanques
deben estar absolutamente limpios y libres de grasa antes de su montaje y que el armado de
los internos y el empaque sea llevado acabo con el mayor grado de limpieza.
Si es necesario una etapa final de limpieza como la descrita en el prrafo anterior se debe
llevar a cabo.
Tuberas de entrada sin filtro, con elementos filtrantes faltantes o desvo abierto.
Tuberas instaladas sin pendiente o con facilidades para acumular liquido.
Cabezal de succin de la bomba de circulacin demasiado pequeo
Un reflujo irregular proveniente del condensador que regresa el fluido de vuelta a la
columna sin control.
Inadecuados instrumentos de medicin y control, por ejemplo: cada de presin
Condiciones de operacin irregulares
Aislamiento trmico deficiente
Subenfriamiento del reflujo que no es tomado en cuenta en el balance trmico
Distribuidor bloqueado
Distribuidor con muy baja carga de liquido con respecto a su diseo (carga de lquido
muy por debajo del mnimo)
23.09.03
0
Doc. No.
Emisor
Ch. Hollenstein
Aprobado
Ch. Bachmann
Vis:
Pagina
Fecha:
Pertenece a :
T-HbI - 01
18 of 18
Sulzer Chemtech AG
Technology
12 Reporte de supervisin
Cliente (Nombre, direccin): .......................................................................................
Nombre del proyecto:
......................................... Proyecto.-No:
Columna No:
.........................................
Coordinador
Responsable:
Compaa del
......................................... montaje:
Supervisor:
...............................................................................................
1
2
3
4
5
6
7
8
9
10
11
12
13
Inspecciones ejecutadas
S
Desviacin vertical de la columna < 3
Empaque instalado de acuerdo a las instrucciones
Los internos fueron instalados segn las
instrucciones de instalacin
Distribuidor de lquido nivelado
Tubera interna correctamente instalada en canal
principal (Distancia de la tubera segn dibujo)
Colector de lamelas correctamente instalado
(sobrepone al anillo de canal)
Colector de lamelas para columnas bridadas
correctamente sellado
Prueba de hermeticidad de colector de chimenea
Orificio en empaque para sensor de temperatura
Demister correctamente instalado
Limpieza visual de la columna satisfactorio
Todos los registros cerrados
NO
...........................
.............................
N.A. OBSERVACIONES
Tipo de empaque
H1 mm = distancia entre capa superior de empaque y borde inferior registro
Brida
Lecho 1
Lecho 2
Lecho 3
Lecho 4
Lecho 5
Lecho 6
Empaque
H1 mm
SULZER CHEMTECH
CLIENTE
Nombre: ..
Nombre: .
Firma:...........................................
Firma: ....
Lugar/Fecha : ..................................
Lugar/Fecha : ...........................................
16.10.03
Rev.No.
Issuer
Approved
Vis:
Date:
Page
1 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
Contenido
1
2
2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.2
2.2.1
2.2.2
2.2.3
3
3.1
4
4.1
4.2
4.3
4.3.1
4.3.2
4.3.3
4.4
4.4.1
4.4.2
4.4.2.1
4.4.2.1.1
4.4.2.1.2
4.4.2.2
4.4.2.3
4.4.2.3.1
4.4.2.3.2
4.4.2.4
4.4.2.5
4.4.2.6
4.4.3
4.4.3.1
4.4.3.2
4.4.3.3
4.4.4
4.4.4.1
4.4.4.2
3
5
5
5
5
5
5
5
6
6
6
7
8
9
10
10
11
12
12
13
14
15
15
16
16
16
16
17
18
18
18
19
20
20
21
21
21
22
23
23
24
4.4.4.3
5
5.1
5.1.1
5.1.2
5.1.3
5.2
5.3
5.3.1
5.3.2
5.3.2.1
6
6.1
6.2
6.3
6.3.1
6.3.2
6.4
7
16.10.03
0
Issuer
Approved
Vis:
Date:
Ch. Bachmann
Page
2 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
E-43
Bajantes
Bajante convencional (normal)
Ensamblado de las placas del bajante
Ensamble de la parte superior
Ensamble de la parte inferior
Bajantes tipo Vortex
Bajantes tipo seccin calmadora (Calming Section)
Bajantes normales tipo seccin calmadora (Calming Section)
Bajantes tipo HI-FI seccin calmadora (Calming Section)
ENSAMBLADO E INSTALACIN DE LOS BAFFLES
Instalacin de los platos
Instalacin de bajantes de plato normales
Instalacin de platos tipo Vortex
Instalacin de platos Shell tipo seccin calmadora (Calming Section)
Platos normales seccin calmadora (Calming Section)
Platos HI-FI seccin calmadora (Calming Section)
Instalacin de vlvulas tipo snap-in
Inspeccin final
25
26
26
26
27
28
29
30
30
31
32
33
33
33
33
33
33
34
35
Platos de un paso
Platos de dos pasos
Platos de tres pasos
Platos de cuatro pasos
37
40
44
46
Apndice B. Tolerancias para platos Shell (copiado de Shell DEP 31.22.20.31-Gen, marzo
2001, pginas 50-52 )
50
54
55
16.10.03
0
Issuer
Approved
Vis:
Ch. Bachmann
Plato de un paso
Date:
Page
3 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Ch. Bachmann
Page
4 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Rev.No.
Issuer
Approved
Vis:
Date:
Ch. Bachmann
Page
5 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
Para cada ensamble de platos/internos, usted deber trabajar con dibujos especficos suministrados
por Sulzer, y este manual debe ser usado slo como una gua.
Debe trabajar con los dibujos especficos para los platos que este instalando.
2.1.2
Requerimientos de espacio
El rea de la clasificacin, debe estar tan cercana a la columna como sea posible ( 100 a 400m).
El rea de almacenamiento de cajas, debe estar tan cercana como sea posible al rea de
clasificacin.
2.1.3
Cajas/Cajones de embalaje
2.1.4
Documentos
Listas de embarque.
Dibujos de ubicacin (elevaciones y orientaciones), elementos soldados al cuerpo de la torre.
Dibujos detallados de las partes a fijar o unir.
2.1.5
La lectura del dibujo del plato con respecto a la lista de embalaje permitir la identificacin de cada
parte por su nmero de referencia que corresponde a una serie de partes.
Cada parte del plato es marcada con su nmero de referencia. Tome slo la parte que necesita,
dejando las dems en la caja.
16.10.03
0
Issuer
Approved
Vis:
Date:
Ch. Bachmann
Page
6 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
Importante! evite vaciar y/o abrir innecesariamente las cajas ya sea al azar o que no corresponda
al ensamble que se va a realizar.
2.2.1
Instalacin
La instalacin de los platos debe iniciarse del fondo de la columna hacia la parte superior.
Modificaciones, si realmente son inevitables, slo durante la instalacin.
2.2.2
Inspeccin
Cada plato ensamblado deber ser inspeccionado sistemticamente para asegurar que:
a) las orientacin, dimensiones y tolerancias estn correctas.
b) todas las partes estn ensambladas y ajustadas correctamente.
c) ningn tornillo o pieza de ensamble quede suelto.
Es necesario realizar una verificacin final antes del cierre de los registros (manways).
Basado en la experiencia previa, los siguientes puntos deben ser checados cuidadosamente:
Las platos deben estar libres de cualquier material suelto (tornillos, rondanas, empacaduras, lentes
de proteccin, herramientas, estopa, etc.) el cual pueda tener un efecto adverso en el
funcionamiento del plato.
16.10.03
0
Issuer
Approved
Vis:
Ch. Bachmann
Page
Date:
7 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
2.2.3
NOTAS IMPORTANTES
Evite vaciar y/o abrir innecesariamente las cajas ya sea al azar o que no corresponda al ensamble
que se va a realizar..
Sobre el piso adyacente a la torre haga la maqueta del plato a instalar.
Cada uno en secuencia segn el(los) dibujo(s) que aplique(n).
La maqueta de la plato sobre el terreno le permitir al personal de instalacin:
Se Familiarizarse con los dibujos de Sulzer.
Identifique la posicin de varias piezas con la ayuda de las marcas de referencia pintadas en cada
una de las piezas que componen el plato.
Se acostumbre a las precauciones observadas al manejar las piezas de los platos.
Ejecute una pre-verificacin de los componentes, a ser inspeccionados despus de la instalacin.
Aunque el arreglo de un pre-armando pueda aparecer al principio como una prdida de tiempo,
nuestra extensa experiencia ha probado lo contrario.
16.10.03
0
Issuer
Approved
Vis:
Date:
Ch. Bachmann
Page
8 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
Verifique con respecto a las listas de embalaje si estn todas las cajas.
Organizar las cajas de embalaje, de forma que coincidan con la secuencia de instalacin de las
partes.
Saque las piezas de las cajas de embalaje, slo como se vayan necesitando.
Verifique con las listas de embalaje si todas las cajas estn disponibles.
Verifique con las listas de embalaje y los dibujos pertinentes si todas las partes estn completas.
Presente los internos sobre el piso adyacente a la torre antes de iniciar la instalacin.
La presentacin de los internos se debe hacer con respecto a los dibujos correspondientes.
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
9 of 53
Dibujo No.
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Page
Date:
Belongs to :
10 of 53
Ch. Bachmann
Doc. No.
T-HbI - 06
Sulzer Chemtech AG
Technology
detalle general.
Despus de ensamblar todas las cubiertas del plato el man-way se puede cerrar.
Importante
La uniformidad de la cubierta de plato no se debe alterar debido al trabajo de instalacin.
4.2
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
11 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
12 of 53
Doc. No.
Belongs to :
T-HbI - 06
4.3
4.3.1
Instalacin de la viga(s)
Sulzer Chemtech AG
Technology
Para la ubicacin y orientacin de la viga ver los dibujos de arreglo general y del (los) plato(s).
Verifique la diferencia de nivel entre el lado superior del anillo de soporte y de la viga 2 mm.
Despus de la instalacin de la viga verifique dimensiones:
A=AoA=B=A
La viga deber ser fijada (atornillada) a los soportes de la columna.
4.3.2
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
13 of 53
Doc. No.
Belongs to :
T-HbI - 06
Los Platos con una viga, son divididos en dos (2) secciones
Sulzer Chemtech AG
Technology
4.3.3
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
14 of 53
Doc. No.
Belongs to :
T-HbI - 06
Los Platos con 2 vigas principales, son divididos en tres (3) secciones.
Sulzer Chemtech AG
Technology
16.10.03
0
Rev.No.
Issuer
Approved
Vis:
Ch. Bachmann
Date:
Page
15 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
4.4
Conexiones
4.4.1
Tan pronto como el panel del plato ha sido presentado, ajuste las grapas de fijacin (clamps).
Las conexiones con pasadores se pueden reemplazar por conexiones atornilladas.
Existen dos tipos de grapas de fijacin para platos.
a. grapas de fijacin a presin
16.10.03
0
Rev.No.
4.4.2
Issuer
Approved
Vis:
Date:
Page
16 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
4.4.2.1.1
MOUNTING POSITION
16.10.03
Rev.No.
4.4.2.1.2
Issuer
Approved
Vis:
Date:
Ch. Bachmann
Page
17 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
Rev.No.
Issuer
Approved
Vis:
Ch. Bachmann
Date:
Page
18 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
4.4.2.3.1
2.1a
(Grapa de fijacin instalada
fuera de la columna)
2.1b
(Grapa de fijacin instalada
dentro de la columna)
Levantar clamp
Deslice el pasador dentro de la ranura
El Pasador debe fijarse solo a mano
16.10.03
Rev.No.
4.4.2.3.2
Issuer
Approved
Vis:
Date:
Page
19 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Ch. Bachmann
Date:
Page
20 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
4.4.3
16.10.03
0
Issuer
Approved
Vis:
Ch. Bachmann
Date:
Page
21 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
22 of 53
Doc. No.
Belongs to :
T-HbI - 06
4.4.4
4.4.4.1 E-20
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
23 of 53
Ch. Bachmann
Doc. No.
Belongs to :
T-HbI - 06
4.4.4.2 E-21
MANWAY OPEN
MANWAY CLOSED
MANWAY
MANWAY
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Ch. Bachmann
4.4.4.3 E-43
Ubicacin de la conexin
Vis:
Date:
Page
24 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Ch. Bachmann
Bajantes
5.1
5.1.1
Page
25 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
5.1.2
16.10.03
0
Issuer
Approved
Vis:
Ch. Bachmann
Date:
Page
26 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
5.1.3
16.10.03
Issuer
Approved
Vis:
Date:
Page
27 of 53
Ch. Bachmann
Doc. No.
Belongs to :
T-HbI - 06
Los Orificios sin uso se deben tapar con tornillos, tuercas y rondanas
A = Separacin bajante plato (clearance)
Sulzer Chemtech AG
Technology
5.2
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
28 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Page
Date:
Belongs to :
29 of 53
Ch. Bachmann
Doc. No.
T-HbI - 06
5.3
5.3.1
Sulzer Chemtech AG
Technology
5.3.3
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
30 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Page
Date:
31 of 53
Ch. Bachmann
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Ch. Bachmann
Page
32 of 53
Doc. No.
Belongs to :
T-HbI - 06
6.1
6.2
6.3
6.3.1
6.3.2
Sulzer Chemtech AG
Technology
6.4
16.10.03
0
Issuer
Approved
Vis:
Date:
Ch. Bachmann
Page
33 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
34 of 53
Ch. Bachmann
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
Inspeccin Final
Debe realizarse una inspeccin final antes de cerrar los registros hombres (manways).
Basado en experiencias previas, los siguientes puntos deben ser cuidadosamente observados:
Todos los seguros deben estar doblados
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
35 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
36 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
37 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
38 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
39 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
40 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
41 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
42 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
43 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
44 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
45 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
46 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
47 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
0
Issuer
Approved
Vis:
Date:
Page
48 of 53
Ch. Bachmann
Doc. No.
Belongs to :
Sulzer Chemtech AG
Technology
T-HbI - 06
Apndice B . Tolerancias para las estructuras de platos ( copiado de Shell DEP 31.22.20.31Gen, marzo de 2001 , pginas 50-52 )
APENDICE 3
1.
GENERAL
Tolerancias para las torres sujetas a presin interna y/o externa ser como se afirma en UG-80 y
UG-81. La desviacin mxima en la verticalidad de la torre, no exceder de 0.3%, ya sea de la
altura cilndrica total o de alguna individual de 5m de altura de la torre.
2.
Si las torres poseen mallas o filtros especiales que requieren un ajuste ms preciso, las tolerancias
estarn de acuerdo con las recomendaciones del fabricante del la malla/filtro y ser especificado en
las hojas de datos/requisicin (datasheets).
3.
ALTURA
La tolerancia en la altura total medida entre las lneas tangentes ser segn la siguiente tabla:
Tolerancia
(mm)
Altura L
(mm)
L
1000
2.0
1000
<
4000
4.0
4000
<
10000
8.0
L
>
10 000
Y todas las torres teniendo un espesor de pared > 70 mm
13.0
NOTA: Las lneas tangentes sern marcadas con punto de golpe en la parte inferior y superior,
tanto interna como externamente en la interseccin de las tapas con la seccin cilndrica.
4.
ELEMENTOS SOLDADOS
16.10.03
0
Issuer
Approved
Vis:
Date:
Ch. Bachmann
Page
49 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
4.1
a.
b.
Proyeccin para boquillas en recipiente medida desde la curvatura del recipiente y para
boquillas en domos medidos desde la lnea tangente: 6 mm.
c.
d.
Orientacin radial, medida desde el centro de la torre a la lnea del centro de la boquilla: 1,
con una tolerancia mxima radial de 15 mm.
e.
Orientacin del barreno para tornillos: rotacin mxima 1.5 mm medido en el crculo para
tornillos.
NOTA: Los barrenos de tornillo para montaje, debern ser paralelos a la lnea del centro, a menos
que sea indicado de otra manera.
f.
NOTA: Las Boquillas y soportes de cambiadores de calor montados uno encima del otro, sern
verificados para su correcta alineacin durante la fabricacin, y el ajuste ser hecho para
los empaques especificados.
4.2
g.
h.
Diferencia de proyeccin por cada par de bridas, medido desde la curvatura del recipiente:
1.0 mm.
i.
4.3
j.
k.
l.
16.10.03
0
Issuer
Approved
Vis:
Date:
Ch. Bachmann
4.4
SOPORTES DE LA TORRE
m.
Altura de soporte
Page
50 of 53
Doc. No.
Belongs to :
T-HbI - 06
Tolerancia
1000
2.0
1000
<
4000
4.0
4000
<
10000
8.0
Sulzer Chemtech AG
Technology
(mm)
n.
Anillo base o soporte desnivelado: 0.2% del dimetro nominal con un mximo de 12 mm.
p.
q.
r.
4.5
SOPORTES DE PLATO
s.
Nivelacin del anillo soporte: medido como la mayor diferencia en la circunferencia: 0.15%
del dimetro externo del plato, con un mximo de 4 mm.
t.
Posicin del anillo soporte del plato: distancia del anillo soporte a la lnea de tangencia
inferior: 6 mm.
u.
Distancia entre dos anillos soportes adyacentes (y desde anillo de soporte al centro de la
boquilla adyacente o conexin de instrumento): 3 mm, excepto para la distancia de un
anillo de soporte de retiro de producto al centro de la correspondiente boquilla, para lo cual la
tolerancia es 2 mm.
v.
w.
y.
16.10.03
Rev.No.
Figura 1
Issuer
Approved
Cdigo alfabtico
Vis:
Date:
Page
51 of 53
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
16.10.03
Rev.No.
Westendorp
Issuer
Approved
Doc. No.
Page
Date:
Belongs to :
Ch. Bachmann
Sulzer Chemtech AG
Technology
T-HbI - 06
52 of 53
Supervision
Q A Manager
Fecha:
Origen:
31.07.2003
--
CLIENTE:
Supersedes:
31.01.2003
FO-OSS-
CONTRATO No:
PROYECTO:
COLUMNA / ARTICULO
No:
Plato No
FIRMA VERIFICACION
SULZER
OPERACION
Verificar Todas las partes del plato se instalaron
correctamente como indica el dibujo
Verificar Los herrajes corresponden a los que indica el
Dibujo.
Verificar Todas las orientaciones y medidas son correctas
Verificar Bajante Alturas de rebosadero entrada/salida
estn correctas
Verificar Tornilleria fija y apretada como indica el dibujo.
Verificar No quedan accesorios sueltos
Verificar El rea esta limpia y libre de desechos.
OPERADOR
FIRMA
FECHA COMPLETA
COMENTARIOS:
FIRMA SUPERVISOR:
FECHA:
16.10.03
0
Rev.No.
Issuer
Approved
Vis:
Page
Date:
53 of 53
Ch. Bachmann
Doc. No.
Belongs to :
T-HbI - 06
Sulzer Chemtech AG
Technology
ORDEN No:
SPC No:
SI
NO
N.A
OBSERVACIONES
SULZER CHEMTECH
CLIENTE
NOMBRE:
NOMBRE:
FIRMA:
FECHA:
FIRMA:
FECHA:
Issue
Fecha
Rev.No.
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
INDICE
1
2
2.1
3
4
5
6
7
7.1
7.1.1
7.1.2
7.1.3
7.1.4
7.1.5
7.1.6
7.1.7
7.2
7.2.1
7.2.2
7.2.3
7.2.4
7.2.5
7.2.6
7.3
7.3.1
7.3.2
7.3.3
7.3.4
7.3.5
7.4
7.4.1
7.4.2
7.4.3
7.4.4
7.4.5
8
8.1
8.1.1
8.1.2
Fecha:
Pgina
1 de 37
DE
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
CONTENIDO
Prefacio
Informacin sobre Preparacin General
Qu se debe evitar?
Orientacin de los Distribuidores de Lquido
Criterio de nivelacin aceptable
Fijacin
Sistemas de entrada de lquido (LV)
Distribuidores de lquido
(Distribuidores VE)
Distribuidor VEP plato para salpicaduras
Distribuidor VEG orificios en la parte inferior
Concepto del diseo del Distribuidor VE
Procedimiento de instalacin para Distribuidores VE
Fijacin de cajas laterales (Distribuidores VEP)
Fijacin de VEP plato para salpicaduras
Diseo del Distribuidor VE auto soportado
Distribuidores VK
Distribuidor tipo canal VKG con orificios en la base VKG
Distribuidor tipo canal VKR2
Concepto de diseo para distribuidor VK de una pieza
Procedimiento de instalacin para distribuidores VK de una pieza
Concepto del diseo para distribuidores VK bridados
Procedimiento de instalacin para distribuidores VK bridados
Distribuidor VKRPW con baja carga de lquido
Distribuidores VKRPW para columnas bridadas 1
Concepto del diseo para distribuidor de una pieza
Procedimiento de instalacin para distribuidores VKRPW de una pieza
Distribuidores VKRFPW para instalacin mediante la compuerta
Procedimiento de instalacin para Distribuidor bridado VKRFPW
Distribuidor VDR con espreas
Localizacin
Procedimiento de instalacin
Instalacin de la esprea
Chequeo de los niveles
Aseguramiento
Colector VS / Distribuidor
Colector VSIR / Distribuidor
Concepto de diseo
Procedimiento de instalacin
3
3
3
4
5
5
6
7
7
7
7
7
8
9
9
10
11
11
11
12
12
13
13
14
14
14
15
16
16
17
17
17
18
18
19
19
19
19
20
Issue
Fecha
Rev.No.
8.2
8.2.1
9
9.1
9.1.1
9.1.2
9.1.3
9.2
9.2.1
9.2.2
9.2.3
10
10.1.1
10.1.2
10.1.3
10.1.4
10.1.5
10.1.6
10.1.7
10.1.8
10.1.9
11
11.1
11.1.1
11.1.2
11.1.3
11.1.4
11.2
11.2.1
11.2.2
11.3
11.3.1
11.3.2
11.3.3
11.4
11.4.1
11.4.2
11.4.3
11.5
11.5.1
11.5.2
11.5.3
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
2 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
22
22
23
23
23
23
23
24
24
24
25
25
26
26
26
26
26
28
28
28
29
29
29
30
31
31
31
32
32
32
33
33
33
34
34
34
35
35
35
35
36
36
Issue
Fecha
23.09.03
0
Rev.No.
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
3 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Prefacio
Estas instrucciones tienen la intencin de ser una gua para la instalacin de todo tipo de internos
manufacturados por Sulzer Chemtech.
El buen funcionamiento de la columna se puede lograr slo si se siguen apegadamente las
siguientes instrucciones y la instalacin es llevada a cabo correctamente.
Para ser capaz de instalar los internos en un corto perodo de tiempo, es de primordial importancia
considerar una planificacin detallada de los procedimientos de instalacin y transmitir las
instrucciones al personal de instalacin
La instalacin debe estar bajo la supervisin de un Supervisor de Sulzer.
Sulzer no se responsabiliza de costos ocasionados por una instalacin inadecuada.
La garanta de proceso de la columna o columnas slo es vlida si la instalacin es llevada a cabo
bajo la supervisin de Sulzer.
Ver tambin Thb1-01 para instrucciones Generales de Seguridad.
Deben ser retirados del interior de la columna todos los desechos, tales como: residuos de
soldadura, polvo, partculas corrosivas o cualquier material externo que pueda causar
obstrucciones o ensuciamiento.
Los internos para columnas bridadas son suministrados en una pieza; mientras que para columnas
monobloc los internos son suministrados en secciones para ser pasadas a travs de los registro pasa
hombre.
2.1 Que se debe evitar?
Issue
Fecha
Rev.No.
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
4 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Issue
Fecha
23.09.03
0
Rev.No.
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
5 de 37
Doc. No.
Belongs to :
Sulzer Chemtech AG
Technology
T-HbI - 04
Adems, los distribuidores deben ser colocados precisamente alineados en el centro de la columna y
horizontalmente instalado con mecanismos de nivelacin.
Estos mecanismos pueden ser rejas de nivelacin, barras niveladoras, jigs o tornillos de nivelacin.
La nivelacin tiene que ser verificada con exactitud con el indicador de nivel de gota.
Para columnas con dimetros > 3 metros, nosotros recomendamos instrumentos lser.
L < 2m
L > 2m
A
L=chann
e
L=channel
l length
length
El nivel debe ser revisado y verificado en ambos ejes, "X" y "Y" durante y despus de la instalacin.
Los puntos de medicin estn al final de cada brazo o canal principal, (Ver Figura 3).
5
Fijacin
Despus de la nivelacin final, los distribuidores de gravedad de lquido tienen que quedar
fuertemente asegurados en la posicin nivelada.
a)
II
X
Y
IV
measuring
points
Puntos de
III
medicin
X
Y
nn
ha
c
L=
Fig. 3
b)
th
ng
e
l
l
Issue
Fecha
Rev.No.
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
6 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Arreglo Estndar
Con el diseo Standard, los tubos de
alimentacin deben estar unidos a la brida
interna de la columna.
Para columnas grandes el tubo debe ser
suspendido con clips a la pared de la torre.
La distancia entre la salida del tubo de
alimentacin y el canal principal o canal de predistribucin tiene que ser de acuerdo al dibujo
de montaje y tiene que ser ajustado durante el
ensamble.
Si no es especificado en el dibujo, sta
distancia deber ser:
0.5 x d
d = dimetro interno del tubo
Empaque
Issue
Fecha
23.09.03
0
Rev.No.
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
7 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Tubera de
alimentacin
Caja
calmadora
Distribuidores de lquido
7.1 (Distribuidores VE)
Dependiendo del sistema de descarga, los tipos de distribuidor estn diferenciados entre VEP y VEG.
7.1.1
Issue
Fecha
Rev.No.
7.1.2
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
Doc. No.
Belongs to :
T-HbI - 04
8 de 37
Sulzer Chemtech AG
Technology
El distribuidor VEG es parecido al distribuidor con placa para escurrimiento VEP, la diferencia es que
el lquido es descargado a travs de los agujeros en el fondo del canal en lugar de lateralmente
contra un deflector vertical.
No se recomienda para lquidos que contengan slidos.
Sistema de descarga del VEG
7.1.3
Canal
colgante
Esprrago de
nivelacin
Brazo
canal
Bafle
Soporte
perforado
Mellapak
Issue
Fecha
Rev.No.
7.1.4
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
9 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
main trough
side box
arm trough
2
Vista en 3D de la caja
1. Insertarlo a las ranuras laterales por la parte superior y asegrese que la caja lateral se encuentre
fija en su sitio.
2. Verifique que este asentada jalando desde abajo.
Para retirar las cajas laterales se debe presionar la ranura lateral.
Issue
Fecha
Rev.No.
7.1.6
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
10 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Para el distribuidor VEP, debe verificarse la correcta fijacin de las placas para escurrimiento, antes
de su instalacin.
7.1.7
Para columnas con un dimetro mayor a 1 metro, es tambin posible auto soportar distribuidores a
la pared de la columna.
La ventaja de este sistema es que el distribuidor permanece en su posicin, en el caso de que el
empaque se deteriore por corrosin.
El proceso de instalacin es el mismo que para los distribuidores soportados sobre el empaque, pero
adicionalmente los soportes (pies) deben ajustarse a la pared de la columna de acuerdo a los
siguientes detalles.
Vista superior del distribuidor VEP
Issue
Fecha
Rev.No.
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
11 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
7.2 Distribuidores - VK
Dependiendo del sistema de descarga, los distribuidores se distinguen entre VKG o VKR.
7.2.1
7.2.2
Los distribuidores VKR2 distribuyen los lquidos a travs de tuberas, las cuales estn conectadas por
ambos lados a los canales.
El lquido es guiado en un tubo de goteo de alta capacidad, al tope del empaque.
Sistema de descarga Distribuidores VKR2
Issue
Fecha
Rev.No.
7.2.3
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
12 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
7.2.4
Muestra A
Issue
Fecha
Rev.No.
7.2.5
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
13 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Para columnas que cuentan con registros hombre, los distribuidores estn seccionados para pasar a
travs de los registros.
Los canales laterales y principal estn bridadados y debern cerrarse sin el empaque.
7.2.6
Issue
Fecha
Rev.No.
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
14 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
7.3.1
7.3.2
Issue
Fecha
Rev.No.
7.3.3
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
15 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Para
columna
bridada,
colocar
el
distribuidor VKRPW encima del empaque.
Use los tornillos laterales solamente para
alinear el distribuidor al centro de la
columna! (ver Muestra A)
Detalle A
Issue
Fecha
Rev.No.
7.3.4
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
16 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
7.3.5
segmentos
bridados
del
Issue
Fecha
Rev.No.
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
17 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
7.4.1
Localizacin
7.4.2
Procedimiento de instalacin
Issue
Fecha
Rev.No.
7.4.3
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
18 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Instalacin de la esprea
7.4.4
7.4.5 Aseguramiento
Los elementos roscados se deben asegurar con tuercas (deben ser evitadas tuercas soldadas).
Issue
Fecha
23.09.03
0
Rev.No.
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
19 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Distribuidor / Colector VS
El distribuidor / Colector se utiliza para colectar y redistribuir los lquidos entre lechos empacados.
El distribuidor / Colector VSI para DI > 800 mm se soportan en un anillo.
Para un DI ms pequeo el sistema es instalado entre las bridas de las columnas.
Procedimiento de instalacin
Los anillos de soporte deben de ser de una sola pieza sin interrupciones.
Para anillos no cerrados es importante llenarlo para minimizar fugas a travs de las paredes de la
columna.
Issue
Fecha
23.09.03
Rev.No.
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Lateral de la chimenea
Pos. 1:
Se debe iniciar a instalar el lateral de la
chimenea (Pos. 1). Coloque el segmento en el
anillo y fjelo con clamps. No apriete los clamps
desde el principio.
Pgina
20 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Issue
Fecha
23.09.03
Rev.No.
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Cubierta de la Chimenea
Pos. 4
El diseo Standard del distribuidor VSI incluye
cubiertas para las chimeneas utilizadas para
colectar y redistribuir el lquido. Atornillar la
cubierta al final a los segmentos frontal y
posterior y checa que cubra la chimenea.
Sellado
Para sellar son utilizadas Juntas de fibra de
vidrio ubicadas entre el anillo y el VSI.
Finalmente apretar todos los clamps.
Pgina
21 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Issue
Fecha
Rev.No.
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
22 de 37
8.2.1
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Issue
Fecha
23.09.03
0
Rev.No.
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
23 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Colectores
9.1 Colector SLR / SLM
9.1.1
Diseo conceptual
El colector SL est construido en segmentos y puede ser instalado a travs de registros hombre. Los
segmentos tienen que ser ensamblados juntos durante la instalacin.
9.1.2
Procedimiento de instalacin
Asegrese que los clips para ajustar el colector estn soldados al canal del anillo y colocados
correctamente. La instalacin del colector SLR/SLM solo puede hacerse desde abajo. Comience por
fijar uno de los dos conectores al anillo canal. Instale primero los segmentos ms pequeos por
debajo y fjelo al conector. Despus instale el siguiente segmento y continu. Al final ajuste el
segundo conector al anillo canal y fijelo tambin al conector. El ajuste de los segmentos debe ser
acorde a los siguientes detalles. Finalmente checar que el colector quede sobre el anillo canal.
9.1.3
Vista superior
Issue
Fecha
Rev.No.
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
24 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Detalle
El colector SLRT/SLMT tiene dos funciones, un soporte de empaque y un colector tipo vane.
Como soporte de empaque, puede soportar la carga directa del empaque.
Para algunos empaques, son usados platos de goteo adicionales.
9.2.1
Diseo conceptual
Estos colectores no-soldados generalmente son utilizados en aplicaciones donde el espacio entre los
lechos de empaque es crtico. Este colector requiere un anillo de soporte dentro de la columna.
Pueden instalarse a travs de registros hombre.
9.2.2
Procedimiento de instalacin
Los segmentos pueden ser colocados en un anillo dentro de la columna. Instalar primero los dos
segmentos pre-ensamblados ms pequeos y apernar el plato conector al colector. Despus instalar
los otros segmentos en la parte media. Para ajustarlos juntos usar los perfiles de conexin. Los
perfiles de conexin se pueden deformar (Las bridas se presionan juntas) y empujados en las
ranuras de conexin. Despus de liberar las bridas, la conexin puede ser ajustada en su sitio. Seria
recomendable usar unas pinzas para abrir cerraduras para empujar las bridas juntas. (Para mayores
detalles ver el procedimiento de instalacin de la rejilla de soporte TSB).
Issue
Fecha
Rev.No.
9.2.3
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
25 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Seccin B B
(Fijacin del plato conector)
Issue
Fecha
Rev.No.
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Pgina
Fecha:
26 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Issue
Fecha
23.09.03
Rev.No.
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
27 de 37
Doc. No.
Belongs to :
Sulzer Chemtech AG
Technology
T-HbI - 04
Bajante lateral
Canal central
La instalacin de los segmentos de la chimenea debe comenzar primero por las partes del sumidero,
las cuales deben alinearse en posicin central y adjuntadas con soldadura punteada.
Lado intermedio de la
chimenea
Plato frontal/trasero
Segmento de bandeja
Cubierta
Issue
Fecha
23.09.03
Rev.No.
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
28 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Solamente despus que todas las vigas, chimeneas, cubiertas y platos laterales estn posicionados y
alineados, comenzar con la soldadura de sellado.
Para evitar fugas checar que no existan aberturas en cada esquina de las chimeneas, etc. y se
realicen todos los sellos con soldadura.
Las cubiertas (sombreros) deben instalarse con la inclinacin y direccin correcta de flujo.
Si la cubierta de la chimenea es muy alta, es posible que sea sellado por abajo.
Cuando se suelda los platos de chimeneas y bajantes se deben seguir las siguientes instrucciones
importantes:
El tamao de los sellos soldados deben mantenerse al mnimo necesario para mantener las
juntas ajustadas
El calentamiento debe mantenerse al mnimo a efecto de reducir la distorsin del plato.
La soldadura debe comenzar desde el centro progresivamente haca los lados.
La ltima soldadura debe ser con el anillo soporte o pared de la torre.
Issue
Fecha
23.09.03
Rev.No.
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
29 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
10.1.8 Fugas
La fuga de un plato de chimenea es definida como la cantidad permitida de lquido del flujo de
operacin. La cantidad de fuga es tambin funcin del nivel de lquido de operacin en el plato.
Para checar las fugas, se puede realizar una prueba con agua en el plato.
Cerrar todos los tubos de flujo y orificios, llenar el plato con agua, El nivel de la prueba no
debe exceder el nivel de operacin normal.
Issue
Fecha
Rev.No.
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
30 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
11 Sistemas de soporte
El sistema de soporte debe sostener la carga de operacin del empaque incluyendo el lquido
retenido por el mismo y la carga muerta, si el distribuidor esta soportado en el empaque, tambin
debe soportar la carga del distribuidor y sistema de nivelacin.
Detalle TSB
002
brida
001
Issue
Fecha
Rev.No.
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
31 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Las ranuras de desage son aadidas entre las vigas de soporte principal en las partes de conexin.
Issue
Fecha
Rev.No.
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
32 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Issue
Fecha
Rev.No.
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
33 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Issue
Fecha
Rev.No.
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
34 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
La GIS es construida por segmentos y puede ser instalada a travs de registro hombre. Los
segmentos tienen que ser apernados durante la instalacin.
11.3.2 Procedimiento de instalacin
Comenzar la instalacin con el segmento ms pequeo y colquelo sobre el anillo soporte.
Para uso estndar los segmentos del GIS pueden ser posicionados sobre el anillo soporte sin
atornillarlo.
Despus instalar el siguiente segmento en adelante.
El ajuste de los segmentos debe ir acorde con los siguientes detalles.
Detalle A
Detalle B
Issue
Fecha
Rev.No.
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
35 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Issue
Fecha
Rev.No.
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
36 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Issue
Fecha
Rev.No.
23.09.03
0
Emisin
Ch. Hollenstein
Apovado
Ch. Bachmann
Vis:
Fecha:
Pgina
37 de 37
Doc. No.
Belongs to :
T-HbI - 04
Sulzer Chemtech AG
Technology
Detalle A
Detalle B