15510 Federal Register / Vol. 73, No.

57 / Monday, March 24, 2008 / Notices

at: http://www.ferc.gov/docs-filing/ DEPARTMENT OF ENERGY distance of approximately 2,300 feet.


esubscription.asp to be notified via The pipeline crosses the International
e-mail of new filings and issuances Federal Energy Regulatory Boundary for a distance of 30 feet (the
related to this or other pending projects. Commission Pipeline) and interconnects with a 4-
For assistance, call 1–866–208–3676 or [Docket No. CP08–90–000] inch (114.3 mm) diameter pipeline (the
e-mail FERCOnlineSupport@ferc.gov, Connector Pipeline) operated by Sword.
for TTY, call (202) 502–8659. A copy is Sword Energy Limited; Eagle Rock The Connector Pipeline connects with
also available for inspection and Exploration Ltd.; Notice of Application an existing North Western-operated
reproduction at the address in item (h) To Transfer Natural Gas Act Section 3; gathering system in northern Montana at
above. Authorization and Presidential Permit SE 1⁄4 Section 8, Township 37N, Range
m. Individuals desiring to be included March 14, 2008. 4W downstream of the North Western-
on the Commission’s mailing list should On March 11, 2008, Sword Energy operated North Moulton compressor
so indicate by writing to the Secretary Limited (Sword) and Eagle Rock station.
of the Commission. Exploration Ltd. (Eagle Rock) filed an Sword and Eagle Rock state that the
application in Docket No. CP08–90–000 border facilities will remain in place
n. Comments, Protests, or Motions to
pursuant to section 3 of the Natural Gas and operation following the requested
Intervene: Anyone may submit Act (NGA) and section 153 of the
comments, a protest, or a motion to transfer and assignment. Sword and
Commission’s Regulations and Eagle Rock also state that there are no
intervene in accordance with the Executive Order No. 10485, as amended
requirements of Rules of Practice and current third party service agreements
by Executive Order No. 12038, and the
Procedure, 18 CFR 385.210, .211, .214. associated with the Sword pipeline,
Secretary of Energy’s Delegation Order
In determining the appropriate action to although Eagle Rock would be prepared
No. 00–004.00A, effective May 16, 2006,
take, the Commission will consider all seeking authorization to transfer to offer transportation services to any
protests or other comments filed, but Sword’s existing NGA section 3 other shipper.
only those who file a motion to authorization and Presidential Permit to There are two ways to become
intervene in accordance with the Eagle Rock, all as more fully set forth in involved in the Commission’s review of
Commission’s Rules may become a the application which is on file with the this project. First, any person wishing to
party to the proceeding. Any comments, Commission and open to the public for obtain legal status by becoming a party
protests, or motions to intervene must inspection. This filing is available for to the proceedings for this project
be received on or before the specified review at the Commission or may be should, on or before the comment date,
comment date for the particular viewed on the Commission’s Web site at file with the Federal Energy Regulatory
application. http://www.ferc.gov, using the Commission, 888 First Street, NE.,
‘‘eLibrary’’ link. Enter the docket Washington, DC 20426, a motion to
o. Any filings must bear in all capital number excluding the last three digits in
letters the title ‘‘COMMENTS’’, intervene in accordance with the
the docket number field to access the requirements of the Commission’s Rules
‘‘PROTEST’’, or ‘‘MOTION TO document. For assistance, please contact
INTERVENE’’, as applicable, and the of Practice and Procedure (18 CFR
FERC Online Support at
Project Number of the particular 385.214 or 385.211) and the Regulations
FERCOnlineSupport@ferc.gov or toll-
application to which the filing refers. free at (866) 208–3676, or for TTY, under the NGA (18 CFR 157.10). A
contact (202) 502–8659. person obtaining party status will be
p. Agency Comments: Federal, state,
Any questions regarding the placed on the service list maintained by
and local agencies are invited to file
application may be directed to: Ron the Secretary of the Commission and
comments on the described application.
Chapman, Vice President of Operations, will receive copies of all documents
A copy of the application may be
Sword Energy Limited, 300, 340–12th filed by the applicant and by all other
obtained by agencies directly from the
Avenue, SW., Calgary, Alberta T2R IL5 parties. A party must submit 14 copies
Applicant. If an agency does not file
or call (403) 269–4040, facsimile (403) of filings made with the Commission
comments within the time specified for
261–1978, or e-mail: and must mail a copy to the applicant
filing comments, it will be presumed to
rchapman@eagler.ca. and to every other party in the
have no comments. One copy of an Specifically, Sword and Eagle Rock proceeding. Only parties to the
agency’s comments must also be sent to request the Commission to issue an proceeding can ask for court review of
the Applicant’s representatives. order: (1) Transferring Sword’s NGA Commission orders in the proceeding.
q. Comments, protests and section 3 authorization to Eagle Rock for
The Commission strongly encourages
interventions may be filed electronically the operation and maintenance of
facilities for the importation of natural electronic filings of comments, protests,
via the Internet in lieu of paper. See, 18
gas from the Province of Alberta, and interventions via the internet in lieu
CFR 385.2001(a)(1)(iii) and the
Canada, into Glacier County, Montana; of paper. See 18 CFR 385.2001(a)(1)(iii)
instructions on the Commission’s Web
and (2) authorizing the assignment of and the instructions on the
site at: http://www.ferc.gov under the
Sword’s October 6, 2006, Presidential Commission’s Web site (http://
‘‘e-Filing’’ link.
Permit for the operation and www.ferc.gov) under the ‘‘e-Filing’’ link.
Kimberly D. Bose, maintenance of facilities at the Alberta, Comment Date: April 4, 2008.
Secretary. Canada/Montana import point.
The import facilities consist of: (1) A Kimberly D. Bose,
[FR Doc. E8–5838 Filed 3–21–08; 8:45 am]
mstockstill on PROD1PC66 with NOTICES

gas meter station in LSD 8–4–1–16 W4M Secretary.


BILLING CODE 6717–01–P
in the Province of Alberta; (2) a 4-inch [FR Doc. E8–5833 Filed 3–21–08; 8:45 am]
(114.3 mm) diameter pipeline located BILLING CODE 6717–01–P
directly south of this meter station
across the Canada-United States border
at Section 1 T37N R5W, extending a

VerDate Aug<31>2005 16:33 Mar 21, 2008 Jkt 214001 PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 E:\FR\FM\24MRN1.SGM 24MRN1