Anda di halaman 1dari 2

Federal Register / Vol. 73, No.

41 / Friday, February 29, 2008 / Notices 11111

information (subject heading, Federal rulemaking (ANPR) was published (72 Review Process (ERP), under section
Register date and page number). FR 71488). The ANPR identified a 309 of the Clean Air Act and section
• Follow directions—The agency may number of potential revisions to the lead 102(2)(c) of the National Environmental
ask you to respond to specific questions monitoring requirements. CASAC Policy Act as amended. Requests for
or organize comments by referencing a conducted a review of the ANPR in copies of EPA comments can be directed
Code of Federal Regulations (CFR) part December 2007, and submitted a final to the Office of Federal Activities at
or section number. letter on January 22, 2008 (EPA– 202–564–7167.
• Explain why you agree or disagree; CASAC–08–007) providing CASAC’s An explanation of the ratings assigned
suggest alternatives and substitute advice and recommendations to the to draft environmental impact
language for your requested changes. Agency on the policy options discussed statements (EISs) was published in FR
• Describe any assumptions and in the ANPR. One of CASAC’s dated April 6, 2007 (72 FR 17156).
provide any technical information and/ recommendations was that a more
or data that you used. Draft EISs
detailed review of the monitoring issues
• If you estimate potential costs or should be conducted by the CASAC EIS No. 20070518, ERP No. D–COE–
burdens, explain how you arrived at AAMM Subcommittee. D40340–PA, Southern Beltway
your estimate in sufficient detail to In this notice, EPA is announcing the Transportation Project, Transportation
allow for it to be reproduced. availability of technical documents that Improvement between I–79 to Mon/
• Provide specific examples to provide useful information regarding a Fayette Expressway (PA Turnpike 43),
illustrate your concerns, and suggest number of issues pertinent to the Application for U.S. Army COE
alternatives. monitoring requirements for the Pb section 404 Permit, Washington
• Explain your views as clearly as NAAQS. Specifically, these documents County, PA.
possible, avoiding the use of profanity discuss the Pb NAAQS indicator Summary: EPA expressed
or personal threats. options being considered, specifications environmental concerns about potential
• Make sure to submit your impacts to wetlands, air quality, and
and rationale for a Federal Reference
comments by the comment period environmental justice communities.
Method (FRM) and Federal Equivalency
deadline identified. Rating EC2.
Method (FEM) criteria, potential
B. Background network design requirements, and EIS No. 20070529, ERP No. D–NCP–
Under section 108(a) of the Clean Air potential revisions to the monitoring D61060–DC, Smithsonian Institution
Act (CAA), the Administrator identifies sampling frequency. The technical National Museum of African
and lists certain pollutants which documents will be available online at: American History and Culture,
‘‘cause or contribute to air pollution http://www.epa.gov/ttn/naaqs/ Construction and Operation, Between
which may reasonably be anticipated to standards/pb/s_pb_cr_td.html on or 14th and 15th Streets, NW., and
endanger public health or welfare.’’ The before March 3, 2008. Constitution Avenue, NW., and
EPA then issues air quality criteria for The EPA is soliciting advice and Madison Drive, NW., Washington, DC.
listed pollutants, which are commonly recommendations from the CASAC Summary: EPA expressed
referred to as ‘‘criteria pollutants.’’ The AAMM Subcommittee by means of environmental concerns about potential
air quality criteria are to ‘‘accurately consultation at an upcoming public impacts to air quality and suggested the
reflect the latest scientific knowledge teleconference of the CASAC AAMM final EIS recommend use of ultra-low
useful in indicating the kind and extent Subcommittee. A separate Federal sulfur diesel fuel and particulate filters
of all identifiable effects on public Register notice will inform the public of on construction equipment and that all
health or welfare which may be the date and phone number for the Build Alternatives apply low impact
expected from the presence of [a] public teleconference. Following the development and green building
pollutant in the ambient air, in varying CASAC AAMM Subcommittee public technologies. The final EIS should
quantities.’’ Under section 109 of the teleconference, EPA will consider provide information on the site
CAA, EPA establishes NAAQS for each comments received from the CASAC selection process, environmental justice,
listed pollutant, with the NAAQS based AAMM Subcommittee and the public in and how this project’s impacts relate to
on the air quality criteria. Section 109(d) formulating any decisions regarding other projects under the new plan for
of the CAA requires periodic review proposed revisions to the lead the National Mall. Rating EC2.
and, if appropriate, revision of existing monitoring requirements as part of the
lead NAAQS rulemaking. Final EISs
air quality criteria. The revised air
quality criteria reflect advances in Dated: February 22, 2008. EIS No. 20070546, ERP No. F–IBR–
scientific knowledge on the effects of Jennifer N. Edmonds, J28022–00, Red River Valley Water
the pollutant on public health or Acting Director, Office of Air Quality Planning
Supply Project, Development and
welfare. The EPA is also required to and Standards. Delivery of a Bulk Water Supply to
periodically review and revise the [FR Doc. E8–3935 Filed 2–28–08; 8:45 am]
meet Long-Term Water Needs of the
NAAQS, if appropriate, based on the Red River Valley, Implementation, ND
BILLING CODE 6560–50–P
revised criteria. and MN.
Lead is one of six criteria pollutants Summary: While EPA expressed
for which EPA has established air ENVIRONMENTAL PROTECTION concern about any project involving the
quality criteria and NAAQS. Presently, AGENCY inter-basin transfer of water, EPA is
EPA is reviewing the air quality criteria confident that the additional
[ER–FRL–6696–5] refinements that have been made to the
and NAAQS for lead.
As part of its review of the lead project treatment and design and the
rwilkins on PROD1PC63 with NOTICES

Environmental Impact Statements and


NAAQS, EPA is considering revising the Regulations; Availability of EPA application of mitigation measures that
associated monitoring requirements Comments have been identified will further reduce
(contained in 40 CFR parts 50, 53, and the potential environmental impacts of
58). On December 12, 2007, an Availability of EPA comments the preferred alternative. EPA is
advanced notice of proposed prepared pursuant to the Environmental prepared to work with Reclamation and

VerDate Aug<31>2005 19:22 Feb 28, 2008 Jkt 214001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\29FEN1.SGM 29FEN1
11112 Federal Register / Vol. 73, No. 41 / Friday, February 29, 2008 / Notices

the State of North Dakota during the Existing Land Use Plans, Several Sale, Implementation, Timber Harvest
engineering phase and adaptive Counties, ID, Wait Period Ends: 03/ and Related Activities, Ketchikan-
management process. 31/2008, Contact: Terry Smith 208– Misty Fiords Ranger District, Tongass
EIS No. 20080012, ERP No. F–NAS– 478–6347. National Forest, AK, Comment Period
A12044–00, PROGRAMMATIC— EIS No. 20080067, Draft EIS, FHW, MI, Ends: 06/26/2001, Contact: Susan
Constellation Program, Develop the Detroit River International Crossing Marthaller 907–225–2148. Revision of
Flight Systems and Earth-based Study, Propose Border Crossing FR Published 01/19/2001: Officially
Ground Infrastructure for Future System between the International Withdrawn by the Preparing Agency.
Missions, International Space Station, Border Cities of Detroit, Michigan and EIS No. 20040393, Final EIS, AFS, AK,
The Moon, Mars, and Beyond, Windsor, Ontario, Wayne County, MI, Withdrawn—Gravina Island Timber
Brevard and Volusia Counties, FL; Comment Period Ends: 04/29/2008, Sale, Implementation, Timber Harvest
Hancock County, MS; Orlean Parish, Contact: David T. Williams 517–702– and Related Activities, Ketchikan-
LA; Harris County, TX; Madison 1820. Misty Fiords Ranger District, Tongass
County, AL; Cuyahoga and Erie EIS No. 20080068, Draft EIS, NPS, SD, National Forest, AK, Wait Period
Counties, OH; Hampton, VA; Santa Minuteman Missile National Historic Ends: 09/20/2004, Contact: Rob Reeck
Clara County, CA; Dona Ana and Site, General Management Plan, 907–228–4114. Revision of FR
Otero Counties, NM; and Box Elder Implementation, Jackson and Published 08/20/2004: Officially
and Davis Counties, UT. Pennington Counties, SD, Comment Withdrawn by the Preparing Agency.
Period Ends: 04/29/2008, Contact:
Summary: No formal comment letter Dated: February 26, 2008.
Mark Herberger 605–433–5552.
was sent to the preparing agency. EIS No. 20080069, Final EIS, NPS, AZ, Ken Mittelholtz,
EIS No. 20080024, ERP No. F–AFS– Saguaro National Park General Environmental Protection Specialist, Office
L61218–ID, Frank Church—River of Management Plan, Implementation, of Federal Activities.
No Return Wilderness (FC–RONRW), Rincon Mountain District and Tucson [FR Doc. E8–3917 Filed 2–28–08; 8:45 am]
Noxious Weed Treatments, Updated Mountain District, Pima County, AZ, BILLING CODE 6560–50–P
Information to Supplement the 1999 Wait Period Ends: 03/31/2008,
Final EIS for FC–RONRW, Contact: Mary McVeigh 303–969–
Implementation, Bitterroot, Boise, Nez 2360. ENVIRONMENTAL PROTECTION
Perce, Payette, and Salmon-Challis EIS No. 20080070, Draft EIS, AFS, AZ, AGENCY
National Forests, ID. Warm Fire Recovery Project, Removal
Summary: No formal comment letter of Fire-Killed Trees Reforestation, [EPA–HQ–OAR–2008–0142; FRL–8535–5]
was sent to the preparing agency. Fuel Reduction and Road
Reconstruction of Wildland Fire Burn Consumer Products Environmental
Dated: February 26, 2008. Partnerships Program—Public Meeting
Portion, Coconino County, AZ,
Robert W. Hargrove,
Comment Period Ends: 04/14/2008, AGENCY: Environmental Protection
Director, NEPA Compliance Division Office Contact: Lois Pfeffer 559–359–7023.
of Federal Activities. Agency (EPA).
EIS No. 20080071, Draft EIS, NOA, 00,
[FR Doc. E8–3937 Filed 2–28–08; 8:45 am] ACTION: Notice of Public Meeting.
PROGRAMMATIC—Incorporation of
BILLING CODE 6560–50–P the Revised Washington Shoreline SUMMARY: EPA will convene a public
Management Act Guidelines into the meeting to discuss opportunities for
Federally Approved Washington industry-government partnerships to
ENVIRONMENTAL PROTECTION Coastal Management Program,
AGENCY foster greater public awareness of the
Amendment No. 4 Approval, Coastal environmental attributes of household
[ER–FRL–6696–4] Counties in WA, Comment Period and institutional consumer products
Ends: 04/14/2008, Contact: Helen Farr and help make consumers aware of
Environmental Impacts Statements; 301–713–3155 Ext. 175. efforts on the part of consumer product
Notice of Availability EIS No. 20080072, Draft EIS, IBR, CO, manufacturers to improve the
Southern Delivery System Project, environmental performance of their
Responsible Agency: Office of Federal
Water Supply Development, products and production facilities. The
Activities, General Information (202)
Execution of up to 40-year Contracts primary purpose of this initial meeting
564–7167 or http://www.epa.gov/
for Use of Fryingpan-Arkansas Project is to establish a dialog among
compliance/nepa/.
Facilities, Special Use Permit, El Paso government, industry, and public
Weekly receipt of Environmental Impact County, CO, Comment Period Ends:
Statements Filed 02/18/2008 through stakeholders leading to formation of a
04/29/2008, Contact: Kara Lamb 970– Consumer Products Environmental
02/22/2008. Pursuant to 40 CFR 663–3212.
1506.9. Partnerships Working Group. Once
EIS No. 20080073, Final EIS, FHW, IL, formed, the working group will identify
EIS No. 20080065, Final EIS, BLM, ID, Prairie Parkway Study, Transportation
Snake River Birds of Prey National and develop possible partnership
System Improvement between I–80 approaches such as product labeling,
Conservation Area, Resource and I–88, Widening IL–47 to 4 Lanes
Management Plan, Implementation, consumer education programs,
from I–80 to Caton Farm Road, environmental information Web sites,
Ada, Canyon, Elmore, Owyhee Funding, U.S. Army COE Section 404,
Counties, ID, Wait Period Ends: 03/ product stewardship programs, and
Grundy, Kendall and Kane Counties, manufacturer recognition programs.
31/2008, Contact: Michael O’Donnell IL , Wait Period Ends: 03/31/2008,
208–384–3315. DATES: The meeting will be held from 1
Contact: Norman R. Stoner 217–492–
rwilkins on PROD1PC63 with NOTICES

EIS No. 20080066, Final EIS, BLM, ID, 4640. p.m. to 5 p.m. on Monday, March 17
Fire, Fuels and Related Vegetation and from 9 a.m. to 5 p.m. on Tuesday,
Management Direction Plan Amended Notices March 18, 2008.
Amendment, Upper Snake River EIS No. 20010014, Draft EIS, AFS, AK, ADDRESSES: The meeting will be held in
District (The District), Amending 12 Withdrawn—Gravina Island Timber Building C of the EPA campus at 109

VerDate Aug<31>2005 19:22 Feb 28, 2008 Jkt 214001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\29FEN1.SGM 29FEN1

Anda mungkin juga menyukai