Anda di halaman 1dari 2

71396 Federal Register / Vol. 72, No.

241 / Monday, December 17, 2007 / Notices

representative of the Applicant Internet in lieu of paper; see 18 CFR application no later than 30 days after
specified in the particular application. 385.2001(a)(1)(iii) and the instructions the specified comment date for the
s. Agency Comments: Federal, State, on the Commission’s Web site under the particular application. A competing
and local agencies are invited to file ‘‘e-Filing’’ link. The Commission preliminary permit application must
comments on the described application. strongly encourages electronic filings. conform with 18 CFR 4.30 and 4.36.
A copy of the application may be Please include the project number (P– n. Competing Development
obtained by agencies directly from the 13034–000) on any comments or Application—Any qualified
Applicant. If an agency does not file motions filed. development applicant desiring to file a
comments within the time specified for The Commission’s Rules of Practice competing development application
filing comments, it will be presumed to and Procedure require all intervenors must submit to the Commission, on or
have no comments. One copy of an filing documents with the Commission before a specified comment date for the
agency’s comments must also be sent to to serve a copy of that document on particular application, either a
the Applicant’s representatives. each person in the official service list competing development application or a
for the project. Further, if an intervenor notice of intent to file such an
Kimberly D. Bose, files comments or documents with the application. Submission of a timely
Secretary. Commission relating to the merits of an notice of intent to file a development
[FR Doc. E7–24300 Filed 12–14–07; 8:45 am] issue that may affect the responsibilities application allows an interested person
BILLING CODE 6717–01–P of a particular resource agency, they to file the competing application no
must also serve a copy of the document later than 120 days after the specified
on that resource agency. comment date for the particular
DEPARTMENT OF ENERGY k. Description of Project: The application. A competing license
proposed project using the U.S. Army application must conform with 18 CFR
Federal Energy Regulatory Corps of Engineers’ Mississippi River 4.30 and 4.36.
Commission Lock & Dam No. 17 and operated in a o. Notice of Intent—A notice of intent
[Project No. 13034–000] run-of-river mode would consist of: (1) must specify the exact name, business
A new 90-foot long, 130-foot wide, 60- address, and telephone number of the
BPUS Generation Development, LLC; foot high concrete powerhouse; (2) a prospective applicant, and must include
Notice of Application Accepted for new intake channel and tailrace channel an unequivocal statement of intent to
Filing and Soliciting Motions To on the levee section of the Corps’ submit, if such an application may be
Intervene, Protests, and Comments facility, on the Iowa shore, opposite the filed, either a preliminary permit
river from the lock structure; (3) two application or a development
December 10, 2007. turbine/generator units with a combined application (specify which type of
Take notice that the following installed capacity of 8 megawatts; (4) a application). A notice of intent must be
hydroelectric application has been filed new 27,217-foot long above ground served on the applicant(s) named in this
with the Commission and is available transmission line extending from the public notice.
for public inspection: switchyard near the powerhouse west to p. Proposed Scope of Studies Under
a. Type of Application: Preliminary an interconnection point with an Permit—A preliminary permit, if issued,
Permit. existing transmission line; and (5) does not authorize construction. The
b. Project No.: 13034–000. appurtenant facilities. The proposed term of the proposed preliminary permit
c. Date filed: September 28, 2007. Mississippi River Lock & Dam No. 17 would be 36 months. The work
d. Applicant: BPUS Generation Project would have an average annual proposed under the preliminary permit
Development, LLC. generation of 45 gigawatt-hours. would include economic analysis,
e. Name of Project: Mississippi River l. This filing is available for review at preparation of preliminary engineering
Lock & Dam No. 17 Hydroelectric the Commission in the Public Reference plans, and a study of environmental
Project Room or may be viewed on the impacts. Based on the results of these
f. Location: Mississippi River in Commission’s Web site at http:// studies, the Applicant would decide
Mercer County, Iowa. It would use the www.ferc.gov using the ‘‘eLibrary’’ link. whether to proceed with the preparation
U.S. Army Corps of Engineers’ Enter the docket number excluding the of a development application to
Mississippi River Lock & Dam No. 17. last three digits in the docket number construct and operate the project.
g. Filed Pursuant to: Federal Power field to access the document. For q. Comments, Protests, or Motions to
Act, 16 U.S.C. 791(a)–825(r). assistance, call toll-free 1–866–208– Intervene—Anyone may submit
h. Applicant Contact: Mr. Jeffrey M. 3676 or e-mail comments, a protest, or a motion to
Auser, P.E., BPUS Generation FERCONLINESUPPORT@FERC.GOV. intervene in accordance with the
Development, LLC, 225 Greenfield For TTY, call (202) 502–8659. A copy is requirements of Rules of Practice and
Parkway, Suite 201, Liverpool, NY also available for inspection and Procedure, 18 CFR 385.210, .211, .214.
13088, (315) 413–2700. reproduction at the address in item h In determining the appropriate action to
i. FERC Contact: Robert Bell, (202) above. take, the Commission will consider all
502–4126. m. Competing Preliminary Permit— protests or other comments filed, but
j. Deadline for filing comments, Anyone desiring to file a competing only those who file a motion to
protests, and motions to intervene: 60 application for preliminary permit for a intervene in accordance with the
days from the issuance date of this proposed project must submit the Commission’s Rules may become a
notice. competing application itself, or a notice party to the proceeding. Any comments,
All documents (original and eight of intent to file such an application, to protests, or motions to intervene must
ebenthall on PROD1PC69 with NOTICES

copies) should be filed with: Kimberly the Commission on or before the be received on or before the specified
D. Bose, Secretary, Federal Energy specified comment date for the comment date for the particular
Regulatory Commission, 888 First particular application (see 18 CFR 4.36). application.
Street, NE., Washington, DC 20426. Submission of a timely notice of intent r. Filing and Service of Responsive
Comments, protests, and interventions allows an interested person to file the Documents—Any filings must bear in
may be filed electronically via the competing preliminary permit all capital letters the title

VerDate Aug<31>2005 15:28 Dec 14, 2007 Jkt 214001 PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 E:\FR\FM\17DEN1.SGM 17DEN1
Federal Register / Vol. 72, No. 241 / Monday, December 17, 2007 / Notices 71397

‘‘COMMENTS’’, ‘‘NOTICE OF INTENT g. Filed Pursuant to: Federal Power field to access the document. For
TO FILE COMPETING APPLICATION’’, Act, 16 U.S.C. 791(a)–825(r). assistance, call toll-free 1–866–208–
‘‘COMPETING APPLICATION’’, h. Applicant Contact: Mr. Jeffrey M. 3676 or e-mail
‘‘PROTEST’’, and ‘‘MOTION TO Auser, P.E., BPUS Generation FERCONLINESUPPORT@FERC.GOV.
INTERVENE’’, as applicable, and the Development, LLC, 225 Greenfield For TTY, call (202) 502–8659. A copy is
Project Number of the particular Parkway, Suite 201, Liverpool, NY also available for inspection and
application to which the filing refers. 13088, (315) 413–2700. reproduction at the address in item h
Any of the above-named documents i. FERC Contact: Robert Bell, (202) above.
must be filed by providing the original 502–4126. m. Competing Preliminary Permit—
and the number of copies provided by j. Deadline for filing comments, Anyone desiring to file a competing
the Commission’s regulations to: The protests, and motions to intervene: 60 application for preliminary permit for a
Secretary, Federal Energy Regulatory days from the issuance date of this proposed project must submit the
Commission, 888 First Street, NE., notice. competing application itself, or a notice
Washington, DC 20426. An additional All documents (original and eight of intent to file such an application, to
copy must be sent to Director, Division copies) should be filed with: Kimberly the Commission on or before the
of Hydropower Administration and D. Bose, Secretary, Federal Energy specified comment date for the
Compliance, Federal Energy Regulatory Regulatory Commission, 888 First particular application (see 18 CFR 4.36).
Commission, at the above-mentioned Street, NE., Washington, DC 20426. Submission of a timely notice of intent
Comments, protests, and interventions allows an interested person to file the
address. A copy of any notice of intent,
may be filed electronically via the competing preliminary permit
competing application or motion to
Internet in lieu of paper; see 18 CFR application no later than 30 days after
intervene must also be served upon each
385.2001(a)(1)(iii) and the instructions the specified comment date for the
representative of the Applicant
on the Commission’s Web site under the particular application. A competing
specified in the particular application.
‘‘e-Filing’’ link. The Commission preliminary permit application must
s. Agency Comments—Federal, State,
strongly encourages electronic filings. conform with 18 CFR 4.30 and 4.36.
and local agencies are invited to file
Please include the project number (P– n. Competing Development
comments on the described application.
13035–000) on any comments or Application—Any qualified
A copy of the application may be
motions filed. development applicant desiring to file a
obtained by agencies directly from the The Commission’s Rules of Practice
Applicant. If an agency does not file competing development application
and Procedure require all intervenors must submit to the Commission, on or
comments within the time specified for filing documents with the Commission
filing comments, it will be presumed to before a specified comment date for the
to serve a copy of that document on particular application, either a
have no comments. One copy of an each person in the official service list
agency’s comments must also be sent to competing development application or a
for the project. Further, if an intervenor notice of intent to file such an
the Applicant’s representatives. files comments or documents with the application. Submission of a timely
Kimberly D. Bose, Commission relating to the merits of an notice of intent to file a development
Secretary. issue that may affect the responsibilities application allows an interested person
[FR Doc. E7–24301 Filed 12–14–07; 8:45 am] of a particular resource agency, they to file the competing application no
BILLING CODE 6717–01–P
must also serve a copy of the document later than 120 days after the specified
on that resource agency. comment date for the particular
k. Description of Project: The application. A competing license
DEPARTMENT OF ENERGY proposed project using the U.S. Army application must conform with 18 CFR
Corps of Engineers’ Kaskaskia River 4.30 and 4.36.
Federal Energy Regulatory Lock & Dam and operated in a run-of- o. Notice of Intent—A notice of intent
Commission river mode would consist of: (1) A new must specify the exact name, business
30-foot long, 30-foot wide, 30-foot high address, and telephone number of the
[Project No. 13035–000]
concrete powerhouse and associated prospective applicant, and must include
BPUS Generation Development, LLC; switchyard; (2) a new intake channel an unequivocal statement of intent to
Notice of Application Accepted for and tailrace channel opposite the submit, if such an application may be
Filing and Soliciting Motions To existing lock (river left); (3) two turbine/ filed, either a preliminary permit
Intervene, Protests, and Comments generator units with a combined application or a development
installed capacity of 8 megawatts; (4) a application (specify which type of
December 10, 2007. new 46,578-foot long above ground application). A notice of intent must be
Take notice that the following transmission line extending from the served on the applicant(s) named in this
hydroelectric application has been filed switchyard near the powerhouse public notice.
with the Commission and is available southwest to an interconnection point p. Proposed Scope of Studies Under
for public inspection: with an existing transmission line Permit—A preliminary permit, if issued,
a. Type of Application: Preliminary owned by Southern Illinois Power; and does not authorize construction. The
Permit. (5) appurtenant facilities. The proposed term of the proposed preliminary permit
b. Project No.: 13035–000. Kaskaskia Lock & Dam Project would would be 36 months. The work
c. Date filed: September 28, 2007. have an average annual generation of 27 proposed under the preliminary permit
d. Applicant: BPUS Generation gigawatt-hours. would include economic analysis,
Development, LLC. l. This filing is available for review at preparation of preliminary engineering
ebenthall on PROD1PC69 with NOTICES

e. Name of Project: Kaskaskia River the Commission in the Public Reference plans, and a study of environmental
Lock and Dam Hydroelectric Project. Room or may be viewed on the impacts. Based on the results of these
f. Location: Kaskaskia River in Commission’s Web site at http:// studies, the Applicant would decide
Randolph County, Illinois. It would use www.ferc.gov using the ‘‘eLibrary’’ link. whether to proceed with the preparation
the U.S. Army Corps of Engineers’ Enter the docket number excluding the of a development application to
Kaskaskia River Lock & Dam. last three digits in the docket number construct and operate the project.

VerDate Aug<31>2005 15:28 Dec 14, 2007 Jkt 214001 PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 E:\FR\FM\17DEN1.SGM 17DEN1

Anda mungkin juga menyukai