68138 Federal Register / Vol. 72, No.

232 / Tuesday, December 4, 2007 / Notices

determining the appropriate action to be Environmental Impact Statement (EIS) Compressor Station in Phelps County,
taken, but the filing of a comment alone for the construction and operation of the Nebraska; and
will not serve to make the filer a party natural gas pipeline facilities proposed • 20 meter stations and associated
to the proceeding. The Commission’s by Rockies Express Pipeline LLC interconnecting pipeline facilities at 13
rules require that persons filing (Rockies Express) in the above- locations along the proposed pipeline
comments in opposition to the project referenced docket. The Project facilities route and 42 mainline valves.
provide copies of their protests only to would be located in Wyoming, Comment Procedures and Public
the party or parties directly involved in Nebraska, Missouri, Illinois, Indiana, Meetings
the protest. and Ohio.
Persons who wish to comment only This draft EIS was prepared to satisfy Any person wishing to comment on
on the environmental review of this the requirements of the National the draft EIS may do so. To ensure
project should submit an original and Environmental Policy Act (NEPA). The consideration prior to a Commission
two copies of their comments to the U.S. Army Corps of Engineers, U.S. Fish decision on the proposal, it is important
Secretary of the Commission. and Wildlife Service, Natural Resources that the Commission receive your
Environmental commentors will be Conservation Service, and Illinois comments before the date specified
placed on the Commission’s Department of Agriculture are below. Please carefully follow these
environmental mailing list, will receive cooperating agencies for the instructions to ensure that your
copies of the environmental documents, development of the EIS. A cooperating comments are received and properly
and will be notified of meetings agency has jurisdiction by law or special recorded:
associated with the Commission’s expertise with respect to potential • Send an original and two copies of
environmental review process. environmental impacts associated with your comments to: Kimberly D. Bose,
Environmental commentors will not be the proposal and is involved in the Secretary, Federal Energy Regulatory
required to serve copies of filed NEPA analysis. Commission, 888 First Street, NE.,
documents on all other parties. The FERC staff concludes that if the Room 1A, Washington, DC 20426.
However, the non-party commentors Project is constructed and operated in • Reference Docket No. CP07–208–
will not receive copies of all documents accordance with applicable laws and 000.
filed by other parties or issued by the • Label one copy of the comments for
regulations, and the project sponsor’s
Commission (except for the mailing of the attention of Gas Branch 2.
proposed mitigation, and the staff’s
environmental documents issued by the • Mail your comments so that they
additional mitigation recommendations,
Commission) and will not have the right will be received in Washington, DC on
it would have mostly limited adverse
to seek court review of the or before January 14, 2008.
environmental impacts and would be an The Commission strongly encourages
Commission’s final order. environmentally acceptable action.
Comments, protests and interventions electronic filing of any comments,
As currently proposed, the Rockies interventions or protests to this
may be filed electronically via the Express (REX) East Project would
Internet in lieu of paper. See 18 CFR proceeding. See 18 Code of Federal
consist of the construction and Register (CFR) 385.2001(a)(1)(iii) and
385.2001(a) (1) (iii) and the instructions operation of approximately 639.1 miles
on the Commission’s Web site under the the instructions on the Commission’s
of natural gas pipeline and a total of Internet Web site (http://www.ferc.gov)
‘‘e-Filing’’ link at http://www.ferc.gov. 225,716 horsepower (hp) of new
The Commission strongly encourages under the ‘‘e-Filing’’ link and the link to
compression. The REX East Project the User’s Guide. Before you can submit
intervenors to file electronically. would be part of the Rockies Express
Persons unable to file electronically comments, you will need to create a free
Pipeline System—a 1,679-mile natural account, by clicking on ‘‘Sign-up’’ under
should submit an original and 14 copies gas pipeline system that would extend
of the protest or intervention to the ‘‘New User.’’ You will be asked to select
from Colorado to Ohio. The Project the type of submission you are making.
Federal Energy Regulatory Commission, pipeline would deliver up to 1.8 billion
888 First Street, NE., Washington, DC This type of submission is considered a
cubic feet per day of gas to other ‘‘Comment on Filing.’’ Comments
20426. interstate natural gas pipelines. The
Comment Date: December 18, 2007. submitted electronically must be
Project would provide access to an submitted by January 14, 2008.
Kimberly D. Bose, additional 16 inter- and intra-state In lieu of sending written comments,
Secretary. natural gas pipelines at 20 interconnect you are invited to attend public
points. Specifically, the draft EIS comment meetings the FERC has
[FR Doc. E7–23451 Filed 12–3–07; 8:45 am]
addresses the potential environmental scheduled as follows:
BILLING CODE 6717–01–P
effects of the construction and operation January 7, 2008 6 p.m. to 10 p.m.
of the following natural gas pipeline Lanphier High School, 1300 N 11th
DEPARTMENT OF ENERGY facilities proposed by Rockies Express: Street, Springfield, IL 62702, (217)
• 639.1 miles of 42-inch-diameter 525–3080
Federal Energy Regulatory natural gas pipeline in Missouri, Clark’s Hall Reception Area, 2155 E
Commission Illinois, Indiana, and Ohio; U.S. Highway 36, Rockville, IN
• Seven new compressor stations 47872, (765) 569–5794
[Docket No. CP07–208–000]
(Mexico Compressor Station in Audrain Zanesville High School, 1701 Blue
Rockies Express Pipeline, LLC; Notice County, Missouri; Blue Mound Avenue, Zanesville, OH 43701,
of Availability of the Draft Compressor Station in Christian County, (740) 588–4203
Environmental Impact Statement for Illinois; Bainbridge Compressor Station January 8, 2008 6 p.m. to 10 p.m.
mstockstill on PROD1PC66 with NOTICES

the Proposed REX East Project in Putnam County, Indiana; Hamilton Pittsfield High School, 201 E Higbee
Compressor Station in Butler County, Street, Pittsfield, IL 62363, (217)
November 23, 2007. Ohio; Chandlersville Compressor 285–6888
The staff of the Federal Energy Station in Muskingum County, Ohio; Greensburg Jr. High School, 505 E
Regulatory Commission (FERC or Arlington Compressor Station in Carbon Central Ave, Greensburg, IN 47240,
Commission) has prepared this draft County, Wyoming; and Bertrand (812) 663–7523

VerDate Aug<31>2005 17:38 Dec 03, 2007 Jkt 214001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\04DEN1.SGM 04DEN1
Federal Register / Vol. 72, No. 232 / Tuesday, December 4, 2007 / Notices 68139

Teays Valley High School, 3887 St. draft EIS were mailed to those Pittsylvania, Franklin, and Roanoke
Route 752, Ashville, OH 43103, specifically requesting them. Counties, Virginia.
(740) 983–3131 Additional information about the g. Filed Pursuant to: Federal Power
January 9, 2008 6 p.m. to 10 p.m. project is available from the Act, 16 U.S.C. 791(a)–825(r).
Presser Hall, 900 South Jefferson Commission’s Office of External Affairs, h. Applicant Contact: Elizabeth B.
Street, Mexico, MO, (573) 581–5592 at 1–866–208–FERC or on the FERC Parcell, Environmental Coordinator I,
Greenwood Community High School, Internet Web site (http://www.ferc.gov) Appalachian Power Company, P.O. Box
615 W Smith Valley Road, using the eLibrary link. Click on the 2021, Roanoke, Virginia 24022–2121
Greenwood, IN 46142, (317) 889– eLibrary link, click on ‘‘General Search’’ (703) 985–2348.
4000 and enter the docket number excluding i. FERC Contact: Any questions on
Edgwood High School, 5005 Oxford the last three digits in the Docket this notice should be addressed to Jade
State Rd, Trenton, OH 45067, (513) Number (e.g. CP07–208). Be sure you Alvey, Telephone (202) 502–6849, and
867–7425 have selected an appropriate date range. e-mail: Jade.Alvey@ferc.gov.
Interested groups and individuals are For assistance, please contact FERC j. Deadline for filing comments,
encouraged to attend and present oral Online Support at motions to intervene, and protest:
comments on the draft EIS. Transcripts FERCOnlineSupport@ferc.gov or toll December 26, 2007.
of the meetings will be prepared. All documents (original and eight
free at 1–866–208–3676, or for TTY,
After the comments are reviewed, any copies) should be filed with: Kimberly
contact (202) 502–8659. The eLibrary
significant new issues are investigated, D. Bose, Secretary, Federal Energy
link on the FERC Internet Web site also
and modifications are made to the draft Regulatory Commission, 888 First
provides access to the texts of formal
EIS, a final EIS will be published and Street, NE., Washington, DC 20426.
documents issued by the Commission, The Commission’s Rules of Practice
distributed by the FERC staff. The final such as orders, notices, and and Procedure require all intervenors
EIS will contain the staff’s responses to rulemakings. filing documents with the Commission
timely comments received on the draft In addition, the Commission now to serve a copy of that document on
EIS. offers a free service called eSubscription
Comments will be considered by the each person whose name appears on the
which allows you to keep track of all official service list for the project.
Commission and cooperating agencies formal issuances and submittals in
but will not serve to make the Further, if an intervenor files comments
specific dockets. This can reduce the or documents with the Commission
commentor a party to the proceeding. amount of time you spend researching
Any person seeking to become a party relating to the merits of an issue that
proceedings by automatically providing may affect the responsibilities of a
to the proceeding must file a motion to you with notification of these filings,
intervene pursuant to Rule 214 of the particular resource agency, they must
document summaries, and direct links also serve a copy of the document on
Commission’s Rules of Practice and to the documents. Go to the
Procedures (18 CFR 385.214). Anyone that resource agency. A copy of any
eSubscription link on the FERC Internet motion to intervene must also be served
may intervene in this proceeding based Web site.
on this draft EIS. Only intervenors have upon each representative of the
the right to seek rehearing of the Kimberly D. Bose, Applicant specified in the particular
Commission’s decision. You must file Secretary. application.
[FR Doc. E7–23445 Filed 12–3–07; 8:45 am] k. Description of Request:
your request to intervene as specified
Appalachian Power Company (APC) is
above.1 You do not need intervenor BILLING CODE 6717–01–P
seeking Commission approval to grant
status to have your comments
permission to Grant Sutherland to
considered.
DEPARTMENT OF ENERGY construct a single dock with 2 boat slips
The draft EIS has been placed in the
adjacent to shoreline identified as an
public files of the FERC and is available
Federal Energy Regulatory Impact Mitigation Zone (IMZ), as
for distribution and public inspection
Commission defined in the project’s shoreline
at:
Federal Energy Regulatory management plan (SMP). The proposed
[Project No. 2210–157]
Commission, Public Reference Room, dock would serve a single-family home
888 First Street, NE., Room 2A, Appalachian Power Company; Notice to be constructed on Christmas Tree
Washington, DC 20426, (202) 502–8371. of Application for Non-Project Use of Island, located on the Blackwater River
A limited number of hardcopies and Project Lands and Soliciting near its confluence with the Roanoke
CD-ROMs of the draft EIS are available Comments, Motions To Intervene, and River on Smith Mountain Lake. The
from the FERC’s Public Reference Room, Protests licensee is requesting a variance as
identified above. This draft EIS is also required by the SMP for development
available for public viewing on the November 26, 2007. within the IMZ. In accordance with the
FERC’s Internet Web site at http:// Take notice that the following SMP, Grant Sutherland has developed a
www.ferc.gov. CD-ROM copies of the hydroelectric application has been filed plan to construct a single dock, the
draft EIS have been mailed to Federal, with the Commission and is available length of which would not exceed a
State, and local agencies; public interest for public inspection: water depth of 8 feet, and would retain
groups; individuals and affected a. Application Type: Non-Project Use all vegetation within the project
landowners who requested a copy of the of Project Lands and Waters. boundary.
b. Project No: 2210–157. l. Locations of the Application: A
draft EIS or provided comments during
c. Date Filed: November 7, 2007. copy of the application is available for
scoping; libraries and newspapers in the
mstockstill on PROD1PC66 with NOTICES

d. Applicant: Appalachian Power inspection and reproduction at the


Project area; and parties to this
Company. Commission’s Public Reference Room,
proceeding. Hard copy versions of the
e. Name of Project: Smith Mountain located at 888 First Street, NE., Room
1 Interventions may also be filed electronically via Pumped Storage Project. 2A, Washington, DC 20426, or by calling
the Internet in lieu of paper. See the previous f. Location: The project is located on (202) 502–8371. This filing may also be
discussion on filing comments electronically. the Roanoke River, in Bedford, viewed on the Commission’s Web site at