Anda di halaman 1dari 2

68144 Federal Register / Vol. 72, No.

232 / Tuesday, December 4, 2007 / Notices

to serve a copy of that document on p. Competing Development Project Number of the particular
each person in the official service list Application—Any qualified application to which the filing refers.
for the project. Further, if an intervenor development applicant desiring to file a Any of the above-named documents
files comments or documents with the competing development application must be filed by providing the original
Commission relating to the merits of an must submit to the Commission, on or and the number of copies provided by
issue that may affect the responsibilities before a specified comment date for the the Commission’s regulations to: The
of a particular resource agency, they particular application, either a Secretary, Federal Energy Regulatory
must also serve a copy of the document competing development application or a Commission, 888 First Street, NE.,
on that resource agency. notice of intent to file such an Washington, DC 20426. An additional
k. Competing Applications: Project application. Submission of a timely copy must be sent to Director, Division
No. 12833–000, Date Filed: July 23, notice of intent to file a development of Hydropower Administration and
2007, Date Public Notice Issued: application allows an interested person Compliance, Federal Energy Regulatory
October 3, 2007, Due Date: December 2, to file the competing application no Commission, at the above-mentioned
2007, and Project No. 12829–000, Date later than 120 days after the specified address. A copy of any notice of intent,
filed: July 23, 2007, Date Public Notice comment date for the particular competing application or motion to
Issued: October 19, 2007, Date Due: application. A competing license intervene must also be served upon each
December 19, 2007. application must conform with 18 CFR representative of the Applicant
l. Description of Project: The proposed 4.30 and 4.36. specified in the particular application.
project consists of: (1) 50 proposed 100 q. Notice of Intent—A notice of intent Comments, protests and interventions
kilowatt dual ducted horizontal axis must specify the exact name, business may be filed electronically via the
hydrokinetic generating units having a address, and telephone number of the Internet in lieu of paper; see 18 CFR
total installed capacity of 5 megawatts, prospective applicant, and must include 385.2001(a)(1)(iii) and the instructions
(2) a proposed 3-miles-long, 13.6–kV an unequivocal statement of intent to on the Commission’s Web site under the
transmission line, and (3) appurtenant submit, if such an application may be ‘‘e-Filing’’ link. The Commission
facilities. The Hydro Green Energy, filed, either a preliminary permit strongly encourages electronic filings.
LLC’s project would have an average application or a development u. Agency Comments—Federal, state,
annual generation of 82.87 gigawatt- application (specify which type of and local agencies are invited to file
hours and be sold to a local utility. application). A notice of intent must be comments on the described application.
served on the applicant(s) named in this A copy of the application may be
m. Locations of Applications: A copy
public notice. obtained by agencies directly from the
of the application is available for r. Proposed Scope of Studies Under
inspection and reproduction at the Applicant. If an agency does not file
Permit—A preliminary permit, if issued, comments within the time specified for
Commission in the Public Reference does not authorize construction. The
Room, located at 888 First Street, NE., filing comments, it will be presumed to
term of the proposed preliminary permit have no comments. One copy of an
Room 2A, Washington DC 20426, or by would be 36 months. The work
calling (202) 502–8371. This filing may agency’s comments must also be sent to
proposed under the preliminary permit the Applicant’s representatives.
also be viewed on the Commission’s would include economic analysis,
Web site at http://www.ferc.gov using preparation of preliminary engineering Kimberly D. Bose,
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental Secretary.
number excluding the last three digits in impacts. Based on the results of these [FR Doc. E7–23431 Filed 12–3–07; 8:45 am]
the docket number field to access the studies, the Applicant would decide BILLING CODE 6717–01–P
document. For assistance, call toll-free whether to proceed with the preparation
1–866–208–3676 or e-mail of a development application to
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project. DEPARTMENT OF ENERGY
call (202) 502–8659. A copy is also s. Comments, Protests, or Motions To
available for inspection and Intervene—Anyone may submit Federal Energy Regulatory
reproduction at the address in item h. comments, a protest, or a motion to Commission
above. intervene in accordance with the
n. Individuals desiring to be included [Project No. 12875–000]
requirements of Rules of Practice and
on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214. Hydro Green Energy, LLC; Notice of
so indicate by writing to the Secretary In determining the appropriate action to Application Accepted for Filing and
of the Commission. take, the Commission will consider all Soliciting Comments, Motions To
o. Competing Preliminary Permit— protests or other comments filed, but Intervene, and Protests
Anyone desiring to file a competing only those who file a motion to
application for preliminary permit for a intervene in accordance with the November 26, 2007.
proposed project must submit the Commission’s Rules may become a Take notice that the following
competing application itself, or a notice party to the proceeding. Any comments, hydroelectric application has been filed
of intent to file such an application, to protests, or motions to intervene must with the Commission and is available
the Commission on or before the be received on or before the specified for public inspection:
specified comment date for the comment date for the particular a. Type of Application: Preliminary
particular application (see 18 CFR 4.36). application. Permit.
Submission of a timely notice of intent t. Filing and Service of Responsive b. Project No: 12875–000.
allows an interested person to file the Documents—Any filings must bear in c. Date Filed: July 25, 2007.
mstockstill on PROD1PC66 with NOTICES

competing preliminary permit all capital letters the title d. Applicant: Hydro Green Energy,
application no later than 30 days after ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT LLC.
the specified comment date for the TO FILE COMPETING APPLICATION’’, e. Name of Project: Duncan Point
particular application. A competing ‘‘COMPETING APPLICATION’’, Project.
preliminary permit application must ‘‘PROTEST’’, or ‘‘MOTION TO f. Location: The project would be
conform with 18 CFR 4.30 and 4.36. INTERVENE’’, as applicable, and the located on the Mississippi River in West

VerDate Aug<31>2005 17:38 Dec 03, 2007 Jkt 214001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\04DEN1.SGM 04DEN1
Federal Register / Vol. 72, No. 232 / Tuesday, December 4, 2007 / Notices 68145

Baton Rouge and East Baton Rouge document. For assistance, call toll-free whether to proceed with the preparation
Parishes, Louisiana. The project uses no 1–866–208–3676 or e-mail of a development application to
dam or impoundment. FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
g. Filed Pursuant to: Federal Power call (202) 502–8659. A copy is also s. Comments, Protests, or Motions To
Act, 16 U.S.C. 791(a)–825(r). available for inspection and Intervene—Anyone may submit
h. Applicant Contact: Mr. Wayne F. reproduction at the address in item h. comments, a protest, or a motion to
Krouse, Hydro Green Energy, LLC, 5090 above. intervene in accordance with the
Richmond Avenue #390, Houston, TX n. Individuals desiring to be included requirements of Rules of Practice and
77056, phone (877) 556–6566. on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214.
i. FERC Contact: Mr. Robert Bell, so indicate by writing to the Secretary In determining the appropriate action to
(202) 502–6062. of the Commission. take, the Commission will consider all
j. Deadline for filing motions to o. Competing Preliminary Permit— protests or other comments filed, but
intervene, protests and comments: 60 Anyone desiring to file a competing only those who file a motion to
days from the issuance date of this application for preliminary permit for a intervene in accordance with the
notice. proposed project must submit the Commission’s Rules may become a
All documents (original and eight competing application itself, or a notice party to the proceeding. Any comments,
copies) should be filed with: Kimberly of intent to file such an application, to protests, or motions to intervene must
D. Bose, Secretary, Federal Energy the Commission on or before the be received on or before the specified
Regulatory Commission, 888 First specified comment date for the comment date for the particular
Street, NE., Washington, DC 20426. particular application (see 18 CFR 4.36). application.
Comments, protests, and interventions Submission of a timely notice of intent t. Filing and Service of Responsive
may be filed electronically via the allows an interested person to file the Documents—Any filings must bear in
Internet in lieu of paper; see 18 CFR competing preliminary permit all capital letters the title
385.2001(a)(1)(iii) and the instructions application no later than 30 days after ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
on the Commission’s Web site under the the specified comment date for the TO FILE COMPETING APPLICATION’’,
‘‘e-Filing’’ link. The Commission particular application. A competing ‘‘COMPETING APPLICATION’’,
strongly encourages electronic filings. preliminary permit application must ‘‘PROTEST’’, or ‘‘MOTION TO
Please include the project number (P– conform with 18 CFR 4.30 and 4.36. INTERVENE’’, as applicable, and the
12875–000) on any comments or p. Competing Development Project Number of the particular
motions filed. Application—Any qualified application to which the filing refers.
The Commission’s Rules of Practice development applicant desiring to file a Any of the above-named documents
and Procedure require all intervenors competing development application must be filed by providing the original
filing documents with the Commission must submit to the Commission, on or and the number of copies provided by
to serve a copy of that document on before a specified comment date for the the Commission’s regulations to: The
each person in the official service list particular application, either a Secretary, Federal Energy Regulatory
for the project. Further, if an intervenor competing development application or a Commission, 888 First Street, NE.,
files comments or documents with the notice of intent to file such an Washington, DC 20426. An additional
Commission relating to the merits of an application. Submission of a timely copy must be sent to Director, Division
issue that may affect the responsibilities notice of intent to file a development of Hydropower Administration and
of a particular resource agency, they application allows an interested person Compliance, Federal Energy Regulatory
must also serve a copy of the document to file the competing application no Commission, at the above-mentioned
on that resource agency. later than 120 days after the specified address. A copy of any notice of intent,
k. Competing Application: Project No. comment date for the particular competing application or motion to
12817–000, Date Filed: July 23, 2007, application. A competing license intervene must also be served upon each
Date Issued: October 2, 2007, Due Date: application must conform with 18 CFR representative of the Applicant
December 1, 2007. 4.30 and 4.36. specified in the particular application.
l. Description of Project: The proposed q. Notice of Intent—A notice of intent Comments, protests and interventions
project consists of: (1) 50 proposed 100 must specify the exact name, business may be filed electronically via the
kilowatt dual ducted horizontal axis address, and telephone number of the Internet in lieu of paper; see 18 CFR
hydrokinetic generating units having a prospective applicant, and must include 385.2001(a)(1)(iii) and the instructions
total installed capacity of 5 megawatts, an unequivocal statement of intent to on the Commission’s Web site under the
(2) a proposed 3-miles-long, 13.6-kV submit, if such an application may be ‘‘e-Filing’’ link. The Commission
transmission line, and (3) appurtenant filed, either a preliminary permit strongly encourages electronic filings.
facilities. The Hydro Green Energy, application or a development u. Agency Comments—Federal, State,
LLC’s project would have an average application (specify which type of and local agencies are invited to file
annual generation of 82.87 gigawatt- application). A notice of intent must be comments on the described application.
hours and be sold to a local utility. served on the applicant(s) named in this A copy of the application may be
m. Locations of Applications: A copy public notice. obtained by agencies directly from the
of the application is available for r. Proposed Scope of Studies Under Applicant. If an agency does not file
inspection and reproduction at the Permit—A preliminary permit, if issued, comments within the time specified for
Commission in the Public Reference does not authorize construction. The filing comments, it will be presumed to
Room, located at 888 First Street, NE., term of the proposed preliminary permit have no comments. One copy of an
Room 2A, Washington, DC 20426, or by would be 36 months. The work agency’s comments must also be sent to
mstockstill on PROD1PC66 with NOTICES

calling (202) 502–8371. This filing may proposed under the preliminary permit the Applicant’s representatives.
also be viewed on the Commission’s would include economic analysis,
Web site at http://www.ferc.gov using preparation of preliminary engineering Kimberly D. Bose,
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental Secretary.
number excluding the last three digits in impacts. Based on the results of these [FR Doc. E7–23432 Filed 12–3–07; 8:45 am]
the docket number field to access the studies, the Applicant would decide BILLING CODE 6717–01–P

VerDate Aug<31>2005 17:38 Dec 03, 2007 Jkt 214001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\04DEN1.SGM 04DEN1

Anda mungkin juga menyukai