62642 Federal Register / Vol. 72, No.

214 / Tuesday, November 6, 2007 / Notices

The purpose of the G–II Project is to Regulatory Commission, Public DEPARTMENT OF ENERGY
provide facilities necessary to provide Reference Room, 888 First Street, NE.,
about 537,200 decatherms per day of Room 2A, Washington, DC 20426, (202) Federal Energy Regulatory
additional natural gas capacity to 502–8371. Commission
Guardian’s existing pipeline system. A limited number of copies of the [Project No. 199–205]
The proposed additional capacity would
Final EIS are available from the Public
facilitate the transport of natural gas to Santee Cooper Hydroelectric Project;
Reference Room identified above. In
customers within the state of Wisconsin Notice of Availability of the Final
and provide those customers with the addition, the Final EIS has been mailed
Environmental Impact Statement for
necessary infrastructure to support to affected landowners; various federal,
the Santee Cooper Hydroelectric
growth, choice, and competition within state, and local government agencies; Project
the natural gas marketplace. elected officials; environmental and
The Final EIS addresses the potential public interest groups; Native American October 26, 2007.
environmental effects of construction tribes; local libraries and newspapers; In accordance with the National
and operation of the following facilities: intervenors; and other individuals that Environmental Policy Act of 1969 and
• 83.9 miles of 30-inch-diameter expressed an interest in the proposed the Federal Energy Regulatory
natural gas pipeline in Jefferson, Dodge, Project. Commission (Commission or FERC)
Fond du Lac, Calumet, Brown, and regulations contained in the Code of
Additional information about the Federal Regulations (CFR)(18 CFR part
Outagamie Counties, Wisconsin; proposed Project is available from the
• 31.3 miles of 20-inch-diameter 380 [FERC Order No. 486, 52 FR
Commission’s Office of External Affairs, 47897]), the Office of Energy Projects
natural gas pipeline in Brown and
Outagamie Counties, Wisconsin; at 1–866–208–FERC or on the FERC staff (staff) reviewed the application for
• 1.4 miles of 16-inch-diameter Internet Web site (http://www.ferc.gov). a New Major License for the Santee
natural gas branch line referred to as the To access information via the FERC Cooper Hydroelectric Project, and have
Denmark Branch Line in Brown County, website click on the ‘‘eLibrary’’ link prepared a final environmental impact
Wisconsin; then click on ‘‘General Search’’ and statement (FEIS) for the project which is
• Two 20-inch-diameter natural gas enter the docket number (CP07–8) located on the Santee and Cooper Rivers
branch lines including the 1.8-mile excluding the last three digits in the in Berkeley, Calhoun, Clarendon,
Southwest Green Bay Branch Line in Docket Number field. Be sure you have Orangeburg, and Sumpter Counties,
Brown County and a 0.8-mile West selected an appropriate date range. The South Carolina.
Green Bay Branch Line in Outagamie ‘‘eLibrary’’ link provides access to the The FEIS contains staff’s analysis of
County, Wisconsin; texts of formal documents issued by the the applicant’s proposal and the
• Two new 39,000 horsepower (hp) Commission, such as orders, notices, alternatives for relicensing the Santee
electric-motor-driven compressor and rulemakings. For assistance with Cooper Hydroelectric Project. The FEIS
stations including the Sycamore ‘‘eLibrary’’, please contact FERC Online documents the views of governmental
Compressor Station located in the Support at FercOnlineSupport@ferc.gov agencies, non-governmental
Sycamore Township in DeKalb County, or toll free at 1–866–208–3676, or for organizations, affected Indian tribes, the
Illinois and the Bluff Creek Compressor TTY, contact (202) 502–8659. public, the license applicant, and
Station located in the Town of La Commission staff.
Grange in Walworth County, Wisconsin; In addition, the Commission now The FEIS will be part of the record
• Modifications to the existing Ixonia offers a free service called eSubscription from which the Commission will make
Meter Station in Jefferson County, which allows you to keep track of all its decision.
Wisconsin and the construction of seven formal issuances and submittals in A copy of the FEIS is available for
new meter stations in the Counties of specific dockets. This can reduce the review at the Commission’s Public
Dodge, Fond du Lac, Calumet, Brown, amount of time you spend researching Reference Room (Room 2A, located at
and Outagamie Counties, Wisconsin; proceedings by automatically providing 888 First Street, NE., Washington, DC
• New pig launcher/receiver facilities you with notification of these filings, 20426) or may be viewed on the
within Guardian’s existing Ixonia Meter document summaries and direct links to Commission’s Web site at http://
Station in Jefferson County, Wisconsin, these documents. To learn more about www.ferc.gov, using the ‘‘e-Library’’
within the proposed Fox Valley Meter eSubscription and to sign-up for this link. Enter the docket number,
Station in Calumet County, Wisconsin, service please go to http://www.ferc.gov/ excluding the last three digits, to access
and West Green Bay Meter Station in esubscribenow.htm. the document. For assistance, contact
Outagamie County, Wisconsin; and FERC Online Support at
• Six new mainline valves (MLVs), Kimberly D. Bose, FERCOnlineSupport@ferc.gov or toll-
four of which would occur along the 30- Secretary. free at (866) 208–3676, or for TTY,
inch-diameter pipeline in the counties [FR Doc. E7–21730 Filed 11–5–07; 8:45 am] contact (202) 502–8659.
of Dodge, Fond du Lac, and Calumet, CD versions of the FEIS have been
BILLING CODE 6717–01–P
Wisconsin, and two which would occur mailed to everyone on the mailing list
along the 20-inch-diameter pipeline in for the project. Copies of the CD, as well
Brown and Outagamie Counties, as a limited number of paper copies, are
Wisconsin. available from the Public Reference
Guardian proposes to have Project Room identified above.
construction initiated in the spring of You may also register online at
mstockstill on PROD1PC66 with NOTICES

2008 and would be completed for a http://www.ferc.gov/docs-filing/


proposed in-service date of November esubscription.asp to be notified via
2008. e-mail of new filings and issuances
The Final EIS has been placed in the related to this or other pending projects.
public files of the FERC and is available For assistance, contact FERC Online
for public inspection at: Federal Energy Support.

VerDate Aug<31>2005 16:55 Nov 05, 2007 Jkt 214001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 E:\FR\FM\06NON1.SGM 06NON1
Federal Register / Vol. 72, No. 214 / Tuesday, November 6, 2007 / Notices 62643

For further information, please Summary of the Proposed Project construction and operation of the
contact Monte TerHaar at (202) 502– El Paso proposes to install three gas- proposed project under these general
6035 or at monte.terhaar@ferc.gov. fired compressor units totaling 8,290 headings:
horsepower at the new Picacho • Geology and soils.
Kimberly D. Bose, • Land use and visual quality.
Compressor Station in Pinal County,
Secretary.
Arizona. The proposed project would • Cultural resources.
[FR Doc. E7–21733 Filed 11–5–07; 8:45 am] • Vegetation and wildlife (including
provide up to 372,500 dekatherms per
BILLING CODE 6717–01–P threatened and endangered species).
day of gas to interconnects with
• Air quality and noise.
Transwestern Pipeline Company, LLC’s
• Reliability and safety.
DEPARTMENT OF ENERGY proposed Phoenix Expansion (Docket We will also evaluate possible
No. CP06–459–000) and El Paso’s alternatives to the proposed project or
Federal Energy Regulatory existing pipeline system. portions of the project, where necessary,
Commission The proposed compressor station
and make recommendations on how to
would be located along El Paso’s Line
[Docket No. CP07–448–000] lessen or avoid impacts on the various
20120 in an 8-acre parcel owned by
resource areas.
El Paso. The parcel is also the current
El Paso Natural Gas Company; Notice Our independent analysis of the
location of El Paso’s Line 20120 pigging
of Intent to Prepare an Environmental issues will be in the EA. Depending on
facilities. El Paso indicates that
Assessment for the Proposed Picacho the comments received during the
additional workspace would not be
Compressor Station Project and scoping process, the EA may be
required outside of the 8-acre parcel,
Request for Comments on published and mailed to federal, state,
and an existing public road would be
Environmental Issues utilized for access to the construction and local agencies, public interest
area. groups, interested individuals, affected
October 26, 2007. landowners, newspapers, libraries, and
The staff of the Federal Energy The general location of the proposed
facilities is shown in Appendix 11. the Commission’s official service list for
Regulatory Commission (FERC or this proceeding. A comment period will
Commission) will prepare an The EA Process be allotted for review if the EA is
environmental assessment (EA) that will We 2 are preparing this EA to comply published. We will consider all
discuss the environmental impacts of with the National Environmental Policy comments on the EA before we make
the Picacho Compressor Station Project Act (NEPA) which requires the our recommendations to the
involving construction and operation of Commission to take into account the Commission.
natural gas pipeline facilities by El Paso environmental impact that could result To ensure your comments are
Natural Gas Company (El Paso) in Pinal if it authorizes El Paso’s proposal. By considered, please carefully follow the
County, Arizona. The EA will be used this notice, we are also asking federal, instructions in the Public Participation
by the Commission in its decision- state, and local agencies with section below.
making process to determine whether jurisdiction and/or special expertise
the project is in the public convenience Public Participation
with respect to environmental issues to
and necessity. formally cooperate with us in the You can make a difference by
This notice announces the opening of preparation of the EA. Agencies that providing us with your specific
the scoping process the Commission would like to request cooperating status comments or concerns about the project.
will use to gather input from the public should follow the instructions for filing By becoming a commentor, your
and interested agencies on the project. comments provided below. concerns will be addressed in the EA
Your input will help determine which NEPA also requires the FERC to and considered by the Commission. You
issues need to be evaluated in the EA. discover and address concerns the should focus on the potential
Please note that the scoping period will public may have about proposals. This environmental effects of the proposal,
close on November 26, 2007. Details on process is referred to as ‘‘scoping.’’ The alternatives to the proposal including
how to submit comments are provided main goal of the scoping process is to alternative compressor station sites, and
in the Public Participation section of focus the analysis in the EA on the measures to avoid or lessen
this notice. important environmental issues. By this environmental impact. The more
This notice is being sent to affected Notice of Intent, we are requesting specific your comments, the more useful
landowners; Federal, State, and local public comments on the scope of the they will be. Please carefully follow
government agencies; elected officials; issues to address in the EA. All these instructions to ensure that your
Native American tribes; other interested comments received are considered comments are received in time and
parties; and local libraries and during the preparation of the EA. properly recorded:
newspapers. State and local government The EA will discuss impacts that • Send an original and two copies of
representatives are asked to notify their could occur as a result of the your letter to: Kimberley D. Bose,
constituents of this proposed project Secretary, Federal Energy Regulatory
and to encourage them to comment on 1 The appendices referenced in this notice are not
Commission, 888 First St., NE., Room
their areas of concern. being printed in the Federal Register. Copies are
available on the Commission’s Internet Web site
1A, Washington, DC 20426;
A fact sheet prepared by the FERC (http://www.ferc.gov) at the ‘‘eLibrary’’ link or from • Label one copy of the comments for
entitled ‘‘An Interstate Natural Gas the Commission’s Public Reference Room at (202) the attention of Gas Branch 1, PJ–11.1;
Facility On My Land? What Do I Need 502–8371. For instructios on connecting to • Reference Docket No. CP07–448–
To Know?’’ addresses a number of eLibrary, refer to the ‘‘Additional Information’’
section at the end of this notice. Copies of the
000; and
mstockstill on PROD1PC66 with NOTICES

typically asked questions, including the appendices were sent to all those receiving this • Mail your comments so that they
use of eminent domain and how to notice in the mail. Requests for detailed maps of the will be received in Washington, DC on
participate in the Commission’s proposed facilities should be made directly to or before November 26, 2007.
El Paso.
proceedings. It is available for viewing 2 ‘‘We,’’ ‘‘us,’’ and ‘‘our ’’ refer to the
The Commission encourages
on the FERC Internet Web site (http:// environmental staff of the FERC’s Office of Energy electronic filing of comments. See 18
www.ferc.gov). Projects. Code of Federal Regulations

VerDate Aug<31>2005 16:55 Nov 05, 2007 Jkt 214001 PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 E:\FR\FM\06NON1.SGM 06NON1

Anda mungkin juga menyukai